Finished hoop for erecting secondary structure construction formwork
By designing a finished product hoop for secondary structure construction, the problems of complexity and high cost of formwork fixation in the prior art are solved, and more efficient construction, more stable structure and lower costs are achieved.
Patent Information
- Application Number
- CN202510171870.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-17
- Publication Date
- 2025-04-25
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In secondary structure construction, the clamps set up by existing formwork have problems with small size but large quantity. The traditional screw fixing method is inconvenient and may cause damage to the masonry, which increases the construction complexity and cost.
A finished clamping hoop including an upper wing plate, an upper tube, a lower tube and a lower wing plate is designed to simplify the fixing process of the template by welding and threaded connection of bolts and nuts.
It improves construction efficiency, enhances structural stability, saves materials and costs, is highly adaptable, and is easy to install and maintain.
Smart Images

Figure CN119877838A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of construction engineering, and more specifically to a finished hoop for erecting a secondary structure construction template. Background Art
[0002] Secondary structure construction is usually carried out after the completion of the main structure, and the formwork needs to be carefully handled during installation and removal to avoid damage to the main structure. In addition, the size and shape of the formwork may need to be adjusted according to the specific structure, which increases the complexity and difficulty of construction. In secondary structure construction, the stability and safety of the formwork are crucial. The formwork must be able to withstand the lateral pressure during concrete pouring, prevent the formwork from deforming or collapsing, and ensure construction safety. This requires the formwork to be reasonably designed, firmly installed, and regularly inspected and maintained during construction. The formwork needs to be frequently disassembled and reinstalled. This requires the formwork to have high durability and easy maintenance characteristics to reduce construction time and cost.
[0003] In secondary structure construction, formwork erection needs to be coordinated with other construction processes. For example, formwork erection needs to be carried out after the water and electricity reserved positions are accurate to ensure the smooth progress of subsequent construction. This requires careful construction planning and coordination between various processes. In order to improve the formwork of secondary structure columns, lintels, etc., the existing clamps are small in size but large in number. The traditional use of screws is inconvenient and sometimes passes through the masonry partition wall, causing certain damage to the blocks. Summary of the invention
[0004] In view of the problems existing in the prior art, the purpose of the present invention is to provide a finished clamp for erecting a secondary structure construction formwork, which improves construction efficiency, enhances structural stability, and saves materials and costs.
[0005] The present invention adopts the following technical solution:
[0006] A finished clamp for secondary structure construction template erection, comprising an upper wing plate, an upper tube, a lower tube and a lower wing plate, wherein the upper wing plate is connected to the upper tube, the lower tube is connected to the lower wing plate, the lower tube is sleeved on the upper tube, the inner sides of the upper wing plate and the lower wing plate are parallel, the inner sides of the upper wing plate and the lower wing plate are both in contact with the template, a bolt support plate is installed at the end of the lower tube, a nut mounting plate is installed at the end of the upper tube facing the bolt support plate, a nut is installed in the middle of the nut mounting plate, the bolt passes through the bolt support plate, and the bolt is threadedly connected to the nut.
[0007] Furthermore, the upper wing plate and the upper tube are connected by welding, and the lower tube and the lower wing plate are connected by welding.
[0008] Furthermore, the upper wing plate and the lower wing plate are both grooved plates, the upper wing plate includes a bottom plate and vertical plates located on both sides of the bottom plate, and the projections of the upper wing plate and the lower wing plate toward the bottom plate are both right-angled trapezoids.
[0009] Furthermore, the vertical plates of the upper wing plate and the lower wing plate face in opposite directions.
[0010] Furthermore, a plurality of finished clamps are vertically distributed up and down.
[0011] Beneficial Effects
[0012] The present invention can not only improve construction efficiency and enhance structural stability, but also save materials and costs, has strong adaptability and is easy to install and maintain. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 This is a front view of an embodiment of the present invention;
[0014] Figure 2 A top view of an embodiment of the present invention;
[0015] Figure 3 It is a partial schematic diagram of an embodiment of the present invention;
[0016] Figure 4 This is a schematic diagram of an application of an embodiment of the present invention. DETAILED DESCRIPTION
[0017] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0018] As shown in the figure, the present invention discloses a finished clamp for secondary structure construction template erection, including an upper wing plate 1, an upper tube 2, a lower tube 3 and a lower wing plate 4, the upper wing plate 1 is connected to the upper tube 2, the lower tube 3 is connected to the lower wing plate 4, the lower tube 3 is sleeved on the upper tube 2, the inner sides of the upper wing plate 1 and the lower wing plate 4 are parallel, the inner sides of the upper wing plate 1 and the lower wing plate 4 are in contact with the template 5, the end of the lower tube 3 is installed with a bolt support plate 6, the upper tube 2 is installed with a nut mounting plate 7 toward the end of the bolt support plate 6, the middle of the nut mounting plate 7 is installed with a nut 8, the bolt 9 passes through the bolt support plate 6, and the bolt 9 is threadedly connected with the nut 8. The design of the finished clamp makes the template 5 easier and faster in the erection process, reducing construction time and labor costs. Traditional construction methods require a lot of manpower and material resources, while the use of finished clamps can greatly reduce construction time and labor costs through mechanized means, thereby improving construction efficiency.
[0019] Tighten the bolts 9 so that the upper tube 2 and the lower tube 3 move toward each other, the distance between the upper wing plate 1 and the lower wing plate 4 gradually decreases, and finally the template 5 is clamped.
[0020] In one embodiment of the present invention, the upper wing plate 1 and the upper tube 2 are connected by welding, and the lower tube 3 and the lower wing plate 4 are connected by welding.
[0021] In one embodiment of the present invention, the upper wing plate 1 and the lower wing plate 4 are both grooved plates, the upper wing plate 1 includes a bottom plate 11 and vertical plates 12 located on both sides of the bottom plate, and the projections of the upper wing plate 1 and the lower wing plate 4 toward the bottom plate 11 are both right-angled trapezoids. The present invention utilizes the two bottom plates 11 of the upper wing plate 1 and the lower wing plate 4 to clamp the template 5.
[0022] In one embodiment of the present invention, the vertical plates 12 of the upper wing plate 1 and the lower wing plate 4 face in opposite directions.
[0023] In one embodiment of the present invention, a plurality of finished clamps are vertically distributed up and down.
[0024] The present invention enhances structural stability: the finished clamp is not easily deformed by clamping the formwork, thereby increasing the stability and load-bearing capacity of the formwork and reducing potential safety hazards during the construction process.
[0025] The present invention saves materials and costs. Compared with the traditional welding and screw fixing methods, the fixing method of the finished clamp is simpler and more flexible, reducing the use of materials and construction costs. In addition, the design of the finished clamp also makes the construction of the bracket more material-saving, further reducing the construction cost.
[0026] The invention has strong adaptability, and the finished clamp can be adjusted according to different needs and is suitable for lintels and structural columns of different sizes. This flexibility enables it to play a good effect in different construction environments.
[0027] The invention is easy to install and maintain. The design of the finished clamp makes the installation and maintenance of the equipment more convenient. During the installation process, the construction personnel can quickly and accurately fix the equipment, thereby improving work efficiency. In the later maintenance, the detachability of the clamp also makes the inspection and replacement of the equipment more convenient.
[0028] The above is only a preferred specific implementation of the present invention; however, the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solution and its improved conception within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A finished clamp for secondary structure construction template erection, characterized in that: It includes an upper wing plate, an upper tube, a lower tube and a lower wing plate. The upper wing plate is connected to the upper tube, the lower tube is connected to the lower wing plate, the lower tube is sleeved on the upper tube, the inner sides of the upper wing plate and the lower wing plate are parallel, the inner sides of the upper wing plate and the lower wing plate are both in contact with the template, a bolt support plate is installed at the end of the lower tube, a nut mounting plate is installed at the end of the upper tube facing the bolt support plate, a nut is installed in the middle of the nut mounting plate, the bolt passes through the bolt support plate, and the bolt is threadedly connected to the nut.
2. The finished clamp for secondary structure construction template erection according to claim 1 is characterized by: The upper wing plate and the upper tube are connected by welding, and the lower tube and the lower wing plate are connected by welding.
3. The finished clamp for secondary structure construction template erection according to claim 1 is characterized by: The upper wing plate and the lower wing plate are both grooved plates. The upper wing plate comprises a bottom plate and vertical plates located at both sides of the bottom plate. The projections of the upper wing plate and the lower wing plate toward the bottom plate are both right-angled trapezoids.
4. The finished clamp for secondary structure construction template erection according to claim 3 is characterized by: The vertical plates of the upper wing plate and the lower wing plate face in opposite directions.
5. The finished clamp for secondary structure construction template erection according to claim 1 is characterized by: Multiple finished hoops are distributed vertically up and down.
Citation Information
Patent Citations
ferrule.
CH194381A
Tool type template
CN203462752U
Large-section frame beam reinforcing device
CN221321755U
Adjustable formwork frame for holding the formwork together for the production of prismatic concrete structures
DE1559101A1
improvements to clamping devices for masonry formwork and the like
FR1178923A