An assembly support device for high-altitude beams and its usage method

By assembling the support formwork and positioning components of the support device at high altitude beams, using components such as lateral support frames and hydraulic cylinders, the precise butt and stable movement of the beams and the main pier are achieved, solving the docking problems in the installation of prefabricated cross beams, and improving construction efficiency and safety.

CN120042155BActive Publication Date: 2025-07-25CHINA RAILWAY 11TH BUREAU GRP CORP LTD +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202510529616.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2025-04-25
Publication Date
2025-07-25
Estimated Expiration
2045-04-25

AI Technical Summary

Technical Problem

When installing prefabricated beams in complex urban environments or in high altitudes, there are problems such as difficulty in precise docking between the beams and the main pier, low construction efficiency and high safety risks.

Method used

A high-altitude cross beam assembly support device is provided, including a support formwork and positioning assembly, and the cross beam is accurately positioned and stable movement by using a lateral support frame, a horizontal adjustment hydraulic cylinder and a lateral positioning plate, and through pressure sensor monitoring and projection spotlight assistance, the cross beam is realized.

Benefits of technology

The precise docking between the beam and the main pier is achieved, reducing construction difficulty and safety risks, and improving construction efficiency and stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120042155B_ABST
    Figure CN120042155B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of crossbeam assembly, and in particular to a high-altitude crossbeam assembly support device and a usage method. The high-altitude crossbeam assembly support device includes a support template and a positioning component. There are two support templates, which are symmetrically distributed. Installation holes matching the main pier casting template are provided at the butt joint part of the two support templates; multiple groups of positioning components are provided and are dispersedly arranged on the outer sides of the tops of the two support templates, and are used to block the horizontal position of the prefabricated crossbeam during crossbeam assembly; the positioning component includes a lateral support frame, a horizontal adjustment hydraulic cylinder and a lateral positioning plate. During the assembly process of the crossbeam in the present invention, the lateral positioning plate in the positioning component will block and limit the outer wall of the hoisted crossbeam. When the side wall of the crossbeam abuts against the lateral positioning plate, the positioning of the crossbeam can be achieved. At this time, making the crossbeam fall vertically can accurately install the crossbeam on the top of the main pier. Therefore, the alignment of the crossbeam assembly can be made more convenient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of crossbeam assembly, and particularly relates to a high-altitude crossbeam assembly support device and a usage method thereof. Background Art

[0002] A crossbeam is a beam body horizontally arranged in a bridge span structure, perpendicular to the main piers (longitudinal beams), and plays a role in connecting the main piers to each other, dispersing loads, and enhancing the overall stiffness of the bridge. With the development of transportation construction in China, large bridges have sprung up, with the tower columns getting taller and the crossbeams getting longer. When constructing crossbeams in complex urban environments or at high altitudes, using traditional cast-in-place construction for crossbeams often faces problems such as difficult scaffold erection, large traffic impact, cumbersome construction processes, and high safety risks. While prefabricated crossbeam structures can significantly improve construction efficiency, reduce construction risks, and enable rapid installation.

[0003] Meanwhile, when installing prefabricated crossbeams in complex urban environments or at high altitudes, there are still some difficult problems: 1. Crossbeams are usually hoisted to above the main piers by lifting devices such as crawler cranes and truck cranes, and the position of the crossbeam is adjusted by adjusting the position of the crawler crane and the staff towing the cable to assist in adjusting the position of the crossbeam to achieve precise docking between the crossbeam and the main pier. The connection between the crossbeam and the main pier is usually a sleeve - threaded steel bar structure, and the general requirement for docking accuracy is less than 2 mm. Using the existing methods to adjust the alignment, the construction efficiency is low, the difficulty is high, the traffic impact is large, and there is a certain safety risk.

[0004] Therefore, it is necessary to provide a new high-altitude crossbeam assembly support device to solve the above technical problems. Summary of the Invention

[0005] To solve the above technical problems, the present invention provides a high-altitude crossbeam assembly support device and a usage method thereof. The device can support the suspended crossbeam and can adjust it to ensure the precise and rapid assembly between the crossbeam and the main pier, reducing the installation difficulty of the crossbeam and the construction safety risk.

[0006] To achieve the above technical purpose, the present invention provides a high-altitude crossbeam assembly support device for the assembly construction of prefabricated crossbeams and main piers erected at high altitudes. The support device is installed at the connection part between the main pier and the prefabricated crossbeam and is used for supporting the prefabricated crossbeam; the support device includes a support formwork and a positioning component. There are two support formworks, which are symmetrically distributed. Installation holes matching the main pier casting formwork are provided at the docking part of the two support formworks; multiple groups of positioning components are dispersedly arranged on the outer sides of the tops of the two support formworks and are used for limiting the horizontal position of the prefabricated crossbeam during crossbeam assembly.

[0007] The positioning assembly includes a lateral support frame, a horizontal adjustment hydraulic cylinder and a lateral positioning plate. The lower end of the lateral support frame is fixed on the support template, and the upper end extends upward. A lateral support plate is fixed at the top end of the lateral support frame. The horizontal adjustment hydraulic cylinder is fixedly installed inside the lateral support plate and is parallel to the support template. A transfer plate is fixedly installed at the output end of the horizontal adjustment hydraulic cylinder. Guide rods are inserted and slidably connected on both sides inside the lateral support plate. The end of the guide rod is fixedly connected to the transfer plate. The lateral positioning plate is fixed on the side of the transfer plate away from the lateral support plate. A pressure sensor is fixedly installed on the side wall of the transfer plate adjacent to the lateral positioning plate, and the force-receiving end of the pressure sensor is fixedly connected to the lateral positioning plate.

[0008] A preferred technical solution of the present invention: A supporting assembly for supporting the prefabricated cross beam is provided on the top of the support template. The supporting assembly includes a jacking hydraulic cylinder and a supporting plate. There are multiple jacking hydraulic cylinders, which are evenly distributed above the support template. The supporting plate is fixedly installed at the top ends of the multiple jacking hydraulic cylinders, and an assembly hole is opened at the position of the supporting plate corresponding to the installation hole.

[0009] A preferred technical solution of the present invention: The supporting device further includes a support frame, which is fixedly installed on the top of the cross beam by bolts. A projection spotlight is fixedly installed on the inner top of the support frame, and a lifting hanging ring is fixedly installed on the top of the support frame.

[0010] A preferred technical solution of the present invention: An alignment groove matching the protrusion on the outer wall of the main pier casting formwork is opened on the inner wall of the installation hole, and the two support templates are fixedly installed on the outer wall of the main pier casting formwork by bolts.

[0011] A preferred technical solution of the present invention: Extension plates are fixedly installed on the tops of both support templates. Through holes with the same size and shape as the installation holes are opened at the positions of the two extension plates corresponding to the installation holes; Multiple groups of positioning assemblies are evenly dispersed outside the extension plates. The bottom of each lateral support frame is fixedly connected to the extension plate by bolts, and multiple lateral support frames are all inclined outward; The bottom of each jacking hydraulic cylinder is fixed on the top surface of the extension plate.

[0012] A preferred technical solution of the present invention: Installation frames are symmetrically erected on both sides of the top of the supporting plate. Multiple longitudinally guiding rollers that are evenly distributed and rotatably connected are erected inside the installation frames, and the outer walls of the longitudinally guiding rollers are located above the top of the installation frames.

[0013] A preferred technical solution of the present invention: Mounting plates that are fixedly connected are symmetrically installed on both sides of the assembly hole of the supporting plate, and cameras that are fixedly connected are installed on the opposite surfaces of the two mounting plates.

[0014] A preferred technical solution of the present invention: A transfer frame is fixedly installed on the top of the supporting plate. On both sides of the top of the transfer frame, vertical adjustment hydraulic cylinders are fixedly installed. The tops of multiple vertical adjustment hydraulic cylinders are installed with a top frame fixedly connected together. Inside the top frame, multiple horizontally guiding rollers are evenly distributed and rotatably connected, and the outer wall of the horizontally guiding roller is located above the top of the top frame; Multiple installation frames are evenly distributed between adjacent two horizontally guiding rollers, and the distance between adjacent two horizontally guiding rollers is greater than the outer wall specification of the installation frame.

[0015] The present invention also provides a usage method of an aerial beam assembly support device. This device is used in the assembly of an assembled beam erected at high altitude and a main pier. The assembled beam and the main pier are perpendicular to each other. This device is installed at the connection part between the main pier and the assembled beam and is used to support and adjust the assembly of the assembled beam. The specific usage of this device includes the following steps:

[0016] S1. Before the construction of the main pier casting is completed and before the assembled beam is installed, first fixedly install the support template in the support device on the outer wall of the template built during the main pier casting through bolts, and then fixedly install the positioning component and the supporting component on the top of the support template in sequence;

[0017] S2. Connect the assembled beam with an external lifting device; After the assembly of the device is completed, electrically connect the electrical components in the device with the controller of the terminal;

[0018] S3. Control the lifting device to hoist the assembled beam to the assembly position of the main pier, and the assembled beam is located above the supporting component;

[0019] S4. After the preliminary positioning of the assembled beam is completed, control the lateral positioning plate in the positioning component to move, so that the lateral positioning blocks the trajectory of the beam during later movement, and the assembled beam is moved to the required position according to needs;

[0020] S5. After the adjustment of the positioning component is completed, control the lifting device to pull the assembled beam, so that the assembled beam moves horizontally in the corresponding direction, and is supported and guided by the supporting component during the movement;

[0021] S6. During the movement of the assembled beam, the pressure sensor in the positioning component detects the pressure value of the lateral positioning plate to accurately control the movement position of the beam;

[0022] S7. After monitoring the position of the beam is completed, control the lifting hydraulic cylinder in the supporting component to contract, so that the beam moves downward until the assembled beam is erected on the top of the main pier, and the assembly of the beam can be completed.

[0023] A preferred technical solution of the present invention: In the step S1, a support frame is fixedly installed on the top of the prefabricated cross beam, and a projection spotlight is installed on the support frame. In the step S6, after the horizontal movement of the prefabricated cross beam is completed, the projection spotlight is controlled to irradiate, and further detect the alignment state of the cross beam.

[0024] In the step S4, when the supporting component supports and guides the prefabricated cross beam, according to the need, the longitudinal guiding roller or the transverse guiding roller in the supporting component is controlled to abut against the bottom of the cross beam, so as to support and guide the moving cross beam and improve the moving stability of the cross beam.

[0025] Compared with the related technology, the high-altitude cross beam assembly support device provided by the present invention has the following beneficial effects:

[0026] (1) Through the setting of the positioning component in the present invention, during the assembly process of the cross beam, the lateral positioning plate in the positioning component will limit and control the outer wall of the hoisted cross beam. When the side wall of the cross beam coincides with the lateral positioning plate, the positioning of the cross beam can be realized. At this time, the cross beam is vertically lowered to accurately install the cross beam on the top of the main pier, which can realize the precise docking of the cross beam assembly, reduce the fine adjustment difficulty, improve the construction efficiency, and avoid the safety risks brought by the need for personnel to assist in construction in the traditional process.

[0027] (2) Through the setting of the supporting component in the present invention, when the cross beam is horizontally moved during the assembly process, the longitudinally arranged longitudinal guiding roller and the transversely arranged transverse guiding roller in the supporting component can support and guide the horizontally moving cross beam. Compared with the simple hoisting and moving, the problem that the cross beam is easy to shake and not easy to accurately position and adjust during the suspension construction can be solved, and it can ensure that the horizontal movement and adjustment of the cross beam are faster and more stable during the assembly process.

[0028] (3) By installing a projection spotlight on the top of the cross beam in the present invention, after the positioning of the cross beam is completed, the alignment angle of the cross beam can be further determined by detecting the light of the projection spotlight, and further, the influence of the deviation of the cross beam after positioning on the subsequent insertion and assembly can be reduced. Description of the Drawings

[0029] Figure 1 It is a schematic structural diagram of a preferred embodiment of the high-altitude cross beam assembly support device provided by the present invention;

[0030] Figure 2 It is Figure 1 The enlarged schematic diagram of part A in

[0031] Figure 3 It is Figure 1 The schematic structural diagram of the connection between the shown support template and the positioning component;

[0032] Figure 4 It isFigure 3 Schematic diagram of the enlarged structure of part B shown;

[0033] Figure 5 is Figure 1 Schematic diagram of the structure of the supporting component shown;

[0034] Figure 6 is Figure 4 Schematic diagram of the structure of the jacking hydraulic cylinder and its components shown;

[0035] Figure 7 is Figure 1 Schematic diagram of the structure of the support frame and its components shown;

[0036] Figure 8 is Figure 1 Schematic diagram of the structure of the mounting plate and its components shown;

[0037] Figure 9 Schematic diagram of the assembly of the present invention.

[0038] Reference numerals in the figure: 1, support formwork; 11, extension plate; 12, alignment groove; 2, positioning component; 21, lateral support frame; 22, lateral support plate; 221, guide rod; 23, horizontal adjustment hydraulic cylinder; 24, adapter plate; 241, pressure sensor; 25, lateral positioning plate; 3, supporting component; 31, jacking hydraulic cylinder; 32, supporting plate; 321, mounting frame; 322, longitudinal guide roller; 33, adapter frame; 331, vertical adjustment hydraulic cylinder; 332, top frame; 333, transverse guide roller; 4, support frame; 41, projection spotlight; 42, lifting hanging ring; 5, mounting plate; 51, camera; 6, main pier; 7, prefabricated cross beam; 8, main pier casting formwork; 9, mounting hole; 10, assembly hole. Detailed implementation manners

[0039] In order to make the objectives, technical solutions and advantages of the present invention clearer and more understandable, the present invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0040] The following describes the specific implementation of the present invention in detail with reference to specific embodiments.

[0041] Please refer to Figures 1 to 9, a high-altitude beam assembly support device provided by an embodiment of the present invention is used for the assembly of a prefabricated beam 7 erected at high altitude and a main pier 6. The support device is installed at the connection part between the main pier 6 and the prefabricated beam 7 and is used for supporting the prefabricated beam 7. The support device includes a support formwork 1 and a positioning assembly 2. There are two support formworks 1, which are symmetrically distributed. Installation holes 9 matching the main pier casting formwork 8 are provided at the butt joint part of the two support formworks 1. There are multiple groups of positioning assemblies, which are dispersedly arranged on the outer sides of the tops of the two support formworks 1 and are used for blocking the horizontal position of the prefabricated beam 7 during beam assembly. The positioning assembly 2 includes a lateral support frame 21, a horizontal adjustment hydraulic cylinder 23 and a lateral positioning plate 25. The lower end of the lateral support frame 21 is fixed on the support formwork 1, and the upper end extends upward. A lateral support plate 22 is fixed at the top end of the lateral support frame 21. The horizontal adjustment hydraulic cylinder 23 is fixedly installed inside the lateral support plate 22 and is parallel to the support formwork 1. A transfer plate 24 is fixedly installed at the output end of the horizontal adjustment hydraulic cylinder 23. Guide rods 221 that are slidably connected are inserted on both sides inside the lateral support plate 22. The end of the guide rod 221 is fixedly connected to the transfer plate 24. The lateral positioning plate 25 is fixed on the side of the transfer plate 24 away from the lateral support plate 22. A pressure sensor 241 is fixedly installed on the side wall of the transfer plate 24 adjacent to the lateral positioning plate 25. The force-receiving end of the pressure sensor 241 is fixedly connected to the lateral positioning plate 25;

[0042] It should be noted that: through the setting of the positioning assembly 2, during the beam assembly process, when the prefabricated beam 7 is placed on the supporting assembly 3 by an external lifting device, the horizontal adjustment hydraulic cylinder 23 in the positioning assembly 2 can be controlled to work as needed, so as to drive the lateral positioning plate 25 at the corresponding end to move. When the lateral positioning plate 25 is adjusted to the required position, it can block and limit the outer wall of the lifted beam. Thus, when the side wall of the moving beam abuts against the adjusted lateral positioning plate 25 during assembly, the pressure sensor 241 will monitor the acting force when the lateral positioning plate 25 abuts against the beam. At this time, the controller at the terminal, while detecting the change in the value of the pressure sensor 241, controls the alarm at the terminal to give an alarm prompt. At this time, the driver of the lifting device can stop controlling the lifting device, so that the beam is stable on the supporting assembly 3, and thus the horizontal position of the beam can be positioned. Then, the remaining horizontal adjustment hydraulic cylinders 23 in the positioning assembly 2 can be controlled to drive the corresponding lateral positioning plates 25 to move, so that multiple lateral positioning plates 25 can block and limit multiple side walls of the beam. Therefore, the beam can be blocked and limited in the horizontal direction, and the phenomenon that the adjusted beam moves randomly in the horizontal plane can be avoided.

[0043] In the embodiment of the present invention, please refer to Figures 1 to 8, a supporting component 3 for supporting the assembly crossbeam is provided at the top of the supporting template 1. The supporting component 3 includes a jacking hydraulic cylinder 31 and a supporting plate 32. A plurality of jacking hydraulic cylinders 31 are provided and evenly distributed above the supporting template 1. The supporting plate 32 is fixedly installed at the tops of the plurality of jacking hydraulic cylinders 31, and an assembly hole 10 is opened at the position of the supporting plate 32 corresponding to the installation hole 9. The jacking hydraulic cylinders 31 are symmetrically distributed on both sides of the assembly hole 10. Symmetrically distributed mounting frames 321 are fixedly erected on both sides of the top of the supporting plate 32. A plurality of longitudinally guiding rollers 322 that are evenly distributed and rotatably connected are erected inside the mounting frames 321, and the outer walls of the longitudinally guiding rollers 322 are located above the tops of the mounting frames 321. A transfer frame 33 is fixedly installed on the top of the supporting plate 32. Vertically adjusting hydraulic cylinders 331 are fixedly installed on both sides of the top of the transfer frame 33. The tops of the plurality of vertically adjusting hydraulic cylinders 331 are installed with a top frame 332 fixedly connected therewith. A plurality of horizontally guiding rollers 333 that are evenly distributed and rotatably connected are erected inside the top frame 332, and the outer walls of the horizontally guiding rollers 333 are located above the tops of the top frame 332. A plurality of mounting frames 321 are evenly distributed between two adjacent horizontally guiding rollers 333, and the distance between two adjacent horizontally guiding rollers 333 is greater than the outer wall specification of the mounting frame 321.

[0044] It should be noted that: by erecting the mounting frame 321 between two adjacent horizontally guiding rollers 333, during the use of the support, when the vertical adjusting cylinder works, the top frame 332 and the horizontally guiding rollers 333 can move smoothly along the outer walls of the longitudinally guiding rollers 322 and the mounting frame 321, so that the horizontally guiding rollers 333 or the longitudinally guiding rollers 322 can be adjusted to abut against the bottom of the crossbeam as required. Furthermore, during the use process, when the external lifting device pulls the crossbeam horizontally or longitudinally, the crossbeam can move more stably on the supporting component 3.

[0045] Therefore, when using this device to assemble the prefabricated crossbeam, compared with simply lifting and moving, the phenomenon that the suspended crossbeam moves randomly in the horizontal plane can be reduced, and thus the movement of the crossbeam in the horizontal direction can be more stable during the assembly process.

[0046] In the embodiment of the present invention, please refer to Figures 1 to 8 , the support frame 4 is fixedly installed on the top of the crossbeam by bolts. A projection spotlight 41 is fixedly installed on the inner top of the support frame 4, and a lifting hanging ring 42 is fixedly installed on the top of the support frame 4. Mounting plates 5 fixedly connected are installed on the tops of both supporting plates 32, and cameras 51 fixedly connected are installed on the opposite surfaces of both mounting plates 5.

[0047] It should be noted that: through the setting of the projection spotlight 41, during the assembly process, after the positioning of the cross beam is completed, the projection spotlight 41 can be turned on, and then the light at the projection position of the projection spotlight 41 can be observed through the camera 51. When the position of the cross beam is aligned with the position of the main pier, the light at the projection position can smoothly be located at the top of the docking rod on the top of the main pier, so as to realize the monitoring and positioning of the position of the adjusted main pier; and through the setting of the lifting loop 42, after the use of the projection spotlight 41 is completed, an external lifting device can be connected to the lifting loop 42, and then it is convenient to disassemble the support frame 4 from the cross beam.

[0048] In an embodiment of the present invention, please refer to Figures 1 to 8 , extension plates 11 are fixedly installed at the tops of both support templates 1, and through holes having the same size and shape as the mounting holes 9 are provided at the positions of the two extension plates 11 corresponding to the mounting holes 9; multiple groups of positioning components are evenly dispersed outside the extension plates 11, the bottom of each lateral support frame 21 is fixedly connected to the extension plate 11 by bolts, and multiple lateral support frames 21 are all inclined outward; the bottoms of the jacking hydraulic cylinders 31 are all fixed on the top surface of the extension plate 11. Alignment grooves 12 are provided inside the support templates 1, and the two support templates 1 are fixedly installed on the outer wall of the main pier casting form 8 by bolts.

[0049] It should be noted that: through the setting of the extension plate 11, during the use process, the extension plate 11 can increase the area of the support template 1, and then the support template 1 can smoothly support the positioning component 2. And by providing the alignment groove 12 on the inner wall of the support template 1, during the installation process, when the support template 1 is sleeved and installed towards the outer wall of the main pier, the inner wall of the alignment groove 12 can smoothly abut against the outer wall of the reinforcing rib on the outer wall of the main pier casting form, so that the support template 1 can smoothly be sleeved on the outer wall of the main pier casting form, and then the support template 1 can smoothly support structures such as the positioning component 2 and the supporting component 3 in the later stage.

[0050] The working principle of the high-altitude beam assembly support device provided by the present invention is as follows: When using this device, the support template 1 in this device can be installed on the outer wall of the casting formwork during the casting of the main pier. Then, according to needs, the positioning component 2 and the supporting component 3 can be installed on the extension plate 11 at the top of the support template 1. Next, the installation frame 321 can be installed on the top of the assembled beam 7. Furthermore, during assembly, an external hoisting device can be connected to the top of the assembled beam 7. Then, through the hoisting device, the assembled beam 7 can be lifted and moved towards the top of the main pier 6. When the assembled beam 7 moves above the main pier 6 and the bottom of the assembled beam 7 abuts against the lateral guide roller 333 in the supporting component 3, the placed assembled beam 7 will shift towards one side at the top of the main pier 6. During this process, the horizontal adjustment hydraulic cylinder 23 in the positioning component 2 that is far from the side wall of the assembled beam 7 can be controlled to work, so that the corresponding lateral positioning plate 25 can be moved to the position required for beam alignment. After the adjustment of the lateral positioning plate 25 is completed, the hoisting device can be controlled to pull the assembled beam 7. At this time, the beam that abuts against the lateral guide roller 333 or the longitudinal guide roller 322 will move towards the corresponding lateral positioning plate 25 on the lateral guide roller 333 or the longitudinal guide roller 322. During this process, the lateral guide roller 333 or the longitudinal guide roller 322 can make the movement of the beam more stable and convenient. Therefore, through the support of the lateral guide roller 333 or the longitudinal guide roller 322, the random displacement of the beam in the horizontal direction when the hoisting device directly hoists and moves the beam can be reduced, and thus the adjustment drive of the hoisting device for the beam can be made more stable.

[0051] When the side wall of the moving beam abuts against the adjusted lateral positioning plate 25, the pressure sensor 241 will monitor the force when the lateral positioning plate 25 abuts against the beam. At this time, the terminal controller detects the value change of the pressure sensor 241 and controls the terminal alarm to give an alarm prompt. At this time, the driver of the lifting device can stop operating the lifting device to stabilize the assembled beam 7 on the supporting component 3, and then control the remaining horizontal adjustment hydraulic cylinders 23 in the positioning component 2 to drive the corresponding lateral positioning plate 25 to move, so that the lateral positioning can be completed. The outer wall of the assembled crossbeam 7 is shielded and positioned; after the horizontal position of the assembled crossbeam 7 is adjusted, the projection spotlight 41 at the top of the support frame 4 can be controlled to work, and the working projection spotlight 41 will pass through the assembled crossbeam 7 to project toward the top of the main pier 6. During this process, the staff can watch the position of the projection light at the top of the main pier 6 through the camera 51. When the projection light passes through the docking hole in the crossbeam and shines on the top of the docking rod at the top of the main pier 6, the docking hole in the surface crossbeam and the docking rod in the main pier are in the same vertical plane, thereby ensuring the accuracy of the crossbeam position adjustment. At this point, the staff can control the jacking hydraulic cylinder 31 to shrink, and the shrinking jacking hydraulic cylinder 31 can drive the crossbeam to fall in the vertical direction until the alignment rod at the top of the main pier 6 is inserted into the alignment hole in the assembled crossbeam 7, and the assembly of the assembled crossbeam 7 can be completed.

[0052] The embodiment provides a method for using a high-altitude crossbeam assembly support device, which is used in the assembly of a prefabricated crossbeam 7 and a main pier 6 erected at high altitude. The prefabricated crossbeam 7 and the main pier 6 are perpendicular to each other. The device is installed at the connection between the main pier 6 and the prefabricated crossbeam 7, and is used to support and adjust the assembly of the prefabricated crossbeam 7. The specific use of the device includes the following steps:

[0053] S1. After the main pier 6 is cast and before the assembled crossbeam 7 is installed, the support formwork 1 in the support device is first fixed on the outer wall of the formwork built during the casting of the main pier by bolts;

[0054] S2, then fix the positioning component 2 and the supporting component 3 on the top of the supporting template 1 in sequence;

[0055] S3, then the support frame 4 can be fixedly installed on the top of the beam to be assembled, and the assembled beam 7 can be connected to the external lifting device;

[0056] S4. After the device is assembled, the electrical components in the device can be electrically connected to the controller of the terminal;

[0057] S5, at this time the staff can control the lifting device to move the assembled beam 7 to the supporting assembly 3;

[0058] After the preliminary positioning of the prefabricated cross beam 7 is completed, the lateral positioning plate 25 in the positioning assembly 2 can be controlled as needed, so that the lateral positioning can block the trajectory of the laterally moving prefabricated cross beam 7, enabling the prefabricated cross beam 7 to move to the required position as needed;

[0059] After the adjustment of the positioning assembly 2 is completed, the lifting device can be controlled to pull the cross beam, so that the prefabricated cross beam 7 moves horizontally in the corresponding direction. During this process, the longitudinal guide roller 322 or the transverse guide roller 333 in the supporting assembly 3 can be controlled to abut against the bottom of the cross beam as needed, so as to support and guide the moving cross beam and improve the moving stability of the cross beam;

[0060] During the movement of the cross beam, the pressure sensor 241 in the positioning assembly 2 can accurately control the moving position of the prefabricated cross beam 7 by detecting the pressure value of the lateral positioning plate 25;

[0061] After the horizontal movement of the position of the prefabricated cross beam 7 is completed, the projection spotlight 41 can be controlled to irradiate to further detect the alignment state of the prefabricated cross beam 7;

[0062] After monitoring the position of the prefabricated cross beam 7 is completed, the jacking hydraulic cylinder 31 in the supporting assembly 3 can be controlled to contract, so that the prefabricated cross beam 7 moves downward until the prefabricated cross beam 7 is erected on the top of the main pier, and the assembly process of the prefabricated cross beam 7 can be completed.

[0063] The above are only embodiments of the present invention, and do not limit the patent scope of the present invention accordingly. Any equivalent structure or equivalent process transformation made by using the content of the specification and drawings of the present invention, or directly or indirectly applied to other related technical fields, shall be equally included in the patent protection scope of the present invention.

Claims

1. An assembly support device for high-altitude beams, which is used in the assembly of prefabricated beams (7) erected at high altitudes and main piers (6), and is characterized in that: The support device is installed at the connection part of the main pier (6) and the prefabricated cross beam (7) and is used for supporting the prefabricated cross beam (7); the support device includes a support formwork (1) and a positioning assembly (2). There are two support formworks (1) which are symmetrically distributed. An installation hole (9) matching the main pier casting formwork (8) is provided at the butt joint part of the two support formworks (1); multiple groups of the positioning assemblies are provided and are dispersedly arranged on the outer sides of the tops of the two support formworks (1) and are used for limiting the horizontal position of the prefabricated cross beam (7) during the assembly of the cross beam. The positioning assembly (2) includes a lateral support frame (21), a horizontal adjustment hydraulic cylinder (23) and a lateral positioning plate (25). The lower end of the lateral support frame (21) is fixed on the support formwork (1), and the upper end extends upward. A lateral support plate (22) is fixed at the top end of the lateral support frame (21). The horizontal adjustment hydraulic cylinder (23) is fixedly installed inside the lateral support plate (22) and is parallel to the support formwork (1). A transfer plate (24) is fixedly installed at the output end of the horizontal adjustment hydraulic cylinder (23). Guide rods (221) which are slidably connected are inserted on both sides inside the lateral support plate (22). The end of the guide rod (221) is fixedly connected to the transfer plate (24). The lateral positioning plate (25) is fixed on the side of the transfer plate (24) away from the lateral support plate (22). A pressure sensor (241) is fixedly installed on the side wall of the transfer plate (24) close to the lateral positioning plate (25). The force receiving end of the pressure sensor (241) is fixedly connected to the lateral positioning plate (25). The pressure sensor (241) monitors the acting force when the lateral positioning plate (25) abuts against the cross beam. At this time, the controller of the terminal, while detecting the change in the value of the pressure sensor (241), controls the alarm of the terminal to give an alarm prompt. At this time, the driver of the lifting device can stop controlling the lifting device, so that the cross beam is stably on the supporting assembly (3), thereby realizing the positioning of the horizontal position of the cross beam. Then, the remaining horizontal adjustment hydraulic cylinders (23) in the positioning assembly (2) are controlled to drive the corresponding lateral positioning plates (25) to move, so that multiple lateral positioning plates (25) block and limit multiple side walls of the cross beam.

2. The high-altitude beam assembly support device according to claim 1, characterized in that: A supporting assembly (3) for supporting the prefabricated cross beam (7) is provided at the top of the support formwork (1). The supporting assembly (3) includes a jacking hydraulic cylinder (31) and a supporting plate (32). There are multiple jacking hydraulic cylinders (31) which are evenly distributed above the support formwork (1). The supporting plate (32) is fixedly installed at the tops of the multiple jacking hydraulic cylinders (31), and an assembly hole (10) is provided at the position of the supporting plate (32) corresponding to the installation hole (9).

3. The high-altitude beam assembly support device according to claim 1 or 2, characterized in that: The support device further includes a support frame (4). The support frame (4) is fixedly installed on the top of the cross beam by bolts. A projection spotlight (41) is fixedly installed on the inner top of the support frame (4), and a lifting hanging ring (42) is fixedly installed on the top of the support frame (4).

4. An aerial beam assembly support device according to claim 1 or 2, characterized in that: An alignment groove (12) matching the outer wall protrusion of the main pier casting formwork (8) is provided on the inner wall of the installation hole (9), and the two support formworks (1) are fixedly installed on the outer wall of the main pier casting formwork (8) by bolts.

5. The high-altitude beam assembly support device according to claim 2, characterized in that: Expansion plates (11) are fixedly installed at the tops of the two support formworks (1). Through holes having the same size and shape as the installation holes (9) are provided at the positions of the two expansion plates (11) corresponding to the installation holes (9). Multiple groups of positioning components are evenly dispersed outside the expansion plates (11). The bottom of each lateral support frame (21) is fixedly connected to the expansion plate (11) by bolts, and the multiple lateral support frames (21) are all inclined outward; the bottoms of the jacking hydraulic cylinders (31) are all fixed on the top surface of the expansion plate (11).

6. The high-altitude beam assembly support device according to claim 2, characterized in that: Symmetrically distributed mounting frames (321) are fixedly installed on both sides of the top of the supporting plate (32). A plurality of longitudinally guiding rollers (322) which are evenly distributed and rotatably connected are installed inside the mounting frames (321), and the outer walls of the longitudinally guiding rollers (322) are located above the tops of the mounting frames (321).

7. The high-altitude beam assembly support device according to claim 2, characterized in that: Mounting plates (5) fixedly connected are symmetrically installed on both sides of the assembly hole (10) of the supporting plate (32), and cameras (51) fixedly connected are installed on the opposite surfaces of the two mounting plates (5).

8. The high-altitude beam assembly support device according to claim 5, characterized in that: A transfer frame (33) is fixedly installed on the top of the supporting plate (32). Vertical adjustment hydraulic cylinders (331) are fixedly installed on both sides of the top of the transfer frame (33). The tops of the multiple vertical adjustment hydraulic cylinders (331) are installed with a top frame (332) fixedly connected. A plurality of horizontally guiding rollers (333) which are evenly distributed and rotatably connected are installed inside the top frame (332), and the outer walls of the horizontally guiding rollers (333) are located above the top of the top frame (332); a plurality of mounting frames (321) are evenly distributed between two adjacent horizontally guiding rollers (333), and the distance between two adjacent horizontally guiding rollers (333) is greater than the outer wall specification of the mounting frame (321).

9. A method for using the high-altitude beam assembly support device according to any one of claims 2 to 8, characterized in that This device is used for the assembly of the prefabricated cross beam for high-altitude erection and the main pier. The prefabricated cross beam and the main pier are perpendicular to each other. This device is installed at the connection part of the main pier and the prefabricated cross beam and is used for supporting and adjusting the assembly of the prefabricated cross beam. The specific use of this device includes the following steps: S1. Before the construction of the main pier casting is completed and before the prefabricated cross beam is installed, first fixedly install the support formwork in the support device on the outer wall of the formwork built during the main pier casting by bolts, and then fixedly install the positioning components and the supporting components on the top of the support formwork in sequence; S2. Connect the prefabricated cross beam with an external lifting device; after the assembly of the device is completed, electrically connect the electrical components in the device with the controller of the terminal; S3. Control the lifting device to hoist the prefabricated cross beam to the assembly position of the main pier, and the prefabricated cross beam is located above the supporting component; S4. After the preliminary positioning of the prefabricated cross beam is completed, control the movement of the lateral positioning plate in the positioning component, so that the lateral positioning blocks the track of the cross beam moving later, and the prefabricated cross beam is moved to the required position according to the need; S5. After adjusting the positioning component, control the lifting device to pull the prefabricated crossbeam, so that the prefabricated crossbeam moves in the corresponding direction on the horizontal plane, and support and guide it through the supporting component during the movement; S6. During the movement of the prefabricated crossbeam, the pressure sensor in the positioning component detects the pressure value of the lateral positioning plate to accurately control the movement position of the crossbeam; S8. After monitoring the position of the crossbeam, control the lifting hydraulic cylinder in the supporting component to contract, so that the crossbeam moves downward until the prefabricated crossbeam is erected on the top of the main pier, and the assembly of the crossbeam can be completed.

10. The method for using a high-altitude crossbeam assembly support device according to claim 9, wherein: In step S1, a support frame is fixedly installed on the top of the prefabricated crossbeam, a projection spotlight is installed on the support frame, and in step S6, after the horizontal movement of the position of the prefabricated crossbeam is completed, control the projection spotlight to irradiate to further detect the alignment state of the crossbeam; In step S4, a transfer frame (33) is fixedly installed on the top of the support plate (32) in the support component. Vertical adjustment hydraulic cylinders (331) are fixedly installed on both sides of the top of the transfer frame (33). The tops of multiple vertical adjustment hydraulic cylinders (331) are installed with a top frame (332) fixedly connected together. A plurality of evenly distributed and rotatably connected transverse guide rollers (333) are arranged inside the top frame (332), and the outer wall of the transverse guide roller (333) is located above the top of the top frame (332); A plurality of mounting frames (321) are evenly distributed between two adjacent transverse guide rollers (333), and the distance between two adjacent transverse guide rollers (333) is greater than the outer wall specification of the mounting frame (321); When the support component supports and guides the prefabricated crossbeam, control the longitudinal guide roller or the transverse guide roller in the support component to abut against the bottom of the crossbeam as needed, so as to support and guide the moving crossbeam and improve the moving stability of the crossbeam.