Round TBM tunnel lining safety assessment method

Through load-structure model and internal force analysis, the problem of accurate safety assessment of TBM tunnel lining in existing technologies is solved, a safety assessment method suitable for multiple scenarios is provided, and the safety status assessment and maintenance guidance of TBM tunnel lining are realized.

CN120688271APending Publication Date: 2025-09-23SHENZHEN UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510870398.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-06-26
Publication Date
2025-09-23

Smart Images

  • Figure CN120688271A_ABST
    Figure CN120688271A_ABST
Patent Text Reader

Abstract

The invention discloses a circular TBM tunnel lining safety assessment method, and belongs to the technical field of tunnel construction, and the method comprises the following steps: obtaining design data and geotechnical data of a TBM tunnel; calculating to obtain a coefficient matrix of the load matrix; the detection displacement of the TBM tunnel lining is obtained through calculation, and a corresponding matrix is constructed; calculating to obtain a surrounding rock load matrix; calculating to obtain an analytic displacement matrix at any position of the TBM tunnel lining; calculating to obtain a correlation coefficient between the TBM tunnel lining detection displacement and the analysis displacement; the reliability is judged through the correlation coefficient, and the internal force of any position of the TBM tunnel lining is obtained through tunnel lining displacement deformation analysis when the reliability is achieved; defining the ratio of the tunnel lining stress to the yield strength of the TBM; according to the ratio of the TBM tunnel lining stress to the yield strength, safety evaluation is conducted, and a safety evaluation result is obtained. The problem that it is difficult to accurately evaluate the safety of the integral cast-in-place TBM tunnel lining is solved.