By using a combined structure of angle steel enclosures and rubber capsules in concrete pouring formwork, the problems of inconvenient demolding and poor molding effect of existing formwork are solved, rapid demolding and environmental regulation are achieved, and the quality of concrete molding is improved.
Patent Information
- Application Number
- CN202510331004.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-20
- Publication Date
- 2025-04-18
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing concrete pouring formwork is relatively inconvenient when demolding, and it is impossible to assist in forming the concrete structure, which can easily lead to poor concrete forming effect in unsuitable environments.
The template structure consisting of four groups of angle steel enclosures is adopted. The angle steel enclosures are combined with the angle steel plate, mold frame and rubber capsule body, and the U-shaped flow pipe and water pump are used to control the concrete environment, and automatically release the mold through the expansion of the rubber capsule body.
It achieves rapid mold release, and improves the concrete forming effect through environmental regulation, ensuring good concrete forming under different environmental conditions.
Smart Images

Figure CN119843868A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of casting formwork, and in particular to a concrete casting formwork. Background Art
[0002] There are many concrete soil columns in concrete pouring structures. In the actual construction process, the workers first build the steel cage, and then build the concrete column formwork outside the steel cage. After the concrete column formwork is completed, concrete is injected into the concrete column formwork. After the concrete solidifies, the concrete column formwork can be removed.
[0003] The patent with publication number CN116971599A discloses a formwork structure for casting concrete columns, which relates to the field of concrete column casting, including two panels one and two panels two, panel one and panel two are spliced to form a casting trough, panel one is rotatably connected with a winding disk, a winding rope is wound on the winding disk, the winding rope passes through panel one and is connected to panel two, the rotation axis of the winding disk is perpendicular to the distribution direction of panel two, and panel two is provided with a positioning member, which is used to position the winding rope. Compared with fixing panel one and panel two by pulling screws, fixing panel one and panel two by the cooperation between the winding disk and the winding rope is conducive to improving the construction efficiency of the concrete column casting formwork. When the concrete column formwork needs to be disassembled, the winding rope can be separated from panel two.
[0004] The demoulding of the template structure in the above technical solution is still relatively inconvenient, and the template structure cannot assist in the forming of the concrete structure, which may easily lead to poor concrete forming effects in an unsuitable environment. Summary of the invention
[0005] The purpose of the present invention is to provide a concrete casting template, which solves the problem that demoulding is still relatively inconvenient, and the template structure cannot assist in forming the concrete structure, which easily leads to poor concrete forming effect in an unsuitable environment.
[0006] The present invention solves the above technical problems through the following technical solutions. The present invention includes four groups of angle steel enclosures, which are connected in sequence to form a casting cavity. The angle steel enclosure includes an angle steel plate, two mold frames and two rubber bladders. The two mold frames are respectively arranged at both ends of the angle steel plate. A receiving groove is provided at the front edge of the mold frame and the connection with the end of the angle steel plate. The rubber bladder is arranged in the receiving groove and the two sides are respectively bonded and connected to the mold frame and the angle steel plate. A water storage cavity is arranged in the rubber bladder. U-shaped guide pipes are installed on the outside of the angle steel plate and the mold frame. The U-shaped guide pipe is connected to the water storage cavity in the rubber bladder. A water pump is installed at the bottom of the front side of the angle steel plate. The water pump is connected to the two ends of the U-shaped guide pipe through pipelines. A control valve is installed on the U-shaped guide pipe located at the top of the angle steel plate and connected to the rubber bladder.
[0007] Preferably, a connecting plate is installed on one side of the mold frame, and connecting grooves are opened in both ends of the angle steel plate, and the connecting plate is clamped in the connecting grooves.
[0008] Preferably, an expansion groove is provided on the inner wall of the connecting groove, a limiting protrusion is extended from the edge of the connecting plate, and the limiting protrusion is clamped in the expansion groove.
[0009] Preferably, a water treatment box is also provided at the bottom of the front side of the angle steel plate, and the water treatment box is connected to the U-shaped guide pipe and one end of the water pump.
[0010] Preferably, a mounting folding plate is installed on the outer side of the corner of the angle steel plate, and heating plates are installed on both sides of the mounting folding plate, and the heating plates are arranged on the outer side of the water treatment box.
[0011] Preferably, a heat dissipation fin is installed at the bottom of the water treatment tank.
[0012] Preferably, the U-shaped guide pipe portions located at the edge of the angle steel plate and the edge of the mold frame are extended with extension pipes, and the extension pipes are clamped in the water storage cavity.
[0013] Preferably, a docking plate is installed on the other side edge of the mold frame, and a docking hole is opened on the docking plate.
[0014] Compared with the prior art, the beneficial effects of the present invention are: The invention can achieve the effect of rapid demoulding through the cooperation between the angle steel plate and the mold frame on the angle steel enclosure, and can heat or cool the concrete according to the environment, so as to achieve a better concrete molding effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a structural view of the present invention; Figure 2 This is a structural view of the angle steel enclosure of the present invention; Figure 3 This is a structural view of the angle steel plate of the present invention; Figure 4 It is a structural view of the mold frame of the present invention; Figure 5 It is a top view of the present invention (during pouring); Figure 6 It is a top view of the present invention (during demoulding).
[0016] The numbers in the figure represent: 1. Angle steel enclosure; 101. Angle steel plate; 102. Formwork frame; 103. Rubber bladder; 2. Casting cavity; 3. Accommodation groove; 4. U-shaped guide pipe; 5. Water pump; 6. Control valve; 7. Connecting plate; 8. Connecting groove; 9. Expansion groove; 10. Limiting protrusion; 11. Water treatment box; 12. Installation folding plate; 13. Heating plate; 14. Heat dissipation fin plate; 15. Extension pipe; 16. Docking plate; 17. Docking hole. DETAILED DESCRIPTION
[0017] The above and other technical features and advantages of the present invention are described in more detail below in conjunction with the accompanying drawings.
[0018] Embodiment 1
[0019] This embodiment provides a technical solution: a concrete pouring template, such as Figure 1 As shown, it includes four groups of angle steel panels 1, which are connected in sequence to form a pouring cavity 2. When pouring concrete, the four groups of angle steel panels 1 are connected in sequence as shown in FIG. Figure 1 The state shown is placed in the construction position, so the casting cavity 2 formed in the middle of the four groups of angle steel enclosures 1 can be used for concrete casting and forming. The angle steel enclosure 1 includes an angle steel plate 101, two mold frames 102 and two rubber bladders 103. The two mold frames 102 are respectively arranged at both ends of the angle steel plate 101, and a receiving groove 3 is opened at the front edge of the mold frame 102 and the connection with the end of the angle steel plate 101. The rubber bladder 103 is arranged in the receiving groove 3 and the two sides are respectively bonded to the mold frame 102 and the angle steel plate 101. The mold frame 102 and the angle steel plate 101 are softly connected through the rubber bladder 103. During the casting process, the edge of the angle steel plate 101 contacts the edge of the mold frame 102, so the stability is sufficient. A water storage cavity is arranged in the rubber bladder 103, and a U-shaped guide pipe 4 is installed on the outside of the angle steel plate 101 and the mold frame 102. The U-shaped guide pipe 4 is connected to the rubber bladder 103. The water storage chamber is connected to the U-shaped guide tube 4, and the water storage chamber and the U-shaped guide tube 4 are filled with clean water. The clean water can be used to regulate the environment of the angle steel plate 101 and the concrete, and the water storage capacity can be increased by the hollow characteristic of the rubber bladder 103. A water pump 5 is installed at the bottom of the front side of the angle steel plate 101. The water pump 5 is connected to the two ends of the U-shaped guide tube 4 through pipelines. The water pump 5 can drive the clean water in the water storage chamber and the U-shaped guide tube 4 to circulate. A control valve 6 is installed on the U-shaped guide tube 4 located at the top of the angle steel plate 101 and connected to the rubber bladder 103. The control valve 6 can block the water flow, so that the water in the U-shaped guide tube 4 outside the angle steel plate 101 can be pumped into the U-shaped guide tube 4 outside the mold frame 102 and the rubber bladder 103, so that the rubber bladder 103 can be expanded and deformed, thereby achieving the effect of automatic demoulding.
[0020] Further, such as Figure 2-Figure 4As shown, a connecting plate 7 is installed on one side of the mold frame 102, and connecting grooves 8 are opened at both ends of the angle steel plate 101. The connecting plate 7 is clamped in the connecting groove 8. The cooperation between the connecting plate 7 and the connecting groove 8 can ensure that the connecting plate 7 can automatically move along the connecting groove 8 when the rubber bladder 103 expands and deforms.
[0021] Furthermore, an expansion groove 9 is opened on the inner wall of the connecting groove 8, and a limiting protrusion 10 is extended from the edge of the connecting plate 7. The limiting protrusion is stuck in the expansion groove 9. The limiting protrusion 10 can prevent the mold frame 102 and the angle steel plate 101 from separating, thereby ensuring the structural stability of the angle steel enclosure 1.
[0022] Furthermore, the U-shaped guide tube 4 located at the edge of the angle steel plate 101 and the edge of the mold frame 102 are extended with an extension tube 15, and the extension tube 15 is clamped in the water storage cavity. The extension tube 15 can ensure that the connection between the U-shaped guide tube 4 and the rubber bladder 103 is well sealed, and the clean water inside will not flow out when the rubber bladder 103 is deformed.
[0023] Furthermore, a docking plate 16 is installed on the edge of the other side of the mold frame 102, and a docking hole 17 is opened on the docking plate 16. The docking plate 16 can facilitate the fixed connection between adjacent angle steel enclosures 1, and the two contacting docking plates 16 can be fixedly connected by using bolts and nuts, thereby ensuring the stability of the four-sided structure during the pouring operation.
[0024] In this embodiment, four sets of angle iron panels are arranged as follows: Figure 1 The state shown is placed in the pouring construction area, and the two contact-connected butt plates 16 can be fixedly connected by using bolts and nuts, so that the four-sided structure can be stable during the pouring operation, and then the pouring operation can be carried out inward. After the concrete is poured into the pouring cavity 2, it can be formed after drying. At this time, the concrete state is as follows Figure 5 As shown, the concrete contacts the inner wall of the angle iron enclosure. After forming, the control valves 6 on both sides of the mirrored arrangement are closed in pairs, and the water pump 5 on this side is started at the same time, so that the water pump 5 can pump the water in the U-shaped guide pipe 4 outside the angle steel plate 101 into the U-shaped guide pipe 4 outside the mold frame 102 and the rubber bladder 103, and then the rubber bladder 103 can expand and deform, so the rubber bladder 103 can push the angle steel plate 101 and the mold frame 102 for a distance, and at the same time the connecting plate 7 can adaptively move along the connecting groove 8, at this time, the demoulding between the concrete inside the area and the angle steel enclosure 1 is completed, and the above operation can be performed four times to demould the four sides, and the internal state is as follows Figure 6As shown, the concrete is demoulded. It should be noted that in order to ensure that the expansion direction of the rubber bladder 103 and the movement direction of the connecting plate 7 are correct, the wall thickness of the water storage chamber close to the accommodating groove 3 can be controlled to be thinner, and the wall thickness not in contact with the accommodating groove 3 can be increased, or a limiting structure can be added externally to control the expansion direction of the rubber bladder 103.
[0025] Embodiment 2
[0026] This embodiment provides a technical solution: a concrete pouring template, such as Figure 1 As shown, it includes four groups of angle steel panels 1, which are connected in sequence to form a pouring cavity 2. When pouring concrete, the four groups of angle steel panels 1 are connected in sequence as shown in FIG. Figure 1 The state shown is placed in the construction position, so the casting cavity 2 formed in the middle of the four groups of angle steel enclosures 1 can be used for concrete casting and forming. The angle steel enclosure 1 includes an angle steel plate 101, two mold frames 102 and two rubber bladders 103. The two mold frames 102 are respectively arranged at both ends of the angle steel plate 101, and a receiving groove 3 is opened at the front edge of the mold frame 102 and the connection with the end of the angle steel plate 101. The rubber bladder 103 is arranged in the receiving groove 3 and the two sides are respectively bonded to the mold frame 102 and the angle steel plate 101. The mold frame 102 and the angle steel plate 101 are softly connected through the rubber bladder 103. During the casting process, the edge of the angle steel plate 101 contacts the edge of the mold frame 102, so the stability is sufficient. A water storage cavity is arranged in the rubber bladder 103, and a U-shaped guide pipe 4 is installed on the outside of the angle steel plate 101 and the mold frame 102. The U-shaped guide pipe 4 is connected to the rubber bladder 103. The water storage chamber is connected to the U-shaped guide tube 4, and the water storage chamber and the U-shaped guide tube 4 are filled with clean water. The clean water can be used to regulate the environment of the angle steel plate 101 and the concrete, and the water storage capacity can be increased by the hollow characteristic of the rubber bladder 103. A water pump 5 is installed at the bottom of the front side of the angle steel plate 101. The water pump 5 is connected to the two ends of the U-shaped guide tube 4 through pipelines. The water pump 5 can drive the clean water in the water storage chamber and the U-shaped guide tube 4 to circulate. A control valve 6 is installed on the U-shaped guide tube 4 located at the top of the angle steel plate 101 and connected to the rubber bladder 103. The control valve 6 can block the water flow, so that the water in the U-shaped guide tube 4 outside the angle steel plate 101 can be pumped into the U-shaped guide tube 4 outside the mold frame 102 and the rubber bladder 103, so that the rubber bladder 103 can be expanded and deformed, thereby achieving the effect of automatic demoulding.
[0027] Further, such as Figure 2-Figure 4 As shown, a connecting plate 7 is installed on one side of the mold frame 102, and connecting grooves 8 are opened at both ends of the angle steel plate 101. The connecting plate 7 is clamped in the connecting groove 8. The cooperation between the connecting plate 7 and the connecting groove 8 can ensure that the connecting plate 7 can automatically move along the connecting groove 8 when the rubber bladder 103 expands and deforms.
[0028] Furthermore, an expansion groove 9 is opened on the inner wall of the connecting groove 8, and a limiting protrusion 10 is extended from the edge of the connecting plate 7. The limiting protrusion is stuck in the expansion groove 9. The limiting protrusion 10 can prevent the mold frame 102 and the angle steel plate 101 from separating, thereby ensuring the structural stability of the angle steel enclosure 1.
[0029] In a specific implementation, a water treatment box 11 is further provided at the bottom of the front side of the angle steel plate 101, and the water treatment box 11 is connected to the U-shaped guide pipe 4 and one end of the water pump 5. An installation folding plate 12 is installed on the outer side of the corner of the angle steel plate 101, and heating plates 13 are installed on both sides of the installation folding plate 12. The heating plate 13 is arranged on the outer side of the water treatment box 11. The water in the U-shaped guide pipe 4 and the water storage cavity can be heated by the heating plate 13 on the outer side of the water treatment box 11, thereby preventing freezing of the concrete inside in a low temperature environment. The heating plate 13 can continuously heat the water treatment box 11, thereby heating the clean water passing through the water treatment box 11, and then the warm water can be circulated under the drive of the water pump 5, so that the heat can be transferred through the angle steel enclosure 1 to increase the temperature of the internal concrete.
[0030] Furthermore, the U-shaped guide tube 4 located at the edge of the angle steel plate 101 and the edge of the mold frame 102 are extended with an extension tube 15, and the extension tube 15 is clamped in the water storage cavity. The extension tube 15 can ensure that the connection between the U-shaped guide tube 4 and the rubber bladder 103 is well sealed, and the clean water inside will not flow out when the rubber bladder 103 is deformed.
[0031] Furthermore, a docking plate 16 is installed on the edge of the other side of the mold frame 102, and a docking hole 17 is opened on the docking plate 16. The docking plate 16 can facilitate the fixed connection between adjacent angle steel enclosures 1, and the two contacting docking plates 16 can be fixedly connected by using bolts and nuts, thereby ensuring the stability of the four-sided structure during the pouring operation.
[0032] Embodiment 3
[0033] This embodiment provides a technical solution: a concrete pouring template, such as Figure 1 As shown, it includes four groups of angle steel panels 1, which are connected in sequence to form a pouring cavity 2. When pouring concrete, the four groups of angle steel panels 1 are connected in sequence as shown in FIG. Figure 1The state shown is placed in the construction position, so the casting cavity 2 formed in the middle of the four groups of angle steel enclosures 1 can be used for concrete casting and forming. The angle steel enclosure 1 includes an angle steel plate 101, two mold frames 102 and two rubber bladders 103. The two mold frames 102 are respectively arranged at both ends of the angle steel plate 101, and a receiving groove 3 is opened at the front edge of the mold frame 102 and the connection with the end of the angle steel plate 101. The rubber bladder 103 is arranged in the receiving groove 3 and the two sides are respectively bonded to the mold frame 102 and the angle steel plate 101. The mold frame 102 and the angle steel plate 101 are softly connected through the rubber bladder 103. During the casting process, the edge of the angle steel plate 101 contacts the edge of the mold frame 102, so the stability is sufficient. A water storage cavity is arranged in the rubber bladder 103, and a U-shaped guide pipe 4 is installed on the outside of the angle steel plate 101 and the mold frame 102. The U-shaped guide pipe 4 is connected to the rubber bladder 103. The water storage chamber is connected to the U-shaped guide tube 4, and the water storage chamber and the U-shaped guide tube 4 are filled with clean water. The clean water can be used to regulate the environment of the angle steel plate 101 and the concrete, and the water storage capacity can be increased by the hollow characteristic of the rubber bladder 103. A water pump 5 is installed at the bottom of the front side of the angle steel plate 101. The water pump 5 is connected to the two ends of the U-shaped guide tube 4 through pipelines. The water pump 5 can drive the clean water in the water storage chamber and the U-shaped guide tube 4 to circulate. A control valve 6 is installed on the U-shaped guide tube 4 located at the top of the angle steel plate 101 and connected to the rubber bladder 103. The control valve 6 can block the water flow, so that the water in the U-shaped guide tube 4 outside the angle steel plate 101 can be pumped into the U-shaped guide tube 4 outside the mold frame 102 and the rubber bladder 103, so that the rubber bladder 103 can be expanded and deformed, thereby achieving the effect of automatic demoulding.
[0034] Further, such as Figure 2-Figure 4 As shown, a connecting plate 7 is installed on one side of the mold frame 102, and connecting grooves 8 are opened at both ends of the angle steel plate 101. The connecting plate 7 is clamped in the connecting groove 8. The cooperation between the connecting plate 7 and the connecting groove 8 can ensure that the connecting plate 7 can automatically move along the connecting groove 8 when the rubber bladder 103 expands and deforms.
[0035] Furthermore, an expansion groove 9 is opened on the inner wall of the connecting groove 8, and a limiting protrusion 10 is extended from the edge of the connecting plate 7. The limiting protrusion is stuck in the expansion groove 9. The limiting protrusion 10 can prevent the mold frame 102 and the angle steel plate 101 from separating, thereby ensuring the structural stability of the angle steel enclosure 1.
[0036] In a specific implementation, a water treatment box 11 is also provided at the bottom of the front side of the angle steel plate 101. The water treatment box 11 is connected to the U-shaped guide pipe 4 and one end of the water pump 5. A heat dissipation fin 14 is installed at the bottom of the water treatment box 11. The water treatment box 11 and the heat dissipation fin 14 at the bottom thereof can reduce the temperature of the concrete in a high temperature environment, thereby preventing the concrete surface from drying and cracking. The concrete can transfer the temperature to the angle steel enclosure 1 through heat conduction. The water in the U-shaped guide pipe 4 and the water storage cavity can help the angle steel enclosure 1 to dissipate heat, thereby achieving a cooling effect.
[0037] Furthermore, the U-shaped guide tube 4 located at the edge of the angle steel plate 101 and the edge of the mold frame 102 are extended with an extension tube 15, and the extension tube 15 is clamped in the water storage cavity. The extension tube 15 can ensure that the connection between the U-shaped guide tube 4 and the rubber bladder 103 is well sealed, and the clean water inside will not flow out when the rubber bladder 103 is deformed.
[0038] Furthermore, a docking plate 16 is installed on the edge of the other side of the mold frame 102, and a docking hole 17 is opened on the docking plate 16. The docking plate 16 can facilitate the fixed connection between adjacent angle steel enclosures 1, and the two contacting docking plates 16 can be fixedly connected by using bolts and nuts, thereby ensuring the stability of the four-sided structure during the pouring operation.
[0039] The above are only preferred embodiments of the present invention, which are only illustrative and not restrictive. Those skilled in the art understand that many changes, modifications, and even equivalences may be made to the present invention within the spirit and scope defined by the claims, but all of them will fall within the scope of protection of the present invention.
Claims
1. A concrete pouring formwork, characterized in that: The invention comprises four groups of angle steel panels (1), wherein the four groups of angle steel panels (1) are connected in sequence to form a casting cavity (2), wherein the angle steel panels (1) comprise an angle steel plate (101), two mold frames (102) and two rubber bladders (103), wherein the two mold frames (102) are respectively arranged at two ends of the angle steel plate (101), and a receiving groove (3) is provided at the front edge of the mold frame (102) and at the connection with the end of the angle steel plate (101), and the rubber bladder (103) is arranged in the receiving groove (3) and is respectively connected to the mold frame (102) and the angle steel plate (101) on both sides. 1) bonding connection, a water storage cavity is provided in the rubber bladder (103), a U-shaped flow guide pipe (4) is installed outside the angle steel plate (101) and the mold frame (102), the U-shaped flow guide pipe (4) is connected to the water storage cavity in the rubber bladder (103), a water pump (5) is installed at the bottom of the front side of the angle steel plate (101), the water pump (5) is connected to both ends of the U-shaped flow guide pipe (4) through pipelines, and a control valve (6) is installed on the U-shaped flow guide pipe (4) located at the top of the angle steel plate (101) and connected to the rubber bladder (103).
2. A concrete pouring formwork as claimed in claim 1, characterized in that: A connecting plate (7) is installed on one side of the mold frame (102), and connecting grooves (8) are provided in both ends of the angle steel plate (101), and the connecting plate (7) is clamped in the connecting grooves (8).
3. A concrete pouring formwork as claimed in claim 2, characterized in that: An expansion groove (9) is provided on the inner wall of the connection groove (8), and a limiting protrusion (10) is extended from the edge of the connection plate (7), and the limiting protrusion is clamped in the expansion groove (9).
4. A concrete pouring formwork as claimed in claim 3, characterized in that: A water treatment box (11) is also provided at the bottom of the front side of the angle steel plate (101), and the water treatment box (11) is connected to the U-shaped flow guide pipe (4) and one end of the water pump (5).
5. A concrete pouring formwork as claimed in claim 4, characterized in that: A mounting folding plate (12) is installed on the outside of the corner of the angle steel plate (101), and heating plates (13) are installed on both sides of the mounting folding plate (12), and the heating plates (13) are arranged on the outside of the water treatment box (11).
6. A concrete pouring formwork as claimed in claim 4, characterized in that: A heat dissipation fin plate (14) is installed at the bottom of the water treatment box (11).
7. A concrete pouring formwork as claimed in claim 1, characterized in that: The U-shaped flow guide pipe (4) portions located at the edge of the angle steel plate (101) and the edge of the mold frame (102) are both extended with extension pipes (15), and the extension pipes (15) are clamped in the water storage cavity.
8. A concrete pouring formwork as claimed in claim 1, characterized in that: A docking plate (16) is installed on the other side edge of the mold frame (102), and a docking hole (17) is provided on the docking plate (16).
Citation Information
Patent Citations
Formwork structure for pouring concrete column
CN116971599A
Concrete pouring formwork and concrete pouring method
CN116816072A
Pouring maintenance wall protection template structure
CN116856680A
Steel heatable mold special for concrete column and using method of steel heatable mold
CN117569573A
Recyclable air bag for formwork removal of pier column steel formwork
CN214033388U