By designing the automatic production line of linear motor stator, the automated production of magnet mounts and sheet metal covers mounts is realized, solving the problems of low efficiency and instability in the existing technology, and improving production efficiency and product quality.

CN119834564AActive Publication Date: 2025-04-15SUZHOU TECH BELL DIRECT DRIVE MOTOR CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202510329049.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-03-20
Publication Date
2025-04-15
Estimated Expiration
2045-03-20

AI Technical Summary

Technical Problem

Existing motor stator magnet mounts and sheet metal cover mounts mainly rely on manual operation or semi-automated production, resulting in low efficiency, unstable and lack of standards, affecting product quality.

Method used

An automatic production line of linear motor stator is designed, including magnet mount production line and sheet metal cover mount production line. By setting up loading equipment, magnet mount equipment, testing equipment, wiping equipment, dispensing equipment, sheet metal cover equipment and height detection equipment, the automation of each process is achieved.

Benefits of technology

The entire process automation from magnetic plate loading to magnetization, detection and then discharge is achieved, which reduces manual intervention, improves production efficiency, and ensures the stability of product quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119834564A_ABST
    Figure CN119834564A_ABST
Patent Text Reader

Abstract

A linear motor stator automatic production line disclosed by the present invention comprises a magnet mounting production line and a sheet metal cover mounting production line, the magnet mounting production line comprises a feeding device, a magnet mounting device, a detection device and a first discharging device which are sequentially arranged along a first direction, and the magnet mounting production line is used for mounting a plurality of magnetic strips on the top of a magnetic plate; forming a stator semi-finished product; the sheet metal cover mounting production line comprises a feeding device, a torsion testing device, a wiping device, a dispensing device, a sheet metal mounting device, a height detecting device and a second discharging device which are sequentially arranged in the first direction, and is used for mounting a sheet metal cover on the top of the semi-finished stator product to form a finished stator product and transferring the finished stator product out. By arranging a complete automatic production line, compared with a traditional manual operation or semi-automatic production mode, manual intervention is greatly reduced, and low-efficiency and unstable factors in manual operation are avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of automated production equipment, and in particular to an automatic production line for linear motor stators. Background Art

[0002] In the prior art, the magnet mounting and sheet metal cover mounting of the motor stator are usually carried out manually or by semi-automatic production, which requires a lot of manpower and is inefficient. In addition, there are no fixed standards in manual production, and there are unstable factors, which affect the quality of subsequent products. Summary of the invention

[0003] The present invention provides an automatic production line for linear motor stators to solve the problems raised in the above background technology.

[0004] In order to solve the above technical problems, the technical solution adopted by the present invention is to provide an automatic production line for a linear motor stator, including a magnet mounting production line and a sheet metal cover mounting production line, wherein: The magnet mounting production line includes a basket lifting assembly, a magnetic plate loading device, a magnet mounting device, a detection device and a material unloading device which are sequentially arranged, and is used to mount a plurality of magnetic strips on the top of the magnetic plate to form a stator semi-finished product; The sheet metal cover mounting production line includes a basket lifting assembly, a loading device, a torque testing device, a wiping device, a glue dispensing device, a sheet metal cover mounting device, a height detection device and a unloading device which are arranged in sequence, and are used to mount the sheet metal cover on the top of the stator semi-finished product to form a stator finished product; each of the above devices is equipped with an independent equipment machine, a corresponding carrier assembly line and a reflux mechanism, and an adaptable standard carrier, so that the modules can be quickly connected.

[0005] Compared with the prior art, the technical solution provided by the present invention has the following beneficial effects: the magnet mounting production line realizes the automation of the whole process from magnetic plate loading to magnet mounting, detection and unloading by setting up loading equipment, magnet mounting equipment, detection equipment and first unloading equipment. The sheet metal cover mounting production line integrates multiple processes such as loading, torque testing, wiping, dispensing, mounting, height detection and unloading into one, forming a complete automated production line. Compared with traditional manual operation or semi-automatic production methods, it greatly reduces manual intervention, avoids inefficiency and instability in manual operation, and further improves production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0006] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work, among which: Figure 1 It is a stereogram of an automatic production line for a linear motor stator provided by the present invention; Figure 2 It is a stereoscopic diagram of a feeding device in an automatic production line of a linear motor stator provided by the present invention; Figure 3 It is a three-dimensional diagram of a magnet sticking device in an automatic production line of a linear motor stator provided by the present invention; Figure 4 It is a structural schematic diagram of a magnet sticking device in an automatic production line of a linear motor stator provided by the present invention; Figure 5 It is a stereoscopic diagram of a detection device in an automatic production line of a linear motor stator provided by the present invention; Figure 6 It is a three-dimensional diagram of a first blanking device in an automatic production line for a linear motor stator provided by the present invention; Figure 7 It is a stereoscopic diagram of a torque testing device in a linear motor stator automatic production line provided by the present invention; Figure 8 It is a stereoscopic diagram of a wiping device in an automatic production line of a linear motor stator provided by the present invention; Fig. 9 It is a stereoscopic diagram of a glue dispensing device in an automatic production line of a linear motor stator provided by the present invention; Fig.10 It is a three-dimensional diagram of a sheet metal cover pasting device in an automatic production line for a linear motor stator provided by the present invention; Fig.11 It is a three-dimensional diagram of a height detection device in a linear motor stator automatic production line provided by the present invention; Fig.12 It is a three-dimensional diagram of a second blanking device in an automatic production line for a linear motor stator provided by the present invention; 1. Linear motor stator automatic production line; 10. Magnetic plate; 2. Magnet mounting production line; 20. Loading equipment; 201. Material basket; 202. Material basket elevator; 203. Card placement area; 204. Support frame; 205. Negative pressure adsorption plate; 206. First linear motor; 207. First linear guide rail; 208. Material taking plate; 209. Buffer plate; 210. Limit plate; 211. Mounting block; 212. Stop convex portion; 213. Docking station; 30. Magnetizing equipment; 301. Magnetizing module; 302. Gluing module; 303. Magnetizing assembly line; 304. Horizontal displacement module; 305. Magnetizing lifting platform; 306. Working area; 307. Driving cylinder; 308. Longitudinal displacement module; 309. Placing plate; 310. Feeding plate; 311. Left silo; 312. Right silo; 313. Left feeding groove; 314. Right feeding groove; 315. Ejection cylinder; 316. Ejection plate; 317. First fixed seat; 318. First cylinder; 319. A substrate; 320, a second fixed seat; 321, a second cylinder; 322, a second substrate; 323, a fixed block; 324, a material discharge block; 325, a double-row material discharge pressure plate; 326, a rodless cylinder; 327, a connecting block; 328, a double-row ejector rod; 329, a stand; 330, a third fixed seat; 331, a dispensing lifting cylinder; 332, a mounting side plate; 333, a needle injection assembly; 334, a glue storage syringe; 335, a glue storage table; 336, a second linear motor; 337, a glue receiving cup; 338, a needle sensor; 40. Detection equipment; 401. Fixed side plate; 402. Detection camera; 403. Polarity detection sensor; 50. The first unloading equipment; 6. Sheet metal cover mounting production line; 60. Torque testing equipment; 601. Fourth fixing plate; 602. Torque fixture; 603. Driving motor; 604. Torque calibrator; 70. Wiping equipment; 701. Assembly line; 702. First gantry; 703. Second gantry; 704. Third linear motor; 705. Second slide rail; 706. Fourth linear motor; 707. Servo Z-axis module; 708. Positioning table; 709. First fixed plate; 710. Magnetic felt plate; 711. Cloth tape reel; 712. Waste reel; 713. Liquid storage syringe; 714. Adjusting bearing; 715. Dust-free cloth tape; 716. Needle mounting seat; 717. Instillation needle; 80. Glue dispensing equipment; 90. Sheet metal cover pasting equipment; 901. Third fixing plate; 902. Suction cup assembly; 903. Sheet metal cover silo; 904. Secondary positioning platform; 905. Pressure holding module; 10a, height detection device; 101a, fifth fixing plate; 102a, laser displacement sensor; 20a, the second unloading equipment; 201a, the unloading transportation line. DETAILED DESCRIPTION

[0007] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0008] refer to Figures 1 to 12 , Figure 1 A stereogram of a linear motor stator automatic production line 1 provided by the present invention is shown; Figure 2 A three-dimensional diagram of a feeding device 20 in an automatic production line 1 for a linear motor stator provided by the present invention is shown; Figure 3 A three-dimensional diagram of a magnet sticking device 30 in an automatic production line 1 for a linear motor stator provided by the present invention is shown; Figure 4 The structure diagram of the magnet sticking device 30 in the automatic production line 1 of the linear motor stator provided by the present invention is shown; Figure 5 A three-dimensional diagram of a detection device 40 in an automatic production line 1 for a linear motor stator provided by the present invention is shown; Figure 6 A stereoscopic diagram of a first material discharging device 50 in an automatic production line 1 for a linear motor stator provided by the present invention is shown.

[0009] Figure 7 A three-dimensional diagram of a torque testing device 60 in an automatic production line 1 of a linear motor stator provided by the present invention is shown; Figure 8 A stereoscopic diagram of a wiping device 70 in an automatic production line 1 for a linear motor stator provided by the present invention is shown; Fig. 9 A three-dimensional diagram of a glue dispensing device 80 in an automatic production line 1 for a linear motor stator provided by the present invention is shown; Fig.10 A three-dimensional diagram of a sheet metal cover attaching device 90 in an automatic production line 1 for a linear motor stator provided by the present invention is shown; Fig.11 A three-dimensional diagram of a height detection device 10a in a linear motor stator automatic production line 1 provided by the present invention is shown; Fig.12 A stereoscopic diagram of a second unloading device 20a in an automatic production line 1 for a linear motor stator provided by the present invention is shown.

[0010] like Figures 1 to 12 As shown, the technical solution adopted by the present invention is to provide a linear motor stator automatic production line 1, including a magnet mounting production line 2 and a sheet metal cover mounting production line 6, wherein: The magnet mounting production line 2 includes a loading device 20, a magnet mounting device 30, a detection device 40 and a first unloading device 50 arranged in sequence along a first direction. The loading device 20 is used to provide and transport the magnetic plate 10. The magnet mounting device 30 is used to mount magnets on the top of the magnetic plate 10 to form a stator semi-finished product. The detection device 40 is used to detect the magnet mounting position and the magnet polarity. The first unloading device 50 is used to transfer the stator semi-finished product.

[0011] The sheet metal cover mounting production line 6 includes a first direction ( Figure 2 The feeding device 20, the torque testing device 60, the wiping device 70, the glue dispensing device 80, the sheet metal cover pasting device 90, the height detection device 10a and the second unloading device 20a are sequentially arranged (as shown in the X direction), and are used to paste the sheet metal cover on the top of the stator semi-finished product. The torque testing device 60 is used to detect the torque size of each magnet. The wiping device 70 is used to wipe the dirt on the surface of the magnet. The glue dispensing device 80 is used to apply glue on each magnet. The sheet metal cover pasting device 90 is used to paste the sheet metal cover and the magnet to form a stator finished product. The height detection device 10a is used to detect the overall height of the stator finished product. The second unloading device 20a is used to transfer the stator finished product.

[0012] The present application provides a linear motor stator automatic production line 1, and a magnet mounting production line 2, which realizes the automation of the entire process from loading the magnetic plate 10 to magnet mounting, detection, and unloading by setting a loading device 20, a magnet mounting device 30, a detection device 40, and a first unloading device 50. The sheet metal cover mounting production line 6 integrates multiple processes such as loading, torque testing, wiping, dispensing, mounting, height detection, and unloading into one, forming a complete automated production line. Compared with traditional manual operation or semi-automatic production methods, it greatly reduces manual intervention, avoids inefficiency and instability in manual operation, and further improves production efficiency.

[0013] In some embodiments, reference Figures 1 to 12 The feeding device 20 includes a magnetic plate 10 transport mechanism and a magnetic plate 10 feeding mechanism. The magnetic plate 10 transport mechanism is a feeding end, including a basket 201 and a basket elevator 202. The basket 201 moves along the second direction ( Figure 2 A plurality of clamping and placing areas 203 are provided at intervals (as shown in the Z direction) for placing a plurality of magnetic plates 10. A basket elevator 202 is provided below the basket 201 for driving the basket 201 to move up and down so that any clamping and placing area 203 corresponds to the feeding mechanism of the magnetic plate 10 along the first direction.

[0014] The feeding mechanism of the magnetic plate 10 includes a material pulling module, a material taking module and a docking station 213 arranged in sequence along the first direction, the material taking module includes a support frame 204 and a negative pressure adsorption plate 205, and the support frame 204 is arranged between the material pulling module and the docking station 213 along the third direction ( Figure 2A first linear motor 206 extending in a first direction is disposed on the top of the first linear motor 206. The negative pressure adsorption plate 205 is connected to the driving end of the first linear motor 206, and is used to transfer the magnetic plate 10 between the pulling module and the docking station 213, and transfer the magnetic plate 10 to the next device through the docking station 213.

[0015] Exemplarily, the provision of the material basket 201 and the material basket elevator 202 realizes the automatic loading and transportation of the magnetic plate 10, reduces manual intervention, and ensures that the clamping placement area 203 is accurately docked with the loading mechanism of the magnetic plate 10. The material picking module adopts a negative pressure adsorption plate 205, which can realize the precise transfer of the magnetic plate 10 and avoid the displacement or damage of the magnetic plate 10 during the transfer process. The docking station 213 is a platform commonly used in the prior art to connect and transition different equipment. In this embodiment, the docking station 213 can be raised and lowered, and a carrier assembly line 701 is arranged below it. When the docking station 213 moves to the lower position, it is fixed to the carrier in the carrier assembly line 701, and the magnetic plate 10 that is adsorbed and transferred is carried by the carrier. Then the docking station 213 moves to the upper position, and the carrier with the magnetic plate 10 is sent to the assembly line 701 in the magnet sticking equipment 30 for magnet sticking operation.

[0016] In some embodiments, reference Figures 1 to 12 The material pulling module includes a first linear guide rail 207, a material picking plate 208, a buffer plate 209 and a limit plate 210. The first linear guide rail 207 and the material picking plate 208 both extend along a first direction, the material picking plate 208 is disposed at the top of the first linear guide rail 207 and connected to the driving end of the first linear guide rail 207, and is used to drive the material picking plate 208 to move relative to the basket elevator 202 along the first direction to the basket 201 through the first linear guide rail 207.

[0017] A check assembly is provided at the top of one end of the material picking plate 208 near the material basket 201, and the check assembly includes a mounting block 211, a spring assembly and an elastic downward pressure block. One end of the elastic downward pressure block is rotatably connected to the mounting block 211 along the first direction, and the other end is provided with a stop protrusion 212. The spring assembly is arranged between the stop protrusion 212 and the mounting block 211, and is used for when the check assembly moves to the clamping placement area 203, the stop protrusion 212 abuts and contracts with the top of the magnetic plate 10, and when moving out of the clamping placement area 203, the stop protrusion 212 abuts against the end of the magnetic plate 10 to push the magnetic plate 10 to move to the top of the cache plate 209.

[0018] Exemplarily, the first linear guide 207 drives the material picking plate 208 to move in the first direction, thereby realizing the automatic transfer of the magnetic plate 10 from the material basket 201 to the buffer plate 209, reducing manual operations and improving production efficiency. The check assembly can automatically adapt to the movement of the magnetic plate 10 through the cooperation of the spring assembly and the elastic pressing block, ensuring that the magnetic plate 10 is stable and free of jams during the transfer process, thereby improving the reliability of material transfer. The buffer plate 209 is provided with limit plates 210 at both ends along the third direction and at one end away from the material basket 201 along the first direction, which can fix and limit the magnetic plate 10 to ensure that the magnetic plate 10 is accurately positioned on the buffer plate 209.

[0019] In some embodiments, reference Figures 1 to 12 The magnet sticking equipment 30 includes a magnet sticking module 301, a glue dispensing module 302, a magnet sticking section assembly line 303, a lateral displacement module 304 and a magnet sticking lifting platform 305. The magnet sticking section assembly line 303 is a double-layer assembly line 701, and extends along the first direction and is arranged corresponding to the docking platform 213. The magnet sticking lifting platform 305 is erected at both ends of the magnet sticking section assembly line 303 along the third direction, and is arranged at intervals along the first direction. The top of the magnet sticking lifting platform 305 is provided with an operating area 306 corresponding to the magnetic plate 10, and a lifting block is provided at the bottom. A plurality of driving cylinders 307 are provided on both sides along the third direction, which are used for when the magnetic plate 10 is transported to the magnet sticking lifting platform 305, the plurality of driving cylinders 307 drive the lifting blocks to move upward, and push the magnetic plate 10 into the operating area 306.

[0020] The lateral displacement module 304 extends along the first direction and is arranged on one side of the magnet sticking section assembly line 303 along the third direction. The magnet sticking modules 301 are respectively arranged on both sides of the glue dispensing module 302 along the first direction, and the bottoms of the three are slidably connected to the lateral displacement module 304. A longitudinal displacement module 308 is also arranged at the connection between the magnet sticking module 301 and the glue dispensing module 302 and the lateral displacement module 304, which is used to drive the magnet sticking module 301 or the glue dispensing module 302 to move along the first direction to the magnet sticking lifting platform 305 for operation through the lateral displacement module 304 and the longitudinal displacement module 308.

[0021] For example, the two magnet sticking lifting platforms 305 drive the lifting blocks to move upward by driving the cylinders 307, and push the magnetic plate 10 into the working area 306, so as to realize the automatic positioning and fixing of the magnetic plate 10, reduce the manual operation, and improve the production efficiency. The magnet sticking module 301 and the glue dispensing module 302 realize precise movement through the lateral displacement module 304 and the longitudinal displacement module 308, and can be flexibly adjusted according to the position and demand of the magnetic plate 10 to ensure the accuracy of magnet sticking and glue dispensing.

[0022] In some embodiments, reference Figures 1 to 12The magnetizing module 301 includes a placement plate 309, a feed plate 310, a left material bin 311, a right material bin 312 and a side ejection assembly. The placement plate 309 extends along the third direction, and the bottom is connected to the longitudinal displacement module 308. The feed plate 310 extends along the third direction and is arranged on the top of the placement plate 309. The top of the feed plate 310 is provided with a left feed groove 313 and a right feed groove 314 extending and extending through the third direction in parallel. The left material bin 311 and the right material bin 312 are respectively arranged on both sides of the feed plate 310 along the first direction, and are both hollow, for stacking a plurality of magnetic strips along the second direction.

[0023] Along the first direction, the bottom of the left material bin 311 and the left feeding groove 313, as well as the bottom of the right material bin 312 and the right feeding groove 314 are all connected. The side ejection assembly is respectively arranged on the side of the left material bin 311 and the right material bin 312 away from the feeding plate 310 along the first direction, and includes an ejection cylinder 315 and an ejection plate 316. The ejection plate 316 extends along the first direction, and one end away from the feeding plate 310 is connected to the driving end of the ejection cylinder 315, and is used to drive the ejection plate 316 along the first direction relative to the feeding plate 310 through the ejection cylinder 315 to eject the magnetic strips at the bottom of the left material bin 311 and the right material bin 312 into the left feeding groove 313 and the right feeding groove 314.

[0024] For example, the left bin 311 and the right bin 312 are respectively arranged on both sides of the feeding plate 310, and can store multiple magnetic strips at the same time. Through the cooperation of the ejection cylinder 315 and the ejection plate 316, the magnetic strips can be accurately pushed into the feeding groove, which reduces manual operation and improves feeding efficiency. Through the precise cooperation of the feeding groove and the ejection assembly, the stability of the magnetic strips during the transportation and mounting process is ensured, and quality problems caused by the deviation of the magnetic strips are avoided.

[0025] In some embodiments, reference Figures 1 to 12 The magnetization module 301 also includes a magnetization head, which includes a first fixed seat 317, a first cylinder 318, a first substrate 319, a second fixed seat 320, a second cylinder 321 and a second substrate 322. The first fixed seat 317 extends along the second direction, and the bottom is fixed to the top of the placement plate 309. The first cylinder 318 is arranged on the side of the first fixed seat 317 away from the feed plate 310 along the third direction. The first substrate 319 extends along the first direction, and the top is connected to the driving end of the first cylinder 318. The second cylinder 321 is arranged on the side of the first cylinder 318 away from the feed plate 310 along the second direction, and is connected to the first cylinder 318 through the second fixed seat 320. The second substrate 322 is arranged parallel to the top of the first substrate 319, and the top of the second substrate 322 is connected to the driving end of the second cylinder 321.

[0026] The first substrate 319 is provided with a first through hole, and the first through hole extends along the second direction, and the top cover is provided with a fixed block 323. The second substrate 322 is provided with a second through hole, and the first through hole, the second through hole and the feed plate 310 are provided correspondingly. A blanking block 324 is provided in the second through hole, and a double row of blanking through holes corresponding to the left feed groove 313 and the right feed groove 314 are provided in the blanking block 324. A double row of blanking pressing plates 325 corresponding to the double row of blanking through holes are provided at the bottom of the fixed block 323. The double row of blanking pressing plates 325, the double row of blanking through holes and the size of the magnetic strips are provided correspondingly, and are used to press the magnetic strips in the double row of blanking through holes down to the top of the magnetic plate 10 through the double row of blanking pressing plates 325.

[0027] Exemplarily, the magnetic pasting head uses a combination of the first cylinder 318 and the second cylinder 321, which can achieve multi-directional precise movement, so that the magnetic pasting head can accurately place the magnetic strip to the specified position of the magnetic plate 10, improving the precision and consistency of magnetic pasting. The double blanking through holes in the material block accurately correspond to the feeding grooves of the magnetic plate 10, and the double blanking pressing plates at the bottom of the fixed block 323303 can accurately press the magnetic strip to the top of the magnetic plate 10, ensuring the precise positioning and fixation of the magnetic strip during the pasting process, avoiding quality problems caused by position deviation.

[0028] In some embodiments, reference Figures 1 to 12 The magnetizing module 301 also includes a post-ejection assembly, which includes a rodless cylinder 326, a connecting block 327, and a double-row ejector rod 328. The rodless cylinder 326 extends along the third direction and is arranged on the side of the feed plate 310 away from the magnetizing head along the third direction. The double-row ejector rod 328 extends along the third direction and is arranged on the same side as the rodless cylinder 326. The double-row ejector rod 328 is arranged corresponding to the left feed groove 313 and the right feed groove 314, and the end away from the feed plate 310 is connected to the slider of the rodless cylinder 326 through the connecting block 327, which is used to drive the slider to move along the third direction through the rodless cylinder 326, so that the double-row ejector rod 328 is inserted into the left feed groove 313 and the right feed groove 314, and the magnetic strip is ejected to the double-row blanking through hole.

[0029] Exemplarily, the rodless cylinder 326 achieves precise reciprocating motion through magnetic coupling or mechanical structure, ensuring that the double-row ejector rods 328 can be accurately inserted into the left feed groove 313 and the right feed groove 314, achieving precise ejection of the magnetic strips, thereby improving the efficiency of the magnetization process.

[0030] In some embodiments, reference Figures 1 to 12The glue dispensing module 302 includes a stand 329, a third fixed seat 330, a glue dispensing lifting cylinder 331, a mounting side plate 332, a needle glue injection assembly 333, a glue storage syringe 334 and a glue storage platform 335. The stand 329 extends along the second direction, and a second linear motor 336 extending along the third direction is provided on the top. The third fixed seat 330 is provided on one side of the stand 329 along the first direction, and is connected to the driving end of the second linear motor 336. The glue dispensing lifting cylinder 331 is provided on one side of the third fixed seat 330 along the second direction, and the lifting driving end at the bottom is connected to the mounting side plate 332. The needle glue injection assembly 333 and the glue storage syringe 334 are both provided at the bottom of one side of the mounting side plate 332 along the third direction. The top of the needle glue injection assembly 333 is a glue inlet, which is connected to the glue storage syringe 334 pipeline, and the bottom is a glue outlet needle for performing glue dispensing operations. The needle glue injection assembly 333 includes a T-shaped leak-proof valve for opening or closing the needle glue injection assembly 333 .

[0031] The glue storage table 335 is arranged between the glue dispensing module 302 and the magnet sticking section assembly line 303. The glue cup 337 and the needle sensor 338 are arranged at intervals on the top along the first direction. The needle sensor 338 is used to detect the glue needle to locate the needle glue injection component 333. The glue cup 337 is used to store residual glue.

[0032] For example, the dispensing module 302 can achieve high-precision movement and positioning through the cooperation of the second linear motor 336 and the slider. At the same time, the dispensing needle of the needle dispensing assembly 333 is positioned by the needle sensor 338 to ensure the accuracy of the dispensing position. The needle dispensing assembly 333 adopts a T-type leak-proof valve, which can accurately control the conduction and shutoff of the glue, avoid glue leakage, and improve the accuracy of dispensing.

[0033] In some embodiments, reference Figures 1 to 12The wiping device 70 includes a universal support module, which includes an assembly line 701, a first gantry 702, a second gantry 703, a third linear motor, a second slide rail 705, a fourth linear motor 706, and a servo Z-axis module 707. The assembly line 701 extends along the first direction and is arranged corresponding to the docking station 213. A positioning station 708 is provided inside for positioning the magnetic plate 10 in the transmission stop. The first gantry 702 and the second gantry 703 are both erected on both sides of the assembly line 701 along the third direction and are spaced apart along the first direction. The third linear motor is arranged at the top of the first gantry 702 and extends along the third direction. The second slide rail 705 is arranged at the top of the second gantry 703 and extends along the third direction. The fourth linear motor 706 extends along the first direction, and its two ends are respectively connected to the driving end of the third linear motor and the second slide rail 705. The servo Z-axis module 707 is connected to the driving end of the fourth linear motor 706 , and is used to drive the fourth linear motor 706 to move along the third direction through the third linear motor, and drive the servo Z-axis module 707 to move along the first direction through the fourth linear motor 706 .

[0034] Exemplarily, the wiping device 70 is driven by the cooperation of the third linear motor, the fourth linear motor 706 and the servo Z-axis module 707 to move in three directions. This automated design reduces manual operation and labor intensity, while avoiding inconsistencies and potential contamination caused by manual wiping.

[0035] In some embodiments, reference Figures 1 to 12 The wiping device 70 also includes a first fixed plate 709 and a wiping assembly. The first fixed plate 709 is connected to the driving end of the servo Z-axis module 707 on one side along the third direction, and a wiping assembly is provided on the other side, which is used to drive the wiping assembly to move to a position corresponding to the positioning table 708 through the third linear motor, the fourth linear motor 706 and the servo Z-axis module 707 to wipe the magnetic strip on the top of the magnetic plate 10.

[0036] The wiping assembly includes a magnetic felt plate 710, a cloth tape reel 711, a waste reel 712, a needle mounting seat 716, a liquid storage syringe 713, and a plurality of adjustment bearings 714. The magnetic felt plate 710 is arranged at the bottom of the first fixed plate 709, and the cloth tape reel 711 and the waste reel 712 are both arranged above the magnetic felt plate 710 and spaced apart along the first direction. The cloth tape reel 711 is wrapped with a dust-free cloth tape 715, which passes through the bottom of the magnetic felt plate 710 and is wound around the waste reel 712 to form a waste roll.

[0037] A needle mounting seat 716 is provided above the magnetic felt plate 710, and the needle mounting seat 716 is provided with a drip needle 717 extending along the second direction. The bottom of the drip needle 717 is arranged corresponding to the magnetic felt plate 710, and the top is connected to the liquid storage syringe 713 pipeline, which is used to drip the wiping liquid in the liquid storage syringe 713 into the magnetic felt plate 710 to wet the dust-free cloth belt 715 at the bottom for wiping. A plurality of adjustment bearings 714 are respectively arranged corresponding to the path of the dust-free cloth belt 715, and are used to press the dust-free cloth belt 715.

[0038] Exemplarily, the wiping assembly presses the dust-free cloth belt 715 through multiple adjustment bearings 714 to ensure the stability and consistency of the cloth belt during the wiping process. The wiping assembly drips the wiping liquid into the magnet felt plate 710 through the drip needle 717, soaks the dust-free cloth belt 715 for wiping, and realizes the combination of wet wiping and dry wiping. This design can more efficiently remove stains on the surface of the magnetic plate 10 while avoiding secondary contamination.

[0039] In some embodiments, reference Figures 1 to 12 The dispensing device 80 includes a universal support module, a second fixed plate, and a dispensing module 302. The second fixed plate is connected to the driving end of the servo Z-axis module 707 on one side along the third direction, and a dispensing module 302 is provided on the other side, which is used to drive the dispensing module 302 to move to a position corresponding to the positioning table 708 through the third linear motor, the fourth linear motor 706 and the servo Z-axis module 707, so as to dispense glue to the magnetic strip on the top of the magnetic plate 10. The dispensing module 302 in the sheet metal cover mounting production line 6 has the same structure as the dispensing module 302 in the magnet mounting production line 2, and both perform dispensing operations through the needle glue injection assembly 333 and the glue storage syringe 334.

[0040] In some embodiments, reference Figures 1 to 12 The sheet metal cover pasting device 90 includes a universal support module, a third fixing plate 901, a suction cup assembly 902, a sheet metal cover bin 903, a secondary positioning platform 904 and a pressure holding module 905. The sheet metal cover bin 903 and the secondary positioning platform 904 are both arranged on one side of the assembly line 701 along the third direction. A plurality of sheet metal covers are stacked in the sheet metal cover bin 903 along the second direction. The secondary positioning platform 904 is spaced apart from the sheet metal cover bin 903 along the first direction and is used to place the sheet metal cover.

[0041] The third fixed plate 901 is connected to the driving end of the servo Z-axis module 707 on one side along the third direction, and a suction cup assembly 902 is provided at the bottom, which is used to drive the suction cup assembly 902 to move to the corresponding positioning platform 708 and the secondary positioning platform 904 in sequence through the third linear motor, the fourth linear motor 706 and the servo Z-axis module 707 to place the sheet metal cover. The pressure holding module 905 is slidably arranged on the top of the assembly line 701, and is used to move to the positioning platform 708 and press downward after the sheet metal cover is placed on the positioning platform 708, so that the sheet metal cover and the magnet are tightly attached together.

[0042] Exemplarily, driven by the third linear motor, the fourth linear motor 706 and the servo Z-axis module 707, the adsorption component can achieve high-precision grasping and placement of the sheet metal cover, significantly improving the flexibility and positioning accuracy of the equipment. The sheet metal cover silo 903 stacks multiple sheet metal covers along the third direction, reducing production interruptions caused by frequent refilling, while ensuring the neatness and orderliness of the silo. The pressure holding module 905 performs a pressure holding operation after the sheet metal cover is placed to ensure that the sheet metal cover fits tightly with the magnet, thereby improving the sealing and reliability of the product.

[0043] In some embodiments, reference Figures 1 to 12 The detection device 40 includes a universal bracket module, a fixed side plate 401, a detection camera 402 and a polarity detection sensor 403. The fixed side plate 401 is connected to the driving end of the servo Z-axis module 707 on one side along the third direction, and the other side is provided with a detection camera 402 and a polarity detection sensor 403, which are used to drive the detection camera 402 to move above the magnetic plate 10 through the third linear motor, the fourth linear motor 706 and the servo Z-axis module 707. The detection camera 402 takes pictures to detect the position and size of the magnet mounting, and the polarity detection sensor 403 detects the polarity of the magnet, and transmits the two detection information to the host computer.

[0044] In some embodiments, reference Figure 1 and Figure 4 The torque test equipment 60 includes a universal bracket module, a fourth fixed plate 601, a torque fixture 602, a drive motor 603 and a torque calibrator 604. The fourth fixed plate 601 is connected to the driving end of the servo Z-axis module 707 on one side along the third direction, and a torque fixture 602 and a drive motor 603 are provided on the other side, which are used to drive the torque fixture 602 to move to the magnetic strip through the third linear motor, the fourth linear motor 706 and the servo Z-axis module 707, and clamp the magnetic strip, and drive the torque fixture 602 to rotate through the drive motor 603 to perform torque testing. The torque calibrator 604 is provided on one side of the assembly line 701 along the third direction, and is used to calibrate the torque fixture 602 to be parallel to the extension direction of the magnetic strip.

[0045] In some embodiments, reference Figure 1 and Figure 4The height detection device 10a includes a universal bracket module, a fifth fixed plate 101a, and a laser displacement sensor 102a. The fifth fixed plate 101a is connected to the driving end of the servo Z-axis module 707 on one side along the third direction, and a laser displacement sensor 102a is provided at the bottom of the other side, which is used to drive the laser displacement sensor 102a to move to the top of the magnetic plate 10 through the third linear motor, the fourth linear motor 706 and the servo Z-axis module 707, and move along the first direction to perform overall height detection.

[0046] In some embodiments, reference Figures 1 to 12 The first unloading device 50 is symmetrically arranged with the loading device 20, including a docking station 213, a material picking module, a material pulling module, a material basket 201 and a material basket elevator 202 arranged in sequence along the first direction, but the material picking plate 208 in the material pulling module in the first unloading device 50 is arranged opposite to the magnetic plate 10 loading device 20, and is used to push the magnetic plate 10 in the buffer plate 209 into the material basket 201 through the non-return assembly. The second unloading device 20a includes a docking station 213, a material picking module and an unloading transportation line 201a arranged in sequence along the first direction, and is used to transfer the magnetic plate 10 with the sheet metal cover mounted from the docking station 213 to the unloading transportation line 201a for transportation through the material picking module.

[0047] The workflow of the linear motor stator automatic production line 1 provided in this application is as follows: (1) In magnet mounting production line 2: Fill the clamping placement area 203 in the basket 201 with magnetic plates 10, and then put the basket 201 into the basket elevator 202 (loading); After the material pulling module in the feeding device 20 (magnetic plate 10) hooks out the first magnetic plate 10, the material basket elevator 202 (feeding) rises a specified distance and waits for the next material pulling until all the magnetic plates 10 in the material basket 201 are pulled out and the material basket 201 is replaced; After the pulling module in the loading device 20 (magnetic plate 10) pulls the magnetic plate 10 into place, the picking module takes the magnetic plate 10 and places it on the carrier at the working position of the docking station 213. The docking station 213 rises after detecting the presence of the magnetic plate 10, and the carrier flows out to the magnet sticking device 30.

[0048] When the two working positions in the magnet sticking device 30 detect the carrier, the device starts to work, first dispensing glue, then sticking magnets, and after the magnetic plate 10 is covered with magnets, the carrier flows out to the size and polarity detection device 40; When the workstation in the detection device 40 detects the fixture, the device starts to work. First, the camera is used to detect the position and size of the magnet mounting, and then the polarity detection sensor 403 is used to detect the polarity of the magnet. After the detection is qualified, the carrier flows out to the first unloading device 50 (semi-finished product); When a carrier is to flow into the first unloading device 50 (semi-finished product), the docking platform 213 is in the upper position, and after the carrier flows into place, it descends, and then the material taking module takes the semi-finished stator to the material pulling module, and then the semi-finished stator is brought to the material basket 201 in the material basket elevator 202 (unloading), and the carrier flows back to the docking platform 213 of the loading device 20 (magnetic plate 10); When the basket 201 in the basket elevator 202 (unloading) is filled with semi-finished stators, the basket 201 is manually taken away and placed in a specified area to remain still, waiting for the glue to completely solidify, and then an empty basket 201 is replaced.

[0049] (2) Sheet metal cover mounting production line 6 working process: Put the stationary basket 201 containing the semi-finished stator into the basket elevator 202 (semi-finished product); After the material pulling module in the feeding device 20 (semi-finished product) hooks out the first magnetic plate 10, the material basket elevator 202 (semi-finished product) rises a specified distance and waits for the next material pulling until the magnetic plates 10 in the material basket 201 are pulled out and the material basket 201 is replaced; After the material pulling module in the feeding device 20 (semi-finished product) pulls the magnetic plate 10 into place, the material taking module takes the magnetic plate 10 away and places it on the carrier at the working position of the docking station 213. The docking station 213 rises after detecting the magnetic plate 10, and the carrier flows out to the torque testing device 60; When the working position in the torque testing device 60 detects the fixture, the device starts to work, and the torque module measures the torque of each magnet on the semi-finished stator. After the measurement, the carrier flows out to the wiping device 70; When the work station in the wiping device 70 detects the fixture, the device starts to work, and the wiping module wipes the dirt on the surface of the magnet on the semi-finished stator. After wiping, the carrier flows out to the dispensing device 80; When the work station in the glue dispensing device 80 detects the fixture, the device starts to work, and the glue dispensing module 302 applies glue on each magnet of the semi-finished stator. After the glue is applied, the carrier flows out to the sheet metal cover pasting device 90; A certain amount of sheet metal covers are placed in the sheet metal cover material bin 903 of the sheet metal cover pasting equipment 90, and the material taking module takes a sheet metal cover and places it in the secondary positioning module for positioning to ensure that the sheet metal cover is placed accurately, and then the material taking module takes the sheet metal cover to the top of the working position and waits for the carrier to be in place; After the tool is in place, the material taking module changes the sheet metal cover to the stator, and then the pressure holding module 905 presses downward to make the sheet metal cover and the magnet close together to prevent the sheet metal cover from shifting. After the glue is initially cured for a certain period of time, the carrier flows out to the height detection device 10a; When the work station of the dispensing device 80 detects the fixture, the device starts to work, and the height detection device 10a detects the overall height of the stator after the sheet metal cover is attached. After the detection is qualified, the carrier flows out to the second unloading device 20a (finished product); The docking platform 213 in the finished product unloading equipment is initially in the upper position. When the carrier is in place, the docking platform 213 descends, and the material taking module takes the stator and places it on the unloading transport line 201a. The unloading transport line 201a sends the stator out of the equipment, where the stator is taken away manually, and the carrier returns to the docking platform 213 of the loading equipment 20 (semi-finished product).

[0050] The above description is only an implementation mode of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the present invention specification and drawings, or directly or indirectly used in other related technical fields, should be included in the protection scope of the present invention.

Claims

1. A linear motor stator automatic production line, characterized in that: include: A magnet mounting production line comprises a loading device, a magnet mounting device, a detection device and a first unloading device sequentially arranged along a first direction, wherein the loading device is used to provide and transport a magnetic plate; the magnet mounting device is used to mount a magnet on the top of the magnetic plate to form a stator semi-finished product; the detection device is used to detect the magnet mounting position and the magnet polarity; the first unloading device is used to transfer the stator semi-finished product; A sheet metal cover mounting production line comprises a loading device, a torque testing device, a wiping device, a glue dispensing device, a sheet metal cover mounting device, a height detection device and a second unloading device which are sequentially arranged along the first direction, and are used to mount the sheet metal cover on the top of the stator semi-finished product; the torque testing device is used to detect the torque size of each magnet; the wiping device is used to wipe the dirt on the surface of the magnet; the glue dispensing device is used to apply glue on each magnet; the sheet metal cover mounting device is used to mount the sheet metal cover and the magnet to form a stator finished product; the height detection device is used to detect the overall height of the stator finished product; and the second unloading device is used to transfer the stator finished product.

2. The linear motor stator automatic production line according to claim 1 is characterized in that: The feeding equipment includes a magnetic plate transport mechanism and a magnetic plate feeding mechanism. The magnetic plate transport mechanism is a feeding end, including a material basket and a material basket elevator. The material basket is provided with a plurality of clamping and placing areas at intervals along the second direction for placing a plurality of magnetic plates. The material basket elevator is provided below the material basket for driving the material basket to move up and down so that any one of the clamping and placing areas corresponds to the magnetic plate feeding mechanism along the first direction. The magnetic plate feeding mechanism includes a pulling module, a picking module and a docking platform arranged in sequence along the first direction, the picking module includes a support frame and a negative pressure adsorption plate, the support frame is arranged on one side of the pulling module and the docking platform along the third direction, and a first linear motor extending along the first direction is provided on the top; the negative pressure adsorption plate is connected to the driving end of the first linear motor, and is used to transfer the magnetic plate between the pulling module and the docking platform, and transfer the magnetic plate to the next device through the docking platform.

3. The linear motor stator automatic production line according to claim 2 is characterized in that: The material pulling module includes a first linear guide rail, a material picking plate, a buffer plate and a limit plate; the first linear guide rail and the material picking plate both extend along the first direction, the material picking plate is arranged on the top of the first linear guide rail, and is connected to the driving end of the first linear guide rail, and is used to drive the material picking plate to move relative to the material basket elevator along the first direction into the material basket through the first linear guide rail; A check assembly is provided at the top of the material picking plate near one end of the material basket, and the check assembly includes a mounting block, a spring assembly and an elastic downward pressure block. One end of the elastic downward pressure block along the first direction is rotatably connected to the mounting block, and the other end is provided with a stop protrusion. The spring assembly is arranged between the stop protrusion and the mounting block, and is used for the stop protrusion to abut and contract with the top of the magnetic plate when the check assembly moves to the clamping placement area, and the stop protrusion abuts against the end of the magnetic plate when moving out of the clamping placement area to push the magnetic plate to move to the top of the cache plate.

4. The linear motor stator automatic production line according to claim 2, characterized in that: The magnet sticking equipment includes a magnet sticking module, a glue dispensing module, a magnet sticking section assembly line, a lateral displacement module and a magnet sticking lifting platform; the magnet sticking section assembly line is a double-layer assembly line, and extends along the first direction and is arranged corresponding to the docking platform; the magnet sticking lifting platform is erected at both ends of the magnet sticking section assembly line along the third direction, and is arranged at intervals along the first direction; the top of the magnet sticking lifting platform is provided with an operating area corresponding to the magnetic plate, the bottom is provided with a lifting block, and both sides along the third direction are provided with a plurality of driving cylinders, which are used for when the magnetic plate is transported to the magnet sticking lifting platform, the plurality of driving cylinders drive the lifting blocks to move upward, and push the magnetic plate into the operating area; The lateral displacement module extends along the first direction and is arranged on one side of the magnet sticking section assembly line along the third direction; the magnet sticking modules are respectively arranged on both sides of the glue dispensing module along the first direction, and the bottoms of the three are slidably connected with the lateral displacement module; a longitudinal displacement module is also provided at the connection between the magnet sticking module and the glue dispensing module and the lateral displacement module, which is used to drive the magnet sticking module or the glue dispensing module to move along the first direction to the magnet sticking lifting platform for operation through the lateral displacement module and the longitudinal displacement module.

5. The linear motor stator automatic production line according to claim 4, characterized in that: The magnet sticking module comprises a placement plate, a feed plate, a left material bin, a right material bin and a side ejection assembly; the placement plate extends along the third direction, and the bottom is connected to the longitudinal displacement module; the feed plate extends along the third direction and is arranged on the top of the placement plate; the top of the feed plate is provided with a left feed groove and a right feed groove in parallel along the third direction; the left material bin and the right material bin are respectively arranged on both sides of the feed plate along the first direction, and are both hollow, for stacking a plurality of magnetic strips along the second direction; Along the first direction, the bottom of the left material bin and the left material feeding groove, as well as the bottom of the right material bin and the right material feeding groove are all connected; the side ejection components are respectively arranged on the side of the left material bin and the right material bin away from the material feeding plate along the first direction, including an ejection cylinder and an ejection plate, the ejection plate extends along the first direction, and one end away from the material feeding plate is connected to the driving end of the ejection cylinder, which is used to drive the ejection plate along the first direction relative to the material feeding plate by the ejection cylinder to eject the magnetic strips at the bottom ends of the left material bin and the right material bin into the left and right material feeding grooves.

6. The linear motor stator automatic production line according to claim 5, characterized in that: The magnetization module further includes a magnetization head, which includes a first fixing seat, a first cylinder, a first substrate, a second fixing seat, a second cylinder, and a second substrate; the first fixing seat extends along the second direction, and the bottom is fixed to the top of the placement plate; the first cylinder is arranged on the side of the first fixing seat away from the feeding plate along the third direction; the first substrate extends along the first direction, and the top is connected to the driving end of the first cylinder; the second cylinder is arranged on the side of the first cylinder away from the feeding plate along the second direction, and is connected to the first cylinder through the second fixing seat; the second substrate is arranged above the first substrate in parallel, and the top of the second substrate is connected to the driving end of the second cylinder; The first substrate is provided with a first through hole, which extends along the second direction, and the top cover is provided with a fixed block; the second substrate is provided with a second through hole, and the first through hole, the second through hole and the feed plate are correspondingly arranged; a blanking block is provided in the second through hole, and a double-row blanking through hole corresponding to the left feed groove and the right feed groove is provided in the blanking block; a double-row blanking pressure plate corresponding to the double-row blanking through holes is provided at the bottom of the fixed block; the double-row blanking pressure plate, the double-row blanking through holes and the magnetic strip size are correspondingly arranged, and are used to press the magnetic strips in the double-row blanking through holes down to the top of the magnetic plate through the double-row blanking pressure plate.

7. The linear motor stator automatic production line according to claim 4, characterized in that: The glue dispensing module includes a stand, a third fixed seat, a glue dispensing lifting cylinder, a mounting side plate, a needle glue injection assembly, a glue storage syringe and a glue storage table; the stand extends along the second direction, and a second linear motor extending along the third direction is provided on the top; the third fixed seat is provided on one side of the stand along the first direction, and is connected to the driving end of the second linear motor; the glue dispensing lifting cylinder is provided on one side of the third fixed seat along the second direction, and the lifting driving end at the bottom is connected to the mounting side plate; the needle glue injection assembly and the glue storage syringe are both provided at the bottom of the mounting side plate on one side of the third direction, the top of the needle glue injection assembly is a glue inlet, which is connected to the glue storage syringe pipeline, and the bottom is a glue outlet needle for performing glue dispensing operations; the needle glue injection assembly includes a T-type leak-proof valve for turning on or off the needle glue injection assembly; The glue storage table is arranged between the glue dispensing module and the magnet sticking section assembly line. A glue receiving cup and a needle alignment sensor are arranged at intervals on the top along the first direction. The needle alignment sensor is used to detect the glue needle to locate the needle glue injection component, and the glue receiving cup is used to store residual glue.

8. The linear motor stator automatic production line according to claim 2, characterized in that: The wiping device includes a universal support module, which includes an assembly line, a first gantry, a second gantry, a third linear motor, a second slide rail, a fourth linear motor, and a servo Z-axis module. The assembly line extends along the first direction and is arranged corresponding to the docking station, and is provided with a positioning platform for positioning the magnetic plate that stops transmission; the first gantry and the second gantry are both erected on both sides of the assembly line along the third direction and are arranged at intervals along the first direction; the third linear motor is arranged at the top of the first gantry and extends along the third direction; the second slide rail is arranged at the top of the second gantry and extends along the third direction; the fourth linear motor extends along the first direction, and its two ends are respectively connected to the driving end of the third linear motor and the second slide rail; the servo Z-axis module is connected to the driving end of the fourth linear motor, and is used to drive the fourth linear motor to move along the third direction through the third linear motor, and drive the servo Z-axis module to move along the first direction through the fourth linear motor.

9. The linear motor stator automatic production line according to claim 8, characterized in that: The wiping device also includes a first fixed plate and a wiping assembly. The first fixed plate is connected to the driving end of the servo Z-axis module on one side along the third direction, and the wiping assembly is provided on the other side, which is used to drive the wiping assembly to move to a position corresponding to the positioning table through the third linear motor, the fourth linear motor and the servo Z-axis module to wipe the magnetic strip on the top of the magnetic plate; The wiping assembly includes a magnetic felt plate, a cloth tape reel, a waste reel, a liquid storage syringe, and a plurality of adjustment bearings; the magnetic felt plate is arranged at the bottom of the first fixed plate, the cloth tape reel and the waste reel are both arranged above the magnetic felt plate and are spaced apart along the first direction; the cloth tape reel is wound with a dust-free cloth tape, the dust-free cloth tape passes through the bottom of the magnetic felt plate, and is wound around the waste reel to form a waste roll; A needle mounting seat is provided above the magnet felt plate, and the needle mounting seat is provided with a drip needle extending along the second direction. The bottom of the drip needle is arranged corresponding to the magnet felt plate, and the top is connected to the liquid storage syringe pipeline, which is used to drip the wiping liquid in the liquid storage syringe into the magnet felt plate to wet the dust-free cloth belt at the bottom for wiping; the multiple adjustment bearings are respectively arranged corresponding to the path of the dust-free cloth belt, and are used to press the dust-free cloth belt.

10. The linear motor stator automatic production line according to claim 8, characterized in that: The sheet metal cover pasting equipment comprises the universal bracket module, the third fixing plate, the suction cup assembly, the sheet metal cover bin, the secondary positioning platform and the pressure holding module, the sheet metal cover bin and the secondary positioning platform are both arranged on one side of the assembly line along the third direction, and a plurality of sheet metal covers are stacked in the sheet metal cover bin along the second direction; The secondary positioning platform is spaced apart from the sheet metal cover bin along the first direction and is used for placing the sheet metal cover; The third fixed plate is connected to the driving end of the servo Z-axis module along one side of the third direction, and the suction cup assembly is provided at the bottom, which is used to drive the suction cup assembly to move to the corresponding positioning table and the secondary positioning platform in sequence through the third linear motor, the fourth linear motor and the servo Z-axis module to place the sheet metal cover; the pressure holding module is slidably arranged on the top of the assembly line, and is used to move to the positioning table and press downward after the sheet metal cover is placed on the positioning table, so that the sheet metal cover and the magnet are tightly attached together.

Citation Information

Patent Citations

  • Magnet pasting device

    CN114530994A

  • Automatic assembly line for antenna radiation units

    CN116787145A

  • Linear motor planar magnetic steel pasting machine

    CN209676093U

  • Automatic magnet installation and chip mounter

    CN219005177U

  • Mobile phone voice coil magnet attaching equipment

    CN221448576U