Rail transit monolithic track bed-tunnel interface stripping monitoring device and method

By installing monitoring devices of temperature, humidity and water pressure sensors in rail transit, the problem of difficult monitoring of the interface between the rail transit track bed and the tunnel has been solved, accurate assessment and early warning have been achieved, and operational safety and economy have been improved.

CN120760779APending Publication Date: 2025-10-10SUN YAT SEN UNIV
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202510765010.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-06-10
Publication Date
2025-10-10

AI Technical Summary

Technical Problem

Existing technologies make it difficult to effectively monitor and evaluate the debonding of the interface between the overall trackbed and tunnel of rail transit, especially under complex hydrogeological conditions, which leads to serious damage and threatens the safety of train operations.

Method used

A rail transit integral trackbed-tunnel interface debonding monitoring device is used, including temperature and humidity sensors, water pressure sensors and optical fiber sensors, which are installed in the trackbed and tunnel through drilling. The device monitors the interface status in real time and transmits data to the analysis system for system evaluation and early warning.

Benefits of technology

It achieves accurate monitoring of stripping degree and water pressure in complex environments, provides scientific operation and maintenance suggestions, improves the safety and economy of rail transit, and reduces the cost of the entire life cycle.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120760779A_ABST
    Figure CN120760779A_ABST
Patent Text Reader

Abstract

The invention discloses a rail transit monolithic track bed-tunnel interface stripping monitoring device and method. The integrated ballast bed stripping monitoring device comprises an integrated ballast bed stripping monitoring device main body, a data acquisition system and an integrated ballast bed stripping analysis system, the monolithic track bed stripping monitoring device main body and the data acquisition system are used for monitoring acquired data, and guidance suggestions are provided for operation and maintenance of subway track traffic through the monolithic track bed stripping analysis system. According to the method, the monolithic track bed-tunnel interface stripping degree and the underground water pressure state at the interface can be effectively monitored, the monitored data are systematically calculated and evaluated, and operation and maintenance suggestions of monolithic track bed stripping diseases are given; therefore, technical support is provided for monitoring and repairing of the rail transit monolithic track bed-tunnel interface in practical engineering.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of rail transit monitoring, and in particular relates to a rail transit integral roadbed-tunnel interface peeling monitoring device and an evaluation method. Background Art

[0002] Rail transit, as a vital component of urban transportation, is a fundamental, pioneering, and strategic industry for the social economy. With the expansion of urban construction and the growing demand for convenient intercity connectivity, the construction of metro and rail transit infrastructure has developed rapidly. By the end of 2023, 54 cities across China had 336 operational rail transit lines, totaling 11,362 km. According to incomplete statistics, over 100 cities have proposed rail transit development plans and concepts, totaling over 10,000 km. The volume of underground rail transit projects has increased significantly, particularly along rivers, across rivers, and in coastal areas, demonstrating the enormous development potential of urban rail transit. Monolithic trackbeds are widely used in my country's metro infrastructure construction due to their simple structure, easy construction, and strong structural integrity. However, with increasing service life, especially under the combined effects of complex hydrogeological conditions and train loads, monolithic trackbeds are prone to damage and debonding, leading to problems such as mud and slurry seepage and bottom debonding. In coastal areas, monolithic trackbed debonding is particularly serious due to deformation of soft soil foundations and seawater erosion of subway track structures. Therefore, under the combined effects of complex hydrogeological conditions and train loads, the subway roadbed is prone to damage and peeling, leading to problems such as mud and slurry seepage and hollowing of the bottom of the roadbed, which seriously shortens the service life of the track structure and threatens the safety of train operation.

[0003] However, there is currently no better detection method for subway roadbed stripping. Radar is affected by the steel bars of the subway track slabs and groundwater and cannot well detect the extent of roadbed stripping damage. Although the patent (application number: 202411773956.5) mentions a dynamic monitoring system and method for subway roadbed stripping model tests, the above patent is for model tests, and it fails to include the complex environment of the subway during operation. At the same time, there are still major limitations and deficiencies in measuring roadbed stripping in actual projects. Based on the increasingly serious engineering reality of subway roadbed stripping diseases and the difficulty in detecting and detecting subway roadbed-tunnel interface stripping, the present invention proposes a monitoring device and evaluation method for the integral roadbed-tunnel interface stripping of rail transit tunnels. Summary of the Invention

[0004] The present invention addresses the increasingly serious practical engineering problem of rail transit roadbed stripping in complex dynamic water environments, and solves the technical difficulties in monitoring and evaluating rail transit roadbed-tunnel interface stripping. The present invention provides a rail transit roadbed-tunnel interface stripping monitoring device and evaluation method. The present invention can effectively monitor the degree of stripping at the integral roadbed-tunnel interface and the groundwater pressure state at the interface, and systematically calculate and evaluate the monitored data, providing operation and maintenance recommendations for the integral roadbed stripping disease, thereby providing technical support for the monitoring and repair of the integral roadbed-tunnel interface of rail transit in actual projects.

[0005] The technical solutions of the present invention are as follows.

[0006] A rail transit trackbed-tunnel interface debonding monitoring device includes a trackbed debonding monitoring device body, a data acquisition system, and a trackbed debonding analysis system. The trackbed debonding monitoring device body and the data acquisition system monitor and collect data, and the trackbed debonding analysis system provides guidance and suggestions for the operation and maintenance of subway rail transit.

[0007] The main body of the integral track bed stripping monitoring device includes a temperature and humidity sensor, a water pressure sensor, an optical fiber sensor, a sealing ring, a bottom counterweight, a bottom sealant, a top sealant, a top sleeve and an optical fiber cable;

[0008] The main body of the integral roadbed stripping monitoring device is installed in the integral roadbed and the tunnel after the track structure is drilled; top sealant and bottom sealant are arranged above and below the inside of the device, and a temperature and humidity sensor, a water pressure sensor and an optical fiber sensor are arranged below the top sealant. A bottom counterweight is fixed on the bottom sealant, and the bottom counterweight is connected to the optical fiber sensor; the top sleeve is fixed to the integral roadbed base through the top sealant; the wires of the temperature and humidity sensor, water pressure sensor and optical fiber sensor (the wires of the three sensors are integrated into a cable, which is an optical fiber cable after leaving the device) are connected to the optical fiber cable through the top sleeve; the optical fiber cable is connected to the data acquisition system.

[0009] Furthermore, the main body of the integral roadbed stripping monitoring device monitors the status of the interface between the integral roadbed and the tunnel layer in real time, and records the temperature, humidity and water pressure in the cracks after the roadbed is stripped, and transmits the data to the data acquisition system through the optical fiber cable. The data acquisition system transmits the status information of the integral roadbed and tunnel interface at different positions in the area to the integral roadbed stripping analysis system by wireless transmission; the status information includes the stripping amount, temperature, humidity or water pressure.

[0010] Furthermore, the data acquisition system includes an acquisition module, a power supply and a wireless transmission module; Figure 8The data acquisition system shown is composed of the acquisition module, power supply and wireless transmission module. It mainly analyzes the data collected in real time by the overall roadbed stripping monitoring device, and then transmits it wirelessly to the overall roadbed stripping analysis system on the PC for analysis. The power supply mainly provides power for the overall roadbed stripping monitoring device.

[0011] An evaluation method for a rail transit integral trackbed-tunnel interface debonding monitoring device monitors the debonding status and degree of the interface between a shield tunnel and the integral trackbed in real time through the integral trackbed debonding monitoring device, and wirelessly transmits the data to an integral trackbed debonding analysis system. The integral trackbed debonding analysis system performs a longitudinal comparison based on historical monitoring data and water pressure, and also performs a transverse comparison based on data at different regional locations, thereby obtaining a development time sequence diagram and distribution cloud diagram of debonding and water pressure of the entire integral trackbed. By comparing and judging the current situation with the early warning data, appropriate treatment measures are selected, thereby providing guidance and suggestions for the operation and maintenance of subway rail transit.

[0012] The above method comprises the following steps:

[0013] (1) Installing the integral track bed stripping monitoring device;

[0014] (2) Data analysis and transmission: The data acquisition system collects and analyzes the data collected by each integral track bed stripping monitoring device, and transmits it wirelessly to the integral track bed stripping analysis system on the PC for analysis and evaluation;

[0015] (3) Overall roadbed stripping analysis system: Based on the fact that the optical fiber sensor is affected by the ambient temperature and humidity, the temperature and humidity values ​​monitored by the temperature and humidity sensor are first corrected to obtain the value of the stretching length H.

[0016] The above method step (1) is specifically as follows:

[0017] 1) Positioning Drilling: Based on the contour characteristics of the rail transit tunnel, fixed points are marked at the centerline position, 1 / 4 position, and 3 / 4 position of the line, and vertical drilling is carried out. The depth of the drilling passes through the interface between the monolithic roadbed and the tunnel and extends into the interior of the tunnel matrix to a certain depth. The depth is greater than the bottom counterweight length of the monolithic roadbed debonding monitoring device.

[0018] 2) Install the integral roadbed stripping monitoring device: After the positioning drilling is completed, clean the sand and gravel particles in the hole, and then pour the bottom sealant into the hole; the volume of the grouting is calculated using the following formula:

[0019] V = π × (d / 2) 2 ×h (1);

[0020] 3) Installation of sealing ring and pouring of top sealant: after the bottom sealant solidifies, the whole track bed peeling monitoring device is pulled up to ensure that the optical fiber sensor is in tension, then the position of the sealing ring is adjusted, and the pouring of the top sealant is carried out, and the pouring method and the pouring amount are the same as those of the bottom sealant, wherein the main function of the sealing ring is to prevent the sealant from flowing into the cavity of the whole track bed peeling monitoring device;

[0021] 4) Parallel connection and networking of optical fiber cable: after the top sealant solidifies, the parallel connection and networking of the optical fiber cable of each whole track bed peeling monitoring device are started, according to the number of interfaces of the data acquisition system at the tunnel haunch position, the data of the whole track bed peeling monitoring devices in the adjacent area are accessed, and the fixing or burying of the cable is completed.

[0022] In the above method step 2), the solidification time of the bottom sealant is 5-10 minutes; and the pouring height h is 1-3 cm.

[0023] The above method step (3) is specifically:

[0024] 1) Track bed peeling amount calculation at the tunnel centerline position: the peeling amount of the whole track bed and the shield tunnel interface at the tunnel centerline position is the change of the stretching length of the optical fiber sensor, that is,

[0025] W 中线 = H (1)

[0026] 2) Track bed peeling amount calculation at the position on both sides of the tunnel centerline: since the bottom of the subway tunnel is a curved surface, in order to accurately calculate the whole track bed peeling amount at the position on both sides of the tunnel centerline, the tunnel contour needs to be considered, and the calculation is as follows:

[0027] Assuming that the inner radius of the tunnel is R, the distance between the whole track bed peeling device at the tunnel centerline position and the whole track bed peeling device on both sides is L, then ∠mon can be calculated:

[0028] ∠mon = 180 0 × arcsin (L / R) / π (1)

[0029] Therefore, the track bed peeling amount on both sides is:

[0030] W 两侧 = cos (∠mon) × H (1)

[0031] At the same time, the lateral displacement of the whole track bed is:

[0032] D 两侧 = W 两侧 × sin (∠mon) (1)

[0033] 3) Analysis of time series data: By analyzing the peeling amount W between the overall roadbed and the tunnel layer 中线 、W 两侧 and D 两侧 The data, especially the curve of change over time, can be used to obtain the stripping and lateral displacement of the entire roadbed at that location;

[0034] 4) Spatial data analysis: By drawing contour cloud maps of the overall roadbed stripping data monitored at different regional locations, the regional distribution of overall roadbed stripping during operation can be determined; through time series and spatial data analysis, and in combination with specifications or standards, corresponding stripping thresholds, water pressure thresholds and other warning limits are set to issue warnings for corresponding potential danger areas, thereby providing guidance for subsequent operation and maintenance.

[0035] This invention addresses the technical difficulties in monitoring and evaluating the debonding of the integral trackbed-tunnel interface of rail transit, and its main advantages are as follows:

[0036] Breaking through the limitations of complex environments and accurately monitoring key indicators: Targeting the real-world engineering challenges of complex dynamic water environments, this invention can effectively and reliably monitor the degree of debonding and groundwater pressure at the interface between the trackbed and tunnel structure. This addresses the challenge of obtaining interfacial debonding data under harsh hydrological conditions.

[0037] Realize simultaneous perception of multiple parameters and provide a comprehensive diagnostic basis: The device simultaneously captures two core parameters, the degree of stripping and groundwater pressure, providing a more comprehensive and relevant data basis for evaluating the causes, development trends and risk levels of interface stripping diseases, far exceeding the monitoring of a single indicator.

[0038] Provide accurate quantitative assessment and solve the evaluation problem: The invention not only monitors data, but also includes systematic calculation and evaluation methods. It can conduct in-depth analysis of monitoring data, accurately quantify the severity and potential risks of interface peeling, and solve the core technical bottleneck of "difficulty in evaluating the peeling status".

[0039] Realize intelligent diagnosis and decision support: Based on monitoring data and system evaluation, the invention can automatically generate targeted operation and maintenance suggestions (such as early warning, maintenance priority, repair strategy, etc.), and convert data into engineering decisions that can directly guide actions, greatly improving the intelligence and foresight of operation and maintenance.

[0040] Form a closed-loop solution to empower engineering practice: integrating "monitoring (data collection) - evaluation (data analysis) - recommendation (decision output)", it provides a complete and reliable technical support system for the prevention, diagnosis and repair of rail transit integral trackbed-tunnel interface peeling diseases, directly serving the health monitoring, safe operation and maintenance, and repair and reinforcement of actual projects.

[0041] Improve safety and economy: Early and accurate detection of stripping defects and provision of scientific advice can help prevent catastrophic degassing accidents and ensure operational safety. At the same time, condition-based precision maintenance can avoid blind repairs, optimize maintenance resource allocation, and reduce lifecycle costs.

[0042] In summary, the core advantage of the present invention is that it successfully solves the key technical problem of the difficulty in monitoring and scientifically evaluating the debonding state of the rail transit roadbed-tunnel interface in a complex dynamic water environment. Through innovative devices and methods, it realizes the effective synchronous monitoring of the debonding degree and groundwater pressure, and outputs operation and maintenance decision recommendations that directly serve engineering practice based on systematic calculation and evaluation, providing strong technical support for ensuring the safe, durable and efficient operation and maintenance of rail transit infrastructure. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] Figure 1 Schematic diagram of the monitoring section of the integral trackbed-tunnel interface peeling of rail transit.

[0044] Figure 2 for Figure 1 A partial enlarged view.

[0045] Figure 3 for Figure 1 A partial enlarged view of middle B.

[0046] Figure 4 Partial schematic diagram A of the rail transit integral trackbed-tunnel interface after peeling.

[0047] Figure 5 for Figure 4 A partial enlarged view of center C.

[0048] Figure 6 Diagram of the rail transit integral trackbed-tunnel interface peeling monitoring device.

[0049] Figure 7 Analyze the main flow chart of the overall trackbed stripping analysis system.

[0050] Figure 8 Schematic diagram of the data acquisition system. DETAILED DESCRIPTION

[0051] The following description, combined with specific illustrations, illustrates the technical solutions for a thorough understanding of the present invention. However, the present invention can be implemented in many other ways than those described herein. Similar generalizations and implementations made by persons of ordinary skill in the art without inventive effort are also within the scope of protection of the present invention.

[0052] Example 1

[0053] like Figures 1 to 6As shown, the device of the present invention mainly comprises a trackbed stripping monitoring device body 3, a data acquisition system 5, and a trackbed stripping analysis system. The trackbed stripping monitoring device body 3 monitors and collects data through the data acquisition system 5, and the trackbed stripping analysis system provides guidance and suggestions for the operation and maintenance of subway rail transit.

[0054] The main body 3 of the integrated trackbed debonding monitoring device includes a temperature and humidity sensor 9, a water pressure sensor 10, a fiber optic sensor 11, a sealing ring 12, a bottom counterweight 13, a bottom sealant 14-1, a top sealant 14-2, and a top sleeve 15. After the track structure is drilled 6, the main body 3 of the integrated trackbed debonding monitoring device is installed in the integrated trackbed 2 and tunnel 1. The bottom counterweight of the integrated trackbed debonding monitoring device is fixed to the trackbed tunnel matrix with sealant. The top sleeve of the integrated trackbed debonding monitoring device is fixed to the trackbed matrix, and the fiber optic sensor 11 is kept in a stretched state. The stretching deformation range of the fiber optic sensor must meet certain requirements. Specifically, top sealant 14-2 and bottom sealant 14-1 are arranged above and below the inside of the device, and a temperature and humidity sensor 9, a water pressure sensor 10 and an optical fiber sensor 11 are arranged below the top sealant 14-2. A bottom counterweight 13 is fixed on the bottom sealant 14-1, and the bottom counterweight 13 is connected to the optical fiber sensor 11; the top sleeve 15 is fixed to the integral roadbed matrix through the top sealant 14-2; the wires of the temperature and humidity sensor 9, the water pressure sensor 10 and the optical fiber sensor 11 are connected to the optical fiber cable 4 through the top sleeve 15; and the optical fiber cable 4 is connected to the data acquisition system.

[0055] Data acquisition system: mainly includes acquisition card, power supply, wireless transmission module, such as Figure 8 The figure shows a system composed of the acquisition module, power supply and wireless transmission module; it mainly analyzes the data collected in real time by the integral roadbed stripping monitoring device, and then transmits it to the integral roadbed stripping analysis system on the PC side through the wireless transmission module for analysis. The power supply mainly provides power for the integral roadbed stripping monitoring device.

[0056] The integrated roadbed stripping analysis system, which critically includes modules such as a roadbed stripping calculation algorithm, roadbed evaluation methods, and sensor environmental correction, analyzes real-time data from the integrated roadbed stripping monitoring device. By combining known physical information such as the tunnel profile with the collected stripping data and correcting for environmental influences such as temperature and humidity, the system can determine the overall roadbed stripping situation at monitoring points in different regions.

[0057] The main body 3 of the integral roadbed stripping monitoring device monitors the status of the interface between the integral roadbed and the tunnel layer in real time, and records the temperature, humidity and water pressure in the cracks after the roadbed is stripped, and transmits the data to the 5-data acquisition system through the optical fiber cable. The data acquisition system transmits the status information of the integral roadbed and tunnel interface at different positions in the area (stripping amount, temperature, humidity, water pressure, etc.) to the integral roadbed stripping analysis system by wireless transmission.

[0058] Example 2

[0059] This embodiment adopts the device described in Example 1 to provide an evaluation method for a rail transit integrated trackbed-tunnel interface debonding monitoring device.

[0060] In this embodiment, the integrated roadbed debonding monitoring device can monitor the debonding status and degree of the interface between the shield tunnel and the integrated roadbed in real time, and wirelessly transmit the data to the integrated roadbed debonding analysis system. The integrated roadbed debonding analysis system compares historical monitoring data with water pressure vertically, and also compares data from different locations horizontally, thereby generating a time series diagram and distribution cloud map of debonding and water pressure development across the entire integrated roadbed. By comparing and judging the current warning, appropriate treatment measures can be selected, providing guidance and suggestions for the operation and maintenance of subway rail transit.

[0061] The specific method is as follows: The main flow chart of the overall track bed stripping analysis system is as follows: Figure 7 As shown:

[0062] (1) Installing the integral track bed stripping monitoring device

[0063] 1) Positioning Drilling: Based on the contour characteristics of the rail transit tunnel, mark the centerline position, 1 / 4 position, and 3 / 4 position of the line. Then, use a drill bit with a diameter of less than 3 cm to drill vertically. The depth of the drill hole must pass through the interface between the integral roadbed and the tunnel and extend into the tunnel matrix to a certain depth (the depth is greater than the bottom counterweight length of the integral roadbed debonding monitoring device). Note that the steel bars inside the track structure must be avoided during the drilling process.

[0064] 2) Install the integral roadbed stripping monitoring device: After the positioning drilling is completed, clean the sand and gravel particles in the hole, and then pour the bottom sealant into the hole. The sealant used should have moderate viscosity and a setting time of more than 5 minutes and less than 10 minutes. The grouting volume should not be too much, and the grouting height h is recommended to be less than 2cm. The grouting volume is calculated using the following formula:

[0065] V = π × (d / 2) 2 ×h (1)

[0066] During the grouting process, the sealant can be poured into the tunnel matrix using a diversion tube; then the integrated roadbed stripping monitoring device is placed into the drilled hole; the bottom counterweight of the integrated roadbed stripping monitoring device is used to allow the bottom counterweight to sink into the bottom sealant, ensuring that the bottom sealant can wrap the lower half of the bottom counterweight of the integrated roadbed stripping monitoring device;

[0067] 3) Install the sealing ring and pour the top sealant: After the bottom sealant solidifies, lift the integrated roadbed debonding monitoring device upward to ensure that the optical fiber sensor 11 is in a stretched state. Then, after adjusting the position of the sealing ring, pour the top sealant. The grouting method and amount are the same as those for the bottom sealant. The main function of the sealing ring is to prevent the sealant from flowing into the cavity of the integrated roadbed debonding monitoring device.

[0068] 4) Parallel connection and networking of optical fiber cables: After the top sealant solidifies, start parallel connection and networking of the optical fiber cables of each integral roadbed stripping monitoring device. According to the number of 5-data acquisition system interfaces at the tunnel arch waist, connect the data of the integral roadbed stripping monitoring device in the adjacent area, and fix or bury the cables.

[0069] (2) Data analysis and transmission: The data acquisition system collects and analyzes the data collected by each integral track bed stripping monitoring device, and transmits it wirelessly to the integral track bed stripping analysis system on the PC for analysis and evaluation.

[0070] (3) Integral roadbed stripping analysis system

[0071] Since the optical fiber sensor 11 is affected by the ambient temperature and humidity, it is first corrected according to the temperature and humidity values ​​monitored by the temperature and humidity sensor 9, so as to obtain the following: Figure 5 The stretched length shown is the value of H.

[0072] 1) Calculation of the stripping amount of the roadbed at the tunnel centerline: The stripping amount of the interface between the integral roadbed and the shield tunnel installed at the tunnel centerline is 11-The change in the tensile length of the optical fiber sensor is:

[0073] W 中线 =H(1)

[0074] 2) Calculation of the roadbed stripping amount on both sides of the tunnel centerline: Since the bottom of a subway tunnel is a certain curved surface, the tunnel contour needs to be considered to accurately calculate the overall roadbed stripping amount on both sides of the centerline. The calculation is as follows:

[0075] Assuming that the inner radius of the tunnel is R, and the distance between the integral roadbed stripping device at the tunnel centerline and the integral roadbed stripping devices on both sides is L, ∠mon can be calculated as:

[0076] ∠mon=180 0 ×arcsin(L / R) / π (1)

[0077] Therefore, the stripping amount of the ballast bed on both sides is:

[0078] W 两侧 =cos(∠mon)×H (1)

[0079] At the same time, the lateral displacement of the entire roadbed is:

[0080] D 两侧 =W 两侧 ×sin(∠mon) (1)

[0081] 3) Analysis of time series data: By analyzing the peeling amount W between the overall roadbed and the tunnel layer 中线 、W 两侧 and D 两侧 By using the data, especially the curve of change over time, the stripping situation and lateral displacement of the overall roadbed at that location can be obtained. There are many causes of roadbed stripping that need attention, such as uneven tunnel settlement, high underground water pressure, etc. Therefore, the occurrence and cause can be determined with the help of daily track unevenness inspections and the water pressure sensor data in the overall roadbed stripping device. For example, if the daily track unevenness inspection finds that the unevenness has not changed or has become smaller, while the stripping of the overall roadbed has become larger, it can be determined that the tunnel has undergone uneven settlement, which has led to the stripping of the overall roadbed. Therefore, in the later stage, not only the stripping needs to be treated, but also the tunnel settlement needs to be treated.

[0082] 4) Spatial data analysis: By drawing contour cloud maps of the overall roadbed stripping data monitored at different regional locations, the regional distribution of overall roadbed stripping during operation can be determined; through time series and spatial data analysis, and in combination with specifications or standards, corresponding stripping thresholds, water pressure thresholds and other warning limits are set, so that warnings can be issued for corresponding potential danger areas, thereby providing guidance for subsequent operation and maintenance.

[0083] The embodiments of the present invention are described in detail above with reference to the accompanying drawings. However, the present invention is not limited to the above embodiments. Various changes can be made within the scope of knowledge possessed by ordinary technicians in the relevant technical field without departing from the scope of the present invention.

Claims

1. A rail transit monolithic roadbed-tunnel interface peeling monitoring device, characterized in that: The invention comprises an integral track bed stripping monitoring device body (3), a data acquisition system (5) and an integral track bed stripping analysis system; the integral track bed stripping monitoring device body (3) monitors and collects data through the data acquisition system (5), and provides guidance and suggestions for the operation and maintenance of subway rail transit through the integral track bed stripping analysis system; The main body (3) of the integral track bed stripping monitoring device comprises a temperature and humidity sensor (9), a water pressure sensor (10), an optical fiber sensor (11), a sealing ring (12), a bottom counterweight (13), a bottom sealant (14-1), a top sealant (14-2) and a top sleeve (15); The main body (3) of the integral track bed stripping monitoring device is installed in the integral track bed (2) and the tunnel (1) after the track structure is drilled (6); a top sealant (14-2) and a bottom sealant (14-1) are arranged above and below the device; a temperature and humidity sensor (9), a water pressure sensor (10) and an optical fiber sensor (11) are arranged below the top sealant (14-2); a bottom counterweight (13) is fixed on the bottom sealant (14-1), and the bottom counterweight (13) is connected to the optical fiber sensor (11); the top sleeve (15) is fixed to the integral track bed base through the top sealant (14-2); the wires of the temperature and humidity sensor (9), the water pressure sensor (10) and the optical fiber sensor (11) are connected to the optical fiber cable (4) through the top sleeve (15); and the optical fiber cable (4) is connected to a data acquisition system.

2. A rail transit monolithic trackbed-tunnel interface debonding monitoring device as claimed in claim 1, characterized in that: The main body (3) of the integral roadbed stripping monitoring device monitors the status of the interface between the integral roadbed and the tunnel layer in real time, and records the temperature, humidity and water pressure in the cracks after the roadbed is stripped, and transmits the data to the data acquisition system (5) through the optical fiber cable (4). The data acquisition system (5) transmits the status information of the integral roadbed and tunnel interface at different positions in the area to the integral roadbed stripping analysis system by wireless transmission; the status information includes the stripping amount, temperature, humidity or water pressure.

3. A rail transit monolithic roadbed-tunnel interface debonding monitoring device as claimed in claim 2, characterized in that: The data acquisition system (5) is composed of the acquisition module, the power supply and the wireless transmission module; the data acquisition system (5) analyzes the data collected in real time by the integral track bed stripping monitoring device, and then transmits the data to the integral track bed stripping analysis system on the PC side through the wireless transmission module for analysis; the power supply provides power to the integral track bed stripping monitoring device.

4. The method for evaluating the device according to any one of claims 1 to 3, characterized in that: The overall roadbed stripping monitoring device monitors the stripping status and degree of the interface between the shield tunnel and the overall roadbed in real time, and transmits the data wirelessly to the overall roadbed stripping analysis system. The overall roadbed stripping analysis system conducts a longitudinal comparison based on historical monitoring data and water pressure, and the system also conducts a horizontal comparison based on data at different regional locations, thereby obtaining a development time sequence diagram and distribution cloud diagram of the stripping and water pressure of the entire overall roadbed; by comparing and judging with the current warning, appropriate treatment measures are selected, thereby providing guidance and suggestions for the operation and maintenance of subway rail transit.

5. The evaluation method according to claim 4, wherein: The steps include: (1) Installing the integral track bed stripping monitoring device; (2) Data analysis and transmission: The data acquisition system collects and analyzes the data collected by each integral track bed stripping monitoring device, and transmits it wirelessly to the integral track bed stripping analysis system on the PC for analysis and evaluation; (3) Overall roadbed stripping analysis system: Based on the influence of ambient temperature and humidity on the optical fiber sensor (11), the temperature and humidity values ​​monitored by the temperature and humidity sensor (9) are corrected to obtain the value of the stretching length H.

6. The evaluation method according to claim 5, wherein: Step (1) is specifically as follows: 1) Positioning Drilling: Based on the contour characteristics of the rail transit tunnel, fixed points are marked at the centerline position, 1 / 4 position, and 3 / 4 position of the line, and vertical drilling is carried out. The depth of the drilling passes through the interface between the monolithic roadbed and the tunnel and extends into the interior of the tunnel matrix to a certain depth. The depth is greater than the bottom counterweight length of the monolithic roadbed debonding monitoring device. 2) Install the integral roadbed stripping monitoring device: After the positioning drilling is completed, clean the sand and gravel particles in the hole, and then pour the bottom sealant into the hole; the volume of the grouting is calculated using the following formula: V=π×(d / 2) 2 ×h (1) Where: d is the diameter of the drill hole; h is the grouting height; 3) Install the sealing ring and pour the top sealant: When the bottom sealant solidifies, lift the integrated roadbed stripping monitoring device upward to ensure that the optical fiber sensor is in a stretched state. Then, after adjusting the position of the sealing ring, pour the top sealant. The grouting method and grouting amount are the same as those for the bottom sealant. The main function of the sealing ring is to prevent the sealant from flowing into the cavity of the integrated roadbed stripping monitoring device. 4) Parallel connection and networking of optical fiber cables: After the top sealant solidifies, start parallel connection and networking of the optical fiber cables of each integral roadbed stripping monitoring device. According to the number of data acquisition system interfaces at the tunnel arch waist, connect the data of the integral roadbed stripping monitoring device in the adjacent area, and fix or bury the cables.

7. The evaluation method according to claim 6, wherein: In step 2), the solidification time of the bottom sealant is 5 to 10 minutes; and the grouting height h is 1 cm to 3 cm.

8. The evaluation method according to claim 5, wherein: Step (3) is specifically as follows: 1) Calculation of the stripping amount of the roadbed at the tunnel centerline: The stripping amount of the interface between the whole roadbed and the shield tunnel installed at the tunnel centerline is the change in the stretched length of the optical fiber sensor: W 中线 =H (1) 2) Calculation of the roadbed stripping amount on both sides of the tunnel centerline: Since the bottom of the subway tunnel is a curved surface, the tunnel contour needs to be considered to accurately calculate the overall roadbed stripping amount on both sides of the centerline. The calculation is as follows: Assuming that the inner radius of the tunnel is R, and the distance between the integral roadbed stripping device at the tunnel centerline and the integral roadbed stripping devices on both sides is L, ∠mon can be calculated as: ∠mon=180°×arcsin(L / R) / π (1) Therefore, the stripping amount of the ballast bed on both sides is: W 两侧 =cos(∠mon)×H (1) At the same time, the lateral displacement of the entire roadbed is: D 两侧 =W 两侧 ×sin(∠mon) (1) 3) Analysis of time series data: By analyzing the peeling amount W between the overall roadbed and the tunnel layer 中线 、W 两侧 and D 两侧 The data, especially the curve of change over time, can be used to obtain the stripping and lateral displacement of the entire roadbed at that location; 4) Spatial data analysis: By drawing contour cloud maps of the overall roadbed stripping data monitored at different regional locations, the regional distribution of overall roadbed stripping during operation can be determined; through time series and spatial data analysis, and in combination with specifications or standards, corresponding stripping thresholds or water pressure thresholds are set to issue early warnings for corresponding potential danger areas, thereby providing guidance for subsequent operation and maintenance.

Citation Information

Patent Citations

  • Dynamic monitoring system and method for subway ballast bed stripping model test