Environment-friendly metal surface treatment agent and preparation method thereof

By designing a preparation bucket with automatic cleaning and drying functions, the problem of manual operation of cleaning of the preparation bucket in the prior art is solved, and the efficiency of treatment agent preparation is improved.

CN120079333AInactive Publication Date: 2025-06-03TONGLING HUIPING ENVIRONMENTAL PROTECTION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510164239.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-02-14
Publication Date
2025-06-03
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During the preparation process of existing metal surface treatment agents, cleaning of the preparation barrel requires manual operation, resulting in inefficiency and affecting the preparation of subsequent treatment agents.

Method used

A preparation barrel with a drive motor, rotating shaft, flow ring, spray head and stirring paddle is designed, which can be automatically cleaned and dried, reducing manual operation.

Benefits of technology

Automatic cleaning and rapid drying of preparation buckets are realized, the efficiency of treatment agent preparation is improved, and the inefficiency problem caused by manual cleaning is avoided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120079333A_ABST
    Figure CN120079333A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of treatment agent preparation, and discloses an environment-friendly metal surface treatment agent and a preparation method thereof.The environment-friendly metal surface treatment agent comprises a preparation barrel, a cover plate is arranged at the top of the preparation barrel, a driving motor is fixedly mounted in the center of the top of the cover plate, and the driving end of the driving motor is connected with a rotating shaft; the rotating shaft is rotationally mounted in the central inner cavity positions of the preparation barrel and the cover plate; according to the preparation device, the preparation barrel and the cover plate are arranged, so that a structure main body on the preparation barrel and the cover plate can be supported, and meanwhile, a driving motor, a rotating shaft, a circulating ring, a spray head, a fixed rod, a water guide pipe, a stirring paddle, an insertion hole, a U-shaped frame, an insertion rod, a fixed bolt, a cleaning brush, a discharge pipe and an electromagnetic valve I are arranged in a matched manner; the environment-friendly metal surface treatment agent can be conveniently prepared, meanwhile, the preparation barrel can be conveniently and automatically cleaned when needed, and therefore the problem that in an existing manual cleaning mode, operation is troublesome is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the technical field of treatment agent preparation, and more specifically, to an environmentally friendly metal surface treatment agent and a preparation method thereof. Background Art

[0002] A metal surface treatment agent generally refers to a chemical agent for various treatments of the metal surface. Metal surface treatment includes substrate pretreatment such as degreasing, rust removal, phosphating, and rust prevention, which prepares for metal coating technology and metal protection technology. The quality of substrate pretreatment has a great impact on the subsequent coating preparation and the use of the metal.

[0003] Currently, when preparing an environmentally friendly metal surface treatment agent, a preparation barrel for mixing and reacting is required. Moreover, in order to improve the preparation quality of the treatment agent, the preparation barrel needs to be cleaned regularly. However, the existing cleaning work of the preparation barrel is generally carried out manually, which is rather troublesome during the operation process. At the same time, the prepared barrel after cleaning needs to be naturally dried, thus affecting the subsequent preparation work efficiency of the treatment agent.

[0004] In order to solve the above problems, this application provides an environmentally friendly metal surface treatment agent and a preparation method thereof. Summary of the Invention

[0005] An environmentally friendly metal surface treatment agent and a preparation method thereof provided by this application adopt the following technical solutions:

[0006] An environment-friendly metal surface treatment agent and its preparation method, including a preparation barrel, a cover plate is arranged at the top of the preparation barrel, a driving motor is fixedly installed at the center position of the top of the cover plate, the driving end of the driving motor is connected with a rotating shaft, and the rotating shaft is rotatably installed at the central inner cavity positions of the preparation barrel and the cover plate. A circulation ring is arranged inside the upper side of the preparation barrel. A plurality of spray nozzles are evenly fixedly sleeved on the outer circumference of the bottom end of the circulation ring. And three fixing rods are evenly fixedly installed on the circumference of the connection between the top of the circulation ring and the bottom of the cover plate. One side of the top end of the circulation ring is fixedly sleeved with a water guide pipe. The water guide pipe is located on the side of the fixing rod, and the water guide pipe is fixedly sleeved through one side of the periphery of the cover plate. Four stirring paddles are linearly and evenly fixedly connected to both sides of the lower end of the rotating shaft. A jack is opened at one end of each stirring paddle facing away from the rotating shaft. And the outer ends of the four stirring paddles on each side are jointly movably clamped and installed with a U-shaped frame. The inner side wall of the middle part of the U-shaped frame is fixedly connected with four U-shaped frames, and each U-shaped frame is respectively inserted and adapted to each jack. First screw holes are opened at both ends of the U-shaped frame, and second screw holes are opened in the inner cavities of the uppermost and lowermost stirring paddles. Each of the first screw holes and the second screw holes is distributed in one-to-one correspondence, and a fixing bolt is screwed at the connection of each first screw hole and the second screw hole. Cleaning brushes are fixedly installed on the outer side walls of the middle part and the bottom end of the U-shaped frame. A discharge pipe is fixedly sleeved at the center position of the bottom end of the preparation barrel. A solenoid valve I is arranged at the lower end of the discharge pipe, and an auxiliary drying component is arranged on one side of the upper end of the discharge pipe.

[0007] Through the above technical solution, the inclined design of the spray nozzles facilitates direct spraying onto the inner wall of the preparation barrel.

[0008] Further, a protective sleeve is movably clamped on the outer wall of the top end of the water guide pipe, and a sealing ring is fixedly sleeved on the inner wall of the top end of the water guide pipe.

[0009] Through the above technical solution, the protective sleeve facilitates the port protection of the water guide pipe when it is idle.

[0010] Further, a feeding port is arranged on one side of the driving motor facing away from the water guide pipe. The feeding port is fixedly sleeved on one side of the cover plate, and a movable cover is hinged on the top of the feeding port.

[0011] Through the above technical solution, the movable cover facilitates the movable protection work at the top of the feeding port.

[0012] Further, handle rings are distributed on both the front and back sides of the driving motor. The handle rings are fixedly installed on the top of the cover plate, and the handle rings are semi-circular metal ring structures.

[0013] Through the above technical solution, the handle rings facilitate the extraction operation of the whole cover plate.

[0014] Further, three screw members are evenly and penetratingly movably inserted around the circumference of the cover plate. The three screw members are all fixedly installed on the top of the preparation barrel, and locking nuts are screwed and installed on the outer walls of the three screw members. The three locking nuts are all abutted and distributed on the top of the cover plate.

[0015] Through the above technical solution, the screw members and the locking nuts realize the positioning of the cover plate on the top of the preparation barrel.

[0016] Further, an extension sleeve disc is fixedly sleeved on the outer wall of the bottom end of the preparation barrel, and support legs are fixedly connected evenly around the bottom circumference of the extension sleeve disc.

[0017] Through the above technical solution, the extension sleeve disc and the support legs realize the stable supporting effect of the preparation barrel.

[0018] Further, the auxiliary drying component includes a side pipe fixedly sleeved on one side of the discharge pipe. An electromagnetic valve II is arranged on the side pipe, and a magnifying port is fixedly connected to the end of the side pipe facing away from the discharge pipe. A connecting cylinder is fixedly connected to the end of the magnifying port facing away from the side pipe. A dust-proof net is arranged at the end of the connecting cylinder facing away from the magnifying port, and the outer wall of the top end of the connecting cylinder is fixedly connected to the bottom of the preparation barrel through a backing plate. An exhaust fan is arranged inside the connecting cylinder near the magnifying port. A round rod is arranged on one side of the exhaust fan. An electric heating tube is fixedly installed on the outer surface of the round rod, and positioning brackets are fixedly connected to both ends of the round rod. The two positioning brackets are both fixedly installed on the inner wall of one side of the connecting cylinder.

[0019] Further, the outer end of the dust-proof net is fixedly sleeved with a frame, and the side end of the frame is installed at one side port of the connecting cylinder through a plurality of mounting screws.

[0020] Through the above technical solution, the auxiliary drying component can achieve the rapid drying effect of the inner wall of the preparation barrel.

[0021] Further, it includes 1 - 2 g / L of organic acid, 1 - 3 g / L of corrosion inhibitor, 10 - 15 g / L of surfactant, 2 - 4 g / L of inhibitor, 5 - 8 g / L of isolation mixture and the balance of water. The isolation mixture is composed of sodium alpha-olefin sulfonate, polyvinyl alcohol, polyethylene glycol, glycerol, triethanolamine and other components in equal proportions, and the pH value is controlled within the range of 2.0 - 3.0, and the treatment time is 3 - 6 minutes.

[0022] Further, it includes the following steps:

[0023] S1: While unscrewing and removing each locking nut, vertically extract the cover plate through the handle ring, and drive the lower end of the rotating shaft out of the interior of the preparation barrel. Then, by removing each fixing bolt, the two U-shaped frames and the cleaning brushes thereon can be removed. During this process, each insertion rod is separated from the insertion hole. After that, when resetting the cover plate to the top of the preparation barrel, reinstall and reset each locking nut;

[0024] S2: While putting the raw materials of each ratio of the environmentally friendly metal surface treatment agent into the interior of the preparation barrel through the feeding port, start the drive motor and drive the rotating shaft and each stirring paddle to rotate, so as to fully and evenly mix the raw materials of each ratio. During the mixing process, by detecting with a pH meter and diluting with water raw materials, the pH value range of the prepared treatment agent can be adjusted and controlled. After preparation, it can be discharged and collected through the discharge pipe and solenoid valve 1;

[0025] S3: When it is necessary to clean the inner wall of the preparation barrel, first reinstall the two U-shaped frames and the cleaning brushes, make solenoid valve 1 in the open state and solenoid valve 2 still in the closed state. Then, when connecting the top of the water guide pipe to the water pipe, make the drive motor in the starting state. During this process, the cleaning water source flows into the interior of the flow-through ring, and then is sprayed onto the inner wall of the preparation barrel through each nozzle. During the rotation of the rotating shaft, the two U-shaped frames and the cleaning brushes on both sides are indirectly driven to rotate, so as to complete the cleaning of the inner wall of the preparation barrel. The sewage during the cleaning process is discharged through the discharge pipe;

[0026] S4: After the cleaning of the inner wall of the preparation barrel is completed, make solenoid valve 1 in the closed state and solenoid valve 2 in the open state, make the movable cover on the feeding port in the open state. Then, while synchronously turning on the exhaust fan and the electric heating tube, continuously pour the heat source gas into the interior of the preparation barrel indirectly from the upper side of the discharge pipe, and cooperate with the discharge function of the feeding port for the dried moisture, so as to realize the rapid drying of the inner wall of the preparation barrel after cleaning, thus avoiding affecting the preparation efficiency of the subsequent treatment agent. During the drying process, the gas entering the connecting cylinder is filtered by the dust-proof net to prevent pollution of the interior of the preparation barrel.

[0027] In summary, the present application includes the following beneficial technical effects:

[0028] (1) The present application can realize the support of the main structure on the upper part through the preparation barrel and cover plate provided, and cooperate with the provided drive motor, rotating shaft, circulation ring, nozzle, fixing rod, water guide pipe, stirring paddle, jack, U-shaped frame, plug rod, fixing bolt, cleaning brush and discharge pipe, solenoid valve, so as to facilitate the preparation of environmentally friendly metal surface treatment agent and facilitate the automatic cleaning of the preparation barrel when necessary, thereby overcoming the problem of the existing manual cleaning method, which is relatively troublesome to operate;

[0029] (2) The present application sets a feed inlet so that the auxiliary drying assembly set on one side of the discharge pipe can cooperate with the side pipe, so that the side pipe, solenoid valve 2, enlarged port, connecting tube, dust screen, exhaust fan, round rod, electric heating tube and positioning frame can be used to achieve the effect of quickly drying the water stains on the inner wall of the preparation barrel after the inner wall of the preparation barrel is cleaned, thereby overcoming the problem of natural drying and preventing the subsequent preparation work efficiency from being affected. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 This is a schematic diagram of the overall structure of this application;

[0031] Figure 2 This is a schematic diagram of the first partial structure of this application;

[0032] Figure 3 This is the first partial semi-exploded view of the present application;

[0033] Figure 4 For this application Figure 1 Enlarged view of point A in the middle;

[0034] Figure 5 This is a schematic diagram of the second partial structure of the present application;

[0035] Figure 6 This is the second partial semi-exploded view of this application.

[0036] Description of the numbers in the figure:

[0037] 1. Preparation barrel; 2. Cover plate; 3. Drive motor; 4. Rotating shaft; 5. Circulation ring; 6. Nozzle; 7. Fixed rod; 8. Water guide pipe; 9. Agitator; 10. Socket; 11. U-shaped frame; 12. Insert rod; 13. Fixed bolt; 14. Cleaning brush; 15. Discharge pipe; 16. Solenoid valve 1; 17. Feeding port; 18. Handle ring; 19. Screw piece; 20. Lock nut; 21. Extension sleeve; 22. Side pipe; 23. Solenoid valve 2; 24. Enlarged port; 25. Connecting tube; 26. Dust net; 27. Exhaust fan; 28. Round rod; 29. ​​Electric heating tube; 30. Positioning frame. DETAILED DESCRIPTION

[0038] Next, the technical solutions in the embodiments of the present application will be clearly and completely described in conjunction with the accompanying drawings in the embodiments of the present application; obviously, the described embodiments are only a part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those of ordinary skill in the art without making creative efforts shall fall within the protection scope of the present application.

[0039] In the description of the present application, it should be noted that the orientation or positional relationship indicated by the terms "upper", "lower", "inner", "outer", "top / bottom end", etc. is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation to the present application. In addition, the terms "first" and "second" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0040] In the description of the present application, it should be noted that unless otherwise clearly specified and limited, the terms "installed", "provided with", "sheathed / connected", "connected", etc. should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium, and it can be the communication inside two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present application can be understood according to specific situations.

[0041] Embodiment:

[0042] An embodiment of the present application discloses an environment-friendly metal surface treatment agent and its preparation method. Please refer to Figure 1 、 Figure 2 、 Figure 3 、 Figure 4 and Figure 5, including a preparation barrel 1, a cover plate 2 is arranged at the top of the preparation barrel 1, a driving motor 3 is fixedly installed at the central position of the top of the cover plate 2, the driving end of the driving motor 3 is connected with a rotating shaft 4, and the rotating shaft 4 is rotatably installed at the central inner cavity positions of the preparation barrel 1 and the cover plate 2. An annular flow passage 5 is arranged inside the upper side of the preparation barrel 1. A plurality of nozzles 6 are fixedly sleeved and installed on the outer circumference of the bottom end of the annular flow passage 5 in a uniform manner. And three fixing rods 7 are fixedly installed on the circumference of the connection between the top of the annular flow passage 5 and the bottom of the cover plate 2 in a uniform manner. One side of the top end of the annular flow passage 5 is fixedly sleeved and installed with a water guide pipe 8. The water guide pipe 8 is located on the side of the fixing rod 7, and the water guide pipe 8 is fixedly sleeved through one side of the periphery of the cover plate 2. On both sides of the lower end of the rotating shaft 4, four stirring paddles 9 are linearly and uniformly fixedly connected. A jack 10 is opened at one end of each stirring paddle 9 facing away from the rotating shaft 4. And U-shaped frames 11 are jointly movably clamped and installed at the outer ends of the four stirring paddles 9 on each side. The inner side wall of the middle part of the U-shaped frame 11 is fixedly connected with four U-shaped frames 11, and each U-shaped frame 11 is respectively inserted and matched with each jack 10. Among them, under the insertion and cooperation of each jack 10 and the insertion rod 12, the assembly stability of the U-shaped frame 11 at the outer ends of the four stirring paddles 9 on each side can be improved. First screw holes are opened at both side ends of the U-shaped frame 11, and second screw holes are opened in the inner cavities of the upper and lower stirring paddles 9. Each first screw hole and second screw hole are distributed in a one-to-one correspondence, and fixing bolts 13 are screwed and installed at the connection of each first screw hole and second screw hole. Cleaning brushes 14 are fixedly installed on the outer side walls of the middle part and the bottom end of the U-shaped frame 11. A discharge pipe 15 is fixedly sleeved and installed at the central position of the bottom end of the preparation barrel 1. A solenoid valve 16 is arranged at the lower end of the discharge pipe 15, and an auxiliary main component is arranged on one side of the upper end of the discharge pipe 15.

[0043] A protective sleeve is movably clamped on the outer wall of the top end of the water guide pipe 8, and a sealing ring is fixedly sleeved on the inner wall of the top end of the water guide pipe 8. On one side of the driving motor 3 facing away from the water guide pipe 8, a feeding port 17 is arranged. The feeding port 17 is fixedly sleeved and installed on one side of the cover plate 2, and a movable cover is hinged and installed at the top of the feeding port 17. Handle rings 18 are distributed on both the front and rear sides of the driving motor 3. The handle rings 18 are fixedly installed on the top of the cover plate 2, and the handle rings 18 are semi-circular metal ring structures.

[0044] Three screw members 19 are uniformly and movably inserted through the periphery of the cover plate 2. The three screw members 19 are all fixedly installed on the top of the preparation barrel 1, and locking nuts 20 are screwed on the outer walls of the three screw members 19. The three locking nuts 20 are all abutted and distributed on the top of the cover plate 2. An extension sleeve plate 21 is fixedly sleeved and installed on the outer wall of the bottom end of the preparation barrel 1. Supporting legs are fixedly connected to the bottom circumference of the extension sleeve plate 21 in a uniform manner.

[0045] Please refer to Figure 1 、 Figure 5 and Figure 6, the auxiliary main component includes a side pipe 22 fixedly sleeved and installed on one side of the discharge pipe 15. A second solenoid valve 23 is provided on the side pipe 22. One end of the side pipe 22 facing away from the discharge pipe 15 is fixedly connected to an enlarged port 24. One end of the enlarged port 24 facing away from the side pipe 22 is fixedly connected to a connecting cylinder 25. A dust-proof net 26 is provided at one end of the connecting cylinder 25 facing away from the enlarged port 24. The outer wall of the top end of the connecting cylinder 25 is fixedly connected to the bottom of the preparation barrel 1 through a backing plate. An exhaust fan 27 is provided inside the connecting cylinder 25 near the enlarged port 24. A round rod 28 is provided on one side of the exhaust fan 27. An electric heating pipe 29 is fixedly installed on the outer surface of the round rod 28. Both ends of the round rod 28 are fixedly connected to positioning brackets 30. Both positioning brackets 30 are fixedly installed on the inner wall of one side of the connecting cylinder 25. The outer end of the dust-proof net 26 is fixedly sleeved with a frame, and the side end of the frame is installed at one side port of the connecting cylinder 25 through a plurality of mounting screws. Through the design of the screw connection installation method of the frame, the disassembly operation of the frame can be realized when needed, so as to facilitate the removal of the dust-proof net 26, and thus facilitate the effective cleaning operation of the dust particles accumulated on the outer surface of the dust-proof net 26.

[0046] Among them, the environment-friendly metal surface treatment agent includes 1 - 2 g / L of organic acid, 1 - 3 g / L of corrosion inhibitor, 10 - 15 g / L of surfactant, 2 - 4 g / L of inhibitor, 5 - 8 g / L of isolation mixture and the balance of water. The isolation mixture is a proportional mixture of alpha olefin sulfonate, polyvinyl alcohol, polyethylene glycol, glycerol, triethanolamine, etc., and the pH value is controlled within the range of 2.0 - 3.0, and the treatment time is 3 - 6 minutes.

[0047] The implementation principle of this application includes the following steps:

[0048] S1: While unscrewing and removing each locking nut 20, vertically extract the cover plate 2 through the handle ring 18, and drive the lower end of the rotating shaft 4 to disengage from the inside of the preparation barrel 1. Then, through the removal of each fixing bolt 13, the disassembly operation of the two U-shaped frames 11 and the cleaning brushes 14 thereon is realized. During this process, each insertion rod 12 is separated from the insertion hole 10. After that, while resetting the cover plate 2 to the top of the preparation barrel 1, reinstall and reset each locking nut 20;

[0049] S2: While putting each proportioned raw material of the environment-friendly metal surface treatment agent into the preparation barrel 1 through the feeding port 17, start the driving motor 3 and drive the rotating shaft 4 and each stirring paddle 9 to rotate, so as to realize the full and uniform mixing of each proportioned raw material. During the mixing process, the pH value of the prepared treatment agent is adjusted and controlled by detecting with a pH meter and adding water raw material for dilution. After the preparation is completed, it can be discharged and collected through the discharge pipe 15 and the first solenoid valve 16;

[0050] S3: When it is necessary to clean the inner wall of the preparation barrel 1, after the two U-shaped frames 11 and the cleaning brushes 14 are reset and installed, the solenoid valve 16 is opened and the solenoid valve 23 remains closed. Then, while connecting a water pipe to the top of the water guide pipe 8, the drive motor 3 is started. During this process, the cleaning water source flows into the inside of the flow ring 5 and is then sprayed onto the inner wall of the preparation barrel 1 through each nozzle 6. The rotating shaft 4 indirectly drives the two U-shaped frames 11 and the cleaning brushes 14 to rotate during the rotation process, thereby completing the cleaning of the inner wall of the preparation barrel 1. The sewage during the cleaning process is discharged through the discharge pipe 15.

[0051] S4: After the cleaning of the inner wall of the preparation barrel 1 is completed, the solenoid valve 16 is closed and the solenoid valve 23 is opened. The movable cover on the feed inlet 17 is opened. Then, while the exhaust fan 27 and the electric heating tube 29 are simultaneously turned on, hot source gas is continuously poured into the inside of the preparation barrel 1 indirectly through the upper side of the discharge pipe 15. With the cooperation of the discharge function of the dried moisture through the feed inlet 17, the rapid drying of the inner wall of the preparation barrel 1 after cleaning is realized, thus avoiding affecting the preparation efficiency of the subsequent treatment agent. During the drying process, the gas entering the inside of the connecting cylinder 25 is filtered by the dust-proof net 26 to prevent pollution of the inside of the preparation barrel 1.

[0052] The above are all preferred embodiments of this application, and the protection scope of this application is not limited accordingly. Therefore, all equivalent changes made according to the structure, shape, and principle of this application shall be covered within the protection scope of this application.

Claims

1. A preparation device for an environmentally friendly metal surface treatment agent, comprising a preparation barrel (1), characterized in that: A cover plate (2) is arranged on the top of the preparation barrel (1), a driving motor (3) is fixedly installed at the center position of the top of the cover plate (2), a driving end of the driving motor (3) is connected to a rotating shaft (4), and the rotating shaft (4) is rotatably installed at the center inner cavity position of the preparation barrel (1) and the cover plate (2), a circulation ring (5) is arranged inside the upper side of the preparation barrel (1), a plurality of nozzles (6) are fixedly installed in a circumferentially uniform manner on the outer side of the bottom end of the circulation ring (5), and three fixed rods (7) are fixedly installed in a circumferentially uniform manner at the connection between the top of the circulation ring (5) and the bottom of the cover plate (2), a water pipe (8) is fixedly installed on one side of the top of the circulation ring (5), the water pipe (8) is located at the side of the fixed rod (7), and the water pipe (8) is fixedly installed on one side of the outer periphery of the cover plate (2), and four stirring paddles (9) are linearly and uniformly fixedly connected on both sides of the lower end of the rotating shaft (4), and each stirring paddle (9) rotates in reverse. One end of the moving shaft (4) is provided with a plug hole (10), and the outer ends of the four stirring paddles (9) on each side are movably connected to a U-shaped frame (11), the inner side wall of the middle part of the U-shaped frame (11) is fixedly connected with four U-shaped frames (11), and each U-shaped frame (11) is respectively plugged and matched with each plug hole (10), and the two side ends of the U-shaped frame (11) are provided with a first screw hole, and the inner cavities of the two stirring paddles (9) at the uppermost side and the lowermost side are provided with a second screw hole , each of the first screw hole and the second screw hole is distributed in a one-to-one correspondence, and a fixing bolt (13) is screwed and installed at the connection point of each first screw hole and the second screw hole, a cleaning brush (14) is fixedly installed on the outer wall of the middle part and the bottom end of the U-shaped frame (11), and a discharge pipe (15) is fixedly sleeved and installed at the center position of the bottom end of the preparation barrel (1), a solenoid valve (16) is arranged at the lower end of the discharge pipe (15), and an auxiliary dry component is arranged on one side of the upper end of the discharge pipe (15).

2. The preparation device of an environmentally friendly metal surface treatment agent according to claim 1, characterized in that: The outer wall of the top end of the water conduit (8) is movably connected with a protective sleeve, and the inner wall of the top end of the water conduit (8) is fixedly connected with a sealing ring.

3. The preparation device of an environmentally friendly metal surface treatment agent according to claim 1, characterized in that: A feed inlet (17) is provided on one side of the driving motor (3) facing away from the water guide pipe (8); the feed inlet (17) is fixedly sleeved and installed on one side of the cover plate (2); and a movable cover is hingedly installed on the top of the feed inlet (17).

4. The preparation device of an environmentally friendly metal surface treatment agent according to claim 1, characterized in that: Handle rings (18) are distributed on both the front and rear sides of the driving motor (3). The handle rings (18) are fixedly mounted on the top of the cover plate (2), and the handle rings (18) are semicircular metal ring structures.

5. The preparation device of an environmentally friendly metal surface treatment agent according to claim 1, characterized in that: The outer circumference of the cover plate (2) is uniformly and movably inserted with three screw members (19), the three screw members (19) are all fixedly installed on the top of the preparation barrel (1), and the outer walls of the three screw members (19) are all screwed with locking nuts (20), and the three locking nuts (20) are all distributed in contact with the top of the cover plate (2).

6. The preparation device of an environmentally friendly metal surface treatment agent according to claim 1, characterized in that: An extension sleeve (21) is fixedly sleeved and installed on the outer wall of the bottom end of the preparation barrel (1), and a support leg is evenly fixedly connected to the bottom circumference of the extension sleeve (21).

7. The preparation device of an environmentally friendly metal surface treatment agent according to claim 1, characterized in that: The auxiliary trunk assembly comprises a side tube (22) fixedly sleeved and installed on one side of the discharge pipe (15), the side tube (22) being provided with a second solenoid valve (23), and one end of the side tube (22) facing away from the discharge pipe (15) being fixedly connected with an enlarged port (24), and one end of the enlarged port (24) facing away from the side tube (22) being fixedly connected with a connecting tube (25), and one end of the connecting tube (25) facing away from the enlarged port (24) being provided with a dustproof net (26), and the top of the connecting tube (25) being provided with a dustproof net (26). The outer wall of the end is fixedly connected to the bottom of the preparation barrel (1) through a pad, and an exhaust fan (27) is arranged inside the side of the connecting tube (25) close to the enlarged opening (24), and a round rod (28) is arranged on one side of the exhaust fan (27). An electric heating pipe (29) is fixedly installed on the outer surface of the round rod (28), and positioning frames (30) are fixedly connected to both ends of the round rod (28), and the two positioning frames (30) are fixedly installed on the inner wall of one side of the connecting tube (25).

8. The preparation device of an environmentally friendly metal surface treatment agent according to claim 7, characterized in that: The outer end of the dustproof net (26) is fixedly sleeved with a frame, and the side end of the frame is installed at a side port of the connecting tube (25) through a plurality of installation screws.

9. An environmentally friendly metal surface treatment agent, characterized in that: The method comprises 1-2 g / L of organic acid, 1-3 g / L of corrosion inhibitor, 10-15 g / L of surfactant, 2-4 g / L of inhibitor, 5-8 g / L of isolation mixture and the remainder of water. The isolation mixture is a mixture of sodium α-olefin sulfonate, polyvinyl alcohol, polyethylene glycol, propylene glycol and triethanolamine in equal proportions, and the pH value is controlled within the range of 2.0-3.

0. The treatment time is 3-6 minutes.

10. A method for preparing an environmentally friendly metal surface treatment agent, characterized in that: The following steps are involved: S1: While each locking nut (20) is being screwed off, the cover plate (2) is vertically extracted by the ring (18), and the lower end of the rotating shaft (4) is driven to be separated from the interior of the preparation barrel (1), and then the U-shaped frames (11) on both sides and the cleaning brushes (14) thereon are removed by disassembling each fixing bolt (13), and each insertion rod (12) is separated from the insertion hole (10) during the process, and then the cover plate (2) is reset to the top of the preparation barrel (1), and each locking nut (20) is reinstalled and reset; S2: while feeding the various proportions of raw materials of the environmentally friendly metal surface treatment agent into the preparation barrel (1) through the feed port (17), the drive motor (3) is started to drive the rotating shaft (4) and each stirring paddle (9) to rotate, so as to achieve full and uniform mixing of the various proportions of raw materials, and during the mixing process, the pH value range of the prepared treatment agent can be adjusted and controlled by detecting with a pH meter and adding water raw materials for dilution. After the preparation is completed, the treatment agent can be discharged and collected through the discharge pipe (15) and the electromagnetic valve 1 (16); S3: When it is necessary to clean the inner wall of the preparation barrel (1), the two U-shaped frames (11) and the cleaning brush (14) must be reset and installed first, so that the first solenoid valve (16) is in an open state and the second solenoid valve (23) is still in a closed state, and then the top of the water pipe (8) is connected to the water pipe, and the drive motor (3) is started. During this process, the cleaning water source flows into the inside of the circulation ring (5) and is then sprayed onto the inner wall of the preparation barrel (1) through each nozzle (6). During the rotation of the rotating shaft (4), the U-shaped frames (11) and the cleaning brush (14) on both sides are indirectly driven to rotate, thereby completing the cleaning of the inner wall of the preparation barrel (1), and the sewage during the cleaning process is discharged through the discharge pipe (15); S4: After the inner wall of the preparation barrel (1) is cleaned, the solenoid valve 1 (16) is in a closed state and the solenoid valve 2 (23) is in an open state, so that the movable cover on the feed port (17) is in an open state, and then the exhaust fan (27) and the electric heating tube (29) are simultaneously turned on, and the heat source gas is continuously injected into the interior of the preparation barrel (1) indirectly through the upper side of the discharge pipe (15), and the feed port (17) cooperates with the discharge of dried water to achieve rapid drying of the inner wall of the preparation barrel (1) after cleaning, thereby avoiding affecting the preparation efficiency of the subsequent treatment agent. During the drying process, the gas entering the interior of the connecting tube (25) is filtered by the dustproof net (26) to prevent contamination of the interior of the preparation barrel (1).