Rapid hoisting equipment and hoisting method for prefabricated bridge deck slab of steel-concrete composite beam

By setting up mobile tracks on the steel beams and fast lifting equipment using electric hoists and slip mechanisms, the problem of rapid and accurate installation of prefabricated bridge decks in the prior art by steel concrete composite beams is solved, and efficient and accurate installation in confined spaces is achieved.

CN119976666AActive Publication Date: 2025-05-13CHINA RAILWAY BRIDGE BUREAU OF THE NINTH ENG CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202510065621.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-16
Publication Date
2025-05-13
Estimated Expiration
2045-01-16

AI Technical Summary

Technical Problem

The existing prefabricated bridge deck installation technology of steel concrete composite beams is difficult to achieve rapid and accurate installation in environments with busy traffic and limited underground space, and is greatly affected by the weather, so the installation accuracy is difficult to control.

Method used

A fast lifting equipment for prefabricated bridge deck panels of steel concrete composite beams is designed. By setting a moving track on the steel beams, the lifting equipment is moved along the moving tracks, and the prefabricated bridge deck is lifted and moved by electric hoists and sliding mechanisms to achieve rapid and accurate installation.

Benefits of technology

Quickly and accurately install prefabricated bridge panels of steel concrete composite beams in confined spaces, improving installation efficiency and quality, and suitable for construction environments with busy traffic and limited underground space.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119976666A_ABST
    Figure CN119976666A_ABST
Patent Text Reader

Abstract

The invention discloses a steel concrete composite beam prefabricated bridge deck rapid hoisting device and hoisting method.The steel concrete composite beam prefabricated bridge deck rapid hoisting device comprises a main bearing beam, a hoisting device, a supporting device, a moving device and a reshipment device, the main bearing beam, the hoisting device, the supporting device and the moving device are combined to form the hoisting device, and a moving track is installed on a steel beam; the hoisting equipment is installed on a moving track through the moving device and moves along the moving track, the prefabricated bridge deck is installed through the steps of hoisting, transverse moving, alignment, hook falling and the like of the hoisting device, the hoisting equipment is longitudinally controlled to move, align and circulate through the moving device, and therefore the steel-concrete composite beam prefabricated bridge deck is rapidly and accurately installed. Installation is more convenient and efficient, and quality is better.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of material batching, and in particular to a fast lifting device and a hoisting method for a prefabricated bridge deck of a steel-concrete composite beam. Background Art

[0002] Steel-concrete composite beam refers to a beam bridge formed by the joint force of steel beam and concrete bridge deck through connectors. The concrete deck is the upper structure of the steel-concrete composite beam and is the load-bearing structure that directly bears the vehicle load. It usually adopts prefabricated assembly construction technology. The installation of prefabricated bridge deck is an important process in the construction of steel-concrete composite beam. Its installation quality directly affects the overall structural safety and service life of the bridge.

[0003] For the installation of conventional steel-concrete composite beam precast bridge decks, a truck crane is generally used to install the precast bridge deck to the designed position. However, the truck crane needs to be moved several times during the installation process, and the construction area occupies a large area, which is not suitable for construction environments with busy traffic and limited underground space. In addition, the installation process of the truck crane is greatly affected by the weather, and the installation accuracy of the bridge deck is difficult to control. Therefore, a construction technology is needed to quickly and accurately install the steel-concrete composite beam precast bridge deck, making the installation more convenient, efficient, and of better quality. Summary of the invention

[0004] In order to overcome the shortcomings of the prior art, the purpose of the present invention is to provide a rapid lifting equipment and lifting method for prefabricated bridge decks of steel-concrete composite beams. When the ground space is limited, the lifting equipment is set on the steel beam. The lifting equipment can lift the prefabricated bridge deck on the ground through an electric hoist, lift the prefabricated bridge deck above the bridge deck, complete the installation of the bridge deck, and then realize the longitudinal movement and alignment of the lifting equipment through its own moving device, so as to quickly and accurately install the prefabricated bridge deck of the steel-concrete composite beam, making the installation more convenient, efficient and of better quality.

[0005] The purpose of the present invention is achieved through the following technical solutions:

[0006] A fast lifting device for prefabricated bridge deck with steel-concrete composite beams, comprising:

[0007] Main load-bearing beam;

[0008] A lifting device is installed on the main load-bearing beam and moves along the main load-bearing beam, and the lifting device is used to lift the prefabricated bridge deck;

[0009] A supporting device, connected to the main load-bearing beam, the supporting device is used to support the main load-bearing beam;

[0010] A moving device, installed on the moving track and connected to the supporting device, the moving device is used to control the lifting device to move along the moving track;

[0011] The inverting device is placed between the moving device and the supporting device, and is used to move the moving track.

[0012] Furthermore, the lifting device includes an electric hoist and a sliding mechanism. The electric hoist is installed on the sliding mechanism, and the sliding mechanism is installed on the main load-bearing beam. The electric hoist lifts the prefabricated bridge panel through a hook, and the sliding mechanism drives the electric hoist to move along the main load-bearing beam.

[0013] Furthermore, the supporting device reserves a moving space, and the lifting device passes through the moving space. The supporting device includes an upper supporting beam, a lower supporting beam and supporting legs. The upper supporting beam is connected to the main load-bearing beam, and the supporting legs are supported between the upper supporting beam and the lower supporting beam. The lower supporting beam is provided with a mounting shaft. The supporting device is installed on the moving device through the mounting shaft, and the inverting device is installed on the mounting shaft.

[0014] Furthermore, the reverse transport device includes a reverse transport rod, a movable pulley and a reverse chain hoist. The reverse transport rod is rotatably installed on the installation shaft. The reverse chain hoist is installed on the reverse transport rod through the movable pulley and moves along the reverse transport rod. The reverse chain hoist is used for hoisting the movable track.

[0015] Furthermore, the moving device includes a motor, a travel wheel box and a travel wheel, the motor and the travel wheel are connected to the travel wheel box, and the motor drives the travel wheel box to drive the travel wheel to move along the moving track;

[0016] The mobile device also includes a fixing device, which is used to fix the mobile device. The fixing device includes a cable wind rope and an anchoring device. The anchoring device is installed on the steel beam. One end of the cable wind rope is connected to the supporting device, and the other end is connected to the anchoring device.

[0017] Furthermore, the mobile device is equipped with a derailing device, which is used to prevent the mobile device from deviating from the mobile track. The derailing device includes an anti-detachment plate and an elastic spring. The anti-detachment plate is hinged on the mobile device through a pin shaft. The anti-detachment plate is provided with an ear plate 1, and the mobile device is provided with an ear plate 2. Both ends of the elastic spring are respectively connected with the ear plate 1 and the ear plate 2. The mobile device is also provided with a limit pin, which is used to limit the anti-detachment plate.

[0018] Furthermore, a stop device is installed at the end of the moving track, which is used to prevent the lifting equipment from leaving the moving track. The stop device includes a fixed steel plate and a stop plate. The stop plate is welded and fixed to the fixed steel plate. The fixed steel plate is fixed by a hook bolt. The stop plate has an arc-shaped structure. The arc-shaped stop plate matches the moving device, and the stop plate acts as a stop for the moving device.

[0019] Furthermore, it also includes a limiting device 1, which is connected to the movable track and is used to limit the movable track. The limiting device 1 includes a pressure plate and two bent hook bolts. The pressure plate is provided with a limiting groove, the movable track is limited in the limiting groove, the two bent hook bolts penetrate the pressure plate, and the pressure plate is fixed by the two bent hook bolts.

[0020] Furthermore, it also includes a second limiting device, which is connected to the moving track and is used to limit the moving track. The second limiting device includes a first clamp, a second clamp and a limiting bolt. The first clamp is against the moving track, and the first clamp and the second clamp are connected by the limiting bolt.

[0021] A method for hoisting a steel-concrete composite beam prefabricated bridge deck fast lifting equipment comprises the following steps:

[0022] Step 1: first install a moving track on the steel beam outside the steel-concrete composite beam, then limit the position of the moving track by limiting device 1 and limiting device 2, then install the lifting device on the moving track, the lifting device is installed on the moving track by the moving device, the lifting device is moved along the moving track to the position where the prefabricated bridge panel is to be installed by the moving device, and then the moving device is fixed by the fixing device to prevent the moving device from moving;

[0023] Step 2: Control the electric hoist to move to the end of the main load-bearing beam through the sliding mechanism, lift the prefabricated bridge deck from the ground to above the bridge deck through the electric hoist, and then drive the prefabricated bridge deck through the moving space reserved by the support device through the sliding of the sliding mechanism. After reaching the designated position, the prefabricated bridge deck passes under the electric hoist to complete the alignment and hook drop, and then repeat this step until the installation of the prefabricated bridge deck in the same row is completed;

[0024] Step 3: After the installation of the same row of prefabricated bridge panels is completed, the limit of the movable rail by the limit device 1 and the limit device 2 is released, the movable rail is reversed to the moving direction of the lifting device by the reverse transport device, and then the movable rail is limited by the limit device 1 and the limit device 2 again, and then the lifting device is moved to the installation position of the next row of prefabricated bridge panels, and then the movable device is fixed by the fixing device;

[0025] Step 4, repeating steps 2 and 3 until the prefabricated bridge deck is installed;

[0026] Step 5: Remove the lifting equipment.

[0027] Compared with the prior art, the present invention has the following beneficial effects:

[0028] In the present invention, a lifting device is formed by combining a main load-bearing beam, a lifting device, a supporting device and a moving device. A moving track is installed on the steel beam. The lifting device is installed on the moving track through the moving device and moved along the moving track. The prefabricated bridge panel is lifted by the lifting device to complete the installation of the prefabricated bridge panel. The lifting device is longitudinally controlled to move and align the lifting device, so that the prefabricated bridge panel of the steel-concrete composite beam is installed quickly and accurately, making the installation more convenient, efficient and of better quality.

[0029] The mobile device of the present invention is also provided with a derailing device, which limits the mobile device through the derailing device to prevent the mobile device from being separated from the mobile track. The derailing device comprises an anti-slip plate and an elastic spring, the anti-slip plate is hinged on the mobile device through a pin shaft, the anti-slip plate is provided with an ear plate one, the mobile device is provided with an ear plate two, and the two ends of the elastic spring are respectively connected with the ear plate one and the ear plate two. When the lifting equipment moves to the position of the steel beam crossbeam, after the anti-slip plate contacts the crossbeam, the anti-slip plate rotates because the anti-slip plate is hinged with the mobile device, so that the lifting equipment passes through the crossbeam, and then the anti-slip plate is restored to an initial state through the restoring force of the elastic spring, and a limiting latch is also provided on the mobile device, and the limiting latch is used to prevent the elastic spring from being tightened too much and the anti-slip plate from rotating in the opposite direction.

[0030] The present invention uses the above method steps to lift, transversely move, align and hook the prefabricated bridge deck using lifting equipment, thereby completing the installation of the prefabricated bridge deck, and repeatedly realizing the flow operation of the prefabricated bridge deck, greatly improving the installation efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] The present invention will be further described below in conjunction with the accompanying drawings:

[0032] Figure 1 It is a structural schematic diagram of a fast lifting device for prefabricated bridge decks of steel-concrete composite beams of the present invention;

[0033] Figure 2 It is a side view of a fast lifting device for prefabricated bridge deck of a steel-concrete composite beam of the present invention;

[0034] Figure 3 It is a schematic diagram of the structure of the mobile device and the fixed device in the present invention;

[0035] Figure 4 The motion state of the inverting device in the present invention Figure 1 ;

[0036] Figure 5 The motion state of the inverting device in the present invention Figure 2 ;

[0037] Figure 6 It is a structural schematic diagram of the moving device and the derailing device in the present invention;

[0038] Figure 7 It is a structural schematic diagram of the moving device and the derailing device in the present invention from another perspective;

[0039] Figure 8 It is a structural schematic diagram of the derailing device in the present invention;

[0040] Fig. 9 It is a structural schematic diagram of the derailing device in the present invention from another perspective;

[0041] Fig.10 It is a schematic diagram of the structure of the stop device in the present invention;

[0042] Fig.11 It is a schematic diagram of the structure of the stop device and the moving device in the present invention;

[0043] Fig.12 It is a structural schematic diagram of the limiting device 1 in the present invention;

[0044] Fig.13 It is a structural schematic diagram of the second limiting device in the present invention;

[0045] Fig.14 It is a structural schematic diagram of another viewing angle of the second limiting device in the present invention;

[0046] Fig.15 This is a usage status diagram of a quick lifting device for prefabricated bridge deck of a steel-concrete composite beam according to the present invention.

[0047] In the figure: 10-main load-bearing beam; 11-prefabricated bridge deck; 12-steel beam;

[0048] 20-lifting device; 21-electric hoist; 22-sliding mechanism; 23-hook;

[0049] 30-support device; 31-upper support beam; 32-lower support beam; 33-support leg; 34-mounting shaft; 35-moving space;

[0050] 40-mobile device; 41-mobile track; 42-fixed device; 43-motor; 44-travel wheel box; 45-travel wheel; 46-cabling rope; 47-anchoring device;

[0051] 50-reverse transport device; 51-reverse transport rod; 52-moving pulley; 53-reverse chain hoist;

[0052] 60-derailment device; 61-anti-slip plate; 62-elastic spring; 63-pin shaft; 64-ear plate 1; 65-ear plate 2; 66-limiting latch;

[0053] 70-stop device; 71-fixed steel plate; 72-stop plate; 73-bend hook bolt 1;

[0054] 80-limiting device 1; 81-pressing plate; 82-hook bolt 2; 83-limiting groove;

[0055] 90-limiting device 2; 91-clamping plate 1; 92-clamping plate 2; 93-limiting bolt. DETAILED DESCRIPTION

[0056] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.

[0057] like Figures 1 to 15 As shown, a fast lifting device for a prefabricated bridge deck 11 of a steel-concrete composite beam of the present invention comprises a main load-bearing beam 10, a lifting device 20, a supporting device 30, a moving device 40, a moving track 41, a reversing device 50, a fixing device 42, a derailing device 60, a stopping device 70, a limiting device 1 80 and a limiting device 2 90. The lifting device 20 is installed on the main load-bearing beam 10 and can move along the main load-bearing beam 10. The prefabricated bridge deck 11 is lifted by the lifting device 20 and the prefabricated bridge deck 11 is moved horizontally to the bridge deck for installation. The supporting device 30 is connected to the main load-bearing beam 10, and the main load-bearing beam 10 is supported on the supporting device 30. The moving device 40 is installed at the bottom of the supporting device 30 to realize the installation of the lifting device. The moving track 41 is laid on the bridge deck steel beam 12, and the moving track 41 is limited by the limiting device 1 80 and the limiting device 2 90 to prevent the moving track 41 from deflecting. The lifting equipment is installed on the moving track 41 through the moving device 40. The movable track 41 is on the track 41 and moves along the movable track 41. The inverting device 50 is installed between the movable device 40 and the supporting device 30. When the prefabricated bridge panels 11 in the same row are installed, the lifting equipment needs to be moved. The movable track 41 is inverted to the direction of movement of the lifting equipment through the inverting device 50, and the movable track 41 is reused to reduce the setting of the movable track 41. When the lifting equipment moves to the to-be-determined position, the movable device 40 is fixed by the fixing device 42 to prevent the movable device 40 from moving during the process of hoisting the prefabricated bridge panels 11. The derailing device 60 is installed on the side of the movable device 40. The rigidity of the derailing device 60 itself limits the left and right deviation of the movable device 40 to prevent the lifting equipment from deviating from the movable track 41 during the movement. The stop device 70 is set at the end of the movable track 41. The setting of the stop device 70 plays a stopping role on the lifting equipment to prevent the lifting equipment from walking out of the movable track 41 during the movement.

[0058] The present invention forms a lifting device by combining a main load-bearing beam 10, a lifting device 20, a supporting device 30 and a moving device 40, installs a moving track 41 on a steel beam 12, and installs the lifting device on the moving track 41 through the moving device 40 and moves along the moving track 41. The prefabricated bridge panel 11 is lifted by the lifting device 20 to complete the installation of the prefabricated bridge panel 11. The lifting device is longitudinally controlled by the moving device 40 to move and align the lifting device, so as to quickly and accurately install the steel-concrete composite beam prefabricated bridge panel 11, making the installation more convenient, efficient and of better quality. A derailing device 60 is installed to limit the moving device 40 through the derailing device 60 to prevent the moving device 40 from deviating from the moving track 41.

[0059] The main load-bearing beam 10 is a truss beam welded from steel sections, and the outer steel beams 12 of the steel-concrete composite beam bridge are cantilevered at both ends thereof, so as to facilitate the lifting device 20 to lift the prefabricated bridge deck 11 from both sides under the bridge.

[0060] The lifting device 20 includes an electric hoist 21 and a sliding mechanism 22. The electric hoist 21 is installed on the sliding mechanism 22, and the sliding mechanism 22 is installed on the main load-bearing beam 10. The sliding mechanism 22 can move laterally along the main load-bearing beam 10. The electric hoist 21 hoists the prefabricated bridge panel 11 through the hook 23, and then drives the electric hoist 21 to move along the main load-bearing beam 10 through the sliding mechanism 22 to move the prefabricated bridge panel 11 to the installation position, thereby realizing the lifting of the prefabricated bridge panel 11. The sliding mechanism 22 belongs to the existing technology, and specifically can adopt a sliding trolley, etc. In this embodiment, the specific structure of the sliding mechanism 22 is not limited, so it is not explained again.

[0061] There may be one or more lifting devices 20. In the present embodiment, one lifting device 20 is provided to lift the prefabricated bridge panels 11 on both sides of the bridge. Alternatively, two lifting devices 20 may be provided to lift the prefabricated bridge panels 11 on both sides of the bridge at the same time.

[0062] The structure of the support device 30 is trapezoidal. The support device 30 includes an upper support beam 31, a lower support beam 32 and support legs 33. The upper support beam 31 is connected to the main load-bearing beam 10. The support legs 33 are supported between the upper support beam 31 and the lower support beam 32. There are two support legs 33. A moving space 35 is reserved between the two support legs 33. The lifting device 20 passes through the moving space 35. The lower support beam 32 is provided with a mounting shaft 34. The support device 30 is installed on the moving device 40 through the mounting shaft 34, and the inverting device 50 is installed on the mounting shaft 34.

[0063] Two supporting devices 30 are provided, and the main load-bearing beam 10 is stably supported by the two supporting devices 30 , and the spacing between the two supporting devices 30 is consistent with the spacing between the outer steel beams 12 of the steel-concrete composite beam.

[0064] The moving device 40 includes a motor 43, a wheel box 44 and a wheel 45. The motor 43 and the wheel 45 are both connected to the wheel box 44. The motor 43 drives the wheel box 44 to drive the wheel 45 to move along the moving track. The moving speed of the wheel 45 is controlled by the wheel box 44.

[0065] The fixing device 42 is used to fix the moving device 40 , and the fixing device includes a cable 46 and an anchoring device 47 . The anchoring device 47 is installed on the steel beam. One end of the cable 46 is connected to the supporting device, and the other end is connected to the anchoring device 47 .

[0066] The reverse transport device 50 includes a reverse transport rod 51, a movable pulley 52 and a reverse chain hoist 53. The reverse transport rod 51 is rotatably installed on the installation shaft 34. The reverse chain hoist 53 is installed on the reverse transport rod 51 through the movable pulley 52 and moves along the reverse transport rod 51. The movable rail 41 is hoisted by the reverse chain hoist 53. When the prefabricated bridge panels 11 in the same row are installed, it is necessary to move the lifting equipment along the movable rail 41, and lift the movable rail 41 by the reverse chain hoist 53. Then, the reverse transport rod 51 is rotated to transport the movable rail 41 to the moving direction of the lifting equipment, and then the movable pulley 52 moves on the reverse transport rod 51 to move the movable rail 41 to the installation position. Finally, the movable rail 41 is lowered by the reverse chain hoist 53 to limit it, so as to realize the reverse transport of the movable rail 41.

[0067] The derailing device 60 comprises an anti-slip plate 61 and an elastic spring 62, the anti-slip plate 61 is hinged on the side of the mobile device 40 by a pin 63, the mobile device 40 is limited to deviate left and right by the rigidity of the anti-slip plate 61, and the mobile device 40 is prevented from deviating from the moving track 41, the anti-slip plate 61 can rotate around the pin 63, the anti-slip plate 61 is provided with an ear plate 1 64, and the mobile device 40 is provided with an ear plate 2 65, and the two ends of the elastic spring 62 are respectively connected with the ear plate 1 64 and the ear plate 2 65, when the lifting equipment moves to the cross beam position of the steel beam 12, the anti-slip plate 61 contacts with the cross beam and rotates, so that the anti-slip plate 61 passes through the cross beam, and the anti-slip plate 61 is tightened by the elastic spring 62 after crossing the cross beam to restore the original state, and the side of the mobile device 40 is also provided with a limiting latch 66, and the limiting latch 66 is used for limiting the anti-slip plate 61, and the elastic spring 62 is prevented from being tightened too much, causing the anti-slip plate 61 to rotate in the opposite direction and lose its effect.

[0068] The stop device 70 includes a fixed steel plate 71 and a stop plate 72. The stop plate 72 is welded and fixed to the fixed steel plate 71. The stop plate 72 is welded to the front end of the fixed steel plate 71. The fixed steel plate 71 is connected and fixed to the shear groove steel bar by a hook bolt 73. The stop plate 72 has an arc-shaped structure. The arc-shaped stop plate 72 matches the moving device 40, and the stop plate 72 acts as a stop for the moving device 40.

[0069] In this embodiment, the movable rail 41 is installed at two positions, one of which is installed on the prefabricated bridge deck 11 that has been laid and is limited by a limiting device 1 80 , and the other installation position of the movable rail 41 is located on the steel beam 12 and is limited by a limiting device 2 90 .

[0070] The limiting device 80 includes a pressure plate 81 and a second hook bolt 82. The pressure plate 81 is provided with a limiting groove 83, and the movable track 41 is limited in the limiting groove 83. Holes are provided on both sides of the pressure plate 81. The second hook bolt 82 passes through the holes and is connected to the shear groove steel bars. The pressure plate 81 is locked by tightening the second hook bolt 82 to achieve the limitation of the movable track 41.

[0071] There are two limit devices 90, which are located on both sides of the moving track 41. The limit device 90 includes a clamp 91, a clamp 92 and a limit bolt 93. The clamp 91 is against the moving track 41, and the moving track 41 is located between the two clamps 91 and is limited by the two clamps 91. The clamp 92 is located on the bottom side of the clamp 91. The clamp 91 and the clamp 92 are connected by the limit bolt 93. After the moving track 41 is installed in place, the limit bolt 93 is tightened to fix the clamp 91 and the clamp 92 on the steel beam 12, thereby avoiding the deviation of the moving track 41. After loosening the limit bolt 93, the clamp 92 can rotate freely, which is convenient for the removal of the moving track 41.

[0072] A method for hoisting a steel-concrete composite beam prefabricated bridge deck 11 with a fast lifting device, comprising the following steps:

[0073] Step 1: first install the moving track 41 on the steel beam 12 outside the steel-concrete composite beam, then limit the position of the moving track 41 by the limiting device 1 80 and the limiting device 2 90, and then install the lifting device on the moving track 41. The lifting device is installed on the moving track 41 by the moving device 40. The lifting device is moved along the moving track 41 to the installation position of the prefabricated bridge panel 11 by the moving device 40, and then the moving device 40 is fixed by the fixing device 42 to prevent the moving device 40 from moving;

[0074] Step 2: Control the electric hoist 21 to move to the end of the main load-bearing beam 10 through the sliding mechanism 22, lift the prefabricated bridge deck 11 from the ground to above the bridge deck through the electric hoist 21, and then drive the prefabricated bridge deck 11 through the moving space 35 reserved by the support device 30 through the sliding of the sliding mechanism 22. After reaching the designated position, the prefabricated bridge deck 11 passes under the electric hoist 21 to complete the alignment and hook drop, and then repeat this step until the installation of the prefabricated bridge deck 11 in the same row is completed;

[0075] Step 3: After the installation of the same row of prefabricated bridge panels 11 is completed, the limiting device 1 80 and the limiting device 2 90 are released from the limit of the movable rail 41, and the movable rail is reversed to the moving direction of the lifting device by the reverse transport device 50, and then the movable rail 41 is limited by the limiting device 1 80 and the limiting device 2 90 again, and then the lifting device is moved to the installation position of the next row of prefabricated bridge panels 11, and then the movable device 40 is fixed by the fixing device 42;

[0076] Step 4, repeating steps 2 and 3 until the prefabricated bridge deck 11 is installed;

[0077] Step 5: Remove the lifting equipment.

[0078] The present invention uses the above method steps to lift, move, align and hook the prefabricated bridge panel 11 using lifting equipment, thereby completing the installation of the prefabricated bridge panel 11, and repeatedly realizing the flow operation of the prefabricated bridge panel 11, thereby greatly improving the installation efficiency.

[0079] The implementation methods of the present invention are not limited to these. According to the above-mentioned embodiments of the present invention, by using conventional technical knowledge and customary means in the field, without departing from the above-mentioned basic technical ideas of the present invention and without conflict, the above-mentioned preferred embodiments may also be modified, replaced or combined in various other forms, and the other embodiments obtained all fall within the scope of protection of the present invention.

Claims

1. A fast lifting equipment for prefabricated bridge decks made of steel-concrete composite beams, characterized in that: include: Main load-bearing beam; A lifting device is installed on the main load-bearing beam and moves along the main load-bearing beam, and the lifting device is used to lift the prefabricated bridge deck; A supporting device connected to the main load-bearing beam, the supporting device being used to support the main load-bearing beam; A moving device, installed on the moving track and connected to the supporting device, the moving device is used to control the lifting device to move along the moving track; The inverting device is placed between the moving device and the supporting device, and the inverting device is used to move the moving track.

2. The rapid lifting equipment for prefabricated bridge deck made of reinforced concrete composite beams according to claim 1 is characterized by: The lifting device includes an electric hoist and a sliding mechanism, the electric hoist is installed on the sliding mechanism, the sliding mechanism is installed on the main load-bearing beam, the electric hoist hoists the prefabricated bridge panel through a hook, and the sliding mechanism drives the electric hoist to move along the main load-bearing beam.

3. The rapid lifting equipment for prefabricated bridge deck made of reinforced concrete composite beams according to claim 1 is characterized by: The support device reserves a moving space, and the lifting device passes through the moving space. The support device includes an upper support beam, a lower support beam and support legs. The upper support beam is connected to the main load-bearing beam, and the support legs are supported between the upper support beam and the lower support beam. The lower support beam is provided with a mounting shaft. The support device is installed on the moving device through the mounting shaft, and the inverting device is installed on the mounting shaft.

4. The rapid lifting equipment for prefabricated bridge deck made of reinforced concrete composite beams according to claim 3 is characterized by: The reverse transport device includes a reverse transport rod, a movable pulley and a reverse chain hoist. The reverse transport rod is rotatably mounted on the mounting shaft. The reverse chain hoist is mounted on the reverse transport rod through the movable pulley and moves along the reverse transport rod. The reverse chain hoist is used to hoist the movable track.

5. The rapid lifting equipment for prefabricated bridge deck made of reinforced concrete composite beams according to claim 1 is characterized by: The moving device comprises a motor, a travel wheel box and a travel wheel, wherein the motor and the travel wheel are both connected to the travel wheel box, and the motor drives the travel wheel box to drive the travel wheel to move along the moving track; The mobile device also includes a fixing device, which is used to fix the mobile device. The fixing device includes a cable and an anchoring device. The anchoring device is installed on a steel beam. One end of the cable is connected to the supporting device, and the other end is connected to the anchoring device.

6. The rapid lifting equipment for prefabricated bridge deck made of reinforced concrete composite beams according to claim 1 is characterized by: The mobile device is equipped with a derailing device, which is used to prevent the mobile device from deviating from the mobile track. The derailing device includes an anti-dropping plate and an elastic spring. The anti-dropping plate is hinged on the mobile device through a pin shaft. The anti-dropping plate is provided with an ear plate 1, and the mobile device is provided with an ear plate 2. Both ends of the elastic spring are respectively connected with the ear plate 1 and the ear plate 2. The mobile device is also provided with a limiting latch, and the limiting latch is used to limit the anti-dropping plate.

7. The rapid lifting equipment for prefabricated bridge deck made of reinforced concrete composite beams according to claim 1 is characterized by: A stop device is installed at the end of the movable track, and the stop device is used to prevent the lifting equipment from leaving the movable track. The stop device includes a fixed steel plate and a stop plate. The stop plate is welded and fixed to the fixed steel plate, and the fixed steel plate is fixed by a hook bolt. The stop plate has an arc-shaped structure, and the arc-shaped stop plate matches the movable device, and the stop plate acts as a stop for the movable device.

8. The rapid lifting equipment for prefabricated bridge deck made of reinforced concrete composite beams according to claim 1 is characterized by: It also includes a limiting device 1, which is connected to the movable track and is used to limit the movable track. The limiting device 1 includes a pressure plate and two bent hook bolts. The pressure plate is provided with a limiting groove, and the movable track is limited in the limiting groove. The two bent hook bolts penetrate the pressure plate, and the pressure plate is fixed by the two bent hook bolts.

9. The rapid lifting equipment for prefabricated bridge deck made of reinforced concrete composite beams according to claim 1 is characterized by: It also includes a second limiting device, which is connected to the movable track and used to limit the movable track. The second limiting device includes a first clamp, a second clamp and a limiting bolt. The first clamp is against the movable track, and the first clamp and the second clamp are connected by the limiting bolt.

10. A method for hoisting a steel-concrete composite beam prefabricated bridge deck fast lifting equipment according to any one of claims 1 to 9, characterized in that The following steps are involved: Step 1: first install a moving track on the steel beam outside the steel-concrete composite beam, then limit the position of the moving track by limiting device 1 and limiting device 2, then install the lifting device on the moving track, the lifting device is installed on the moving track by the moving device, the lifting device is moved along the moving track to the position where the prefabricated bridge panel is to be installed by the moving device, and then the moving device is fixed by the fixing device to prevent the moving device from moving; Step 2: Control the electric hoist to move to the end of the main load-bearing beam through the sliding mechanism, lift the prefabricated bridge deck from the ground to above the bridge deck through the electric hoist, and then drive the prefabricated bridge deck through the moving space reserved by the support device through the sliding of the sliding mechanism. After reaching the designated position, the prefabricated bridge deck passes under the electric hoist to complete the alignment and hook drop, and then repeat this step until the installation of the prefabricated bridge deck in the same row is completed; Step 3: After the installation of the same row of prefabricated bridge panels is completed, the limit of the movable rail by the limit device 1 and the limit device 2 is released, the movable rail is reversed to the moving direction of the lifting device by the reverse transport device, and then the movable rail is limited by the limit device 1 and the limit device 2 again, and then the lifting device is moved to the installation position of the next row of prefabricated bridge panels, and then the movable device is fixed by the fixing device; Step 4, repeating steps 2 and 3 until the prefabricated bridge deck is installed; Step 5: Remove the lifting equipment.

Citation Information

Patent Citations

  • Overweight assembly type prefabricated stair hoisting device and construction method

    CN112320611A

  • Multi -functional walking bridge deck crane structure

    CN207361624U

  • Bridge crane

    JP2004175545A

  • Rail support carriage of bridge crane and rail exchange method

    JP2016011177A