Point inspection task management method and system, computer equipment and storage medium
By setting up the job end and management end in the inspection task management system, the accurate transmission and real-time monitoring of inspection task information is achieved, and the problems of inefficiency and lack of real-time in traditional management methods are solved, and the execution efficiency and real-time management of inspection tasks are improved.
Patent Information
- Application Number
- CN202411898991.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-23
- Publication Date
- 2025-04-15
AI Technical Summary
The traditional method of point inspection task management is inefficient, prone to errors, lacks real-time performance, making it difficult to achieve real-time monitoring and effective management of point inspection tasks.
A method of inspection task management is designed to realize accurate information transmission and real-time monitoring by setting up the work end and management end in the inspection task management system. The work terminal receives inspection task tickets, analyzes and displays target equipment and project information, collects execution results, generates inspection records, and sends them to the management terminal. The management side displays inspection records, and managers can view tasks execution in real time, and promptly discover and deal with problems.
It improves the execution efficiency of inspection tasks and the accuracy of information, enhances the real-time and efficiency of inspection tasks management, and ensures the safe and timely maintenance of equipment operation.
Smart Images

Figure CN119831248A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of equipment management, and in particular to an inspection task management method, system, computer equipment and storage medium. Background Art
[0002] In the fields of industrial production and equipment maintenance, inspection task management is an important part of ensuring the safe operation of equipment and timely discovering and handling equipment failures. Traditional inspection task management methods mostly rely on paper work orders, manual records and reports. This method is not only inefficient, but also prone to errors, making it difficult to achieve real-time monitoring and effective management of inspection tasks. With the continuous development of information technology, it is particularly important to develop an efficient and accurate inspection task management method.
[0003] The inspection task management in the existing technology usually has the following problems: first, information transmission is not smooth, and the processes such as issuing inspection task work orders and feedback on execution results are cumbersome and error-prone; second, it lacks real-time performance, and it is difficult for managers to obtain the execution status of inspection tasks in a timely manner and make timely and effective decisions; third, data recording and preservation are inconvenient, and paper records are easy to lose and difficult to query, which is not conducive to subsequent data analysis and equipment maintenance. Summary of the invention
[0004] In view of this, the purpose of the present invention is to provide a spot inspection task management method, system, computer equipment and storage medium to improve the execution efficiency of spot inspection tasks, enhance the accuracy of information during the execution of spot inspection tasks, and at the same time improve the efficiency and real-time performance of spot inspection task management.
[0005] In a first aspect, an embodiment of the present application provides a spot inspection task management method, which is applied to a spot inspection task management system, wherein the system includes an operation end and a management end, and the operation end and the management end are capable of communicating, and the method includes:
[0006] The operation end receives the inspection task work order, and parses the inspection task work order to obtain target inspection equipment information and target inspection item information;
[0007] The operation end displays the target inspection equipment information and the target inspection item information to the operation personnel, so that the operation personnel can perform the target inspection task according to the target inspection equipment information and the target inspection item information;
[0008] The operation end generates an inspection record of the target inspection task based on the execution result uploaded by the operator in response to the execution result of the target inspection task, and sends the inspection record to the management end;
[0009] The management terminal displays the inspection record to the management personnel.
[0010] Optionally, the method further comprises:
[0011] The operation end generates a replacement work order according to the replacement work order creation instruction input by the operator in response to the replacement work order creation instruction, and sends the replacement work order to the management end;
[0012] The management terminal displays the replacement work order to the management personnel.
[0013] Optionally, the method further comprises:
[0014] The management end responds to the replacement work order closing instruction input by the management personnel and closes the replacement work order according to the replacement work order closing instruction.
[0015] Optionally, the method further comprises:
[0016] The operation end generates a work record according to the inspection task work order and the personnel information of the operator in response to the inspection task completion instruction input by the operator, and sends the work record to the management end;
[0017] The management end determines the work income of the operator according to the work record.
[0018] Optionally, the method further comprises:
[0019] The operation end generates an abnormality report based on the abnormality of the target inspection task input by the operator;
[0020] The management end analyzes the abnormality report, determines the abnormality type and corresponding treatment measures, and sends the treatment measures to the operation end;
[0021] The operation end receives the processing measure and displays it to the operator so that the operator can perform subsequent operations according to the processing measure;
[0022] After the exception problem is solved, the operation end generates an exception handling record and sends the exception handling record to the management end for archiving.
[0023] Optionally, the method further comprises:
[0024] The operation end sends a task execution reminder to the operator according to the planned execution time in the inspection task work order to prompt the operator to input an inspection task start instruction;
[0025] If the inspection task start instruction is not received at the planned execution time, the operation end sends an overdue reminder to the operator, and sends the overdue reminder to the management end;
[0026] The management terminal displays the overdue reminder to the management personnel.
[0027] Optionally, the method comprises:
[0028] The operation end obtains the input time of the spot inspection task completion instruction in response to the spot inspection task completion instruction input by the operator;
[0029] The operation end determines the completion status of the inspection task worksheet based on the planned completion time in the inspection task worksheet and the input time, wherein the completion status includes ahead of schedule, on time and overtime;
[0030] When the completion status of the inspection task worksheet is timed out, the operation end sends a timed out completion reminder to the operator, and sends the timed out completion reminder to the management end;
[0031] The management terminal displays the timeout completion reminder to the management personnel.
[0032] In a second aspect, an embodiment of the present application provides a spot inspection task management system, the system comprising an operation end and a management end, the operation end and the management end being able to communicate;
[0033] The operation end is used to receive the inspection task work order, and parse the inspection task work order to obtain target inspection equipment information and target inspection item information;
[0034] The operation end is used to display the target inspection equipment information and the target inspection item information to the operation personnel, so that the operation personnel can perform the target inspection task according to the target inspection equipment information and the target inspection item information;
[0035] The operation end is used to generate an inspection record of the target inspection task based on the execution result of the target inspection task uploaded by the operator, and send the inspection record to the management end;
[0036] The management terminal is used to display the inspection record to the management personnel.
[0037] Optionally, the method further comprises:
[0038] The operation end generates a replacement work order according to the replacement work order creation instruction input by the operator in response to the replacement work order creation instruction, and sends the replacement work order to the management end;
[0039] The management terminal displays the replacement work order to the management personnel.
[0040] Optionally, the method further comprises:
[0041] The management end responds to the replacement work order closing instruction input by the management personnel and closes the replacement work order according to the replacement work order closing instruction.
[0042] Optionally, the method further comprises:
[0043] The operation end generates a work record according to the inspection task work order and the personnel information of the operator in response to the inspection task completion instruction input by the operator, and sends the work record to the management end;
[0044] The management end determines the work income of the operator according to the work record.
[0045] Optionally, the method further comprises:
[0046] The operation end generates an abnormality report based on the abnormality of the target inspection task input by the operator;
[0047] The management end analyzes the abnormality report, determines the abnormality type and corresponding treatment measures, and sends the treatment measures to the operation end;
[0048] The operation end receives the processing measure and displays it to the operator so that the operator can perform subsequent operations according to the processing measure;
[0049] After the exception problem is solved, the operation end generates an exception handling record and sends the exception handling record to the management end for archiving.
[0050] Optionally, the method further comprises:
[0051] The operation end sends a task execution reminder to the operator according to the planned execution time in the inspection task work order to prompt the operator to input an inspection task start instruction;
[0052] If the inspection task start instruction is not received at the planned execution time, the operation end sends an overdue reminder to the operator, and sends the overdue reminder to the management end;
[0053] The management terminal displays the overdue reminder to the management personnel.
[0054] Optionally, the method comprises:
[0055] The operation end obtains the input time of the spot inspection task completion instruction in response to the spot inspection task completion instruction input by the operator;
[0056] The operation end determines the completion status of the inspection task worksheet based on the planned completion time in the inspection task worksheet and the input time, wherein the completion status includes ahead of schedule, on time and overtime;
[0057] When the completion status of the inspection task worksheet is timed out, the operation end sends a timed out completion reminder to the operator, and sends the timed out completion reminder to the management end;
[0058] The management terminal displays the timeout completion reminder to the management personnel.
[0059] In a third aspect, an embodiment of the present application provides a computer device, comprising: a processor, a memory and a bus, wherein the memory stores machine-readable instructions executable by the processor, and when the computer device is running, the processor and the memory communicate through the bus, and when the machine-readable instructions are executed by the processor, the steps of the inspection task management method described in any optional implementation manner of the first aspect are performed.
[0060] In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the steps of the inspection task management method described in any optional implementation manner in the first aspect above are executed.
[0061] The technical solution provided by this application includes but is not limited to the following beneficial effects:
[0062] In this application, the operation end first receives the inspection task work order issued by the management end, and then parses the work order to extract the target inspection equipment information and target inspection project information, ensuring the accurate transmission of information and laying a solid foundation for subsequent inspection work; the parsed target inspection equipment information and target inspection project information will be displayed to the operator, and the operator will perform the target inspection task based on this information, which not only improves the accuracy of the operation, but also makes the inspection work more standardized and orderly. Then the operation end responds to the target inspection task execution results uploaded by the operator, and automatically generates the inspection record of the target inspection task based on these results, realizing the automatic collection and recording of data, and greatly improving work efficiency. The inspection records finally generated will be sent to the management end, and the management end will display these records to the management personnel. The management personnel can view the execution of the inspection task in real time, discover and deal with problems in time, and make more scientific and reasonable decisions.
[0063] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0064] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.
[0065] Figure 1 A flowchart of a spot inspection task management method provided by the first embodiment of the present invention is shown;
[0066] Figure 2 A flowchart of a method for displaying a replacement work order provided in the first embodiment of the present invention is shown;
[0067] Figure 3 A flow chart of a method for determining work income provided by the first embodiment of the present invention is shown;
[0068] Figure 4 A flowchart of an abnormal report display method provided by Embodiment 1 of the present invention is shown;
[0069] Figure 5 A flowchart of a method for displaying an overdue reminder provided by the first embodiment of the present invention is shown;
[0070] Figure 6 A flowchart of a timeout completion reminder display method provided by Embodiment 1 of the present invention is shown;
[0071] Figure 7 A flowchart of a dismantling task management method provided by the first embodiment of the present invention is shown;
[0072] Figure 8 A schematic diagram of the structure of a spot inspection task management system provided by the second embodiment of the present invention is shown;
[0073] Fig. 9 A schematic diagram of the structure of a computer device provided in Embodiment 3 of the present invention is shown. DETAILED DESCRIPTION
[0074] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. The components of the embodiments of the present invention generally described and shown in the drawings here can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present invention provided in the drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without making creative work belong to the scope of protection of the present invention.
[0075] Embodiment 1
[0076] To facilitate understanding of this application, Figure 1 The flowchart of a spot inspection task management method provided by the first embodiment of the present invention is shown to describe the contents of the first embodiment of the present application in detail.
[0077] See also Figure 1 As shown, Figure 1 A flowchart of a spot inspection task management method provided by Embodiment 1 of the present invention is shown, wherein the method is applied to a spot inspection task management system, the system includes an operation end and a management end, the operation end and the management end can communicate, and the method includes steps S101 to S104:
[0078] S101: The operation end receives an inspection task work order, and parses the inspection task work order to obtain target inspection equipment information and target inspection item information.
[0079] Specifically, on the operation side of the inspection task management system, the system will first automatically receive the inspection task work order issued by the management side or other sources of assigned tasks. This work order contains detailed inspection task information and is the basis for the operator to carry out subsequent work. After receiving the work order, the operation side will immediately parse it. The parsing process is to extract key information from the work order, such as the specific information of the target inspection equipment (such as the name, model, installation location, etc. of the equipment) and the target inspection items that need to be executed (such as the equipment parts that need to be inspected, the inspection standards, whether there are matters that need special attention, etc.). Through this step, the operation side is fully prepared for the subsequent display and execution of tasks.
[0080] S102: The operation end displays the target inspection equipment information and the target inspection item information to the operation personnel, so that the operation personnel can perform the target inspection task according to the target inspection equipment information and the target inspection item information.
[0081] Specifically, after parsing the inspection task work order, the operation end will clearly display the extracted target inspection equipment information and target inspection item information to the operator responsible for executing the task. This display process can be achieved through the display screen of the operation end or the printed paper work order. By viewing this information, the operator can quickly understand where they need to go, which equipment to check, which specific inspection items to perform, and which inspection standards to follow. This display method ensures that the operator can accurately and comprehensively grasp the task requirements and provides clear guidance for the subsequent inspection work.
[0082] S103: The operation end generates an inspection record of the target inspection task based on the execution result of the target inspection task uploaded by the operator in response to the execution result, and sends the inspection record to the management end.
[0083] Specifically, after the operators complete the inspection tasks as required, they need to feedback the results of the execution to the operation end. This feedback process can be through inputting data, checking options, or uploading photos. After receiving the execution results of the operators, the operation end will immediately process them and generate a detailed inspection record based on these results. This record includes the time, location, personnel, inspection results, and any possible abnormalities or problems of the task execution. The purpose of generating inspection records is to record the execution of the task comprehensively and accurately, and to provide data support for subsequent management and analysis. After completing this step, the operation end will send the generated inspection records to the management end for management personnel to view and review.
[0084] S104: The management terminal displays the inspection record to the management personnel.
[0085] Specifically, after receiving the inspection records sent by the operation end, the management end will immediately process them and display these records to the person in charge of management. This is achieved through the display screen of the management end or the printed paper report. By viewing the inspection records, managers can quickly understand the execution status of each inspection task, including which tasks have been successfully completed, which tasks have abnormalities or problems, and the specific situation of the problems. This display method helps managers fully understand the actual situation of equipment maintenance and provides a strong basis for them to formulate subsequent management and decision-making. At the same time, the management end can also store and back up the inspection records for reference and analysis when needed.
[0086] In an alternative embodiment, see Figure 2 As shown, Figure 2A flowchart of a method for displaying a replacement work order provided in the first embodiment of the present invention is shown, wherein the method further includes steps S201 to S202:
[0087] S201: The operation end generates a replacement work order according to the replacement work order creation instruction input by the operator, and sends the replacement work order to the management end.
[0088] Specifically, during the execution of the inspection task, the operator may find that some equipment parts have been damaged or worn to the extent that they can no longer be used, and then they need to be replaced. When the operator determines that the equipment parts need to be replaced, they will enter the creation instruction of the replacement work order on the operation end. This instruction contains detailed information such as the part information that needs to be replaced (such as part name, model, quantity, etc.), the reason for replacement, and the recommended replacement parts. After receiving this instruction, the operation end will immediately generate a complete replacement work order based on this information. This work order not only records the specific requirements for replacing parts, but may also include relevant information such as the estimated time of the replacement work, the required tools, and personnel arrangements. After completing the generation of the work order, the operation end will send it to the management end for subsequent review and approval by the management personnel.
[0089] S202: The management terminal displays the replacement work order to management personnel.
[0090] Specifically, after receiving the replacement work order sent by the operation end, the management end will immediately process it and display the work order to the person in charge of management. By viewing the replacement work order, the manager can quickly understand which equipment parts need to be replaced, the reason for the replacement, and the recommended replacement parts. This display method helps managers fully understand the actual situation of equipment replacement and provides a strong basis for them to make subsequent approvals and decisions. At the same time, the management end can also store and back up the replacement work order so that it can be reviewed and analyzed when needed.
[0091] These two steps not only improve the method of inspection task management, but also improve the efficiency and accuracy of equipment maintenance and replacement. Through the close cooperation between the operation end and the management end, it can ensure that the equipment is replaced and maintained in time when needed, thus ensuring the smooth progress of production or service.
[0092] In an optional embodiment, the method further comprises:
[0093] The management end responds to the replacement work order closing instruction input by the management personnel and closes the replacement work order according to the replacement work order closing instruction.
[0094] Specifically, after the manager obtains the replacement work order through the management end, the manager will deliver the hot field parts. After confirming that the relevant equipment parts have been successfully replaced and the replaced equipment is operating normally and meets the use requirements, the manager will enter the replacement work order closing instruction on the management end. This instruction marks the official completion of the replacement work and triggers the management end to update the work order status to "closed" or a similar mark indicating completion.
[0095] In an alternative embodiment, see Figure 3 As shown, Figure 3 A flowchart of a method for determining work income provided in the first embodiment of the present invention is shown, wherein the method further includes steps S301 to S302:
[0096] S301: The operation end generates a work record according to the inspection task work order and the operator's personnel information in response to the inspection task completion instruction input by the operator, and sends the work record to the management end.
[0097] Specifically, after the inspection task is completed, the operator will enter the inspection task completion instruction on the operation end, marking the official end of the inspection work. After receiving this instruction, the operation end will automatically generate a detailed work record based on the previously received inspection task work order and the operator's personnel information. This record not only contains the basic information of the inspection task (such as task name, target equipment, inspection items, etc.), but also records the operator's name, work number, completion time and other key information. Through this work record, you can clearly understand the inspection tasks completed by each operator.
[0098] After the work record is generated, the operation end will send it to the management end for subsequent review and statistical analysis by the management. This step ensures the accuracy and timeliness of the work record and provides a reliable data basis for the subsequent work benefit calculation.
[0099] S302: The management end determines the work income of the operator according to the work record.
[0100] Specifically, after receiving the work records sent by the operation end, the management end will process and analyze the data in the records according to the preset rules and algorithms to determine the work benefits of each operator. This work benefit may include multiple aspects, such as basic salary, performance bonus, additional rewards, etc. Among them, the amount of performance bonus and additional rewards may be comprehensively evaluated based on factors such as the quality and efficiency of the operator's inspection task completion, and whether potential problems are discovered and solved in a timely manner.
[0101] By determining the work benefits, the management can not only give reasonable rewards to the operators for their efforts, but also motivate them to be more actively involved in the inspection work, thereby improving the overall work efficiency and quality. At the same time, this step also provides important data support for managers, helping them to better understand the performance of operators and provide a basis for the subsequent training and incentive measures.
[0102] Through the two steps S301 and S302, the inspection task management method is further improved. Not only the work status of the operators is recorded, but also their work benefits are calculated, which provides strong support for motivating operators and improving work efficiency.
[0103] In an alternative embodiment, see Figure 4 As shown, Figure 4 A flowchart of an abnormal report display method provided in the first embodiment of the present invention is shown, wherein the method further includes steps S401 to S404:
[0104] S401: The operation end generates an abnormality report based on the abnormality of the target inspection task input by the operator.
[0105] Specifically, during the execution of the inspection task, the operator may find that the target inspection equipment has abnormal problems, such as equipment failure, data anomalies, or safety hazards. In order to record and report these problems in a timely manner, the operator will enter the corresponding abnormal information on the operation end. After receiving this information, the operation end will immediately generate a detailed abnormal report based on the specific situation of the abnormal problem. This report not only contains a description of the abnormal problem, but may also contain key information such as the time, location, and scope of impact of the problem. In this way, it can ensure that abnormal problems are recorded in a timely and accurate manner, providing reliable data support for subsequent analysis and processing.
[0106] S402: The management end analyzes the exception report, determines the exception type and corresponding processing measures, and sends the processing measures to the operation end.
[0107] Specifically, after receiving the abnormal report sent by the operation end, the management end will immediately organize relevant personnel to analyze the abnormal problems in the report. This analysis process may involve the collaboration of multiple departments and professional fields to ensure accurate understanding and evaluation of the abnormal problems. Based on the analysis results, the management end will determine the type of abnormal problem and formulate corresponding treatment measures. These measures may include equipment repair, data adjustment, safety inspection and other aspects, aiming to eliminate the impact of abnormal problems and ensure the normal operation of equipment and the safety of personnel. After completing the formulation of the treatment measures, the management end will send them to the operation end so that the operator can perform subsequent operations according to the measures.
[0108] S403: The operation end receives the processing measures and displays them to the operation personnel so that the operation personnel can perform subsequent operations according to the processing measures.
[0109] Specifically, after receiving the treatment measures sent by the management end, the operation end will immediately display these measures to the operator responsible for the inspection task. By viewing the treatment measures, the operator can understand the specific cause and solution of the abnormal problem, so as to carry out subsequent operations in a targeted manner. This step ensures that the operator can accurately understand and implement the treatment measures, improving the efficiency and accuracy of abnormal problem resolution.
[0110] S404: After the exception problem is solved, the operation end generates an exception handling record and sends the exception handling record to the management end for archiving.
[0111] Specifically, after the abnormal problem is properly resolved, the operation end will generate a detailed abnormal handling record based on the processing process and results. This record not only contains the description of the abnormal problem and the implementation of the treatment measures, but may also contain key information such as the equipment status after the problem is resolved and personnel feedback. In this way, the handling process and results of the abnormal problem can be fully understood, providing an important reference for subsequent equipment maintenance and management. After the generation of the abnormal handling record is completed, the operation end will send it to the management end for archiving so that it can be reviewed and analyzed when needed.
[0112] Through the four steps from S401 to S404, the inspection task management method is further improved, which not only ensures that abnormal problems are solved in a timely and effective manner, but also improves the efficiency and safety of equipment maintenance. At the same time, these steps also provide valuable data support for subsequent equipment management and data analysis.
[0113] In an alternative embodiment, see Figure 5 As shown, Figure 5 A flowchart of a method for displaying an overdue reminder provided by the first embodiment of the present invention is shown, wherein the method further includes steps S501 to S503:
[0114] S501: The operation end sends a task execution reminder to the operator according to the planned execution time in the inspection task work order, so as to prompt the operator to input an inspection task start instruction.
[0115] Specifically, in order to ensure that the inspection task can start on time, the operation end will send a task execution reminder to the operator responsible for the task according to the scheduled execution time preset in the inspection task work order. This reminder may be sent through SMS, email, in-app notification and other methods to remind the operator to pay attention to the upcoming task and prepare the corresponding tools and equipment. Through such reminders, it can help operators arrange their time reasonably, ensure that they can start the task within the planned time, and avoid task delays.
[0116] S502: If the inspection task start instruction is not received at the planned execution time, the operation end sends an overdue reminder to the operator, and sends the overdue reminder to the management end.
[0117] Specifically, if the operation end does not receive the inspection task start instruction input by the operator when the planned execution time arrives, it means that the task may be delayed. In order to deal with this situation in a timely manner, the operation end will send an overdue reminder to the operator again, urging them to start the task as soon as possible. At the same time, in order to ensure that the management personnel can grasp the status of task execution, the operation end will also send this overdue reminder to the management end. This step not only helps the operators realize the delay of the task, but also enables the management personnel to intervene in time, understand the cause of the delay, and take necessary measures to solve the problem to ensure the smooth progress of the task.
[0118] S503: The management terminal displays the overdue reminder to management personnel.
[0119] Specifically, after receiving the overdue reminder sent by the operation end, the management end will immediately process it and show the reminder to the person in charge of management. By viewing the overdue reminder, the manager can quickly understand which inspection tasks are delayed and the specific circumstances of the delay. This display method helps managers fully understand the actual situation of task execution and provides a strong basis for them to formulate subsequent response measures. At the same time, the management end can also store and back up the overdue reminder so that it can be reviewed and analyzed when needed, providing a reference for subsequent task management and optimization.
[0120] Through the three steps from S501 to S503, the inspection task management method is further improved. Through the reminder and monitoring mechanism, it is ensured that the task can be smoothly executed according to the planned time, and the punctuality and efficiency of task execution are improved. At the same time, these steps also provide important data support for managers, helping them to better understand the status of task execution and provide a strong basis for subsequent decision-making and optimization.
[0121] In an alternative embodiment, see Figure 6 As shown, Figure 6A flowchart of a timeout completion reminder display method provided by the first embodiment of the present invention is shown, wherein the method comprises steps S601 to S604:
[0122] S601: The operation end obtains the input time of the inspection task completion instruction in response to the inspection task completion instruction input by the operator.
[0123] Specifically, when the operator completes the inspection task, they will enter the inspection task completion instruction on the operation end, marking the official end of the inspection work. When the operation end receives this instruction, it will record the input time of the instruction, that is, the actual completion time of the inspection task. This time is an important basis for subsequent judgment on whether the task is completed on time.
[0124] S602: The operation end determines the completion status of the inspection task worksheet based on the planned completion time in the inspection task worksheet and the input time, wherein the completion status includes ahead of schedule, on time, and overtime.
[0125] Specifically, the operation end will determine the completion status of the inspection task work order based on the preset planned completion time in the previously received inspection task work order and the actual completion time recorded in step S601. The completion status is divided into three types: ahead of schedule, on time, and overtime. If the actual completion time is earlier than the planned completion time, the task is completed ahead of schedule; if the two times are the same, it is completed on time; if the actual completion time is later than the planned completion time, it is completed overtime.
[0126] S603: When the completion status of the inspection task worksheet is timed out, the operation end sends a timed out completion reminder to the operator, and sends the timed out completion reminder to the management end.
[0127] Specifically, when the operation side determines that the completion status of the inspection task work order is timed out, it means that the task was not completed as planned and there may be a delay. In order to deal with this situation in a timely manner, the operation side will send a timeout completion reminder to the operators, reminding them that the task has timed out and urging them to take remedial measures as soon as possible. At the same time, in order to ensure that managers can grasp the completion of the task, the operation side will also send this timeout completion reminder to the management side. This step not only helps operators realize the delay of the task, but also enables managers to intervene in time, understand the cause of the delay, and take necessary measures to solve the problem to ensure the smooth progress of subsequent tasks.
[0128] S604: The management terminal displays the timeout completion reminder to the management personnel.
[0129] Specifically, after receiving the timeout completion reminder sent by the operation end, the management end will immediately process it and display the reminder to the person in charge of management. By viewing the timeout completion reminder, the manager can quickly understand which inspection tasks have timed out and the specific circumstances of the timeout. This display method helps managers fully understand the actual situation of task execution and provides a strong basis for them to formulate subsequent response measures. At the same time, the management end can also store and back up the timeout completion reminder.
[0130] Through the four steps from S601 to S604, the inspection task management method is further improved. Through the monitoring and reminder mechanism, it is ensured that the task can be completed smoothly according to the planned time, and the punctuality and efficiency of task execution are improved. At the same time, these steps also provide important data support for managers, helping them to better understand the status of task execution and provide a strong basis for subsequent decision-making and optimization. In order to review and analyze when necessary, it provides a reference for subsequent task management and optimization.
[0131] The inspection task management method provided in this application can be applied to the disassembly and cleaning tasks in the crystal pulling process. Figure 7 As shown, Figure 7 The flowchart of a dismantling task management method provided by the first embodiment of the present invention is shown, wherein the method comprises: firstly collecting information and creating a work order; the dismantling operator, i.e. the dismantling worker, receives the dismantling task work order through the system, and the work order contains the corresponding equipment number, the work order start time and other information, and the dismantling worker receives the dismantling work order of the corresponding furnace number. After the task start time is reached, the dismantling worker goes to the corresponding equipment to start the dismantling operation. During the operation, a handheld PDA is used to start the inspection of the required inspection items and the necessary items. After the inspection is completed, the inspection content is uploaded to the system, and the system automatically generates the corresponding inspection record. If the equipment needs to replace the graphite parts, the dismantling worker can use the handheld PDA to create a replacement work order in the system, and this work order will be sent to the person in charge of the relevant process at the same time. The responsible department receives the work order and delivers the parts to the site. After the delivery is completed, the responsible department completes the work order. After completing the inspection and replacement of parts, the dismantling operator can submit the work order completion information and choose to complete the work order. The work order will then be generated under the relevant operator's account as a work record for subsequent statistical revenue use.
[0132] Embodiment 2
[0133] See also Figure 8 As shown, Figure 8 A schematic diagram of the structure of a spot inspection task management system provided by the second embodiment of the present invention is shown, wherein the system includes an operation end 801 and a management end 802, and the operation end and the management end can communicate;
[0134] The operation end is used to receive the inspection task work order, and parse the inspection task work order to obtain target inspection equipment information and target inspection item information;
[0135] The operation end is used to display the target inspection equipment information and the target inspection item information to the operation personnel, so that the operation personnel can perform the target inspection task according to the target inspection equipment information and the target inspection item information;
[0136] The operation end is used to generate an inspection record of the target inspection task based on the execution result of the target inspection task uploaded by the operator, and send the inspection record to the management end;
[0137] The management terminal is used to display the inspection record to the management personnel.
[0138] In an optional embodiment, the method further comprises:
[0139] The operation end generates a replacement work order according to the replacement work order creation instruction input by the operator in response to the replacement work order creation instruction, and sends the replacement work order to the management end;
[0140] The management terminal displays the replacement work order to the management personnel.
[0141] In an optional embodiment, the method further comprises:
[0142] The management end responds to the replacement work order closing instruction input by the management personnel and closes the replacement work order according to the replacement work order closing instruction.
[0143] In an optional embodiment, the method further comprises:
[0144] The operation end generates a work record according to the inspection task work order and the personnel information of the operator in response to the inspection task completion instruction input by the operator, and sends the work record to the management end;
[0145] The management end determines the work income of the operator according to the work record.
[0146] In an optional embodiment, the method further comprises:
[0147] The operation end generates an abnormality report based on the abnormality of the target inspection task input by the operator;
[0148] The management end analyzes the abnormality report, determines the abnormality type and corresponding treatment measures, and sends the treatment measures to the operation end;
[0149] The operation end receives the processing measure and displays it to the operator so that the operator can perform subsequent operations according to the processing measure;
[0150] After the exception problem is solved, the operation end generates an exception handling record and sends the exception handling record to the management end for archiving.
[0151] In an optional embodiment, the method further comprises:
[0152] The operation end sends a task execution reminder to the operator according to the planned execution time in the inspection task work order to prompt the operator to input an inspection task start instruction;
[0153] If the inspection task start instruction is not received at the planned execution time, the operation end sends an overdue reminder to the operator, and sends the overdue reminder to the management end;
[0154] The management terminal displays the overdue reminder to the management personnel.
[0155] In an alternative embodiment, the method comprises:
[0156] The operation end obtains the input time of the spot inspection task completion instruction in response to the spot inspection task completion instruction input by the operator;
[0157] The operation end determines the completion status of the inspection task worksheet based on the planned completion time in the inspection task worksheet and the input time, wherein the completion status includes ahead of schedule, on time and overtime;
[0158] When the completion status of the inspection task worksheet is timed out, the operation end sends a timed out completion reminder to the operator, and sends the timed out completion reminder to the management end;
[0159] The management terminal displays the timeout completion reminder to the management personnel.
[0160] Embodiment 3
[0161] Based on the same application concept, see Fig. 9 As shown, Fig. 9 FIG. 4 shows a schematic diagram of the structure of a computer device provided by Embodiment 3 of the present invention, wherein: Fig. 9 As shown, a computer device 900 provided in Embodiment 3 of the present application includes:
[0162] A processor 901, a memory 902 and a bus 903, wherein the memory 902 stores machine-readable instructions executable by the processor 901. When the computer device 900 is running, the processor 901 communicates with the memory 902 via the bus 903. When the processor 901 is running, the machine-readable instructions execute the steps of the inspection task management method shown in the above-mentioned embodiment 1.
[0163] Embodiment 4
[0164] Based on the same application concept, an embodiment of the present application further provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the steps of the inspection task management method described in any one of the above embodiments are executed.
[0165] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working process of the system and device described above can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.
[0166] The computer program product for performing inspection task management provided in the embodiment of the present invention includes a computer-readable storage medium storing program code. The instructions included in the program code can be used to execute the method described in the previous method embodiment. The specific implementation can be found in the method embodiment and will not be repeated here.
[0167] The inspection task management system provided in the embodiment of the present invention can be specific hardware on the device or software or firmware installed on the device. The system provided in the embodiment of the present invention has the same implementation principle and technical effects as the aforementioned method embodiment. For the sake of brief description, for matters not mentioned in the system embodiment, reference can be made to the corresponding contents in the aforementioned method embodiment. Technical personnel in the relevant field can clearly understand that for the convenience and simplicity of description, the specific working processes of the systems, devices and units described above can all refer to the corresponding processes in the aforementioned method embodiment, and will not be repeated here.
[0168] In the embodiments provided by the present invention, it should be understood that the disclosed systems and methods can be implemented in other ways. The system embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be an indirect coupling or communication connection through some communication interface, device or unit, which can be electrical, mechanical or other forms.
[0169] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0170] In addition, each functional unit in the embodiment provided by the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.
[0171] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc., which can store program codes.
[0172] It should be noted that similar numbers and letters represent similar items in the following figures. Therefore, once an item is defined in one figure, it does not need to be further defined and explained in subsequent figures. In addition, the terms "first", "second", "third", etc. are only used to distinguish the description and are not to be understood as indicating or implying relative importance.
[0173] Finally, it should be noted that the above-described embodiments are only specific implementations of the present invention, which are used to illustrate the technical solutions of the present invention, rather than to limit them. The protection scope of the present invention is not limited thereto. Although the present invention is described in detail with reference to the above-described embodiments, those skilled in the art should understand that any person skilled in the art can still modify the technical solutions described in the above-described embodiments within the technical scope disclosed by the present invention, or can easily think of changes, or make equivalent replacements for some of the technical features therein; and these modifications, changes or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention. They should all be covered within the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.
Claims
1. A method for managing inspection tasks, characterized in that: Applied to a spot inspection task management system, the system includes an operation end and a management end, the operation end and the management end are capable of communicating, and the method includes: The operation end receives the inspection task work order, and parses the inspection task work order to obtain target inspection equipment information and target inspection item information; The operation end displays the target inspection equipment information and the target inspection item information to the operation personnel, so that the operation personnel can perform the target inspection task according to the target inspection equipment information and the target inspection item information; The operation end generates an inspection record of the target inspection task based on the execution result uploaded by the operator in response to the execution result of the target inspection task, and sends the inspection record to the management end; The management terminal displays the inspection record to the management personnel.
2. The method according to claim 1, characterized in that The method further comprises: The operation end generates a replacement work order according to the replacement work order creation instruction input by the operator in response to the replacement work order creation instruction, and sends the replacement work order to the management end; The management terminal displays the replacement work order to the management personnel.
3. The method according to claim 1, characterized in that The method further comprises: The management end responds to the replacement work order closing instruction input by the management personnel and closes the replacement work order according to the replacement work order closing instruction.
4. The method according to claim 1, characterized in that: The method further comprises: The operation end generates a work record according to the inspection task work order and the personnel information of the operator in response to the inspection task completion instruction input by the operator, and sends the work record to the management end; The management end determines the work income of the operator according to the work record.
5. The method according to claim 1, characterized in that The method further comprises: The operation end generates an abnormality report based on the abnormality of the target inspection task input by the operator; The management end analyzes the abnormality report, determines the abnormality type and corresponding treatment measures, and sends the treatment measures to the operation end; The operation end receives the processing measure and displays it to the operator so that the operator can perform subsequent operations according to the processing measure; After the exception problem is solved, the operation end generates an exception handling record and sends the exception handling record to the management end for archiving.
6. The method according to claim 1, characterized in that The method further comprises: The operation end sends a task execution reminder to the operator according to the planned execution time in the inspection task work order to prompt the operator to input an inspection task start instruction; If the inspection task start instruction is not received at the planned execution time, the operation end sends an overdue reminder to the operator, and sends the overdue reminder to the management end; The management terminal displays the overdue reminder to the management personnel.
7. The method according to claim 1, characterized in that The method comprises: The operation end obtains the input time of the spot inspection task completion instruction in response to the spot inspection task completion instruction input by the operator; The operation end determines the completion status of the inspection task worksheet based on the planned completion time in the inspection task worksheet and the input time, wherein the completion status includes ahead of schedule, on time and overtime; When the completion status of the inspection task worksheet is timed out, the operation end sends a timed out completion reminder to the operator, and sends the timed out completion reminder to the management end; The management terminal displays the timeout completion reminder to the management personnel.
8. A spot inspection task management system, characterized in that: The system includes an operation end and a management end, and the operation end and the management end are capable of communicating; The operation end is used to receive the inspection task work order, and parse the inspection task work order to obtain target inspection equipment information and target inspection item information; The operation end is used to display the target inspection equipment information and the target inspection item information to the operation personnel, so that the operation personnel can perform the target inspection task according to the target inspection equipment information and the target inspection item information; The operation end is used to generate an inspection record of the target inspection task based on the execution result of the target inspection task uploaded by the operator, and send the inspection record to the management end; The management terminal is used to display the inspection record to the management personnel.
9. A computer device, characterized in that: include: A processor, a memory and a bus, wherein the memory stores machine-readable instructions executable by the processor, and when the computer device is running, the processor and the memory communicate via the bus, and when the machine-readable instructions are executed by the processor, the steps of the inspection task management method as described in any one of claims 1 to 7 are performed.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the inspection task management method according to any one of claims 1 to 7 are executed.