Road collapse emergency disposal method, device, equipment, medium and program product
By using the hierarchical task network to plan emergency response and disposal processes and resource scheduling in road collapse emergency response, the problem that existing technology cannot effectively deal with emergency response at the micro level is solved, and efficient emergency response and resource scheduling are achieved.
Patent Information
- Application Number
- CN202510668547.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-05-23
- Publication Date
- 2025-06-24
- Estimated Expiration
- 2045-05-23
AI Technical Summary
The existing technology cannot analyze and plan the road collapse emergency environment at the micro level and realize resource automation scheduling, resulting in the inability to provide specific, fast and flexible emergency response plans.
By establishing an emergency response and disposal process based on pre-constructed road collapse emergency environment knowledge, it is planned to a hierarchical task network, obtaining the initial state, performing resource scheduling, feedback and updating the emergency process status.
It has achieved emergency treatment for road collapse at the micro level, improved emergency response efficiency, and reduced the impact of road collapse.
Smart Images

Figure CN120197839A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of public safety affairs processing, and in particular to a method, device, equipment, medium and program product for emergency disposal of road collapse. Background Art
[0002] Urban road collapse is generally caused by underground diseases such as voids, cavities, loose bodies, and water-rich bodies existing underground in the city. Cascade accidents are also likely to occur during road collapse, affecting the operation of surrounding urban areas and causing public safety impacts.
[0003] In the prior art, the emergency plan for road collapse usually judges the impact of road collapse at the macroscopic level and conducts event classification response. However, it is impossible to analyze and plan the emergency environment at the microscopic level to achieve automatic resource scheduling under multi-objective constraints in emergency handling. Therefore, it is impossible to provide a resource scheduling plan that can guide specific operations when a disaster occurs, and to conduct rapid, flexible and dynamic emergency disposal of road collapse. Summary of the Invention
[0004] The present invention provides a method, device, equipment, medium and program product for emergency disposal of road collapse, so as to realize emergency handling of road collapse at the microscopic level, improve the efficiency of emergency disposal, and minimize the impact of road collapse.
[0005] According to one aspect of the present invention, there is provided a method for emergency disposal of road collapse, the method comprising:
[0006] Establishing an emergency response and disposal process for road collapse according to the pre-constructed knowledge of the road collapse emergency environment;
[0007] Planning the emergency response and disposal process for road collapse into a hierarchical task network, and obtaining the initial state of road collapse emergency in the hierarchical task network;
[0008] Performing resource scheduling in the emergency disposal of road collapse according to the initial state of road collapse emergency to obtain a resource scheduling result;
[0009] Feeding back the resource scheduling result to the hierarchical task network for operation execution, and updating the emergency process state of road collapse in the hierarchical task network.
[0010] According to another aspect of the present invention, there is provided a device for emergency disposal of road collapse, the device comprising:
[0011] A disposal process establishment module, configured to establish an emergency response and disposal process for road collapse according to the pre-constructed knowledge of the road collapse emergency environment;
[0012] An emergency initial state acquisition module, configured to plan the road collapse emergency response and disposal process into a hierarchical task network, and acquire the road collapse emergency initial state in the hierarchical task network;
[0013] A resource scheduling result determination module, configured to perform resource scheduling in the road collapse emergency disposal according to the road collapse emergency initial state, and obtain a resource scheduling result;
[0014] An emergency process state update module, configured to feedback the resource scheduling result to the hierarchical task network for operation execution, and update the road collapse emergency process state in the hierarchical task network.
[0015] According to another aspect of the present invention, there is provided an electronic device, which includes:
[0016] At least one processor; and a memory communicatively connected to the at least one processor; wherein,
[0017] The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor, so that the at least one processor can execute the road collapse emergency disposal method according to any embodiment of the present invention.
[0018] According to another aspect of the present invention, there is provided a computer-readable storage medium, which stores computer instructions, and the computer instructions are used to implement the road collapse emergency disposal method according to any embodiment of the present invention when executed by a processor.
[0019] According to another aspect of the present invention, there is provided a computer program product, including a computer program, and the computer program implements the road collapse emergency disposal method according to any embodiment of the present invention when executed by a processor.
[0020] The technical solution of the embodiment of the present invention solves the problem of emergency disposal of road collapse by establishing a road collapse emergency response and disposal process according to the pre-constructed road collapse emergency environment knowledge; planning the road collapse emergency response and disposal process into a hierarchical task network, and acquiring the road collapse emergency initial state in the hierarchical task network; performing resource scheduling in the road collapse emergency disposal according to the road collapse emergency initial state to obtain a resource scheduling result; and feedbacking the resource scheduling result to the hierarchical task network for operation execution to update the road collapse emergency process state in the hierarchical task network. By planning the road collapse emergency response and disposal process into a hierarchical task network and completing task matching with the initial state of the event and the progress of the emergency disposal process, the emergency treatment of road collapse can be realized from the micro level. By performing resource scheduling, specific operations with guiding significance can be provided, the emergency disposal efficiency can be improved, and the impact of road collapse can be minimized.
[0021] It should be understood that the content described in this section is not intended to identify the key or important features of the embodiments of the present invention, nor is it used to limit the scope of the present invention. Other features of the present invention will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following will briefly introduce the drawings required for the description of the embodiments. Obviously, the drawings in the following description are only some embodiments of the present invention. For those of ordinary skill in the art, without creative efforts, other drawings can be obtained based on these drawings.
[0023] Figure 1 is a flowchart of a method for emergency disposal of road collapse according to Embodiment 1 of the present invention;
[0024] Figure 2 is a schematic diagram of the emergency response and disposal process of road collapse according to Embodiment 1 of the present invention;
[0025] Figure 3 is a flowchart of a method for emergency disposal of road collapse according to Embodiment 2 of the present invention;
[0026] Figure 4 is a flowchart of resource scheduling for transporting the wounded in the emergency disposal of road collapse according to Embodiment 2 of the present invention;
[0027] Figure 5 is a flowchart of emergency vehicle scheduling according to Embodiment 2 of the present invention;
[0028] Figure 6 is a flowchart of medical resource scheduling according to Embodiment 2 of the present invention;
[0029] Figure 7 is a schematic diagram of the search process of road segment sets according to Embodiment 2 of the present invention;
[0030] Figure 8 is a schematic diagram of the structure of an emergency disposal device for road collapse according to Embodiment 3 of the present invention;
[0031] Figure 9 is a schematic diagram of the structure of an electronic device for implementing the emergency disposal method of road collapse in the embodiments of the present invention. DETAILED DESCRIPTION OF THE EMBODIMENTS
[0032] To enable those skilled in the art to better understand the solution of the present invention, the following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. All other embodiments obtained by those of ordinary skill in the art based on the embodiments of the present invention without creative efforts shall fall within the protection scope of the present invention.
[0033] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and do not necessarily need to describe a specific order or sequence. It should be understood that such used data can be interchanged under appropriate circumstances so that the embodiments of the present invention described here can be implemented in an order different from those illustrated or described here. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusion. For example, a process, method, system, product or device including a series of steps or units does not necessarily have to be limited to those steps or units clearly listed, but may include other steps or units not clearly listed or inherent to these processes, methods, products or devices.
[0034] Embodiment 1
[0035] Figure 1 is a flowchart of a method for emergency disposal of road collapse according to Embodiment 1 of the present invention. This embodiment is applicable to the situation where resources are scheduled and specific emergency disposal is carried out when the road collapses due to various factors. This method can be executed by a road collapse emergency disposal device, which can be implemented in the form of hardware and / or software, and can be configured in an electronic device, which can be a computer, a controller, etc. As Figure 1 shown, the method includes:
[0036] Step 110: Establish a road collapse emergency response and disposal process according to the pre-constructed road collapse emergency environment knowledge.
[0037] Among them, road collapse is usually caused by underground diseases such as voids, cavities, loose bodies, and water-rich bodies existing under the urban ground. In the embodiments of the present invention, the formation of underground disease bodies can be mainly attributed to three aspects of factors: environment (such as underground rock and soil conditions, water environment conditions), engineering (such as construction interference, surface load), and pipelines (such as underground pipeline vulnerability, service life).
[0038] When a road collapses, it is also prone to trigger cascading accidents. For example, due to construction interference or damage to underground pipelines, the formation becomes unstable and collapses. The movement of underground rock and soil masses displaces or crushes underground pipelines, causing gas and sewage pipelines to leak or burst. The leaked combustible gas, electric current, and sewage cause explosions, fires, and pollution, which in turn disrupt traffic, cut off energy supply, and even affect public safety in the surrounding urban areas.
[0039] Road collapses are characterized by suddenness, randomness, and extensiveness. In the emergency response and disposal of road collapses, it is necessary to quickly, flexibly, and dynamically dispatch various types of resources at multiple levels within the city. Based on the analysis of the causes, impacts, and resource scheduling involved in road collapses, the emergency environment knowledge of road collapses can be constructed.
[0040] Exemplarily, Table 1 shows a model of the emergency environment knowledge of road collapses provided in the first embodiment of the present invention. As shown in Table 1, the emergency environment knowledge of road collapses is represented by emergency ontology concepts and ontology instances. Among them, the ontology concepts include abnormal events, disaster-bearing carriers, emergency organizations, emergency resources, and geographical environments, etc. The ontology instances can be set based on the specific urban conditions and may vary in different application scenarios.
[0041] Table 1
[0042]
[0043] Based on the emergency environment knowledge of road collapses shown in Table 1, Figure 2 is a schematic diagram of the emergency response and disposal process of road collapses provided in the first embodiment of the present invention. As Figure 2 shown, the emergency response and disposal process of road collapses can be as follows: First, cut off the accident source; implement traffic isolation to control the loss of personnel and property; immediately stop work for collapses caused by construction disturbances. When a pipeline bursts, dispatch engineering repair forces. When the source is a gas or drainage pipeline burst or such a cascading accident occurs, start the gas concentration and river pollution monitoring procedures; evacuate personnel and conduct emergency treatment of the river according to the monitoring results. Then, according to the occurrence of cascading accidents, the disappearance of personnel and items, and the casualties of personnel, dispatch resources such as fire, medical, and engineering to carry out rescue and repair; at the same time, dispatch subgrade and pavement equipment and materials to the site according to the road collapse repair requirements. At this point, the impact of the abnormal event is under control. Finally, carry out subgrade and pavement repair, lift traffic isolation until the energy supply is restored, the road resumes traffic, and the emergency response and disposal are completed.
[0044] In the embodiments of the present invention, the acquisition of road collapse-related information is obtained after being authorized by the corresponding institution, and the acquisition method is reasonable and legal.
[0045] Step 120: Plan the road collapse emergency response and disposal process into the Hierarchical Task Network (HTN), and obtain the initial state of road collapse emergency in the HTN.
[0046] The planning process of the Hierarchical Task Network (HTN) is to decompose composite tasks into smaller tasks using methods until all composite tasks are decomposed into atomic tasks that can be directly instantiated into actions through operators. For example, for Figure 2 the traffic isolation in can be decomposed into road blockage and setting up warning enclosures. Road blockage can be further decomposed into operators such as setting up roadblocks, setting up warning signs, and updating electronic road signs. Setting up warning enclosures can be further decomposed into operators such as setting up warning lines, setting up isolation fences, and setting up warning signs.
[0047] In an optional implementation manner of the embodiment of the present invention, planning the road collapse emergency response and disposal process into the HTN includes: according to the road collapse emergency disposal requirements, planning the road collapse emergency disposal as a five-tuple planning problem P=(IS; PS; T; O; M) based on the HTN; where IS is the initial state of road collapse emergency in the HTN, PS is the process state of road collapse emergency in the HTN, T is the initial task network of the planning problem, O is the set of operators of the planning problem, and M is the set of methods of the planning problem; taking the road collapse emergency response and disposal process as the main line, using IS as the input data, associating and nesting T, O, and M, updating IS to obtain PS, and generating the HTN of road collapse emergency disposal.
[0048] Specifically, the initial state of road collapse emergency (Initial State, IS) is the content and initial state of various emergency resources related to emergency activities. IS covers nine types of emergency ontologies: abnormal event ISe, disaster-bearing carrier ISdc, emergency engineering materials ISgm, emergency engineering repair ISee, emergency medical ISem, emergency rescue ISer, emergency vehicle ISveh, urban traffic ISct, and environmental standard threshold ISst. IS is expressed as: IS={ISe, ISdc, ISgm, ISee, ISem, ISer, ISveh, ISct, ISst}.
[0049] Table 2, Table 3, and Table 4 are the structural tables of each emergency ontology of the initial state of road collapse emergency IS provided in the first embodiment of the present invention. As shown in Table 2, Table 3, and Table 4, ISe is the set of initial states of abnormal events, ISe={ISe0}, and ISe0={occurrence time, source}. ISdc is the set of initial states of disaster-bearing carriers, ISdc={ISdc0, ISdc1, ISdc2,...}. Among them, ISdci ={Coding, Type, Geographical Location, Collapse Depth (m), Collapse Area (m 2 ), Collapse Volume (m 3 ), Fire Rating, Degree of Injury, Damage Status, Number Involved}. i = 1, 2, 3…. Among them, ISdc encompasses the different states of each disaster-bearing carrier, and not every ISdc i applies to all disaster-bearing carriers. ISgm is the initial state set of emergency engineering materials, ISgm = {ISgm0, ISgm1, ISgm2,...}, and ISgm i ={Coding, Type, Geographical Location, Number of Dispatchable Vehicles}. ISee is the initial state set of emergency engineering repair forces, ISee = {See0, See1, See2,...}, and ISee i ={Coding, Type, Geographical Location, Number of Dispatchable Vehicles}. ISem is the initial state set of emergency medical forces, ISem = {ISem0, ISem1, ISem2,...}, and ISem i ={Medical Force Coding, Geographical Location, Type, Number of Dispatchable Personnel, Number of Dispatchable Vehicles, Number of Available Beds}. ISer is the initial state set of emergency rescue forces, ISer = {ISer0, ISer1, ISer2,...}, and ISer i ={Coding, Geographical Location, Type, Nature of the Institution, Number of Dispatchable Personnel, Number of Dispatchable Vehicles, Charging Standard}. ISveh is the initial state set of emergency vehicles, ISveh = {ISveh0, ISveh1, ISveh2...}, and ISveh i ={Coding, Use, Energy Form, Average Speed}. ISct is the initial state set of urban traffic, ISct = {ISct0, ISct1, ISct2...}, and ISct i ={Coding, Starting Geographical Location, Ending Geographical Location, Length, Traffic Status}. ISst is the set of environmental standard thresholds, ISst = {ISst0}, and ISst0 = {Gas Standard Threshold, Water Quality Standard Threshold}.
[0050] Table 2
[0051]
[0052] Table 3
[0053]
[0054] Table 4
[0055]
[0056] In the embodiment of the present invention, the state of a certain type of emergency ontology set can be represented by a combination of multiple state information. For example, the state of a certain type of emergency ontology set can be represented by an expression such as "ontology type (state 1 = value ..., state X = value). state Y". For example, "ISdc (type = PO, DS = Injury). IN" represents the number of injured persons in the disaster-bearing carrier.
[0057] In an embodiment of the present invention, the road collapse emergency process state (Process State, PS) reflects the evolution of the emergency situation and can be expressed using first-order logic. Specifically, PS is the state of dynamic changes in various types of disaster-bearing carriers and emergency resources during the road collapse emergency response process, which reflects the progress and results of the emergency response. PS includes: the state of the disaster-bearing carrier, the geographical state of the emergency vehicle, and the emergency situation of abnormal events. PS is expressed as: PS={PSdc, PSveh, PSsit}.
[0058] Table 5 is an emergency entity structure table of a road collapse emergency process state according to the first embodiment of the present invention. As shown in Table 5, PSdc is a set of disaster-bearing carrier process states, PSdc={PSdc0, PSdc1, PSdc2, ...}, PSdc i ={code, type, blockade range, construction site status, valve status, gas concentration, harmful substance content}. PSveh is the process status set of emergency vehicles. PSveh={PSveh0,PSveh1,PSveh2,…}, PSveh i ={code,purpose,readiness,geographical location}.
[0059] PSsit is the emergency situation set, PSsit={PSsit0,PSsit1,PSsit2,…PSsit 15}, each element uses a Boolean value to represent the disposal status of 16 emergency tasks in the road collapse domain. i ={handling status}, the overall emergency situation of the road collapse event can be represented by a 4-bit hexadecimal code composed of various elements. Specifically, Table 6 is an emergency situation structure table provided according to the first embodiment of the present invention.
[0060] Combined with Figure 2 The road collapse emergency response process shown in the figure, when PSsit=x1FFF, the emergency situation is abnormal event control; when PSsit=xFFFF, the emergency situation is abnormal event release.
[0061] In an embodiment of the present invention, T is the initial task network of the planning problem. T includes Compound Tasks and Primitive Tasks. The root task is the emergency response task for road collapse. O (Operator) is the set of operators of the planning problem. Specifically, O are the instance actions that need to be executed to complete the emergency response task for road collapse, their preconditions, and effects. M (Method) is the set of methods of the planning problem. Specifically, M is the set of methods for road collapse problems and is also the possible decomposition paths of compound tasks under different preconditions.
[0062] Table 5
[0063]
[0064] Table 6
[0065]
[0066] Specifically, planning the emergency response process for road collapse into the hierarchical task network can be based on the emergency response process for road collapse as the main line, with IS as the input data, associating and nesting T, O, and M to update IS to obtain PS.
[0067] Exemplarily, in the emergency response for road collapse, it may include at least one of the following compound tasks: construction site shutdown, traffic isolation, environmental monitoring, casualty transportation, on-site rescue, pipeline repair, engineering material transportation, road surface and subgrade repair, traffic isolation removal, and construction site resumption. The construction site shutdown can be decomposed into subtasks related to the construction site shutdown, and the method condition is that the event is caused by construction interference. The subtasks related to the construction site shutdown can be decomposed into operators for notifying the construction site shutdown.
[0068] Traffic isolation can be decomposed into subtasks of road blockage and setting up warning enclosures. The road blockage subtask can be decomposed into primitive tasks of setting up roadblocks, setting up warning signs, and updating electronic road signs, and the method condition is that the collapse volume ≥ 50m 3 or a gas or water supply pipeline bursts or a fire occurs. The operator for setting up roadblocks is to place roadblocks. The operator for setting up warning signs is to place warning signs. The operator for updating electronic road signs is to update electronic road signs. The subtask of setting up warning enclosures can be decomposed into primitive tasks of setting up warning lines, setting up isolation fences, and setting up warning signs, and the method condition is that the collapse volume < 50m 3 and no gas or water supply pipeline bursts or fires occur. The operator for setting up warning lines is to pull warning lines. The operator for setting up isolation fences is to place isolation fences. The operator for setting up warning signs is to place warning signs.
[0069] Environmental monitoring can be decomposed into subtasks of gas monitoring and water quality monitoring. Gas monitoring can be decomposed into atomic tasks of setting gas monitoring points and personnel evacuation, with the method condition being gas pipeline burst or leakage. The operator for setting gas monitoring points is to install temporary gas sensing equipment. The operator for personnel evacuation is personnel transfer. Water quality monitoring can be decomposed into atomic tasks of setting water quality monitoring points and river ecological restoration, with the method condition being sewage overflow from drainage pipes. The operator for setting water quality monitoring points is to install temporary water quality sensing equipment. The operator for river ecological restoration is to release biological agents.
[0070] The transportation of the wounded can be decomposed into atomic tasks of emergency rescue force dispatch, arrival of the ambulance, transportation of the wounded to the ambulance, arrival of the ambulance at the hospital, and placement of the wounded, with the method condition being the number of wounded > 0. The operator for emergency rescue force dispatch is emergency rescue force dispatch. The operator for the arrival of the ambulance is the arrival of the ambulance. The operator for transporting the wounded to the ambulance is transporting the wounded to the ambulance. The operator for the arrival of the ambulance at the hospital is the ambulance driving to the hospital. The operator for the placement of the wounded is the placement of the wounded.
[0071] Fire rescue can be decomposed into atomic tasks of fire force dispatch, arrival of the fire truck, fire extinguishing, search for missing persons, and salvage of dropped property, with the method conditions being a fire, missing persons, or dropped property. The operator for fire force dispatch is fire force dispatch. The operator for the arrival of the fire truck is the fire truck driving. The operator for fire extinguishing is extinguishing the fire. The operator for searching for missing persons is searching for missing persons. The operator for salvaging dropped property is salvaging dropped property.
[0072] Pipeline repair can be decomposed into subtasks of closing valves, gas pipeline repair, drainage pipeline repair, water supply pipeline repair, and heat pipeline repair. Closing valves can be decomposed into subtasks of closing gas pipeline valves, closing drainage pipeline valves, closing water supply pipeline valves, and closing heat pipeline valves, with the method condition being burst or leakage of one or more pipelines. Gas pipeline repair can be decomposed into atomic tasks of gas repair force dispatch, arrival of the gas repair vehicle at the incident site, gas pipeline repair, and opening the valve, with the method conditions being gas pipeline burst or leakage and all fire rescue tasks have been completed. The operator for gas repair force dispatch is gas repair force dispatch. The operator for the arrival of the gas repair vehicle at the incident site is the repair vehicle driving. The operator for gas pipeline repair is gas pipeline repair operation. The operator for opening the valve is opening the valve.
[0073] The emergency repair of drainage pipelines can be decomposed into atomic tasks such as the dispatching of drainage pipeline emergency repair forces, the arrival of drainage emergency repair vehicles at the incident site, the emergency repair of drainage pipelines, and the opening of valves. The emergency repair of water supply pipelines can be decomposed into the dispatching of water supply pipeline emergency repair forces, the arrival of water supply emergency repair vehicles at the incident site, the emergency repair of water supply pipelines, and the opening of valves. The emergency repair of heat pipelines can be decomposed into atomic tasks such as the closing of valves, the dispatching of heat pipeline emergency repair forces, the arrival of heat pipeline emergency repair vehicles at the incident site, the emergency repair of heat pipelines, and the opening of valves. The method condition is that the corresponding pipeline bursts or leaks and its previous emergency repair, fire rescue, and casualty transfer tasks have been completed.
[0074] The transportation of engineering materials can be decomposed into atomic tasks such as engineering material dispatching, engineering material loading, the arrival of engineering material vehicles at the incident site, and engineering material unloading. The method condition is that the corresponding pipeline bursts or leaks and its previous emergency repair tasks and all fire rescue tasks have been completed. The operator of engineering material dispatching is engineering material dispatching search and dispatch. The operator of engineering material loading is engineering material loading. The operator of the arrival of engineering material vehicles at the incident site is the driving of engineering material vehicles. The operator of engineering material unloading is engineering material unloading.
[0075] The repair of roadbeds can be decomposed into atomic tasks of repair construction. The method condition is that the abnormal event is under control. The operator of repair construction is backfill grouting and pouring. The lifting of traffic isolation can be decomposed into atomic tasks of lifting road blockades and lifting warning enclosure facilities. The method condition is that the abnormal event is under control and the repair of roadbeds has been completed. The lifting of road blockades can be decomposed into atomic tasks of removing roadblocks, removing warning signs, and updating electronic road signs. The lifting of warning enclosure facilities can be decomposed into atomic tasks of removing warning lines, removing isolation fences, and removing warning signs. The method condition for the resumption of construction at the construction site is that the event is caused by construction interference, the abnormal event is under control, and the repair of roadbeds has been completed.
[0076] The preconditions in the set of operators for each atomic task express the dependence relationships between instance actions and the initial state, process state, and emergency situation. For example, the precondition for the emergency repair operation of gas pipelines is that the gas pipeline valves have been closed, and the precondition for the release of biological agents is that the harmful substance content in the river exceeds the standard, etc.; the effects in the set of operators express the impact of instance actions on the process state or emergency situation. For example, the effect of the dispatching of first aid forces is that the dispatched first aid vehicles reach the ready state, and the effect of the unloading of engineering materials is PSsit 12 =true, etc.
[0077] In the embodiments of the present invention, based on the above composite tasks, atomic tasks, and operators, by associating and nesting T, O, and M, the hierarchical task network for the emergency disposal of road collapses represented by pseudocode can be obtained as follows:
[0078] Pseudo-code of the first sub-part:
[0079]
[0080] Pseudo-code of the second sub-part:
[0081]
[0082] Pseudo-code of the third sub-part:
[0083]
[0084] Pseudo-code of the fourth sub-part:
[0085]
[0086] Pseudo-code of the fifth sub-part:
[0087]
[0088] Among them, the operations and logical relationships in the above pseudo-code can refer to the Python language, and the state parameters can refer to Table 2, Table 3, Table 4, Table 5, and Table 6. The task, method, and operator names are represented in Chinese. When there are multiple emergency resource ontologies of the same type involved in the emergency disposal of road collapse, the corresponding original state and process state can be indexed through the ontology encoding. Specifically, each scheduling task takes the initial state set ISdc of the disaster-bearing carrier as input, obtains the ontology encoding after calling the corresponding emergency resource ontology, and then indexes to PSdc with this ontology encoding, thereby affecting the operation. This step is omitted in the above pseudo-code. By planning the road collapse emergency response and disposal process into a hierarchical task network, the composite task can be decomposed into atomic tasks, and then the tasks can be executed through operators. By inputting different initial state sets ISdc of road collapse, the corresponding initial hierarchical task network can be obtained. With the change of the process state and the evolution of the emergency situation in the emergency response, the corresponding task and operator lists will be triggered, so that the emergency handling of different road collapse events can be realized from the micro level.
[0089] Step 130: Perform resource scheduling in the emergency disposal of road collapse according to the initial state of road collapse to obtain the resource scheduling result.
[0090] After the emergency disposal task of road collapse is completed in the plan, for the event instance, suitable emergency resources are scheduled for the atomic tasks to form an executable emergency action plan. In the embodiment of the present invention, the atomic tasks of road collapse emergency disposal are summarized as: notification, placement, loading, unloading, transportation, extinguishing, searching, salvaging, repairing, and construction, etc.
[0091] When performing resource scheduling, the disposal cost of atomic tasks can be constrained under multiple objectives, so as to achieve reasonable resource scheduling. For example, time, economy, and environment can be used as three types of objectives for constraining resource scheduling.
[0092] The inventors found that under the constraints of the above three types of objectives, the uncertainty of transportation tasks in atomic tasks is relatively significant. The transportation efficiency is often affected by objective factors such as the degree of disaster, distance, road conditions, etc. and the subjective conditions of emergency resources. While the disposal costs of other tasks are relatively stable. When constraining the transportation efficiency during the disposal process, the efficiency and cost of the road collapse emergency task can be ensured to be generally controllable.
[0093] Therefore, in the embodiments of the present invention, the resource scheduling in atomic tasks can be considered as resource scheduling centered on transportation tasks. Among them, when performing resource scheduling, the initial state of the road collapse emergency is used as the input, and the transportation resources are considered under three types of objectives: time, economy, and environment, to obtain the resource scheduling result.
[0094] Step 140: Feed back the resource scheduling result to the hierarchical task network for operation execution, and update the road collapse emergency process state in the hierarchical task network.
[0095] The resource scheduling result can be fed back to the hierarchical task network for operation execution. For example, the resource scheduling result can be fed back to the emergency force scheduling for transporting the wounded, the emergency vehicle driving to the hospital, the fire force scheduling in fire rescue, the repair force scheduling in pipeline repair, and the engineering material scheduling in engineering material transportation, etc., so as to realize the specific execution of the road collapse emergency disposal and update the road collapse emergency process state in the hierarchical task network.
[0096] The technical solution of this embodiment establishes a road collapse emergency response and disposal process according to the pre-constructed road collapse emergency environment knowledge; plans the road collapse emergency response and disposal process into the hierarchical task network, and obtains the initial state of the road collapse emergency in the hierarchical task network; performs resource scheduling in the road collapse emergency disposal according to the initial state of the road collapse emergency to obtain the resource scheduling result; feeds back the resource scheduling result to the hierarchical task network for operation execution, and updates the road collapse emergency process state in the hierarchical task network, solving the micro emergency disposal problem of road collapse. By planning the road collapse emergency response and disposal process into the hierarchical task network and completing task matching with the initial state of the event and the progress of the emergency disposal process, the road collapse emergency can be realized from the micro level. By performing resource scheduling, specific operations with guiding significance can be provided, improving the emergency disposal efficiency and minimizing the impact of road collapse.
[0097] Embodiment Two
[0098] Figure 3It is a flowchart of a method for emergency disposal of road collapse provided in Embodiment 2 of the present invention. This embodiment further refines the above technical solution, and the technical solution in this embodiment can be combined with each optional solution in one or more of the above embodiments. As Figure 3 shown, the method includes:
[0099] Step 310: Establish an emergency response and disposal process for road collapse according to the pre-constructed knowledge of the emergency environment for road collapse.
[0100] Step 320: According to the requirements of emergency disposal of road collapse, plan the emergency disposal of road collapse as a five-tuple planning problem P=(IS; PS; T; O; M) based on the hierarchical task network.
[0101] Among them, IS is the initial state of road collapse emergency in the hierarchical task network, PS is the process state of road collapse emergency in the hierarchical task network, T is the initial task network of the planning problem, O is the set of operators of the planning problem, and M is the set of methods of the planning problem.
[0102] Step 330: Taking the emergency response and disposal process of road collapse as the main line and IS as the input data, associate and nest T, O, and M, update IS to obtain PS, and generate a hierarchical task network for emergency disposal of road collapse.
[0103] Step 340: Obtain the initial state of road collapse emergency in the hierarchical task network.
[0104] Step 350: Perform resource scheduling in the emergency disposal of road collapse according to the initial state of road collapse emergency to obtain the resource scheduling result.
[0105] When considering the resource scheduling in the atomic task as a resource scheduling centered on the transportation task and considering it under three types of objectives: time, economy, and environment, the resource scheduling can be classified. Optionally, performing resource scheduling in the emergency disposal of road collapse according to the initial state of road collapse emergency includes: performing resource scheduling of at least one of the following in the emergency disposal of road collapse according to the initial state of road collapse emergency: transporting the wounded, transporting rescue forces, transporting repair forces, and transporting engineering equipment and materials.
[0106] Among them, the task of transporting the wounded includes three locations: the emergency center, the incident site, and the hospital, which is relatively complex compared to other direct transports. Therefore, when performing resource scheduling, a type of optimal decision-making scheme can be adopted for transporting the wounded. And other resource scheduling can refer to the resource scheduling and decision-making methods adopted for transporting the wounded, and finally obtain an optimal decision-making scheme for the emergency of road collapse.
[0107] In an alternative implementation of the embodiment of the present invention, resource scheduling in road collapse emergency disposal is performed according to the initial state of road collapse emergency, including: when the resource scheduling is for transporting rescue forces, repair forces, or engineering equipment and materials, the resource scheduling is performed through the following steps: taking the disaster-bearing carriers and emergency resources in the initial state of road collapse emergency as inputs, performing emergency vehicle scheduling to generate an emergency vehicle scheduling plan; calculating the cost of emergency vehicle scheduling based on the road collapse location, source of emergency resources, road network information, vehicle energy type, energy cost, and energy carbon emission information during emergency vehicle scheduling; and determining the target emergency vehicle scheduling plan in the emergency vehicle scheduling plan according to the calculation result of the emergency vehicle scheduling cost.
[0108] In an alternative implementation of the embodiment of the present invention, resource scheduling in road collapse emergency disposal is performed according to the initial state of road collapse emergency, including: when the resource scheduling is for transporting the wounded, the resource scheduling is performed through the following steps: taking the wounded composition information in the disaster-bearing carrier and the emergency center information in the emergency resources in the initial state of road collapse emergency as inputs, performing first-aid vehicle scheduling to generate a first-aid vehicle scheduling plan; taking the number of wounded in the disaster-bearing carrier and the medical treatment resource information in the emergency resources in the initial state of road collapse emergency as inputs, performing medical treatment resource scheduling to generate a medical treatment resource scheduling result; connecting and matching the first-aid vehicle scheduling plan and the medical treatment resource scheduling result to obtain a wounded transportation plan; calculating the cost of first-aid vehicle scheduling based on the road collapse location, source of first-aid vehicles, location of medical treatment resources, road network information, vehicle energy type, energy cost, and energy carbon emission information during first-aid vehicle scheduling; and determining the target wounded transportation plan in the wounded transportation plan according to the calculation result of the first-aid vehicle scheduling cost.
[0109] Specifically, the following content takes the transportation of the wounded as an example for resource scheduling. The resource scheduling for transporting rescue forces, repair forces, and engineering equipment and materials can be adjusted with reference to the resource scheduling method for transporting the wounded.
[0110] Figure 4 It is a flowchart of resource scheduling for transporting the wounded in road collapse emergency disposal provided by Embodiment 2 of the present invention. As Figure 4 shown, in the resource scheduling for transporting the wounded, the input is the initial state of the event, the output is the optimal decision-making plan, and the process includes links such as resource scheduling, cost calculation, and plan decision-making.
[0111] Specifically, in the transportation of the wounded, the first step can be the scheduling of first-aid vehicles. The scheduling of first-aid vehicles can take the wounded composition information and the emergency center information as inputs, calculate the scheduling requirements of first-aid vehicles according to the rated loading capacity rule of first-aid vehicles, and complete the polling search for the demand to be transported and the transportation capacity.
[0112] Figure 5 It is a first-aid vehicle scheduling flow chart provided according to Embodiment 2 of the present invention. As Figure 5 shown, when performing first-aid vehicle scheduling, the information on the composition of the wounded (ISdc (type = P0, DS = Injury, that is, the information on the injured persons in the disaster-bearing carrier) and the information on the first-aid center (ISem (type = First-aid), that is, the information on the vehicles that can be called for first-aid in the emergency medical service) are used as inputs. The number of first-aid vehicles required (?vehRequest) is determined according to the number of persons with different degrees of injury and the rule of the rated loading capacity of the first-aid vehicle.
[0113] Among them,?vehRequest = Ceil(ISdc(type = P0, DS = Injury.ID = Severe).IN / C3) + Ceil(ISdc(type = P0, DS = Injury.ID = Moderate).IN / C2)+ Ceil(ISdc(type = P0, DS = Injury.ID = MILD).IN / C1). In the formula, "Ceil(ISdc(type = P0, DS = Injury.ID = Severe).IN / C3)" represents the number of first-aid vehicles required for the severely injured persons determined according to the ratio of the number of severely injured persons in the disaster-bearing carrier to the rated loading capacity of the first-aid vehicle for severely injured persons (the ratio is rounded up). "Ceil(ISdc(type = P0, DS = Injury.ID = Moderate).IN / C2)" represents the number of first-aid vehicles required for the moderately injured persons determined according to the ratio of the number of moderately injured persons in the disaster-bearing carrier to the rated loading capacity of the first-aid vehicle for moderately injured persons (the ratio is rounded up). "Ceil(ISdc(type = P0, DS = Injury.ID = MILD).IN / C1)" represents the number of first-aid vehicles required for the mildly injured persons determined according to the ratio of the number of mildly injured persons in the disaster-bearing carrier to the rated loading capacity of the first-aid vehicle for mildly injured persons (the ratio is rounded up). C3, C2, and C1 respectively represent the rated loading capacity of the first-aid vehicle for severely, moderately, and mildly injured persons. C3 < C2 < C1, unit: person / vehicle.
[0114] As Figure 5 shown, all first-aid center resources can be obtained to get the emergency medical array "?ISemFa[] = ISem (type = First-aid)".
[0115] As Figure 5As shown, the emergency vehicle dispatching for gasoline-powered vehicles and electric vehicles in the emergency medical array?ISemFa[] can be carried out according to the required number of emergency vehicles?vehRequest. When carrying out emergency vehicle dispatching, the number of available gasoline-powered vehicles in the emergency center (?avaGas = sum(1 for item in?ISemFa[?i].Isveh(func = First-aid) if item['EF'] == 'Gasoline')) and the number of available electric vehicles (?avaEle = sum(1 for item in?ISemFa[?i].Isveh(func = First-aid) if item['EF'] == 'Electric')) can be obtained.
[0116] When the vehicles in the current emergency center meet the dispatching requirements, that is, when (?avaGas +?avaEle) >=?vehRequest, initialize the search variable?vehRequestTemp =?vehRequest. Then, search for a dispatching plan for the number of gasoline-powered vehicles (?g =?vehRequest -?vehRequestTemp), and a dispatching plan for the number of electric vehicles (?e =?vehRequestTemp). When the number of available gasoline-powered vehicles and electric vehicles in the current emergency center meets the search results, that is, when (?g <=?avaGas) and (?e <=?avaEle), an emergency vehicle dispatching plan for the current emergency center can be generated according to the dispatching situation of the current emergency center.
[0117] Among them, the emergency vehicle dispatching plan (?jsonVehResult.append) includes the emergency center code ('faN0':?ISemFa[?i].code), location ('LOC':?ISemFa[?i].loc), the number of dispatched gasoline-powered vehicles ('numGas':?g), and the number of dispatched electric vehicles ('numEle':?e).
[0118] When the number of available gasoline-powered vehicles and electric vehicles in the current emergency center does not meet the search results, the search variable (?vehRequestTemp) is decreased by 1, and when the search variable is greater than 0 (that is, when?vehRequestTemp-- < 0 is not satisfied), return to search for a dispatching plan for the number of gasoline-powered vehicles (?g =?vehRequest -?vehRequestTemp), and a dispatching plan for the number of electric vehicles (?e =?vehRequestTemp).
[0119] Repeat the above search process. After dispatching the current emergency center, if the search variable (?vehRequestTemp) is less than 0, complete the search for the current emergency center and proceed to the next emergency center dispatch (?ISemFa[++?i]==null), until all emergency centers have been traversed.
[0120] According to the process as Figure 5 described, an emergency vehicle dispatch plan can be generated for emergency vehicle dispatch. In the transfer of the wounded, the second step can be the dispatch of medical treatment resources. The dispatch of medical treatment resources can take the number of wounded and medical treatment resource information as inputs and perform a polling search for medical treatment resources. Figure 6 Figure 7 is a flowchart of a medical treatment resource dispatch provided according to Embodiment 2 of the present invention. In the dispatch of medical treatment resources, the required number of available beds can be determined based on the number of injured persons (?bedRequest = ISdc(type = P0, DS = Injury).IN). All medical treatment resources can be obtained to get the medical treatment resource array?ISemTr[] = ISem(type = Treat). Initialize the medical treatment resource dispatch result (?jsonBedResult = json.loads('[]')). For the i-th medical treatment resource, determine whether the number of available beds meets the dispatch requirements, that is,?ISemTr[?i].NAB >=?bedRequest. When the number of available beds meets the dispatch requirements, the medical treatment resources can be dispatched according to the number of available beds in the i-th medical treatment resource to generate the medical treatment resource dispatch result for the i-th medical treatment resource. The medical treatment resource dispatch result (?jsonBedResult.append) includes: hospital number ('trN0':?ISemTr[?i].code), hospital address ('LOC':?ISemTr[?i].loc), and number of beds ('numBed':?ISemTr[?i].NAB). When the number of available beds does not meet the dispatch requirements, the next medical treatment resource can be dispatched until all medical treatment resources have been traversed.
[0121] When the emergency vehicle dispatch plan and the medical treatment resource dispatch result are obtained, the third step of the wounded transfer can be carried out, that is, the cross-combination of the emergency vehicle dispatch plan?jsonvehResult and the medical treatment resource dispatch result?jsonBedResult, as well as the extended dispatch of vehicles and road networks, to achieve the connection and matching of the wounded transfer. Starting from the emergency center, passing through the incident location, and ending at the medical treatment resources, a set of road segments is obtained by searching the road network in the initial state of the event, Road = {Road0, Road1, Road2…, Road m}, where Road k (k = 1, 2, 3…, m) = {road segment code, length, traffic status}.
[0122] If the road network roads are abstracted into two types of orientations, east-west and north-south, based on a two-dimensional electronic map, the road segment set will include: the east-west road segment set 1 (emergency center → incident location), the north-south road segment set 1 (emergency center → incident location), the east-west road segment set 2 (incident location → hospital), and the north-south road segment set 2 (incident location → hospital), a total of 4 subsets. Taking the east-west road segment set 1 (emergency center → incident location) Road k as an example, the process of designing a search method takes an emergency center object with a certain code faNOi, a disaster-bearing carrier, and the urban road network as inputs, and the output is a json object?jsonRoadResult.
[0123] Figure 7 is a schematic diagram of a road segment set search process provided in Embodiment 2 of the present invention. As Figure 7As shown in the figure, when taking the east-west road section set 1 (emergency center → accident site) as an example for searching, the emergency medical ISem (type = First-aid, code = faNOi) for first aid in the emergency center faNOi, the disaster-bearing carrier ISdc, and the urban road network ISst can be used as inputs. Obtain the position of the emergency center faNOi (?xs,?ys) and the position of the injured at the accident site (?xe) in the current casualty transfer connection plan. Among them,?xs = ISem(type = First-aid, code = faNOi).locx,?ys = ISem(type = First-aid, code = faNOi).locy,?xe = ISdc(type = P0).locx. Initialize the temporary variables?xTemp1 =?xs,?xTemp2 =?xs. Calculate the road section position increment?delta=(?xe -?xs) / abs(?xe -?xs), considering whether the accident site is east or west of the emergency center. Initialize the scheduling result?jsonRoadResult = json.loads('[]'), calculate the end position of the road section?xTemp2 +=?delta. In each search, the abscissa of the emergency center faNOi can be used as the starting point, and the road section search can be carried out along the east or west direction of the emergency center with one road section as the step length. According to the starting point and end position, obtain the road section information to generate the road section scheduling result?jsonRoadResult.append, including: code ('code': ISst(sLocx =?xTemp1, sLocy =?ys, eLocx =?xTemp2, eLocy =?ys).code), length ('lenth': ISst(sLocx =?xTemp1, sLocy =?ys, eLocx =?xTemp2, eLocy =?ys).length), and traffic status ('roadTS': ISst(sLocx =?xTemp1, sLocy =?ys, eLocx =?xTemp2, eLocy =?ys).TS). Among them, the starting point in the road section scheduling result is the abscissa of the emergency center, and the end point is the end point of the current search road section. When the end point of the current search road section is the position of the injured at the accident site, that is,?xTemp2 ==?xe, the search ends; otherwise, set the starting point of the next search road section to the end point of the current road section, that is,?xTemp1 =?xTemp2.
[0124] The search methods for the remaining subsets can be based on Figure 7The process shown is derived similarly. Among them, when conducting a road segment search, the path from a starting point to an ending point can be simply summarized into two cases: first east-west and then north-south, and first north-south and then east-west. Due to the different dynamic traffic conditions when passing through road segments, the driving times required for the two cases will be different. To obtain the path with the least expected time, it is necessary to perform a complete search of the road segment subsets according to the two cases, and obtain two sets of dynamic distance schemes considering the traffic state from the product of 'length' and 'roadTS' in the result object as shown in Figure 7 and take the smaller value as the road segment search result.
[0125] Through the scheduling and search of the emergency center, medical treatment resources, and road network resources, the casualty transportation plan Plan={Plan0,Plan1,Plan2…,Plan n} is finally obtained, where n is the total number of casualty transportation plans. Among them, Plan i (i = 1,2,3…,n)={emergency center code, geographical location, gasoline vehicle set {vehicle code, unit energy consumption}, electric vehicle set {vehicle code, unit energy consumption}, hospital code, geographical location, available bed number, road segment set}.
[0126] The fourth step of casualty transportation can be to calculate the emergency vehicle scheduling cost for each casualty transportation plan. In the embodiment of the present invention, the emergency vehicle scheduling cost can be calculated according to the road collapse location (accident site) during emergency vehicle scheduling, the source location of the emergency vehicle (geographical location of the emergency center), the location of the medical treatment resources (geographical location of the medical treatment resources), road network information, vehicle energy type, energy cost, and energy carbon emission information.
[0127] In the embodiment of the present invention, emergency vehicle scheduling constraints are carried out under three major objectives. Specifically, the emergency vehicle scheduling cost can be calculated according to the expected distance, expected time, expected cost, and expected carbon emission of casualty transportation; the locations of the emergency center, accident site, and hospital and the road network state, and the expected time and expected cost are different; the vehicles scheduled are gasoline or new energy vehicles, and the expected carbon emission is different.
[0128] When obtaining the emergency vehicle scheduling cost, the target casualty transportation plan can be determined in the casualty transportation plan according to the calculation result of the emergency vehicle scheduling cost. For example, the plan with the lowest cost is used as the target casualty transportation plan.
[0129] In an alternative embodiment of the present invention, the calculation of the emergency vehicle dispatching cost is performed based on the road collapse location, the source location of the emergency vehicle, the location of the medical resources, the road network information, the vehicle energy type, the energy cost, and the energy carbon emission information during emergency vehicle dispatching, including: determining the expected distance of the emergency vehicle dispatching based on the road collapse location, the road network information, the source location of the emergency vehicle, and the location of the medical resources; determining the expected time of the emergency vehicle dispatching based on the expected distance, the vehicle speed, the number of wounded, the on-site loading time of the wounded, and the hospital placement time of the wounded; determining the expected cost of the emergency vehicle dispatching based on the expected distance, the vehicle energy type and quantity, and the energy cost; determining the expected carbon emission of the emergency vehicle dispatching based on the expected distance, the vehicle energy type and quantity, and the energy carbon emission information; and calculating the emergency vehicle dispatching cost based on the expected distance, the expected time, the expected cost, and the expected carbon emission.
[0130] Specifically, taking Plan i as an example, the calculation method of its cost index can be: determining the expected distance of the emergency vehicle dispatching through the formula . Among them, is the expected distance of Plan i , with the unit of km; r i is the total number of road segments of Plan i (from the source location of the emergency vehicle → the road collapse location → the location of the medical resources); is the length of road segment k, with the unit of km; is the road network information (for example, taking constant values C4, C5, C6 for the three situations of smooth, slow, and congested respectively, where 0 < C6 < C5 < C4 ≤ 1).
[0131] Determining the expected time of the emergency vehicle dispatching through the formula . Among them, is the expected time of Plan i , with the unit of minutes (min); Speed is the vehicle speed, with the unit of km / h, and can take the constant value C7. It is assumed that the average speeds of vehicles with different models and energy forms facing urban road conditions are the same; IN is the number of wounded to be transported, with the unit of person; UTQ l is the on-site loading time for each wounded, with the unit of min / person, and can take the constant value C8; UTQ r is the hospital placement time for each wounded, with the unit of min / person, and can take the constant value C9. It should be noted that the time for on-site loading and hospital placement of the wounded during the transportation process has relatively stable costs. Therefore, in the embodiments of the present invention, preset constants are set for them, and the dispatching strategy is not considered.
[0132] Determining the expected cost of the emergency vehicle dispatching through the formula . is the expected cost of Plan iThe expected cost, For Plan i the number of gasoline vehicles, For Plan i the number of gasoline vehicles, For Plan i the unit energy consumption of the k-th gasoline vehicle, For Plan i the unit energy consumption of the p-th electric vehicle, The energy cost of gasoline vehicles such as the gasoline unit price, which can take a constant C 10 , The energy cost of electric vehicles such as the electricity unit price, which can take a constant C 11 .
[0133] Determine the expected carbon emissions of emergency vehicle dispatching through the formula . Among them, For Plan i the expected carbon emissions, in kgCO2; The energy carbon emission information of gasoline vehicles, such as the gasoline vehicle carbon emission factor, which takes a constant C 12 , unit: kgCO2 / L, The energy carbon emission information of electric vehicles, such as the electric vehicle carbon emission factor, which takes a constant C 13 , unit: kgCO2 / kWh; among them, gasoline vehicles are direct carbon emissions, and electric vehicles are indirect carbon emissions.
[0134] When calculating the cost of emergency vehicle dispatching, the expected time, expected cost, and expected carbon emissions can be accumulated. However, in order to ensure the consistency of cost units, normalization can be performed. For example, through the formula , normalize the expected time, expected cost, and expected carbon emissions of Plan i .
[0135] After normalization, weights can also be attached to each cost indicator to obtain the calculation results of the emergency vehicle dispatching cost for each casualty transportation plan. Select the casualty transportation plan corresponding to the calculation result of the emergency vehicle dispatching cost with the lowest cost as the target casualty transportation plan. Through the above process, the optimal emergency vehicle dispatching result that takes into account the decision-making principles of short time consumption, low cost, and low emissions can be obtained, realizing the multi-objective optimal dispatching of emergency centers, hospitals, vehicles, and road network resources.
[0136] When scheduling the transportation of rescue forces, repair forces, or engineering equipment and materials, the emergency vehicle scheduling method in the casualty transfer can be referred to for generating an emergency vehicle scheduling plan for emergency vehicle scheduling; the emergency vehicle scheduling cost calculation method in the casualty transfer can be referred to for calculating the emergency vehicle scheduling cost; finally, based on the calculation result of the emergency vehicle scheduling cost, the target emergency vehicle scheduling plan can be determined in the emergency vehicle scheduling plan. The specific emergency vehicle scheduling method and emergency vehicle scheduling cost calculation will not be elaborated.
[0137] In the embodiments of the present invention, the transportation activities are characterized by vehicle carbon emissions as environmental indicators, which are obtained by converting vehicle energy consumption. By considering economic costs, transportation time, and environmental benefits in casualty transfer, transportation of rescue forces, transportation of repair forces, and transportation of engineering equipment and materials, a resource scheduling scheme for emergency disposal of road collapse under multi-objective constraints can be obtained. Then, by combining the hierarchical task network, the emergency disposal efficiency of abnormal events can be improved under the conditions of low cost, short time, and low environmental impact, and the impact on urban operation and people's livelihood can be minimized.
[0138] Step 360: Feed back the resource scheduling result to the hierarchical task network for operation execution, and update the emergency process state of road collapse in the hierarchical task network.
[0139] The technical solution of the embodiments of the present invention is to establish an emergency response and disposal process for road collapse according to the pre-constructed emergency environment knowledge of road collapse; plan the emergency disposal of road collapse as a five-tuple planning problem P=(IS; PS; T; O; M) based on the hierarchical task network according to the emergency disposal requirements of road collapse; take the emergency response and disposal process of road collapse as the main line and IS as the input data, associate and nest T, O, and M, update IS to obtain PS, and generate a hierarchical task network for emergency disposal of road collapse; obtain the initial emergency state of road collapse in the hierarchical task network; perform resource scheduling in the emergency disposal of road collapse according to the initial emergency state of road collapse to obtain a resource scheduling result; feed back the resource scheduling result to the hierarchical task network for operation execution, and update the emergency process state of road collapse in the hierarchical task network, which solves the problem of emergency disposal of road collapse. By planning the emergency response and disposal process of road collapse into the hierarchical task network and completing task matching as the initial state of the event and the emergency disposal process progress, the emergency treatment of road collapse can be realized from the micro level, and multi-objective constraints of low cost, short time, and low environmental impact can be ensured in the emergency disposal of road collapse, reducing the impact of road collapse.
[0140] Embodiment III
[0141] Figure 8 It is a schematic structural diagram of an emergency disposal device for road collapse provided by Embodiment III of the present invention. As Figure 8As shown in the figure, the device includes: a disposal process establishment module 810, an emergency initial state acquisition module 820, a resource scheduling result determination module 830, and an emergency process state update module 840. Among them:
[0142] The disposal process establishment module 810 is used to establish an emergency response disposal process for road collapse according to the pre-constructed road collapse emergency environment knowledge; the emergency initial state acquisition module 820 is used to plan the road collapse emergency response disposal process into a hierarchical task network and obtain the road collapse emergency initial state in the hierarchical task network; the resource scheduling result determination module 830 is used to perform resource scheduling in the road collapse emergency disposal according to the road collapse emergency initial state to obtain a resource scheduling result; the emergency process state update module 840 is used to feedback the resource scheduling result to the hierarchical task network for operation execution and update the road collapse emergency process state in the hierarchical task network.
[0143] Optionally, the emergency initial state acquisition module 820 includes: a hierarchical task network planning unit, which is used to plan the road collapse emergency disposal into a five-tuple planning problem P=(IS; PS; T; O; M) based on the hierarchical task network according to the road collapse emergency disposal requirements; where IS is the road collapse emergency initial state in the hierarchical task network, PS is the road collapse emergency process state in the hierarchical task network, T is the initial task network of the planning problem, O is the set of operators of the planning problem, and M is the set of methods of the planning problem; the hierarchical task network generation unit is used to take the road collapse emergency response disposal process as the main line and IS as the input data, associate and nest T, O, and M, update IS to obtain PS, and generate a hierarchical task network for road collapse emergency disposal.
[0144] Optionally, the resource scheduling result determination module 830 is specifically used to perform resource scheduling on at least one of the following in the road collapse emergency disposal: casualty transfer, rescue force transportation, emergency repair force transportation, and engineering equipment and material transportation.
[0145] Optionally, the resource scheduling result determination module 830 performs resource scheduling on the rescue force transportation, emergency repair force transportation, or engineering equipment and material transportation through the following execution units: an emergency vehicle scheduling plan unit, which is used to take the disaster-bearing carrier and emergency resources in the road collapse emergency initial state as the input, perform emergency vehicle scheduling to generate an emergency vehicle scheduling plan; an emergency vehicle scheduling cost calculation unit, which is used to calculate the emergency vehicle scheduling cost according to the road collapse location, emergency resource source, road network information, vehicle energy type, energy cost, and energy carbon emission information during emergency vehicle scheduling; a target emergency vehicle scheduling plan determination unit, which is used to determine the target emergency vehicle scheduling plan in the emergency vehicle scheduling plan according to the emergency vehicle scheduling cost calculation result.
[0146] Optionally, the resource scheduling result determination module 830 performs resource scheduling for the wounded transfer through the following execution units: an emergency vehicle scheduling plan generation unit, which is used to take the wounded composition information in the disaster-bearing carriers and the emergency center information in the emergency resources in the initial state of the road collapse emergency as inputs, and generate an emergency vehicle scheduling plan through emergency vehicle scheduling; a medical resource scheduling result generation unit, which is used to take the number of wounded in the disaster-bearing carriers and the medical resource information in the emergency resources in the initial state of the road collapse emergency as inputs, and generate a medical resource scheduling result through medical resource scheduling; a wounded transfer plan generation unit, which is used to connect and match the emergency vehicle scheduling plan and the medical resource scheduling result to obtain a wounded transfer plan; an emergency vehicle scheduling cost calculation unit, which is used to calculate the emergency vehicle scheduling cost according to the road collapse position, the origin of the emergency vehicle, the location of the medical resources, the road network information, the vehicle energy type, the energy cost, and the energy carbon emission information during the emergency vehicle scheduling; and a target wounded transfer plan determination unit, which is used to determine the target wounded transfer plan in the wounded transfer plan according to the emergency vehicle scheduling cost calculation result.
[0147] Optionally, the emergency vehicle scheduling cost calculation unit includes: an expected distance determination subunit, which is used to determine the expected distance of the emergency vehicle scheduling according to the road collapse position, the road network information, the origin of the emergency vehicle, and the location of the medical resources during the emergency vehicle scheduling; an expected time determination subunit, which is used to determine the expected time of the emergency vehicle scheduling according to the expected distance, the vehicle speed, the number of wounded, the on-site loading time of the wounded, and the hospital placement time of the wounded; an expected cost determination subunit, which is used to determine the expected cost of the emergency vehicle scheduling according to the expected distance, the vehicle energy type and quantity, and the energy cost; an expected carbon emission determination subunit, which is used to determine the expected carbon emission of the emergency vehicle scheduling according to the expected distance, the vehicle energy type and quantity, and the energy carbon emission information; and an emergency vehicle scheduling cost calculation subunit, which is used to calculate the emergency vehicle scheduling cost according to the expected distance, the expected time, the expected cost, and the expected carbon emission.
[0148] The road collapse emergency disposal device provided by the embodiment of the present invention can execute the road collapse emergency disposal method provided by any embodiment of the present invention, and has the corresponding functional modules and beneficial effects for executing the method.
[0149] In the technical solution of the embodiment of the present invention, the collection, storage, use, processing, transmission, provision, and disclosure of the road collapse emergency disposal information (such as the road collapse position, the origin of the emergency resources, the road network information, the vehicle energy type, the energy cost, and the energy carbon emission information, etc.) all comply with the provisions of relevant laws and regulations and do not violate public order and good customs.
[0150] Embodiment 4
[0151] Figure 9 FIG. 2 shows a schematic structural diagram of an electronic device 10 that can be used to implement embodiments of the present invention. The electronic device is intended to represent various forms of digital computers, such as, laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device can also represent various forms of mobile devices, such as, personal digital processors, cellular phones, smart phones, wearable devices (such as helmets, glasses, watches, etc.) and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present invention described and / or claimed herein.
[0152] As Figure 9 shown, the electronic device 10 includes at least one processor 11, and a memory communicatively connected to the at least one processor 11, such as a read-only memory (ROM) 12, a random access memory (RAM) 13, etc. The memory stores a computer program executable by the at least one processor. The processor 11 can perform various appropriate actions and processes according to the computer program stored in the read-only memory (ROM) 12 or the computer program loaded from the storage unit 18 into the random access memory (RAM) 13. In the RAM 13, various programs and data required for the operation of the electronic device 10 can also be stored. The processor 11, the ROM 12, and the RAM 13 are connected to each other through a bus 14. An input / output (I / O) interface 15 is also connected to the bus 14.
[0153] Multiple components in the electronic device 10 are connected to the I / O interface 15, including: an input unit 16, such as a keyboard, a mouse, etc.; an output unit 17, such as various types of displays, speakers, etc.; a storage unit 18, such as a magnetic disk, an optical disk, etc.; and a communication unit 19, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 19 allows the electronic device 10 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.
[0154] The processor 11 can be various general-purpose and / or special-purpose processing components with processing and computing capabilities. Some examples of the processor 11 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various dedicated artificial intelligence (AI) computing chips, various processors running machine learning model algorithms, a digital signal processor (DSP), and any suitable processor, controller, microcontroller, etc. The processor 11 executes the various methods and processes described above, such as the road collapse emergency response method.
[0155] In some embodiments, the method for emergency disposal of road collapse can be implemented as a computer program tangibly embodied in a computer-readable storage medium, such as storage unit 18. In some embodiments, part or all of the computer program can be loaded and / or installed onto the electronic device 10 via the ROM 12 and / or the communication unit 19. When the computer program is loaded into the RAM 13 and executed by the processor 11, one or more steps of the method for emergency disposal of road collapse described above can be performed. Alternatively, in other embodiments, the processor 11 can be configured to execute the method for emergency disposal of road collapse by any other suitable means (e.g., by means of firmware).
[0156] The various embodiments of the systems and techniques described above in this document can be implemented in digital electronic circuitry, integrated circuit systems, field-programmable gate arrays (FPGA), application specific integrated circuits (ASIC), application specific standard products (ASSP), systems-on-chip (SOC), complex programmable logic devices (CPLD), computer hardware, firmware, software, and / or combinations thereof. These various embodiments can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special-purpose or general-purpose programmable processor that receives data and instructions from a storage system, at least one input device, and at least one output device, and transmits the data and instructions to the storage system, the at least one input device, and the at least one output device.
[0157] The computer program for implementing the method of the present invention can be written in any combination of one or more programming languages. These computer programs can be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device, such that when the computer programs are executed by the processor, the functions / operations specified in the flowchart and / or block diagram are implemented. The computer programs can be executed entirely on the machine, partially on the machine, as a stand-alone software package partially on the machine and partially on a remote machine, or entirely on a remote machine or server.
[0158] In the context of the present invention, a computer-readable storage medium can be a tangible medium that can contain or store a computer program for use by or in connection with an instruction execution system, apparatus, or device. The computer-readable storage medium can include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, apparatus, or devices, or any suitable combination of the foregoing. Alternatively, the computer-readable storage medium can be a machine-readable signal medium. More specific examples of the machine-readable storage medium would include an electrical connection based on one or more wires, a portable computer diskette, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or Flash memory), an optical fiber, a portable compact disc read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
[0159] To provide for interaction with a user, the systems and techniques described herein can be implemented on an electronic device having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and a pointing device (e.g., a mouse or a trackball) by which the user can provide input to the electronic device. Other kinds of devices can also be used to provide for interaction with the user; for example, feedback provided to the user can be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user can be received in any form (including acoustic input, speech input, or tactile input).
[0160] The systems and techniques described herein can be implemented in a computing system that includes backend components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes frontend components (e.g., a user computer having a graphical user interface or a web browser through which the user can interact with an implementation of the systems and techniques described herein), or a computing system that includes any combination of such backend components, middleware components, or frontend components. The components of the system can be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), a blockchain network, and the Internet.
[0161] A computing system may include a client and a server. The client and the server are generally far from each other and usually interact via a communication network. The client-server relationship is created by computer programs running on respective computers and having a client-server relationship with each other. The server may be a cloud server, also known as a cloud computing server or a cloud host, which is a host product in the cloud computing service system, solving the defects of difficult management and weak business scalability existing in traditional physical hosts and VPS services.
[0162] It should be understood that various forms of processes shown above can be used, with steps reordered, added or deleted. For example, the steps recited in the present invention can be executed in parallel, sequentially or in a different order, as long as the desired results of the technical solution of the present invention can be achieved, and no limitation is made herein.
[0163] The above specific embodiments do not constitute a limitation on the protection scope of the present invention. Those skilled in the art should understand that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modifications, equivalent substitutions and improvements made within the spirit and principle of the present invention shall be included within the protection scope of the present invention.
Claims
1. A method for emergency disposal of road collapse, characterized in that, Including: Establish a road collapse emergency response and disposal process based on pre-constructed road collapse emergency environment knowledge; Plan the road collapse emergency response and disposal process into a hierarchical task network, and obtain the initial state of road collapse emergency in the hierarchical task network; Conduct resource scheduling in road collapse emergency disposal according to the initial state of road collapse emergency, and obtain a resource scheduling result; Feed back the resource scheduling result to the hierarchical task network for operation execution, and update the process state of road collapse emergency in the hierarchical task network.
2. The method according to claim 1, wherein Planning the road collapse emergency response and disposal process into a hierarchical task network includes: According to the road collapse emergency disposal requirements, plan the road collapse emergency disposal as a five-tuple planning problem P=(IS; PS; T; O; M) based on the hierarchical task network; Wherein, IS is the initial state of road collapse emergency in the hierarchical task network, PS is the process state of road collapse emergency in the hierarchical task network, T is the initial task network of the planning problem, O is the set of operators of the planning problem, and M is the set of methods of the planning problem; Taking the road collapse emergency response and disposal process as the main line and IS as the input data, associate and nest T, O, and M, update IS to obtain PS, and generate a hierarchical task network for road collapse emergency disposal.
3. The method according to claim 1, wherein Conducting resource scheduling in road collapse emergency disposal according to the initial state of road collapse emergency includes: Conduct resource scheduling of at least one of the following in road collapse emergency disposal according to the initial state of road collapse emergency: casualty transfer, transportation of rescue forces, transportation of repair forces, and transportation of engineering equipment and materials.
4. The method according to claim 3, wherein Conducting resource scheduling in road collapse emergency disposal according to the initial state of road collapse emergency includes: When the resource scheduling is for the transportation of rescue forces, the transportation of repair forces, or the transportation of engineering equipment and materials, conduct resource scheduling through the following steps: Taking the disaster-bearing carriers and emergency resources in the initial state of road collapse emergency as the input, conduct emergency vehicle scheduling to generate an emergency vehicle scheduling plan; According to the road collapse location, emergency resource source, road network information, vehicle energy type, energy cost, and energy carbon emission information during emergency vehicle scheduling, calculate the emergency vehicle scheduling cost; According to the emergency vehicle scheduling cost calculation result, determine the target emergency vehicle scheduling plan in the emergency vehicle scheduling plan.
5. The method according to claim 3, characterized in that, Conducting resource scheduling in road collapse emergency disposal according to the initial state of road collapse emergency includes: When the resource scheduling is for casualty transfer, conduct resource scheduling through the following steps: Taking the casualty composition information in the disaster-bearing carrier in the initial state of road collapse emergency and the first aid center information in the emergency resources as the input, conduct first aid vehicle scheduling to generate a first aid vehicle scheduling plan; Taking the number of casualties in the disaster-bearing carrier in the initial state of road collapse emergency and the medical treatment resource information in the emergency resources as the input, conduct medical treatment resource scheduling to generate a medical treatment resource scheduling result; Match and connect the first aid vehicle scheduling plan and the medical treatment resource scheduling result to obtain a casualty transfer plan. Calculate the emergency vehicle dispatching cost based on the road collapse location, the source location of the emergency vehicle, the location of the medical treatment resources, the road network information, the vehicle energy type, the energy cost, and the energy carbon emission information during emergency vehicle dispatching; Determine the target casualty transfer plan in the casualty transfer plan according to the calculation result of the emergency vehicle dispatching cost.
6. The method according to claim 5, wherein Calculate the emergency vehicle dispatching cost based on the road collapse location, the source location of the emergency vehicle, the location of the medical treatment resources, the road network information, the vehicle energy type, the energy cost, and the energy carbon emission information during emergency vehicle dispatching, including: Determine the expected distance of the emergency vehicle dispatching according to the road collapse location, the road network information, the source location of the emergency vehicle, and the location of the medical treatment resources during emergency vehicle dispatching; Determine the expected time of the emergency vehicle dispatching according to the expected distance, the vehicle speed, the number of casualties, the on-site loading time of the casualties, and the hospital placement time of the casualties; Determine the expected cost of the emergency vehicle dispatching according to the expected distance, the vehicle energy type and quantity, and the energy cost; Determine the expected carbon emission of the emergency vehicle dispatching according to the expected distance, the vehicle energy type and quantity, and the energy carbon emission information; Calculate the emergency vehicle dispatching cost according to the expected distance, the expected time, the expected cost, and the expected carbon emission.
7. An emergency disposal device for road collapse, characterized in that, Including: A disposal process establishment module for establishing an emergency response disposal process for road collapse according to the pre-constructed road collapse emergency environment knowledge; An emergency initial state acquisition module for planning the road collapse emergency response disposal process into a hierarchical task network and acquiring the road collapse emergency initial state in the hierarchical task network; A resource scheduling result determination module for performing resource scheduling in the road collapse emergency disposal according to the road collapse emergency initial state to obtain a resource scheduling result; An emergency process state update module for feeding back the resource scheduling result to the hierarchical task network for operation execution and updating the road collapse emergency process state in the hierarchical task network.
8. An electronic device, characterized in that, The electronic device includes: At least one processor; and a memory communicatively connected to the at least one processor; wherein, The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the road collapse emergency disposal method according to any one of claims 1-6.
9. A computer-readable storage medium, characterized in that, The computer-readable storage medium stores computer instructions for causing a processor to execute the road collapse emergency disposal method according to any one of claims 1-6 when executed.
10. A computer program product, including a computer program, which when executed by a processor implements the road collapse emergency disposal method according to any one of claims 1-6.
Citation Information
Patent Citations
HTN planning-based emergency resource allocation task planning method and system
CN110175754A
Pre-hospital emergency resource scheduling optimization method and system
CN116402301A
Edge algorithm scheduling method and system based on mobile sensing source
CN117194040A
Road collapse monitoring method and device, storage medium and electronic equipment
CN118211184A
Power grid emergency rescue resource dynamic scheduling optimization method based on artificial intelligence
CN118710032A