A gas lifter assembly, a gas cooling tower, and a flue gas purification system

By employing multiple air-lifting cap units arranged in parallel and spaced apart, along with a guide tube combination structure in the gas cooling tower, the leakage problem of traditional gas cooling towers during low-load operation is solved, achieving stable gas-liquid separation and continuous operation of the device, thereby reducing production costs and environmental risks.

CN120403322BActive Publication Date: 2026-11-10JIANGSU SAILBOAT PETROCHEMICAL CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202510820209.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2025-06-19
Publication Date
2026-11-10
Estimated Expiration
2045-06-19

AI Technical Summary

Technical Problem

Traditional gas cooling towers cannot effectively form a gas-liquid separation interface during low-load operation or start-up and shutdown phases, resulting in serious liquid leakage, affecting the stable operation of the unit, increasing the risk of pump tank liquid level fluctuations and unplanned shutdowns.

Method used

Multiple lifting cap units are arranged in parallel and spaced apart. The combination structure of the flow guide tube and the lifting cap is used to constrain the airflow path and enhance the inertial collision effect of droplets. The airflow is guided to converge and form a shear-induced vortex by using the common lifting cap opening to achieve secondary separation. The spacing between the lifting caps is dynamically adjusted by the pressure sensor and controller to adapt to load fluctuations.

Benefits of technology

Maintaining a stable gas-liquid separation interface under wide load conditions eliminates leakage, ensures self-balancing of pump tank liquid level, reduces production water replenishment, lowers environmental protection costs, extends equipment life, and ensures safe continuous operation of the unit.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120403322B_ABST
    Figure CN120403322B_ABST
Patent Text Reader

Abstract

This invention relates to the field of flue gas treatment technology, specifically to a gas lifter assembly, a gas cooling tower, and a flue gas purification system. The gas lifter assembly includes multiple gas lifter units arranged side-by-side with intervals. Each gas lifter unit includes a guide tube and a first gas lifter. The guide tube guides the gas upward for cooling. The first gas lifter is positioned above the guide tube and at least covers the top of the guide tube. Along the axial direction of the guide tube, a gap exists between the first gas lifter and the top of the guide tube for gas to overflow from the guide tube. At least some adjacent gas lifter units share a first gas lifter, and this shared first gas lifter has an opening located between the tops of adjacent guide tubes. The gas lifter assembly provided by this invention can improve gas-liquid separation efficiency and avoid or reduce low-load leakage problems.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of flue gas treatment technology, specifically to a gas lifter assembly, a gas cooling tower, and a flue gas purification system. Background Technology

[0002] In gas purification processes, high-temperature flue gas is cooled by a quench cooler before entering a gas cooling tower for gas-liquid separation. Traditional gas cooling towers employ a single-layer umbrella-shaped riser structure, which can meet basic separation requirements under full-load operation. However, in actual production, it has been found that when the unit is operating at low load (e.g., below 60% of design flow) or during start-up and shutdown, the kinetic energy of the gas phase decreases significantly, making it impossible to form an effective gas-liquid separation interface at the riser. This results in a fluid dynamic imbalance between the gas and liquid phases, causing a large number of droplets to be carried away by the gas flow and overflow, leading to severe leakage and making it impossible to maintain the liquid level in the gas-cooled tower pump tank.

[0003] To compensate for liquid level losses, operators have to frequently start and stop the circulating pump (once per hour) and continuously replenish production water. This not only increases the discharge of high-salt wastewater but also raises the risk of pump failure and unplanned shutdowns. Especially when the spray flow rate is not adjusted in a timely manner, it can easily trigger the gas-cooled tower outlet temperature interlock shutdown, causing double damage to production safety and economy. Therefore, the existing gas-lift cap structure, due to its fixed geometry and single separation level, cannot dynamically adapt to wide load fluctuations, becoming a bottleneck restricting the flexible operation of the unit. Summary of the Invention

[0004] In view of the shortcomings of the prior art, the purpose of the present invention is to provide a gas lift cap assembly, a gas cooling tower and a flue gas purification system, which can improve gas-liquid separation efficiency and avoid or reduce the occurrence of low-load leakage problems.

[0005] To achieve the above and other related objectives, the present invention provides a lifting cap assembly, comprising a plurality of lifting cap units, wherein the lifting cap units are arranged in parallel at intervals, and each lifting cap unit includes:

[0006] A flow guide tube is used to guide gas upwards for cooling and temperature reduction.

[0007] A first gas-lifting cap is disposed above the guide tube and at least covers the top of the guide tube; along the axial direction of the guide tube, there is a gap between the first gas-lifting cap and the top of the guide tube for gas to overflow from the guide tube.

[0008] At least some of the adjacent air-lifting cap units share a first air-lifting cap, and the shared first air-lifting cap is provided with an opening located between the upper parts of the adjacent guide tubes.

[0009] In one embodiment of the present invention, the common first air-lift cap is flat or curved downwards.

[0010] In one embodiment of the present invention, at least some of the first air-lifting caps of the adjacent air-lifting cap units are connected in series and / or in parallel to form a first air-lifting cap shared by multiple guide tubes.

[0011] In one embodiment of the present invention, among the first air-lifting caps above the plurality of guide tubes, the first air-lifting caps located on the outer ring are connected in series to form a ring;

[0012] The first air-lift caps located on the inner side are connected in series and / or in parallel along a straight line, and at least one end of the first air-lift caps connected in series and / or in parallel as a straight line is connected to the first air-lift caps that form a circle.

[0013] In one embodiment of the present invention, each of the air-lifting cap units further includes a second air-lifting cap, which is conical in shape. The second air-lifting cap covers the top of the guide tube and is located below the first air-lifting cap, and is spaced apart from the upper end of the guide tube.

[0014] In one embodiment of the present invention, the gas lifting cap assembly further includes a first controller. The first and / or second gas lifting caps are supported above the guide tube by a telescopic member. A first pressure sensor for real-time monitoring of gas phase kinetic energy data is provided inside the guide tube.

[0015] The telescopic component and the first air pressure sensor are both electrically connected to the first controller. The first controller is used to control the telescopic component to rise and fall according to the gas phase kinetic energy data detected by the first air pressure sensor, so as to adjust the distance between the first air lifting cap and / or the second air lifting cap and the top of the guide tube.

[0016] In one embodiment of the present invention, the air-lifting cap assembly further includes an adjustable air-lifting cap unit, the adjustable air-lifting cap unit comprising:

[0017] The third vent cap is located above the first vent cap.

[0018] The lifting component is used to adjust the distance between the third lifting cap and the upper end of the guide tube.

[0019] A second air pressure sensor is installed in the guide tube;

[0020] The second controller is electrically connected to the third air cap and the second air pressure sensor.

[0021] In view of the above-mentioned shortcomings of the prior art, the object of the present invention is to provide a gas cooling tower, including the aforementioned gas lifting cap assembly.

[0022] In one embodiment of the present invention, the gas cooling tower includes:

[0023] A cooling tower body, including partitions for dividing the interior of the cooling tower body;

[0024] A liquid delivery pipe, one end of which enters the body of the cooling tower and is located below the partition plate;

[0025] An infusion tube has one end connected to the liquid delivery tube and the other end passing through the partition to guide the liquid above the partition into the liquid delivery tube.

[0026] A packing plate is disposed above the air lifting cap assembly inside the cooling tower body and is spaced apart from the air lifting cap assembly.

[0027] A spray head is positioned above the packing plate and is used to spray water downwards;

[0028] The air-lift cap assembly is disposed on the partition and communicates with the lower part of the partition.

[0029] In view of the above-mentioned shortcomings of the prior art, the purpose of the present invention is to provide a flue gas purification system, including the gas cooling tower, as well as a quench cooler, a gas cooling tower pump tank and an electrostatic demister;

[0030] After being cooled by the quencher, the flue gas is introduced into the gas cooling tower. After gas-liquid separation in the gas cooling tower, the liquid phase enters the gas cooling tower pump tank, and the gas phase enters the electrostatic demister.

[0031] In summary, this invention constrains the upward path of the airflow through a guide tube, increasing the gas velocity within the tube to enhance the inertial collision effect of droplets and promote droplet aggregation. The shearing effect generated by the accelerated gas at the axial gap causes droplets to detach from the gas phase flow. The shared opening of the first lifting cap guides the convergence of airflow from adjacent lifting cap units, generating shear-induced vortices to achieve secondary separation and enhance droplet aggregation. This design maintains a local critical gas velocity even when the gas phase kinetic energy decreases, ensuring a stable separation interface. Multiple lifting cap units are arranged in parallel to form a distributed airflow network, eliminating dead zones and balancing pressure drop distribution. The structure of some adjacent units sharing the first lifting cap expands the separation interface area, providing a sufficient condensation and attachment platform for humid gas, significantly improving gas-liquid separation efficiency. This allows the device to maintain a stable separation interface under wide load conditions, eliminating or significantly reducing leakage, ensuring self-balancing of the pump tank level, avoiding frequent start-ups and shutdowns of the circulating pump, extending equipment lifespan, and eliminating the risk of unplanned shutdowns. Simultaneously, it significantly reduces the amount of production water replenishment and the load on high-salt wastewater treatment, reducing water consumption and environmental costs, eliminating outlet temperature interlock shutdown conditions, and ensuring safe continuous operation of the device. Attached Figure Description

[0032] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0033] Figure 1 This is a schematic diagram of the internal structure of a gas cooling tower according to an embodiment of the present invention;

[0034] Figure 2 This is a diagram illustrating one possible structural configuration of the first air-lift cap arranged above the guide tube in one embodiment of the present invention;

[0035] Figure 3 This is a diagram showing another structural form of the first air-lifting cap arranged above the guide tube in one embodiment of the present invention;

[0036] Figure 4 This is a diagram showing the positional relationship between the first and second air-lifting caps in one embodiment of the present invention.

[0037] Figure 5 This is a schematic diagram of the arrangement of the guide tube in the gas cooling tower according to one embodiment of the present invention;

[0038] Figure 6 This is a schematic diagram of a flue gas purification system according to an embodiment of the present invention;

[0039] Component labeling: Gas cooling tower 100, lifting cap unit 1, guide tube 11, gap 111, first lifting cap 12, opening 121, second lifting cap 13, adjustable lifting cap unit 2, third lifting cap 21, lifting component 22, second air pressure sensor 23, cooling tower body 101, baffle plate 102, liquid delivery pipe 103, liquid delivery pipe 104, packing plate 105, spray head 106, quench cooler 200, pump tank 300, electrostatic demister 400, weak acid stripping tower 500, neutralization reactor 600, safety seal water 700, drying tower 800, high temperature flue gas X, emergency water Y, gas phase A, liquid phase B. Detailed Implementation

[0040] The following specific examples illustrate the implementation of the present invention. Those skilled in the art can easily understand other advantages and effects of the present invention from the content disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and various details in this specification can also be modified or changed based on different viewpoints and applications without departing from the spirit of the present invention. It should be noted that, unless otherwise specified, the following embodiments and features can be combined with each other. It should also be understood that the terminology used in the embodiments of the present invention is for describing specific implementation schemes and not for limiting the scope of protection of the present invention. Test methods in the following embodiments that do not specify specific conditions are generally performed under conventional conditions or according to the conditions recommended by the respective manufacturers.

[0041] Please see Figures 1 to 6 It should be understood that the structures, proportions, sizes, etc., depicted in the accompanying drawings are merely for illustrative purposes to aid those skilled in the art and to facilitate understanding. They are not intended to limit the scope of the invention and therefore have no substantial technical significance. Any modifications to the structure, changes in proportions, or adjustments to size, without affecting the effectiveness and purpose of the invention, should still fall within the scope of the technical content disclosed herein. Furthermore, the terms such as "upper," "lower," "left," "right," "middle," and "one" used in this specification are merely for clarity and not intended to limit the scope of the invention. Changes or adjustments to their relative relationships, without substantially altering the technical content, should also be considered within the scope of the invention.

[0042] When numerical ranges are given in the embodiments, it should be understood that, unless otherwise stated in the present invention, both endpoints of each numerical range and any value between the two endpoints may be selected. Unless otherwise defined, all technical and scientific terms used in this invention, as well as the prior art known to those skilled in the art and the description of this invention, may be implemented using any prior art methods, devices, and materials similar to or equivalent to those described, used, or made of materials in the embodiments of this invention.

[0043] It should be understood that the previous solution in this case was an immature technical solution, and immature technology does not mean that it is existing technology.

[0044] The high-temperature flue gas at 350℃ enters the purification unit from the regeneration unit, and the gas first enters the quench cooler 200. The quench cooler 200 is a convection spray tower that performs circulating cooling spray under adiabatic saturation to complete the washing and quenching of the furnace gas, removing most of the impurities. The furnace gas is quenched to 75-77℃ and then enters the gas cooling tower 100.

[0045] The process gas (including at least flue gas and water vapor) entering the gas cooling tower 100 undergoes gas-liquid two-phase separation within the gas cooling tower 100. The liquid phase enters the bottom of the pump tank 300 of the gas cooling tower 100 and participates in the circulation process of the gas cooling tower 100. The gas phase passes through the riser assembly and then through the packing plate 105 inside the gas cooling tower 100. The process gas then comes into convective contact with the weak acid cooled to 33°C from the gas cooling tower circulation pump, ensuring that the temperature of the process gas leaving the gas cooling tower 100 is less than 35°C. Subsequently, it enters the electrostatic precipitator 400.

[0046] During the low-load operation and start-up heating phases of the original unit, the gas cooling tower 100, due to its independent multi-point installation of the gas lifting caps, experienced excessive leakage at each lifting cap, making it impossible to maintain the liquid level in the pump tank 300 of the gas cooling tower 100. For example, some liquid phase splashed into the guide tube 11 at each lifting cap, or the gas phase containing water vapor in the gas cooling tower 100 entered the guide tube 11 under pressure, thus failing to meet the requirements for low-load and start-up / shutdown operation. Specifically, while the original unit can meet the full-load operation requirements, frequent pump start-ups, shutdowns, and water replenishment are necessary during start-up, shutdowns, and low-load operation, which can easily lead to pump failures and unit shutdown risks. It also increases production water consumption and wastewater discharge. Traditional air-lift caps use a multi-point distributed single-layer umbrella-shaped structure, which has the following drawbacks: First, fluid dynamics imbalance; at low loads (<60% of design flow), insufficient gas-phase kinetic energy prevents the formation of an effective gas-liquid separation interface. Second, critical carryover phenomenon: when the F-factor (gas kinetic energy factor) <0.6 m / s·(kg / m³) 3 When the value is 0.5, the amount of droplet entrainment increases exponentially.

[0047] In actual production testing, the leakage data of the gas cooling tower 100 (32-U-6530 gas cooling tower) before the improvement in this case are shown in Table 1 below:

[0048] Test Project 100% load 60% load flue gas volume 113000 67800 Leakage 0 16.7t / h pressure drop 8.4 kPa 4.8 kPa

[0049] Table 1

[0050] In actual production, prior to the improvements in this case, during the low-load operation and start-up heating phases of the unit, the gas cooling tower 100 could not maintain the liquid level in the pump tank 300 due to excessive leakage at the gas vent cap. This required a short stop of the gas cooling tower pump every hour to maintain the liquid level, frequent pump starts, and the need to add 16.7 t / h of production water. This added production water was sent to the wastewater treatment plant as high-salt wastewater. In addition, the spray flow rate was not adjusted in time during the start-up period, which could easily trigger the gas cooling tower 100 outlet temperature to be too high and cause an interlock shutdown. As a result, there are many problems in this case that need to be improved.

[0051] Please see Figure 1The present invention provides a lifting cap assembly, including a plurality of lifting cap units 1, wherein each lifting cap unit 1 is arranged in parallel at intervals, and each lifting cap unit 1 includes a guide tube 11 and a first lifting cap 12;

[0052] The guide tube 11 is used to guide the gas to rise and cool down; the first gas lifting cap 12 is disposed above the guide tube 11 and at least covers the top of the guide tube 11; along the axial direction of the guide tube 11, there is a gap 111 between the first gas lifting cap 12 and the top of the guide tube 11 for the gas inside the guide tube 11 to overflow.

[0053] At least some of the adjacent air-lifting cap units 1 share a first air-lifting cap 12, and the shared first air-lifting cap 12 is provided with an opening 121, which is located above the adjacent guide tubes 11.

[0054] It should be noted that, Figure 1 The infusion tube 104 is not located directly below the guide tube 11; the two are not on the same axial direction, and there is no guide tube 11 directly above the infusion tube 104. The guide tube 11 serves as a gas rising channel, its wall guiding the directional flow of high-temperature gas to achieve initial airflow rectification. The guide tube 11 can have a circular cross-section, a regular polygonal cross-section (such as hexagonal or octagonal), or an elliptical cross-section; different cross-sectional shapes affect separation efficiency by altering the boundary layer flow state. A first lifting cap 12 is provided above the axial top of the guide tube 11. This first lifting cap 12 at least covers the open area at the upper end of the guide tube 11 and completely covers the area above the cross-section of the guide tube 11. An axial gap 111 is maintained between the top of the guide tube 11 and the first lifting cap 12. This gap 111 forms a physical channel for the overflow of gas phase (at least including flue gas and water vapor) in the process gas. The height of the gap 111 is controlled by a bracket, a hydraulic lifting mechanism, or a fixed support rib to ensure a good gas flow rate under different gas phase flow rates. Furthermore, at least some adjacent lifting cap units 1 share the same first lifting cap 12. This shared first lifting cap 12 effectively reduces the number of separation interfaces and lowers the probability of local eddy current generation. An opening 121 is provided on the shared first lifting cap 12. This opening 121 is located in the upper region between adjacent guide tubes 11, meaning that the opening 121 does not cover the top of each guide tube 11 to prevent liquid phase from directly falling into the guide tube 11 and causing leakage. For example, the opening 121 can be a rectangular opening centrally located on the axis of symmetry of the adjacent guide tubes 11, or distributed in an array of honeycomb-shaped through holes in the shared first lifting cap 12. The opening 121 can be a gradually expanding conical orifice, a Venturi-type contraction orifice, or a straight-through circular orifice.

[0055] This solution addresses the low-load leakage problem through a multi-pronged approach: First, the guide tube 11 constrains the upward path of the airflow, increasing the air velocity within the guide tube 11 to enhance the inertial collision effect of the droplets and promote droplet aggregation. Second, the gas at the axial gap 111 accelerates, creating a shearing effect that causes the droplets to detach from the gas phase flow due to inertia. Finally, the opening 121 of the shared first lifting cap 12 guides the airflow of adjacent lifting cap units 1 to converge, forming a shear-induced vortex. This achieves secondary separation of the droplets from the flue gas and further promotes droplet aggregation. When the kinetic energy of the gas phase decreases, although the velocity of the converging airflow at opening 121 decreases, it can still maintain a local critical velocity due to the relatively high initial velocity, avoiding chaos at the separation interface. Multiple lifting cap units 1 are arranged in parallel to form a distributed airflow network, effectively eliminating airflow dead zones and balancing pressure drop distribution. Finally, some adjacent lifting cap units 1 share a first lifting cap 12, thereby increasing the area of ​​the first lifting cap 12. This larger area of ​​the first lifting cap 12 provides a larger attachment platform for process gases containing water vapor, thus facilitating the sufficient cooling, condensation, and liquefaction of process gases containing water vapor. In other words, this larger area of ​​the first lifting cap 12 provides a larger attachment platform for process gases containing water vapor. The process gas provides a larger gas-liquid separation interface, which is beneficial for gas-liquid separation. By increasing the area of ​​the first gas cap 12, the present invention can maintain a stable gas-liquid separation interface under low load conditions (30%-60% of design flow rate), completely eliminate leakage, and ensure the self-balancing of the liquid level in the pump tank 300. It also avoids frequent start-up and shutdown of the circulating pump, extends the service life of the pump, and eliminates the risk of unplanned shutdowns caused by liquid level fluctuations. In addition, it reduces the amount of production water replenishment and the load of high-salt wastewater treatment, and simultaneously reduces water consumption and environmental treatment costs. At the same time, the present invention eliminates the outlet temperature interlock shutdown trigger condition, ensuring the safety of continuous operation of the device.

[0056] like Figure 1 , 2 As shown in Figure 3, as an optional embodiment of this case, the common first air-lift cap 12 is flat or curved downwards.

[0057] It should be noted that the shared first lifting cap 12 serves as a shared separation interface for adjacent lifting cap units 1, and its structural form directly affects the airflow distribution and droplet removal efficiency. A flat plate configuration refers to a lifting cap with a planar geometric shape, including but not limited to rectangular plates and polygonal spliced ​​plate structures. This configuration simplifies the manufacturing process and reduces production costs, and its planar characteristics provide a uniform impact surface for droplet aggregation. A downwardly curved arc shape refers to a lifting cap working surface with continuous curvature, such as a single-curvature arc (e.g., a cylindrical section) or a double-curvature arc (e.g., a spherical section). The downwardly curved arc structure extends the airflow path through the wall-attachment effect, enhancing the centrifugal separation of droplets along the curved first lifting cap 12 and the gas. Its radius of curvature needs to match the diameter of the guide tube 11 to optimize the flow field. Both configurations are fixed to the supporting structure by bolting, welding, or integral molding. The materials used are fiberglass, stainless steel, or nickel-based alloys to withstand corrosive environments. The flat first gas-lifting cap 12 forms a stable shear layer in the interval region between adjacent guide tubes 11. After the rising gas phase impacts the flat plate, it generates a radial diffusion flow. The droplets detach from the main gas phase due to momentum decay. A low-pressure zone is formed at the junction of the edge of the flat plate and the opening 121, promoting the separation of the liquid and gas phases. The downwardly curved arc-shaped first gas-lifting cap 12 utilizes the curved surface fluid adhesion effect to make the gas move along the tangent of the curvature. The centripetal acceleration generated by the arc surface forces the droplets to be thrown towards the wall. At the same time, the curved structure extends the gas-liquid contact path, enhancing the inertial separation effect. The setting of the lowest point of the arc and the position of the opening 121 guides the gas-liquid separation. The gas phase continues to rise, and the liquid phase descends, improving the gas-liquid separation efficiency.

[0058] like Figure 1-3 As shown, in an optional embodiment of this case, at least some of the first air-lifting caps 12 of the adjacent air-lifting cap units 1 are connected in series and / or in parallel to form a first air-lifting cap 12 shared by multiple guide tubes 11.

[0059] It should be noted that, as Figure 2 As shown, the series configuration is, for example, multiple parallel-arranged first air-lifting cap units 1 are connected in series in the lateral direction to form a shared, continuous first air-lifting cap 12 structure. Figure 3 As shown, the parallel connection can be, for example, multiple first air-lifting caps 12 connected in series vertically are connected in parallel horizontally; the hybrid connection mode includes both series and parallel structures, such as series sub-units nested within a parallel unit group. The interface between the shared first air-lifting cap 12 and the guide tube 11 is connected via a detachable flange or bracket, and its coverage must ensure that the area above each guide tube 11 is completely shielded. The series-parallel structure can form a continuous separation interface along the upward airflow path, construct a large-area shared separation region, and balance the air pressure distribution among multiple guide tubes 11.

[0060] like Figure 2As shown in Figure 3, as an optional embodiment of this case, among the first air-lifting caps 12 above the plurality of guide tubes 11, the first air-lifting caps 12 located on the outer ring are connected in series to form a ring;

[0061] The first air-lift caps 12 located on the inner side are connected in series and / or in parallel along a straight line, and at least one end of the first air-lift caps 12 connected in series and / or in parallel as a straight line is connected to the first air-lift caps 12 that form a circle.

[0062] It should be noted that the outer ring series structure refers to a group of guide tubes 11 arranged circumferentially along the tower wall, connected into a closed annular frame by continuous first lifting caps 12. The inner linear layout refers to the guide tubes 11 in the central region extending axially or radially. In the series configuration, adjacent tubes are connected by linear first lifting caps 12, and in the parallel configuration, multiple groups of guide tubes 11 are covered by integrated first lifting caps 12. At least one end of the inner linear first lifting cap 12 is physically connected to the first lifting cap 12 of the outer ring structure. The straight extension direction of the inner first lifting cap 12 can be adapted to the flow field requirements of the tower body, using a transverse arrangement perpendicular to the airflow direction, a longitudinal arrangement parallel to the airflow direction, or an inclined staggered arrangement. In this case, the outer ring series configuration forms a boundary constraint layer, suppressing the flow field distortion caused by the tower wall effect. The continuous curved surface of the annular first lifting cap 12 guides the wall airflow centripetally, eliminating the vortex dead zone generated at the tower wall by traditional discrete lifting caps and avoiding local droplet accumulation. The inner straight-line series / parallel configuration maintains the directional delivery of the central airflow, while the series structure enhances the air velocity at low loads and the parallel structure disperses the airflow pressure at high loads. The consistency of the straight-line extension direction with the mainstream direction reduces flow resistance losses. The inner and outer connection nodes achieve dynamic pressure differential balance between the airflow at the first lifting cap 12 in the boundary region and the first lifting cap 12 in the mainstream region. A guide transition surface can be installed at the connection point to allow the outer centripetal airflow and the inner axial airflow to form a swirling fusion, enhancing the inertial collision and removal of droplets in the convergence zone, making it particularly suitable for sudden flow changes during start-up and shutdown.

[0063] like Figure 4 As shown, as an optional embodiment of this case, each of the air-lifting cap units 1 further includes a second air-lifting cap 13. The second air-lifting cap 13 is conical in shape. The second air-lifting cap 13 covers the top of the guide tube 11 and is located below the first air-lifting cap 12. A gap 111 is provided between the second air-lifting cap 13 and the upper end of the guide tube 11.

[0064] It should be noted that the second lifting cap 13 covers the top of the guide tube 11, and the diameter of the second lifting cap 13 is larger than the outer diameter of the guide tube 11. The second lifting cap 13 serves as the primary interface for gas-liquid separation, and its conical structure includes equal-angle cones and variable-angle cones. The cone apex angle is designed to be 30°-90°, preferably 45°-60° to balance flow resistance and separation efficiency. The second lifting cap 13 can be mounted on the upper end of the guide tube 11 via a bracket or directly connected to the partition 102 inside the gas cooling tower 100. Alternatively, the top of the second lifting cap 13 can be fixedly connected to the bottom surface of the first lifting cap 12, but it is necessary to ensure that the cone axis coincides with the center of the guide tube 11. An annular gap 111 is formed between the lower edge of the cone-shaped second lifting cap 13 and the top of the guide tube 11, thereby facilitating the overflow of gas from the guide tube 11. The rising gas is accelerated within the conical surface of the second lifting cap 13. Under inertia, the droplets impact the conical surface to form a primary liquid film. The conical surface of the second lifting cap 13 guides the liquid film to flow downward along the slope and drip onto the guide plate 102, while the gas continues to rise, thus separating the liquid phase from the gas phase. As the rising gas passes through the annular gap 111, it forms a high-speed jet, generating a strong shearing effect that strips away the fine droplets in the gas phase. After the cone of the second lifting cap 13 intercepts the large droplets, the remaining droplets in the gas phase are removed a second time by the first lifting cap 12 above. When some of the droplets dripping from the first lifting cap 12 fall to the top of the second lifting cap 13, they slide down the top slope of the second lifting cap 13 onto the baffle 102 and then flow into the infusion pipe 104, ensuring the liquid level in the pump tank 300. When there are a lot of droplets flowing down the top slope of the second lifting cap 13, a water curtain is formed. This water curtain can also promote the liquefaction of water vapor in the gas that just overflows from the axial gap 111 of the second lifting cap 13, further promoting gas-liquid separation. In addition, the cone-shaped structure of the second lifting cap 13 reduces the vapor liquefaction load of the first lifting cap 12, avoiding overload of the separation interface and failure to achieve the expected effect.

[0065] As an optional embodiment of this case, the lifting cap assembly further includes a first controller, the first lifting cap 12 and / or the second lifting cap 13 are supported above the guide tube 11 by a telescopic member, and a first air pressure sensor for real-time monitoring of gas phase kinetic energy data is provided in the guide tube 11.

[0066] The telescopic component and the first air pressure sensor are both electrically connected to the first controller. The first controller is used to control the telescopic component to rise and fall according to the gas phase kinetic energy data detected by the first air pressure sensor, so as to adjust the distance between the first air lifting cap 12 and / or the second air lifting cap 13 and the top of the guide tube 11.

[0067] It should be noted that the telescopic component, as an actuator, includes two implementation forms: a multi-stage piston rod driven by a hydraulic cylinder, a lead screw and nut pair controlled by a stepper motor, or other driving methods that meet the requirements of this application. The first sensor is, for example, a pressure sensor, located in the stable airflow area within the guide tube 11. Its detection point layout adopts single-point monitoring along the central axis, three-point monitoring evenly distributed around the circumference, or matrix nine-point grid monitoring to collect pressure gradient data characterizing the kinetic energy of the gas phase in real time. The first controller is an embedded PLC, an industrial microcontroller, or a DCS system module. By establishing a mapping relationship between the pressure data and the spacing of the first lifting cap 1, when the detection value of the first sensor is lower than the critical separation threshold, the first controller controls the telescopic component to reduce the spacing to increase the gas flow rate; when the detection value is higher than the turbulence threshold, the spacing is increased to suppress pressure drop. The dynamic control in this case addresses separation failures caused by load fluctuations through closed-loop feedback. A pressure sensor captures instantaneous changes in the kinetic energy of the gas phase within the guide tube 11. Its data characteristics include, for example, the amplitude of static pressure fluctuations, the rate of change of dynamic pressure gradient, or the turbulence intensity spectrum, reflecting insufficient gas velocity under low loads and overloaded airflow under high loads. During spacing adjustment, reducing the distance between the first lifting cap 1 and the top of the guide tube 11 shrinks the area of ​​the annular gap 111, accelerating the gas and creating a strong shear field to enhance droplet removal. Increasing the spacing expands the flow channel, reducing local resistance and preventing a surge in pressure drop under high loads. By converting pressure data into spacing adjustment commands, pre-compensation addresses sudden load changes during start-up and shutdown, feedback correction eliminates steady-state operational deviations, and ensures the stability of the separation interface under all operating conditions. This project utilizes adaptive separation across all operating conditions to dynamically maintain optimal gas-liquid separation within a load range of 30%-120%, thereby eliminating or reducing leakage at low loads and pressure drop at high loads. It also eliminates the adjustment lag caused by manual intervention, prevents interlocking shutdowns at the gas-cooled tower outlet temperature, and reduces the rate of unplanned downtime. Precise control of the gas lifter spacing reduces the power consumption of the circulating pump, thereby reducing energy consumption for production water replenishment and wastewater treatment.

[0068] like Figure 1 As shown, as an optional embodiment of this case, the air-lifting cap assembly further includes an adjustable air-lifting cap unit 2, which includes a third air-lifting cap 21, a lifting component 22, a second air pressure sensor 23, and a second controller.

[0069] The third lifting cap 21 is located above the first lifting cap 12. The lifting member 22 supports the third lifting cap 21 above the guide tube 11. The lifting member 22 is used to adjust the distance between the third lifting cap 21 and the upper end of the guide tube 11. The second air pressure sensor 23 is disposed on the guide tube 11. The second controller is electrically connected to the third lifting cap 21 and the second air pressure sensor 23.

[0070] It should be noted that the third lifting cap 21 is positioned above the first lifting cap 12, and its structural form includes an umbrella-shaped dome, a multi-cone assembly, or a disc-shaped cover with guide vanes. The lifting component 22 is, for example, a hydraulic synchronous lifting system or a worm gear mechanism driven by a servo motor, with a stroke range designed to be 10%-40% of the diameter of the guide tube 11. The second air pressure sensor 23 is embedded in the upper airflow stabilization zone of the guide tube 11, and its sensing principle adopts piezoresistive, capacitive, or resonant micromechanical detection to collect dynamic pressure pulsation spectrum data in real time. The second controller is configured independently or integrated with the first controller, and the control strategy adopts adaptive sliding mode control or neural network algorithm control, and establishes real-time data interaction with the lifting component 22 and the sensor through a bus protocol. In this case, the second air pressure sensor 23 captures the kinetic energy distribution characteristics of the airflow inside the guide tube 11, and predicts the instability trend of the separation interface through turbulence intensity spectrum analysis, responding to load changes earlier than traditional static monitoring; the lifting component 22 drives the third lifting cap 21 to vertical displacement, changing the cross-section of the interlayer flow channel between it and the lower lifting cap. Decreasing the spacing creates a Venturi acceleration effect, enhancing droplet collisions; increasing it expands the flow field, suppressing high-load pressure drop. The guide vanes of the third lifting cap 21 guide the airflow to form a swirling confluence with the lower separation interface, generating a low-pressure adsorption effect in the gas-liquid junction zone, strengthening the secondary removal of fine droplets. In practical applications, the third lifting cap 21 works in conjunction with a hydraulic lifting system. A piezoresistive sensor array is arranged with eight monitoring points along the circumference of the guide tube 11, establishing a mapping model between the pressure gradient and the optimal spacing. When the F-factor is detected to be below 0.3, the controller instructs the third lifting cap 21 to move downwards, forming a secondary acceleration channel; when the F-factor is above 1.2, it moves upwards to expand the flow channel, thus enabling the lifting cap assembly to quickly adapt to large load step changes, further improving gas-liquid separation efficiency.

[0071] The present invention also provides a gas cooling tower 100, including the aforementioned gas lifting cap assembly.

[0072] As an optional embodiment of this case, the gas cooling tower 100 includes a cooling tower body 101, a liquid conveying pipe 103, a liquid delivery pipe 104, a packing plate 105, and a spray head 106; the cooling tower body 101 includes a partition 102 for dividing the interior of the cooling tower body 101; one end of the liquid conveying pipe 103 enters the cooling tower body 101 and is located below the partition 102; one end of the liquid delivery pipe 104 is connected to the liquid conveying pipe 103, and the other end passes through the partition 102 to guide the liquid above the partition 102 into the liquid conveying pipe 103; the packing plate 105 is disposed above the gas lifting cap assembly inside the cooling tower body 101 and is spaced apart from the gas lifting cap assembly; the spray head 106 is disposed above the packing plate 105 and is used for spraying downwards; wherein, the gas lifting cap assembly is disposed on the partition 102 and is connected to the lower part of the partition 102.

[0073] It should be noted that the cooling tower body 101 is internally divided into upper and lower functional chambers by a partition 102. The partition 102 is a flat, sealed plate made of fiberglass laminate, Hastelloy composite plate, or rubber-lined carbon steel. The liquid delivery pipe 103 extends through the tower wall to the chamber below the partition 102, with its interface using a flange seal or a welded sleeve structure. The delivery pipe 104 serves as an interstage transfer channel; its lower end connects to the liquid delivery pipe 103 via a T-junction, Y-type distributor, or ring manifold, while its upper end passes through the partition 102 to form a liquid phase passage. The packing plate 105 is positioned above the riser assembly, with the distance between them controlled by an adjustable bracket, fixed support column, or suspension chain. The packing type includes structured corrugated plates, random Raschig rings, or high-efficiency structured packing. The spray head 106 distribution system uses a rotating spray disc, pressure atomizing nozzle, or overflow trough-type distributor, maintaining the optimal mass transfer distance with the packing plate 105.

[0074] This design uses a baffle 102 to physically isolate the gas-liquid two-phase flow field. The lower chamber maintains a stable gas phase transport process, while the upper chamber serves as the gas-liquid separation flow field. The process gas in the upper chamber is cooled, completing the gas phase mass transfer process. The liquid delivery pipe 104 guides the separated liquid phase back to the liquid delivery pipe 103, eliminating the gas phase short-circuiting phenomenon of traditional structures. After the riser assembly completes the primary gas-liquid separation, the gas phase rises to the packing plate 105 and comes into secondary countercurrent contact with the spray liquid. The spacing between the packing plate 105 and the riser assembly forms a buffer zone to prevent droplets from being carried into the packing layer of the packing plate 105. The spray head 106 forms a uniform liquid film above the packing plate 105, achieving efficient mass transfer with the rising gas phase on the packing surface. The baffle 102's blocking effect eliminates the interference of the lower flow field on the upper gas-liquid distribution, ensuring the temperature gradient distribution throughout the axial section of the tower, which is beneficial for gas-liquid separation.

[0075] This solution effectively addresses the issue of liquid level fluctuations in the pump tank 300 by using partition 102 for zoned configuration. The cascaded structure of the delivery pipe 104 eliminates the need for 16.7 t / h of makeup water, achieving zero external water supply operation. The coordinated operation of the packing area and the gas lifter assembly optimizes the gas phase temperature gradient distribution, ensuring that the outlet gas temperature is stably controlled below 35℃, thereby eliminating or mitigating the risk of temperature-interlocked shutdowns.

[0076] The present invention also provides a flue gas purification system, including the gas cooling tower 100, as well as a quench cooler 200, a pump tank 300 and an electrostatic demister 400;

[0077] After being cooled by the quencher 200, the flue gas is introduced into the gas cooling tower 100. After gas-liquid separation in the gas cooling tower 100, the liquid phase enters the pump tank 300 and the gas phase enters the electrostatic demister 400.

[0078] It should be noted that the quench cooler 200, as a pretreatment unit, can be structured as a spray tower, a Venturi scrubber, or a cyclone scrubber. The gas cooling tower 100 is a vertical cylindrical, square multi-chamber, or modular assembly type, configured as a single tower or multiple towers in parallel according to the processing capacity requirements. The pump tank 300, as a liquid phase collection unit, includes a conical bottom collection tank, a flat bottom buffer tank, or a composite tank with anti-vortex baffles, maintaining liquid level balance through gravity flow or forced circulation. The electrostatic precipitator 400 includes parallel plate type, honeycomb tube type, or spiral electrode type, and the power system adopts high-frequency pulse power supply, DC constant voltage, or intelligent voltage regulation mode. The units are connected flexibly by flanges, bellows, expansion joints, or hoses to compensate for thermal displacement stress. The quench cooler 200 achieves rapid cooling of flue gas from 350℃ to 75-77℃ through adiabatic saturated cooling, with most soluble impurities precipitating in the high-temperature section. The gas cooling tower 100 completes gas-liquid balance regulation in the low-temperature zone of 33-35℃, and the two-stage temperature difference design avoids stress concentration in the equipment caused by thermal shock. The multi-stage adjustable structure of the riser assembly adapts to fluctuations in flue gas volume, and the series separation interface ensures zero liquid phase escape under low load. The electrostatic precipitator 400 captures residual mist droplets through adaptive adjustment of electric field strength, forming a dual insurance mechanism for gas-liquid separation. The differential pressure linkage control between the electrostatic precipitator 400 and the cooling tower reduces fan energy consumption, and the system resistance is lower than that of traditional structures.

[0079] This design utilizes a series / parallel lifting cap assembly for staged interception, increasing the effective separation interface and reducing droplet carryover. Simultaneously, the first lifting cap 12 improves airflow stability, significantly reducing leakage and substantially decreasing spray liquid leakage, thus meeting the operational requirements during low load and start-up / shutdown periods. The original single-layer lifting cap structure is optimized into multiple series-connected lifting caps. Specifically, the second lifting cap 13 is used for initial gas-liquid separation, reducing liquid carryover; the first lifting cap 12 is used for secondary droplet interception, further reducing leakage; and the third lifting cap 21 is a dynamically adjustable multi-stage lifting cap structure. This dynamically adjustable multi-stage lifting cap structure solves the problem of traditional fixed lifting caps being unable to adapt to drastic load fluctuations (e.g., 30%-120%), leading to leakage at low loads and a sharp increase in pressure drop at high loads. This design employs a three-stage cascaded air-lifting cap system, with the third stage being a retractable structure. A pressure sensor monitors the gas phase kinetic energy (F-factor) in real time, driving a hydraulic system to adjust the height and spacing of the third air-lifting cap 21. During low-load operation, if the liquid level in the pump tank cannot be maintained at 300 after passing through the first and second air-lifting caps 12 and 13, the third air-lifting cap 21 is added to further reduce leakage. Traditional discrete arrangement of circular air-lifting caps leads to uneven airflow distribution and excessively high local pressure drops. This design optimizes the uniformity of the airflow channel by redesigning the air-lifting cap unit 1 into other shapes, such as by incorporating guide vanes to guide the airflow into vortices and enhance separation.

[0080] The optimized operating data is shown in Table 2 below. This operating data is based on the configuration of the first lifting cap 1 and the second lifting cap 13 in this case. The second lifting cap 13 is located below the first lifting cap 1, and the first lifting cap 1 is connected to the upper end of the guide tube 11 through the bracket below the second lifting cap 13. Figure 1 As shown in the local structure,

[0081] Test Project 100% load 60% load flue gas volume 113000 67800 Leakage 0 0 / h pressure drop 8.4 kPa 5.0 kPa

[0082] Table 2

[0083] Compared with the original technology, the improved gas lifter assembly has at least the following advantages: First, the improved assembly effectively reduces leakage, improves the safety and reliability of the equipment, and avoids unplanned shutdowns. Second, it avoids repeated start-ups and shutdowns of the air-cooled tower circulating pump, preventing pump failures due to repeated start-ups and shutdowns, and reducing economic losses by hundreds of thousands of yuan per unit. Third, it reduces the need for replenishing 16.7 t / h of production water and 16.7 t / h of high-salt wastewater, reducing production water costs by several thousand yuan and high-salt wastewater costs by tens of thousands of yuan. Fourth, it avoids equipment shutdowns, reducing losses by more than one million yuan per instance. Fifth, the modification uses fiberglass material, allowing for adjustment of the airflow plate distribution according to different flue gas volumes, simplifying the process and facilitating operation. Sixth, the dynamically adjustable multi-stage gas lifter structure can be adjusted in real time according to the operating status, meeting various operating conditions.

[0084] In summary, the present invention effectively overcomes some practical problems in the prior art, thus having high utilization value and significance.

[0085] The above embodiments are merely illustrative of the principles and effects of the present invention and are not intended to limit the invention. Any person skilled in the art can modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by those skilled in the art without departing from the spirit and technical concept disclosed in the present invention should still be covered by the claims of the present invention.

Claims

1. A type of air-lift cap assembly, characterized in that, It includes multiple air-lifting cap units, which are arranged side by side at intervals. Each air-lifting cap unit includes: A flow guide tube is used to guide gas upwards for cooling and temperature reduction. A first gas-lifting cap is disposed above the guide tube and at least covers the top of the guide tube; along the axial direction of the guide tube, there is a gap between the first gas-lifting cap and the top of the guide tube for gas to overflow from the guide tube. At least some of the adjacent air-lifting cap units share a first air-lifting cap, and the shared first air-lifting cap is provided with an opening; At least some of the first air-lifting caps of the adjacent air-lifting cap units are connected in series and / or in parallel to form a first air-lifting cap shared by multiple guide tubes, and there is an opening between adjacent first air-lifting caps, the opening being located above adjacent guide tubes; Among the multiple first air-lifting caps above the guide tubes, the first air-lifting caps located on the outer ring are connected in series to form a circle; The first air-lift caps located on the inner side are connected in series and / or in parallel along a straight line, and at least one end of the first air-lift caps connected in series and / or in parallel as a straight line is connected to the first air-lift caps that form a circle.

2. The air-lift cap assembly according to claim 1, characterized in that, The shared first air-lift cap is either flat or curved downwards.

3. The air-lift cap assembly according to claim 1, characterized in that, Each of the aforementioned air-lifting cap units further includes a second air-lifting cap, which is conical in shape. The second air-lifting cap covers the top of the guide tube and is located below the first air-lifting cap, with a gap between the second air-lifting cap and the upper end of the guide tube.

4. The air-lift cap assembly according to claim 1, characterized in that, It also includes a first controller, the first gas lifting cap is supported above the guide tube by a telescopic component, and a first sensor for real-time monitoring of gas phase kinetic energy data is provided inside the guide tube. The telescopic component and the first sensor are both electrically connected to the first controller. The first controller is used to control the telescopic component to rise and fall according to the gas phase kinetic energy data detected by the first sensor, so as to adjust the distance between the first air-lift cap and the top of the guide tube.

5. The air-lift cap assembly according to claim 1, characterized in that, It also includes an adjustable air-lifting cap unit, which comprises: The third air vent is located above the first air vent. The lifting component is used to adjust the distance between the third lifting cap and the upper end of the guide tube. A second air pressure sensor is installed in the guide tube; The second controller is electrically connected to the third air cap and the second air pressure sensor.

6. A gas cooling tower, characterized in that, Includes the air-lift cap assembly as described in any one of claims 1-5.

7. The gas cooling tower according to claim 6, characterized in that, The gas cooling tower includes: A cooling tower body, including partitions for dividing the interior of the cooling tower body; A liquid delivery pipe, one end of which enters the body of the cooling tower and is located below the partition plate; An infusion tube has one end connected to the liquid delivery tube and the other end passing through the partition to guide the liquid above the partition into the liquid delivery tube. A packing plate is disposed above the air lifting cap assembly inside the cooling tower body and is spaced apart from the air lifting cap assembly. A spray head is positioned above the packing plate and is used to spray water downwards; The air-lift cap assembly is disposed on the partition and communicates with the lower part of the partition.

8. A flue gas purification system, characterized in that, Includes the gas cooling tower as described in any one of claims 6-7, as well as a quench cooler, a gas cooling tower pump tank, and an electrostatic demister; After being cooled by the quencher, the flue gas is introduced into the gas cooling tower. After gas-liquid separation in the gas cooling tower, the liquid phase enters the gas cooling tower pump tank, and the gas phase enters the electrostatic demister.

Citation Information

Patent Citations

  • Liquid-collecting gas-lift cap structure for flue gas desulfurization treatment system

    CN109453633A

  • Combined type gas lifting cap

    CN211585928U

  • Water scrubber

    CN216440325U

  • Flue gas desulfurization and dehumidification device

    CN220176510U