Offshore photovoltaic defect-eliminating operation and maintenance landing leg platform
By designing the offshore photovoltaic defect removal operation and maintenance leg platform, the problem of difficulties in traditional transportation ships in the offshore photovoltaic field is solved, a safe operation platform and efficient operation and maintenance solution are provided, and free passage and various operation needs are achieved in the photovoltaic plant area.
Patent Information
- Application Number
- CN202510440734.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-04-09
- Publication Date
- 2025-07-11
AI Technical Summary
Traditional transportation ships are prone to collision with the platform and cannot turn around when sailing in the offshore photovoltaic field, and the platform structure is not strong enough to withstand impact forces, resulting in safety risks and traffic difficulties.
A offshore photovoltaic defect removal operation and maintenance leg platform was designed, including a support body, a platform lifting mechanism, a power generation device and a paddle hanging machine. The platform lifting mechanism is used to achieve lifting and positioning of the platform. The paddle hanging machine provides power. The support body is composed of steel trusses and steel plates, and the filling is provided with protection. It is equipped with a lift and a curved arm truck to provide a stable working platform.
It realizes free passage within the photovoltaic factory area, reduces the risk of platform collision, provides a safe operating platform, reduces the risk of personnel climbing, improves operation and maintenance efficiency, and can carry mechanical equipment for a variety of operations.
Smart Images

Figure CN120291496A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a leg platform for defect elimination and operation and maintenance of offshore photovoltaic power generation. Background Art
[0002] Solar energy is a renewable and infinite energy source. Therefore, the energy source for offshore photovoltaic power generation is very rich and can meet a large amount of energy demand. The ocean covers most of the earth's area. By building offshore photovoltaic power stations, the dependence on traditional energy sources can be reduced. An offshore photovoltaic power generation system usually consists of photovoltaic panels, brackets, cables, power electronic devices, etc. Among them, the photovoltaic panel is the core component for converting solar energy into electrical energy. When the sun shines on the photovoltaic panel, the light energy is converted into electrical energy and transmitted to the power electronic device through the cable, and finally converted into usable electricity.
[0003] Currently, the platforms in offshore photovoltaic fields are distributed relatively densely. The spacing between rows of platforms is about 26m, and the height of the platforms from the sea surface is 7 - 11m. There are the following problems when traditional traffic boats navigate in offshore photovoltaic fields: 1. The height of the traffic boat cab is too high, and it is very easy to collide with the platforms when entering and leaving between the platforms; 2. The platform spacing is less than the turning radius of the traffic boat, and the traffic boat cannot turn around; 3. The structural strength of the platform is relatively low and cannot withstand the impact force brought by the berthing of the traffic boat. Therefore, a leg platform for defect elimination and operation and maintenance of offshore photovoltaic power generation is proposed to solve the above problems. Summary of the Invention
[0004] The purpose of the present invention is to provide a leg platform for defect elimination and operation and maintenance of offshore photovoltaic power generation to overcome the existing defects, which can realize free passage within the photovoltaic plant area.
[0005] The technical solution to achieve the above purpose is: a leg platform for defect elimination and operation and maintenance of offshore photovoltaic power generation, including a support main body, a platform lifting mechanism, a power generation device, and a paddle wheel;
[0006] The platform lifting mechanism is arranged at the four corners of the support main body; the power generation device is arranged on the upper end surface of the support main body; the paddle wheel is arranged on the side wall of the support main body;
[0007] The support main body includes a steel truss, a filler, and two steel plates. The filler is arranged inside the steel truss, and the upper and lower end surfaces of the steel truss are respectively connected to the steel plates; insertion pile holes are arranged at the four corners of the support main body.
[0008] Preferably, the platform lifting mechanism includes four leg piles, four winches, four lifting steel wires, four pile pulling steel wires, and four groups of guiding supports;
[0009] The four leg piles are respectively inserted into the four pile insertion holes; upper rollers are arranged at the upper ends of each of the leg piles, two lower rollers are arranged in the middle of each of the leg piles, a set of the guiding supports is arranged on the inner side of each of the leg piles, and the guiding supports are connected to the steel plate; a lifting lug is arranged on the outer side of each of the leg piles, and the lifting lug is connected to the steel plate; a winch is arranged on the inner side of each of the leg piles, and the winch is connected to the steel plate;
[0010] One end of the lifting steel wire rope is connected to the winch, and the other end passes through the guiding roller on the guiding support, then passes through the upper roller and is connected to the lifting lug;
[0011] One end of the pile pulling steel wire rope is connected to the winch, and the other end passes through the guiding roller on the guiding support, then passes through the two lower rollers and is connected to the lifting lug.
[0012] Preferably, the steel truss includes seven first truss pieces, five second truss pieces and two third truss pieces; the seven first truss pieces are arranged horizontally, the five second truss pieces are arranged vertically, the seven first truss pieces and the five second truss pieces are cross-connected, and the two third truss pieces are respectively connected to both ends of the five second truss pieces.
[0013] Preferably, the first truss piece includes two first main steel pipes and seven first connecting steel pipes; the two first main steel pipes are arranged in parallel, and the seven first connecting steel pipes are arranged between the two first main steel pipes.
[0014] Preferably, the second truss piece includes two second main steel pipes, seven second connecting steel pipes and six first web members; the two second main steel pipes are arranged in parallel, the seven second connecting steel pipes are arranged between the two second main steel pipes, and the six first web members are arranged between the seven second connecting steel pipes.
[0015] Preferably, the third truss piece includes two third main steel pipes, eleven third connecting steel pipes and six second web members; the two third main steel pipes are arranged in parallel, seven third connecting steel pipes are arranged between the two third main steel pipes, six second web members are arranged between the seven third connecting steel pipes, and two third connecting steel pipes are respectively added to both ends of the two third main steel pipes.
[0016] Preferably, the power generation device is a diesel generator, which provides power for the winch and the paddle hanging machine respectively.
[0017] Preferably, the filler can be one of foam, airbag or wood.
[0018] The beneficial effects of the present invention are as follows: This offshore photovoltaic defect elimination and maintenance leg platform can achieve free passage within the photovoltaic plant area and can be used as a means of transportation for defect elimination and maintenance personnel and materials. The platform is small in size and low in height, without the risk of colliding with the platform, and can effectively protect the finished products. When paired with a lift and a knuckle boom truck, it can provide a controllable working platform, reduce the safety risk of operators climbing the photovoltaic platform, and increase the efficiency of defect elimination and maintenance. Subsequently, corresponding mechanical equipment can be carried according to needs to meet more operation requirements for offshore photovoltaic construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 is the top view of the offshore photovoltaic defect elimination and maintenance leg platform of the present invention;
[0020] Figure 2 is the side view of the offshore photovoltaic defect elimination and maintenance leg platform of the present invention;
[0021] Figure 3 is the detailed view of the position of the pile insertion hole of the present invention;
[0022] Figure 4 is the detailed view of the first truss piece of the present invention;
[0023] Figure 5 is the detailed view of the second truss piece of the present invention;
[0024] Figure 6 is the detailed view of the third truss piece of the present invention.
[0025] In the figure: 1, support main body; 101, steel truss; 103, steel plate; 104, first truss piece; 105, second truss piece; 106, third truss piece; 107, first main steel pipe; 108, first connecting steel pipe; 109, second main steel pipe; 110, second connecting steel pipe; 111, first web member; 112, third main steel pipe; 113, third connecting steel pipe; 114, second web member; 115, pile insertion hole; 2, platform lifting mechanism; 201, leg pile; 202, winch; 203, lifting steel wire rope; 204, pile pulling steel wire rope; 205, guiding support; 206, guiding roller; 207, upper roller; 208, lower roller; 209, lifting lug; 3, power generation device; 4, paddle wheel; 401, propeller; 402, control rod; 5, lift. DETAILED DESCRIPTION OF THE EMBODIMENTS
[0026] The technical solution of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. In the description of the present invention, it should be noted that the orientation or positional relationship indicated by the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. is based on the orientation or positional relationship shown in the accompanying drawings. It is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of the present invention. In addition, the terms "first", "second", "third" are only used for descriptive purposes and cannot be construed as indicating or implying relative importance.
[0027] The present invention will be further described below in conjunction with the accompanying drawings.
[0028] As shown in Figures 1-6, a maintenance and defect elimination leg platform for offshore photovoltaic power generation includes a support main body 1, a platform lifting mechanism 2, a power generation device 3, and a paddle hanging machine 4; the platform lifting mechanism 2 is arranged at the four corners of the support main body 1; the power generation device 3 is arranged on the upper end surface of the support main body 1; the paddle hanging machine 4 is arranged on the side wall of the support main body 1; the support main body 1 includes a steel truss 101, a filler, and two steel plates 103. The filler is arranged inside the steel truss 101, and the upper and lower end surfaces of the steel truss 101 are respectively connected to the steel plates 103; pile insertion holes 111 are arranged at the four corners of the support main body 1.
[0029] As shown in Figure 2, the platform lifting mechanism 2 includes four leg piles 201, four winches 202, four lifting steel wires 203, four pile pulling steel wires 204, and four groups of guiding supports 205; the four leg piles 201 are respectively inserted into the four pile insertion holes 111; an upper roller 207 is arranged at the upper end of each leg pile 201, two lower rollers 208 are arranged in the middle of each leg pile 201, and a group of guiding supports 205 is arranged inside each leg pile 201. The guiding supports 205 are connected to the steel plates 103; a lifting lug 209 is arranged on the outer side of each leg pile 201, and the lifting lug 209 is connected to the steel plates 103; a winch 202 is arranged inside each leg pile 201, and the winch 202 is connected to the steel plates 103; one end of the lifting steel wire 203 is connected to the winch 202, and the other end passes through the guiding roller 206 on the guiding support 205, then passes through the upper roller 207 and is connected to the lifting lug 209; one end of the pile pulling steel wire 204 is connected to the winch 202, and the other end passes through the guiding roller 206 on the guiding support 205, then passes through the two lower rollers 208 and is connected to the lifting lug 209.
[0030] Specifically, when the platform is lifted, the pile-pulling steel wire rope 204 is untied. The leg pile 201 moves downward under gravity until the pile bottom is inserted into the seabed firmly. Then, the lifting steel wire rope 203 is connected. At the same time, 4 winches 202 are started, and the lifting steel wire rope 203 is tightened. The lifting steel wire rope 203 applies an upward pulling force to the support main body 1 through the lifting lug 209 to lift the support main body 1. Observe the levelness of the support main body 1 during the lifting process. The winches 202 can be started and stopped and the speed can be adjusted until the support main body 1 is lifted out of the sea level. When the platform descends, the winches 202 are controlled to release the lifting steel wire rope 203. The upward pulling force on the support main body 1 decreases, and under the influence of gravity, it slowly descends until the support main body 1 falls into the sea water and floats on the sea surface by its own buoyancy. When pulling out the pile and shifting the position, the lifting steel wire rope 203 is untied, the pile-pulling steel wire rope 204 is connected to the winch 202, and the winch 202 is controlled to tighten the pile-pulling steel wire rope 204. The pile-pulling steel wire rope 204 applies an upward pushing force to the leg pile 201 through the roller 208 to lift the leg pile 201 inserted into the seabed to its initial state.
[0031] As shown in Figure 3, the steel truss 101 includes seven first truss pieces 104, five second truss pieces 105, and two third truss pieces 106. The seven first truss pieces 104 are arranged horizontally, the five second truss pieces 105 are arranged vertically, the seven first truss pieces 104 and the five second truss pieces 105 are cross-connected, and the two third truss pieces 106 are respectively connected to both ends of the five second truss pieces 105. The first truss piece 104 includes two first main steel pipes 107 and seven first connecting steel pipes 108. The two first main steel pipes 107 are arranged in parallel, and the seven first connecting steel pipes 108 are arranged between the two first main steel pipes 107. The second truss piece 105 includes two second main steel pipes 109, seven second connecting steel pipes 110, and six first web members 111. The two second main steel pipes 109 are arranged in parallel, the seven second connecting steel pipes 110 are arranged between the two second main steel pipes 109, and the six first web members 111 are arranged between the seven second connecting steel pipes 110. The third truss piece 106 includes two third main steel pipes 112, eleven third connecting steel pipes 113, and six second web members 114. The two third main steel pipes 112 are arranged in parallel, seven third connecting steel pipes 113 are arranged between the two third main steel pipes 112, the six second web members 114 are arranged between the seven third connecting steel pipes 113, and two third connecting steel pipes 113 are respectively added to both ends of the two third main steel pipes 112.
[0032] Specifically, the power generation device 3 is a diesel generator, which provides power for the winches 202 and the paddle wheel machine 4 respectively. The paddle wheel machine 4 is installed on the side edge of the steel plate 103. It is powered by the power generation device 3. Through the high-speed rotation of the propeller 401, it pushes the sea water to move forward. The operator controls the control lever 402 to adjust the forward direction of the platform.
[0033] Specifically, the filler can be one of foam, airbag or wood. All are low-density materials and fill the inside of the steel truss 101. Steel plates 103 are fully laid on the top and bottom of the steel truss 101. The steel truss 101 and the steel plates 103 serve as the outer protection of the filler to prevent damage from external forces.
[0034] Specifically, in the lifting condition, a lift 5 (only schematically shown in the figure) is configured on the platform, which can provide a stable working platform for defect elimination and operation and maintenance personnel, or a safe way to go up and down the photovoltaic platform (not shown in the figure). With a boom lift (not shown in the figure), a stable and movable working platform can be provided.
[0035] This offshore photovoltaic defect elimination and operation and maintenance leg platform can not only provide an economical and safe marine vehicle and carrier between photovoltaic platforms, but also independently realize support and positioning, providing a stable and reliable working platform. With the use of equipment such as elevators and boom lifts, it can deliver operators to the platform passage or directly to the damaged photovoltaic panels and lines to carry out defect elimination and operation and maintenance operations.
[0036] This offshore photovoltaic defect elimination and operation and maintenance leg platform can realize free passage within the photovoltaic plant area and can be used as a tool for defect elimination and operation and maintenance personnel and material transportation; the platform is small in volume and low in height, without the risk of colliding with the platform, and can effectively protect the finished products. With elevators and boom lifts, a controllable working platform can be provided, reducing the safety risk of operators climbing the photovoltaic platform and increasing the efficiency of defect elimination and operation and maintenance. Subsequently, corresponding mechanical equipment can be carried according to needs to meet more operation requirements for offshore photovoltaic construction.
[0037] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand that: they can still modify the technical solutions described in the foregoing embodiments, or perform equivalent replacements for some or all of the technical features; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. An offshore photovoltaic defect elimination and maintenance support leg platform, characterized in that It includes a support main body (1), a platform lifting mechanism (2), a power generation device (3) and a paddle wheel machine (4). The platform lifting mechanism (2) is arranged at the four corners of the support main body (1); the power generation device (3) is arranged on the upper end surface of the support main body (1); the paddle wheel machine (4) is arranged on the side wall of the support main body (1). The support main body (1) includes a steel truss (101), a filler and two steel plates (103). The filler is arranged inside the steel truss (101), and the upper and lower end surfaces of the steel truss (101) are respectively connected to the steel plates (103); there are pile insertion holes (115) at the four corners of the support main body (1).
2. The leg platform for defect elimination and operation and maintenance of offshore photovoltaic according to claim 1, wherein, The platform lifting mechanism (2) includes four leg piles (201), four winches (202), four lifting steel wires (203), four pile pulling steel wires (204) and four groups of guiding supports (205). The four leg piles (201) are respectively inserted into the four pile insertion holes (115); an upper roller (207) is arranged at the upper end of each leg pile (201), two lower rollers (208) are arranged in the middle of each leg pile (201), and a group of guiding supports (205) is arranged inside each leg pile (201), and the guiding supports (205) are connected to the steel plate (103); an ear (209) is arranged on the outer side of each leg pile (201), and the ear (209) is connected to the steel plate (103); a winch (202) is arranged inside each leg pile (201), and the winch (202) is connected to the steel plate (103). One end of the lifting steel wire (203) is connected to the winch (202), and the other end passes through the guiding roller (206) on the guiding support (205), then passes through the upper roller (207) and is connected to the ear (209). One end of the pile pulling steel wire (204) is connected to the winch (202), and the other end passes through the guiding roller (206) on the guiding support (205), then passes through the two lower rollers (208) and is connected to the ear (209).
3. The offshore PV defect elimination and operation and maintenance support leg platform according to claim 1, wherein The steel truss (101) includes seven first truss pieces (104), five second truss pieces (105) and two third truss pieces (106); the seven first truss pieces (104) are arranged horizontally, the five second truss pieces (105) are arranged vertically, the seven first truss pieces (104) and the five second truss pieces (105) are cross-connected, and the two third truss pieces (106) are respectively connected to both ends of the five second truss pieces (105).
4. The leg platform for defect elimination and operation and maintenance of offshore photovoltaic according to claim 3, wherein, The first truss piece (104) includes two first main steel pipes (107) and seven first connecting steel pipes (108); the two first main steel pipes (107) are arranged in parallel, and the seven first connecting steel pipes (108) are arranged between the two first main steel pipes (107).
5. The leg platform for defect elimination and operation and maintenance of offshore photovoltaic according to claim 3, characterized in that, The second truss piece (105) includes two second main steel pipes (109), seven second connecting steel pipes (110) and six first web members (111); the two second main steel pipes (109) are arranged in parallel, the seven second connecting steel pipes (110) are arranged between the two second main steel pipes (109), and the six first web members (111) are arranged between the seven second connecting steel pipes (110).
6. The leg platform for defect elimination and operation and maintenance of offshore photovoltaic according to claim 3, wherein, The third truss piece (106) includes two third main steel pipes (112), eleven third connecting steel pipes (113) and six second web members (114); the two third main steel pipes (112) are arranged in parallel, seven third connecting steel pipes (113) are arranged between the two third main steel pipes (112), the six second web members (114) are arranged between the seven third connecting steel pipes (113), and two third connecting steel pipes (113) are respectively added to both ends of the two third main steel pipes (112).
7. The leg platform for defect elimination and operation and maintenance of offshore photovoltaic according to claim 2, characterized in that, The power generation device (3) is a diesel generator, which provides power for the winch (202) and the paddle hanging machine (4) respectively.
8. The leg platform for defect elimination and operation and maintenance of offshore photovoltaic according to claim 1, characterized in that The filler can be one of foam, airbag or wood.