By designing a flip-flop elevator shaft operating platform, using the combination of flip-flop and extended plates, the complex structure and safety hazards of the operating platform in the existing technology are solved, and safety and efficiency improvements are achieved during the construction process.
Patent Information
- Application Number
- CN202510068353.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-16
- Publication Date
- 2025-04-25
AI Technical Summary
In the existing elevator shaft construction technology, the operating platform structure is complex, poses safety hazards, and the material costs are high and not environmentally friendly, which affects the construction progress.
A flip-flop elevator shaft operation platform is designed to achieve flip-flop and cover the platform through the combination of flip-flop and extension plate. It can be used as a construction platform and as a protective fence, with a simple structure and high safety.
It has achieved safety and no hidden dangers during the construction process, saved materials, high construction efficiency, and no garbage accumulation, which affects the construction progress.
Smart Images

Figure CN119877826A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of elevator shaft construction, and in particular to a flap-type elevator shaft operating platform and a use method thereof. Background Art
[0002] At present, in the construction of residential structures, the elevator shaft operating platform mostly adopts a complex structure, including a movable lifting platform (such as CN204112696U), a pre-buried steel mesh structure for top plate construction, and a scaffolding structure. The lifting platform is highly efficient, but there are still safety hazards at the lower opening; the steel mesh is seriously labor-intensive and wasteful, and its high density is unsafe, while its low density is very easy to accumulate garbage and waste, affecting the construction progress; the scaffolding is only suitable for low-rise buildings, and the safety of the scaffolding is relatively low, which also poses safety hazards. Summary of the invention
[0003] In order to solve the above technical problems, the present invention provides a flap-type elevator shaft operating platform and a method of using the same. The operating platform can be flipped as needed and can be used as a construction platform or a protective enclosure. It has a simple structure and no safety hazards.
[0004] In the first aspect, the present invention provides a flap-type elevator shaft operating platform, wherein the elevator shaft is surrounded by shaft walls, and an installation hole for an elevator door is reserved on one side of the wall; the operating platform comprises a flap and an extension plate, a flap is hingedly placed vertically on the bottom plate at the installation hole, and two extension plates are hingedly arranged symmetrically on the outer side of the flap, and after the extension plate is opened in the elevator shaft, the outer edge of the extension plate is in contact with the inner wall of the shaft wall, and after the extension plate is opened on the floor slab, the extension plate is detachably connected to the wall outside the installation hole; a supporting structure is fixed to the inner wall of the shaft wall on the opposite side of the installation hole, and the supporting structure is used to overlap the upper edge of the flap.
[0005] The flap has a simple structure and fully covers the elevator shaft opening through the extension plate, eliminating safety hazards during operation. After the flap is pulled up, it acts as a protective door to prevent people from accidentally falling into the elevator shaft. One structure realizes two functions, saving materials and being safer.
[0006] Preferably, the supporting structure is a supporting plate, the fixed height of the supporting plate is the same as the height of the floor slab; or the supporting structure is a corbel, the upper surface height of the corbel is flush with the height of the floor slab, so as to ensure that the flap is in a horizontal state after being lowered.
[0007] Preferably, the extension plate is connected to the outer wall of the installation opening by a pin connection structure; preferably, a door pin structure is adopted, the pin hole ring is installed on the wall, the latch is installed on the extension plate, or the two are installed in reverse, so that the extension plate is fixedly connected to the wall after being pulled up to prevent accidental tipping over.
[0008] Preferably, a handle is provided on the extension plate for lowering or pulling up the flap; or a pull ring is provided on the upper end of the extension plate, and a rope is connected to the pull ring, through which the flap is lowered or pulled up.
[0009] In a second aspect, the present invention provides a method for using a flap-type elevator shaft operating platform, the steps of which are as follows: Stand on the support structure in the hoistway wall at the bottom of the elevator shaft to install the upper floor slab, hinge the flap of the upper floor slab at the installation hole, open the pin joint structure, and lower the flap by a handle or rope so that the upper edge of the flap overlaps the support structure; Lower the extension plate so that the outer edge of the extension plate fits with the inner wall of the hoistway wall to form an operating platform that fully covers the entire elevator shaft. Stand on the operating platform to perform operations on this floor and install the upper support structure; Repeat the above steps to complete the flap installation and other elevator shaft construction work layer by layer; When the flap needs to be retracted, first reset the extension plate to be perpendicular to the flap, pull up the flap with a rope or handle, and then pin the flap to temporarily fix it after resetting; After the elevator shaft construction work is completed, the flaps and supporting structures are removed from top to bottom, and the supporting structure of the upper layer is removed standing on the flap of the lower layer.
[0010] Compared with the prior art, the present invention has the following beneficial effects: (1) Installation and dismantling are convenient, fast and efficient during construction, saving a lot of labor; (2) Excellent safety performance. After the flap is fully opened, the well coverage area is 100%; (3) After closing the flap, it acts as a hole protection, saving materials and being safer; (4) When the flap is not in use, garbage will not accumulate in the well and the construction progress will not be affected. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 A schematic diagram of the structure of an embodiment provided by the present invention; Figure 2 A schematic structural diagram of another embodiment provided by the present invention; Figure 3 A usage status diagram of the operating platform provided by the present invention; Marked in the figure: 1. Shaft wall; 2. Support structure; 3. Flap; 4. Extension plate; 5. Door pin; 6. Damping hinge; 7. Invisible door stopper; 8. Rope; 9. Pull hole. DETAILED DESCRIPTION
[0012] In order to fully understand the purpose, features and effects of the present invention, the present invention is described in detail through the following specific implementation methods, but the present invention is not limited thereto.
[0013] like Figure 1 As shown, the present invention provides a flap-type elevator shaft operating platform, the elevator shaft is surrounded by a shaft wall 1, and an installation hole for an elevator door is reserved on one side of the wall; the operating platform includes a flap 3 and an extension plate 4, the flap 3 is hingedly placed vertically on the bottom plate at the installation hole, the outer side surface of the flap 3 is detachably connected to the wall outside the installation hole, and two symmetrically arranged extension plates 4 are hingedly connected to the outer side surface of the flap 3, and the outer edge of the extension plate 4 is close to the inner wall of the shaft wall 1 after opening; a support structure 2 is fixed to the inner wall of the shaft wall on the opposite side of the installation hole, and the support structure 2 is used to overlap the upper edge of the flap 3.
[0014] In order to ensure that the flap 3 is in a horizontal state after being lowered, the supporting structure 2 can be a supporting plate or a corbel. The supporting plate is horizontally fixed on the inner wall of the shaft wall opposite to the installation hole at the same height as the floor slab, and the top of the flap 3 is overlapped on the supporting plate 2; if it is a corbel, more than two corbels are horizontally evenly distributed on the inner wall of the shaft wall opposite to the installation hole to balance the force.
[0015] In some preferred embodiments, the flap 3 is connected to the extension plate 4 through a damping hinge 6, which ensures that the extension plate 4 will not rotate under the action of non-human external forces, thereby preventing the extension plate from rotating at will and causing safety hazards. The extension plate 4 is connected to the outer wall of the installation hole through a door pin 5 to achieve a detachable connection. The pin hole ring is installed on the outer wall of the wall on one side of the installation hole, and the latch is installed on one side of the outer surface of the extension plate, or the two can be installed in reverse. When the flap 3 is pulled up, the extension plate 4 is opened again, and the latch is inserted into the pin hole ring to temporarily fix the flap 3 to the wall to prevent accidental tipping over, thereby serving as a protective door for the hole. When the side edge of the extension plate 4 is closely adjacent to the floor wall and there is no space for installing the door pin, a magnetic invisible door stopper 7 is installed on the wall to prevent the extension plate 4 from swinging arbitrarily in the upright state.
[0016] like Figure 2 As shown, the extension plate 4 is also provided with a handle or a pull hole 9, and the construction worker holds the handle or the pull hole 9 to lower and pull up the flap. Figure 1 As shown, a pull ring is installed on the upper outer surface of the flap 3, and a rope 8 is connected to the pull ring, and the flap 3 is lowered or pulled up by the rope 8.
[0017] In actual application, the flap is mostly made of 4mm thick steel plate, the height of the flap is the same as the distance from the installation hole to the inner wall of the opposite side of the well wall, the extension plate is made of 2mm thick steel plate, the height of each extension plate is the same as the height of the flap, and each extension plate is connected to the flap through two damping hinges. The bottom of the flap is connected to the floor slab through a hinge.
[0018] The method of using the above-mentioned flap type elevator shaft operating platform is as follows: Stand on the support structure in the shaft wall of the elevator shaft at the bottom layer where the upper floor slab is installed, hinge the flap of the upper floor slab to the installation hole of this layer, open the pin connection structure, and lower the flap by a handle or rope so that the upper edge of the flap overlaps the support structure; Lower the extension plate so that the outer edge of the extension plate fits the inner wall of the shaft wall, forming an operating platform that fully covers the entire elevator shaft and can be used by construction workers to stand. Figure 3 As shown, standing on the operating platform, the operation on this layer and the installation of the upper support structure are performed; Repeat the above steps to complete the flap installation and other elevator shaft construction work layer by layer; When the flap needs to be retracted, first reset the extension plate to be perpendicular to the flap, pull up the flap with a rope or handle, and then pin the flap to temporarily fix it after resetting; After the elevator shaft construction work is completed, the flaps and supporting structures are removed from top to bottom, and the supporting structure of the upper layer is removed standing on the flap of the lower layer.
[0019] Finally, it should be noted that the above are only preferred embodiments of the present invention. Of course, those skilled in the art can make changes and modifications to the present invention. If these modifications and variations fall within the scope of the claims of the present invention and their equivalent technologies, they should be considered to be within the scope of protection of the present invention.
Claims
1. A flap-type elevator shaft operating platform, the elevator shaft is surrounded by a shaft wall, and a hole for installing an elevator door is reserved on one side of the wall; characterized in that: The operating platform includes a flap and an extension plate. A flap placed vertically is hinged on the bottom plate at the installation opening. Two symmetrically arranged extension plates are hinged on the outer side of the flap. After the extension plate is opened in the elevator shaft, the outer edge of the extension plate fits the inner wall of the shaft wall. After the extension plate is opened on the floor slab, the extension plate is detachably connected to the wall outside the installation opening. A supporting structure is fixed to the inner wall of the shaft wall on the opposite side of the installation opening, and the supporting structure is used to overlap the upper edge of the flap.
2. The flap-type elevator shaft operating platform according to claim 1, characterized in that: The supporting structure is a supporting plate, and the fixing height of the supporting plate is the same as the floor height.
3. The flap-type elevator shaft operating platform according to claim 1, characterized in that: The supporting structure is a corbel, and the upper surface height of the corbel is flush with the floor height.
4. The flap-type elevator shaft operating platform according to claim 1, characterized in that: The extension plate is connected to the outer wall of the installation opening through a pin connection structure.
5. The flap-type elevator shaft operating platform according to claim 1, characterized in that: A handle is provided on the extension plate for lowering or raising the flap; or A pull ring is provided at the upper end of the extension plate, and a rope is connected to the pull ring, and the flap is lowered or pulled up by the rope.
6. The method for using the flap-type elevator shaft operating platform according to any one of claims 1 to 5, characterized in that: Here are the steps: Stand on the support structure in the hoistway wall at the bottom of the elevator shaft to install the upper floor slab, hinge the flap of the upper floor slab at the installation hole, open the pin joint structure, and lower the flap by a handle or rope so that the upper edge of the flap overlaps the support structure; Lower the extension plate so that the outer edge of the extension plate fits with the inner wall of the hoistway wall to form an operating platform that fully covers the entire elevator shaft. Stand on the operating platform to perform operations on this floor and install the upper support structure; Repeat the above steps to complete the flap installation and other elevator shaft construction work layer by layer; When the flap needs to be retracted, first reset the extension plate to be perpendicular to the flap, pull up the flap with a rope or handle, and then pin the flap to temporarily fix it after resetting; After the elevator shaft construction work is completed, the flaps and supporting structures are removed from top to bottom, and the supporting structure of the upper layer is removed standing on the flap of the lower layer.
Citation Information
Patent Citations
Electric hoist elevator shaft platform for main building construction
CN204112696U