Well pattern deployment method based on differential remaining oil distribution in late period of oil reservoir development
Through the well network deployment method based on differentiated residual oil distribution, the problem of well network deployment in the oil field is solved, and the scientific calculation of residual oil reserve distribution on the reservoir plane and the optimization of well site deployment are achieved, which improves the efficiency and effect of oil field development.
Patent Information
- Application Number
- CN202510524194.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-04-24
- Publication Date
- 2025-06-27
AI Technical Summary
In the later stage of high water content in the oil field, existing well network deployment methods are difficult to effectively cope with complex oil-water distribution and highly flooding characteristics, resulting in a gradual reduction in development benefits and increasing difficulty.
A well network deployment method based on differentiated residual oil distribution is adopted. By obtaining the data of the spatial distribution characteristics of residual oil, the residual oil reserve distribution is calculated on the reservoir plane, the reservoir is divided into irregular injection and production units with balanced reserves, and the well position deployment of production wells and water injection wells is carried out, and the calculation method for the entire district injection and production parameters configuration is established.
It realizes the rapid and accurate determination of encrypted well positions, optimizes the injection and production parameter configuration, improves the efficiency and effect of reservoir development, and provides an efficient well network reconstruction and displacement system.
Smart Images

Figure CN120211724A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of oil and gas field development, and in particular relates to a well pattern deployment method based on differentiated residual oil distribution in the late stage of oil reservoir development. Background Art
[0002] After long-term water injection development, the main onshore oil fields have gradually entered the stage of ultra-high water content oil production, and the situation of oil field development is becoming increasingly severe. In the past development life of the oil field, through the application of technologies such as stratum reorganization, well network adjustment, injection and production optimization, flow field adjustment, and three-dimensional development, the purpose of controlling water, stabilizing oil and improving recovery rate was achieved. However, in the subsequent development life of the oil field, the comprehensive benefits of development will gradually deteriorate, and the difficulty of development will increase year by year.
[0003] In view of the complex underground oil and water distribution of high water-cut reservoirs, the effect of conventional well network layer adjustment methods has gradually decreased. After analysis by reservoir and geological personnel, a new well network deployment method has been gradually proposed. This well network temporarily does not consider the current well network deployment, but only aims at the basic distribution characteristics of the differentiated material reserves underground, and establishes a new well network for the current high water-cut period of oil field development. Obviously, in the late stage of high water-cut in oil fields, it is not realistic from an economic point of view to completely redeploy a new well network. However, if the new well network has a good match with the existing well network, the deployment of the new well network can be achieved by using old wells, side drilling, transfer injection and drilling new wells. It only needs to adjust and deploy the well network under the current development status to achieve the purpose of building an efficient injection and production well network in the late stage of extremely high water-cut in oil reservoirs.
[0004] In the late stage of high water content in oil fields, a new well network system is deployed. The deployment method is significantly different from that of new oil fields. The following issues need to be considered during the deployment process: First, old oil fields with high water content have undergone a relatively complex development process and have gone through multiple development modes, which may include elastic development, early water drive development, chemical drive and subsequent water drive, etc. These multiple displacement systems will make the fluid distribution in the reservoir extremely complex, which will bring many difficulties to the deployment of the later well network. Secondly, after long-term development, the general reservoir is highly flooded in the plane and vertical direction. For the main and non-main layers, the remaining oil may coexist with distribution modes such as "high dispersion, local enrichment", "large-scale flooding, scattered enrichment", and "general enrichment, local flooding". Therefore, even if the overall recovery of the reservoir is relatively high at this stage, the difference in remaining oil between layers is large, and some small layers still have considerable potential. This situation has brought great difficulties to the deployment of the new well network. In addition, oil fields in the late stage of high water content have experienced a long development stage and carried out various well networks and formation adjustments. Therefore, the well network is generally dense and the well conditions are very complex. The role of old wells in the new well network is highly uncertain, which increases the difficulty in deploying the new well network.
[0005] In view of the above problems, it is necessary to break the traditional idea of well pattern reconstruction, consider the current underground remaining oil material basis distribution and the existing well pattern system, and explore a new well pattern construction idea for the extra-high water cut period of the oilfield under the given economic conditions, form a typical well pattern reconstruction mode, explore the well pattern reconstruction method under the background of "extra-high water cut and high recovery degree", improve the development effect, and establish an efficient well pattern reconstruction displacement system in the current reservoir environment. Summary of the Invention
[0006] The purpose of the present invention is to provide a well pattern deployment method based on differential remaining oil distribution in the late stage of reservoir development, so as to scientifically, quickly and efficiently determine the positions of infill wells on the premise of less investment.
[0007] The technical solution adopted by the present invention is a well pattern deployment method based on differential remaining oil distribution in the late stage of reservoir development, and the steps include:
[0008] Step S1, obtaining data on the spatial distribution characteristics of remaining oil;
[0009] Step S2, calculating the remaining oil reserve distribution in the reservoir plane;
[0010] Step S3, dividing the reservoir into irregular injection-production units with balanced reserves;
[0011] Step S4, deploying the positions of production wells and injection wells;
[0012] Step S5, establishing a calculation method for configuring injection-production parameters in the whole area.
[0013] The beneficial effects of the present invention are as follows: Based on considering the characteristics of underground remaining oil distribution, the present invention forms a general method for determining the positions of infill wells according to the principles of seepage mechanics. Moreover, the method of the present invention is fast and consumes less, achieving the deployment of quickly and accurately determining the positions of infill wells, and optimizing the configuration of injection-production parameters, providing new technical support for the late stage of reservoir development. Brief Description of the Drawings
[0014] In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the drawings required for the description of the embodiments or the prior art. Obviously, the following drawings are only some embodiments of the present invention. For those of ordinary skill in the art, other drawings can be obtained based on these drawings without creative efforts.
[0015] Figure 1 It is a schematic diagram of the scanning process of the present invention.
[0016] Figure 2 It is a flow chart of the division of injection-production units of the present invention.
[0017] Figure 3 It is a schematic diagram of the remaining oil reserve distribution in the irregular injection-production unit of the present invention.
[0018] Figure 4 It is the mass center of the remaining oil reserves in the irregular injection-production unit of the present invention.
[0019] Figure 5 It is a schematic diagram of the sweep extent between the injection and production well positions of the present invention.
[0020] Figure 6 It is the optimization flow chart of the injection well group of the present invention.
[0021] Figure 7 It is a schematic diagram of the optimization of the positions of the irregular injection wells of the present invention.
[0022] Figure 8 It is the injection-production well position deployment between adjacent irregular injection-production units of the present invention.
[0023] Figure 9 It is the flow chart of well spacing thinning of the present invention.
[0024] Figure 10 It is the flow chart of well number thinning of the present invention.
[0025] Figure 11 It is a schematic diagram of the injection-production unit of the present invention.
[0026] Figure 12 It is a schematic diagram of the well position distribution of the present invention.
[0027] Figure 13 It is the distribution diagram of the replaceable degree range of the present invention.
[0028] Figure 14 a to d are the parameter combined calculation results in the embodiments of the present invention.
[0029] Figure 15 It is the planar remaining oil reserve distribution in the Ng3-4 reservoir in the embodiments of the present invention.
[0030] Figure 16 It is the scan result diagram in the embodiments of the present invention.
[0031] Figure 17 It is the control range distribution after the first clustering is completed in the embodiments of the present invention.
[0032] Figure 18 It is the final clustering division result diagram in the embodiments of the present invention.
[0033] Figure 19 It is the initial production well position deployment of the whole area injection-production unit in the embodiments of the present invention.
[0034] Figure 20It is the initial injection well position deployment of the whole-region injection-production unit in the embodiment of the present invention.
[0035] Figure 21 It is the injection-production well position deployment after thinning of the Ng3-4 injection-production unit in the embodiment of the present invention.
[0036] Figure 22 It is the well pattern superposition characterization result diagram of the ideal well pattern and the existing well pattern in the embodiment of the present invention.
[0037] Figure 23 It is the statistical result of the number of available wells in the existing well pattern in the embodiment of the present invention.
[0038] Figure 24 a to d are the well position deployment diagrams after well pattern reconstruction in the embodiment of the present invention.
[0039] Figure 25 It is the cumulative oil production curve graph in the embodiment of the present invention.
[0040] Figure 26 It is the water cut curve graph in the embodiment of the present invention.
[0041] Figure 27 It is the cumulative liquid production curve graph in the embodiment of the present invention. Detailed implementation manners
[0042] Next, the technical solutions in the embodiments of the present invention will be clearly and completely described in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all of the embodiments. All other embodiments obtained by those of ordinary skill in the art based on the embodiments of the present invention without creative efforts shall fall within the protection scope of the present invention.
[0043] Embodiment
[0044] As Figures 1 - 24 shown, the embodiment of the present invention provides a well pattern deployment method based on differential remaining oil distribution in the late stage of reservoir development, and the steps include:
[0045] Step S1, based on the fine geological model (static parameters) of the reservoir in the ultra-high water cut period and the numerical simulation results (dynamic parameters), obtain the basic data of the remaining oil spatial distribution characteristics.
[0046] Step S2, based on the fine geological model and the numerical simulation parameter data, statistically analyze the parameter distribution characteristics, calculate the remaining oil reserve distribution in the reservoir plane, and provide a basis for the division of the injection-production unit. The specific process is as follows:
[0047] S21, based on the dynamic and static parameter data in S1, convert the 3D fine geological model grid unit data into the characterization calculation of the 2D plane grid unit through weighted summation. The specific calculation formula is as follows:
[0048] For porosity:
[0049]
[0050] For oil saturation:
[0051]
[0052] For water saturation:
[0053]
[0054] For permeability:
[0055]
[0056] For the reservoir thickness of reservoir sand bodies:
[0057]
[0058] For the effective thickness of reservoir sand bodies:
[0059]
[0060] Where, φ ij is the grid porosity at the (i, j) position, t is the small layer number of numerical simulation, n is the number of small layers in the vertical direction, φ ijk is the grid porosity at the (i, j, k) position, Dx ijk is the grid length in the x direction at the (i, j, k) position, Dy ijk is the grid width in the y direction at the (i, j, k) position, Dz ijk is the grid height in the z direction at the (i, j, k) position, So ij is the oil saturation of the grid at the (i, j) position, So ijk is the oil saturation of the grid at the (i, j, k) position, Sw ij is the water saturation of the grid at the (i, j) position, Sw ijk is the water saturation of the grid at the (i, j, k) position, permx ij is the permeability of the grid at the (i, j) position, permx ijk is the permeability of the grid at the (i, j, k) position, h ij is the reservoir thickness of the grid at the (i, j) position, h ijk is the grid thickness at the (i, j, k) position, thnet ij is the effective reservoir thickness of the grid at the (i, j) position, NTG ijk is the net-to-gross ratio of the grid at the (i, j, k) position.
[0061] Through the superposition calculation of different parameters, the parameters are merged and output from three-dimensional space to two-dimensional plane, providing data support for the remaining material oil reserves in the reservoir plane. The three-dimensional model is converted into the basic distribution of two-dimensional remaining materials in the plane by the method of longitudinal grid accumulation. The main parameter calculation methods and results are as Figure 14 shown in a - d.
[0062] S22. According to the current plane remaining oil saturation distribution and physical property parameter distribution in the reservoir, calculate the distribution of plane remaining oil reserves, providing a data basis for the division of injection-production unit areas. The results are as Figure 15 shown,
[0063]
[0064] In the formula, Nor ij is the remaining oil reserve after superposition calculation at the (i, j) position, S ij is the grid plane area at the (i, j) position, ρ o is the ground crude oil density, B o is the original crude oil volume coefficient, thnet ij is the effective reservoir thickness after grid merging at the (i, j) position, φ ij is the porosity after grid merging at the (i, j) position, So ij is the oil saturation after grid merging at the (i, j) position.
[0065] Step S3. Based on the remaining oil distribution characteristics, use the double clustering method to divide the reservoir into m injection-production units. The reserves of each injection-production unit are balanced and irregular. The specific number of the injection-production units needs to be determined in combination with the current underground remaining oil material distribution and development degree in the reservoir. The specific division process is as follows:
[0066] S31. According to the actual situation of the oilfield, carry out the division of injection-production units based on the number of oil wells, that is, the number of oil wells is the same as the number of injection-production units.
[0067] S32. Establish a filtering matrix U pⅹq , scan the plane remaining oil reserve distribution field, and find the clustering seeds. The formula is as follows:
[0068]
[0069]
[0070] In the formula, λ 11 , …, λ pq are the weights of the scanning filtering matrix. In this embodiment, it is set to 1. p and q represent the matrix dimensions, d seed is the distance between the clustering seeds, m is the number of injection-production units, L gridxis the plane grid length of the remaining oil reserves, L gridy is the plane grid width of the remaining oil reserves, and A is the oil-bearing area of the target oil reservoir.
[0071] Among them, the matrix dimensions p and q need to be calculated using Equation (9) in combination with the size of the oil-bearing area A of the target oil reservoir and the size of the geological model grid. The filtering matrix U pⅹq is used to scan the plane remaining oil reserves distribution field to find the local reserve potential around the grid. The schematic diagram of the scanning process is shown in Figure 1 Figure [Figure number not provided in the original, so it's left as "Figure" here].
[0072] S33. Perform a weighted sum of the filtering matrix and the scanned plane remaining oil reserves distribution field area to obtain the plane remaining oil reserves local potential field map, as shown in Figure 16 Figure [Figure number not provided in the original, so it's left as "Figure" here]. The specific formula is as follows:
[0073]
[0074] In the formula, p and q are the matrix dimensions, and Y (I,J) is the scanning weighted calculation result centered on the (I, J) grid of the plane remaining oil reserves. N p and N q are the number of grids in the x and y directions of the plane remaining oil reserves distribution respectively. λ pq is the weight value of the scanning filtering matrix at the (p, q) position, is the value of the plane remaining oil reserves parameter covered by the scanning matrix centered on the (I, J) grid of the plane remaining oil reserves at the (p, q) position.
[0075] Select the maximum value of the potential field map as the clustering seed of the injection-production unit, and start from this point to expand the injection-production unit to complete the unit division.
[0076] S34. Establish the objective function for injection-production unit division. Based on the division principle of injection-production unit reserve balance, take the minimum absolute difference of the reserves within the control range between each injection-production unit as the objective function F for injection-production unit division, as follows:
[0077]
[0078] In the formula, thnet ij is the effective reservoir thickness of the grid at the (I, J) position, So ij is the oil saturation of the grid at the (I, J) position, φ ij is the porosity of the grid at the (I, J) position, ρ o is the ground crude oil density, B o is the original crude oil volume coefficient, m is the number of injection-production units, Dx ij is the grid x-direction length at the (i, j) position, Dyij is the grid y-direction width at the (i, j) position, is the average remaining oil reserve of the whole area injection-production unit, N ora is the remaining oil reserve of the a-th injection-production unit, N or Total remaining reserve of the whole area. The min function represents returning the minimum value in a set of numerical values.
[0079] Then, use the partitioning method of "secondary clustering + constrained clustering" for unit partitioning. First, take "remaining oil reserve" as the clustering index, and determine the first clustering partition with 1 / 2F of the unit controlled reserve as the target. Then, use "permeability + distance" as the clustering index to complete the second clustering partition, and establish an extended clustering method for injection-production units. The specific process is as follows;
[0080] S34a, the first clustering partition. After determining the clustering seeds of the injection-production unit, expand outward from this as the center, count the remaining oil reserve parameter values of the expanded grids and sort them. The specific formula is as follows:
[0081] T = sort(x1, x2, …, x ms ) (12)
[0082] Subsequently, continuously update the median x mid of the remaining oil reserve of the grids in the expanded area, and use the difference between the remaining oil reserve of the grids in the surrounding unexpanded area and x mid as the clustering index for the injection-production unit clustering partition. The formula is as follows:
[0083]
[0084] Then, continuously expand the grids with the smallest difference from the median of the remaining oil reserve in the surrounding area, and finally reach the objective function of the smallest absolute difference in the indirectly controlled reserve of the injection-production unit. The formula is as follows:
[0085]
[0086] In the formula, T is the sorted set of the remaining oil reserve parameter values of the expanded grids from small to large, sort is the sorting function, x is the remaining oil reserve of the grids in the expanded area, x mid is the median of the remaining oil reserve of the grids in the expanded area, ms is the number of expanded grids, (I t , J t ) is the grid position corresponding to the smallest median δ difference in the expanded area of the injection-production unit. The min function returns the minimum value in a set of arrays, the abs function represents returning the absolute value of a number, (I, J) is the grid coordinate, and δ is the difference between the remaining oil reserve parameter value x t of the unexpanded grid and the median x mid of the remaining oil reserve parameter values in the expanded area of this injection-production unit.
[0087] When expanding outward from the initial point of the injection-production unit, the grid target is still set to 1 / 2F. However, when expanding outward from the initial point, the unexpanded positions around should be searched for in sequence, and the difference between the grid parameter value and the median of the remaining reserves of the grids in the expanded area of this injection-production unit should be calculated to obtain grid A1 with the smallest difference from the median of the remaining reserves of the grids in the expanded area of this injection-production unit. Calculate the difference d1 in the position distance between grid A1 and the initial point of this injection-production unit; then search for the grid B1 closest to the periphery of this expanded area, and calculate the difference d2 in the position distance between grid B1 and the initial point of this injection-production unit; if the difference between d1 and d2 is greater than a certain threshold η, then give priority to expanding the grid B1 closest to the periphery, otherwise expand grid A1. The specific formula is as follows:
[0088]
[0089] In the formula, is the grid position with the smallest difference between the remaining unexpanded grid area in the work area and the median of the remaining oil reserves of the grids in the expanded area of the a-th injection-production unit, is the remaining unexpanded grid area in the work area and the initial expansion position of the a-th injection-production unit The grid position with the smallest distance, d1 is the initial expansion position of the a-th injection-production unit and The distance, d2 is the initial expansion position of the a-th injection-production unit and The distance, η1 is the difference between d1 and d2, and ζ1 is the grid position for the next expansion.
[0090] S34b, the second clustering division. Calculate the distance and seepage resistance distribution between the grid units to be allocated and the division areas in the first stage, and complete the second-stage clustering division based on the principle of small resistance. The formula is as follows:
[0091]
[0092] In the formula, d p is the initial expansion position of the a-th injection-production unit and The distance, is the grid position with the smallest difference between the remaining unexpanded grid area in the work area and the median of the remaining oil reserves of the grids in the expanded area of the a-th injection-production unit, d d is the initial expansion position of the a-th injection-production unit and The distance, is the remaining unexpanded grid area in the work area and the initial expansion position of the a-th injection-production unit The grid position with the smallest distance, is the grid position with the smallest difference in the median grid permeability between the remaining unexpanded grid areas in the work area and the expanded areas of injection-production unit a, is the initial expansion position of the remaining unexpanded grid area in the work area and injection-production unit i, and η2 is d p and d d the difference between them, and ζ2 is the next expansion grid position.
[0093] According to the injection-production unit division criteria determined in S34 - S35, fully combining the development characteristics of the target oil reservoir and oriented by regional uniform distribution, a set of processes for regional division of injection-production units has been formed, Figure 2 as shown.
[0094] Step S4, adopt the optimization strategy of "first well group, then oil reservoir" to achieve efficient well placement, so as to reduce the time for numerical simulation well placement optimization. The production wells are deployed at the center of gravity of the remaining oil distribution quality, and the injection wells achieve balanced displacement through dynamic thinning, forming an efficient development well pattern. The specific steps are as follows:
[0095] S41, Deployment of production well positions. Based on the principle of the highest degree of control of the remaining reserves by the well pattern after the deployment of injection-production well groups, the mathematical integration method is used to find the planar center of gravity, calculate the center of gravity position of the remaining oil reserves in the planar irregular injection-production unit, so as to determine the position of production well deployment. Select an injection-production unit b as an example. Regard the oil-bearing reserve parameter value of each grid u in the injection-production unit as nn mass points respectively, calculate the sum of the static moments of the nn mass points with respect to the x and y axes, that is, the static moment generated by the remaining oil reserves in the XOY coordinate system. The specific formula is as follows:
[0096]
[0097] Then, calculate the sum of the remaining oil reserves of all grids in injection-production unit b. The formula is as follows:
[0098]
[0099] After that, find a centroid within the area of injection-production unit b Calculate the static moments of this centroid with respect to the x and y axes. The formula is as follows:
[0100]
[0101] To make meet the requirements of the center of gravity of the remaining oil mass in injection-production unit b, it is necessary that the static moment generated by this mass point is equal to the sum of the static moments generated by its nn mass points, which is called the center of mass, that is:
[0102]
[0103] Finally, calculate the centroid of the planar remaining oil reserves in injection-production unit b Take this position as the production well position of the unit, and the formula is as follows:
[0104]
[0105] In the formula, x u , y u are the grid positions of the injection-production unit in the x and y directions respectively, N x , N y are the static moments generated by the remaining oil reserves in the grid in the x and y directions respectively. is the mass centroid coordinate of the remaining oil in injection-production unit b, N x1 , N y1 are the static moments generated by the centroid in the x and y directions respectively, N u is the remaining oil reserve corresponding to the u-th grid, N b is the total remaining oil reserve within the controlled range of injection-production unit b, and v is the total number of grids in injection-production unit b.
[0106] The distribution of the mass center of injection-production unit b is as Figure 4 shown, and the deployment result of the production well positions in the irregular injection-production unit is as Figure 19 shown.
[0107] S42. Deployment of injection well positions. Establish the objective function of the displacement sweep of the injection well group. Taking the angles and distances of the grids swept by the injection-production wells as weights, calculate the total displacement swept reserves under each injection well group. The specific formula is as follows:
[0108]
[0109] In the formula, N weightpp_c is the recoverable reserve displaced by the c-th injection well in the P-th injection-production well group to the production well, N weightp is the total recoverable reserve displaced by all injection wells in the P-th injection-production well group to the production well, n c is the number of grids in the swept area, m z is the number of injection wells in the P-th injection-production well group, θ is the angle between the line connecting the K-th grid controlled by the injection-production well group and the production well position and the line connecting the injection-production well positions, r ij is the distance between the production well position and the injection well position, r jk is the distance between the K-th grid controlled by the injection-production well group and the production well position, r ik is the distance between the K-th grid controlled by the injection-production well group and the injection well position, f kThe planar remaining oil reserve value of the Kth grid controlled by the injection-production well group, α is the included angle between the connection line of the Kth grid controlled by the injection-production well group and the injection well position and the connection line of the injection-production well positions, and β is the included angle between the connection line of the Kth grid controlled by the injection-production well group and the production well position and the connection line of the injection-production well positions.
[0110] The degree of displacement sweep controlled between injection-production wells is related to the sweep angle and sweep distance between injection-production well positions. For example, Figure 5 as shown, the larger the included angle or the longer the distance, the lower the achievable sweep degree. Conversely, the achievable sweep degree is higher. Taking an irregular injection-production unit as an example, as Figure 7 shown, within the reference range of the injection well positions in the injection-production unit, randomly select n z (taking n z as 4 for example) positions as the initial injection well positions, connect their locations in sequence, calculate the displacement sweep degree of the injection well positions, and select the injection well group with the largest relative sweep degree for each unit. The initial division results of each unit are as Figure 20 shown.
[0111] S43. Establish a "two-step" thinning optimization method for injection well positions. From the initial injection well deployment results of Figure 20 , it can be seen that since the reservoir is composed of multiple interconnected irregular injection-production units, there will be a certain redundancy or overlap in the injection well positions between each injection-production unit. The well position thinning is divided into well spacing thinning and well number thinning. The basic steps of thinning are as follows:
[0112] S43a. Well spacing thinning optimization. Determine the minimum injection well spacing threshold L y , calculate the minimum well spacing L ab between ideal well patterns. The formula is as follows:
[0113]
[0114] If L ab is less than the threshold L y , then calculate a common well position to replace two wells. The formula is as follows:
[0115]
[0116] To ensure that the new injection well positions after recombination are also on the boundary of the irregular injection-production unit, calculate the distances between all the new injection well positions that can be merged and the boundary positions of the injection-production unit, and assign the merged well positions to the nearest boundary position to complete the well position thinning work until the distance between all well positions is not less than the minimum well spacing threshold. The formula is as follows;
[0117]
[0118] In the formula, (Ia , J a ) is the position of injection well h, (I b , J b ) is the position of injection well l, (I g , J g ) represents the position of the merged injection well g. Boundary is the set of boundary grid positions of all injection-production units. (I bt , J bt ) represents the position of the t-th boundary grid, (I gb , J gb ) is the position corresponding to the minimum distance value of L gbt . L gbt is the distance between all the boundary positions Boundary of the injection-production units and the position (I g , J g ) of the merged injection well g. (I bi , J bi ) are all the boundary grid positions of the injection-production units. The min function returns the minimum value in an array of numbers.
[0119] The specific process of the combined optimization calculation method for the distance between injection wells is as Figure 10 shown.
[0120] S43b, Well number thinning optimization. Set the maximum number of injection wells. If the requirement for the number of wells is not met after thinning the well spacing in the early stage, then continue to calculate the well positions corresponding to the minimum well spacing in the current well pattern, and continue to achieve thinning by averaging the well positions to realize the deployment of the "ideal well pattern". The specific process is as Figure 11 shown. Taking 50 injection wells as an example, as Figure 21 shown.
[0121] Step S5, For the irregular injection-production unit area, establish a calculation method for the configuration of injection-production parameters in the whole area. The specific steps are as follows:
[0122] S51, Calculate the liquid production of the injection-production unit, determine the daily liquid production rate of the whole oil reservoir and the distribution of liquid production between injection-production units.
[0123] S51a, Determine the daily liquid production rate of the whole oil reservoir. Set the daily liquid production rate of the oil reservoir to 20% of the geological reserve of the whole area. The formula is as follows:
[0124]
[0125] In the formula, Q d is the daily liquid production of the oil reservoir, N is the original geological reserve of the oil reservoir, and Q is the established daily liquid production rate.
[0126] S51b. The liquid production volume allocation between injection-production units can be calculated by the remaining oil reserves, recoverable remaining oil reserves or pore volume controlled by the injection-production unit, and the proportion of each injection-production unit in the whole area can be calculated for the liquid production volume allocation calculation, as follows:
[0127] ① Calculation of the proportion of remaining reserves:
[0128]
[0129] ② Calculation of the proportion of recoverable remaining oil reserves:
[0130]
[0131] ③ Calculation of the proportion of pore volume:
[0132]
[0133] Summarize the liquid production volume allocation ratios of the above three injection-production units using Equation (30). In field applications, one of the liquid production volume splitting criteria for injection-production units can be selected.
[0134]
[0135] After selecting the liquid production volume splitting reference standard for injection-production units according to field requirements, the liquid production volume allocation of injection-production units is completed. In this embodiment, the recoverable remaining oil reserves are selected as the liquid production volume splitting parameter, and the formula is as follows:
[0136] Q dp =R p ·Q d (31)
[0137] In the formula, N osp_ij is the remaining oil reserves of the Pth injection-production well group in the reservoir plane, N os is the remaining oil reserves of the reservoir, R osp is the proportion of the remaining oil reserves of the Pth injection-production unit in the reservoir plane to the total reserves of the whole area, P_N I and P_N J are the numbers of grids in the I and J directions of the grid within the range of the Pth injection-production well group in the reservoir plane respectively, ρ o is the ground crude oil density, B o is the original crude oil volume factor, thnet ij is the effective reservoir thickness after merging the grids at the (i,j) position, So ij is the oil saturation after merging the grids at the (i,j) position, S ij is the grid plane area at the (i,j) position, is the porosity at the (i,j) position, m is the number of injection-production units, S or is the oil saturation of the whole area, N oris the recoverable reserve of remaining oil in the reservoir, N orp_ij is the recoverable reserve of remaining oil in the P-th injection-production well group in the reservoir plane, R orp is the proportion of the recoverable reserve of remaining oil in the P-th injection-production well group in the reservoir plane to the recoverable reserve of remaining oil in the reservoir, POV orp_ij is the pore volume of the P-th injection-production well group in the reservoir plane, POV or is the pore volume of the whole area, R povp is the proportion of the pore volume of the P-th injection-production well group in the reservoir plane to the pore volume of the whole area, R p is the splitting ratio of the liquid production volume of the P-th injection-production well group, R osp is the proportion of the remaining oil reserve in the P-th injection-production well group in the reservoir plane to the reserve of the whole area, Q dp is the liquid production volume of the P-th injection-production well group.
[0138] Since the number of injection-production units is divided according to the number of production wells, the number of injection-production units is the same as the number of production well positions, and only one production well is deployed in each injection-production unit. Therefore, the liquid production volume of the injection-production unit is the liquid production volume of the injection-production well group in this unit, that is, it represents the liquid production volume of the production well in the injection-production unit, and the two are the same.
[0139] S52. Calculate the injection volume of the injection well in the injection-production unit. Determine the required injection volume according to the proportion relationship of the remaining oil reserve controlled by each injection well. For example, Figure 11 As shown, take the midpoint of the line connecting two adjacent injection wells in the injection-production unit. The two midpoints of the injection well and the production well form an irregular quadrilateral. Calculate the remaining oil reserve N controlled within this range ora_c , and then use the proportion of the remaining oil reserve N ora_c contained in this irregular quadrilateral to the reserve of the whole injection-production unit to complete the splitting ratio of the injection volume of each injection well. Finally, allocate the injection volume to each injection well according to the total injection volume of this unit to complete the injection volume allocation calculation. The specific formula is as follows:
[0140]
[0141] In the formula, R a_c is the proportion of the remaining oil reserve within the controlled range of the c-th injection well in the a-th injection-production unit to the total remaining oil reserve within the range of the a-th injection-production unit, W a_c is the injection volume allocated to the c-th injection well in the a-th injection-production unit, N ora is the remaining oil reserve of the a-th injection-production unit, Q a is the injection volume of the a-th injection-production unit.
[0142] S53. Calculate the total injection volume in the injection-production unit. Based on the principle of injection-production balance, determine the total injection volume of the injection wells in this unit through the liquid production volume of the production wells in the injection-production unit. The specific formula is as follows:
[0143]
[0144] Wherein, Q c is the liquid production volume of the injection-production unit, Q z is the total water injection volume of the injection-production unit, n c is the number of water injection wells in the injection-production unit, Q zc represents the water injection volume of the c-th water injection well in the injection-production unit.
[0145] In view of the reservoir in the late stage of ultra-high water cut development, the present invention explores and establishes a new well pattern reconstruction method. The core contents include the division of injection-production units based on reserve balance control, the optimal deployment of oil and water wells, the calculation of injection-production liquid volume allocation, the evaluation of the matching degree between the "existing well pattern" and the "ideal well pattern", and the implementation approach of well pattern reconstruction.
[0146] Experimental verification
[0147] After the well pattern reconstruction, an example application is carried out. By comparing with the existing well pattern and using numerical simulation means to conduct a feasibility test of the well pattern reconstruction. In order to verify the feasibility of the well pattern reconstruction method in this time, the formed well pattern reconstruction method is adopted. The south block 3-4 of the west area of Gudao is selected as the target reservoir, and 4 sets of reconstructed well patterns are respectively compiled and compared with the development effects of the well pattern before reconstruction. Plan 1: The original plan under the current production wells, with 44 oil wells and 33 water wells; Plan 2: 30 oil wells and 50 water wells; Plan 3: 35 oil wells and 35 water wells; Plan 4: 25 oil wells and 50 water wells; Plan 5: 30 oil wells and 45 water wells; respectively representing five situations of the ratio of the number of oil wells to water wells as 44:33, 3:5, 1:1, 1:2, 1:1.5. The well location deployment results of Plan 2-5 after the well pattern reconstruction are as Figure 23 shown. After calculating the injection-production parameters for Plan 2-5, the verification and evaluation analysis are completed by means of numerical simulation. The specific plans are shown in Table 1:
[0148] Table 1 Design table of well pattern reconstruction development plan
[0149]
[0150] The above 5 plans are calculated in the numerical simulation, and the production indexes are counted as shown in Table 2. Among them, the cumulative oil production of the original model is the cumulative oil production developed at the time node before the well pattern reconstruction. Plan 1 is the cumulative oil production calculated under the current production well state of the existing well pattern, and the other 4 plans are the cumulative oil production calculated after the well pattern reconstruction.
[0151] Table 2 Plan index results
[0152] Index Original model Scheme 1 Scheme 2 Scheme 3 Scheme 4 Scheme 5 <![CDATA[Cumulative oil production / (10 4 m 3 )]]> 501.4056 535.3855 588.7532 576.2015 581.0868 583.5077 Recovery rate / % 45.69 48.76 53.63 52.48 52.92 53.15 Water cut / % 96.18 98.83 97.88 98.12 98.10 98.11 Pressure (MPa) 11.556 11.555 11.069 11.489 11.495 11.507
[0153] Under the same liquid volume level, the production index change curves of Plan 1 of the original well pattern and Plans 2 - 5 after well pattern reconstruction are presented starting from 2019, as Figures 25 - 27 shown. Through numerical simulation comparison, it shows that compared with the development plan of the existing well pattern, the cumulative oil production has increased significantly for the 4 reconstructed well patterns. Among them, the plan with an injection - production well number ratio of 3:5 in the ideal well pattern has the best reservoir development effect. Compared with the existing well pattern development plan, the cumulative oil production has increased by 53.3677×10 4 m 3 , the comprehensive water cut has decreased by more than 0.95%, and there are obvious apparent changes in the oil saturation model, as Figure 27 shown. The development effect obtained after well pattern reconstruction is relatively obvious, significantly higher than that of the existing well pattern. The well pattern reconstruction method formed by the present invention has a certain feasibility and provides a certain reference for the solution to improve the recovery rate of high - water - cut oil reservoirs.
[0154] Each embodiment in this specification is described in a related manner. For the same or similar parts among the embodiments, reference can be made to each other. Each embodiment focuses on the differences from other embodiments. In particular, for the system embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and reference can be made to the relevant part of the method embodiment for the related content.
[0155] The above - mentioned are only the preferred embodiments of the present invention and are not used to limit the protection scope of the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention are all included in the protection scope of the present invention.
Claims
1. A well pattern deployment method based on differentiated remaining oil distribution in the late stage of reservoir development, characterized in that the steps include: Step S1, obtaining data of spatial distribution characteristics of residual oil; Step S2, calculating the distribution of remaining oil reserves in the reservoir plane; Step S3, dividing the oil reservoir into irregular injection and production units with balanced reserves; Step S4, deploying production wells and water injection wells; Step S5, establishing a calculation method for configuring injection and production parameters for the entire area.
2. The method for well pattern deployment based on differentiated remaining oil distribution in the late stage of reservoir development according to claim 1, characterized in that: In S2, the specific process of calculating the distribution of the remaining oil reserves in the reservoir plane is as follows: S21, converting the 3D fine geological model grid unit data into the representation calculation of 2D plane grid units. The specific calculation formula is as follows: For porosity: For oil saturation: For water saturation: For permeability: For the reservoir thickness of the reservoir sand body: For the effective thickness of reservoir sand body: In the formula, φ ij is the grid porosity at position (i, j), t is the numerical simulation small layer number, n is the number of small layers in the vertical direction, φ ijk is the mesh porosity at position (i,j,k), Dx ijk is the length of the grid in the x direction at position (i, j, k), Dy ijk is the width of the grid in the y direction at position (i, j, k), Dz ijk is the height of the grid in the z direction at position (i, j, k), So ij is the grid oil saturation at position (i, j), So ijk is the grid oil saturation at position (i, j, k), Sw ij is the water saturation of the grid at position (i, j), Sw ijk is the water saturation of the grid at position (i,j,k), permx ij is the grid permeability at position (i,j), permx ijk is the grid permeability at position (i,j,k), h ij is the grid reservoir thickness at position (i, j), h ijk is the grid thickness at position (i,j,k), thnet ij is the effective reservoir thickness of the grid at position (i, j), NTG ijk is the net-to-gross ratio of the grid at position (i, j, k); S22, calculate the distribution of plane remaining oil reserves, the formula is as follows: In the formula, Nor ij is the remaining oil reserves after superposition calculation at position (i, j), S ij is the area of the grid plane at position (i, j), ρ o is the density of crude oil on the ground, B o is the volume coefficient of the original crude oil, thnet ij is the effective reservoir thickness after merging the grids at position (i, j), φ ij is the porosity of the grid at position (i, j) after merging, So ij is the oil saturation after the grid at position (i, j) is merged.
3. The method for well pattern deployment based on differentiated remaining oil distribution in the late stage of reservoir development according to claim 1, characterized in that: In S3, the specific process of dividing the injection and production units is as follows: S31, divide the injection and production units according to the number of oil wells; S32, establish the filtering matrix U pⅹq , scan the plane remaining oil reserves distribution field and find cluster seeds. The formula is as follows: In the formula, λ 11 ,…,λ pq is the weight of the scan filter matrix, which is set to 1 in this embodiment. p and q represent the matrix dimensions, and d seed is the distance between cluster seeds, m is the number of injection and extraction units, L gridx is the plane grid length of remaining oil reserves, L gridy is the plane grid width of remaining oil reserves, A is the oil-bearing area of the target reservoir; S33, obtain the local potential field map of remaining oil reserves in the plane, the specific formula is as follows: Where p and q are matrix dimensions, Y (I,J) is the scanning weighted calculation result centered on the (I,J) grid of the remaining oil reserves in the plane, N p 、N q are the number of grids for the remaining oil reserves in the plane in the x and y directions, respectively, pq is the weight of the scan filter matrix at the (p,q) position, is the plane remaining oil reserve parameter value under the (p,q) position cover of the scanning matrix centered on the (I,J) grid of the plane remaining oil reserve; S34, establish the objective function of injection-production unit division, take the minimum absolute difference of reserves within the control range of each injection-production unit as the objective function F of injection-production unit division, and perform cluster division. The specific objective function is as follows: In the formula, thnet ij is the effective reservoir thickness of the grid at position (I,J), So ij is the grid oil saturation at position (I,J), φ ij is the mesh porosity at position (I,J), ρ o is the density of crude oil on the ground, B o is the original crude oil volume coefficient, m is the number of injection and production units, Dx ij is the length of the grid in the x direction at position (i, j), Dy ij is the y-direction width of the grid at position (i,j), is the average remaining oil reserves of the injection and production units in the whole area, N ora is the remaining oil reserves of the ath injection-production unit, N or The total remaining reserves of the entire area. The min function returns the minimum value in a set of values.
4. A well pattern deployment method based on differentiated remaining oil distribution in the late stage of reservoir development according to claim 3, characterized in that: In S34, the specific steps of clustering are as follows: S34a, taking 1 / 2F of the unit controlled reserves as the target, the first cluster division is determined. After the cluster seed of the injection-production unit is determined, it is expanded outward from this center, and the remaining oil reserves parameter values of the expanded grids are counted and sorted. The specific formula is as follows: T=sort(x1,x2,…,x ms ) (12) Then, the median value x of the remaining oil reserves in the expanded area grid is continuously updated. mid The remaining oil reserves in the surrounding unexpanded area grid are compared with x mid The difference is the clustering index, and the injection-production unit clustering is performed. The formula is as follows: Then, the grid with the smallest difference between the surrounding and the median of the remaining oil reserves is continuously expanded, and finally the objective function of minimizing the absolute difference of the indirect controlled reserves of the injection and production units is achieved. The formula is as follows: Where T is the sorted set of the remaining oil reserves parameter values of the expanded grid from small to large, sort is the sorting function, x is the remaining oil reserves of the expanded regional grid, and x mid is the median of the remaining oil reserves in the expanded regional grids, ms is the number of expanded grids, (I t , J t ) is the grid position corresponding to the minimum difference of the median δ of the expanded area of the injection-production unit, the min function returns the minimum value in a set of arrays, the abs function returns the absolute value of a number, (I, J) is the grid coordinate, δ is the remaining oil reserves parameter value x of the unexpanded grid t The median value of the remaining oil reserves parameter of the expanded area of the injection and production unit x mid The difference between The objective function is still set to 1 / 2F, and the initial point of the injection-production unit is expanded outward. The specific formula is as follows: In the formula, is the grid position with the smallest median difference between the remaining unexpanded grid area in the work area and the expanded grid area of the ath injection and production unit. The remaining unexpanded grid area in the work area and the initial expansion position of the ath injection and production unit The grid position with the smallest distance, d1 is the initial expansion position of the ath injection and production unit and d2 is the initial expansion position of the ath injection and production unit and , η1 is the difference between d1 and d2, ζ1 is the next grid expansion position; S34b, the second clustering division, the formula is as follows: Where, d p is the initial expansion position of the ath injection and production unit and The distance The grid position with the smallest median difference between the remaining unexpanded grid area and the expanded grid area of the ath injection and production unit is d d is the initial expansion position of the ath injection and production unit and The distance The remaining unexpanded grid area in the work area and the initial expansion position of the injection and production unit a The grid position with the smallest distance, is the grid position with the smallest median difference between the remaining unexpanded grid area in the work area and the expanded area of injection and production unit a. is the remaining unexpanded grid area in the work area and the initial expansion position of the i injection and production unit, η2 is d p With d d The difference between them, ζ2 is the next grid expansion position.
5. The method for well pattern deployment based on differentiated remaining oil distribution in the late stage of reservoir development according to claim 1, characterized in that: In S4, the specific steps of well location deployment are as follows: S41, production well location deployment, determine the center of gravity position of the remaining oil reserves of the plane irregular injection and production unit, first calculate the static moment generated by the remaining oil reserves in the XOY coordinate system, the specific formula is as follows: Then, the sum of the remaining oil reserves of all grids in the injection-production unit is calculated as follows: Then find a centroid in the injection and production unit b area The formula for calculating the static moment of the center of mass on the x and y axes is as follows: To make To meet the requirements of the mass center of gravity of the remaining oil in the injection-production unit b, the static moment generated by this mass point must be equal to the sum of the static moments generated by its n mass points, that is: Finally, calculate the center of mass of the plane remaining oil reserves in injection-production unit b Taking this position as the production well position of this unit, the formula is as follows: In the formula, x u ,y u are the grid positions of the injection and production units in the x and y directions, respectively, N x 、N y are the static moments generated by the remaining oil reserves in the grid in the x and y directions, is the mass center coordinate of the remaining oil in injection-production unit b, N x1 、N y1 Centroid Static moment generated in x and y directions, N u is the remaining oil reserves corresponding to the u-th grid, N b is the total remaining oil reserves within the control range of injection-production unit b, and v is the total number of grids in injection-production unit b; S42, water injection well location deployment, establish the objective function of water injection well group displacement sweep, calculate the total displacement sweep reserves under each water injection well group, the specific formula is as follows: In the formula, is the recoverable reserves of the production well displaced by the c-th injection well in the P-th injection-production well group, N weightp is the sum of recoverable reserves of all injection wells in the Pth injection-production well group displaced by the production wells, n c is the number of grids in the affected area, m z is the number of injection wells in the Pth injection-production well group, θ is the angle between the Kth grid controlled by the injection-production well group and the line connecting the production wells and the injection-production wells, r ij is the distance between the production well and the injection well, r jk is the distance between the Kth grid controlled by the injection and production well group and the production well location, r ik is the distance between the Kth grid controlled by the injection-production well group and the injection well location, f k is the plane remaining oil reserves value of the Kth grid controlled by the injection-production well group, α is the angle between the Kth grid controlled by the injection-production well group and the line connecting the injection well position and the injection-production well position, β is the angle between the Kth grid controlled by the injection-production well group and the line connecting the production well position and the injection-production well position; S43, establishing a water injection well location thinning optimization method to remove redundancy or overlap of water injection well locations between various injection and production units.
6. A well pattern deployment method based on differentiated remaining oil distribution in the late stage of reservoir development according to claim 5, characterized in that: The specific steps for optimizing well location thinning are as follows: S43a, well spacing optimization, determine the minimum injection well spacing threshold L y , calculate the minimum well spacing L between ideal well patterns ab , the formula is as follows: If L ab Less than the threshold L y , then a common well location is calculated to replace the two wells, the formula is as follows: Calculate the distance between the new well locations of all the injection wells that can be merged and the boundary location of the injection and production unit, and assign the merged well locations to the nearest boundary location until the distance between all well locations is not less than the minimum well spacing threshold. The formula is as follows; In the formula, (I a ,J a ) is the location of the injection well h, (I b ,J b ) injection well l location, (I g ,J g ) represents the location of the merged injection well g, Boundary is the set of the boundary grid locations of all injection and production units, (I bt ,J bt ) represents the position of the tth boundary grid, (I gb ,J gb ) is L gbt The position corresponding to the minimum distance value, L gbt The position of all injection-production unit boundaries and the position of the merged injection well g (I g ,J g ) distance, (I bi ,J bi ) The min function returns the minimum value in a set of arrays. S43b, well number thinning optimization, set the maximum number of injection wells, if the well number requirement is not met after the early well spacing thinning, continue to calculate the well position corresponding to the minimum well spacing under the current well network, and continue to achieve thinning by using the well position averaging method to realize the deployment of the "ideal well network".
7. The method for well pattern deployment based on differentiated remaining oil distribution in the late stage of reservoir development according to claim 1, characterized in that: In S5, the specific steps of establishing the calculation method for the injection and production parameter configuration of the entire area are as follows: S51, calculating the liquid production volume of the injection and production units, determining the daily liquid production rate of the entire reservoir and the distribution of liquid production volume among the injection and production units; S52, calculating the injection volume of the water injection well in the injection-production unit, the specific formula is as follows: In the formula, R a_c is the ratio of the remaining oil reserves in the range controlled by the cth injection well in the ath injection-production unit to the total remaining oil reserves in the ath injection-production unit, W a_c is the injection volume allocated to the cth injection well in the ath injection-production unit, N ora is the remaining oil reserves of the ath injection-production unit, Q a is the water injection volume of the ath injection-production unit; S53, calculate the total water injection volume in the injection-production unit, the specific formula is as follows: In the formula, Q c is the liquid production volume of the injection and production unit, Q z is the total water injection volume of the injection-production unit, n c is the number of injection wells in the injection-production unit, Q zc It indicates the injection volume of the cth injection well in the injection-production unit.
8. A well pattern deployment method based on differentiated remaining oil distribution in the late stage of reservoir development according to claim 7, characterized in that: In S51, the calculation process of the liquid production volume of the injection and production unit is as follows: S51a, determine the daily liquid production rate of the entire reservoir, set the daily liquid production rate of the reservoir to 20% of the geological reserves of the entire area, the formula is as follows: In the formula, Q d is the daily liquid production of the reservoir, N is the original geological reserves of the reservoir, and Q is the established daily liquid production rate; S51b, distribution of the liquid volume between the injection and production units, calculate the proportion of each injection and production unit in the whole area, and perform the calculation of the liquid volume distribution, as follows: ① Calculation of remaining reserves ratio: ② Calculation of the proportion of remaining recoverable reserves: ③Calculation of pore volume ratio: Taking the remaining recoverable reserves as the liquid production splitting parameter, the formula for allocating the liquid production volume of the injection and production units is as follows: Q dp =R p ·Q d (31) Where N osp_ij is the remaining oil reserves of the Pth injection-production well group in the reservoir plane, N os is the remaining oil reserves in the reservoir, R osp is the ratio of the remaining oil reserves of the Pth injection-production unit in the reservoir plane to the reserves of the entire area, P_N I 、P_N J are the number of grids in the I and J directions within the Pth injection and production well group in the reservoir plane, ρ o is the density of crude oil on the ground, B o is the volume coefficient of the original crude oil, thnet ij is the effective reservoir thickness after the grid at position (i, j) is merged, So ij is the oil saturation of the grid at position (i, j) after merging, S ij is the grid plane area at position (i,j), is the porosity at position (i, j), m is the number of injection and production units, S or is the oil saturation of the whole area, N or is the recoverable reserves of remaining oil in the reservoir, N orp_ij is the remaining recoverable oil reserves of the Pth injection-production well group in the reservoir plane, R orp POV is the ratio of the remaining recoverable oil reserves of the Pth injection and production well group in the reservoir plane to the remaining recoverable oil reserves of the reservoir. orp_ij POV is the pore volume of the Pth injection and production well group in the reservoir plane, or is the pore volume of the whole area, R povp is the ratio of the pore volume of the Pth injection and production well group in the reservoir plane to the pore volume of the whole area, R p is the split ratio of the liquid production volume of the Pth injection and production well group, R osp Q is the ratio of the remaining oil reserves of the Pth injection-production well group in the reservoir plane to the reserves of the entire area, dp is the liquid production volume of the Pth injection-production well group.