Integrated concrete water collecting tank and mounting method thereof
By using prefabricated construction methods and integrating concrete water collection tanks with interconnected box windows and rubber gasket seals, the problems of long construction cycles and high operational risks have been solved, achieving efficient and safe installation of water collection devices.
Patent Information
- Application Number
- CN202511327591.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-09-17
- Publication Date
- 2025-11-04
AI Technical Summary
Existing water collection devices have long construction cycles and low efficiency on construction sites, and workers are exposed to high risks by working in confined spaces for extended periods.
The prefabricated construction method is adopted, which connects multiple boxes through windows and seals with rubber gaskets, and connects the boxes by pouring concrete in the post-cast cavity to form an integral structure. The sealing of the connection is enhanced by using the opening and end flange plates.
It shortened the construction period, improved construction efficiency, reduced the risk of workers operating in confined spaces, and achieved efficient installation of water collection devices.
Smart Images

Figure CN120889467A_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The present application relates to the technical field of building construction, and more particularly to an integrated concrete water collecting tank and a mounting method thereof. BACKGROUND
[0002] With the development of the construction industry and the continuous adjustment of the industry, it is inevitable to continuously improve the technology level of the construction industry, and people are more inclined to the efficiency and convenience of building construction. At the same time, the state pays more and more attention to environmental protection and industrialized scale integrated production, and a batch of process products that replace traditional complex and high-risk processes have appeared.
[0003] In each link of building construction, water is an indispensable resource, which is usually used for concrete structure maintenance, spraying dust, fire water, etc. In order to ensure the centralized use of water, a water collecting device is usually set up at the construction site.
[0004] The water collecting tank in the prior art usually adopts a reinforced concrete structure, and the workers need to work in a limited space during the steel bar binding, formwork installation and concrete pouring work, which has a very high operation risk, and the construction period is often long and the internal material transportation is extremely inconvenient.
[0005] Therefore, how to provide an integrated concrete water collecting tank capable of reducing the operation time in a limited space is a problem that those skilled in the art need to solve. SUMMARY
[0006] Therefore, the present application provides an integrated concrete water collecting tank and a mounting method thereof, which solves the problems of long construction period, low efficiency, long-time operation of workers in a limited space and high risk coefficient of the water collecting device in the prior art.
[0007] In order to achieve the above-mentioned purpose, the present application adopts the following technical solutions:
[0008] An integrated concrete water collecting tank comprises:
[0009] A plurality of tank bodies, and windows are formed in the end portions of the tank bodies; the windows of adjacent two tank bodies are oppositely arranged and interconnected;
[0010] A mouth flange plate is fixed to the circumferential surface of the tank body corresponding to the window and extends outward along the tank body;
[0011] An end flange plate is fixed to the end portion of the tank body and extends outward along the tank body, and the end flange plate, the mouth flange plate and the end surface of the tank body enclose a post-cast cavity;
[0012] A rubber pad is embedded between the two mouth flange plates of adjacent two tank bodies.
[0013] The beneficial effects of the technical scheme of the present application are that the plurality of boxes are communicated through the windows, facilitating the circulation of water, the mouth flange plates between the two adjacent boxes are sealed through the rubber pads, and the plurality of boxes are connected into an integral structure by pouring concrete in the post-poured cavity. The assembled construction method of the water collecting tank has a short construction period and high efficiency, and solves the problem of high risk of long-time operation in a limited space.
[0014] Preferably, the middle part of the window is provided with a cross beam. The cross beam arranged in the middle part of the window can ensure the overall structural strength of the box and prevent the box from being broken during hoisting.
[0015] Preferably, one end of the box at the end part is closed, and the two ends of the box at the middle part are both provided with the window. The water collecting tank is ensured to be an integral closed box, and the water collecting performance is ensured.
[0016] Preferably, the top surface of the box at the end part is provided with an access hole. When the water collecting tank leaks, the connection part between the boxes can be repaired and sealed through the access hole.
[0017] Preferably, the inner wall of the access hole is fixed with a ladder. The ladder facilitates workers to go up and down into the box.
[0018] Preferably, the window is circumferentially provided with the mouth flange plate; and the two sides and the bottom of the end part of the box are provided with the end flange plate. After the two boxes are butted, the top surface of the connection part is open to facilitate pouring concrete into the post-poured cavity.
[0019] Preferably, the end flange plates located at the bottom and one side of the box are connected through a haunch inclined surface. The haunch inclined surface is arranged to improve the carrying capacity and anti-seismic performance of the box, and to solve the problem of eccentricity of the node of the box.
[0020] The present application also provides an installation method of the integrated concrete water collecting tank, comprising the following steps:
[0021] S1, hoist a plurality of boxes on the foundation;
[0022] S2, embed a rubber pad between the mouth flange plates of the two adjacent boxes;
[0023] S3, seal the gap between the two end flange plates of the two adjacent boxes by using a blocking formwork;
[0024] S4, pour waterproof concrete in the post-poured cavity;
[0025] S5, remove the blocking formwork to complete the installation.
[0026] Through the technical scheme, compared with the prior art, the application provides an integrated concrete water collecting tank and a mounting method thereof, two adjacent tank bodies are connected into a whole by pouring concrete in the post-pouring cavity after butt joint, the construction method of assembly type can reduce the engineering construction cost and improve the construction speed, and the problems of long construction period, low efficiency, long-time operation of the operation personnel in the limited space and high danger coefficient of the water collecting device in the prior art are solved. BRIEF DESCRIPTION OF DRAWINGS
[0027] In order to more clearly illustrate the technical solutions in the embodiments of the present application or the prior art, the drawings needed to be used in the embodiments or the prior art description will be briefly introduced as follows. Obviously, the drawings in the following description only represent some embodiments of the present application, and other drawings can be obtained by those skilled in the art without creative effort on the basis of the provided drawings.
[0028] Figure 1 The box structure schematic diagram provided by the present application is shown in the figure.
[0029] Figure 2 The box assembly flat section schematic diagram provided by the present application is shown in the figure.
[0030] In the figure, 1 is a tank body, 2 is a window, 3 is an opening flange plate, 4 is an end flange plate, 5 is a post-pouring cavity, 6 is a haunching inclined surface, 7 is an inspection opening, 8 is a ladder, 9 is a rubber pad, 10 is a plugging formwork, 11 is a foundation, and 12 is a cross beam. DETAILED DESCRIPTION
[0031] The technical solutions in the embodiments of the present application will be described clearly and completely in combination with the drawings in the embodiments of the present application. Obviously, the described embodiments only represent some of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative effort belong to the scope of protection of the present application.
[0032] Embodiment 1
[0033] The drawings are attached Figure 1 and 2According to the integrated concrete water collecting tank of the embodiment of the present application, the tank is constructed by the assembly type, the multiple tank bodies are connected into the integrated water collecting tank structure by pouring the concrete in the post-poured cavity, the construction efficiency is high, the construction period is short, and the problems of long construction period, low efficiency, long-time operation of the operation personnel in the limited space and high danger coefficient in the prior art are solved. The integrated concrete water collecting tank comprises a tank body 1, a mouth flange plate 3, an end flange plate 4 and a rubber pad 9. The tank body 1 is multiple in number and is provided with a window 2 at the end. The windows 2 of the adjacent two tank bodies 1 are oppositely arranged and are communicated with each other. The tank body 1 at the end is closed at one end and is provided with the window 2 at the other end. The tank body 1 at the middle is provided with the window 2 at both ends. The mouth flange plate 3 is fixed to the peripheral surface of the corresponding window 2 of the tank body 1 and extends outwardly along the tank body 1. The mouth flange plate 3 protrudes from one end of the window 2 by a distance. The mouth flange plate 3 is arranged around the window 2. The end flange plate 4 is fixed to the end of the tank body 1 and extends outwardly along the tank body 1. The end flange plates 4 are arranged on both sides and the bottom of the end of the tank body 1. The width of the end flange plate 4 is greater than that of the mouth flange plate 3. The end flange plate 4, the mouth flange plate 3 and the end surface of the tank body 1 jointly form the post-poured cavity 5. The waterproof concrete is poured in the post-poured cavity 5 between the adjacent two tank bodies 1 to connect the two tank bodies 1. Since the end flange plate 4 is not arranged at the top of the tank body 1, the post-poured cavities 5 of the two tank bodies 1 are communicated with each other and are open at the top after the two tank bodies 1 are butted. The waterproof concrete can be poured into the post-poured cavity through the opening. The rubber pad 9 is embedded between the two mouth flange plates 3 of the adjacent two tank bodies 1. The gap between the two mouth flange plates 3 of the adjacent two tank bodies 1 is sealed by the rubber pad 9 to prevent the slurry from leaking into the window 2 during the pouring of the waterproof concrete.
[0034] In some other embodiments, in order to improve the structural strength of the tank body and prevent the tank body from being broken during hoisting or transferring, a cross beam 12 is arranged at the middle of the window 2.
[0035] In some other embodiments, in order to improve the bearing capacity and the anti-seismic performance of the tank body, a haunch inclined surface 6 is arranged between the end flange plates 4 at the bottom and one side of the tank body 1.
[0036] In order to further optimize the above technical solution, the top surface of the tank body 1 at the end is provided with an inspection hole 7. If the water collecting tank leaks, the leakage is basically at the connection position. Therefore, the tank body can be accessed through the inspection hole for maintenance and maintenance.
[0037] In order to further optimize the above technical solution, the inner wall of the inspection hole 7 is fixed with a climbing ladder 8 for facilitating the construction personnel to access the tank body.
[0038] Embodiment 2
[0039] According to the installation method of the integrated concrete water collecting tank of the embodiment of the present application, the multiple tank bodies are butted to form the water collecting tank, which comprises the following steps:
[0040] S1, hoist a plurality of boxes 1 on the foundation 11;
[0041] S2, insert rubber pads 9 between the mouth flange plates 3 between the two adjacent boxes 1 to seal the mouth flange plates 3 between the two adjacent boxes 1, while ensuring that the post-poured cavities 5 between the two adjacent boxes 1 are connected to each other, that is, the end face of the box is a "hui" character structure;
[0042] S3, the gap between the two end flange plates 4 between the two adjacent boxes 1 is sealed by the blocking formwork 10, and the blocking formwork 10 is arranged to prevent the slurry from leaking through the gap between the end flange plates 4 between the two adjacent boxes 1 during the pouring of concrete;
[0043] S4, pouring waterproof concrete in the post-poured cavity 5;
[0044] S5, remove the blocking formwork 10, and complete the installation.
[0045] Each of the embodiments in the specification is described in a progressive manner, and each embodiment focuses on the difference from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the device disclosed by the embodiments, since it corresponds to the method disclosed by the embodiments, the description is relatively simple, and the related parts can be referred to the method part.
[0046] The above description of the disclosed embodiments enables a person skilled in the art to implement or use the present application. Various modifications to the embodiments will be apparent to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. An integrated concrete water collection tank, characterized in that, include: The box (1) is a plurality of boxes (1) and has a window (2) at its end; the windows (2) of two adjacent boxes (1) are arranged opposite to each other and are interconnected; Mouth flange plate (3), the mouth flange plate (3) is fixed to the periphery of the box body (1) corresponding to the window (2) and extends outward along the box body (1); End flange plate (4) is fixed to the end of the box body (1) and extends outward from the box body (1). The end flange plate (4), the opening flange plate (3) and the end face of the box body (1) enclose a post-cast cavity (5). Waterproof concrete is poured into the post-cast cavity (5) between two adjacent box bodies (1) to connect the two box bodies (1). A rubber pad (9) is embedded between the two opening flanges (3) of two adjacent boxes (1).
2. An integrated concrete water collection tank according to claim 1, characterized in that, A crossbeam (12) is provided in the middle of the window (2).
3. An integrated concrete water collection tank according to claim 1, characterized in that, The box (1) located at one end is closed, and the other end is provided with the window (2); the box (1) located in the middle has windows (2) at both ends.
4. An integrated concrete water collection tank according to claim 3, characterized in that, The top surface of the housing (1) located at the end has an inspection port (7).
5. An integrated concrete water collection tank according to claim 4, characterized in that, A ladder (8) is fixed to the inner wall of the inspection port (7).
6. An integrated concrete water collection tank according to claim 1, characterized in that, The window (2) is provided with the opening flange plate (3) in all directions; the box body (1) is provided with the end flange plate (4) on both sides and bottom.
7. An integrated concrete water collection tank according to claim 6, characterized in that, The end flange (4) located between the bottom of the housing (1) and one side thereof forms a sloping surface (6).
8. The installation method of an integrated concrete water collection tank according to any one of claims 1 to 7, characterized in that, Includes the following steps: S1. Hoist multiple boxes (1) onto the foundation (11); S2. A rubber pad (9) is installed between the opening flanges (3) of two adjacent boxes (1); S3. The gap between the two end flanges (4) between two adjacent boxes (1) is sealed with a sealing template (10); S4. Pour waterproof concrete into the post-pouring cavity (5); S5. Remove the sealing template (10) to complete the installation.
Citation Information
Cited By
Box-type sewage treatment equipment
CN121627276A