Cable laying and fixing system in offshore photovoltaic field

By designing a cable laying and fixing system in the offshore photovoltaic field including box-change support platform, cable climbing frame and operation and maintenance channels, the difficulty of cable fixing and transfer in the offshore photovoltaic field is solved, stable support and fixing of the cable is achieved, and the strength of the system is improved and maintenance is facilitated.

CN119852905APending Publication Date: 2025-04-18NORTHWEST ENGINEERING CORPORATION LIMITED
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510002220.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-02
Publication Date
2025-04-18

AI Technical Summary

Technical Problem

There are difficulties in fixing and connecting cables in offshore photovoltaic fields, especially the fixing and connecting cables on the sea surface, which requires a cable laying and fixing system suitable for the marine environment.

Method used

A cable laying and fixing system in the offshore photovoltaic field area is designed, including a box-change support platform, a first cable climbing frame, an operation and maintenance channel and a second cable climbing frame. These components extend vertically, spaced apart to support and fix cables, and are connected to the support platform and operation and maintenance channels by welding or other fixation.

Benefits of technology

The system enables stable cable routing and fixation, reducing the length of a single cable frame, increasing its strength and ease of installation and repair, while reducing the risk of cable damage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119852905A_ABST
    Figure CN119852905A_ABST
Patent Text Reader

Abstract

The invention relates to the field of photovoltaic technology, and provides a cable laying and fixing system in an offshore photovoltaic field, and the cable laying and fixing system in the offshore photovoltaic field comprises a box transformer substation supporting platform, a first cable climbing frame, an operation and maintenance channel, and a second cable climbing frame. The box-type transformer substation supporting platform is used for supporting the box-type transformer substation; the first cable climbing frame is fixed on the box transformer substation supporting platform, the first cable climbing frame extends in the vertical direction, and the first cable climbing frame is used for supporting a cable; the operation and maintenance channel is fixed on the net rack and forms a pedestrian channel; the second cable climbing frame is fixed on the operation and maintenance channel, the second cable climbing frame extends in the vertical direction, and the second cable climbing frame is used for supporting the cable; wherein the first cable climbing frame and the second cable climbing frame are arranged at an interval in the vertical direction. The cable laying and fixing system in the offshore photovoltaic field can facilitate cable fixation and maintenance.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to the field of photovoltaic technology, and in particular to a cable laying and fixing system in an offshore photovoltaic field. Background Art

[0002] In the relevant technology, when it comes to offshore power generation projects, how to achieve the fixed connection of cables is a relatively important task, especially the fixation of cables located above the sea surface is a relatively difficult task, and because the equipment needs to be connected by cables, it is necessary to ensure that the components are matched through appropriate structures.

[0003] It should be noted that the information disclosed in the above background technology section is only used to enhance the understanding of the background of the present disclosure, and therefore may include information that does not constitute the prior art known to ordinary technicians in the field. Summary of the invention

[0004] According to one aspect of the present disclosure, a cable laying and fixing system in an offshore photovoltaic field is provided, and the cable laying and fixing system in an offshore photovoltaic field comprises:

[0005] Box-type transformer support platform, used to support box-type transformer substation;

[0006] A first cable climbing frame is fixed on the box-type transformer supporting platform, the first cable climbing frame extends in a vertical direction, and the first cable climbing frame is used to support cables;

[0007] An operation and maintenance passage is fixed on the grid, and the operation and maintenance passage forms a pedestrian passage;

[0008] A second cable climbing frame is fixed on the operation and maintenance channel, the second cable climbing frame extends in a vertical direction, and the second cable climbing frame is used to support cables;

[0009] Wherein, the first cable climbing frame and the second cable climbing frame are arranged at intervals in the vertical direction.

[0010] In an exemplary embodiment of the present disclosure, in the vertical direction, the first cable climbing frame and the second cable climbing frame are spaced apart and distributed on the same straight line.

[0011] In an exemplary embodiment of the present disclosure, in the vertical direction, the spacing distance between the first cable climbing frame and the second cable climbing frame is S3, the size of the first cable climbing frame in the vertical direction is S1, and S3 / S1 is greater than or equal to 1 / 15 and less than or equal to 1 / 5.

[0012] In an exemplary embodiment of the present disclosure, a dimension of the first cable climbing frame in the vertical direction is S1, a dimension of the second cable climbing frame in the vertical direction is S2, and S1 / S2 is greater than or equal to 0.8 and less than or equal to 1.2.

[0013] In an exemplary embodiment of the present disclosure, the first cable climbing frame is welded to the box-type transformer supporting platform, and / or the second cable climbing frame is welded to the operation and maintenance channel.

[0014] In an exemplary embodiment of the present disclosure, the first cable climbing frame is fixed to a corner position of the box-type transformer supporting platform.

[0015] In an exemplary embodiment of the present disclosure, the box-type transformer supporting platform includes a first supporting bottom, and the first cable climbing frame is fixed on the first supporting bottom.

[0016] In an exemplary embodiment of the present disclosure, the operation and maintenance channel includes a second supporting bottom, and the second cable climbing frame is fixed on the second supporting bottom.

[0017] In an exemplary embodiment of the present disclosure, the cable laying and fixing system in the offshore photovoltaic field area further includes:

[0018] The pile foundation is fixed on the sea surface, and the pile foundation is used to support the box-type transformer supporting platform.

[0019] In an exemplary embodiment of the present disclosure, the first cable climbing frame includes a first main pole body, and the second cable climbing frame includes a second main pole body;

[0020] The first main rod body and the second main rod body both extend in a vertical direction, and the first main rod body and / or the second main rod body are hollow structures.

[0021] It is to be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the present disclosure. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] The accompanying drawings herein are incorporated into the specification and constitute a part of the specification, illustrate embodiments consistent with the present disclosure, and together with the specification are used to explain the principles of the present disclosure. Obviously, the accompanying drawings described below are only some embodiments of the present disclosure, and for ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without creative work.

[0023] Figure 1 This is a structural schematic diagram of an exemplary embodiment of the cable laying and fixing system in an offshore photovoltaic field disclosed in the present invention;

[0024] Figure 2 for Figure 1A side view of the cable laying and fixing system in the offshore photovoltaic field is shown;

[0025] Figure 3 It is a schematic structural diagram of a first cable climbing frame and a second cable climbing frame in an exemplary embodiment of the cable laying and fixing system in an offshore photovoltaic field disclosed in the present invention;

[0026] Figure 4 for Figure 3 Bottom view of the cable climber shown. DETAILED DESCRIPTION

[0027] Example embodiments will now be described more fully with reference to the accompanying drawings. However, example embodiments can be implemented in a variety of forms and should not be construed as limited to the examples set forth herein; rather, these embodiments are provided so that the present disclosure will be more comprehensive and complete and will fully convey the concepts of the example embodiments to those skilled in the art. The same reference numerals in the figures represent the same or similar structures, and thus their detailed description will be omitted.

[0028] The terms "a", "an", and "said" are used to indicate the presence of one or more elements / components / etc.; the terms "comprising" and "having" are used to indicate an open-ended inclusive meaning and mean that additional elements / components / etc. may be present in addition to the listed elements / components / etc.

[0029] In the description of the present disclosure, unless otherwise clearly specified and limited, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance; the term "plurality" refers to two or more; the term "and / or" includes any and all combinations of one or more associated listed items. In particular, reference to "the / the" object or "an" object is also intended to indicate one of a possible plurality of such objects.

[0030] Unless otherwise specified or explained, the terms "connection", "fixation", etc. should be understood in a broad sense. For example, "connection" can be a fixed connection, a detachable connection, an integral connection, an electrical connection, or a signal connection; "connection" can be a direct connection or an indirect connection through an intermediate medium. For those skilled in the art, the specific meanings of the above terms in this disclosure can be understood according to specific circumstances.

[0031] Further, in the description of the present disclosure, it should be understood that the directional words such as "upper", "lower", "inner", "outer" and the like described in the exemplary embodiments of the present disclosure are described at the angles shown in the accompanying drawings and should not be understood as limitations on the exemplary embodiments of the present disclosure. It should also be understood that, in the context, when it is mentioned that an element or feature is connected to one or more "upper", "lower", or "inner", "outer" of another element, it can not only be directly connected to the "upper", "lower", "inner", "outer" of another element or elements, but can also be indirectly connected to the "upper", "lower", "inner", "outer" of another element or elements through an intermediate element.

[0032] like Figure 1 , 2 As shown, Figure 1 This is a structural schematic diagram of an exemplary embodiment of the cable laying and fixing system in the offshore photovoltaic field disclosed in the present invention. Figure 2 for Figure 1 A side view of the cable laying and fixing system in an offshore photovoltaic field is shown.

[0033] The cable laying and fixing system in the offshore photovoltaic field area includes: a box-type transformer support platform 1, a first cable climbing frame 2, an operation and maintenance channel 3, and a second cable climbing frame. The box-type transformer support platform 1 is used to support the box-type transformer substation; the first cable climbing frame 2 is fixed on the box-type transformer support platform 1, the first cable climbing frame 2 extends in the vertical direction, and the first cable climbing frame 2 is used to support the cable; the operation and maintenance channel 3 is fixed on the grid, and the operation and maintenance channel 3 forms a pedestrian channel; the second cable climbing frame 4 is fixed on the operation and maintenance channel 3, the second cable climbing frame 4 extends in the vertical direction, and the second cable climbing frame 4 is used to support the cable; wherein, the first cable climbing frame 2 and the second cable climbing frame 4 are arranged at intervals in the vertical direction Y.

[0034] In the cable laying and fixing system in the offshore photovoltaic field provided by this exemplary embodiment, the cables on the operation and maintenance channel 3 can pass through the first cable climbing frame 2, the second cable climbing frame 4, and the box-type transformer support platform 1 in sequence, so as to be connected to the box-type substation. The first cable climbing frame 2 and the second cable climbing frame 4 can support and fix the cables, thereby achieving stable routing of the cables. At the same time, this exemplary embodiment fixes the first cable climbing frame 2 and the box-type transformer support platform 1, and fixes the second cable climbing frame 4 and the operation and maintenance channel 3. This setting can reduce the length of a single cable climbing frame, thereby increasing the strength of a single cable climbing frame, reducing the weight of a single cable climbing frame, and facilitating the installation and maintenance of a single cable climbing frame.

[0035] In this exemplary embodiment, Figure 1 , 2As shown, in the vertical direction Y, the first cable rack 2 and the second cable rack 4 are spaced apart on the same straight line. The cables fixed on the first cable rack 2 and the second cable rack 4 extend in the vertical direction. This arrangement can prevent the cables from turning laterally between the first cable rack 2 and the second cable rack 4, thereby reducing the probability of damage caused by horizontal and vertical bending of the cables.

[0036] In this exemplary embodiment, Figure 1 , 2 As shown, in the vertical direction Y, the spacing distance between the first cable climbing frame 2 and the second cable climbing frame 4 is S3, the size of the first cable climbing frame 2 in the vertical direction is S1, and S3 / S1 is greater than or equal to 1 / 15 and less than or equal to 1 / 5. S3 / S1 can be equal to 1 / 15, 2 / 15, 3 / 15, etc. If S3 / S1 is too large, S3 is too large, the cable hanging length is too long, and the cable is easily damaged. If S3 / S1 is too small, S3 is too small, the first cable climbing frame 2 and the second cable climbing frame 4 are prone to interference. This exemplary embodiment sets S3 / S1 to an appropriate size, which can not only avoid mutual interference between the first cable climbing frame 2 and the second cable climbing frame 4, but also reduce the risk of cable damage.

[0037] In this exemplary embodiment, Figure 1 , 2 As shown, the vertical dimension of the first cable climbing frame 2 is S1, and the vertical dimension of the second cable climbing frame 4 is S2, and S1 / S2 is greater than or equal to 0.8 and less than or equal to 1.2. For example, S1 / S2 can be equal to 0.8, 0.9, 1, 1.1, 1.2, etc. In this exemplary embodiment, the first cable climbing frame 2 and the second cable climbing frame 4 are set to be of similar lengths, which can prevent the length of one of the first cable climbing frame 2 and the second cable climbing frame 4 from being too long and the length of the other from being too short, thereby ensuring the strength of the first cable climbing frame 2 and the second cable climbing frame 4.

[0038] In this exemplary embodiment, Figure 1 , 2 As shown, the first cable climbing frame 2 can be welded to the box-type transformer support platform 1, and the second cable climbing frame 4 can be welded to the operation and maintenance channel 3. It should be understood that in other exemplary embodiments, the first cable climbing frame 2 and the box-type transformer support platform 1 can be fixedly connected in other ways, and the second cable climbing frame 4 and the operation and maintenance channel 3 can also be fixedly connected in other ways. For example, the first cable climbing frame 2 and the box-type transformer support platform 1 can be fixedly connected by bolts or the like, and the second cable climbing frame 4 and the operation and maintenance channel 3 can also be fixedly connected by bolts or the like.

[0039] In this exemplary embodiment, Figure 1 , 2As shown, the first cable climbing frame 2 is fixed to the corner position of the box-type transformer support platform 1. This arrangement can prevent the first cable climbing frame 2 from affecting the placement of the box-type transformer substation.

[0040] In this exemplary embodiment, Figure 1 , 2 As shown, the box-type transformer support platform 1 includes a first support bottom 11, and the first cable climbing frame 2 is fixed on the first support bottom 11. The first support bottom 11 has a relatively stable structure, and this arrangement can ensure the stability of the first cable climbing frame 2.

[0041] In this exemplary embodiment, Figure 1 , 2 As shown, the operation and maintenance channel 3 includes a second support bottom 32, and the second cable climbing frame 4 is fixed on the second support bottom 32. The second support bottom 32 has a relatively stable structure, and this arrangement can ensure the stability of the second cable climbing frame 4.

[0042] In this exemplary embodiment, Figure 1 , 2 As shown, the cable laying and fixing system in the offshore photovoltaic field area also includes: pile foundation 5, the pile foundation 5 is fixed on the sea surface, and the pile foundation 5 is used to support the box-type transformer support platform 1. There can be multiple pile foundations 5, for example, there can be 4 pile foundations 5, and the 4 pile foundations 5 are fixed at the four corners of the box-type transformer support platform 1.

[0043] In this exemplary embodiment, Figure 1 , 2 The first cable climbing frame 2 includes a first main rod body 21, and the second cable climbing frame 4 includes a second main rod body 42; the first main rod body 21 and the second main rod body 42 both extend in the vertical direction, and the first main rod body 21 and / or the second main rod body 42 are hollow structures. For example, the first main rod body 21 and / or the second main rod body 42 can be a hollow cylindrical structure. The first main rod body 21 and the second main rod body 42 of the hollow structure have a relatively small weight. This setting can not only meet the supporting function of the cable climbing frame for the cable, but also reduce the load of the cable laying and fixing system in the offshore photovoltaic field.

[0044] In this exemplary embodiment, Figure 1 , 2 The box-type transformer support platform 1 and the operation and maintenance channel 3 may be grid structures, and the box-type transformer support platform 1 and the operation and maintenance channel 3 may be composed of a plurality of reinforcing ribs cross-fixed. The first cable climbing frame 2, the second cable climbing frame 4, the box-type transformer support platform 1, and the operation and maintenance channel may be steel structures.

[0045] In this exemplary embodiment, Figure 1 , 2The operation and maintenance channel 3 may also include a side rail, the side rail may include a vertical support rib 31, and the vertical support rib 31 may include a first support rib 311 located above the second support bottom 32 and a second support rib 312 located below the second support bottom 32. The operation and maintenance channel 3 may also include a reinforcing bar 33, and the reinforcing bar 33 may be connected between the second support rib 312 and the second support bottom 32. The reinforcing bar 33, the second support bottom 32, and the second support rib 312 may form a triangular structure, and this arrangement may improve the strength of the operation and maintenance channel 3. Among them, the reinforcing bar 33 may be fixed to the midpoint of the second support bottom 32 in the width direction.

[0046] In this exemplary embodiment, Figure 3 , 4 As shown, Figure 3 This is a schematic structural diagram of a first cable climbing frame and a second cable climbing frame in an exemplary embodiment of a cable laying and fixing system in an offshore photovoltaic field disclosed in the present invention. Figure 4 for Figure 3 Bottom view of the cable climber shown.

[0047] The first cable climbing frame 2 may include: a first main pole body 21, a plurality of cable clamp groups 22, the first main pole body 21 extends in the vertical direction; the plurality of cable clamp groups 22 are spaced apart along the extension direction of the first main pole body 21; the cable clamp group 22 includes a plurality of cable clamps 6, the plurality of cable clamps 6 in the same cable clamp group 22 are fixed to the same position of the first main pole body 21 in its extension direction, and the plurality of cable clamps 6 in the same cable clamp group 22 are spaced apart in the circumferential direction of the first main pole body 21. Different cable clamps 6 in the same cable clamp group 22 can fix cables respectively, and this arrangement can increase the number of fixed cables on the first cable climbing frame 2. In addition, the cables in the plurality of cable clamps 6 in the same cable clamp group 22 will exert forces on the first main pole body 21 in different directions, and this arrangement can reduce the risk of the first main pole body 21 tipping over.

[0048] In this exemplary embodiment, Figure 3 , 4 As shown, the same cable clamp group 22 may include an even number of cable clamps 6, an even number of cable clamps 6 may form a plurality of cable clamp pairs, the same cable clamp pair may include two cable clamps, and the two cable clamps 6 in the same cable clamp pair may be symmetrically arranged around the central axis of the first main pole body 21. The cables in the centrally symmetrical cable clamps 6 may balance the center of gravity of the first cable climbing frame 2, so that the center of gravity of the first cable climbing frame 2 is located at the central axis position of the first main pole body 21 or near the central axis, thereby further reducing the risk of tipping over of the first main pole body 21.

[0049] In this exemplary embodiment, the cable clamp 6 includes: an extension rod 61, a first half clamp part 62, and a second half clamp part 63. The first end of the extension rod 61 is connected to the circumference of the first main rod body 21, and the extension direction of the extension rod 61 intersects with the extension direction of the first main rod body 21; the first half clamp part 62 is fixed to the second end of the extension rod 61; the second half clamp part 63 is detachably connected to the first half clamp part 62. The first half clamp part 62 and the second half clamp part 63 can be used to fix the cable, and the detachable connection of the first half clamp part 62 and the second half clamp part 63 can facilitate the disassembly and assembly of the cable. The first half clamp part 62 and the second half clamp part 63 are combined to form a fixed part, and the extension rod 61 can pull the distance between the fixed part and the first main rod body 21. Multiple groups of fixed parts in the same cable clamp group 22 can be distributed on a larger circumferential surface. This arrangement can facilitate the arrangement of more cable clamps 6 around the first main rod body 21.

[0050] In this exemplary embodiment, the first half clamp portion 62 includes: a first arc portion 621 and two first straight portions 622, the arc end surface of the first arc portion 621 is fixed to the second end of the extension rod 61; the two first straight portions 622 are connected to the opposite ends of the first arc portion 621; the second half clamp portion 63 includes: a second arc portion 631 and two second straight portions 632; the two second straight portions 632 are connected to the opposite ends of the second arc portion 631; the first arc portion 621 and the second arc portion 631 are spliced ​​to form an annular structure, a first straight portion 622 and a second straight portion 632 are arranged opposite to each other, another first straight portion 622 and another second straight portion 632 are arranged opposite to each other, and the two pairs of first straight portions 622 and second straight portions 632 arranged opposite to each other are detachably connected. The annular structure formed by splicing the first arc portion 621 and the second arc portion 631 can facilitate fixing of the cylindrical cable, and the first straight portion 622 and the second straight portion 632 can be detachably connected by means of bolts or the like.

[0051] The second cable climbing frame 4 may also include a second main rod body 41 and a plurality of cable clamp groups. The arrangement of the plurality of cable clamp groups in the second cable climbing frame may be the same as that of the first cable climbing frame.

[0052] Those skilled in the art will readily appreciate other embodiments of the present disclosure after considering the specification and practicing what is disclosed herein. This application is intended to cover any variations, uses, or adaptations of the present disclosure that follow the general principles of the present disclosure and include common knowledge or customary technical means in the art that are not disclosed in the present disclosure. The specification and embodiments are to be considered merely as exemplary, and the true scope and spirit of the present disclosure are indicated by the claims.

[0053] It should be understood that the present disclosure is not limited to the exact structures that have been described above and shown in the drawings, and that various modifications and changes may be made without departing from the scope thereof. The scope of the present disclosure is limited only by the appended claims.

Claims

1. A cable laying and fixing system in an offshore photovoltaic field, characterized in that: The cable laying and fixing system in the offshore photovoltaic field area includes: The box-type transformer support platform (1) is used to support the box-type transformer substation; A first cable climbing frame (2) is fixed on the box-type transformer supporting platform (1), the first cable climbing frame (2) extends in a vertical direction, and the first cable climbing frame (2) is used to support cables; An operation and maintenance passage (3) is fixed on the grid, and the operation and maintenance passage (3) forms a pedestrian passage; A second cable climbing frame (4) is fixed on the operation and maintenance channel (3), the second cable climbing frame (4) extends in a vertical direction, and the second cable climbing frame (4) is used to support cables; Wherein, the first cable climbing frame (2) and the second cable climbing frame (4) are arranged at intervals in the vertical direction.

2. The cable laying and fixing system in an offshore photovoltaic field according to claim 1 is characterized in that: In the vertical direction, the first cable climbing frame (2) and the second cable climbing frame (4) are spaced apart and arranged on the same straight line.

3. The cable laying and fixing system in the offshore photovoltaic field according to claim 2 is characterized in that: In the vertical direction, the spacing distance between the first cable climbing frame (2) and the second cable climbing frame (4) is S3, the size of the first cable climbing frame (2) in the vertical direction is S1, and S3 / S1 is greater than or equal to 1 / 15 and less than or equal to 1 / 5.

4. The cable laying and fixing system in an offshore photovoltaic field according to claim 2, characterized in that: The dimension of the first cable climbing frame (2) in the vertical direction is S1, the dimension of the second cable climbing frame (4) in the vertical direction is S2, and S1 / S2 is greater than or equal to 0.8 and less than or equal to 1.

2.

5. The cable laying and fixing system in an offshore photovoltaic field according to claim 1, characterized in that: The first cable climbing frame (2) is welded to the box-type transformer supporting platform (1), and / or the second cable climbing frame (4) is welded to the operation and maintenance channel (3).

6. The cable laying and fixing system in an offshore photovoltaic field according to claim 1, characterized in that: The first cable climbing frame (2) is fixed at a corner position of the box-type transformer supporting platform (1).

7. The cable laying and fixing system in an offshore photovoltaic field according to claim 1, characterized in that: The box-type transformer support platform (1) comprises a first support bottom (11), and the first cable climbing frame (2) is fixed on the first support bottom (11).

8. The cable laying and fixing system in an offshore photovoltaic field according to claim 1, characterized in that: The operation and maintenance channel (3) comprises a second supporting bottom (32), and the second cable climbing frame (4) is fixed on the second supporting bottom (32).

9. The cable laying and fixing system in an offshore photovoltaic field according to claim 1, characterized in that: The cable laying and fixing system in the offshore photovoltaic field area also includes: A pile foundation (5) is fixed on the sea surface, and the pile foundation (5) is used to support the box-type transformer supporting platform (1).

10. The cable laying and fixing system in an offshore photovoltaic field according to claim 1, characterized in that: The first cable climbing frame (2) comprises a first main rod body (21), and the second cable climbing frame (4) comprises a second main rod body (42); The first main rod body (21) and the second main rod body (42) both extend in a vertical direction, and the first main rod body (21) and / or the second main rod body (42) are hollow structures.