High-rise building construction device based on BIM and construction method thereof

By designing a BIM-based construction device in high-rise building construction, the automatic diversion and stirring of concrete is achieved using diversion pipes and twisted dragon transmissions, the time-consuming and labor-intensive problem of manually adjusting the direction of the conveying pump pipe is solved, and the construction efficiency and quality are improved.

CN119914076APending Publication Date: 2025-05-02WENZHOU SHENGUANG CONSTRUCT ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510239482.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-03-03
Publication Date
2025-05-02

AI Technical Summary

Technical Problem

In high-rise building construction, when pumping concrete, the direction of the conveying pump pipe needs to be manually adjusted, which leads to time-consuming and labor-intensive processes and wastes labor costs.

Method used

A BIM-based high-rise building construction device is designed, including a load tank, a diversion tank and a diversion mechanism. By setting up multiple flow tubes and twisted dragon transmissions, the concrete is diverted and stirred, reducing the need for manual adjustment, and stably delivering the pump pipe through spring buffer clips.

Benefits of technology

Through the automated concrete splitting and mixing process, labor costs are saved, diversion efficiency is improved, stable concrete conveying is ensured, and construction efficiency and quality are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119914076A_ABST
    Figure CN119914076A_ABST
Patent Text Reader

Abstract

The invention discloses a BIM (Building Information Modeling)-based high-rise building construction device and a construction method thereof, relates to the technical field of building engineering, and aims to solve the technical problem that the process is too time-consuming and labor-consuming since the position of the output end of a conveying pump pipe needs to be manually and continuously adjusted to enable concrete to be always poured at a specified position in the concrete pumping process. The bottom of the bearing tank is fixedly sleeved with a flow dividing tank. By arranging the multiple flow guide pipes, the concrete flow dividing effect is achieved, the labor cost is saved, the flow dividing efficiency is improved, meanwhile, through the auger transmission conveying mode, the stirring function can be provided during concrete conveying, concrete can be prevented from precipitating in a pipeline, acting force is applied to a clamping piece through a first spring, and therefore the concrete flow dividing effect is improved. And the conveying pump pipe can be clamped, meanwhile, shaking of the conveying pump pipe in the concrete pumping process can be buffered, the stable conveying effect is achieved, and the stability and reliability of the device can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building engineering, and more specifically, to a BIM-based high-rise building construction device and a construction method thereof. Background Art

[0002] BIM technology is being used more and more widely in the construction industry, especially in high-rise building construction. BIM technology can significantly improve construction efficiency, quality, and reduce costs. BIM technology can simulate the construction process in the building model, predict conflicts and problems that may be encountered during construction, and formulate solutions in advance, reducing changes and corrections during construction and improving construction efficiency.

[0003] At present, when pouring concrete for high-rise building, concrete is generally delivered to the designated location from the delivery pump pipe by a pump truck. The staff is required to constantly adjust the direction of the delivery pump pipe so that the concrete inside is always poured at the designated location, which makes the process time-consuming and labor-intensive, and wastes labor costs. In view of this, we propose a BIM-based high-rise building construction device and a construction method thereof. Summary of the invention

[0004] The purpose of the present invention is to provide a BIM-based high-rise building construction device and a construction method thereof, so as to solve the technical problem that in pumping concrete, it is necessary to manually adjust the position of the output end of the delivery pump pipe continuously so that the concrete is always poured at the specified position, and this process is too time-consuming and labor-intensive.

[0005] In order to solve the above technical problems, the present invention provides the following technical solutions: a construction device based on high-rise building construction, including a load-bearing tank, a diversion tank is fixedly sleeved at the bottom of the load-bearing tank, a plurality of diversion ports are opened on the side surface of the diversion tank and the diversion ports are distributed in a circular array, a protective sleeve is fixedly sleeved on the side surface of the diversion tank, and a diversion mechanism is arranged inside the diversion tank; the diversion mechanism includes a first motor, a guide unit, a buffer unit and a folding unit, the guide unit is fixedly connected to the diversion tank, the buffer unit is fixedly connected to the load-bearing tank, and the folding unit is movably connected to the protective sleeve; the first motor is fixedly connected to the bottom of the diversion tank, the output end of the first motor is fixedly connected to a first auger through a first plug rod, and the first auger is fixedly connected to the bottom of the diversion tank. The dragon is movably sleeved inside the carrying tank, a plurality of conveying plates are fixedly connected to the side surface of the first plug rod and the conveying plates are movably contacted with the diversion tank, a diversion interface is fixedly sleeved on the inner wall of each diversion port, and a universal tube is fixedly connected to the output end of each diversion interface. The present invention realizes the concrete diversion effect by arranging multiple guide tubes, saves labor costs, and improves the diversion efficiency. At the same time, through the auger transmission and conveying method, it can provide a stirring function when the concrete is conveyed, which can avoid the precipitation of concrete inside the pipeline, and the first spring applies a force to the clamping piece, so that it can clamp the conveying pump pipe and also buffer the shaking of the conveying pump pipe in the pumping concrete, so as to achieve a stable conveying effect, which is beneficial to improve the stability and reliability of the device.

[0006] Preferably, the guide unit includes a plurality of guide tubes, each of which is movably sleeved on the output end of the universal tube, a second auger is fixedly sleeved on the inner wall of each guide tube, one end of each guide tube is movably sleeved on a limit frame, and the inner walls on both sides of the limit frame are movably connected with passive gears.

[0007] Preferably, a second motor is fixedly connected to one side of the limit frame, a driving gear is fixedly connected to the output end of the second motor and the driving gear is meshingly connected to the passive gear, a fixed interface is fixedly connected to one side of the limit frame and the fixed interface is movably connected to the guide tube, and a delivery tube is fixedly connected to the output end of the guide tube.

[0008] Preferably, a plurality of slots are provided on the side surface of the guide tube and are distributed in a ring array, a slider is fixedly connected to the bottom of the limit frame, a plurality of plug-in blocks are fixedly connected to the inner wall of the passive gear and the plug-in blocks are plugged into the slots.

[0009] Preferably, the buffer unit comprises an annular bracket, a plurality of through holes are provided on the side surface of the annular bracket and the through holes are distributed in an annular array, and a movable rod is movably sleeved on the inner wall of the through hole.

[0010] Preferably, a buffer sleeve is movably sleeved on the inner wall of the annular bracket, a first spring is movably sleeved on the side surface of each movable rod, and two ends of the first spring are respectively fixedly connected between the annular bracket and the buffer sleeve.

[0011] Preferably, a plurality of clips are fixedly connected to the top of the buffer sleeve, and the movable rod is fixedly connected to the clips.

[0012] Preferably, the folding unit comprises a plurality of support frames, wherein the plurality of support frames are arranged at the bottom of the protective cover and two adjacent support frames are movably connected via a first latch, wherein four of the support frames are respectively fixedly connected with telescopic struts at the bottom and the telescopic struts are distributed in a square array, wherein four of the first latches are movably sleeved with telescopic brackets at the bottom and the telescopic brackets are movably connected to the protective cover.

[0013] Preferably, a slide groove is provided on the top of each support frame and a sliding block is slidably connected inside the slide groove.

[0014] Preferably, a construction method based on a high-rise building construction device comprises the following steps: S1. Preparation stage for high-rise building construction: Use technology to create detailed building information, determine the goals, scope and requirements of high-rise building construction projects, and use construction simulation to optimize construction plans and discover and solve potential problems in advance; S2, concrete diversion treatment; S2.1. Installation of concrete pump pipe: first, unfold several support frames through the latch, and then, through the telescopic function of the telescopic support rod, keep the support frame and the ground at the same level. When installing the concrete pump pipe, first, lift the concrete pump pipe to the specified position through the pump truck, and then insert the concrete pump pipe into the buffer sleeve, and then apply force to the clips through the first spring, so that several clips are tilted toward the concrete pump pipe to achieve the clamping and limiting effect of the concrete pump pipe. When the concrete pump pipe shows signs of shaking in the conveying concrete, the buffer sleeve applies force to the concrete pump pipe through the first spring, so that the concrete pump pipe can be more stable in the conveying concrete; S2.2, diversion direction adjustment: before pumping concrete, first move the slider inside the chute to drive the limit frame to move, thereby changing the direction of the diversion pipe, which can shorten the time for concrete to flow out of the pipeline. Among them, by setting the delivery pipe, the delivery pipe can be compressed. During use, some concrete will remain inside the delivery pipe. By adjusting the direction of the diversion pipe, the use space of the delivery pipe can be reduced, thereby reducing the concrete sedimentation space. When disassembly and cleaning is required, the delivery pipe can be easily taken out for cleaning by connecting the fixed interface with the delivery pipe; S2.3, Concrete diversion: First, the first motor is operated through the external circuit mechanism, and the first motor drives the first auger to rotate, and also drives the conveying plate to rotate inside the diversion tank. In this process, the concrete is discharged from the conveying pump pipe into the bearing tank through the pump truck, and then the first auger rotates to make the concrete move downward evenly. In this process, the first auger is stirred to make the concrete fully mixed to prevent the blockage and concrete unevenness caused by the precipitation of concrete, which will affect the quality of concrete. The concrete flows downward and rotates through the conveying plate. The concrete flows into the universal pipe from the diversion interface, and then the second motor is operated through the external circuit mechanism. The second motor drives the active gear to rotate, and the active gear rotates to engage the driven gear. The driven gear is inserted into the slot through the plug block, so that the driven gear drives the guide pipe to rotate, and then drives the second auger to rotate, so that the concrete flows from it into the conveying pipe and is transported to the designated position, thereby realizing the concrete diversion function.

[0015] Compared with the prior art, the present invention has the following beneficial effects: The present invention achieves the concrete diversion effect by arranging multiple diversion pipes, saves labor costs, and improves the diversion efficiency. At the same time, through the auger transmission conveying method, it can provide a stirring function when the concrete is conveyed, which can prevent the concrete from settling inside the pipe. In addition, the first spring applies a force to the clamping piece, so that it can clamp the conveying pump pipe and also buffer the shaking of the conveying pump pipe during the pumping of concrete, thereby achieving a stable conveying effect, which is beneficial to improving the stability and reliability of the device. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the three-dimensional structure of the present invention; Figure 2 It is a schematic cross-sectional view of the overall structure of the present invention; Figure 3 It is a schematic diagram of a three-dimensional partial explosion structure of the present invention; Figure 4 For the present invention Figure 3 A is an enlarged structural diagram; Figure 5 It is a schematic diagram of the three-dimensional explosion structure of the diversion mechanism of the present invention; Figure 6 For the present invention Figure 5 The enlarged structural diagram at B in FIG. Figure 7 It is a schematic diagram of the three-dimensional enlarged structure of the present invention.

[0017] Explanation of the numbers in the figure: 1. Carrying tank; 2. Diversion tank; 3. Protective cover; 4. Diversion mechanism; 401. First motor; 402. First auger; 403. Conveying plate; 404. Diversion interface; 405. Universal tube; 5. Guide unit; 501. Guide tube; 501a. Slot; 502. Second auger; 503. Limiting frame; 503a. Sliding block; 504. Passive gear; 504a. Insert block; 505. Second motor; 506. Driving gear; 507. Fixed interface; 508. Conveying tube; 6. Buffer unit; 601. Ring bracket; 602. Through hole; 603. Movable rod; 604. Buffer sleeve; 604a. Clip; 605. First spring; 7. Folding unit; 701. Support frame; 701a. Slide; 702. Telescopic support rod; 703. Telescopic bracket. DETAILED DESCRIPTION

[0018] like Figures 1 to 7 As shown, the present invention relates to a BIM-based high-rise building construction device, including a bearing tank 1, a diversion tank 2 is fixedly sleeved at the bottom of the bearing tank 1, a plurality of diversion ports 201 are opened on the side surface of the diversion tank 2, and the diversion ports 201 are distributed in a ring array, a protective sleeve 3 is fixedly sleeved on the side surface of the diversion tank 2, and a diversion mechanism 4 is arranged inside the diversion tank 2; the diversion mechanism 4 includes a first motor 401, a guide unit 5, a buffer unit 6 and a folding unit 7, the guide unit 5 is fixedly connected to the diversion tank 2, the buffer unit 6 is fixedly connected to the bearing tank 1, and the folding unit 7 is movably connected to the protective sleeve 3; the first motor 401 is fixedly connected to the bottom of the diversion tank 2, the output end of the first motor 401 is fixedly connected to the first auger 402 through a first plug rod, and the first auger 402 is movably sleeved on the bearing tank 1 Internally, a plurality of conveying plates 403 are fixedly connected to the side surface of the first plug rod, and the conveying plates 403 are in active contact with the diversion tank 2. A diversion interface 404 is fixedly sleeved on the inner wall of each diversion port 201, and a universal tube 405 is fixedly connected to the output end of each diversion interface 404. The present invention achieves the concrete diversion effect by arranging a plurality of guide tubes 501, saves labor costs, and improves the diversion efficiency. At the same time, through the auger transmission and conveying method, it can provide a stirring function during concrete transportation, which can prevent concrete from settling inside the pipeline. In addition, a force is applied to the clamp 604a through the first spring 605, so that it can clamp the conveying pump pipe while also buffering the shaking of the conveying pump pipe during the pumping of concrete, thereby achieving a stable conveying effect, which is beneficial to improving the stability and reliability of the device.

[0019] In an embodiment of the present invention, the guide unit 5 includes a plurality of guide tubes 501, each of which is movably sleeved on the output end of the universal tube 405, a second auger 502 is fixedly sleeved on the inner wall of each guide tube 501, one end of each guide tube 501 is movably sleeved on a limit frame 503, and the inner walls on both sides of the limit frame 503 are movably connected with a passive gear 504, one side of the limit frame 503 is fixedly connected with a second motor 505, the output end of the second motor 505 is fixedly connected with a driving gear 506 and the driving gear 506 is meshed with the passive gear 504, one side of the limit frame 503 is fixedly connected with a fixed interface 507 and the fixed interface 507 is movably sleeved with the guide tube 501, and the output end of the guide tube 501 is fixedly connected with a delivery pipe 508.

[0020] In an embodiment of the present invention, a plurality of card slots 501a are provided on the side surface of the guide tube 501 and the card slots 501a are distributed in a circular array, a slider 503a is fixedly connected to the bottom of the limiting frame 503, a plurality of plug blocks 504a are fixedly connected to the inner wall of the passive gear 504 and the plug blocks 504a are inserted into the card slots 501a. By setting the plug blocks 504a and the card slots 501a, during use, the plug blocks 504a can be inserted into the card slots 501a to make the passive gear 504 drive the guide tube 501 to rotate, and during cleaning, the guide tube 501 can be taken out of the device and cleaned.

[0021] In an embodiment of the present invention, the buffer unit 6 includes an annular bracket 601, a plurality of through holes 602 are provided on the side surface of the annular bracket 601, and the through holes 602 are distributed in an annular array, a movable rod 603 is movably sleeved on the inner wall of the through hole 602, and a buffer sleeve 604 is movably sleeved on the inner wall of the annular bracket 601, and a first spring 605 is movably sleeved on the side surface of each movable rod 603, and the two ends of the first spring 605 are respectively fixedly connected between the annular bracket 601 and the buffer sleeve 604.

[0022] As another embodiment of the present invention, a plurality of clips 604a are fixedly connected to the top of the buffer sleeve 604 and the movable rod 603 is fixedly connected to the clip 604a. It is worth noting that the clip 604a is made of rubber. The first spring 605 applies a force to the clip 604a so that the clip 604a is tilted toward the direction of the delivery pump pipe to achieve a pipe clamping effect. In addition, the clip 604a is made of rubber, which provides good friction to prevent the delivery pump pipe from falling off the device.

[0023] As another embodiment of the present invention, the folding unit 7 includes a plurality of support frames 701, the plurality of support frames 701 are arranged at the bottom of the protective cover 3 and two adjacent support frames 701 are movably connected by first latches, wherein the bottoms of four support frames 701 are respectively fixedly connected with telescopic struts 702 and the telescopic struts 702 are distributed in a square array, wherein the bottoms of four first latches are movably sleeved with telescopic brackets 703 and the telescopic brackets 703 are movably connected to the protective cover 3, and it is worth noting that the other two first latches are slidable, such as Figure 7 As shown, during transportation, the three relative support frames 701 can be folded to reduce occupied space and improve transportation efficiency.

[0024] As another embodiment of the present invention, a slide groove 701a is provided on the top of each support frame 701 and a slider 503a is slidably connected inside the slide groove 701a. It is worth noting that by setting the slide groove 701a, during use, the slider 503a slides inside the slide groove 701a, and the direction of the output end of the guide pipe 501 can be adjusted to realize the function of fixed-point concrete transportation.

[0025] Embodiment 2: A construction method based on a BIM high-rise building construction device, comprising the following steps: S1. Preparation stage for high-rise building construction: Use BIM technology to create detailed building information, determine the goals, scope and requirements of the high-rise building construction project, and use BIM to conduct construction simulation, optimize the construction plan, and discover and solve potential problems in advance; S2, concrete diversion treatment; S2.1, installation of concrete delivery pump pipe: first, unfold several support frames 701 through the latch, and then, through the telescopic function of the telescopic strut 702, keep the support frame 701 and the ground at the same level. When installing the concrete delivery pump pipe, first, lift the concrete delivery pump pipe to the specified position through the pump truck, and then insert the concrete delivery pump pipe into the buffer sleeve 604, and then apply force to the clip 604a through the first spring 605, so that the several clips 604a are tilted toward the concrete delivery pump pipe, so as to achieve the clamping and limiting effect of the concrete delivery pump pipe. When the concrete delivery pump pipe shows signs of shaking in the delivery of concrete, the buffer sleeve 604 applies force to the concrete delivery pump pipe through the first spring 605, so that the concrete delivery pump pipe can be more stable in the delivery of concrete; S2.2, diversion direction adjustment: before pumping concrete, first move the slider 503a inside the slide 701a to drive the limit frame 503 to move, thereby changing the direction of the guide pipe 501, which can shorten the time for concrete to flow out of the pipeline. Among them, by setting the delivery pipe 508, the delivery pipe 508 can be compressed. During use, some concrete will remain inside the delivery pipe 508. By adjusting the direction of the guide pipe 501, the use space of the delivery pipe 508 can be reduced, thereby reducing the concrete precipitation space. When disassembly and cleaning are required, the delivery pipe 508 can be easily taken out for cleaning by sleeve connection between the fixed interface 507 and the delivery pipe 508; S2.3, concrete diversion: firstly, the first motor 401 is operated through the external circuit mechanism, and the first motor 401 drives the first auger 402 to rotate, and also drives the conveying plate 403 to rotate inside the diversion tank 2. In this process, the concrete is discharged from the conveying pump pipe into the bearing tank 1 through the pump truck, and then the first auger 402 rotates to make the concrete move downward evenly. In this process, the first auger 402 stirs the concrete to make it fully mixed, to prevent the concrete sedimentation from causing blockage and concrete unevenness, which affects the quality of the concrete, and the concrete flows downward. , through the rotation of the conveying plate 403, the concrete flows into the universal tube 405 from the diversion interface 404, and then the second motor 505 is operated through the external circuit mechanism, and the second motor 505 drives the driving gear 506 to rotate, and the driving gear 506 rotates to engage the driven gear 504, and the driven gear 504 is inserted into the card slot 501a through the plug block 504a, so that the driven gear 504 drives the guide tube 501 to rotate, and then drives the second auger 502 to rotate, so that the concrete flows from it into the conveying pipe 508 and is transported to the designated position, thereby realizing the concrete diversion function.

[0026] The embodiments of the present invention disclose preferred embodiments, but are not limited thereto. A person skilled in the art can easily understand the spirit of the present invention based on the above embodiments and make different extensions and changes. However, as long as they do not deviate from the spirit of the present invention, they are all within the protection scope of the present invention.

Claims

1. A high-rise building construction device based on BIM, characterized in that: The invention comprises a carrying tank (1), wherein a diversion tank (2) is fixedly sleeved on the bottom of the carrying tank (1), a plurality of diversion ports (201) are provided on the side surface of the diversion tank (2), and the diversion ports (201) are distributed in a ring array, a protective sleeve (3) is fixedly sleeved on the side surface of the diversion tank (2), and a diversion mechanism (4) is arranged inside the diversion tank (2); The diversion mechanism (4) comprises a first motor (401), a diversion unit (5), a buffer unit (6) and a folding unit (7); the diversion unit (5) is fixedly connected to the diversion tank (2); the buffer unit (6) is fixedly connected to the support tank (1); and the folding unit (7) is movably connected to the protective sleeve (3); The first motor (401) is fixedly connected to the bottom of the diversion tank (2); the output end of the first motor (401) is fixedly connected to the first auger (402) via a first plug rod, and the first auger (402) is movably sleeved inside the support tank (1); a plurality of conveying plates (403) are fixedly connected to the side surface of the first plug rod, and the conveying plates (403) are in movably contact with the diversion tank (2); a diversion interface (404) is fixedly sleeved on the inner wall of each diversion port (201), and a universal tube (405) is fixedly connected to the output end of each diversion interface (404).

2. A BIM-based high-rise building construction device according to claim 1, characterized in that: The flow guide unit (5) comprises a plurality of flow guide tubes (501), each of the flow guide tubes (501) being movably sleeved on the output end of the universal tube (405), a second auger (502) being fixedly sleeved on the inner wall of each of the flow guide tubes (501), one end of each of the flow guide tubes (501) being movably sleeved on a limiting frame (503), and inner walls on both sides of the limiting frame (503) being movably connected to a passive gear (504).

3. A BIM-based high-rise building construction device according to claim 2, characterized in that: A second motor (505) is fixedly connected to one side of the limiting frame (503); a driving gear (506) is fixedly connected to the output end of the second motor (505); the driving gear (506) is meshingly connected to the driven gear (504); a fixed interface (507) is fixedly connected to one side of the limiting frame (503); the fixed interface (507) is movably sleeved to the guide tube (501); and a delivery tube (508) is fixedly connected to the output end of the guide tube (501).

4. A BIM-based high-rise building construction device according to claim 3, characterized in that: The side surface of the guide tube (501) is provided with a plurality of slots (501a) distributed in a ring array, the bottom of the limit frame (503) is fixedly connected with a slider (503a), the inner wall of the passive gear (504) is fixedly connected with a plurality of plug-in blocks (504a), and the plug-in blocks (504a) are plugged into the slots (501a).

5. A BIM-based high-rise building construction device according to claim 4, characterized in that: The buffer unit (6) comprises an annular bracket (601), a plurality of through holes (602) are provided on the side surface of the annular bracket (601), and the through holes (602) are distributed in an annular array, and a movable rod (603) is movably sleeved on the inner wall of the through hole (602).

6. A BIM-based high-rise building construction device according to claim 5, characterized in that: The inner wall of the annular bracket (601) is movably sleeved with a buffer sleeve (604), the side surface of each movable rod (603) is movably sleeved with a first spring (605), and both ends of the first spring (605) are respectively fixedly connected between the annular bracket (601) and the buffer sleeve (604).

7. A BIM-based high-rise building construction device according to claim 6, characterized in that: A plurality of clips (604a) are fixedly connected to the top of the buffer sleeve (604), and the movable rod (603) is fixedly connected to the clips (604a).

8. The BIM-based high-rise building construction device according to claim 7 is characterized in that: The folding unit (7) comprises a plurality of support frames (701), wherein the plurality of support frames (701) are arranged at the bottom of the protective cover (3) and two adjacent support frames (701) are movably connected via a first latch, wherein four of the support frames (701) are respectively fixedly connected at the bottom with telescopic support rods (702), and the telescopic support rods (702) are distributed in a square array, wherein the bottoms of the four first latches are movably sleeved with telescopic brackets (703), and the telescopic brackets (703) are movably connected to the protective cover (3).

9. A BIM-based high-rise building construction device according to claim 8, characterized in that: A sliding groove (701a) is provided on the top of each support frame (701), and a sliding block (503a) is slidably connected inside the sliding groove (701a).

10. A construction method based on a BIM high-rise building construction device according to claim 9, characterized in that: The following steps are involved: S1. Preparation stage for high-rise building construction: Use BIM technology to create detailed building information, determine the goals, scope and requirements of the high-rise building construction project, and use BIM to conduct construction simulation, optimize the construction plan, and discover and solve potential problems in advance; S2, concrete diversion treatment; S2.1, installation of the concrete delivery pump pipe: first, the plurality of support frames (701) are unfolded by means of a latch, and then the support frames (701) are kept at the same level as the ground through the telescopic function of the telescopic support rod (702). When installing the concrete delivery pump pipe, the concrete delivery pump pipe is first raised to a specified position by means of a pump truck, and then the concrete delivery pump pipe is inserted into the buffer sleeve (604). Then, a force is applied to the clip (604a) by means of a first spring (605), so that the plurality of clips (604a) are tilted toward the concrete delivery pump pipe, thereby achieving a clamping and limiting effect of the concrete delivery pump pipe. When the concrete delivery pump pipe shows signs of shaking during the delivery of concrete, the buffer sleeve (604) is used to apply a force to the concrete delivery pump pipe through the first spring (605), so that the concrete delivery pump pipe can be more stable during the delivery of concrete. S2.2, diversion direction adjustment: before pumping concrete, the slider (503a) is first moved inside the slide groove (701a) to drive the limit frame (503) to move, thereby changing the direction of the guide pipe (501), which can shorten the time for concrete to flow out of the pipeline. In particular, by setting the delivery pipe (508), the delivery pipe (508) can be compressed. During use, some concrete will remain inside the delivery pipe (508). By adjusting the direction of the guide pipe (501), the use space of the delivery pipe (508) can be reduced, thereby reducing the concrete sedimentation space. When disassembly and cleaning is required, the delivery pipe (508) can be easily taken out for cleaning by sleeve connection between the fixed interface (507) and the delivery pipe (508); S2.3, concrete diversion: firstly, the first motor (401) is operated through the external circuit mechanism, and the first motor (401) drives the first auger (402) to rotate, and also drives the conveying plate (403) to rotate inside the diversion tank (2). During this process, the concrete is discharged from the conveying pump pipe into the bearing tank (1) through the pump truck, and then the first auger (402) rotates to make the concrete move downward evenly. During this process, the first auger (402) stirs the concrete to make it fully mixed, so as to prevent the concrete from settling and causing blockage and uneven concrete, which affects the quality of the concrete. The concrete flows downward and passes through the conveying plate ( 403) rotates, and concrete flows from the diversion interface (404) into the interior of the universal tube (405), and then passes through the external circuit mechanism to make the second motor (505) work, and the second motor (505) drives the driving gear (506) to rotate, and the driving gear (506) rotates to mesh with the driven gear (504), and the driven gear (504) is inserted into the slot (501a) through the plug block (504a), so that the driven gear (504) drives the guide tube (501) to rotate, and then drives the second auger (502) to rotate, so that the concrete flows from it into the delivery pipe (508) and is delivered to a designated position, thereby realizing the concrete diversion function.