A battery pack water connector assembly system and assembly method
By designing an automated assembly system, the fully automated assembly of battery pack water connectors was achieved, solving the problems of low efficiency and unsatisfactory precision in existing technologies, and improving product quality and market competitiveness.
Patent Information
- Application Number
- CN202510696855.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2025-05-28
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2045-05-28
AI Technical Summary
The existing battery pack water connector has a complex assembly process, resulting in low assembly efficiency and unsatisfactory accuracy, and poor product quality stability.
An automated assembly system was designed, including a conveying device, visual inspection, floating inspection, manual assembly, and servo riveting stations. The system achieves fully automated assembly through a robotic arm and a servo press, and combines visual inspection and multi-dimensional inspection to ensure assembly accuracy and quality.
This significantly improves the assembly efficiency and precision of battery pack water connectors, enhancing product consistency and market competitiveness.
Smart Images

Figure CN120347524B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to an assembly system, and more particularly to a battery pack water connector assembly system and assembly method. Background Technology
[0002] Electric vehicles (EVs) are vehicles powered by an onboard power source, driven by an electric motor, and that meet all road traffic and safety regulations. EVs can be categorized into pure electric vehicles, hybrid electric vehicles, and fuel cell vehicles. The battery cooler is a key component in liquid-cooled electric vehicles for regulating the battery pack temperature. Enhancing its heat exchange efficiency can reduce the required compressor speed or refrigerant discharge, thereby reducing power consumption and improving driving range and performance.
[0003] A prior art battery pack water connector includes a base plate, a floating seat, a valve body, and a pipe fitting. The base plate is generally rectangular, with pipe mounting holes and floating seat mounting holes extending through its upper and lower ends. The pipe mounting holes are used to install the valve body and pipe fitting, while four floating seat mounting holes are located at the four corners of the base plate for mounting the floating seat. The floating seat is spring-loaded and mounted on the base plate, enabling radial and axial floating. The floating seat includes a lower seat body located at the lower end of the base plate and an upper seat body located at the upper end of the base plate. A sleeve is located at the center of the lower seat body. A first central hole is formed on the upper floating seat. The sleeve passes upward through the first central hole of the upper seat body and then flares outward to form a first stop, which limits the movement of the upper seat body. The valve body is fixed to the upper end of the base plate by bolts. The valve body includes two parallel and interconnected cylinders. The two ends of the cylinders are open to form valve holes. A valve core mounting seat is provided in the center of the valve hole. A second center hole is opened on the valve core mounting seat. A rod is fitted in the center hole. During assembly, it is installed from bottom to top and fixed at its upper end by a nut. A blind hole is opened at the end of the rod. The edge of the blind hole is flared outward to form a second stop, which is used to limit and fix the nut. The pipe fitting passes through the pipe mounting hole and is connected to the interface on the valve body by a snap fastener.
[0004] Because the assembly process of the battery pack water connector is relatively complex, the existing technology uses manual assembly, which results in low assembly efficiency and accuracy, and unsatisfactory product quality stability. Summary of the Invention
[0005] The technical problem to be solved by the present invention is to provide an automatic assembly system and assembly method that can achieve fully automatic assembly with high assembly efficiency and precision.
[0006] A battery pack water connector assembly system for assembling the aforementioned battery pack water connector, comprising a conveying device, wherein the following are sequentially arranged along the conveying path of the conveying device: The riveting station is used to flare the end of the sleeve on the floating seat on the bottom plate of the battery pack water connector using a servo riveting machine to form the first stop. A vision inspection station is used to inspect the outward expansion dimension of the first stop portion using a vision inspection device 3. A floating detection station is used to fix each of the floating seats and detect the horizontal floating amount of the base plate, including a pushing mechanism for pushing the base plate to move horizontally in the X-axis and Y-axis directions; The manual loading station is used for manually assembling and loading valve bodies; The valve core reaming station is used to ream the blind hole at the end of the rod on the valve body using a servo riveting machine to form a second stop. The manual assembly station involves manually assembling the valve body onto the base plate. The piping fitting assembly station is used to assemble the piping fittings onto the valve body and pre-pressurize and fix them. The clamping station is used to clamp the pipe fittings onto the valve body using a servo press and at a preset pressure value. The Z-axis detection station is used to fix the floating seat and detect the vertical floating amount of the base plate, including a pushing mechanism for pushing the base plate to move in the Z-axis direction; The discharge station is used for discharging the battery pack water connector.
[0007] Furthermore, the manual assembly station is equipped with an assembly table located on one side of the conveying device. Between the assembly table and the conveying device, there is a robotic arm, a discharge conveyor belt, and a feeding slide. The robotic arm can move the valve body and base plate on the conveying device to the discharge conveyor belt and transport them to the assembly table, or move the assembled base plate and valve body to the fixture of the conveying device. The feeding slide is used to move the assembled base plate and valve body to the material picking path of the robotic arm.
[0008] Furthermore, a partition net is provided between the feed and discharge ends of the conveyor belt and between the feed and discharge ends of the feed slide.
[0009] Furthermore, each workstation is equipped with a barcode scanner for scanning codes for traceability.
[0010] Furthermore, the discharge station includes a qualified discharge channel and an unqualified discharge channel.
[0011] Furthermore, the conveying device is provided with a fixture, which has a first material placement hole for placing the base plate and a second material placement hole for placing the valve body. The bottom surface of the first material placement hole has a floating seat receiving hole for accommodating the floating seat and a valve body hole for accommodating the valve body to pass through. The side wall of the first material placement hole has a gripper groove for accommodating the gripper to extend in and grasp.
[0012] Furthermore, the Z-axis detection station is equipped with a Z-axis detection device, which includes a positioning mechanism for radially positioning the fixture at the station, a first support component for upwardly supporting the fixture at the station, a second support component that can be inserted into the valve body and is used to upwardly support the valve body, a vertical pushing mechanism for pushing the base plate downward, and a Z-axis detection device for detecting the downward pressure of the base plate.
[0013] Furthermore, the Z-axis detection device includes a lifting seat located directly below the workstation and a first lifting cylinder for driving the lifting seat to move vertically up and down. The top of the lifting seat is provided with a positioning support plate, the upper surface of which serves as a support surface and is used to contact the fixture and provide support. Several positioning pins are provided on the support surface, and the bottom surface of the fixture is provided with positioning holes corresponding to the positioning pins. A second lifting cylinder is provided on the lifting seat, and the upper output end of the second lifting cylinder is provided with a valve body support column that can pass upward through the positioning support plate and be inserted into the valve body on the fixture.
[0014] Furthermore, the floating detection station is equipped with a bidirectional floating detection device.
[0015] Furthermore, the bidirectional floating detection device includes a floating detection mechanism, which includes: Mounting base I serves as the mounting carrier; The testing fixture is fixed on the mounting base I. The top surface of the testing fixture serves as a placement surface and is used to place the base plate of the battery pack water connector. A positioning post corresponding to the sleeve hole on the base plate is vertically arranged on the placement surface. The positioning post can be inserted into the sleeve hole on the base plate and achieve radial positioning of the base plate. A pushing assembly is fixed on the mounting base I. The pushing end of the pushing assembly faces the detection fixture and is used to push the bottom plate on the detection fixture to move radially. There are multiple pushing assemblies, which are respectively arranged on the left and right sides and the front and rear ends of the detection fixture, and are used to push the bottom plate on the placement surface from different directions and make the bottom plate float radially in different directions. A detection sensor, the detection end of which faces the detection fixture, is used to detect the radial floating amount of the base plate on the detection fixture. There are multiple detection sensors, which are respectively arranged on the left and right sides and the front and rear ends of the detection fixture.
[0016] Furthermore, the pushing assembly includes a cylinder and a pusher block disposed at the output end of the cylinder.
[0017] Furthermore, the pushing direction of the pushing component is parallel to the length or width direction of the base plate.
[0018] Furthermore, the contact point between the pusher assembly and the base plate is located on the vertical surface of the base plate.
[0019] Furthermore, the detection end of the detection sensor faces the positioning post.
[0020] Furthermore, the detection ends of each of the detection sensors are oriented toward different positioning posts.
[0021] Furthermore, the end of the positioning post is provided with a chamfer or rounded corner.
[0022] Furthermore, the feeding assembly includes a first feeding assembly disposed on the left side, a second feeding assembly disposed on the right side, a third feeding assembly disposed at the front end, and a fourth feeding assembly disposed at the rear end, and the detection sensor includes a first detection sensor disposed on the left side, a second detection sensor disposed on the right side, a third detection sensor disposed at the front end, and a fourth detection sensor disposed at the rear end.
[0023] Furthermore, the first detection sensor faces the positioning post at the left rear end, the second detection sensor faces the positioning post at the right front end, the third detection sensor faces the positioning post at the left front end, and the fourth detection sensor faces the positioning post at the right rear end.
[0024] Furthermore, the detection sensor is a laser displacement sensor.
[0025] Furthermore, it also includes a material transfer robot I, which is used to transfer the base plate between the fixture of the conveying device and the detection fixture.
[0026] Furthermore, it also includes a barcode scanner for scanning the base plate.
[0027] Furthermore, the valve core reaming station is equipped with a valve core reaming device.
[0028] Furthermore, the valve core reaming device includes: A material placement assembly for placing the valve body of the battery pack water connector, the material placement assembly including a support column corresponding to the valve hole on the valve body, the support column being able to accommodate the valve hole and limit the valve body, the top of the support column contacting the lower end of the valve core inside the valve hole and supporting the valve core. The clamping assembly includes clamping cylinders I disposed on both sides of the material placement assembly and clamping blocks disposed at the output end of the clamping cylinders I for clamping the valve body; The hole-expanding mechanism includes a riveting press located directly above the material feeding assembly and a riveting head located at the output end of the riveting press and coaxial with the support column. The riveting head can be inserted into the hole at the top of the valve core and deform the open edge of the hole outward to form a stop for limiting the nut outside the valve core.
[0029] Furthermore, the material placement assembly also includes a rotating seat and a driving device for driving the rotating seat to rotate. The rotation axis of the rotating seat is parallel to the axis of the support column, and the riveting head is located on the rotation path of the support column.
[0030] Furthermore, there are two support columns, which are evenly distributed around the axis of the rotating seat.
[0031] Furthermore, the driving device is a rotary cylinder.
[0032] Furthermore, it also includes a mounting base II, the material placement assembly and the material clamping assembly are disposed on the upper surface of the mounting base II, and the driving device is disposed at the lower end of the mounting base II.
[0033] Furthermore, the top surface of the support column is provided with a rivet pad for contacting the lower end of the valve core.
[0034] Furthermore, the top surface of the support column is concave to form a mounting hole, and the rivet pad is disposed in the mounting hole.
[0035] Furthermore, it also includes a material transfer robot II, which is used to transfer the valve body between the fixture of the conveying device and the material placement assembly.
[0036] Furthermore, the material handling robot II includes a clamping assembly, which includes grippers for clamping the valve body and an elastic pressure bar disposed between the two grippers. The elastic pressure bar can elastically extend and retract, and its extension and retraction direction is parallel to the axis of the support column. The elastic pressure bar can contact the upper end of the valve body and cause the valve body to have a downward movement tendency.
[0037] Furthermore, it also includes a detection sensor II, which is oriented toward the feeding assembly and is used to detect the sealing ring on the valve body of the feeding assembly.
[0038] Furthermore, the material handling robot II includes a main horizontal slide that slides between the conveying device and the material placement assembly, a vertical slide that slides vertically on the main horizontal slide, a secondary horizontal slide that slides on the vertical slide, and a clamping assembly disposed on the secondary horizontal slide for clamping the valve body. The sliding direction of the secondary horizontal slide is parallel to the sliding direction of the main horizontal slide.
[0039] Furthermore, the piping fitting assembly station is equipped with a piping fitting assembly device.
[0040] Furthermore, the pipe fitting assembly device includes: Discharge mechanism, used for discharging pipe fittings; The material distribution mechanism is disposed at the discharge end of the discharge mechanism and is used for material distribution. It includes a horizontally sliding material distribution seat. The sliding direction of the material distribution seat is perpendicular to the discharge direction of the discharge mechanism and can move between a first position and a second position. When it is in the first position, the material distribution groove on the material distribution seat can be connected with the discharge end of the discharge mechanism and allow the pipe connector of the discharge end of the discharge mechanism to enter the material distribution groove. A material transfer mechanism is used to move the pipe fitting on the material distribution seat located in the second position to the valve body of the battery pack water connector in the fixture at the pipe assembly station; The pre-compression mechanism, located directly above the fixture at the piping assembly station, is used to pre-compress the piping fittings onto the valve body.
[0041] Furthermore, there are multiple material distribution troughs, which are arranged sequentially along the sliding direction of the material distribution seat.
[0042] Furthermore, the material transfer mechanism can simultaneously grab multiple pipe joints in the material distribution troughs.
[0043] Furthermore, there are two material distribution troughs.
[0044] Furthermore, the material distribution mechanism also includes a horizontally sliding limiting seat and a sliding seat, and the limiting seat and the sliding seat are located on the same sliding path. The material distribution seat is installed on the sliding seat. The limiting seat can move between a third position and a fourth position. The sliding seat can abut against the limiting seats at the first position and the second position and respectively connect the two material distribution grooves with the discharge end of the discharge mechanism.
[0045] Furthermore, the material distribution mechanism also includes a first cylinder for driving the limiting seat to slide and a second cylinder for driving the slide block to slide, the second cylinder being fixed on the limiting seat.
[0046] Furthermore, the material transfer mechanism includes a horizontal slide block capable of horizontal sliding and a lifting slide block vertically mounted on the horizontal slide block. The sliding direction of the horizontal slide block is perpendicular to the sliding direction of the material distribution seat. The lifting slide block is provided with a rotary cylinder corresponding to the material distribution groove. The rotation axis of the rotary cylinder is parallel to the length direction of the material distribution groove. The output end of the rotary cylinder is provided with a clamping cylinder II facing the material distribution seat. The output end of the clamping cylinder II is provided with a gripper for clamping the pipe fitting.
[0047] Furthermore, the clamps include an inner clamp and an outer clamp arranged in parallel. The inner clamp can be horizontally inserted into the pipe fitting, and a clamping area is formed between the inner clamp and the outer clamp.
[0048] Furthermore, the sidewall of the inner jaw is provided with an inner clamping surface that can fit against the inner wall of the pipe joint, and the sidewall of the outer jaw is provided with an outer clamping surface that can fit against the outer wall of the pipe joint.
[0049] Furthermore, the pre-compression mechanism includes a vertically arranged pre-compression cylinder and a pressure block disposed at the output end of the pre-compression cylinder, wherein the pressure block is provided with a positioning groove corresponding to the pipe fitting.
[0050] This application also provides an assembly method for assembling the above-mentioned battery pack water connector, which includes the following steps: S1. Loading: The base plate is placed into the first feeding hole of the fixture at the feed end of the conveying device by manual or mechanical loading. S2. Riveting and expanding hole: The end of the sleeve on the floating seat of the base plate is expanded by a servo riveting machine to form the first stop part; S3. Rivet inspection: The outward expansion dimension of the first stop is detected by the vision inspection device 3, and it is determined whether the outward expansion dimension is qualified. If it passes the test, proceed to the next workstation and the next process. If the material fails to meet the requirements, all subsequent processes will be suspended until the material is output from the non-conforming channel at the discharge station. S4. Float detection: Fix each floating seat and detect the horizontal float of the base plate, including the bidirectional horizontal float detection of the base plate along the X and Y axes, and determine whether the float is qualified. If it passes the test, proceed to the next workstation and the next process. If the material fails to meet the requirements, all subsequent processes will be suspended until the material is output from the non-conforming channel at the discharge station. S5. Valve body loading: The valve body is assembled manually and placed in the second loading hole of the fixture at the manual loading station. S6. Valve core enlargement: The blind hole at the end of the rod on the valve body is enlarged by a servo riveting machine to form a second stop. S7. Manual assembly: The valve body is assembled onto the base plate manually. S8. Pipe fitting assembly: Assemble the pipe fitting onto the valve body and pre-press it to fix it so that the pipe fitting is connected to the valve body and does not fall off. S9. Pipe clamping: The pipe fitting is clamped to the valve body by a servo press at a preset pressure value. S10 and Z-axis detection: Fix the floating seat, detect the vertical floating amount of the base plate, and determine whether the floating amount is qualified. If it is qualified, it will be output from the qualified channel of the discharge station; If it is not up to standard, it will be output from the non-compliance channel of the discharge station; S11, Discharge: The robotic arm, based on the front-end detection results, moves the battery pack water connector from the conveying device to the corresponding discharge channel and outputs it.
[0051] The automatic assembly system provided by this invention ensures the assembly accuracy and quality of each component through precise process control and automated testing, significantly improving production efficiency and product consistency, and further enhancing the market competitiveness of battery pack water connectors. Attached Figure Description
[0052] Figure 1 This is a schematic diagram of the battery pack water connector assembly system of the present invention; Figure 2 This is a schematic diagram of the installation of the bidirectional floating detection device of the present invention within the assembly system; Figure 3 This is a schematic diagram of the bidirectional floating detection device of the present invention; Figure 4 This is a schematic diagram of the floating detection mechanism of the bidirectional floating detection device of the present invention; Figure 5 This is a top view of the floating detection mechanism of the bidirectional floating detection device of the present invention; Figure 6 This is a cross-sectional view of the floating detection mechanism of the bidirectional floating detection device of the present invention; Figure 7 This is a schematic diagram of the valve core expansion device of the present invention; Figure 8 This is a schematic diagram of the installation of the material feeding assembly of the valve core expansion device of the present invention; Figure 9 This is a cross-sectional view of the material feeding assembly of the valve core expansion device of the present invention; Figure 10 This is a schematic diagram showing the placement of the valve body in the valve core expansion device of the present invention; Figure 11 This is a schematic diagram of the material handling robot of the valve core expansion device of the present invention; Figure 12 This is a schematic diagram of the elastic pressure rod of the valve core expansion device of the present invention; Figure 13 This is a schematic diagram of the structure of the connector and pipe fitting assembly device of the present invention; Figure 14 This is a schematic diagram of the material distribution mechanism of the pipe fitting assembly device of the present invention; Figure 15 This is a schematic diagram of the installation of the slide of the pipe fitting assembly device of the present invention; Figure 16 This is a schematic diagram of the material transfer mechanism of the pipe fitting assembly device of the present invention; Figure 17 This is a schematic diagram of the gripper structure of the pipe fitting assembly device of the present invention; Figure 18 This is a schematic diagram of the positioning component of the Z-axis detection device of the present invention; Figure 19 This is a schematic diagram of the fixture in this invention; In the diagram: 2-Riveting device, 3-Bidirectional floating detection device, 31-Material handling robot I, 32-Bar scanner, 33-Floating detection mechanism, 331-Mounting base I, 332-Detection fixture, 3320-Allowing groove, 3321-Positioning column, 333-Pushing assembly, 333a-First pushing assembly, 333b-Second pushing assembly, 333c-Third pushing assembly, 333d-Fourth pushing assembly, 3331-Push block, 334-Detection sensor, 334a-First detection sensor, 334b-Second detection sensor, 334c-Third detection sensor, 334d-Fourth detection sensor 4-Assembly table, 5-Valve core reaming device, 51-Material placement assembly, 511-Mounting base II, 512-Rotating seat, 513-Support column, 5131-Riveting pad, 514-Drive device, 52-Clamping assembly, 521-Clamping cylinder I, 522-Clamping block, 53-Damaging mechanism, 531-Riveting head, 54-Transfer manipulator II, 541-Main horizontal slide, 5411-First cylinder I, 542-Vertical slide, 5421-Second cylinder, 543-Clamping cylinder, 544-Gripper, 5441-Pressure rod hole, 545-Pressure rod fixing seat, 546-Elastic pressure rod, 56-Detection sensor Sensor II, 6-Pipe fitting assembly device, 61-Discharge mechanism, 63-Distribution mechanism, 631-Distribution seat, 6310-Distribution trough, 632-First cylinder II, 6321-Limit seat, 633-Second cylinder, 6331-Slide, 634-Limit block, 64-Transfer mechanism, 642-Horizontal slide, 643-Lifting slide, 644-Rotary cylinder, 645-Clamping cylinder II, 6451-Inner gripper, 6452-Outer gripper, 65-Pre-compression mechanism, 651-Pre-compression cylinder, 652-Pressure block, 7-Z-axis detection device, 71-Lifting seat, 72-First lifting cylinder, 73-Positioning Support plate, 74-Second lifting cylinder, 75-Valve body support column, 8-Clamping device, 9-Jig, 92-First material placement hole, 922-Floating seat receiving hole, 920-Valve body hole, 921-Claw groove, 93-Second material placement hole; op10-Base plate loading station, op20-Riveting station, op30-Vision inspection station, op40-Floating inspection station, op50-Manual loading station, op60-Valve core hole enlargement station, op70-Manual assembly station, op80-Pipe fitting assembly station, op90-Clamping station, op100-Z-axis inspection station, op110-Discharge station. Detailed Implementation
[0053] The embodiments of the present invention will now be described in detail with reference to the accompanying drawings.
[0054] See Figures 1-19The present invention also provides an assembly system for assembling battery pack water connectors, which includes a conveying device. The conveying path of the conveying device is provided with a base plate loading station op10, a riveting station op20, a vision inspection station op30, a floating inspection station op40, a manual loading station op50, a valve core hole enlarging station op60, a manual assembly station op70, a pipe connector assembly station op80, a pressing station op90, a Z-axis inspection station op100, and a discharge station op110. The base plate is manually loaded at the OP10 loading station.
[0055] The riveting station op20 is equipped with a riveting device 2, which includes a servo riveting machine. The servo riveting machine is used to flare the end of the sleeve on the floating seat on the base plate of the station to form a first stop.
[0056] The visual inspection station OP30 is used to inspect the outward expansion dimension of the first stop part through a visual inspection device, thereby determining whether its outward expansion dimension is qualified and deciding whether to proceed to the next process; if it is qualified, the downstream process is executed normally; if it is not qualified, the downstream process is not executed until the material is discharged.
[0057] The floating detection station op40 detects the horizontal floating property of the base plate through the bidirectional floating detection device 3. Specifically, it is used to fix each floating seat and then detect the horizontal floating amount of the base plate. It includes a pushing mechanism for pushing the base plate to move horizontally in the X-axis and Y-axis directions. The horizontal floating detection includes X-axis detection and Y-axis detection.
[0058] In order to facilitate system layout, improve overall structural compactness, and shorten the total length of the system and conveying device, this application provides a robotic arm to move the base plate on the workstation to the inspection platform on one side of the conveying device, and then move it back to the workstation after the inspection is completed.
[0059] The manual loading station op50 is used for manual assembly and loading of valve bodies, that is, after assembly, the valve body is manually placed into the second loading hole 93 on the jig 9 of the conveying device at this station.
[0060] The valve core reaming station op60 uses the valve core reaming device 5 to ream the hole. This mainly involves using a servo riveting machine to ream the blind hole at the end of the rod on the valve body, thereby forming the second stop.
[0061] The manual assembly station op70 involves manually assembling the valve body onto the base plate. To facilitate system layout, improve overall structural compactness, and shorten the total length of the system and conveying device, this application includes an assembly platform 4 on the manual assembly station op70. This assembly platform 4 is located on one side of the conveying device. Between the assembly platform 4 and the conveying device, there is a robotic arm, a discharge conveyor belt, and a feed slide. The robotic arm can move the valve body and base plate from the conveying device onto the discharge conveyor belt and transport them towards the assembly platform 4. Simultaneously, it can also... The assembled base plate and valve body are moved to the fixture of the conveying device. The feeding slide is used to move the assembled base plate and valve body to the material picking path of the robotic arm. The worker picks up the material (valve body and base plate) from the discharge conveyor belt and assembles it on the assembly table 4. After assembly, it is placed on the feeding slide and conveyed to the direction of the robotic arm to realize the robotic arm picking up the material. In order to improve safety, a partition net is installed between the feeding and discharging ends of the conveyor belt and between the feeding and discharging ends of the feeding slide to avoid collisions with the robotic arm during the material picking process and to prevent safety hazards.
[0062] At the piping connector assembly station OP80, the piping connector is assembled onto the valve body by the piping connector assembly device 6 and pre-pressurized for fixation.
[0063] At the clamping station op90, the clamping device 8, in this embodiment, uses a servo press to clamp the pipe fitting to the valve body at a preset pressure value, achieving precise clamping and avoiding excessive looseness or tightness that could affect product quality and service life.
[0064] The Z-axis inspection station op100 uses the Z-axis inspection device 7 to detect the vertical floating amount of the base plate, i.e., the Z-axis floating amount. Its core is a fixed floating seat to detect the vertical floating amount of the base plate, including a pushing mechanism for pushing the base plate to move in the Z-axis direction. The discharge station OP110, including a robotic arm and a conveyor belt, is used to remove the battery pack water connector at the end of the conveying device. The discharge station OP110 has two discharge channels: a qualified discharge channel and an unqualified discharge channel. The qualified discharge channel is used for qualified products, and the unqualified discharge channel is used for unqualified products.
[0065] To facilitate product quality traceability, in this embodiment, barcode scanners are installed at each of the above workstations for scanning codes for traceability.
[0066] The Z-axis inspection station is equipped with a Z-axis inspection device 7 for detecting the vertical float of the base plate. It includes a positioning mechanism for radially positioning the fixture 9 at the station, a first support assembly for upwardly supporting the fixture 9 at the station, a second support assembly for inserting a valve body and upwardly supporting the valve body, a vertical pushing mechanism for pushing the base plate downwards, and a Z-axis inspection device for detecting the downward pressure of the base plate; for details, see [link to relevant documentation]. Figure 18The Z-axis detection device 7 includes a lifting seat 71 located directly below the workstation and a first lifting cylinder 72 for driving the lifting seat 71 to move vertically. The top of the lifting seat 71 is provided with a positioning support plate 73, the upper surface of which serves as a support surface for contacting the bottom surface of the fixture 9 to provide support. Several positioning pins are provided on the support surface, and positioning holes corresponding to the positioning pins are provided on the bottom surface of the fixture. The lifting seat 71 is provided with a second lifting cylinder 74, and the upper output end of the second lifting cylinder 74 is provided with a valve body support column 75, which can pass upward through the positioning support plate 73 and be inserted into the valve body on the fixture to support the valve body during detection.
[0067] The fixture structure of this application is referenced. Figure 19 The entire structure is a rectangular plate, which is located on the conveying device and conveys materials from one station to the next, and finally returns them for reuse. Specifically, the fixture 9 is provided with a first material placement hole 92 for placing the base plate and a second material placement hole 93 for placing the valve body. The bottom surface of the first material placement hole 92 is provided with a floating seat receiving hole 922 for accommodating the floating seat and a valve body hole 920 for accommodating the valve body. At the same time, the side wall of the first material placement hole 92 is provided with a gripper groove 921 for accommodating the gripper to extend in and grasp.
[0068] The following is a detailed explanation.
[0069] See Figures 2-6 The bidirectional floating detection device 3 is used to perform floating detection on the base plate of the battery pack water connector. Specifically, it is used to detect the relative horizontal movement (floating) between the floating seat on the base plate and the base plate body, and then to determine whether the base plate is qualified. The design requirement for this floating amount is 4mm or more.
[0070] The floating detection device includes a floating detection mechanism 33, which is used to perform detection, that is, to accurately measure the relative horizontal movement (floating) between the floating seat of the base plate and the base plate body.
[0071] The floating detection mechanism 33 includes a mounting base I 331, which serves as the mounting carrier for the floating detection mechanism and is used to install it into the battery pack water connector assembly system. A detection fixture 332, a pushing assembly 333, and a detection sensor 334 are mounted on the mounting base I 331. The detection fixture 332 is used to place the base plate of the battery pack water connector to be tested for accurate detection. The pushing assembly 333 is used to push the base plate radially (horizontally in this application) to generate a floating amount. The detection sensor 334 is used to detect the floating amount of the base plate and, by comparing it with a preset standard value, determine whether the base plate meets the floating requirements.
[0072] The testing fixture 332 is fixed on the mounting base I 331. In this application, it is positioned near the center of the mounting base I 331. The testing fixture 332 is a cuboid structure, and its length and width are basically the same as the base plate. The top surface of the testing fixture 332 is a horizontal plane, which serves as the placement surface for placing the base plate of the battery pack water connector. A positioning post 3321 is vertically arranged on the placement surface. The positioning post 3321 corresponds one-to-one with the sleeve hole on the base plate. In this application, the positioning post 3321 is cylindrical, and its diameter is the same as the diameter of the sleeve hole. In practice, in order to facilitate the placement of the base plate, the diameter of the positioning post 3321 is slightly smaller than the diameter of the sleeve hole.
[0073] In this embodiment, there are four positioning posts 3321, which correspond to the four sleeve holes on the base plate. The positioning posts 3321 can be inserted into the sleeve holes on the base plate to achieve radial limiting of the base plate, that is, horizontal limiting. More precisely, it limits the floating seat on the base plate. Since there is an elastic element between the floating seat and the base plate body, the base plate body can move under the action of external force relative to the floating seat. This application aims to detect the horizontal offset of the base plate body, that is, the horizontal floating amount.
[0074] Due to the slight difference between the outer diameter of the positioning post 3321 and the inner diameter of the sleeve hole, in order to improve the placement efficiency of the base plate during inspection, this application provides a chamfer or rounded corner at the upper end of the positioning post 3321, which can guide the sleeve hole on the base plate to slide smoothly into the positioning post 3321, reduce jamming, and improve the smoothness of inspection.
[0075] A clearance groove 3320 is provided in the center of the inspection fixture 332, which is used to accommodate the protruding part at the lower end of the base plate and provide horizontal displacement space for the protruding part; it can ensure the stability of the base plate on the inspection fixture 332, avoid contact and friction between the base plate body and the placement surface, and improve inspection efficiency and accuracy.
[0076] The pushing component 333 is horizontally positioned with its pushing end facing the detection fixture 332. It is used to push the bottom plate on the detection fixture 332 to move radially, i.e., horizontally. Specifically, the pushing direction of the pushing component 333 is parallel to the length or width direction of the bottom plate. In this application, there are multiple pushing components 333, preferably four, which are respectively arranged on the left and right sides and the front and rear ends of the detection fixture 332. The pushing components 333 at different positions can be used to push the bottom plate on the placement surface from different directions, thereby causing the bottom plate to float radially in different directions. In this application, through the four pushing components 333, horizontal pushing force can be applied to the bottom plate from the front end, rear end, left side and right side respectively, thereby realizing multi-directional horizontal displacement detection and ensuring that the horizontal floating amount of the bottom plate under different force conditions can be accurately measured.
[0077] In order to improve the smoothness of pushing the base plate and prevent it from deflecting, in this application, the contact point between the pusher assembly 333 and the base plate is located on the vertical plane of the base plate, that is, at the center of the side wall of the base plate; it can make the base plate translate, avoid angular deflection, and thus improve the detection accuracy.
[0078] In this application, the pusher assembly 333 includes a horizontally arranged cylinder, and a pusher block 3331 is provided at the output end of the cylinder. The pusher block 3331 is used to contact the side wall of the base plate, and the movement of the pusher block 3331 is controlled by the extension and retraction of the cylinder to apply a pushing force to the base plate. In order to avoid rigid contact, the contact surface of the pusher block 3331 is usually made of soft material, such as rubber, silicone or plastic, to reduce wear on the base plate.
[0079] The detection end of the detection sensor 334 faces the detection fixture 332. It is used to measure the radial floating amount of the base plate on the detection fixture 332. There are multiple detection sensors 334, preferably four, which are respectively arranged on the left and right sides and the front and rear ends of the detection fixture 332 to detect the floating amount of the base plate in the front, back, left, and right directions, thereby realizing multi-directional detection of the base plate. In this application, the detection sensor 334 is a laser displacement sensor, and its detection direction is perpendicular to the side wall surface of the base plate. It can accurately capture the subtle displacement changes of the base plate under the action of horizontal thrust, ensuring the real-time performance and accuracy of the data, thereby comprehensively improving the overall performance of the detection system.
[0080] To improve detection accuracy and consistency, in this application, the detection end of the detection sensor 334 faces the position of the positioning post 3321. At the same time, the detection ends of each detection sensor 334 face different positioning posts 3321, thereby improving the detection of the floating amount (offset) in various directions. Through this multi-dimensional detection mechanism, the stability of the base plate under different working conditions can be comprehensively evaluated, and the detection effect is good.
[0081] The specific configuration of the feeding assembly 333 and the detection sensor 334 in this application is described below.
[0082] The feeding assembly 333 includes a first feeding assembly 333a, a second feeding assembly 333b, a third feeding assembly 333c, and a fourth feeding assembly 333d. The first feeding assembly 333a is located on the left side of the detection fixture 332, with its feeding end (output end) facing the detection fixture 332 and parallel to the length direction of the base plate. The first feeding assembly 333a is located at the center of the base plate. The second feeding assembly 333b is located on the right side of the detection fixture 332, with its feeding end (output end) facing the detection fixture 332 and parallel to the length direction of the base plate. The second feeding assembly 333b is located at the center of the base plate. The third feeding assembly 333c... The first pusher assembly 333a, the second pusher assembly 333b, the third pusher assembly 333c, and the fourth pusher assembly 333d are respectively used to push the base plate to shift in four directions, thereby accurately measuring the floating amount in different directions. The first pusher assembly 333a, the second pusher assembly 333b, the third pusher assembly 333c, and the fourth pusher assembly 333d are respectively used to push the base plate to shift in four directions, thereby accurately measuring the floating amount in different directions.
[0083] The detection sensors 334 include a first detection sensor 334a, a second detection sensor 334b, a third detection sensor 334c, and a fourth detection sensor 334d. The first detection sensor 334a is located on the left side of the detection fixture 332, the second detection sensor 334b is located on the right side of the detection fixture 332, the third detection sensor 334c is located at the front end of the detection fixture, and the fourth detection sensor 334d is located at the rear end of the detection fixture.
[0084] In this application, the first detection sensor 334a faces the positioning post 3321 at the left rear end, the second detection sensor 334b faces the positioning post 3321 at the right front end, the third detection sensor 334c faces the positioning post 3321 at the left front end, and the fourth detection sensor 334d faces the positioning post 3321 at the right rear end. For ease of explanation, in this embodiment, the positioning post 3321 at the left rear end is referred to as the first positioning post 3321a, the positioning post 3321 at the right front end is referred to as the second positioning post 3321b, the positioning post 3321 at the left front end is referred to as the third positioning post 3321c, and the positioning post 3321 at the right rear end is referred to as the fourth positioning post 3321d. The fourth positioning post 3321d has a first detection sensor 334a located near the first positioning post 3321a and facing the first positioning post 3321a; a second detection sensor 334b located near the second positioning post 3321b and facing the second positioning post 3321b; a third detection sensor 334c located near the third positioning post 3321c and facing the third positioning post 3321c; and a fourth positioning post 3321d located near the first positioning post 3321a and facing the fourth positioning post 3321d. It can detect the offset in different directions and positions, and the detection is comprehensive and accurate.
[0085] To improve automation and adapt it to the assembly system, the floating detection device in this application also includes a material transfer robot I31, which is used to transfer the base plate between the jig 9 of the conveying device and the detection jig 332, so as to realize automatic loading and unloading of the detection and improve the degree of automation.
[0086] To improve product quality monitoring, especially for later traceability, the floating detection device in this application also includes a barcode scanner 32, which is used to scan and record the base plate for later traceability.
[0087] This bidirectional floating detection device employs multiple pushing components and multiple detection sensors working in tandem to detect the floating amount of the base plate in all directions, improving product quality. The detection device faces each positioning column to ensure the consistency and reliability of the detection data, reduce the error rate, and enhance product competitiveness. A material handling robot is included to achieve automatic loading and unloading during detection, improving the level of automation. A barcode scanner is equipped for data recording, facilitating later traceability and providing strong support for improving product quality and subsequent maintenance.
[0088] See Figures 7-12 The valve core expansion device 5 includes a feeding assembly 51, a clamping assembly 52, and an expansion mechanism 53.
[0089] The material placement assembly 51 is used to place the valve body to be enlarged, the clamping assembly 52 is used to fix the valve body to ensure that the valve body will not move during the enlargement process, and the enlargement mechanism 53 is used to enlarge the hole at the upper end of the valve core, so that the edge of the hole deforms outward to form a stop. The stop is used to limit the nut outside the valve core to prevent the nut from loosening and improve the fixing reliability of the nut.
[0090] Specifically, the material placement assembly 51 is used to place the valve body of the battery pack water connector. The material placement assembly 51 includes a support column 513, which corresponds one-to-one with the valve hole on the valve body. The support column 513 is cylindrical, and its axis is perpendicular to the horizontal plane. The support column 513 can accommodate the valve hole, thereby realizing the limiting installation of the valve body. At the same time, the top of the support column 513 can contact the lower end of the valve core in the valve hole, thereby supporting the valve core and providing support force for the riveting of the upper end of the valve core.
[0091] During the reaming process, the top of the support column 513 contacts the lower end of the valve core and forms pressure. Over time, this will cause wear on the top surface of the support column 513, affecting the support accuracy and stability, reducing the reaming accuracy, and affecting product quality. Therefore, in this embodiment, a rivet pressure pad 5131 is provided on the top surface of the support column 513. The rivet pressure pad 5131 is used to contact the lower end of the valve core and is detachably installed on the top of the support column 513 by bolts. Specifically, the top surface of the support column 513 is concave to form a circular mounting hole, and the rivet pressure pad 5131 is disposed in the mounting hole. The top surface of the rivet pad 5131 forms a support surface for contacting the lower end of the valve core. A countersunk hole is provided in the center of the rivet pad 5131 for fixed connection with the support column 513 by bolts. Through the above structural settings, the rivet pad 5131 can be replaced periodically to maintain the support accuracy. The material of the rivet pad 5131 can be hard alloy, which has good wear resistance, thereby extending the service life of the support column 513 and ensuring the accuracy of the hole enlargement operation. This design not only improves work efficiency but also reduces maintenance costs, further improving the overall quality of the product.
[0092] The clamping assembly 52 is used to fix the valve body and includes clamping cylinders I 521 symmetrically arranged on both sides of the feeding assembly 51. The clamping cylinders I 521 are arranged horizontally, that is, the output shaft of the clamping cylinders I 521 is perpendicular to the axis of the support column 513. A clamping block 522 is provided at the output end of the clamping cylinders I 521. The clamping block 522 is used to clamp the valve body. A V-shaped or U-shaped groove is provided on the clamping surface of the clamping block 522 for clamping the cylinder of the valve body.
[0093] The hole-expanding mechanism 53 is used for hole expansion (riveting). It includes a riveting machine located directly above the material feeding assembly 51 and a riveting head 531 located at the output end of the riveting machine and coaxial with the support column 513. The riveting head 531 can be inserted into the hole at the top of the valve core and deform the open edge of the hole outward to form a stop for limiting the nut outside the valve core.
[0094] To improve the hole enlargement (riveting) effect and accuracy, and to avoid the impact on hole enlargement accuracy caused by using multiple riveting heads 531, the material placement assembly 51 in this application further includes a rotating seat 512. This rotating seat 512 is rotatable, and its rotation axis is perpendicular to the horizontal plane, i.e., parallel to the axis of the support column 513. Simultaneously, a driving device 514 is provided at the lower end of the rotating seat 512 to drive the rotating seat 512 to rotate. The aforementioned riveting head 531 is singular, and this riveting head 531 is located on the support column 513. On the rotation path, the distance between each support column 513 and the rotation axis of the rotating seat 512 is equal. By rotating the rotating seat 512, the support columns 513 on the rotating seat 512 can move sequentially to the direct below the riveting head 531 and coaxial with the riveting head 531, thereby sequentially enlarging the top of each valve core. This avoids the errors caused by using multiple riveting heads 531 and ensures the consistency and accuracy of each enlarging operation. In this way, not only is production efficiency improved, but the quality stability of the product is also guaranteed.
[0095] In this application, there are two sets of valve holes and valve cores. Therefore, there are two support columns 513, which are evenly distributed around the axis of the rotating seat 512. The rotating seat 512 is driven to rotate by the driving device 514, which can bring the two support columns 513 (valve cores) directly below the riveting head 531 in sequence for hole enlargement (riveting).
[0096] The aforementioned riveting head 531 includes a cylindrical body that can be inserted into the hole at the upper end of the valve core. The upper end of the cylindrical body extends outward in an arc shape to form a conical structure. The diameter of the conical structure is larger than the diameter of the hole. Therefore, during the insertion of the riveting head 531, the edge of the open end of the hole can be squeezed outward and deformed to form a stop. The stop contacts the end of the nut to limit the nut outside the valve core, prevent it from loosening, and ensure the long-term stable operation of the valve body.
[0097] In this embodiment, the driving device 514 is a rotary cylinder that can rotate 180 degrees, so that the two support columns 513 can move sequentially to the lower end of the riveting head 531 and perform hole enlargement operations in sequence. It has high operating accuracy. By using a single riveting head 531 for operation, it can ensure the accuracy and consistency of hole enlargement operations, and guarantee the reliability and stability of product quality.
[0098] For ease of assembly, this application also includes a mounting base II 511, which is a plate-shaped structure. The material placement assembly 51 and the clamping assembly 52 are disposed on the upper surface of the mounting base II 511, and the driving device 514 is disposed at the lower end of the mounting base II 511.
[0099] To achieve automated loading and unloading and adapt it to the entire assembly system, this application also includes a material transfer robot II 54. The material transfer robot II 54 is used to transfer the valve body between the jig 9 of the conveying device and the material placement assembly 51. That is, it is used to move the valve body to be enlarged from the jig 9 of the conveying device to the support column 513 of the material placement assembly 51, or to move the valve body that has completed the enlargement operation from the material placement assembly 51 to the jig 9 of the conveying device, so as to enter the next process.
[0100] The material handling robot II 54 includes a clamping assembly, which includes grippers 544 for clamping the valve body and an elastic pressure rod 546 disposed between the two grippers 544. The elastic pressure rod 546 can elastically extend and retract, and the extension and retraction direction of the elastic pressure rod 546 is parallel to the axis of the support column 513. The end of the elastic pressure rod 546 can contact the upper end of the valve body, thereby causing the valve body to have a downward movement tendency, realizing reliable material release, especially improving the accuracy of placing the valve body on the placement assembly 51. That is, during placement, it can push the valve body downward and make the valve hole completely fit into the support column 513, improving the placement accuracy, thereby ensuring the hole expansion accuracy, avoiding errors in hole expansion accuracy caused by improper installation, and even preventing riveting operations. It provides a guarantee for the stable progress of hole expansion.
[0101] Specifically, the material handling robot II 54 includes a main horizontal slide 541 horizontally slidably mounted between the conveying device and the material placement assembly 51, a vertical slide 542 vertically slidably mounted on the main horizontal slide 541, a secondary horizontal slide horizontally slidably mounted on the vertical slide 542, and a clamping assembly mounted on the secondary horizontal slide. It is equipped with a first cylinder 5411 for driving the main horizontal slide 541 to slide horizontally, a second cylinder 5421 for driving the vertical slide 542 to rise and fall vertically, and a third cylinder for driving the secondary horizontal slide to slide horizontally. The sliding direction of the secondary horizontal slide is parallel to the sliding direction of the main horizontal slide 541, which increases the stroke of the clamping assembly, reduces the installation space of the main horizontal slide's track, and effectively controls the installation space of the entire assembly system. The clamping assembly includes a vertically arranged clamping cylinder 543, which is a hand... The pneumatic finger is equipped with grippers 544 at both output ends of the clamping cylinder 543 for clamping and grasping the valve body. Each gripper 544 includes a horizontally arranged clamping plate with grooves corresponding to the side wall of the valve body for gripping the valve body cylinder. A pressure rod hole 5441 for a flexible pressure rod 546 to pass through is located in the center of the clamping plate. A pressure rod fixing seat 545 is located on the side wall of the clamping cylinder 543 between the two grippers 544. A pressure rod and a spring with a downward tendency to move are vertically slidably mounted on the pressure rod fixing seat 545. The pressure rod and spring form a flexible pressure rod 546. A pressure block is provided at the lower end of the flexible pressure rod 546, which can contact the top of the valve body to push the valve body downwards during material release, thereby ensuring that the valve body can be accurately placed into the target position, improving the release accuracy and reliability.
[0102] This application also includes a detection sensor II 56, which is tilted and faces the feeding assembly 51. It is used to detect the sealing ring on the valve body of the feeding assembly 51, and to determine whether the sealing ring is installed on the valve body, so as to avoid missing the sealing ring and cause product defects, and to ensure the quality of automatically assembled products.
[0103] This valve core reaming device features support columns and clamping components, enabling dual fixation of the valve body, improving fixation accuracy and stability, and ensuring precise reaming. The support column structure accommodates the valve hole, providing radial restraint to the valve body. Simultaneously, it contacts the end of the valve core, providing effective support and preventing pressure transfer to the valve body during reaming, thus avoiding deformation and ensuring reaming accuracy and product quality. The rotating structure allows the support columns on the rotating base to move sequentially to directly below the riveting head, allowing for sequential reaming of the top of each valve core. This avoids errors associated with using multiple riveting heads, ensuring consistency in each reaming operation. The precision and accuracy of the valve body not only improve production efficiency but also ensure product quality stability. The robotic transfer arm enables automatic loading and unloading of valve bodies, facilitating system integration, reducing manual operation, lowering labor intensity, and further optimizing the production process. An elastic pressure bar on the robotic transfer arm pushes the valve body downwards during unloading, ensuring the valve hole is fully fitted into the support column, improving placement accuracy and ensuring hole enlargement accuracy. This prevents errors caused by improper installation and guarantees stable hole enlargement. The installation of detection sensors monitors the sealing ring's installation status in real time, ensuring correct assembly, improving overall product reliability, and achieving a highly efficient and precise automated production process.
[0104] See Figures 13-17 The pipe fitting assembly device 6 is used to automatically assemble the pipe fitting into the valve body of the battery pack water connector and perform pre-pressure fixation to provide a stable foundation for the subsequent pressing process.
[0105] The battery pack water connector piping assembly device includes a discharge mechanism 61, a distribution mechanism 63, a transfer mechanism 64, and a pre-compression mechanism 65.
[0106] The discharge mechanism 61 is used for discharging pipe fittings. It includes a vibrating plate and a conveying track. The vibrating plate sends the pipe fittings one by one to the conveying track, ensuring that the pipe fittings are arranged in an orderly manner and smoothly enter the distribution mechanism 63. When discharging, the pipe fittings are horizontal, and their length direction is parallel to the discharge direction of the discharge mechanism 61, that is, perpendicular to the sliding direction of the distribution seat 631. The pipe body of the pipe fitting faces away from the end of the discharge mechanism 61, and the fitting faces upward.
[0107] The material distribution mechanism 63 is located at the discharge end of the discharge mechanism 61 and is used for distributing pipe fittings. The material distribution mechanism 63 includes a material distribution seat 631, which can slide horizontally in a direction perpendicular to the discharge direction of the discharge mechanism 61. The material distribution seat 631 can move between a first position and a second position. The first position is used to dock with the discharge mechanism 61, and the material distribution seat 631 in the second position is located on the movement path of the transfer mechanism 64 and is used to dock with the transfer mechanism 64 to ensure accurate transfer of pipe fittings.
[0108] A material distribution groove 6310 is provided on the material distribution seat 631. The shape of the material distribution groove 6310 matches the pipe fitting. It is open at one end facing the discharge mechanism 61 to allow the pipe fitting at the discharge end of the discharge mechanism 61 to enter. The end of the material distribution groove 6310 facing away from the discharge mechanism 61 is provided with a gripper groove to allow the gripper on the material transfer mechanism 64 to pass through and clamp the material. The upper end of the material distribution groove 6310 is open to allow the pipe fitting to be taken out of the material distribution groove 6310 upwards. When in the first position, the material distribution groove 6310 on the material distribution seat 631 can be connected with the discharge end of the discharge mechanism 61, so that the pipe fitting at the discharge end of the discharge mechanism 61 can enter the material distribution groove 6310.
[0109] There are multiple material distribution troughs 6310, which are the same number as the pipe joints on the battery pack water connector, and the multiple material distribution troughs 6310 are arranged sequentially along the sliding direction of the material distribution seat 631; in this embodiment, there are two pipe joints on the battery pack water connector, therefore, there are also two material distribution troughs 6310.
[0110] To improve the accuracy and efficiency of material distribution, the material distribution mechanism 63 in this application further includes a horizontally sliding limiting seat 6321 and a sliding seat 6331. The limiting seat 6321 and the sliding seat 6331 are located on the same sliding path, specifically on the same slide rail, and their sliding direction is perpendicular to the discharge direction of the discharge mechanism 61. The material distribution seat 631 is installed on the sliding seat 6331. In this embodiment, the material distribution seat 631 is fixed on the top of the sliding seat 6331. The limiting seat 6321 can move between the third position and the fourth position, and the sliding seat 6331 can abut against the limiting seat 6321 at the third position and the fourth position, thereby enabling the two material distribution troughs 6310 to connect with the discharge end of the discharge mechanism 61, so as to realize the respective material supply to the two material distribution troughs 6310.
[0111] Because the cylinder has two limit positions, the requirements for the gas are extremely high when it needs to pause in the middle position. At the same time, the gas is compressible. Therefore, the cylinder cannot achieve precise positioning and stopping in the middle. It can only be achieved through a lead screw module. However, the lead screw module is expensive and bulky, requiring a large installation space, which will disrupt the rational layout of the entire assembly device.
[0112] Therefore, by setting the aforementioned limiting seat 6321, which serves as an abutment end to limit the slide 6331 (material distribution seat 631), specifically, the limiting seat 6321 has two extreme positions, namely the third position and the fourth position. The third position and the fourth position respectively correspond to the two material distribution grooves 6310 connecting with the discharge end of the discharge mechanism 61. For example, when the limiting seat 6321 is in the third position, the first material distribution groove 6310 connects with the discharge mechanism 61; when it is in the fourth position, the second... The material distribution trough 6310 is connected to ensure accurate material supply; one end of the slide 6331 serves as the abutment end and contacts the limit seat 6321, while its other limit position is the second position, which is used to connect with the material transfer mechanism 64. At this time, the material distribution trough 6310 is in the waiting state and is located on the movement path of the material transfer mechanism 64. The material transfer mechanism 64 can take material from the material distribution seat 631 and move it to the fixture 9 on the piping assembly station to realize the valve body of the battery pack water connector in the fixture 9.
[0113] The piping assembly station is a station used to assemble piping fittings on the base plate of the battery pack water connector. This station is located on the conveying device.
[0114] The material distribution mechanism 63 also includes a first cylinder 632 and a second cylinder 633. The output end of the first cylinder 632 is connected to the limiting seat 6321 and is used to drive the limiting seat 6321 to slide horizontally. The output end of the second cylinder 633 is connected to the slide 6331 and is used to drive the slide 6331 to slide horizontally. In this application, the second cylinder 633 is fixed on the limiting seat 6321, which can significantly reduce the stroke of the second cylinder 633, thereby reducing the overall length and volume of the second cylinder 633 and improving the structural compactness.
[0115] Meanwhile, limit blocks 634 are provided at the extreme positions of the limit seat 6321 and the slide 6331 to limit and prevent overtravel. Specifically, there are two limit blocks 634: one is set at the third position of the limit seat 6321 to limit the limit seat 6321 at the third position, and the other is set at the second position to limit the slide 6331 at the second position.
[0116] The material transfer mechanism 64 is used to grab and move the pipe connector. Specifically, it can move the pipe connector located on the material distribution seat 631 in the second position to the valve body of the battery pack water connector in the fixture 9 in the pipe assembly station. During the movement, the pipe connector is rotated 180 degrees so that the connector of the pipe connector changes from facing up to facing down and is aligned with the mating end of the valve body.
[0117] To improve assembly efficiency, in this application, the material transfer mechanism 64 can simultaneously grab multiple pipe joints in multiple material distribution slots 6310 and realize synchronous material transfer and assembly; In this embodiment, the material transfer mechanism 64 includes a horizontal slide 642 capable of horizontal sliding and a lifting slide 643 vertically mounted on the horizontal slide 642. The sliding direction of the horizontal slide 642 is perpendicular to the sliding direction of the material distribution seat 631. The lifting slide 643 is provided with a rotary cylinder 644 corresponding to the material distribution groove 6310. In this embodiment, there are two rotary cylinders. The rotation axis of the rotary cylinder 644 is parallel to the length direction of the material distribution groove 6310, that is, perpendicular to the moving direction of the material distribution seat 631. A clamping cylinder II 645 is provided at the output end of the rotary cylinder 644. The clamping cylinder II 645 is a finger cylinder, which is horizontally arranged and its output end faces the material distribution seat 631. A gripper is provided at the output end of the clamping cylinder II 645 for gripping pipe fittings. Specifically, the gripper includes an inner gripper 6451 and an outer gripper 6451 arranged in parallel. 452, both the inner and outer clamping jaws 6451 and 6452 are horizontally arranged, perpendicular to the sliding direction of the material distribution seat 631. The inner clamping jaw 6451 can be horizontally inserted into the pipe fitting, specifically, into the pipe body of the pipe fitting. A clamping area is formed between the inner clamping jaw 6451 and the outer clamping jaw 6452 for clamping the pipe fitting, specifically, for clamping the pipe body of the pipe fitting. When gripping material, the inner clamping jaw 6451 is inserted into the pipe body, and the outer clamping jaw 6452 is located outside the pipe body. Through the closing action of the clamping jaws, the pipe fitting is firmly clamped, ensuring stability and no shaking during the material transfer process. Furthermore, during the material transfer process, the rotary cylinder 644 rotates 180 degrees, causing the pipe fitting to change from facing upwards to facing downwards, aligning with the mating end of the valve body to ensure assembly accuracy. In this application, the sliding direction of the horizontal slide 642 is perpendicular to the sliding direction of the material distribution seat.
[0118] To improve gripping accuracy, in this application, the side wall of the inner gripper 6451 is provided with an inner clamping surface, which can fit against the inner wall of the pipe fitting, and the side wall of the outer gripper 6452 is provided with an outer clamping surface, which fits against the outer wall of the pipe fitting. This can increase the contact area, thereby improving the gripping stability and gripping accuracy, and providing support for the precise assembly of the pipe fitting.
[0119] The pre-compression mechanism 65 is located directly above the fixture 9 at the piping assembly station. It is used to pre-compress the piping connector onto the valve body, so that the piping connector is stably connected to the valve body. The pre-compression mechanism 65 includes a vertically arranged pre-compression cylinder 651 and a pressure block 652 located at the output end of the pre-compression cylinder 651. The bottom surface of the pressure block 652 is provided with a positioning groove corresponding to the piping connector, which can accommodate part of the piping connector to be inserted, thereby improving the pre-compression stability of the piping connector and preventing the piping connector from shifting or tilting during pre-compression, thus ensuring the accuracy of the assembly process.
[0120] This pipe fitting assembly device 6 can automatically grasp, move, rotate, and pre-press pipe fittings, achieving precise assembly, improving production efficiency and assembly quality. It is suitable for large-scale production lines and reduces labor costs. The device features a material distribution mechanism that automatically distributes materials, significantly improving output efficiency and avoiding interference between the material transfer mechanism and the output mechanism, thus enhancing overall structural compactness and rational layout. Multiple material distribution slots enable simultaneous output of multiple pipes, which, combined with the synchronous grasping by the material transfer mechanism, allows for simultaneous assembly of multiple pipes, greatly improving assembly efficiency, shortening the production cycle, effectively controlling the assembly consistency of pipes on the battery pack water connector, and ensuring good product quality stability. A sliding limit seat provides a backing and... Multiple limit positions significantly reduce manufacturing costs while ensuring the sliding accuracy of the slide. Placing the slide cylinder on the limit seat greatly reduces the stroke of the second cylinder, thereby reducing its overall length and volume, minimizing installation space, and improving structural compactness. A pre-compression mechanism pre-tightens the pipe fittings, ensuring a stable connection with the valve body, reducing assembly errors, facilitating subsequent precise tightening, and eliminating the need for robotic arms in subsequent tightening processes. This further optimizes the assembly process, improves automation, and reduces production costs. The insertion-type gripper structure provides high clamping stability, ensuring precise assembly and a tight fit between the fitting and the pipe fitting during assembly, reducing assembly defects caused by loosening.
[0121] In addition, the present invention also provides an assembly method, which includes the following steps: S1. Loading: The base plate is placed in the first feeding hole 92 of the fixture 9 at the feed end of the conveying device by manual or mechanical loading. S2. Riveting and expanding hole: The end of the sleeve on the floating seat of the base plate is expanded by a servo riveting machine to form the first stop part; S3. Rivet inspection: The outward expansion dimension of the first stop is detected by the vision inspection device 3, and it is determined whether the outward expansion dimension is qualified. If it passes the test, proceed to the next workstation and the next process. If the material fails to meet the requirements, all subsequent processes will not be executed until the material is output from the non-conforming channel of the discharge station op110. S4. Float detection: Fix each floating seat and detect the horizontal float of the base plate, including the bidirectional horizontal float detection of the base plate along the X and Y axes, and determine whether the float is qualified. If it passes the test, proceed to the next workstation and the next process. If the material fails to meet the requirements, all subsequent processes will not be executed until the material is output from the non-conforming channel of the discharge station op110. S5. Valve body loading: The valve body is assembled manually and placed in the second material placement hole 93 of the fixture 9 at the manual loading station op50. S6. Valve core enlargement: The blind hole at the end of the rod on the valve body is enlarged by a servo riveting machine to form a second stop. S7. Manual assembly: The valve body is assembled onto the base plate manually. S8. Pipe fitting assembly: Assemble the pipe fitting onto the valve body and pre-press it to fix it so that the pipe fitting is connected to the valve body and does not fall off. S9. Pipe clamping: The pipe fitting is clamped to the valve body by a servo press at a preset pressure value. S10 and Z-axis detection: Fix the floating seat, detect the vertical floating amount of the base plate, and determine whether the floating amount is qualified. If it passes the test, it will be output from the qualified channel of the discharge station op110; If it fails to meet the requirements, it will be output from the failure channel of the discharge station op110; S11, Discharge: The robotic arm, based on the front-end detection results, moves the battery pack water connector from the conveying device to the corresponding discharge channel and outputs it.
[0122] The automatic assembly system provided by this invention ensures the assembly accuracy and quality of each component through precise process control and automated testing, significantly improving production efficiency and product consistency, and further enhancing the market competitiveness of battery pack water connectors.
[0123] The above description is only a preferred embodiment of the present invention. It should be noted that for those skilled in the art, several improvements and modifications can be made without departing from the technical principles of the present invention, and these improvements and modifications should also be considered within the scope of protection of the present invention.
Claims
1. A battery pack water connector assembly system, characterized in that: Includes a conveying device, and the conveying path of the conveying device is provided with the following in sequence: The riveting station is used to flare the end of the sleeve on the floating seat on the base plate of the battery pack water connector using a servo riveting machine to form the first stop. A vision inspection station is used to inspect the outward expansion dimension of the first stop portion using a vision inspection device; A floating detection station is used to fix each of the floating seats and detect the horizontal floating amount of the base plate; The manual loading station is used for manually assembling and loading valve bodies; The valve core reaming station is used to ream the blind hole at the end of the rod on the valve body using a servo riveting machine to form a second stop. The manual assembly station involves manually assembling the valve body onto the base plate. The piping fitting assembly station is used to assemble the piping fittings onto the valve body and pre-pressurize and fix them. The clamping station is used to clamp the pipe fittings onto the valve body using a servo press and at a preset pressure value. The Z-axis detection station is used to fix the floating seat and detect the vertical floating amount of the base plate, including a pushing mechanism for pushing the base plate to move in the Z-axis direction; The discharge station is used for discharging the battery pack water connectors; The floating inspection station is equipped with a bidirectional floating inspection device, which includes a floating inspection mechanism. The floating inspection mechanism includes: Mounting base I serves as the mounting carrier; The testing fixture is fixed on the mounting base I. The top surface of the testing fixture serves as a placement surface and is used to place the base plate of the battery pack water connector. A positioning post corresponding to the sleeve hole on the base plate is vertically arranged on the placement surface. The positioning post can be inserted into the sleeve hole on the base plate and achieve radial limitation of the base plate. It also limits the floating seat on the base plate. Since there is an elastic element between the floating seat and the base plate body, the base plate body can move under the action of external force relative to the floating seat. The end of the positioning post is provided with a chamfer or rounded corner. A pushing assembly is fixed on the mounting base I. The pushing end of the pushing assembly faces the testing fixture and is used to push the base plate on the testing fixture to move radially. There are multiple pushing assemblies, which are respectively arranged on the left and right sides and the front and rear ends of the testing fixture. They are used to push the base plate on the placement surface from different directions and make the base plate float radially in different directions. The pushing assembly includes a cylinder and a pushing block arranged at the output end of the cylinder. The pushing direction of the pushing assembly is parallel to the length direction or width direction of the base plate. The contact point between the pushing assembly and the base plate is located on the vertical plane of the base plate. A detection sensor, the detection end of which faces the detection fixture, is used to detect the radial floating amount of the base plate on the detection fixture. There are multiple detection sensors, which are respectively arranged on the left and right sides and the front and rear ends of the detection fixture. The detection ends of each detection sensor face different positioning columns. The valve core reaming station is equipped with a valve core reaming device, which includes: A material placement assembly for placing the valve body of the battery pack water connector, the material placement assembly including a support column corresponding to the valve hole on the valve body, the support column being able to accommodate the valve hole and limit the valve body, the top of the support column contacting the lower end of the valve core inside the valve hole and supporting the valve core. The clamping assembly includes clamping cylinders I disposed on both sides of the material placement assembly and clamping blocks disposed at the output end of the clamping cylinders I for clamping the valve body; The hole-expanding mechanism includes a riveting press located directly above the feeding assembly and a riveting head located at the output end of the riveting press and coaxial with the support column. The riveting head can be inserted into the hole at the top of the valve core and deform the open edge of the hole outward to form a stop for limiting the nut outside the valve core. The material placement assembly also includes a rotating seat and a driving device for driving the rotating seat to rotate. The rotation axis of the rotating seat is parallel to the axis of the support column, and the riveting head is located on the rotation path of the support column. There are two support columns, which are evenly distributed around the axis of the rotating seat.
2. The battery pack water connector assembly system as described in claim 1, characterized in that: The manual assembly station is equipped with an assembly table located on one side of the conveying device. Between the assembly table and the conveying device, there is a robotic arm, a discharge conveyor belt, and a feeding slide. The robotic arm can move the valve body and base plate on the conveying device to the discharge conveyor belt and transport them to the assembly table, or move the assembled base plate and valve body to the fixture of the conveying device. The feeding slide is used to move the assembled base plate and valve body to the material picking path of the robotic arm.
3. The battery pack water connector assembly system as described in claim 1, characterized in that: Each workstation is equipped with a barcode scanner for scanning codes for traceability.
4. The battery pack water connector assembly system as described in claim 1, characterized in that: The conveying device is equipped with a fixture, which has a first material placement hole for placing the base plate and a second material placement hole for placing the valve body. The bottom surface of the first material placement hole has a floating seat receiving hole for accommodating the floating seat and a valve body hole for accommodating the valve body to pass through. The side wall of the first material placement hole has a gripper groove for accommodating the gripper to extend in and grasp.
5. The battery pack water connector assembly system as described in claim 1, characterized in that: The Z-axis detection station is equipped with a Z-axis detection device, which includes a lifting seat located directly below the station and a first lifting cylinder for driving the lifting seat to move vertically. The top of the lifting seat is equipped with a positioning support plate, the upper surface of which serves as a support surface and is used to contact and support the fixture. Several positioning pins are provided on the support surface, and the bottom surface of the fixture is equipped with positioning holes corresponding to the positioning pins. The lifting seat is equipped with a second lifting cylinder, and the upper output end of the second lifting cylinder is equipped with a valve body support column that can pass upward through the positioning support plate and be inserted into the valve body on the fixture.
6. The battery pack water connector assembly system as described in claim 1, characterized in that: The piping connector assembly station is equipped with a piping connector assembly device, which includes: The discharge mechanism is used for discharging pipe fittings; The material distribution mechanism is disposed at the discharge end of the discharge mechanism and is used for material distribution. It includes a horizontally sliding material distribution seat. The sliding direction of the material distribution seat is perpendicular to the discharge direction of the discharge mechanism and can move between a first position and a second position. When it is in the first position, the material distribution groove on the material distribution seat can be connected with the discharge end of the discharge mechanism and allow the pipe connector of the discharge end of the discharge mechanism to enter the material distribution groove. A material transfer mechanism is used to move the pipe fitting on the material distribution seat located in the second position to the valve body of the battery pack water connector in the fixture at the pipe assembly station; The pre-compression mechanism, located directly above the fixture at the piping assembly station, is used to pre-compress the piping fittings onto the valve body.
7. The battery pack water connector assembly system as described in claim 6, characterized in that: The material distribution mechanism further includes a horizontally sliding limit seat and a slide seat, and the limit seat and the slide seat are located on the same sliding path. The material distribution seat is installed on the slide seat. The limit seat can move between a third position and a fourth position. The slide seat can abut against the limit seat at the third position and the fourth position and respectively connect the two material distribution grooves on the material distribution seat with the discharge end of the discharge mechanism.
8. A method for assembling a battery pack water connector assembly system as described in any one of claims 1-7, characterized in that, Includes the following steps: S1. Loading: The base plate is placed into the first feeding hole of the fixture at the feed end of the conveying device by manual or mechanical loading. S2. Riveting and expanding hole: The end of the sleeve on the floating seat of the base plate is expanded by a servo riveting machine to form the first stop part; S3. Rivet inspection: The outward expansion dimension of the first stop is detected by a vision inspection device, and it is determined whether the outward expansion dimension is qualified. If it passes the test, proceed to the next workstation and the next process. If the material fails to meet the requirements, all subsequent processes will be suspended until the material is output from the non-conforming channel at the discharge station. S4. Float detection: Fix each floating seat and detect the horizontal float of the base plate, including the bidirectional horizontal float detection of the base plate along the X and Y axes, and determine whether the float is qualified. If it passes the test, proceed to the next workstation and the next process. If the material fails to meet the requirements, all subsequent processes will be suspended until the material is output from the non-conforming channel at the discharge station. S5. Valve body loading: The valve body is assembled manually and placed in the second loading hole of the fixture at the manual loading station. S6. Valve core enlargement: The blind hole at the end of the rod on the valve body is enlarged by a servo riveting machine to form a second stop. S7. Manual assembly: The valve body is assembled onto the base plate manually. S8. Pipe fitting assembly: Assemble the pipe fitting onto the valve body and pre-press it to fix it so that the pipe fitting is connected to the valve body and does not fall off. S9. Pipe clamping: The pipe fitting is clamped to the valve body by a servo press at a preset pressure value. S10 and Z-axis detection: Fix the floating seat, detect the vertical floating amount of the base plate, and determine whether the floating amount is qualified. If it is qualified, it will be output from the qualified channel of the discharge station; If it is not up to standard, it will be output from the non-compliance channel of the discharge station; S11, Discharge: Based on the front-end detection results, the robotic arm moves the battery pack water connector from the conveying device to the corresponding discharge channel and outputs it.
Citation Information
Patent Citations
Speed regulating joint throttle sleeve assembling machine and assembling method thereof
CN110977465A
Assembling device and assembling method for battery replacing water nozzle at vehicle body end
CN116197655A
