Reinforcing device for cantilever constructional engineering
By using adjustable cable and rod components in the cantilever structure, the problem of difficulty in achieving adjustability and aesthetics in the cantilever structure reinforcement in the prior art is solved, and a high-precision, aesthetic and stable cantilever structure reinforcement effect is achieved.
Patent Information
- Application Number
- CN202510387217.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-31
- Publication Date
- 2025-04-25
- Estimated Expiration
- 2045-03-31
AI Technical Summary
The existing cantilever structure reinforcement methods are difficult to achieve coordinated deformation of the adjustability of the construction stage and the use stage, and the reinforcement effect of complex shape cantilever structures is poor, affecting the construction accuracy and aesthetics.
Flexible adjustable cable adjustment components and rod adjustment components are adopted. Through the cooperation of sliders and slide chutes, the positions of the rotating connecting blocks and support rods are adjusted to form a stable cable structure, adapt to cantilever platforms of different shapes, and share the load by lifting the cables to ensure space integrity.
The adjustability and coordinated deformation of the cantilever structure are achieved, the construction accuracy and aesthetics are improved, and the stability and earthquake resistance of the structure are enhanced.
Smart Images

Figure CN119877892A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of construction engineering, and specifically refers to a reinforcement device for cantilever construction engineering. Background Art
[0002] Cantilever design is very common in architectural and structural design. It extends part of the structure into the air, without relying on the support below, and only bears the load through the cantilever structure. This design technique not only creates a unique architectural form and spatial effect, but also puts forward higher requirements on structural design and construction technology. In the actual construction process, it is necessary to pay attention to the reinforcement of the cantilever structure.
[0003] Existing cantilever structure reinforcement methods mainly include bonded steel reinforcement, carbon fiber reinforcement and reinforcement by adding additional components, among which the method of adding additional components is more common, such as adding reinforced concrete columns or diagonal braces at the ends of cantilever structures. However, the reinforced concrete columns and diagonal braces together with the cantilever platform constitute a rigid structure, which makes it difficult to achieve adjustability in the construction phase and coordinated deformation in the use phase. At the same time, when reinforcing cantilever structures with complex shapes, the adaptability of standardized components to special-shaped structural surfaces is poor, resulting in difficulty in controlling construction accuracy. Existing cantilever structure reinforcement can also be achieved by setting cables above the cantilever structure to share the load at the ends of the cantilever structure. However, the cables set above the cantilever structure occupy the space above the cantilever structure, affecting the aesthetics of the cantilever structure.
[0004] Therefore, a reinforcement device for cantilever building engineering is proposed to solve the problems existing in the existing cantilever structure reinforcement method. Summary of the invention
[0005] In order to solve the above-mentioned existing problems, the present invention provides a reinforcement device for cantilever construction engineering, wherein a flexibly adjustable steel cable adjustment component and a rod adjustment component are fixedly arranged on the supporting pier, and the first sliding block and the second sliding block are flexibly slid in the first sliding groove and the second sliding groove respectively to adjust the multiple rotating connecting blocks and the support rod to open or close, thereby changing the positions of the inclined steel cable and the support rod to adapt to cantilever platforms of different shapes, and the inclined steel cable is connected to the end of the support rod to form a stable cable structure; the construction personnel evenly fix the lower suspension rod at the end of the lower wall of the cantilever platform according to the shape of the cantilever platform, and connect the support rod with the lower suspension rod by pulling the steel cable, and the pulling steel cable generates an upward pulling force on the lower suspension rod, so that the lower suspension rod applies an upward force to the end of the cantilever platform, thereby effectively sharing the load at the end of the cantilever platform, and at the same time ensuring the integrity of the space above the cantilever platform, avoiding the space being occupied and affecting the appearance due to the cable structure being set above the cantilever platform.
[0006] The technical solution adopted by the present invention is as follows: a reinforcement device for cantilevered construction engineering, comprising original terrain, a cantilevered road surface is provided at the edge of the original terrain, a cantilevered platform is cantilevered at the edge of the cantilevered road surface away from the original terrain, a supporting pier is provided below the cantilevered platform, a cantilevered reinforcement component is connected between the side wall of the supporting pier and the lower wall of the cantilevered platform, the cantilevered reinforcement component comprises a steel cable adjustment component, a rod adjustment component and a lower suspension rod, the steel cable adjustment component is fixedly arranged at the upper end of the side wall of the supporting pier, the rod adjustment component is arranged below the steel cable adjustment component, the rod adjustment component is fixedly arranged at the side wall of the supporting pier, the lower suspension rod is annularly arranged The row is fixed on the edge of one end of the lower wall of the cantilever platform away from the supporting pier, and the steel cable adjustment assembly includes a first connecting plate, a first supporting block, a first slider, a rotating connecting block, an oblique pull roller and an oblique pull steel cable. The first connecting plate is fixed on the side wall of the supporting pier, the first supporting block is fixed on the side wall of the first connecting plate, the first slider ring array is movably arranged on the side wall of the first supporting block, the end of the rotating connecting block is rotatably arranged on the side wall of the first slider, the rotating connecting block pitches and rotates relative to the first slider, the oblique pull roller is rotatably arranged on the end of the rotating connecting block away from the first slider, and one end of the oblique pull steel cable is wound around the side wall of the oblique pull roller.
[0007] Furthermore, the rod adjustment assembly includes a second connecting plate, a second supporting block, a second sliding block and a supporting rod, the second connecting plate is fixedly provided on the side wall of the supporting pier, the second connecting plate is arranged below the first connecting plate, the second supporting block is fixedly provided on the side wall of the second connecting plate, the second sliding block is movably provided in a ring array on the side wall of the second supporting block, the end of the supporting rod is rotatably provided on the side wall of the second sliding block, the supporting rod pitches and rotates relative to the second sliding block, the end of the supporting rod away from the second sliding block is fixedly provided with an upper connecting shaft, the other end of the inclined steel cable is connected to the upper connecting shaft, the lower end of the lower suspension rod is fixedly provided with a lower connecting shaft, the lower connecting shaft is arranged below the upper connecting shaft, and a lifting steel cable is connected between the lower connecting shaft and the upper connecting shaft.
[0008] Furthermore, the first support block and the second support block are semi-cylinders, the side walls of the first support block and the second support block are respectively provided with a first slide groove and a second slide groove, and the first sliding block and the second sliding block are respectively slidably arranged in the first slide groove and the second slide groove.
[0009] Furthermore, the upper and lower end surfaces of the first support block are symmetrically provided with first adjustment slits, the first adjustment slit is connected with the first slide groove, the upper and lower ends of the first sliding block are symmetrically fixed with first sliding screws, the first sliding screw passes through the first adjustment slit, a first fixing nut is sleeved on the first sliding screw, the first fixing nut is threadedly connected with the first sliding screw, and the first fixing nut is movably contacted with the upper and lower end surfaces of the first support block.
[0010] Furthermore, the upper and lower end surfaces of the second support block are symmetrically provided with second adjustment slits, the second adjustment slits are connected with the second slide groove, the upper and lower ends of the second sliding slider are symmetrically fixed with second sliding screws, the second sliding screw is arranged to penetrate the second adjustment slit, a second fixing nut is sleeved on the second sliding screw, the second fixing nut is threadedly connected with the second sliding screw, and the second fixing nut is movably contacted with the upper and lower end surfaces of the second support block.
[0011] Furthermore, an adjusting worm wheel is coaxially fixed to the center of the end face of the oblique winding roller, an adjusting worm is rotatably provided below the adjusting worm wheel, the adjusting worm is rotatably connected to the side wall of the rotating connecting block, and a twisting handle is coaxially fixed to the end of the adjusting worm.
[0012] Furthermore, an upper adjusting groove is provided on the side wall of the upper connecting shaft, and a lower adjusting groove is provided on the side wall of the lower connecting shaft. A first adjusting block and a second adjusting block are provided in the upper adjusting groove for sliding cooperation. The end of the inclined steel cable is connected to the side wall of the first adjusting block, and a third adjusting block is provided in the lower adjusting groove for sliding cooperation. An upper clamping groove is symmetrically provided on the inner side wall of the upper adjusting groove, and a lower clamping groove is symmetrically provided on the inner side wall of the lower adjusting groove. Clamping blocks are symmetrically provided on the side walls at both ends of the first adjusting block, the second adjusting block and the third adjusting block, and the clamping blocks are respectively slidably provided in the upper clamping groove and the lower clamping groove.
[0013] Furthermore, the side wall array of the first connecting plate away from the first support block is provided with a first anchor bar, and the side wall array of the second connecting plate away from the second support block is provided with a second anchor bar, and the first anchor bar and the second anchor bar are respectively tied to the internal steel bars of the supporting pier.
[0014] Furthermore, a third connecting plate is fixedly provided at the upper end of the lower suspension rod, and the third connecting plate is arranged at the lower wall edge of the cantilever platform. The upper wall array of the third connecting plate is provided with a third anchor bar, and the third anchor bar is tied to the internal steel bars of the cantilever platform.
[0015] Furthermore, the inclined steel cables and the pulling steel cables are epoxy-coated high-strength steel wire cables.
[0016] Compared with the prior art, the present invention has the following beneficial effects: (1) A flexibly adjustable steel cable adjustment assembly and a rod adjustment assembly are fixedly arranged on the supporting pier, and the first slider and the second slider are flexibly slid in the first slide groove and the second slide groove respectively to adjust the opening or closing of the plurality of rotating connecting blocks and the supporting rod, thereby changing the positions of the inclined steel cables and the supporting rods to adapt to cantilever platforms of different shapes. The inclined steel cables are connected to the ends of the supporting rods to form a stable cable structure; (2) According to the shape of the cantilever platform, the construction workers evenly fixedly set the lower suspension rod at the end of the lower wall of the cantilever platform, and connected the support rod to the lower suspension rod through the lifting steel cable. The support rod is under pressure under the pull of the inclined steel cable and the lifting steel cable. The lifting steel cable exerts an upward pulling force on the lower suspension rod, so that the lower suspension rod exerts an upward force on the end of the cantilever platform, thereby effectively sharing the load at the end of the cantilever platform and ensuring the integrity of the space above the cantilever platform. Avoid the cable structure being set above the cantilever platform, which will cause the space to be occupied and affect the appearance. (3) Construction workers can rotate the adjusting worm by turning the twisting handle, and the adjusting worm drives the adjusting worm wheel to rotate, and the adjusting worm wheel drives the inclined winding roller to rotate, so that the inclined steel cable is reeled back onto the inclined winding roller or released from the inclined winding roller, and the length of the inclined steel cable between the inclined winding roller and the upper connecting shaft changes. When the inclined steel cable is reeled back onto the inclined winding roller, the upper connecting shaft moves upward under the tension of the inclined steel cable, and the support rod pitches upward. The upper connecting shaft pulls the lower connecting shaft upward through the lifting steel cable, so that the lower suspension rod drives the end of the cantilever platform to deflect upward, further improving the bending deformation problem caused by the deadweight of the end of the cantilever platform and increasing the stability of the structure. The reeling amount of the inclined steel cable can be adjusted according to actual conditions to meet the construction requirements of different cantilever structures, and realize the adjustability in the construction stage and the coordinated deformation in the use stage. At the same time, by setting the inclined steel cable and the lifting steel cable, the cantilever reinforcement component forms a flexible structure, which has stronger earthquake resistance and environmental adaptability than the traditional rigid structure. (4) The first adjustment block and the second adjustment block can slide in the upper adjustment groove, and the third adjustment block can slide in the lower adjustment groove. When the inclined steel cable pulls the upper connecting shaft, the first adjustment block, the second adjustment block and the third adjustment block can adaptively slide in the upper adjustment groove and the lower adjustment groove respectively according to the change of the relative positions of the upper connecting shaft and the lower connecting shaft, so that the force of the inclined steel cable and the pulling steel cable is more reasonable. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a schematic diagram of the structure of a reinforcement device for cantilevered building engineering proposed by the present invention in use; Figure 2 It is a schematic diagram of the first structure of the cantilever reinforcement component; Figure 3 It is a cross-sectional view of the cantilever reinforcement component; Figure 4 is a second structural schematic diagram of the cantilever reinforcement component; Figure 5 It is a structural schematic diagram of a steel cable adjustment assembly and a rod adjustment assembly; Figure 6 It is a schematic diagram of the exploded structure of the steel cable adjustment assembly and the rod adjustment assembly; Figure 7It is a schematic diagram of the connection structure of the upper connecting shaft, the pulling steel cable and the lower connecting shaft; Figure 8 It is a schematic diagram of the exploded structure of the first adjusting block, the second adjusting block, the upper adjusting slot, the upper clamping slot, the third adjusting block, the lower adjusting slot and the lower clamping slot.
[0018] Among them, 1. original terrain, 2. cantilevered road surface, 3. cantilevered platform, 4. supporting pier, 5. cantilevered reinforcement assembly, 6. cable adjustment assembly, 7. first connecting plate, 8. first anchor bar, 9. first supporting block, 10. first slide groove, 11. first adjustment gap, 12. first slider, 13. first sliding screw, 14. first fixing nut, 15. rotating connecting block, 16. inclined winding roller, 17. adjusting worm gear, 18. adjusting worm, 19. inclined cable, 20. rod adjustment assembly, 21. second connecting plate, 22. second anchor Rebar, 23. Second support block, 24. Second slide groove, 25. Second adjustment gap, 26. Second slider, 27. Second sliding screw, 28. Second fixing nut, 29. Support rod, 30. Upper connecting shaft, 31. Upper adjustment groove, 32. Upper clamping groove, 33. First adjustment block, 34. Second adjustment block, 35. Clamping block, 36. Lower suspension rod, 37. Third connecting plate, 38. Third anchoring bar, 39. Lower connecting shaft, 40. Lower adjustment groove, 41. Lower clamping groove, 42. Third adjustment block, 43. Lifting cable, 44. Turning handle.
[0019] The accompanying drawings are used to provide further understanding of the present invention and constitute a part of the specification. They are used to explain the present invention together with the embodiments of the present invention and do not constitute a limitation of the present invention. DETAILED DESCRIPTION
[0020] The present invention is further described in detail with reference to the accompanying drawings.
[0021] like Figure 1-Figure 8As shown, the present scheme provides a reinforcement device for cantilevered construction engineering, including original terrain 1, a cantilevered road surface 2 is provided at the edge of the original terrain 1, a cantilevered platform 3 is cantilevered on the cantilevered road surface 2 away from the edge of the original terrain 1, a supporting pier 4 is provided below the cantilevered platform 3, a cantilevered reinforcement component 5 is connected between the side wall of the supporting pier 4 and the lower wall of the cantilevered platform 3, the cantilevered reinforcement component 5 includes a steel cable adjustment component 6, a rod adjustment component 20 and a lower suspension rod 36, the steel cable adjustment component 6 is fixedly arranged at the upper end of the side wall of the supporting pier 4, the rod adjustment component 20 is arranged below the steel cable adjustment component 6, the rod adjustment component 20 is fixedly arranged on the side wall of the supporting pier 4, and the lower suspension rod 36 is fixedly arranged in a circular array on the cantilevered platform 3, the lower wall of which is away from one end edge of the supporting pier 4, the cable adjustment assembly 6 comprises a first connecting plate 7, a first supporting block 9, a first slider 12, a rotating connecting block 15, an oblique winding roller 16 and an oblique steel cable 19, the first connecting plate 7 is fixedly arranged on the side wall of the supporting pier 4, the first supporting block 9 is fixedly arranged on the side wall of the first connecting plate 7, the first slider 12 is movably arranged in an annular array on the side wall of the first supporting block 9, the end of the rotating connecting block 15 is rotatably arranged on the side wall of the first slider 12, the rotating connecting block 15 pitches and rotates relative to the first slider 12, the oblique winding roller 16 is rotatably arranged on the end of the rotating connecting block 15 away from the first slider 12, and one end of the oblique steel cable 19 is wound around the side wall of the oblique winding roller 16; An adjusting worm wheel 17 is coaxially fixed to the center of the end face of the oblique winding roller 16, an adjusting worm 18 is rotatably provided below the adjusting worm wheel 17, the adjusting worm 18 is rotatably connected to the side wall of the rotating connecting block 15, and a twisting handle 44 is coaxially fixed to the end of the adjusting worm 18.
[0022] The rod adjustment assembly 20 includes a second connecting plate 21, a second supporting block 23, a second sliding block 26 and a supporting rod 29. The second connecting plate 21 is fixedly arranged on the side wall of the supporting pier 4, and the second connecting plate 21 is arranged below the first connecting plate 7. The second supporting block 23 is fixedly arranged on the side wall of the second connecting plate 21. The second sliding block 26 is movably arranged in a ring array on the side wall of the second supporting block 23. The end of the supporting rod 29 is rotatably arranged on the side wall of the second sliding block 26. The supporting rod 29 pitches and rotates relative to the second sliding block 26. An upper connecting shaft 30 is fixedly arranged at the end of the supporting rod 29 away from the second sliding block 26. The other end of the inclined steel cable 19 is connected to the upper connecting shaft 30. A lower connecting shaft 39 is fixedly arranged at the lower end of the lower hanging rod 36. The lower connecting shaft 39 is arranged below the upper connecting shaft 30. A pulling steel cable 43 is connected between the lower connecting shaft 39 and the upper connecting shaft 30. The inclined steel cable 19 and the pulling steel cable 43 are made of epoxy-coated high-strength steel wire cables.
[0023] The side wall array of the first connecting plate 7 away from the first support block 9 is provided with a first anchoring bar 8, and the side wall array of the second connecting plate 21 away from the second support block 23 is provided with a second anchoring bar 22, and the first anchoring bar 8 and the second anchoring bar 22 are respectively connected to the internal steel bars of the support pier 4; the upper end of the lower suspension rod 36 is fixedly provided with a third connecting plate 37, and the third connecting plate 37 is arranged on the lower wall edge of the cantilever platform 3, and the upper wall array of the third connecting plate 37 is provided with a third anchoring bar 38, and the third anchoring bar 38 is connected to the internal steel bars of the cantilever platform 3.
[0024] The first support block 9 and the second support block 23 are semi-cylindrical, and the side walls of the first support block 9 and the second support block 23 are respectively provided with a first slide groove 10 and a second slide groove 24, and the first slider 12 and the second slider 26 are respectively slidably arranged in the first slide groove 10 and the second slide groove 24; The upper and lower end surfaces of the first support block 9 are symmetrically provided with first adjustment slits 11, the first adjustment slit 11 is connected with the first slide groove 10, the upper and lower ends of the first slide block 12 are symmetrically fixed with first sliding screws 13, the first sliding screws 13 are arranged through the first adjustment slit 11, the first sliding screws 13 are sleeved with a first fixing nut 14, the first fixing nut 14 is threadedly connected with the first sliding screw 13, and the first fixing nut 14 is movably contacted with the upper and lower end surfaces of the first support block 9; The second support block 23 is symmetrically provided with second adjustment slits 25 on the upper and lower end surfaces, the second adjustment slits 25 are connected with the second slide groove 24, and the second sliding screws 27 are symmetrically fixed on the upper and lower ends of the second sliding block 26, the second sliding screw 27 is arranged to penetrate the second adjustment slit 25, and a second fixing nut 28 is sleeved on the second sliding screw 27, the second fixing nut 28 is threadedly connected with the second sliding screw 27, and the second fixing nut 28 is movably contacted with the upper and lower end surfaces of the second support block 23.
[0025] An upper adjusting groove 31 is provided on the side wall of the upper connecting shaft 30, and a lower adjusting groove 40 is provided on the side wall of the lower connecting shaft 39. A first adjusting block 33 and a second adjusting block 34 are provided in the upper adjusting groove 31 for sliding cooperation. The end of the inclined steel cable 19 is connected to the side wall of the first adjusting block 33, and a third adjusting block 42 is provided in the lower adjusting groove 40 for sliding cooperation. An upper clamping groove 32 is symmetrically provided on the inner side wall of the upper adjusting groove 31, and a lower clamping groove 41 is symmetrically provided on the inner side wall of the lower adjusting groove 40. Clamping blocks 35 are symmetrically provided on the side walls at both ends of the first adjusting block 33, the second adjusting block 34 and the third adjusting block 42, and the clamping blocks 35 are respectively slidably provided in the upper clamping groove 32 and the lower clamping groove 41.
[0026] Working principle and workflow: According to the pre-designed plan, the construction personnel firstly tie the first anchor rib 8 provided on the first connecting plate 7 and the second anchor rib 22 provided on the second connecting plate 21 to the internal steel bars of the supporting pier 4 respectively, so that the first connecting plate 7 and the second connecting plate 21 can be firmly connected to the supporting pier 4 when casting the supporting pier 4, so that the steel cable adjustment assembly 6 and the rod adjustment assembly 20 are firmly fixed on the supporting pier 4. After the installation is completed, the construction personnel evenly fix the lower suspension rod 36 at the end of the lower wall of the cantilever platform 3 according to the shape of the cantilever platform 3. During the specific construction, the third anchor rib 38 provided on the third connecting plate 37 can be tied to the internal steel bars of the cantilever platform 3. When casting the cantilever platform 3, the third connecting plate 37 can be firmly connected to the cantilever platform 3, so that the lower suspension rod 36 is firmly fixed on the lower wall of the cantilever platform 3.
[0027] The construction personnel unscrew the first fixing nut 14 and the second fixing nut 28 from the first sliding screw 13 and the second sliding screw 27 respectively, so that the first fixing nut 14 and the second fixing nut 28 are separated from the contact with the upper and lower walls of the first support block 9 and the second support block 23 respectively. At this time, the first sliding screw 13 and the second sliding screw 27 can slide along the first adjustment gap 11 and the second adjustment gap 25 respectively, so that the first slider 12 and the second slider 26 can slide flexibly along the first slide groove 10 and the second slide groove 24 respectively. By adjusting the positions of the first slider 12 and the second slider 26 in the first slide groove 10 and the second slide groove 24 respectively, multiple The rotating connecting block 15 and the support rod 29 are opened or retracted, thereby changing the position of the rotating connecting block 15 and the support rod 29 to adapt to cantilever platforms 3 of different shapes, so that the first slider 12 and the second slider 26 correspond to the lower suspension rod 36 respectively. At this time, the construction personnel release the inclined steel cable 19 wound on the inclined winding roller 16, and connect the inclined steel cable 19 with the first adjusting block 33 set on the upper connecting shaft 30 at the end of the support rod 29, so that the inclined steel cable 19 and the support rod 29 form a stable triangular cable structure, and the inclined steel cable 19 and the first adjusting block 33 are fixed by anchoring. The specific anchoring structure belongs to the prior art and will not be repeated here.
[0028] After the inclined steel cable 19 is fixed, the construction personnel connect the support rod 29 with the lower suspension rod 36 through the lifting steel cable 43. The upper end of the lifting steel cable 43 is fixed to the second adjustment block 34 set on the upper connecting shaft 30, and the lower end of the lifting steel cable 43 is fixed to the third adjustment block 42 set on the lower connecting shaft 39. The lifting steel cable 43 is fixed to the second adjustment block 34 and the third adjustment block 42 respectively by the existing anchoring technology. The support rod 29 is under pressure under the pulling of the inclined steel cable 19 and the lifting steel cable 43. Since the lower suspension rod 36 is set on the cantilever platform 3 At the end, the cantilever platform 3 will have a downward deflection under the action of its own weight, so the lower suspension rod 36 generates a downward pulling force on the pulling cable 43, and on the contrary, the pulling cable 43 generates an upward pulling force on the lower suspension rod 36, so that the lower suspension rod 36 applies an upward force to the end of the cantilever platform 3, effectively sharing the load at the end of the cantilever platform 3. At the same time, since the cantilever reinforcement component 5 is located below the cantilever platform 3, the integrity of the space above the cantilever platform 3 is guaranteed, avoiding the problem of traditional cable structure being set above the cantilever platform 3, resulting in space being occupied and affecting the appearance.
[0029] The construction personnel can rotate the adjusting worm 18 by turning the screw handle 44, and the adjusting worm 18 drives the adjusting worm wheel 17 to rotate, and the adjusting worm wheel 17 drives the inclined winding roller 16 to rotate, so that the inclined steel cable 19 is wound back onto the inclined winding roller 16 or released from the inclined winding roller 16, so that the length of the inclined steel cable 19 between the inclined winding roller 16 and the upper connecting shaft 30 changes. When the inclined steel cable 19 is wound back onto the inclined winding roller 16, the upper connecting shaft 30 moves upward under the pulling force of the inclined steel cable 19, and the support rod 29 pitches upward, and the upper connecting shaft 30 pulls the lower connecting shaft 39 to deflect upward through the lifting steel cable 43, so that the lower suspension rod 36 drives the end of the cantilever platform 3 to deflect upward. In order to further improve the bending deformation problem caused by the deadweight of the end of the cantilever platform 3 and increase the stability of the structure, the winding amount of the inclined steel cable 19 can be adjusted according to actual conditions to adapt to the construction requirements of different cantilever structures, thereby realizing the adjustability in the construction stage and the coordinated deformation in the use stage. At the same time, by arranging the inclined steel cable 19 and the pulling steel cable 43, the cantilever reinforcement component 5 forms a flexible structure. Compared with the traditional rigid structure, it has stronger seismic resistance and environmental adaptability. The adjusting worm 18 and the adjusting worm wheel 17 together form a worm gear structure. The worm gear structure has a self-locking function, which realizes the self-locking effect of the inclined winding roller 16 during the rotation process and ensures the stability of the inclined steel cable 19.
[0030] The first adjustment block 33 and the second adjustment block 34 can slide in the upper adjustment groove 31, and the third adjustment block 42 can slide in the lower adjustment groove 40. When the inclined steel cable 19 pulls the upper connecting shaft 30, the first adjustment block 33, the second adjustment block 34 and the third adjustment block 42 can adaptively slide in the upper adjustment groove 31 and the lower adjustment groove 40 respectively according to the change of the relative position of the upper connecting shaft 30 and the lower connecting shaft 39, so that the force of the inclined steel cable 19 and the pulling steel cable 43 is more reasonable.
[0031] It should be noted that, in this document, relational terms such as first and second, etc. are merely used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any actual relationship or order between these entities or operations.
[0032] The present invention and its embodiments are described above, which is not restrictive. What is shown in the accompanying drawings is only one of the embodiments of the present invention, and the actual structure is not limited thereto. In short, if ordinary technicians in this field are inspired by it and do not deviate from the purpose of the invention, they can creatively design structural methods and embodiments similar to the technical scheme, which should all fall within the scope of protection of the present invention.
Claims
1. A reinforcement device for cantilevered construction engineering, comprising an original terrain (1), wherein a cantilevered road surface (2) is provided at the edge of the original terrain (1), characterized in that: The cantilevered road surface (2) is cantilevered away from the edge of the original terrain (1) to provide a cantilevered platform (3), a supporting pier (4) is provided below the cantilevered platform (3), a cantilevered reinforcement component (5) is connected between the side wall of the supporting pier (4) and the lower wall of the cantilevered platform (3), the cantilevered reinforcement component (5) comprises a steel cable adjustment component (6), a rod adjustment component (20) and a lower suspension rod (36), the steel cable adjustment component (6) is fixedly arranged at the upper end of the side wall of the supporting pier (4), the rod adjustment component (20) is arranged below the steel cable adjustment component (6), the rod adjustment component (20) is fixedly arranged at the side wall of the supporting pier (4), the lower suspension rod (36) is fixedly arranged in a circular array at an edge of the lower wall of the cantilevered platform (3) away from the supporting pier (4), and the steel cable adjustment component (6) comprises a first connecting plate (7), a first supporting block (9), a first slider (12), a rotating connecting block (15), an inclined winding roller (16) and an inclined steel cable (19), wherein the first connecting plate (7) is fixedly arranged on the side wall of the supporting pier (4), the first supporting block (9) is fixedly arranged on the side wall of the first connecting plate (7), the first slider (12) is movably arranged in an annular array on the side wall of the first supporting block (9), the end of the rotating connecting block (15) is rotatably arranged on the side wall of the first slider (12), the rotating connecting block (15) pitches and rotates relative to the first slider (12), the inclined winding roller (16) is rotatably arranged on the end of the rotating connecting block (15) away from the first slider (12), and one end of the inclined steel cable (19) is wound around the side wall of the inclined winding roller (16).
2. A reinforcement device for cantilevered construction engineering according to claim 1, characterized in that: The rod adjustment assembly (20) comprises a second connecting plate (21), a second supporting block (23), a second sliding block (26) and a supporting rod (29), wherein the second connecting plate (21) is fixedly arranged on the side wall of the supporting pier (4), the second connecting plate (21) is arranged below the first connecting plate (7), the second supporting block (23) is fixedly arranged on the side wall of the second connecting plate (21), the second sliding block (26) is movably arranged in an annular array on the side wall of the second supporting block (23), and the end of the supporting rod (29) is rotatably arranged on the first connecting plate (7). The support rod (29) is arranged on the side wall of the second slider (26), and the support rod (29) is pitched and rotated relative to the second slider (26). An upper connecting shaft (30) is fixedly provided at the end of the support rod (29) away from the second slider (26). The other end of the inclined steel cable (19) is connected to the upper connecting shaft (30). A lower connecting shaft (39) is fixedly provided at the lower end of the lower suspension rod (36). The lower connecting shaft (39) is arranged below the upper connecting shaft (30). A pulling steel cable (43) is connected between the lower connecting shaft (39) and the upper connecting shaft (30).
3. A reinforcement device for cantilevered construction engineering according to claim 2, characterized in that: The first support block (9) and the second support block (23) are semi-cylindrical, and the side walls of the first support block (9) and the second support block (23) are respectively provided with a first slide groove (10) and a second slide groove (24), and the first slide block (12) and the second slide block (26) are respectively slidably arranged in the first slide groove (10) and the second slide groove (24).
4. A reinforcement device for cantilevered construction engineering according to claim 3, characterized in that: The upper and lower end surfaces of the first support block (9) are symmetrically provided with first adjustment slits (11), the first adjustment slits (11) are connected with the first slide groove (10), the upper and lower ends of the first slide block (12) are symmetrically fixed with first sliding screws (13), the first sliding screws (13) are arranged to penetrate the first adjustment slits (11), a first fixing nut (14) is sleeved on the first sliding screw (13), the first fixing nut (14) is threadedly connected with the first sliding screw (13), and the first fixing nut (14) is movably contacted with the upper and lower end surfaces of the first support block (9).
5. A reinforcement device for cantilevered construction engineering according to claim 4, characterized in that: The upper and lower end surfaces of the second support block (23) are symmetrically provided with second adjustment slits (25), the second adjustment slits (25) are connected with the second slide groove (24), the upper and lower ends of the second sliding block (26) are symmetrically fixed with second sliding screws (27), the second sliding screws (27) are arranged to penetrate the second adjustment slits (25), the second sliding screws (27) are sleeved with second fixing nuts (28), the second fixing nuts (28) are threadedly connected with the second sliding screws (27), and the second fixing nuts (28) are movably contacted with the upper and lower end surfaces of the second support block (23).
6. A reinforcement device for cantilevered construction engineering according to claim 5, characterized in that: An adjusting worm wheel (17) is coaxially fixedly disposed at the center of the end face of the oblique winding roller (16); an adjusting worm (18) is rotatably disposed below the adjusting worm wheel (17); the adjusting worm (18) is rotatably connected to the side wall of the rotating connecting block (15); and a twisting handle (44) is coaxially fixedly disposed at the end of the adjusting worm (18).
7. A reinforcement device for cantilevered construction engineering according to claim 6, characterized in that: An upper adjustment groove (31) is formed on the side wall of the upper connecting shaft (30), and a lower adjustment groove (40) is formed on the side wall of the lower connecting shaft (39). A first adjustment block (33) and a second adjustment block (34) are slidably provided in the upper adjustment groove (31). The end of the inclined steel cable (19) is connected to the side wall of the first adjustment block (33). A third adjustment block (42) is slidably provided in the lower adjustment groove (40). An upper clamping groove (32) is symmetrically formed on the inner side wall of the upper adjustment groove (31), and a lower clamping groove (41) is symmetrically formed on the inner side wall of the lower adjustment groove (40). Clamping blocks (35) are symmetrically provided on the side walls at both ends of the first adjustment block (33), the second adjustment block (34) and the third adjustment block (42). The clamping blocks (35) are slidably provided in the upper clamping groove (32) and the lower clamping groove (41), respectively.
8. A reinforcement device for cantilevered construction engineering according to claim 7, characterized in that: A first anchor bar (8) is provided on the side wall array of the first connecting plate (7) away from the first supporting block (9), and a second anchor bar (22) is provided on the side wall array of the second connecting plate (21) away from the second supporting block (23), and the first anchor bar (8) and the second anchor bar (22) are respectively connected to the internal steel bars of the supporting pier (4).
9. A reinforcement device for cantilevered construction engineering according to claim 8, characterized in that: A third connecting plate (37) is fixedly provided at the upper end of the lower suspension rod (36), the third connecting plate (37) being arranged at the lower wall edge of the cantilever platform (3), and a third anchoring bar (38) is arranged in an array on the upper wall of the third connecting plate (37), the third anchoring bar (38) being connected to the internal steel bars of the cantilever platform (3).
10. A reinforcement device for cantilevered construction engineering according to claim 9, characterized in that: The inclined steel cables (19) and the pulling steel cables (43) are epoxy-coated high-strength steel wire cables.
Citation Information
Patent Citations
High-altitude glass plank road
CN107881913A
Suspension bridge stay cable construction platform
CN115142352A
Inhaul cable cross arrangement structure
CN212506981U
Novel stay cable bridge structure for water conservancy project
CN213740553U
Steel cable tensioning device for bridge construction
CN216739306U