Hanging lug type steel structure operation platform of roof tower crown steel column and construction method of hanging lug type steel structure operation platform

By designing the ear-hanging steel structure operation platform and using hanging boxes and overlapping plates to form a paper-shaped operation platform, the problems of difficulty and high safety risks of roof tower crown steel columns are solved, efficient and safe construction results are achieved, and welding quality is improved.

CN120119781APending Publication Date: 2025-06-10CHINA CONSTRUCTION EIGHTH BUREAU (INNER MONGOLIA) CONSTRUCTION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510165581.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-02-14
Publication Date
2025-06-10

AI Technical Summary

Technical Problem

The construction of roof tower crown steel columns is difficult, the safety risks are high, and the sectional welding quality of steel columns is difficult to control.

Method used

A hanging steel structure operating platform is designed, including a hanging box with bottom and no cover, overlapping board and fireproof cloth. The hanging box hooking ear plate is installed on the connecting ear plate of the steel column. The lap plate and the hanging box form a paper-shaped operating platform. The hanging box can be detached for material lifting.

Benefits of technology

It improves the safety and stability of the operating platform, reduces construction difficulty and safety risks, improves welding efficiency and quality, and realizes the multi-functional use of the hanging box.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120119781A_ABST
    Figure CN120119781A_ABST
Patent Text Reader

Abstract

The invention discloses a hanging lug type steel structure operation platform for roof tower crown steel columns and a construction method thereof.The hanging lug type steel structure operation platform comprises two hanging boxes which are provided with bottoms and free of covers and are oppositely arranged, the opposite sides of the two hanging boxes are connected with hanging lug plates, and the two hanging boxes are arranged on the two opposite sides of the splicing position of every two vertically-adjacent steel columns respectively; the upper box openings of the hanging boxes are formed below the splicing positions, the hanging lug plates are detachably installed on the connecting lug plates at the splicing positions of the two sections of steel columns, notches are formed in the two ends of the opposite sides of the two hanging boxes respectively, and the two notches of the hanging boxes are formed in the two opposite sides of the steel columns respectively; the lapping plate is connected between the two notches corresponding to the positions of the two hanging boxes; and the fireproof cloth covers the outer wall of the hanging box. The problems that the construction operation difficulty of the roof tower crown steel column is large, and the safety risk is high are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building construction, and particularly relates to a hanging ear type steel structure operation platform for a roof crown steel column and a construction method thereof. Background Art

[0002] The main cross-sectional form of the roof crown steel column is mainly box-shaped column, which is 30 meters high above the roof. The steel column has a large cross-section and a large steel plate thickness, and the welding quality of the steel column segments is particularly critical. Since the installation height of the roof steel structure crown is relatively high, the safety risk of edge operation is high, and the steel consumption is large, the part above the embedded section is installed on site by means of segmented welding. During the project construction process, the steel column is segmented into multiple sections (4 sections), with many welding operation surfaces, large workload, high operation height, great construction difficulty and difficult quality control. Summary of the Invention

[0003] In order to overcome the defects existing in the prior art, the present invention provides a hanging ear type steel structure operation platform for a roof crown steel column and a construction method thereof, so as to solve the problems of great construction operation difficulty and high safety risk of the roof crown steel column.

[0004] To achieve the above object, a hanging ear type steel structure operation platform for a roof crown steel column is provided, including:

[0005] Two hanging boxes with a bottom but no cover and arranged oppositely. The opposite sides of the two hanging boxes are connected with hanging ear plates. The two hanging boxes are respectively arranged on the opposite sides of the splicing joint of two adjacent upper and lower steel columns. The upper box opening of the hanging box is arranged below the splicing joint. The hanging ear plates are detachably installed on the connecting ear plates at the splicing joint of the two steel columns. The two ends of the opposite sides of the two hanging boxes respectively form notches, and the two notches of the hanging box are respectively arranged on the opposite sides of the steel column;

[0006] Lap plates, and the lap plates are connected between the two notches corresponding to the positions of the two hanging boxes;

[0007] Fireproof cloth, which is wrapped on the outer wall of the hanging box.

[0008] Further, the hanging box includes:

[0009] A bottom plate, which has a first side close to the steel column and a second side far from the steel column;

[0010] Columns, two oppositely arranged columns are vertically provided on the first side of the bottom plate, and the upper ends of the columns are connected to the hanging ear plates;

[0011] Guardrails, which are provided at both ends of the bottom plate and on the second side of the bottom plate. The notches are formed between the columns and the guardrails at the ends of the bottom plate.

[0012] Further, one end of the lapping plate is slidably disposed on the bottom plate of a suspension box, the other end of the lapping plate is rotatably connected with a hook, a retaining rod is erected on the bottom plate of the other suspension box, a pushing member is installed between one end of the lapping plate and the bottom plate of the one suspension box, and the pushing member pushes the lapping plate to hook the hook to the retaining rod.

[0013] Further, a guardrail is erected on the side of the lapping plate away from the steel column.

[0014] Further, a pull rod is connected to the other end of the lapping plate, and one end of the hook is hinged to the pull rod through a hinge shaft.

[0015] The present invention provides a construction method for a hanging ear type steel structure operation platform of a roof crown steel column, including the following steps:

[0016] Lift and install two suspension boxes, and detachably install the hanging ear plates of the two suspension boxes on the connecting ear plates at the splicing position of two steel columns, so that the two ends of the opposite sides of the two suspension boxes are arranged opposite to each other;

[0017] Connect the lapping plate between the two notches corresponding to the positions of the two suspension boxes;

[0018] Cover the outer wall of the suspension box with a fireproof cloth.

[0019] The beneficial effects of the present invention are as follows: for the hanging ear type steel structure operation platform of the roof crown steel column of the present invention, the suspension box is hung on the connecting ear plate of the steel column, with high operability, which can be increased or decreased according to the actual situation on site, and the installation is convenient. For the hanging ear type steel structure operation platform of the roof crown steel column of the present invention, the lapping plate and the two suspension boxes form a rectangular operation platform, and after disassembly, the suspension box can be used as a metal hopper for material hoisting, which is green and environmentally friendly. For the hanging ear type steel structure operation platform of the roof crown steel column of the present invention, the safety factor is high, and it can stably bear the weight of operating personnel and construction machinery. For the hanging ear type steel structure operation platform of the roof crown steel column of the present invention, it has strong applicability, is convenient for installation and disassembly, and is suitable for high-altitude welding operation of steel structures. During the construction process of the hanging ear type steel structure operation platform of the roof crown steel column of the present invention, fireproof cloth can be hung around and at the bottom, which can play a role in wind prevention and fire prevention, and improve the construction safety, welding efficiency and quality. Description of the Drawings

[0020] By reading the detailed description of the non-limiting embodiments with reference to the following drawings, other features, purposes and advantages of the present application will become more obvious:

[0021] Figure 1 It is a schematic structural diagram of a hanging ear type steel structure operation platform of a roof crown steel column according to an embodiment of the present invention.

[0022] Figure 2 ForFigure 1 The cross-sectional view taken along line A-A in

[0023] Figure 3 is Figure 1 The cross-sectional view taken along line B-B in

[0024] Figure 4 The structural schematic diagram of the connection node between the hanging ear plate and the connecting ear plate of the embodiment of the present invention.

[0025] Figure 5 and Figure 6 is the schematic diagram of the connection process between the overlapping plate and the bottom plate of the embodiment of the present invention. Detailed implementation manners

[0026] The following further elaborates on the present application in conjunction with the drawings and embodiments. It can be understood that the specific embodiments described herein are merely for explaining the relevant invention rather than limiting the invention. Additionally, it should be noted that for ease of description, only the parts related to the invention are shown in the drawings.

[0027] It should be noted that, without conflict, the embodiments in the present application and the features in the embodiments can be combined with each other. The following will elaborate on the present application in detail with reference to the drawings and embodiments.

[0028] Referring to Figures 1 to 6 as shown, the present invention provides a hanging ear type steel structure operation platform for a roof crown steel column, including: a hanging box 1, an overlapping plate 2, and a fireproof cloth 4.

[0029] The hanging box 1 has a bottom but no cover. A hanging ear is installed at the top of the hanging box. The number of hanging boxes is two. The two hanging boxes are arranged oppositely. The two hanging boxes are respectively arranged at the splicing seams of the two adjacent upper and lower steel columns of the roof crown steel column. Connecting ear plates are respectively installed at the top and bottom of the steel column.

[0030] In this embodiment, hanging ear plates 11 are connected to the opposite sides of the two hanging boxes 1. The two hanging boxes 1 are respectively arranged on the opposite sides at the splicing position of the two adjacent upper and lower steel columns 3. The upper box opening of the hanging box 1 is arranged below the splicing position. The hanging ear plates 11 are detachably installed on the connecting ear plates 31 at the splicing position of the two steel columns 3. Notches are respectively formed at both ends of the opposite sides of the two hanging boxes 1. The two notches of the hanging box 1 are respectively arranged on the opposite sides of the steel column 3.

[0031] The number of overlapping plates 2 is two. An overlapping plate 2 is connected between the two notches corresponding to the positions of the two hanging boxes 1. The position of the overlapping plate corresponds to the position of the ladder 31 on the steel column.

[0032] The fireproof cloth 4 covers the outer wall of the hanging box 1.

[0033] As a preferred embodiment, the hanging box 1 includes: a bottom plate 12, a column 13, and a guardrail 14.

[0034] In this embodiment, the bottom plate 12 is rectangular. The bottom plate 12 has a first side close to the steel column 3 and a second side far from the steel column 3.

[0035] The number of columns 13 is two. Two columns 13 are vertically arranged on the first side of the bottom plate 12 and are oppositely arranged. The upper ends of the columns 13 are connected to the hanging ear plates 11.

[0036] Guardrails 14 are provided at both ends of the bottom plate 12 and on the second side of the bottom plate 12. A notch is formed between the column 13 and the guardrail 14 at the end of the bottom plate 12.

[0037] In this embodiment, the bottom plate includes a support frame and a platform plate. The support frame is a planar frame. The platform plate is laid on the support frame. A hook is installed on one side of the support frame. The bottom plate is hung on the lower ends of the columns through the hook. When installing the hanging box, first install the columns on the steel columns, and then install the bottom plate on the columns.

[0038] One end of the overlapping plate 2 slides on the bottom plate 12 of a hanging box 1. The other end of the overlapping plate 2 is rotatably connected with a hook 21. A stop bar 22 is erected on the bottom plate 12 of another hanging box 1. A pushing member 23 is installed between one end of the overlapping plate 2 and the bottom plate 12 of a hanging box 1. The pushing member pushes the overlapping plate 2 to hook the hook on the stop bar.

[0039] In this embodiment, the pushing member is an electric hydraulic push rod. When the overlapping plate is connected to the bottom plate of another hanging box, refer to Figure 5 and Figure 6 As shown, the electric hydraulic push rod pushes the overlapping plate, so that the other end of the overlapping plate approaches the stop bar on the bottom plate of another hanging box. When the pull rod touches the stop bar, it flips upward, bypasses the stop bar, flips downward, and hooks on the stop bar.

[0040] In this embodiment, a guardrail 14 is erected on the side of the overlapping plate 2 far from the steel column 3.

[0041] As a preferred embodiment, the other end of the overlapping plate 2 is connected with a pull rod 24. One end of the hook is hinged to the pull rod through a hinge shaft.

[0042] The present invention provides a construction method for a hanging ear type steel structure operation platform of a roof crown steel column, including the following steps:

[0043] S1. Hoist two hanging boxes 1, and detachably install the hanging ear plates 11 of the two hanging boxes 1 on the connecting ear plates 31 at the splicing position of two sections of steel columns 3, so that the two ends of the opposite sides of the two hanging boxes 1 are arranged opposite to each other with gaps.

[0044] S2. Connect the overlapping plate 2 between the two gaps corresponding to the positions of the two hanging boxes 1.

[0045] S3, covering the outer wall of the hanging box 1 with a fireproof cloth 4.

[0046] When installing the hanging box, first connect the hanging ear plate at the upper end of the column to the connecting ear plates of the two adjacent upper and lower steel columns, and then connect and fasten the hanging ear plate to the connecting ear plates of the upper and lower steel columns by bolts.

[0047] Then hang the bottom plate of the hanging box to the hook at the root of the installed column. The supporting frame of the bottom plate is hung on the hook of the column and fastened with two rows of 24mm long bolts.

[0048] After the hanging box is installed, the steel platform plate is laid horizontally on the supporting frame. The platform plate is a 1mm thick perforated steel plate. After the platform plate is laid, the lap plate is overlapped between the bottoms of the two hanging boxes.

[0049] Specifically, the electro-hydraulic push rod pushes against the lap plate to make the pull rod of the lap plate hook the stopper on the bottom plate of another hanging box. The lap plate is pulled and connected to the two hanging boxes, and the two hanging boxes are connected to form a circular operating platform.

[0050] After the construction of the steel column section is completed, the operator removes the overlapping steel plate, removes the bolts at the connection between the operating platform and the column on both sides at the ladder of the steel column, and then removes the bolts at the ear plate to complete the disassembly of the platform and the column. Then hoist it to the next section and install it according to the steps in this section.

[0051] After the steel column construction is completed, the two sides of the operating platform are assembled together and used as scattered parts to lift the hopper.

[0052] The ear-hanging steel structure operating platform of the roof tower crown steel column of the present invention has high operability, can be increased or decreased according to actual conditions on site, and is easy to install.

[0053] The material of the ear-hanging steel structure operating platform of the roof tower crown steel column of the present invention can be circulated, can be used as a metal hopper for material lifting, and is green and environmentally friendly.

[0054] The ear-hanging steel structure operating platform of the roof tower crown steel column of the present invention has a high safety factor and can stabilize load-bearing operating personnel and construction machinery.

[0055] The ear-hanging steel structure operating platform of the roof tower crown steel column of the present invention has strong applicability, is convenient to install and disassemble, and is suitable for high-altitude welding operations of steel structures.

[0056] The ear-hanging steel structure operating platform of the roof tower crown steel column of the present invention can be equipped with fireproof cloths on all sides and at the bottom during the construction process, so as to achieve windproof and fireproof effects and improve construction safety, welding efficiency and quality.

[0057] The above description is only a preferred embodiment of the present application and an explanation of the technical principles applied. Those skilled in the art should understand that the scope of the invention involved in the present application is not limited to the technical solution formed by the specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the inventive concept. For example, a technical solution formed by mutually replacing the above features with technical features (but not limited to) having similar functions disclosed in the present application.

Claims

1. A hanging ear type steel structure operation platform for roof crown steel column, characterized in that: include: Two hanging boxes with bottoms but no covers and arranged opposite to each other, the opposite sides of the two hanging boxes are connected with hanging ear plates, the two hanging boxes are respectively arranged at the opposite sides of the joint of two upper and lower adjacent steel columns, the upper box opening of the hanging box is arranged below the joint, the hanging ear plates are detachably mounted on the connecting ear plates at the joint of the two steel columns, the two ends of the opposite sides of the two hanging boxes are respectively formed with notches, and the two notches of the hanging boxes are respectively arranged at the opposite sides of the steel column; A lap plate, the lap plate being connected between two notches corresponding to the positions of the two hanging boxes; The fireproof cloth is covered on the outer wall of the hanging box.

2. The ear-hanging steel structure operation platform of the roof tower crown steel column according to claim 1 is characterized in that: The hanging box comprises: a bottom plate having a first side close to the steel column and a second side away from the steel column; A column, wherein two columns arranged opposite to each other are vertically arranged on the first side of the bottom plate, and the upper ends of the columns are connected to the hanging ear plates; Guardrails are provided at both ends of the base plate and on the second side of the base plate, and the gap is formed between the upright post and the guardrails at the end of the base plate.

3. The ear-hanging steel structure operation platform of the roof crown steel column according to claim 2 is characterized in that: One end of the lap plate is slidably mounted on the bottom plate of a hanging box, and the other end of the lap plate is rotatably connected to a draw hook. A stop rod is mounted on the bottom plate of the other hanging box, and a pushing piece is installed between one end of the lap plate and the bottom plate of the hanging box. The pushing piece pushes the lap plate to make the draw hook hooked to the stop rod.

4. The ear-hanging steel structure operation platform of the roof crown steel column according to claim 3 is characterized in that: A guardrail is vertically arranged on one side of the lap plate away from the steel column.

5. The ear-hanging steel structure operation platform of the roof crown steel column according to claim 3 is characterized in that: The other end of the lap plate is connected with a pull rod, and one end of the pull hook is hinged to the pull rod through a hinge shaft.

6. A construction method for the ear-hanging steel structure operating platform of the roof crown steel column as claimed in any one of claims 1 to 5, characterized in that: The following steps are involved: Hoist two hanging boxes, and detachably install the hanging ear plates of the two hanging boxes on the connecting ear plates at the joint of the two steel columns, so that the notches at both ends of the opposite sides of the two hanging boxes are arranged opposite to each other; Connecting the lap plate between the two gaps corresponding to the positions of the two hanging boxes; The outer wall of the hanging box is covered with fireproof cloth.