Hydraulic concrete lining structure capable of being quickly assembled
Through the integration of modular design and drainage system, the problem of low construction efficiency of existing precast concrete lining structures is solved, and rapid installation and durability are achieved.
Patent Information
- Application Number
- CN202510507971.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-04-22
- Publication Date
- 2025-07-04
AI Technical Summary
The existing precast concrete lining structure takes a long time during on-site construction and cannot operate in parallel, resulting in inefficient construction.
The hydraulic concrete lining structure adopts a modular design. By accurately connecting the first support ring and the second support ring and inserting it into the cylinder, the trapezoidal snap and the second support ring are driven by an extruded push rod to lock the trapezoidal snap and the second support ring, achieving a fast and stable connection between the main body, and an integrated drainage system is used to automatically guide the water leakage and enhance durability.
It significantly shortens the installation cycle, improves construction efficiency, and adapts to tunnel deformation through sealing gaskets, maintains long-term waterproof performance, and enhances overall durability.
Smart Images

Figure CN120251270A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of concrete assembly, and particularly to a hydraulic concrete lining structure that can be quickly assembled. Background Art
[0002] The precast concrete tunnel lining structure is a tunnel support system formed by prefabricating concrete components such as arch rings, side walls, and invert arches in a factory and mechanically assembling them on site. This structure transfers the processes of concrete pouring, curing, and formwork removal in traditional in-situ construction to the factory, uses standardized molds to produce high-precision components, transports them to the site for rapid assembly, and realizes the integrity and waterproof performance of the structure through joint treatment technology.
[0003] According to the tunnel design drawings, geological exploration reports, and relevant specifications, a detailed precast lining construction plan is formulated. Precast concrete lining components are prefabricated in the factory according to the design requirements. Cranes, transport vehicles, assembly equipment, surveying instruments, etc. are prepared to ensure that the equipment performance is good and meets the construction requirements. After the tunnel excavation and initial support construction are completed, the precast components are transported from the factory to the construction site by special transport vehicles. A temporary storage area is set up at the tunnel entrance or a designated site, and the precast components are stored separately. A cushion layer is laid at the bottom of the tunnel, and the installation position of the invert arch is determined by measuring and setting out. The precast invert arch component is hoisted to the design position by a crane, and the elevation and flatness of the component are adjusted. The side wall components are hoisted in sequence and connected to the invert arch and adjacent side wall components through embedded connectors. Support frames are set on the side walls, and the arch ring components are installed to the design position by means of segmented hoisting or integral hoisting.
[0004] However, traditional in-situ cast concrete lining requires on-site formwork support, pouring, and curing. The construction of a single ring takes a long time. The in-situ casting process needs to be carried out layer by layer and cannot be carried out in parallel. On-site pouring and curing are required, resulting in a long construction period and low efficiency. Summary of the Invention
[0005] (1) Technical Problems to be Solved
[0006] The problem that the existing building blocks need on-site formwork support for construction is solved, the problem of long construction time is avoided, and the work efficiency is improved.
[0007] (2) Technical Solutions
[0008] In view of the problem of slow construction efficiency described above, the present invention is proposed.
[0009] To solve the above technical problems, the present invention provides the following technical solution: A quickly assembled hydraulic concrete lining structure, including a bottom plate, a plurality of main bodies are fixedly connected to the top end of the bottom plate, a first support ring is fixedly connected to the inner wall of the main body, a sealing gasket is fixedly connected to the outer wall of the first support ring, the outer wall of the sealing gasket is movably connected to a second support ring fixedly connected to the inner wall of the main body, two drain pipes distributed in a mirror image are fixedly connected to the inner wall of the main body, a diversion pipe slidably connected to the inner wall of the main body is provided in the inner wall of the drain pipe, and a plurality of cylinders clamped to the inner wall of the second support ring are slidably connected to the inner wall of the first support ring.
[0010] As a preferred solution of a quickly assembled hydraulic concrete lining structure of the sealing ring of the present invention, wherein: Two sliding blocks distributed in a mirror image are fixedly connected to the outer wall of the cylinder, a convex plate fitting the outer wall of the first support ring is fixedly connected to the outer wall of the cylinder, and a push rod is slidably connected to the inner wall of the cylinder.
[0011] As a preferred solution of a quickly assembled hydraulic concrete lining structure of the sealing ring of the present invention, wherein: Two baffle plates distributed in a mirror image are fixedly connected to the outer wall of the push rod, two movable plates corresponding to the baffle plates are slidably connected to the inner wall of the cylinder, and a first spring is connected between the outer wall of the movable plate and the inner wall of the baffle plate.
[0012] As a preferred solution of a quickly assembled hydraulic concrete lining structure of the sealing ring of the present invention, wherein: Two trapezoidal blocks distributed in a mirror image are slidably connected to the inner wall of the cylinder, two second springs distributed in a mirror image are connected between the outer wall of the trapezoidal block and the inner wall of the cylinder, and a notch for the second spring to slide is provided on the outer wall of the second support ring.
[0013] As a preferred solution of a quickly assembled hydraulic concrete lining structure of the sealing ring of the present invention, wherein: A diversion port for the outer wall of the diversion pipe to slide is provided at the top end of the main body, two sealing rings distributed in a mirror image are fixedly connected to the inner wall of the diversion port, and a geotextile is installed between the two sealing rings.
[0014] As a preferred solution of a quickly assembled hydraulic concrete lining structure of the sealing ring of the present invention, wherein: A plurality of positioning rods distributed in a circular array are fixedly connected to one end of the outer wall of the drain pipe, a circular groove for the positioning rod to slide is provided at the other end of the drain pipe, magnet rings are fixedly connected to both ends of the outer wall of the drain pipe, and a drain port communicating with the inner wall of the drain pipe is provided at the bottom end of the bottom plate.
[0015] The beneficial effects of the present invention:
[0016] 1. This structure adopts a modular design. By precisely docking the first support ring and the second support ring and inserting the cylinder, and using the extrusion push rod to drive the trapezoidal buckle to lock with the second support ring, a quick and stable connection between the main bodies is achieved, simplifying the operation process. It does not rely on complex tools such as wrenches and welders, significantly shortening the installation period and improving the construction efficiency. At the same time, a drainage system is integrated inside the main body, which can automatically drain seepage water, effectively alleviating the cumulative impact of water pressure on the structure and enhancing the overall durability.
[0017] 2. By providing a sealing gasket on the outer wall of the first support ring, after the main bodies are aligned and fixed, the sealing gasket covers the joint. It has a high elastic modulus and ductility, and can adapt to the deformation of the surrounding rock of the tunnel, such as the opening and closing of the joint caused by settlement and shrinkage, avoiding the tearing or peeling of the sealing material due to joint deformation and maintaining long-term waterproof performance. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following will briefly introduce the drawings required for the description of the embodiments. Obviously, the drawings in the following description are only some embodiments of the present invention. For those of ordinary skill in the art, without creative efforts, other drawings can also be obtained based on these drawings.
[0019] Among them:
[0020] Figure 1 is a schematic diagram of the overall structure of the present invention.
[0021] Figure 2 is a schematic diagram of the installation structure of the drain pipe of the present invention.
[0022] Figure 3 is a schematic diagram of the installation structure of the sealing gasket of the present invention.
[0023] Figure 4 is a schematic diagram of the installation structure of the cylinder of the present invention.
[0024] Figure 5 is Figure 2 an enlarged schematic diagram of part A in
[0025] Description of the reference numerals: 1, bottom plate; 2, main body; 3, diversion port; 4, first support ring; 5, drain pipe; 6, drain outlet; 7, positioning rod; 8, magnet ring; 9, second support ring; 10, diversion pipe; 11, sealing gasket; 12, push rod; 13, cylinder; 14, sliding block; 15, baffle; 16, first spring; 17, movable plate; 18, trapezoidal block; 19, second spring; 20, permeable geotextile; 21, sealing ring. DETAILED DESCRIPTION OF THE EMBODIMENTS
[0026] To make the above objects, features, and advantages of the present invention more apparent and understandable, the following provides a detailed description of the specific embodiments of the present invention with reference to the accompanying drawings of the specification.
[0027] Embodiment 1
[0028] Referring to Figures 1 - 4 , which is the first embodiment of the present invention, a quickly assembled hydraulic concrete lining structure is provided, including a bottom plate 1. A plurality of main bodies 2 are fixedly connected to the top end of the bottom plate 1. A first support ring 4 is fixedly connected to the inner wall of the main body 2. A through hole for the sliding of a cylinder 13 is formed in the outer wall of the first support ring 4. A sealing gasket 11 is fixedly connected to the outer wall of the first support ring 4. The sealing gasket 11 is elastic. A second support ring 9 fixedly connected to the inner wall of the main body 2 is movably connected to the outer wall of the sealing gasket 11. Two drain pipes 5 distributed in a mirror image are fixedly connected to the inner wall of the main body 2. The drain pipes 5 are used to guide water flow into a drain port 6. A diversion pipe 10 slidably connected to the inner wall of the main body 2 is formed in the inner wall of the drain pipe 5. A plurality of cylinders 13 clamped to the inner wall of the second support ring 9 are slidably connected to the inner wall of the first support ring 4. The cylinders 13 are used to fix the first support ring 4 and the second support ring 9.
[0029] Two sliding blocks 14 distributed in a mirror image are fixedly connected to the outer wall of the cylinder 13. The sliding blocks 14 are used to position the angle of insertion of the cylinder 13. A convex plate fitting the outer wall of the first support ring 4 is fixedly connected to the outer wall of the cylinder 13. A push rod 12 is slidably connected to the inner wall of the cylinder 13. The push rod 12 is used to push a trapezoidal block 18.
[0030] Two baffles 15 distributed in a mirror image are fixedly connected to the outer wall of the push rod 12. Two movable plates 17 corresponding to the baffles 15 are slidably connected to the inner wall of the cylinder 13. A first spring 16 is connected between the outer wall of the movable plate 17 and the inner wall of the baffle 15. The first spring 16 is used to push the baffle 15. A moving groove for the movement of the baffle 15 is formed in the inner wall of the cylinder 13. The moving groove is in an "L" shape.
[0031] Two trapezoidal blocks 18 distributed in a mirror image are slidably connected to the inner wall of the cylinder 13. Two second springs 19 distributed in a mirror image are connected between the outer wall of the trapezoidal block 18 and the inner wall of the cylinder 13. The second springs 19 are used to push the trapezoidal block 18 into a notch. A notch for the sliding of the second spring 19 is formed in the outer wall of the second support ring 9.
[0032] During use, the main body 2 drives the sealing gasket 11 to be inserted into the outer wall of the second support ring 9 through the first support ring 4, and the cylinder 13 is inserted along the through hole of the first support ring 4. The cylinder 13 enters the inner wall of the second support ring 9 through the sliding block 14. When the convex plate contacts the outer wall of the first support ring 4, the push rod 12 is pushed to squeeze the first spring 16 through the baffle 15. At the same time, the push rod 12 squeezes the outer wall of the trapezoidal block 18. Since the contact surface between the trapezoidal block 18 and the push rod 12 is an inclined surface, the trapezoidal block 18 is forced to squeeze the second spring 19, and the trapezoidal block 18 enters the groove. At this time, the push rod 12 is rotated to drive the baffle 15 and the movable plate 17 to rotate, and then the limit is achieved.
[0033] Example 2
[0034] Reference Figure 1 , Figure 2 , Figure 3 and Figure 5 , which is the second embodiment of the present invention. This embodiment is different from the first embodiment in that: a guide port 3 is provided at the top of the main body 2 to facilitate the sliding of the outer wall of the guide pipe 10. Two mirror-distributed sealing rings 21 are fixedly connected to the inner wall of the guide port 3. The sealing ring 21 is used to limit the permeable geotextile 20. A permeable geotextile 20 is installed between the two sealing rings 21. The permeable geotextile 20 is used to prevent sand from entering the guide pipe 10, while not affecting the water entering the guide pipe 10 through the permeable geotextile 20.
[0035] One end of the outer wall of the drain pipe 5 is fixedly connected to a plurality of positioning rods 7 distributed in a circular array. The positioning rods 7 facilitate the installation of multiple main bodies 2. The other end of the drain pipe 5 is provided with a circular groove for facilitating the sliding of the positioning rods 7. Both ends of the outer wall of the drain pipe 5 are fixedly connected to a magnet ring 8. The bottom end of the base plate 1 is provided with a drain outlet 6 connected to the inner wall of the drain pipe 5. The drain outlet 6 is used to discharge water to avoid accumulation.
[0036] During use, when the main body 2 is installed in sequence, the positioning rod 7 of the drain pipe 5 is aligned with the circular groove of the other drain pipe 5 and inserted, and at the same time, the two magnet rings 8 are adsorbed and fitted, and the water flows into the diversion port 3 from the top of the main body 2, and the water flows into the diversion pipe 10 through the permeable geotextile 20, and the water flows into the inner wall of the drain pipe 5 through the diversion pipe 10, and the water flows into the drain port 6 through the drain pipe 5 and is discharged, and the operation is completed.
[0037] The remaining structures are the same as those of Example 1.
[0038] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.
Claims
1. A quickly assembled hydraulic concrete lining structure, characterized in that: It includes a bottom plate (1), at the top end of the bottom plate (1), a plurality of bodies (2) are fixedly connected, inside the wall of the body (2), a first support ring (4) is fixedly connected, on the outer wall of the first support ring (4), a sealing gasket (11) is fixedly connected, on the outer wall of the sealing gasket (11), a second support ring (9) fixedly connected to the inner wall of the body (2) is movably connected, inside the wall of the body (2), two drain pipes (5) distributed in a mirror image are fixedly connected, inside the wall of the drain pipe (5), a diversion pipe (10) slidably connected to the inner wall of the body (2) is provided, inside the wall of the first support ring (4), a plurality of cylinders (13) clamped to the inner wall of the second support ring (9) are slidably connected.
2. A quickly assembled hydraulic concrete lining structure according to claim 1, characterized in that: On the outer wall of the cylinder (13), two sliding blocks (14) distributed in a mirror image are fixedly connected, on the outer wall of the cylinder (13), a convex plate fitting to the outer wall of the first support ring (4) is fixedly connected, inside the wall of the cylinder (13), a push rod (12) is slidably connected.
3. A quickly assembled hydraulic concrete lining structure according to claim 2, characterized in that: On the outer wall of the push rod (12), two baffles (15) distributed in a mirror image are fixedly connected, inside the wall of the cylinder (13), two movable plates (17) corresponding to the baffles (15) are slidably connected, between the outer wall of the movable plate (17) and the inner wall of the baffle (15), a first spring (16) is connected.
4. A quickly assembled hydraulic concrete lining structure according to claim 1, characterized in that: Inside the wall of the cylinder (13), two trapezoidal blocks (18) distributed in a mirror image are slidably connected, between the outer wall of the trapezoidal block (18) and the inner wall of the cylinder (13), two second springs (19) distributed in a mirror image are connected, on the outer wall of the second support ring (9), a notch facilitating the sliding of the second spring (19) is provided.
5. A quickly assembled hydraulic concrete lining structure according to claim 1, characterized in that: At the top end of the body (2), a diversion port (3) facilitating the sliding of the outer wall of the diversion pipe (10) is provided, inside the wall of the diversion port (3), two sealing rings (21) distributed in a mirror image are fixedly connected, between the two sealing rings (21), a permeable geotextile (20) is installed.
6. A quickly assembled hydraulic concrete lining structure according to claim 1, characterized in that: At one end of the outer wall of the drain pipe (5), a plurality of positioning rods (7) distributed in a circular array are fixedly connected, at the other end of the drain pipe (5), a circular groove facilitating the sliding of the positioning rod (7) is provided, at both ends of the outer wall of the drain pipe (5), magnet rings (8) are fixedly connected, at the bottom end of the bottom plate (1), a drain port (6) communicating with the inner wall of the drain pipe (5) is provided.