A numerical control drilling method for double-sided printed circuit board production line

By dynamically adjusting drilling parameters and analyzing drill bit vibration data, the positioning deviation problem in the drilling process of double-sided printed circuit boards was solved, achieving stability and accuracy in drilling quality and reducing the risk of circuit board damage.

CN121397890BActive Publication Date: 2026-06-05HUIZHOU HUAXINGBO ELECTRONICS CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202511594084.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2025-11-03
Publication Date
2026-06-05
Estimated Expiration
2045-11-03

AI Technical Summary

Technical Problem

Existing technologies suffer from large positioning deviations during drilling of double-sided printed circuit boards, resulting in inconsistent drilling quality.

Method used

By dynamically determining drilling production parameters based on the borehole radius and distribution location, collecting and analyzing the consistency of drill bit vibration data, and generating coordinate calibration adjustment commands to correct positioning deviations.

Benefits of technology

It effectively reduces positioning deviations during the drilling process, ensures consistent and accurate drilling quality, and reduces the risk of circuit board breakage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN121397890B_ABST
    Figure CN121397890B_ABST
Patent Text Reader

Abstract

The present application relates to the technical field of circuit board production, and particularly relates to a numerical control drilling method for a double-sided printed circuit board production line. The method comprises the following steps: determining drilling production parameters of each drilling hole according to radii and distribution positions of a plurality of drilling holes of a to-be-produced circuit board; performing drilling operation on the to-be-produced circuit board based on the drilling production parameters of each drilling hole, and collecting a plurality of vibration data within a target drilling time period; performing consistency analysis on the plurality of vibration data to obtain a vibration anomaly index of the target drilling time period; and determining whether to generate drilling adjustment instructions for coordinate calibration according to the vibration anomaly index of the target drilling time period. The present application can timely find that drilling effect deviates from expectation, and effectively correct abnormal drilling vibration caused by positioning deviation through coordinate calibration, so that the positioning deviation in the PCB drilling process is always kept within an expected error range.
Need to check novelty before this filing date? Find Prior Art

Citation Information

Patent Citations

  • Electric drill control method and system, computer equipment and storage medium

    CN118926582A

  • Control method and system of vertical three-in-one production line for PCB production

    CN120065887A