Constructional column non-dismantling formwork construction device and process
By combining steel frames with fiber cement boards, and using installation devices to enable free movement and precise fixing of fiber cement boards in three-dimensional space, the problems of cumbersome formwork removal and difficulty in ensuring accuracy in traditional structural column formwork construction are solved, achieving efficient and precise formwork removal-free construction.
Patent Information
- Application Number
- CN202510987558.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-07-17
- Publication Date
- 2025-11-25
AI Technical Summary
Traditional structural column formwork construction involves a cumbersome demolding process, significant formwork wear and tear, a long construction period, and difficulty in ensuring construction accuracy, which affects building quality.
Employing a template-free technology, the steel frame is combined with fiber cement board, and an installation device is used to achieve free three-dimensional movement and precise fixation of the fiber cement board. Hydraulic and adsorption components are used for positioning and connection.
It simplifies the installation process of fiber cement boards, reduces formwork waste, improves construction efficiency and accuracy, and meets the requirements of green construction.
Smart Images

Figure CN121006864A_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The present application relates to the technical field of formwork construction devices, in particular to a construction column formwork construction device and process. BACKGROUND
[0002] In traditional building construction, the formwork of construction columns usually adopts wooden formwork or steel formwork. After the concrete pouring is completed, the formwork needs to be removed, and then the surface treatment is carried out. This construction method has many disadvantages, such as complicated formwork removal process, large formwork loss, long construction period, and easy generation of construction waste, which does not meet the requirements of green construction. In addition, the installation and removal of traditional formwork have high requirements for construction precision. If not handled properly, it may cause uneven surface or size deviation of the construction column, affecting the overall quality.
[0003] To solve the above problems, the formwork removal technology emerges as the times require. The formwork removal technology is a construction method that permanently combines the formwork with the structure. The formwork does not need to be removed after the concrete pouring and directly serves as a part of the construction column. Common formwork removal materials include fiber cement board, glass steel plate, etc. These materials have high strength, durability and fireproof performance, which can meet the requirements of building structures. By combining the formwork removal with the steel frame and using reliable connection methods, efficient construction of the construction column can be realized, and the overall structure and aesthetics can be improved.
[0004] When the construction device is used to install the fiber cement board, the fiber cement board needs to be fixed first, then lifted, and then fixed and connected with the steel frame through bolts. During the connection process, the connection holes reserved on the fiber cement board need to be aligned with the connection holes on the steel frame. However, the fiber cement board is adsorbed and fixed by the construction device, which makes it difficult to finely adjust the fiber cement board, making it difficult to install the screws. SUMMARY
[0005] The present application aims to solve the problems in the background art and proposes a construction column formwork construction device and process.
[0006] The technical solution of the present application is as follows: on the one hand, the present application proposes a construction column formwork construction device, which comprises a steel frame, a fiber cement board fixedly installed on the steel frame, and an installation device for installing the fiber cement board, and further comprises: a plurality of connection blocks with threaded holes fixedly installed on the steel frame, and a plurality of waist-shaped holes corresponding to the threaded holes are provided on the fiber cement board; The mounting device comprises a base, two support plates fixedly installed on the base, a guide rod slidingly installed on the support plates, a first connecting plate slidingly installed on the guide rod, a second connecting plate slidingly installed on the first connecting plate, and an adsorption assembly rotatably installed on the second connecting plate and used for fixing the fiber cement board. A first limiting assembly for limiting the guide rod is installed on the support plate, a second limiting assembly for limiting the second connecting plate is installed on the second connecting plate, and a plurality of third limiting assemblies for limiting the adsorption assembly are installed between the second connecting plate and the adsorption assembly.
[0007] Optionally, the first limiting assembly comprises a first limiting cylinder fixedly installed on the support plate, a first plug slidingly installed in the first limiting cylinder, a first limiting rod fixedly installed on the first plug, one end of the first limiting rod penetrating through the first limiting cylinder and being slidingly connected with the first connecting plate, two ends of the first limiting cylinder being communicated through a first pipeline, a first electric control valve fixedly installed on the first pipeline, and the first limiting cylinder and the first pipeline being filled with hydraulic medium.
[0008] Optionally, the second limiting assembly comprises a second limiting cylinder fixedly installed on the second connecting plate, a second plug slidingly installed in the second limiting cylinder, a second limiting rod fixedly installed on the second plug, one end of the second limiting rod penetrating through the second limiting cylinder and being fixedly connected with the first connecting plate, two ends of the second limiting cylinder being communicated through a second pipeline, a second electric control valve fixedly installed on the second pipeline, and the second limiting cylinder and the second pipeline being filled with hydraulic medium.
[0009] Optionally, the third limiting assembly comprises a third limiting cylinder rotatably installed on the second connecting plate, a third plug slidingly installed in the third limiting cylinder, a third limiting rod fixedly installed on the third plug, one end of the third limiting rod penetrating through the third limiting cylinder and being rotatably connected with the adsorption assembly, two ends of the third limiting cylinder being communicated through a third pipeline, a third electric control valve fixedly installed on the third pipeline, and the third limiting cylinder and the third pipeline being filled with hydraulic medium.
[0010] Optionally, the adsorption assembly comprises an adsorption box rotatably installed on a plurality of the third limiting rods, a plurality of adsorption holes provided on the adsorption box, rubber heads fixedly installed in the adsorption holes, a connecting hole provided on one side of the adsorption box, a gas pump assembly fixedly installed on the base, and a gas pipe connecting the connecting hole and the gas pump assembly.
[0011] Optionally, the installation device further comprises a lifting plate rotatably mounted on the base, a first hydraulic rod is rotatably mounted on the base, the output end of the first hydraulic rod is rotatably connected with the lifting plate, one end of the lifting plate is fixedly mounted with an extension rod and rotatably mounted with an internally threaded rod, the other end of the extension rod is fixedly connected with one of the support plates, the other support plate is fixedly connected with the bottom of the lifting plate, the internally threaded rod is internally threadedly connected with a threaded rod, and the threaded rod is fixedly connected with the support plate.
[0012] Optionally, the bottom of one of the suction boxes is fixedly mounted with a second hydraulic rod, a base is fixedly mounted on the output shaft of the second hydraulic rod, and a plurality of rollers are rotatably mounted on the base.
[0013] Optionally, a reversing positioning module is fixedly mounted on the base, and the reversing positioning module guides the base when the base rotates with the steel structure center as the base point.
[0014] Optionally, the reversing positioning module comprises a sliding block slidably mounted on the base, a guide plate is slidably mounted on the sliding block, a sliding groove slidably connected with the sliding block is arranged in the guide plate, the connecting line between the two ends of the sliding groove and the center of the guide plate is 90°, laser lights are fixedly mounted at the two ends of the guide plate, a lead screw is rotatably mounted on the base, the lead screw is threadedly connected with the sliding block, and a rotating handle is fixedly mounted at one end of the lead screw.
[0015] In another aspect, the present application provides a construction column demoulding formwork construction process applied to the construction column demoulding formwork construction device, which comprises the following steps: Step one: place the fiber cement board on the suction box, fix the fiber cement board through the suction assembly, and then move the fiber cement board to the vertical position through the first hydraulic rod; Step two: cancel the limiting effect of the first limiting assembly, the second limiting assembly and the third limiting assembly, and make the rollers move downward through the second hydraulic rod, so that the fiber cement board maintains a certain gap; Step three: adjust the position of the fiber cement board, so that the position of the waist-shaped hole on the fiber cement board corresponds to the threaded hole on the connecting block; Step four: activate the limiting effect of the first limiting assembly, the second limiting assembly and the third limiting assembly, make the fiber cement board contact the ground through the second hydraulic rod, then fixedly connect the fiber cement board with the steel structure through the bolts, and cancel the fixing effect of the suction assembly on the fiber cement board; Step five: coincide the center of the guide plate with the center of the steel structure, and fix the guide plate; Step six: push the base, install the fiber cement board on the suction assembly after the base rotates 90°, and fixedly install the other side of the steel structure. Step seven: after the four side fiber cement board is installed, the steel frame is poured with concrete.
[0016] In summary, the present application includes the following at least beneficial technical effects: The device can make the fiber cement board move freely in three directions in three-dimensional space, adjust the hole position on the fiber cement board, and fix the fiber cement board after adjustment, prevent the fiber cement board from shifting during bolt installation, and facilitate fine adjustment of the fiber cement board, greatly reducing the difficulty of screw installation. BRIEF DESCRIPTION OF DRAWINGS
[0017] Figure 1 Structure diagram of the construction column formwork construction device Figure 1 ; Figure 2 Structure diagram of the construction column formwork construction device Figure 2 ; Figure 3 Structure diagram of the reversing positioning module Figure 4 Positioning diagram of the suction box Figure 5 Structure diagram of the installation device Figure 6 Positioning diagram of the first connecting plate and the second connecting plate Figure 7 Structure diagram of the first limiting assembly Figure 8 Structure diagram of the second limiting assembly Figure 9 Structure diagram of the third limiting assembly
[0018] Fig. 1 steel frame; 101 fiber cement board; 102 connecting block; 2 base; 201 lifting plate; 202 first hydraulic rod; 203 support plate; 204 first connecting plate; 205 second connecting plate; 206 suction box; 2061 suction hole; 2062 rubber head; 2063 connecting hole; 207 telescopic rod; 208 internal threaded rod; 209 threaded rod; 210 guide rod; 3 air pump assembly; 4 first limiting assembly; 401 first limiting cylinder; 402 first plug; 403 first limiting rod; 404 first pipeline; 405 first electric control valve; 5 second limiting assembly; 501 second limiting cylinder; 502 second plug; 503 second limiting rod; 504 second pipeline; 505 second electric control valve; 6 third limiting assembly; 601 third limiting cylinder; 602 third plug; 603 third limiting rod; 604 third pipeline; 605 third electric control valve; 7 sliding block; 701 guide plate; 702 sliding groove; 703 laser lamp; 704 screw rod; 705 rotating handle; 8 second hydraulic rod; 801 base; 802 roller. DETAILED DESCRIPTION
[0019] The technical solutions of the present application are further described below in combination with the drawings and specific embodiments.
[0020] As Figures 1 to 6 shown, the present application proposes a construction column disassembly-free formwork construction device, which comprises a steel frame 1, a fiber cement board 101 fixedly installed on the steel frame 1, and an installation device for installing the fiber cement board 101. The fiber cement board 101 can be erected and attached to the steel frame 1 through the installation device, which facilitates positioning and installation. The present embodiment further comprises a plurality of connecting blocks 102 fixedly installed on the steel frame 1 and having threaded holes. The fiber cement board 101 is provided with a plurality of waist-shaped holes corresponding to the threaded holes. Since the bottom of the fiber cement board 101 is in contact with the bottom plate, the fiber cement board 101 is not easy to move due to the friction between the fiber cement board 101 and the bottom plate. Therefore, the fiber cement board 101 is easy to move. Through the design of the waist-shaped hole, when the fiber cement board 101 is raised, the bolt can still pass through the waist-shaped hole and be connected with the connecting block 102, which can reduce the resistance when adjusting the fiber cement board 101.
[0021] Further, the mounting device comprises a base 2, two support plates 203 are fixedly installed on the base 2, a guide rod 210 is slidably installed on the support plate 203, the guide rod 210 can make the fiber cement board 101 move towards or away from the steel frame 1, a first connecting plate 204 is slidably installed on the guide rod 210, the first connecting plate 204 can make the fiber cement board 101 move up and down, a second connecting plate 205 is slidably installed on the first connecting plate 204, the second connecting plate 205 can make the fiber cement board 101 move in a certain range in the front and back directions, an adsorption assembly for fixing the fiber cement board 101 is rotatably installed on the second connecting plate 205, the angle of the fiber cement board 101 can be adjusted through the rotation, so that the fiber cement board 101 is parallel to the surface of the steel frame 1, and the adsorption assembly can adsorb and fix the fiber cement board 101.
[0022] As shown in Figures 6 to 9 The embodiment also comprises a first limiting assembly 4 installed on the support plate 203 to limit the guide rod 210, a second limiting assembly 5 installed on the second connecting plate 205 to limit the second connecting plate 205, and a plurality of third limiting assemblies 6 installed between the second connecting plate 205 and the adsorption assembly to limit the adsorption assembly. Through the setting of the first limiting assembly 4, the second limiting assembly 5 and the third limiting assembly 6, the fiber cement board 101 can be limited in three directions in the three-dimensional space, and after the adjustment of the fiber cement board 101 is completed, the fiber cement board 101 is prevented from being deviated during the installation of the bolts.
[0023] Further, the first limiting assembly 4 comprises a first limiting cylinder 401 fixedly installed on the support plate 203, a first plug 402 slidably installed in the first limiting cylinder 401, a first limiting rod 403 fixedly installed on the first plug 402, one end of the first limiting rod 403 penetrating through the first limiting cylinder 401 and being slidably connected with the first connecting plate 204, both ends of the first limiting cylinder 401 being communicated through a first pipeline 404, a first electric control valve 405 fixedly installed on the first pipeline 404, and the first limiting cylinder 401 and the first pipeline 404 being filled with hydraulic medium. The hydraulic medium is a liquid that cannot be compressed in a working environment. When the first electric control valve 405 is opened, moving the first limiting rod 403 drives the first plug 402 to compress the hydraulic medium on one side, and the compressed hydraulic medium can enter the other side of the first limiting cylinder 401 through the first pipeline 404, so that the first limiting rod 403 can move. When the first electric control valve 405 is closed, the hydraulic medium on both sides of the first limiting cylinder 401 cannot flow to each other, so that the position of the first limiting rod 403 is fixed, and the fiber cement board 101 cannot move towards or away from the steel frame 1.
[0024] Further, the second limiting assembly 5 comprises a second limiting cylinder 501 fixedly installed on the second connecting plate 205, a second plug 502 is slidably installed in the second limiting cylinder 501, a second limiting rod 503 is fixedly installed on the second plug 502, one end of the second limiting rod 503 penetrates through the second limiting cylinder 501 and is fixedly connected with the first connecting plate 204, two ends of the second limiting cylinder 501 are communicated through a second pipeline 504, a second electric control valve 505 is fixedly installed on the second pipeline 504, the second limiting cylinder 501 and the second pipeline 504 are both filled with hydraulic medium, and according to the same principle, whether the second limiting rod 503 can move can be controlled by controlling the second electric control valve 505, and whether the fiber cement board 101 can move in the front-back direction can be controlled.
[0025] The third limiting assembly 6 comprises a third limiting cylinder 601 rotatably installed on the second connecting plate 205, a third plug 602 is slidably installed in the third limiting cylinder 601, a third limiting rod 603 is fixedly installed on the third plug 602, one end of the third limiting rod 603 penetrates through the third limiting cylinder 601 and is rotatably connected with the adsorption assembly, two ends of the third limiting cylinder 601 are communicated through a third pipeline 604, a third electric control valve 605 is fixedly installed on the third pipeline 604, the third limiting cylinder 601 and the third pipeline 604 are both filled with hydraulic medium, and according to the same principle, whether the fiber cement board 101 can rotate can be controlled by controlling the third electric control valve 605.
[0026] As shown in Figures 1 to 6 In the embodiment, the adsorption assembly comprises an adsorption box 206 rotatably installed on the plurality of third limiting rods 603, the adsorption box 206 is provided with a plurality of adsorption holes 2061, a rubber head 2062 is fixedly installed in the adsorption hole 2061, a connecting hole 2063 is arranged on one side of the adsorption box 206, and the gas pump assembly 3 is fixedly installed on the base 2. The connecting hole 2063 and the gas pump assembly are connected through an air pipe. The adsorption box 206 is subjected to negative pressure by the gas pump assembly, so that the adsorption hole 2061 generates suction force on the fiber cement board 101. Under the action of air pressure, the fiber cement board 101 will be pressed on the adsorption box 206.
[0027] As shown in Figures 1 to 6As shown, the mounting device further comprises a lifting plate 201 rotatably mounted on the base 2, a first hydraulic rod 202 is rotatably mounted on the base 2, the output end of the first hydraulic rod 202 is rotatably connected with the lifting plate 201, the lifting plate 201 can be driven to rotate by controlling the extension state of the first hydraulic rod 202, and then the fiber cement board 101 is moved to a vertical state by the lifting plate 201, one end of the lifting plate 201 is fixedly provided with an extension rod 207 and rotatably provided with an internally threaded rod 208, the other end of the extension rod 207 is fixedly connected with one of the support plates 203, the other support plate 203 is fixedly connected with the bottom of the lifting plate 201, the internally threaded rod 208 is internally threaded connected with a threaded rod 209, the threaded rod 209 is fixedly connected with the support plate 203, the threaded rod 209 can be driven to lift by rotating the internally threaded rod 208, and the fiber cement board 101 of different heights can be appropriately adjusted.
[0028] It is worth noting that the bottom of one of the adsorption boxes 206 is fixedly provided with a second hydraulic rod 8, a base 801 is fixedly mounted on the output shaft of the second hydraulic rod 8, a plurality of rollers 802 are rotatably mounted on the base 801, the first connecting plate 204 can be moved up and down on the support plate 203 by driving the rollers 802 to lift by controlling the second hydraulic rod 8, and then the bottom of the fiber cement board 101 can be controlled to contact the ground, when the hole position on the fiber cement board 101 is adjusted, the bolt is first inserted, at this time the bolt is in a loose state, then the fiber cement board 101 is placed on the ground by the second hydraulic rod 8, and the bolt is tightened.
[0029] As shown, Figures 1 to 3 In this embodiment, the base 2 is fixedly provided with a reversing positioning module, which guides the base 2 when the base 2 rotates around the center of the steel frame 1. When the formwork of the structural column is constructed, the fiber cement board 101 needs to be installed on four sides, and when one side is installed, the base 2 needs to be moved when the adjacent side is installed, which will result in the need to repeat the above steps to adjust the hole position on the fiber cement board 101 when the next fiber cement board 101 is installed, which is not conducive to increasing the installation efficiency. The structural column is generally square in structure, and after the position of one side is adjusted, the device after adjustment is only needed to be rotated 90° around the center of the structural column to install the fiber cement board 101 on the next side, and the step of repositioning the hole position on the fiber cement board 101 can be reduced.
[0030] It should be noted that in order to reduce the step of repositioning the hole position on the fiber cement board 101, the center position of the fiber cement board 101 needs to correspond to the center position of the adsorption box 206 when the fiber cement board 101 is installed on the adsorption box 206 each time.
[0031] Further, the reversing positioning module comprises a sliding block 7 slidingly mounted on the base 2, a guide plate 701 slidingly mounted on the sliding block 7, a sliding groove 702 slidingly connected with the sliding block 7 arranged in the guide plate 701, the connecting line between the two ends of the sliding groove 702 and the center of the guide plate 701 being 90°, and laser lamps 703 fixedly mounted at the two ends of the guide plate 701. The base 2 is rotatably mounted with a lead screw 704, the lead screw 704 is threadedly connected with the sliding block 7, and one end of the lead screw 704 is fixedly mounted with a rotating handle 705. Since the widths of different structural columns are different and the initial position of the base 2 is different, the center of the guide plate 701 and the center of the structural column are not concentric at the beginning. At this time, the two laser lamps 703 on the two sides are started, and the intersection of the two laser beams is the circular position of the guide plate 701. At this time, the position of the guide plate 701 can be adjusted by rotating the lead screw 704, so that the center position of the guide plate 701 coincides with the center position of the structural column. Then, the position of the guide plate 701 is fixed, the guide plate 701 can be fixed by pressing a weight on the two sides of the guide plate 701, and then the base 2 is pushed to rotate along the sliding groove 702, so that the base 2 can rotate along the center position of the structural column by 90°.
[0032] On the other hand, the present application provides a construction column demoulding formwork construction process based on the above construction column demoulding formwork construction device, comprising the following steps: Step one: place the fiber cement board 101 on the adsorption box 206, and fix the fiber cement board 101 through the adsorption assembly, and then move the fiber cement board 101 to the vertical position through the first hydraulic rod 202; Step two: cancel the limiting action of the first limiting assembly 4, the second limiting assembly 5 and the third limiting assembly 6, and make the fiber cement board 101 keep a certain gap by driving the roller 802 downward through the second hydraulic rod 8; Step three: adjust the position of the fiber cement board 101, so that the position of the waist-shaped hole on the fiber cement board 101 corresponds to the threaded hole on the connecting block 102; Step four: start the limiting action of the first limiting assembly 4, the second limiting assembly 5 and the third limiting assembly 6, and make the fiber cement board 101 contact with the ground through the second hydraulic rod 8, and then fix and connect the fiber cement board 101 with the steel frame 1 through the bolts, and cancel the fixing effect of the adsorption assembly on the fiber cement board 101; Step five: coincide the center of the guide plate 701 with the center of the steel frame 1, and fix the guide plate 701; Step six: push the base 2, install the fiber cement board 101 on the adsorption assembly after the base 2 is rotated by 90°, and fix and install the other side of the steel frame 1; Step seven: after the four side fiber cement board 101 is installed, the steel frame 1 is poured with concrete.
[0033] Working principle: start the two laser lights 703, and the intersection of the two laser beams is the circular position of the guide plate 701. At this time, the position of the guide plate 701 can be adjusted by rotating the lead screw 704, so that the center position of the guide plate 701 coincides with the center position of the structural column. Then the position of the guide plate 701 is fixed. The fiber cement board 101 is placed on the adsorption box 206, and the fiber cement board 101 is fixed by the adsorption assembly. Then the fiber cement board 101 is moved to the vertical position by the first hydraulic rod 202. The second hydraulic rod 8 drives the roller 802 to lift, so that the bottom of the fiber cement board 101 is not in contact with the ground. Then the hole position on the fiber cement board 101 is adjusted. After adjustment, the bolt is inserted first. At this time, the bolt is in a loose state. Then the fiber cement board 101 is placed on the ground by the second hydraulic rod 8, and the bolt is tightened. Then push the base 2, so that the base 2 rotates along the chute 702, and then the base 2 rotates 90° along the center position of the structural column, so that the fiber cement board 101 is installed on the other side of the structural column, and the step of adjusting the hole position again is reduced, so as to improve the installation efficiency.
[0034] The above specific embodiments are only several optional embodiments of the present application. Based on the technical solutions of the present application and the related inspiration of the above embodiments, those skilled in the art can make various alternative improvements and combinations on the above specific embodiments.
Claims
1. A construction column formwork construction device, comprising a steel frame (1) and a fiber cement plate (101) fixedly installed on the steel frame (1), and an installation device for installing the fiber cement plate (101), characterized in that, Also include: A plurality of connecting blocks (102) with threaded holes are fixedly installed on the steel frame (1), and a plurality of waist-shaped holes corresponding to the threaded holes are arranged on the fiber cement board (101); The mounting device comprises a base (2), two support plates (203) are fixedly installed on the base (2), a guide rod (210) is slidably installed on the support plate (203), a first connecting plate (204) is slidably installed on the guide rod (210), a second connecting plate (205) is slidably installed on the first connecting plate (204), and an adsorption assembly for fixing the fiber cement board (101) is rotatably installed on the second connecting plate (205); A first limiting assembly (4) for limiting the guide rod (210) is installed on the support plate (203), a second limiting assembly (5) for limiting the second connecting plate (205) is installed on the second connecting plate (205), and a plurality of third limiting assemblies (6) for limiting the adsorption assembly are installed between the second connecting plate (205) and the adsorption assembly.
2. The construction column formwork construction device according to claim 1, wherein The first limiting assembly (4) comprises a first limiting cylinder (401) fixedly installed on the support plate (203), a first plug (402) slidably installed in the first limiting cylinder (401), a first limiting rod (403) fixedly installed on the first plug (402), one end of the first limiting rod (403) penetrating through the first limiting cylinder (401) and being in sliding connection with the first connecting plate (204), both ends of the first limiting cylinder (401) being communicated through a first pipeline (404), a first electric control valve (405) fixedly installed on the first pipeline (404), and the first limiting cylinder (401) and the first pipeline (404) being filled with hydraulic medium.
3. The construction column formwork construction device according to claim 1, wherein The second limiting assembly (5) comprises a second limiting cylinder (501) fixedly installed on the second connecting plate (205), a second plug (502) slidably installed in the second limiting cylinder (501), a second limiting rod (503) fixedly installed on the second plug (502), one end of the second limiting rod (503) penetrating through the second limiting cylinder (501) and being in fixed connection with the first connecting plate (204), both ends of the second limiting cylinder (501) being communicated through a second pipeline (504), a second electric control valve (505) fixedly installed on the second pipeline (504), and the second limiting cylinder (501) and the second pipeline (504) being filled with hydraulic medium.
4. The construction column formwork construction device according to claim 1, wherein The third limiting component (6) comprises a third limiting cylinder (601) rotatably installed on the second connecting plate (205), a third plug (602) slidably installed in the third limiting cylinder (601), a third limiting rod (603) fixedly installed on the third plug (602), one end of the third limiting rod (603) penetrating through the third limiting cylinder (601) and rotatably connected with the adsorption component, and the two ends of the third limiting cylinder (601) being communicated through a third pipeline (604), wherein a third electric control valve (605) is fixedly installed on the third pipeline (604), and the third limiting cylinder (601) and the third pipeline (604) are both filled with hydraulic medium.
5. The construction column formwork construction device according to claim 4, wherein The adsorption component comprises an adsorption box (206) rotatably installed on a plurality of the third limiting rods (603), a plurality of adsorption holes (2061) are arranged on the adsorption box (206), a rubber head (2062) is fixedly installed in each adsorption hole (2061), and a connecting hole (2063) is arranged on one side of the adsorption box (206).
6. The construction column formwork construction device according to claim 1, wherein The mounting device further comprises a lifting plate (201) rotatably installed on the base (2), a first hydraulic rod (202) rotatably installed on the base (2), the output end of the first hydraulic rod (202) being rotatably connected with the lifting plate (201), a telescopic rod (207) fixedly installed at one end of the lifting plate (201) and an internally-threaded rod (208) rotatably installed on the lifting plate (201), the other end of the telescopic rod (207) being fixedly connected with one of the support plates (203), the other support plate (203) being fixedly connected with the bottom of the lifting plate (201), and an externally-threaded rod (209) being internally-threadedly connected with the internally-threaded rod (208), the externally-threaded rod (209) being fixedly connected with the support plate (203).
7. The construction column formwork construction device according to claim 5, wherein The bottom of one of the adsorption boxes (206) is fixedly installed with a second hydraulic rod (8), a base (801) is fixedly installed on the output shaft of the second hydraulic rod (8), and a plurality of rollers (802) are rotatably installed on the base (801).
8. The construction column formwork construction device according to claim 1, wherein A reversing positioning module is fixedly installed on the base (2), and the reversing positioning module guides the base (2) when the base (2) rotates with the steel frame 1 center as a base point.
9. The construction column formwork construction device according to claim 8, wherein The reversing positioning module comprises a sliding block (7) slidably installed on the base (2), a guide plate (701) slidably installed on the sliding block (7), a sliding groove (702) slidably connected with the sliding block (7) arranged in the guide plate (701), a connecting line between the two ends of the sliding groove (702) and the center of the guide plate (701) being 90°, laser lamps (703) fixedly installed at the two ends of the guide plate (701), a lead screw (704) rotatably installed on the base (2), the lead screw (704) being threadedly connected with the sliding block (7), and a rotating handle (705) fixedly installed at one end of the lead screw (704).
10. A construction column formwork construction process applied to the construction column formwork construction device according to any one of claims 1-9, characterized in that, The method comprises the following steps: Step one: the fiber cement board (101) is placed on the adsorption box (206), and the fiber cement board (101) is fixed by the adsorption assembly, then the fiber cement board (101) is moved to the vertical position by the first hydraulic rod (202); Step two: cancel the limiting effect of the first limiting assembly (4), the second limiting assembly (5) and the third limiting assembly (6), and drive the roller (802) to move down by the second hydraulic rod (8), so that the fiber cement board (101) keeps a certain gap; Step three: adjust the position of the fiber cement board (101), so that the position of the waist-shaped hole on the fiber cement board (101) corresponds to the threaded hole on the connecting block (102); Step four: start the limiting effect of the first limiting assembly (4), the second limiting assembly (5) and the third limiting assembly (6), and make the fiber cement board (101) contact with the ground by the second hydraulic rod (8), then fix and connect the fiber cement board (101) with the steel frame (1) by bolts, and cancel the fixing effect of the adsorption assembly on the fiber cement board (101); Step five: the center of the guide plate (701) coincides with the center of the steel frame (1), and the guide plate (701) is fixed; Step six: push the base (2), rotate the base (2) by 90°, install the fiber cement board (101) on the adsorption assembly, and fix and install the other side of the steel frame (1); Step seven: after installing the four side fiber cement boards (101), pour concrete in the steel frame (1).