Electrical construction method free of on-site slot removing
By prefabricating electrical wall modules in prefabricated components factory and assembling and fixing them on the main structure of the building, the time-consuming, destructive and pollution problems of groove removal in traditional electrical construction are solved, efficient and safe electrical wiring is achieved, and the construction cycle is shortened.
Patent Information
- Application Number
- CN202510009008.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-03
- Publication Date
- 2025-04-22
- Estimated Expiration
- 2045-01-03
AI Technical Summary
In traditional buildings, electrical installation requires grooves and wiring in walls or floors, which leads to time-consuming and labor-intensive construction, low accuracy, and damage to the building structure, reduces structural safety performance, and poses environmental pollution and health threats.
Using the electrical construction method without site-free groove removal, the electrical wall module containing electrical pipeline components is prefabricated in the prefabricated component factory, and assembled and fixed on the main structure of the building according to the layout diagram to connect the preset wire pipes in the building to form a wiring channel.
Eliminate on-site trough removal steps, reduce damage to the building structure, improve construction safety and environmental protection effects, shorten the construction cycle, and ensure the firm installation of electrical wall modules and building structures.
Smart Images

Figure CN119860096A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building electromechanical assembly construction, and in particular to an electrical construction method without on-site grooving. Background Art
[0002] In traditional buildings, after the construction is completed, in order to hide the wires for electrical installation, it is usually necessary to cut grooves in the wall or floor slab for wiring. This process is not only time-consuming and labor-intensive, but also has low construction precision and is easy to damage the building structure, reducing the structural safety performance of the building. In addition, the on-site groove cutting work will generate a large amount of construction waste and dust, causing pollution to the environment and posing a threat to the physical and mental health of the workers. Therefore, an efficient and groove-free electrical construction method is urgently needed. Summary of the invention
[0003] In view of this, the present invention provides an electrical construction method that does not require on-site grooving to solve the problem of lack of an efficient and grooving-free electrical construction method.
[0004] The present invention provides an electrical construction method without on-site grooving, comprising the following steps:
[0005] Modeling is performed to determine the pipeline direction, and an electrical wall module layout diagram is drawn, wherein the electrical wall module layout diagram includes multiple electrical wall module design diagrams;
[0006] Prefabricated electrical wall modules: prefabricating a corresponding number of electrical wall modules in a prefabricated component factory according to the electrical wall module design drawing of the electrical wall module layout drawing, wherein the electrical wall modules are provided with electrical pipeline components;
[0007] Electrical wall module assembly: assembling a plurality of electrical wall modules according to the electrical wall module layout drawing and joining them to the wall panels of the main structure of the building, then fixing the electrical wall modules to the steel bars in the floor slab of the main structure of the building through fixing components, and connecting the wire pipes preset in the floor slab of the main structure of the building with the electrical pipeline components of the electrical wall modules;
[0008] The floor slab of the main structure of the building is cast.
[0009] The electrical construction method without on-site grooving according to the present invention has at least the following beneficial effects:
[0010] By prefabricating an electrical wall module containing an electrical pipeline component in a prefabricated component factory, and after assembling the electrical wall module according to the electrical wall module layout diagram and joining it to the wall panel column of the main structure of the building, the electrical pipeline component can be connected and combined with the preset wire pipe in the floor slab of the main structure of the building to form a wiring channel, thereby eliminating the construction step of on-site grooving. On the one hand, it reduces damage to the original building structure and improves construction safety. On the other hand, it greatly reduces construction waste generated during the construction process, reduces noise and dust generation, and is beneficial to environmental protection and the health of workers. On the third hand, because the electrical wall module is prefabricated in the prefabricated component factory, the main structure of the building can be constructed on the construction site while the electrical wall module is prefabricated, effectively shortening the overall construction period of the building. At the same time, the electrical wall module is joined to the wall panel columns of the main structure of the building, and the electrical wall module is fixedly connected to the steel bars in the floor slab of the main structure of the building through a fixing assembly, to ensure that during the process of pouring the floor slab of the main structure of the building, the electrical wall module does not move relative to the wall panel columns of the main structure of the building and the steel bars in the floor slab of the main structure of the building, thereby ensuring that the electrical wall module and the main structure of the building are securely installed to form the overall structure of the building.
[0011] In an optional embodiment, the fixing assembly includes an L-shaped steel bar; and fixing the electrical wall module to the steel bar in the floor slab of the main structure of the building by the fixing assembly includes the following steps:
[0012] Prefabricate a corresponding number of L-shaped steel bars;
[0013] A mounting hole is preset at one end of each electrical wall module that is relatively close to the floor slab of the main structure of the building;
[0014] The first part of the L-shaped steel bar is inserted into the installation hole and fixed by bonding, and the second part of the L-shaped steel bar is tied and fixed to the steel bars in the floor slab of the main structure of the building through steel bar tying wire.
[0015] In an optional embodiment, each of the electrical wall modules is provided with a mounting hole at four corners of one end of the floor slab close to the main structure of the building.
[0016] In an optional embodiment, before the first portion of the L-shaped steel bar is inserted into the mounting hole, cement slurry is applied to the outer surface of the first portion of the L-shaped steel bar.
[0017] In an optional embodiment, the electrical pipeline assembly includes a wiring base box and a wiring inner conduit, the wiring base box is arranged on one side of the electrical wall module along the thickness direction of the electrical wall module; the wiring inner conduit is arranged in the electrical wall module, and one end of the wiring inner conduit is connected to the wiring base box; the method of connecting the wire conduit preset in the floor slab of the main structure of the building with the electrical pipeline assembly of the electrical wall module into one body includes:
[0018] The wire conduit preset in the floor slab of the main structure of the building is embedded in the wiring inner conduit to communicate with the wiring bottom box.
[0019] In an optional embodiment, the junction box is removably filled with environmentally friendly EPE pearl cotton.
[0020] In an optional embodiment, two adjacent electrical wall modules are joined by cement mortar.
[0021] In an optional embodiment, the electrical wall module and the wall panel column of the main building structure are joined by cement mortar.
[0022] In an optional embodiment, before the electrical wall module is joined to the wall panel column of the main building structure, the electrical conduits preset in the wall panel column of the main building structure are connected to the electrical pipeline assembly of the electrical wall module as a whole.
[0023] In an optional embodiment, before the electrical conduits preset in the wall panel columns of the main building structure are connected to the electrical pipeline components of the electrical wall module as one, steel wires for subsequent threading are laid in the electrical conduits. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0025] Figure 1 It is a cross-sectional structural schematic diagram of the assembly of the electrical wall module and the floor slab in an embodiment of the present invention;
[0026] Figure 2 A schematic cross-sectional structure diagram of the assembly of the electrical wall module and the floor slab from another perspective in an embodiment of the present invention;
[0027] Figure 3 Schematic diagram of the top view of the electrical wall module in an embodiment of the present invention.
[0028] Description of reference numerals:
[0029] 100- electrical wall module, 110- mounting hole, 120- wiring base box, 130- wiring inner conduit, 200- floor slab, 210- wire conduit, 300- L-shaped steel bar, 310- first part, 320- second part. DETAILED DESCRIPTION
[0030] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.
[0031] In the description of this embodiment, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing this embodiment and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting this embodiment. In addition, the terms "first", "second", and "third" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.
[0032] In the description of this embodiment, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this embodiment can be understood according to specific circumstances.
[0033] Combine the following Figures 1 to 3 , describing an embodiment of the present invention.
[0034] According to an embodiment of the present invention, an electrical construction method without on-site grooving is provided, comprising the following steps:
[0035] The BIM and CAD technologies are used to integrate the floor electrical piping layout model and the building model to determine the pipeline direction, and the electrical wall module layout diagram is drawn, and the electrical wall module layout diagram includes multiple electrical wall module design diagrams;
[0036] Prefabricated electrical wall modules 100: Prefabricate a corresponding number of electrical wall modules 100 in a prefabricated component factory according to an electrical wall module design drawing of an electrical wall module layout drawing, wherein electrical pipeline components are arranged in the electrical wall modules 100;
[0037] Assembling the electrical wall module 100: assembling a plurality of the electrical wall modules 100 according to the electrical wall module layout diagram and joining them to the wallboard columns of the main structure of the building, then fixing the electrical wall module 100 to the steel bars in the floor slab 200 of the main structure of the building through a fixing assembly, and connecting the wire conduit 210 preset in the floor slab 200 of the main structure of the building with the electrical conduit assembly of the electrical wall module 100 into one;
[0038] The floor slab 200 of the main structure of the building is cast.
[0039] The electrical construction method of this embodiment is to prefabricate an electrical wall module 100 containing an electrical pipeline assembly in a prefabricated component factory, and after the electrical wall module 100 is assembled according to the electrical wall module layout and joined to the wall panel column of the main structure of the building, the electrical pipeline assembly can be connected and combined with the preset wire pipe 210 in the floor 200 of the main structure of the building to form a wiring channel, thereby eliminating the construction step of on-site grooving. On the first hand, it reduces damage to the original building structure and improves construction safety. On the second hand, it greatly reduces construction waste generated during the construction process, reduces noise and dust generation, and is beneficial to environmental protection and the health of workers. On the third hand, because the electrical wall module 100 is prefabricated in the prefabricated component factory, the main structure of the building can be constructed on the construction site while the electrical wall module 100 is prefabricated, effectively shortening the overall construction period of the building. At the same time, the electrical wall module 100 is joined to the wall panel columns of the main structure of the building, and the electrical wall module 100 is fixedly connected to the steel bars in the floor slab 200 of the main structure of the building through a fixing assembly, to ensure that during the process of casting the floor slab 200 of the main structure of the building, the electrical wall module 100 does not move relative to the wall panel columns of the main structure of the building and the steel bars in the floor slab 200 of the main structure of the building, thereby ensuring that the electrical wall module 100 and the main structure of the building are securely installed to form the overall structure of the building.
[0040] It should be noted that the electrical wall module 100 is completed in a prefabricated component factory, and quality control can be more stringent, which is beneficial to reducing construction errors compared to on-site construction.
[0041] In some embodiments, the fixing assembly includes an L-shaped steel bar 300; the fixing of the electrical wall module 100 to the steel bar in the floor slab 200 of the main structure of the building by the fixing assembly includes the following steps:
[0042] Prefabricate a corresponding number of L-shaped steel bars 300;
[0043] A mounting hole 110 is preset at one end of each of the electrical wall modules 100 that is relatively close to the floor slab 200 of the main structure of the building;
[0044] The first portion 310 of the L-shaped steel bar 300 is inserted into the mounting hole 110 and fixed by bonding, and the second portion 320 of the L-shaped steel bar 300 is tied and fixed to the steel bars of the floor slab 200 of the main structure of the building by steel bar tying wire.
[0045] The electrical construction method of this embodiment uses a plurality of L-shaped steel bars to fix each electrical wall module 100 to the steel bars in the floor slab 200 of the main structure of the building, which facilitates construction and ensures that the electrical wall module 100 and the main structure of the building are securely installed to form an integral building structure.
[0046] like Figure 3 As shown, specifically, each of the electrical wall modules 100 is preset with a mounting hole 110 at four corners of one end of the floor slab 200 of the main structure of the building. By fixing the four corners of the electrical wall module 100 with the steel bars in the floor slab 200 of the main structure of the building through an L-shaped steel bar 300, the installation reliability of the overall building structure formed by the electrical wall module 100 and the main structure of the building is improved.
[0047] Specifically, before the first portion 310 of the L-shaped steel bar 300 is inserted into the mounting hole 110, cement slurry is applied to the outer surface of the first portion 310 of the L-shaped steel bar 300; cement slurry has good bonding performance after solidification, and is a slurry commonly used at construction sites, saving construction costs. Of course, in other specific application environments, a special adhesive can also be used to bond and fix the first portion 310 of the L-shaped steel bar 300 into the corresponding mounting hole 110.
[0048] In some embodiments, the electrical pipeline assembly includes a wiring base box 120 and a wiring inner conduit 130, wherein the wiring base box 120 is disposed on one side of the electrical wall module 100 along the thickness direction of the electrical wall module 100; the wiring inner conduit 130 is disposed in the electrical wall module 100, and one end of the wiring inner conduit 130 is connected to the wiring base box 120; the method of connecting the wire tube 210 preset in the floor 200 of the main structure of the building with the electrical pipeline assembly of the electrical wall module 100 into one body includes:
[0049] The wire tube 210 preset in the floor 200 of the main structure of the building is embedded in the wiring inner conduit 130 to communicate with the wiring bottom box 120.
[0050] According to the electrical construction method of this embodiment, before pouring the floor 200 of the main structure of the building, the wire conduit 210 is preset in a cage surrounded by the steel bars constituting the floor 200, and the wire conduit 210 is embedded and connected with the wiring inner conduit 130 and connected with the wiring base box 120 to form a wiring channel. Under the fixed connection of the L-shaped steel bar 300, the electrical wall module 100 and the main structure of the building are firmly installed to form the overall structure of the building while ensuring the continuity of the wiring channel.
[0051] Specifically, the wiring base box 120 is removably filled with environmentally friendly EPE pearl cotton; when the wiring base box 120 has not been installed with electrical components such as switches, environmentally friendly EPE pearl cotton can be embedded in the wiring base box 120 for filling to avoid accumulation of impurities. When electrical components such as switches need to be installed, the environmentally friendly EPE pearl cotton can be taken out and transferred to fill another idle wiring base box 120 to achieve recycling.
[0052] Specifically, two adjacent electrical wall modules 100 are joined by cement mortar, so that the connection and installation between the two adjacent electrical wall modules 100 are reliable, and the joints between the two adjacent electrical wall modules 100 are sealed.
[0053] Specifically, the electrical wall module 100 and the wall panel columns of the main structure of the building are joined by cement mortar, so that the connection and installation between the electrical wall module 100 and the wall panel columns of the main structure of the building are reliable, which is conducive to improving the installation reliability of the overall building structure formed by the electrical wall module 100 and the main structure of the building.
[0054] In some embodiments, before the electrical wall module 100 is joined to the wallboard column of the main structure of the building, the electrical conduit preset in the wallboard column of the main structure of the building is connected to the electrical pipeline assembly of the electrical wall module 100. In this embodiment, the electrical conduit preset in the wallboard column of the main structure of the building, the electrical pipeline assembly of the electrical wall module 100 and the wire conduit 210 preset in the floor slab 200 of the main structure of the building are connected and combined to form a wiring channel, which saves the construction step of on-site grooving on the basis of meeting the overall electrical connection requirements of the building, reduces damage to the original building structure, and improves construction safety.
[0055] Specifically, before the electrical conduits preset in the wall panel columns of the main structure of the building are connected to the electrical pipeline components of the electrical wall module 100, steel wires for later threading are laid in the electrical conduits to ensure that the wall panel columns of the main structure of the building remain connected before joining the electrical wall module 100.
[0056] Specifically, after the construction of the entire main structure of the building is completed by pouring the floor slab 200, electrical equipment is installed and wires are connected, and a comprehensive electrical system test is performed to ensure the safety and reliability of the electrical system.
[0057] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the present invention.
Claims
1. An electrical construction method without on-site grooving, characterized in that: The following steps are involved: Modeling is performed to determine the pipeline direction, and an electrical wall module layout diagram is drawn, wherein the electrical wall module layout diagram includes multiple electrical wall module design diagrams; Prefabricated electrical wall modules (100): prefabricating a corresponding number of electrical wall modules (100) in a prefabricated component factory according to an electrical wall module design drawing of an electrical wall module layout drawing, wherein the electrical wall modules (100) are provided with electrical pipeline components; Assembling the electrical wall module (100): assembling a plurality of the electrical wall modules (100) according to the electrical wall module layout diagram and joining them to the wallboard columns of the main structure of the building, then fixing the electrical wall module (100) to the steel bars in the floor slab (200) of the main structure of the building through a fixing assembly, and connecting the electrical conduit (210) preset in the floor slab (200) of the main structure of the building to the electrical conduit assembly of the electrical wall module (100) as a whole; The floor slab (200) of the main structure of the building is cast.
2. The electrical construction method without on-site grooving according to claim 1 is characterized in that: The fixing assembly comprises an L-shaped steel bar (300); the fixing of the electrical wall module (100) to the steel bar in the floor slab (200) of the main structure of the building by the fixing assembly comprises the following steps: Prefabricate a corresponding number of L-shaped steel bars (300); A mounting hole (110) is preset at one end of each electrical wall module (100) that is relatively close to the floor slab (200) of the main structure of the building; The first portion (310) of the L-shaped steel bar (300) is inserted into the mounting hole (110) and bonded and fixed, and the second portion (320) of the L-shaped steel bar (300) is tied and fixed to the steel bars in the floor slab (200) of the main structure of the building through steel bar tying wire.
3. The electrical construction method without on-site grooving according to claim 2 is characterized in that: Each of the electrical wall modules (100) is provided with a mounting hole (110) at four corners of one end of the floor slab (200) that is relatively close to the main structure of the building.
4. The electrical construction method without on-site grooving according to claim 2 is characterized in that: Before the first portion (310) of the L-shaped steel bar (300) is inserted into the installation hole (110), cement slurry is applied to the outer surface of the first portion (310) of the L-shaped steel bar (300).
5. An electrical construction method without on-site grooving according to any one of claims 1 to 4, characterized in that: The electrical pipeline assembly comprises a wiring base box (120) and a wiring inner conduit (130), wherein the wiring base box (120) is arranged on one side of the electrical wall module (100) along the thickness direction of the electrical wall module (100); the wiring inner conduit (130) is arranged in the electrical wall module (100), and one end of the wiring inner conduit (130) is connected to the wiring base box (120); the method of connecting the wire conduit (210) preset in the floor slab (200) of the main structure of the building and the electrical pipeline assembly of the electrical wall module (100) into one body comprises: The wire conduit (210) preset in the floor slab (200) of the main structure of the building is embedded in the wiring inner conduit (130) to communicate with the wiring bottom box (120).
6. The electrical construction method without on-site grooving according to claim 5, characterized in that: The wiring bottom box (120) is removably filled with environmentally friendly EPE pearl cotton.
7. The electrical construction method without on-site grooving according to claim 1, characterized in that: Two adjacent electrical wall modules (100) are joined together by cement mortar.
8. The electrical construction method without on-site grooving according to claim 1, characterized in that: The electrical wall module (100) is joined to the wallboard column of the main building structure by cement mortar.
9. The electrical construction method without on-site grooving according to claim 1, characterized in that: Before the electrical wall module (100) is joined to the wallboard column of the main structure of the building, the electrical conduits preset in the wallboard column of the main structure of the building are connected to the electrical pipeline assembly of the electrical wall module (100) as a whole.
10. The electrical construction method without on-site grooving according to claim 9, characterized in that: Before the electrical conduit preset in the wallboard column of the main structure of the building is connected to the electrical pipeline assembly of the electrical wall module (100) as a whole, a steel wire for later threading is laid in the electrical conduit.
Citation Information
Patent Citations
Integrally-assembled cantilever-type retaining wall and construction method thereof
CN101787708A
Building light wall power distribution cabinet mounting structure and construction method
CN110593434A
Novel electromechanical spool prefabricating, mounting and connection construction method for prefabricated building
CN111119332A
Keyway-connected full-assembly integral building system and construction method
CN115162505A
Fabricated method for external wall panel synchronously constructed with main body structure
CN115162556A