Roof cornice large cantilever component outer decorative plate installation construction device and method
By designing the installation and construction device of the exterior decorative panel of the roof eaves large cantilever component, and using the reinforced concrete structure and exterior wall window openings as the focus points of the construction device, the problem of the difficulty of the construction of the exterior decorative panel of the roof eaves large cantilever component is solved, achieving efficient and safe construction results.
Patent Information
- Application Number
- CN202510240890.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-03
- Publication Date
- 2025-04-29
AI Technical Summary
The construction of exterior decorative panels of large cantilever components of roof eaves is difficult, and traditional construction methods require the installation and removal of scaffolding multiple times, resulting in inefficiency and increased costs.
A construction device for installation and construction of the exterior decorative panel of the large cantilever component of the roof eaves is designed, and the large cantilever reinforced concrete structure of the eaves is used as the main structure, and combined with the exterior wall window openings as the focus point of the construction device, the main vertical pole, horizontal pole, oblique pole, operating platform, guardrail and straight ladder are set up to achieve flexible movement of the operating platform through rollers and horizontal tie rods.
It reduces the construction difficulty of the exterior decorative surface layer of the large cantilevered components on the roof eaves, provides a stable working platform, improves construction efficiency and safety, and reduces construction costs.
Smart Images

Figure CN119900388A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building roof panel installation, and in particular to a device and method for installing an outer decorative panel of a large cantilevered component of a roof eave. Background Art
[0002] The building roof adopts a sloping roof, and the structure at the eaves is cantilevered outward to form a flying eaves structure. The cantilevered structure is often long, and the lower part of the eaves is wrapped with metal plates or other exterior wall decoration materials. Because the cantilever is located at the top of the building and protrudes from the structure, the construction difficulty increases. The traditional approach is to use a ground scaffolding or a cantilevered scaffolding as a working platform for decoration construction.
[0003] This method of scaffolding construction, if the structural construction and the building construction units are the same or the construction time interval is small, can still use the structural construction scaffolding as the decoration work frame. However, it is often impossible to achieve this due to reasons such as division of work surfaces, inconsistent entry times, insufficient coordination between general and subcontractors, replacement of the construction entity, etc., and it is necessary to re-erect the work platform later. Summary of the invention
[0004] The purpose of the present invention is to provide a device and method for installing and constructing external decorative panels of large cantilevered components at roof eaves, so as to reduce the difficulty of constructing external decorative surface layers of large cantilevered components at roof eaves and provide an installation and construction work platform therefor, so as to solve the problems raised by the above-mentioned background technology.
[0005] To achieve the above object, the present invention provides the following technical solutions:
[0006] A construction device for installing an exterior decorative panel of a roof eaves large cantilever component comprises a main structure and a construction device model, wherein the main structure is a reinforced concrete structure with a large cantilever at the eaves, and the reinforced concrete structure main body and the exterior wall window openings are used as fulcrums of the construction device model, and the construction device model comprises a main vertical pole, an upper horizontal pole, a lower horizontal pole, a positioning piece and a fastener; the main vertical pole is fixed in a frame of the main structure by the positioning piece and the fastener; the upper horizontal pole and the lower horizontal pole are fixed on the main vertical pole at upper and lower intervals.
[0007] Furthermore, the construction device model also includes a left diagonal rod, a vertical rod, a right diagonal rod, an operating platform, a horizontal tie rod, a guardrail and a straight ladder; both ends of the left diagonal rod and the right diagonal rod are fixed on the upper horizontal rod and the lower horizontal rod, a vertical rod is provided between the left diagonal rod and the right diagonal rod, and both ends of the vertical rod are fixed between the upper horizontal rod and the lower horizontal rod; a horizontal tie rod is fixed on the upper horizontal rod; rollers are installed at the bottom of the operating platform, and the operating platform is installed in the groove of the horizontal tie rod channel steel through the rollers at the bottom, and guardrails are connected on both sides of the operating platform; the straight ladder is arranged in a frame composed of the main vertical rod and the main structure, which is used for construction personnel to enter and exit the operating platform.
[0008] Furthermore, the operating platform is assembled from main beams made of channel steel or I-beams and steel or wooden walkway boards erected between the main beams.
[0009] The present invention provides another technical solution: a method for installing an outer decorative plate of a large cantilevered member of a roof eave, comprising the following steps:
[0010] S1: Determine the cantilever length of the operating platform according to the design length of the cantilever components, and then install the cantilever components in groups, with the interval between each group not exceeding four meters;
[0011] S2: Install two main poles of a single piece;
[0012] S3: Install the lower horizontal bars at the bottom of the single piece respectively;
[0013] S4: Install the upper horizontal bars on the upper part of the single piece respectively;
[0014] S5: Install the vertical rod of the single piece → the left diagonal rod, the right diagonal rod → the upper and lower positioning pieces → the upper and lower fasteners in sequence;
[0015] S6: Install left and right guardrails on the upper horizontal bar;
[0016] S7: Adjust the position and install the horizontal tie rods connecting the single pieces one by one;
[0017] S8: The operating platform is installed in sections as a whole. The operating platform adopts a combined structure. The crossbeam is made of channel steel. The upper part is paved with walkway plates. The lower part of the channel steel is equipped with rollers and placed in the groove of the horizontal tie bar channel steel.
[0018] S9: The operating platform moves horizontally on the construction device between the cantilever support structures through rollers, which are stuck in the horizontal tie rods;
[0019] S10: Construction workers go up and down the operating platform and enter and exit the room through a straight ladder;
[0020] S11: The dismantling of the entire construction device model is in the reverse order of installation, that is, the first installed is dismantled last, and the last installed is dismantled first.
[0021] Furthermore, all components in the operating platform and construction device model in S1 are connected by bolts.
[0022] Furthermore, the operating platform in S8 is a movable installation structure, and the entire operating platform moves in the horizontal direction through rollers.
[0023] Furthermore, the movement of the operating platform adopts mechanical traction or manual traction.
[0024] Furthermore, the operating platform can be placed on the cantilever bracket composed of the upper horizontal rods after the floor is assembled as a whole, or the single piece can be directly assembled on the upper part of the cantilever bracket.
[0025] Compared with the prior art, the present invention has the following beneficial effects:
[0026] The invention discloses a device and method for installing and constructing an outer decorative panel of a large cantilevered component of a roof eave, comprising a main structure and a construction device model. The main structure is a reinforced concrete structure with a large cantilevered eave. The original main structure and the window openings on the outer wall are used as fulcrums of the construction device. The overall structure is simple and can be assembled on site, which greatly reduces the difficulty of constructing an outer decorative surface layer of a large cantilevered component of a roof eave, and provides an extremely favorable working platform for the installation and construction of the roof eave. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is an overall schematic diagram of the construction structure of the present invention;
[0028] Figure 2 It is a front view of the construction structure of the present invention;
[0029] Figure 3 This is an enlarged view of the installation of the roller of the present invention;
[0030] Figure 4 It is a structural diagram of the operating platform of the present invention.
[0031] In the figure: 1. Main structure; 2. Main vertical pole; 4. Upper horizontal pole; 5. Lower horizontal pole; 8. Positioning piece; 9. Fastener; 7. Left diagonal pole; 6. Vertical pole; 3. Right diagonal pole; 10. Operating platform; 11. Horizontal tie rod; 12. Guardrail; 13. Straight ladder; 14. Roller. DETAILED DESCRIPTION
[0032] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0033] See also Figure 1-4A device for installing an exterior decorative panel of a large cantilevered member of a roof eave provided in an embodiment of the present invention comprises a main structure 1 and a construction device model, wherein the main structure 1 is a reinforced concrete structure with a large cantilevered eave, and the main reinforced concrete structure body and the window openings on the exterior wall are used as the fulcrums of the construction device model, and the construction device model comprises a main vertical pole 2, an upper horizontal pole 4, a lower horizontal pole 5, a positioning member 8 and a fastener 9; the main vertical pole 2 is fixed in the frame of the main structure 1 by the positioning member 8 and the fastener 9; the upper horizontal pole 4 and the lower horizontal pole 5 are fixed on the main vertical pole 2 at intervals up and down; specifically, the construction device model further comprises a left oblique pole 7, a vertical pole 6, a right oblique pole 3, an operating platform 10, a horizontal tie rod 11, a guardrail 12 and a straight ladder 13; both ends of the left oblique pole 7 and the right oblique pole 3 are It is fixed on the upper horizontal rod 4 and the lower horizontal rod 5, and a vertical rod 6 is provided between the left oblique rod 7 and the right oblique rod 3, and the two ends of the vertical rod 6 are fixed between the upper horizontal rod 4 and the lower horizontal rod 5; a horizontal tie rod 11 is fixed on the upper horizontal rod 4; a roller 14 is installed at the bottom of the operating platform 10, and the operating platform 10 is embedded in the groove of the channel steel of the horizontal tie rod 11 through the roller 14 at the bottom, and guardrails 12 are connected on both sides of the operating platform 10; the straight ladder 13 is arranged in a frame composed of the main vertical rod 2 and the main structure 1, and is used for construction personnel to enter and exit the operating platform 10, wherein the operating platform 10 is assembled by a main beam made of channel steel or I-beam and a steel or wooden walkway board erected between the main beams, and each supporting member of the entire construction device model is connected and fixed by bolts.
[0034] In order to further better explain the embodiment of the present invention, a method for installing an outer decorative plate of a large cantilevered member of a roof eave is also provided, comprising the following steps:
[0035] S1: Determine the cantilever length of the operating platform 10 according to the design length of the cantilever component. The cantilever length of the operating platform 10 is the structural length plus the width of the operating surface. Install the cantilever components in groups, with the interval between each group not exceeding four meters. All components are connected by bolts.
[0036] S2: First install two main poles 2 of a single piece. The poles 2 are made of channel steel or I-beam. The specifications and models are determined by calculation, but the cross-sectional height is not less than the cantilever scaffolding specification requirements;
[0037] S3: Install the lower horizontal rods 5 at the lower part of the single piece respectively;
[0038] S4: Install the upper horizontal rods 4 on the upper part of the single piece respectively;
[0039] S5: sequentially install the single-piece vertical rod 6 → the left diagonal rod 7, the right diagonal rod 3 → the upper and lower positioning members 8 → the upper and lower fasteners 9;
[0040] S6: Install left and right side guardrails 12 on the upper horizontal bar 4;
[0041] S7: Adjust the position and install the horizontal tie rods 11 connecting the single pieces one by one;
[0042] S8: The operating platform 10 is installed in sections as a whole. The operating platform 10 adopts a combined structure. The crossbeam is made of channel steel. The upper part is paved with a walkway plate. The lower part of the channel steel is installed with a roller 14, which is placed in the groove of the channel steel of the horizontal tie rod 11;
[0043] S9: The operating platform 10 can be horizontally moved between the cantilever support structures by means of rollers 14, and the rollers 14 are stuck in the horizontal tie rods 11, so that it can be used as a personnel operating platform or a transportation platform for decorative materials; specifically, the operating platform 10 is placed on the horizontal tie rods 11 as a whole, and can be moved horizontally by means of the rollers 14, so that it has good flexibility, and the operating platform 10 only needs to be assembled once; the movement of the operating platform 10 can be manual or electric, and can be set according to specific needs;
[0044] S10: Construction workers go up and down the operating platform 10 and enter and exit the room through the straight ladder 13;
[0045] S11: The dismantling of the entire construction device model is in the reverse order of installation, that is, the first installed is dismantled last, and the last installed is dismantled first.
[0046] In the above embodiment, the operating platform 10 of the present invention and all components in the construction device model are connected by bolts. The operating platform 10 is a movable installation structure. The entire operating platform 10 moves in the horizontal direction through rollers 14. The movement of the operating platform 10 adopts mechanical traction or manual traction. The operating platform 10 can be placed on the cantilever bracket composed of the upper horizontal rod 4 after the overall assembly of the floor, or the single piece can be directly assembled on the upper part of the cantilever bracket.
[0047] In summary: the present invention provides a device and method for installing and constructing an exterior decorative panel of a roof eaves large cantilever component, comprising a main structure 1 and a construction device model. The main structure 1 is a reinforced concrete structure with a large cantilever of the eaves. The original structure main body and the exterior wall window openings are used as the fulcrum of the construction device. The overall structure is simple and can be assembled on site, which greatly reduces the difficulty of constructing the exterior decorative surface layer of the roof eaves large cantilever component and provides an extremely favorable working platform for the installation and construction of the roof eaves.
[0048] It should be noted that, in the description of the present invention, the terms "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, and are only simplified descriptions for the convenience of describing the present invention. They do not indicate or imply that the device or component referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.
[0049] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A device for installing and constructing an outer decorative plate of a large cantilevered member of a roof eave, characterized in that: The invention comprises a main structure (1) and a construction device model. The main structure (1) is a reinforced concrete structure with a large cantilevered cornice. The main reinforced concrete structure and the window openings on the outer wall are used as the fulcrums of the construction device model. The construction device model comprises a main vertical pole (2), an upper horizontal pole (4), a lower horizontal pole (5), a positioning member (8) and a fastener (9). The main vertical pole (2) is fixed in the frame of the main structure (1) by means of the positioning member (8) and the fastener (9). The upper horizontal pole (4) and the lower horizontal pole (5) are fixed on the main vertical pole (2) at intervals.
2. A device for installing and constructing an outer decorative plate of a large cantilevered member of a roof eave as claimed in claim 1, characterized in that: The construction device model also includes a left oblique rod (7), a vertical rod (6), a right oblique rod (3), an operating platform (10), a horizontal tie rod (11), a guardrail (12) and a straight ladder (13); both ends of the left oblique rod (7) and the right oblique rod (3) are fixed on the upper horizontal rod (4) and the lower horizontal rod (5); a vertical rod (6) is provided between the left oblique rod (7) and the right oblique rod (3); and both ends of the vertical rod (6) are fixed between the upper horizontal rod (4) and the lower horizontal rod (5); A horizontal tie rod (11) is fixed on the upper horizontal rod (4); a roller (14) is installed at the bottom of the operating platform (10), and the operating platform (10) is mounted in a groove of the channel steel of the horizontal tie rod (11) through the roller (14) at the bottom, and guardrails (12) are connected on both sides of the operating platform (10); the straight ladder (13) is arranged in a frame composed of the main upright (2) and the main structure (1) for construction personnel to enter and exit the operating platform (10).
3. A device for installing and constructing an outer decorative plate of a large cantilevered member of a roof eave as claimed in claim 2, characterized in that: The operating platform (10) is assembled from main crossbeams made of channel steel or I-beams and steel or wooden walkway boards arranged between the main crossbeams.
4. A method for installing an exterior decorative panel of a large cantilevered member of a roof eave, characterized in that: The following steps are involved: S1: Determine the cantilever length of the operating platform (10) according to the design length of the cantilever components, and then install the cantilever components in groups, with the interval between each group not exceeding four meters; S2: Install two main poles (2) on a single piece; S3: Install the lower horizontal rods (5) at the lower part of the single piece respectively; S4: Install the upper horizontal rods (4) on the upper part of the single piece respectively; S5: sequentially install the single-piece vertical rod (6) → the left diagonal rod (7), the right diagonal rod (3) → the upper and lower positioning members (8) → the upper and lower fasteners (9); S6: Install left and right side guardrails (12) on the upper horizontal bar (4); S7: Adjust the position and install the horizontal tie rods (11) connecting the individual pieces one by one; S8: The operating platform (10) is installed in sections as a whole. The operating platform (10) adopts a combined structure. The cross beam adopts channel steel. The upper part is paved with a walkway plate. The lower part of the channel steel is equipped with rollers (14) and placed in the groove of the channel steel of the horizontal tie rod (11); S9: The operating platform (10) moves horizontally on the construction device between the cantilever support structures via rollers (14), and the rollers (14) are stuck in the horizontal tie rods (11); S10: Construction workers go up and down the operating platform (10) and enter and exit the room through a straight ladder (13); S11: The dismantling of the entire construction device model is in the reverse order of installation, that is, the first installed is dismantled last, and the last installed is dismantled first.
5. A method for installing and constructing an outer decorative plate of a large cantilevered roof eave member as claimed in claim 4, characterized in that: All components in the operating platform (10) and the construction device model in S1 are connected by bolts.
6. A method for installing and constructing an outer decorative plate of a large cantilevered member of a roof eave as claimed in claim 4, characterized in that: The operating platform (10) in S8 is a movable installation structure, and the entire operating platform (10) moves in the horizontal direction via rollers (14).
7. A method for installing an exterior decorative plate of a large cantilevered roof eave member as claimed in claim 6, characterized in that: The movement of the operating platform (10) is achieved by mechanical traction or manual traction.
8. A method for installing an exterior decorative plate of a large cantilevered roof eave member as claimed in claim 4, characterized in that: The operating platform (10) can be placed on the cantilever bracket formed by the upper horizontal rods (4) after the floor is assembled as a whole, or a single piece can be directly assembled on the upper part of the cantilever bracket.
Citation Information
Patent Citations
High altitude is faced limit operation and is assembled operation platform
CN208039787U
Overhanging operation frame
CN211899558U
Cantilever formwork supporting system
CN215254604U
Overhanging type movable scaffold
CN216690300U
Portable cantilevered I-beam dismantling scaffold
CN218843687U