Construction method for concealing distribution box body in masonry wall

By using booms, T-shaped fixtures and lifting installation equipment in construction, the distribution box box is accurately positioned and fixed, and the problem of difficult to accurately match the hole size is solved, and the rapid and accurate installation and efficient construction of the distribution box box box is achieved.

CN119852864APending Publication Date: 2025-04-18CHINA HUAYE GROUP
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202510028769.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-08
Publication Date
2025-04-18

AI Technical Summary

Technical Problem

During construction, the size of the reserved holes in the distribution box box is difficult to accurately match, resulting in too large or too small holes, affecting the integrity of the wall structure, load-bearing capacity and sealing of the box, and increasing construction costs and workload.

Method used

By making and installing booms and T-shaped fixtures, combined with lifting and mounting equipment, accurately positioning and fixing the distribution box box box, ensuring the accuracy of its height and position.

Benefits of technology

It realizes the rapid and accurate installation of the distribution box box, reduces construction processes, improves installation quality and efficiency, and reduces costs and labor consumption.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119852864A_ABST
    Figure CN119852864A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of building construction, in particular to a construction method for hiding a distribution box body in a masonry wall. According to the technical scheme, the method comprises the steps of 1, positioning and paying off, wherein the position and the installation height of a distribution box body are accurately positioned, the fixing position of an expansion bolt is marked, and a suspender is manufactured; the upper end of the suspender is fixed to a floor through expansion bolts, and the lower end of the suspender is lower than the bottom edge of the distribution box body; 3, manufacturing and installing a T-shaped fixing piece: after the T-shaped fixing piece is manufactured, sleeving the hanging rod with the T-shaped fixing piece, and fixing the distribution box body; and 4, installing the distribution box body. The built-in distribution box body in the masonry wall is installed in advance, wall masonry is completed at a time, the construction difficulty is reduced, the secondary construction procedure is avoided, the progress is fast, the quality is good, labor is saved, the cost is low, and the built-in distribution box is widely applicable to building construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction, and in particular to a construction method for a concealed distribution box body in a masonry wall. Background Art

[0002] In modern building electrical installation projects, the distribution box is the key hub for power distribution and control, and its installation quality directly affects the safety, stability and functionality of the entire building electrical system.

[0003] The usual practice is to set lintels and reserved holes when the wall is built, then conceal the distribution box body, and then perform secondary sealing around and on the back of the box body; during the construction process, the size of the reserved holes is usually estimated based on experience, and it is difficult to accurately match the actual size of the distribution box body. If the hole is too large, it will destroy the integrity of the wall structure and weaken the bearing capacity of the wall. At the same time, when repairing the holes later, the construction workload and material consumption will increase, and the repaired parts are prone to cracks, hollows and other quality problems; if the hole is too small, it is necessary to forcibly expand the hole or cut and grind the distribution box body, which will not only damage the anti-corrosion layer and appearance of the box body and reduce the service life of the box body, but also may affect the sealing of the box body, allowing dust, moisture, etc. to invade the box, accelerating the aging and damage of electrical components; and the prefabricated installation of lintels and secondary sealing of the box body has many processes, resulting in increased construction costs.

[0004] In order to avoid the above-mentioned quality problems and achieve cost reduction and efficiency improvement, measures need to be taken to install and fix the concealed switch box in the masonry wall in advance, and then the wall masonry is completed in one go to avoid secondary blocking of the box. Furthermore, this application proposes a construction method for pre-installing and fixing the concealed switch box in the masonry wall. Summary of the invention

[0005] The purpose of the present invention is to address the problems existing in the background technology and to propose a construction method for pre-installing and fixing a concealed distribution box body in a masonry wall.

[0006] The technical solution of the present invention is a construction method for concealed installation of a distribution box body in a masonry wall, the construction method comprising the following steps:

[0007] Step 1: Positioning and laying out: According to the design requirements of the drawings, accurately locate the position and installation height of the distribution box, lay out the lines on the concrete base above the floor, mark the fixing position of the expansion bolts, and make the length of the suspension rod according to the installation height of the distribution box to ensure that the height adjustment range meets the installation requirements;

[0008] Step 2: Production and installation of the suspension rod: The suspension rod is made of galvanized steel square tube. The length is determined according to the installation height of the distribution box. The upper end is fixed to the floor slab with expansion bolts, and the lower end is lower than the bottom edge of the distribution box.

[0009] Step 3: Production and installation of T-shaped fixings: T-shaped fixings are made of galvanized steel square tubes and welded to the connecting parts of the suspension rod. After the T-shaped fixings are completed, they are sleeved on the suspension rods and adjusted to the appropriate height in combination with the lifting and installation equipment. Tighten the height adjustment bolts. The height adjustment bolts are installed in two pieces, upper and lower, to facilitate the fixing of the distribution box body;

[0010] Step 4: Install the distribution box: Place the distribution box on the T-shaped fixings, and adjust the height adjustment bolts to make the two T-shaped fixings close to the upper and lower inner walls of the distribution box. After verifying that the installation height of the distribution box meets the requirements, tighten the top bolts;

[0011] The lifting and installation equipment specifically includes a front card plate located below the distribution box body for bearing and a side card plate pulled out and arranged inside the front card plate. A driving member for lifting and driving the side card plate is also arranged below the side card plate.

[0012] Optionally, the cross-sectional dimensions of the suspension rod and the T-shaped fixing piece are both 30*30 mm;

[0013] The boom sleeve connection portion is made of a 50*50mm galvanized steel square tube.

[0014] Optionally, the lifting and mounting equipment also includes a base plate placed in contact with the ground, and a plurality of groups of anti-slip bumps are provided at the bottom of the base plate to ensure the stability of its contact with the ground, and the base plate is made of Q460 steel.

[0015] Optionally, two groups of columns are fixedly connected to the top of the base plate, and the tops of the columns are sleeved with sleeve columns located outside the columns, and the top ends of the sleeve columns are welded to the bottom surface of the front clamping plate;

[0016] The front clamping plate is an "L"-shaped steel plate.

[0017] Optionally, a sliding cavity is formed on the inner wall of the horizontal plate of the front clamping plate, and a fixing block is welded and connected to the center line of the sliding cavity.

[0018] Optionally, multiple groups of springs are fixedly connected to both sides of the fixed block, and the other ends of the springs are welded to one end of the side clamping plate;

[0019] Among them, the cross-section of the sliding cavity located on one side of the fixed block is a "T"-shaped structure, and the side clamping plate is located on one end of the inner wall of the sliding cavity and is connected to a sliding strip plate that is slidably arranged with the inner wall thereof, so as to prevent the side clamping plate from detaching from the sliding cavity during pulling.

[0020] Optionally, the driving member further comprises a support rod rotatably connected to the side walls of the two groups of sleeve columns, the other end of the support rod is rotatably connected to a threaded sleeve, and the support rod is connected to the threaded sleeve and the sleeve column via a hinge block.

[0021] Optionally, a threaded rod is threadably arranged in the threaded sleeve, and one end of the two groups of threaded rods is connected to the same dual-axis motor.

[0022] Compared with the prior art, the present invention has the following beneficial technical effects:

[0023] The present invention realizes the advance installation of the concealed distribution box body in the masonry wall by manufacturing the connection components of the distribution box body, and then the wall masonry is completed at one time, with fewer processes, faster progress, better quality, less labor and lower cost. According to the improved construction method, not only can the installation of the distribution box body be completed quickly and accurately, but also it has the advantages of saving time and labor, reducing costs, increasing efficiency and ensuring quality.

[0024] Furthermore, the stable installation of the distribution box body is achieved by setting the lifting and installation equipment, wherein the two sides of the distribution box body are clamped by setting the side clamping plates, so as to achieve the clamping and fixing of distribution boxes of different sizes. The height of the distribution box body can be adjusted by setting the driving member, the sleeve column and the column, and the adjustment accuracy is high, so as to adapt to the lifting of distribution boxes of different heights, reduce the workload of manual hand-held work, and reduce the difficulty of construction;

[0025] In summary, the concealed distribution box body in the masonry wall proposed by the present invention is installed in advance, and the wall masonry is completed at one time, which reduces the construction difficulty and avoids the generation of secondary construction processes. It has fast progress, good quality, labor saving, low cost, and is suitable for a wide range of construction projects. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 A schematic diagram of the assembly structure of the distribution box body of the present invention is given;

[0027] Figure 2 This is a schematic diagram of the state after construction using the present invention;

[0028] Figure 3 A bottom-up structural diagram of the present invention after construction is provided;

[0029] Figure 4 for Figure 2 A rear view structural diagram of ;

[0030] Figure 5 This is a schematic diagram of the cross-sectional structure of the lifting and installation equipment.

[0031] Reference numerals:

[0032] 1. Concrete matrix;

[0033] 2. Floor slab;

[0034] 3. Suspension rod;

[0035] 4. Expansion bolts;

[0036] 5. T-shaped fixings;

[0037] 6. Suspension rod socket;

[0038] 7. Height adjustment bolt;

[0039] 8. Distribution box body;

[0040] 9. Tighten the bolts;

[0041] 10. Lifting and installation equipment; 101. Base plate; 102. Column; 103. Sleeve column; 104. Front clamp; 105. Side clamp; 106. Spring; 107. Driving part; 1071. Dual-axis motor; 1072. Threaded rod; 1073. Threaded sleeve; 1074. Support rod. DETAILED DESCRIPTION

[0042] The technical solution of the present disclosure will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present disclosure, rather than all of the embodiments.

[0043] The components of the embodiments of the present disclosure generally described and shown in the drawings herein may be arranged and designed in a variety of different configurations. Therefore, the following detailed description of the embodiments of the present disclosure provided in the drawings is not intended to limit the scope of the present disclosure claimed, but merely represents selected embodiments of the present disclosure.

[0044] Based on the embodiments in the present disclosure, all other embodiments obtained by ordinary technicians in the field without making any creative work shall fall within the scope of protection of the present disclosure.

[0045] In the description of the present disclosure, it should be noted that the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present disclosure and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present disclosure.

[0046] In the description of the present disclosure, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present disclosure can be understood according to specific circumstances.

[0047] Example

[0048] like Figure 1-Figure 4 As shown, the present invention proposes a construction method for concealed installation of a distribution box body in a masonry wall, and the construction method comprises the following steps:

[0049] Step 1: Positioning and laying out: According to the design requirements of the drawings, accurately locate the position and installation height of the distribution box body 8, lay out the lines on the concrete base 1 above the floor slab 2, mark the fixing position of the expansion bolt 4, and make the length of the suspension rod 3 according to the installation height of the distribution box body 8 to ensure that the height adjustment range meets the installation requirements;

[0050] Step 2: Production and installation of the suspension rod: The suspension rod 3 is made of galvanized steel square tube, the cross-sectional size is 30*30mm, the length is determined according to the installation height of the distribution box body 8, the upper end is fixed to the floor 2 with expansion bolts 4, and the lower end is lower than the bottom edge height of the distribution box body 8;

[0051] Step 3: Production and installation of T-shaped fixing part 5: T-shaped fixing part 5 is made of galvanized steel square tube, the cross-sectional size is 30*30mm, and it is welded to the connecting part of the suspension rod sleeve 6. The suspension rod sleeve 6 is made of 50*50mm galvanized steel square tube. After the T-shaped fixing part 5 is made, it is sleeved on the suspension rod 3. Figure 1 and Figure 5 As shown, the lifting installation device 10 is adjusted to a suitable height, and the height adjustment bolts 7 are tightened. The height adjustment bolts 7 are installed in two upper and lower positions to facilitate fixing the distribution box body 8;

[0052] Step 4: Install the distribution box body 8: Place the distribution box body 8 on the T-shaped fixing piece 5, and adjust the height adjustment bolt 7 so that the two T-shaped fixing pieces 5 are respectively close to the upper and lower inner walls of the distribution box body 8. After verifying that the installation height of the distribution box body 8 meets the requirements, tighten the top bolt 9;

[0053] The lifting and installation device 10 specifically includes a front card plate 104 located below the distribution box body 8 for bearing and a side card plate 105 drawn and arranged inside the front card plate 104. The front card plate 104 and the side card plate 105 are both "L"-shaped steel plates. A sliding cavity is provided on the inner wall of the horizontal plate of the front card plate 104. A fixed block is welded and connected at the center line of the sliding cavity. Multiple groups of springs 106 are fixedly connected on both sides of the fixed block. The other end of the spring 106 is welded to one end of the side card plate 105. The cross-section of the sliding cavity located on one side of the fixed block is a "T"-shaped structure, and one end of the side card plate 105 located on the inner wall of the sliding cavity is connected to a sliding strip plate slidably arranged with the inner wall thereof, so as to prevent the side card plate 105 from detaching from the sliding cavity during the pulling process.

[0054] Reference Figure 5 As shown, a driving member 107 for lifting and driving the side clamping plate 105 is also provided below the side clamping plate 105, and the driving member 107 also includes a support rod 1074 rotatably connected to the side walls of the two sets of sleeve columns 103, and the other end of the support rod 1074 is rotatably connected to a threaded sleeve 1073, and the support rod 1074 is connected to the threaded sleeve 1073 and the sleeve column 103 through a hinge block;

[0055] A threaded rod 1072 is also threadedly rotatably arranged in the threaded sleeve 1073, and one end of the two sets of threaded rods 1072 is connected to the same dual-axis motor 1071;

[0056] The lifting and installation equipment 10 also includes a base plate 101 placed in contact with the ground. A plurality of anti-slip bumps are arranged at the bottom of the base plate 101 to ensure the stability of its contact with the ground, and the base plate 101 is made of Q460 steel. Two groups of columns 102 are fixedly connected to the top of the base plate 101. The top of the column 102 is sleeved with a sleeve column 103 located outside it, and the top end of the sleeve column 103 is welded to the bottom surface of the front clamping plate 104.

[0057] In this embodiment, the installation position of the expansion bolt 4 is drawn at the bottom of the floor 2, and the installation position of the distribution box body 8 is calibrated. The hanger 3 and the floor 2 are pre-assembled through the expansion bolt 4, and the two sets of hanger sleeve parts 6 are sleeved on the outer ring of the hanger 3. After determining the upper installation position of the hanger 3, a height adjustment bolt 7 arranged on the top is rotated to achieve a fast connection between the upper hanger sleeve part 6 and the hanger 3, and the distribution box body 8 is lifted to a height in combination with the lifting installation equipment 10. Specifically, a dual-axis motor 1071 is used to drive the rotation to realize the rotation of the threaded rod 1072, and then the threaded sleeve 1073 is limited and guided on the support rod 1074 and the column 102 and the sleeve column 103. Under use, it can only move horizontally, so as to lift the sleeve column 103 connected to one end of the support rod 1074, and then lift the distribution box body 8, and move the distribution box body 8 and the lifting and installation equipment 10 as a whole close to the position of the suspension rod 3, so that the top inner wall of the distribution box body 8 is located above a T-shaped fixing piece 5, and at the same time, a T-shaped fixing piece 5 below is fixed at the height position of the outer circle of the suspension rod 3, and the two T-shaped fixing pieces 5 are combined to achieve contact with the upper and lower sides of the inner wall of the distribution box body 8 respectively, and at the same time, the tightening bolts 9 installed on the T-shaped fixing piece 5 are rotated to achieve tightening installation on the upper and lower sides of the distribution box body 8. After installation, the lifting and installation equipment 10 can be removed.

[0058] The above specific embodiment is only an optional embodiment of the present invention. Based on the technical solution of the present invention and the relevant inspiration of the above embodiment, those skilled in the art can make various alternative improvements and combinations to the above specific embodiment.

Claims

1. A construction method for concealed installation of a switch box in a masonry wall, characterized in that: The construction method comprises the following steps: Step 1: Positioning and laying out: According to the design requirements of the drawings, accurately locate the position and installation height of the distribution box body (8), lay out the lines on the concrete base (1) above the floor slab (2), mark the fixing position of the expansion bolt (4), and make the length of the suspension rod (3) according to the installation height of the distribution box body (8), ensuring that the height adjustment range meets the installation requirements; Step 2: Production and installation of the suspension rod: The suspension rod (3) is made of galvanized steel square tube, the length of which is determined according to the installation height of the distribution box body (8), the upper end is fixed to the floor slab (2) by expansion bolts (4), and the lower end is lower than the bottom edge height of the distribution box body (8); Step 3: Production and installation of the T-shaped fixing member (5): The T-shaped fixing member (5) is made of a galvanized steel square tube and welded to the connecting portion of the suspension rod sleeve (6). After the T-shaped fixing member (5) is produced, it is sleeved on the suspension rod (3), adjusted to a suitable height in combination with the lifting installation device (10), and the height adjustment bolt (7) is tightened. The height adjustment bolt (7) is installed in two upper and lower positions to facilitate fixing the distribution box body (8); Step 4: Installing the distribution box body (8): Place the distribution box body (8) on the T-shaped fixing piece (5), and adjust the height adjustment bolt (7) so that the two T-shaped fixing pieces (5) are respectively close to the upper and lower inner walls of the distribution box body (8). After verifying that the installation height of the distribution box body (8) meets the requirements, tighten the top bolt (9); The lifting and installation device (10) specifically includes a front card plate (104) located below the distribution box body (8) for bearing and a side card plate (105) drawn and arranged inside the front card plate (104), and a driving member (107) for lifting and driving the side card plate (105) is also arranged below the side card plate (105).

2. The construction method of a concealed switch box in a masonry wall according to claim 1, characterized in that: The cross-sectional dimensions of the suspension rod (3) and the T-shaped fixing member (5) are both 30*30 mm; The suspension rod sleeve portion (6) is made of a 50*50mm galvanized steel square tube.

3. The construction method of a concealed switch box in a masonry wall according to claim 1, characterized in that: The lifting and mounting device (10) further comprises a base plate (101) placed in contact with the ground, a plurality of groups of anti-skid protrusions are arranged at the bottom of the base plate (101) to ensure the stability of its contact with the ground, and the base plate (101) is made of Q460 steel.

4. The construction method of a concealed switch box in a masonry wall according to claim 3 is characterized in that: Two groups of columns (102) are fixedly connected to the top of the base plate (101), a sleeve column (103) located outside the top of the column (102) is sleeved, and the top end of the sleeve column (103) is welded to the bottom surface of the front clamping plate (104); The front clamping plate (104) is an "L"-shaped steel plate.

5. The construction method of a concealed switch box in a masonry wall according to claim 4, characterized in that: A sliding cavity is provided on the inner wall of the horizontal plate of the front clamping plate (104), and a fixing block is welded and connected at the center line of the sliding cavity.

6. The construction method of a concealed switch box in a masonry wall according to claim 5, characterized in that: Multiple groups of springs (106) are fixedly connected to both sides of the fixed block, and the other end of the spring (106) is welded to one end of the side clamping plate (105); The cross-section of the sliding cavity located on one side of the fixed block is a "T"-shaped structure, and one end of the side clamp (105) located on the inner wall of the sliding cavity is connected to a sliding strip plate slidably arranged with the inner wall thereof, so as to prevent the side clamp (105) from being separated from the sliding cavity during the pulling process.

7. The construction method of a concealed switch box in a masonry wall according to claim 4, characterized in that: The driving member (107) further comprises a support rod (1074) rotatably connected to the side walls of the two groups of sleeve columns (103); the other end of the support rod (1074) is rotatably connected to a threaded sleeve (1073); the support rod (1074) is connected to the threaded sleeve (1073) and the sleeve column (103) via a hinge block.

8. The construction method of a concealed switch box in a masonry wall according to claim 7, characterized in that: A threaded rod (1072) is also threadably arranged in the threaded sleeve (1073), and one end of the two groups of threaded rods (1072) is connected to the same dual-axis motor (1071).

Citation Information

Patent Citations

  • Method for one-stop concealed installation of distribution box in wall building after construction

    CN107171233A

  • Pre -buried water and electricity pipeline box positioner of wall body

    CN207283099U

  • Positioning device for fixing post-built wall pre-buried box body

    CN212671240U

  • Lifting device for mounting electromechanical equipment of constructional engineering

    CN214192421U