A foundation structure for a large concrete silo
By using zoned variable-length pile foundation design and hollow load optimization zone, the problems of large pile foundation engineering volume and high cost in large concrete silo foundation structures are solved, achieving material savings and reduced construction costs, especially improving the bearing capacity of pile foundations in liquefied soil strata.
Patent Information
- Application Number
- CN202511979524.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-25
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2045-12-25
AI Technical Summary
Existing technologies for large concrete silo foundation structures suffer from problems such as excessive pile foundation work and high project costs. Furthermore, the horizontal bearing capacity of the pile foundation is insufficient in liquefiable soil layers, leading to material waste and increased construction costs.
The design adopts a zoned variable-length pile foundation, with protective piles, short piles, medium-long piles and long piles distributed in the area below the foundation slab from the outside to the inside. Combined with the load optimization zone of the hollow foundation slab, it replaces the plain soil backfill and optimizes the load transfer path and pile foundation layout.
It effectively reduces the amount of pile foundation work, lowers construction costs, avoids the impact of liquefied soil on the horizontal bearing capacity of the pile foundation, and achieves material savings and shortens the construction period.
Smart Images

Figure CN121700844B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of civil engineering technology, and in particular to a foundation structure for a large concrete silo. Background Technology
[0002] Large concrete silos are commonly used in industries such as power, coal, and cement to store bulk materials such as coal, ore, and powder. These silos typically have a large diameter and height, and their foundations must withstand enormous vertical and horizontal loads. Traditional foundation structures generally include a circular or annular base slab with multiple annular cylindrical walls arranged from the outside in to transfer the weight of the upper silo and materials to the base slab. The load is then transferred to the deeper ground through pile foundations.
[0003] In existing technologies, the foundation treatment for large concrete silos typically employs a uniform pile distribution method. For example... Figure 1 As shown, pile foundations are installed below the foundation slab, with all piles having a roughly uniform length. Furthermore, the space between the top surface of the foundation slab and the interior design elevation (often referred to as the 0-meter level) is traditionally backfilled and compacted with unreinforced natural soil. Unreinforced natural soil is used for layered backfilling; its own weight is transferred as an additional load to the foundation slab, thus increasing the total load on the foundation.
[0004] Existing technical solutions have revealed several limitations in practical engineering applications: Firstly, the design using equal-length piles does not fully consider the uneven stress distribution under the foundation slab. The silo load is transferred to the foundation slab through the annular wall, resulting in stress concentration in the central area and lower stress in the peripheral areas. Uniform pile distribution leads to incomplete utilization of the bearing capacity potential of piles in the central area, while the pile length in the peripheral areas may exceed actual needs, causing material waste and increased project costs. Secondly, the use of plain soil backfill from the top of the foundation slab to the 0-meter layer means that the self-weight of this backfill soil is applied as a permanent load to the foundation slab, directly increasing the total reaction force of the foundation, leading to an increase in the number of piles required, thus increasing the amount of pile foundation work and construction costs. Furthermore, in strata containing liquefiable soil, to compensate for the reduction in the horizontal bearing capacity of the pile foundation, it is often necessary to increase the number or diameter of piles, further increasing foundation treatment costs. Summary of the Invention
[0005] To address the shortcomings of existing technologies, the purpose of this invention is to provide a large concrete silo foundation structure that solves problems such as excessive pile foundation work and high project costs. By optimizing the pile length arrangement below the foundation slab, reducing the additional load transmitted to the foundation base, and effectively handling the impact of liquefied soil, the invention achieves the technical effects of saving materials, shortening the construction period, and reducing overall construction costs.
[0006] To achieve the above objectives, the embodiments of the present invention provide the following technical solutions: A large concrete silo foundation structure includes an outer ring wall, a middle ring wall, and an inner ring wall arranged sequentially from the outside to the inside on the foundation slab. The upper side of the foundation slab has a load optimization zone, which is the area from the top of the 0-meter layer to the top of the foundation slab within the middle ring wall. This load optimization zone is a hollow area. The lower side of the foundation slab consists of a pile distribution area, a short pile distribution area, a medium-long pile distribution area, and a long pile distribution area, arranged sequentially from the outside to the inside. The piles in each area increase in length sequentially from the outside to the inside.
[0007] Optionally, the outer ring wall, middle ring wall, and inner ring wall are all annular thin-walled structures, with the diameters of the three walls decreasing sequentially, and the three walls nested and concentrically arranged.
[0008] Optionally, the distribution area of the protective piles is located on the outer periphery of the lower side of the silo foundation slab.
[0009] Optionally, the short pile distribution area is located in the edge area below the silo foundation slab.
[0010] Optionally, the distribution area of the medium-length piles is located in the area corresponding to the outer ring wall below the bottom plate of the silo foundation.
[0011] Optionally, the long pile distribution area is located in the middle area below the bottom plate of the silo foundation, corresponding to the middle ring wall and inner ring wall areas.
[0012] Optionally, the 0-meter top plate is fixed to the inner and middle ring cylinder walls using the inner and middle ring cylinder walls as supports.
[0013] Optionally, the 0-meter floor slab is a reinforced concrete floor slab.
[0014] Optionally, the outer ring wall, the middle ring wall, and the inner ring wall are all reinforced concrete structures.
[0015] Optionally, the silo foundation base plate is a cast-in-place reinforced concrete circular or annular base plate.
[0016] One or more technical solutions provided in the embodiments of the present invention have at least the following technical effects or advantages: In the silo foundation structure of this invention, a hollow area extending from the 0-meter top slab downwards to the top surface of the foundation slab is provided above the foundation base slab and within the inner ring wall. This hollow area replaces the traditional method of backfilling this area with plain soil. Since the hollow area is not filled with any backfill material, it does not generate its own weight, thus effectively eliminating the additional dead load applied to the foundation slab by traditional backfill soil. The reduction in load lowers the total vertical force required to be borne by the foundation slab, thereby reducing the total number of piles needed to support the entire structure, directly reducing the material consumption and construction costs of the pile foundation project. Below the foundation slab, based on the actual stress distribution characteristics of the foundation slab, the pile foundation area is divided from the outside in into a protective pile distribution area, a short pile distribution area, a medium-long pile distribution area, and a long pile distribution area, with the pile length increasing sequentially from the outside in. The silo load is mainly transmitted downwards through the inner and inner ring walls, resulting in a stress in the central area of the foundation slab that is much greater than that in the edge areas. For friction piles, which rely primarily on side friction for bearing capacity, the vertical bearing capacity of the pile typically increases with pile length. Therefore, a differentiated pile length design, with shorter piles placed at the edge of the slab where the load is lower and the longest piles placed in the center where the load is highest, allows for more efficient utilization of the bearing capacity of each pile. This avoids the capacity redundancy of traditional equal-length piles at the edge, thus significantly saving on the total amount of concrete and steel reinforcement and shortening the overall construction time while meeting overall bearing capacity and deformation requirements.
[0017] Advantages of additional aspects of the invention will be set forth in the description which follows, and in part will be obvious from the description, or may be learned by practice of the invention. Attached Figure Description
[0018] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. The drawings described below are only some embodiments recorded in the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort. In addition, the dimensions or spacing between the components are exaggerated to show the position of each component, and the schematic diagrams are for illustrative purposes only.
[0019] Figure 1 This is a schematic diagram of the existing silo foundation structure; Figure 2 This is a schematic diagram of the pile foundation distribution at the bottom of a large concrete silo foundation provided in an embodiment of the present invention; Figure 3 This is a schematic diagram of the cross-section below 0 meters of a large concrete silo provided in an embodiment of the present invention; Figure 4 This is a schematic diagram of the 0-meter structural layout of a large concrete silo provided in an embodiment of the present invention; In the diagram: 1. Silo foundation slab; 2. Outer ring slab wall; 3. Middle ring slab wall; 4. Inner ring slab wall; 5. 0-meter top slab; 6. Optimized load zone of foundation slab; 7. Distribution area of retaining piles; 8. Distribution area of short piles; 9. Distribution area of medium and long piles; 10. Distribution area of long piles; Detailed Implementation It should be noted that the following detailed description is illustrative and intended to provide further explanation of the invention. Unless otherwise specified, all technical and scientific terms used in this invention have the same meaning as commonly understood by one of ordinary skill in the art to which this invention pertains. Furthermore, it should be understood that when the terms "comprising" and / or "including" are used in this specification, they indicate the presence of features, steps, operations, devices, components, and / or combinations thereof.
[0020] Example 1 like Figure 2 , Figure 3 , Figure 4 As shown in the figure, this embodiment proposes a large concrete silo foundation structure. The silo foundation base slab 1 is provided with an outer ring wall 2, a middle ring wall 3 and an inner ring wall 4 from the outside to the inside. The upper side of the silo foundation base slab 1 has a foundation base slab load optimization zone 6, which is the area from the top slab 5 of the 0-meter layer inside the middle ring wall 3 of the silo to the top of the silo foundation base slab 1. The foundation base slab load optimization zone 6 is a hollow area. The lower side of the silo foundation base slab 1 is provided with a pile distribution area 7, a short pile distribution area 8, a medium and long pile distribution area 9 and a long pile distribution area 10 from the outside to the inside. The piles in each area increase in length from the outside to the inside.
[0021] The foundation structure features a hollow load optimization zone 6 on the upper side of the silo foundation slab 1. This zone is located within the inner ring wall 3 and between the 0-meter top slab 5 and the top of the foundation slab. The hollow design replaces the traditional soil backfill layer, eliminating the direct impact of the backfill's self-weight as a permanent load on the foundation slab. Since the load inside the silo is mainly concentrated in the storage areas corresponding to the inner ring wall 3 and inner ring wall 4, the vertical stress in this area is much greater than in the edge areas. The additional load caused by traditional solid backfill accounts for a considerable proportion of the total load. By designing this area as hollow, the total vertical load transmitted to the foundation slab is reduced accordingly, thereby simultaneously reducing the number of piles and the bearing capacity requirements for foundation treatment. Simultaneously, the lower side of the foundation slab employs a zoned variable-length pile arrangement. The outermost pile distribution area 7 is located, followed by short pile distribution area 8, medium-long pile distribution area 9, and long pile distribution area 10, with the pile length increasing from the outside in. The inner and middle ring areas bear the concentrated load of the storage hopper and material pressure, with the largest vertical load. Long piles can meet the high bearing capacity requirements. The load in the outer ring cylinder wall area 2 is relatively small, and medium-length piles are sufficient to meet the bearing requirements. The edge area of the foundation slab mainly bears the lateral earth pressure and its own structural weight, with the smallest vertical load. Short piles are sufficient to meet the design requirements. The outermost protective pile distribution area 7 undertakes a specific function under liquefiable soil foundation conditions.
[0022] The hollow area and variable-length piles work synergistically, with the former reducing the load on the superstructure and the latter optimizing the distribution of the foundation's bearing capacity, together achieving the goal of reducing the amount of pile foundation work. For geological conditions with liquefiable soil layers, the outer retaining piles and the inner variable-length piles work together. The retaining piles bear the horizontal loads under seismic conditions, preventing the liquefied soil from reducing the horizontal bearing capacity of the pile foundation, while the inner piles concentrate on bearing the vertical loads. This clear division of horizontal and vertical forces avoids the traditional approach of increasing the number of piles across the board due to insufficient horizontal bearing capacity. This zoned force distribution approach allows for precise allocation of materials, directly matching pile length with load magnitude, and avoiding the problem of overcapacity in the peripheral areas of traditional equal-length pile designs.
[0023] The outer ring wall 2, the middle ring wall 3, and the inner ring wall 4 are all annular thin-walled structures, with the diameters of the three walls decreasing sequentially. The three walls are nested and arranged concentrically.
[0024] This coaxial nested layout is a typical and reasonable stress-bearing form for large silo structures. The outer ring wall 2 is the outermost vertical load-bearing and enclosure component in the silo structure; the middle ring wall 3 is the vertical load-bearing component in the middle below the storage layer funnel in the silo structure; and the inner ring wall 4 is the innermost vertical load-bearing component below the storage layer funnel in the silo structure.
[0025] The protective pile distribution area 7 is located on the outer perimeter of the lower side of the silo foundation slab 1, where the perimeter refers to the area around the outer edge of the foundation slab's projected surface. The primary function of the protective piles is not to provide the main vertical bearing capacity, but rather to provide horizontal resistance. In sites where the foundation soil has the potential for liquefaction, the liquefied soil layer will exert additional horizontal forces on the piles and weaken the horizontal constraint capacity of the surrounding soil, leading to a decrease in the pile foundation's horizontal bearing capacity. Concentrating the protective piles around the foundation slab is equivalent to setting up a barrier composed of pile groups around the foundation structure, effectively resisting and dispersing horizontal forces from the surrounding soil, protecting the innermost engineering piles that primarily bear vertical loads from or reducing the adverse horizontal effects caused by liquefied soil.
[0026] By setting up the protective pile distribution area 7, the reduction in horizontal bearing capacity caused by liquefaction can be ignored or reduced when calculating the inner engineering piles, thus avoiding the practice of generally increasing the number of piles or pile diameter to compensate for this reduction, and realizing economical design under liquefaction site conditions.
[0027] The short pile distribution area 8 is located on the edge area below the foundation slab 1 of the silo. The edge area refers to the part below the foundation slab that is far from the center and close to the outer edge.
[0028] As mentioned earlier, since the silo load is mainly transmitted through the silo wall in the central area, the vertical pressure on the edge area of the bottom slab is relatively small. Therefore, the requirement for the vertical bearing capacity of the pile foundation in this area is also lower. Arranging shorter piles in this area is sufficient to meet the vertical bearing capacity and settlement control requirements. Using short piles can meet the requirements for both vertical and horizontal bearing capacity, while reducing the cost and construction difficulty of a single pile in this area, reducing the amount of pile foundation work, and shortening the construction period.
[0029] The medium-length pile distribution area 9 is located in the area corresponding to the outer ring wall 2 on the lower side of the silo foundation base slab 1.
[0030] The outer ring wall 2, as the main vertical load-bearing and enclosure component, transmits a load greater than that of the wallless area at the edge of the base slab, but typically less than that of the inner and middle ring walls 3, which directly support the storage hopper. Therefore, the required vertical bearing capacity in this area is between that of the edge and central areas. Arranging medium-length piles here reliably bears the load transmitted from the outer ring wall 2 while avoiding the waste caused by using the same excessively long piles as in the central area. The medium-length pile distribution area 9 serves as a transition between the short pile area and the long pile area, ensuring that the pile length variation adapts to the continuous trend of load variation, guaranteeing the smoothness of foundation stiffness changes, and facilitating the control of overall foundation settlement differentials.
[0031] The long pile distribution area 10 is located in the middle area below the silo foundation base plate 1, corresponding to the middle ring wall 3 and the inner ring wall 4 area.
[0032] This area is the most stress-concentrated part of the entire foundation, bearing the majority of the vertical force transmitted from the storage load through the inner and middle ring walls 3. This area has the highest requirements for the vertical bearing capacity of the pile foundations and is most prone to settlement. Placing the longest piles here allows for the utilization of the bearing capacity of deeper soil layers, providing the maximum vertical bearing capacity of a single pile and effectively controlling settlement in this critical area.
[0033] The arrangement of short pile distribution area 8, medium-long pile distribution area 9, and long pile distribution area 10 can not only meet the bearing capacity requirements of different areas, but also greatly save the total pile length and reduce the project cost.
[0034] The 0-meter floor top slab 5 is fixed to the inner ring cylinder wall 4 and the middle ring cylinder wall 3 as supports. This support method utilizes the existing, robust vertical structure as the fulcrum of the horizontal members, eliminating the need for separate columns or walls to support the 0-meter floor top slab 5. The fixed connection method, such as through steel bar anchoring or integral concrete casting, ensures reliable transmission of shear force and bending moment between the top slab and the cylinder wall, making the 0-meter floor top slab 5 a stable horizontal force-bearing system. This allows the top slab to effectively bear the loads of the process equipment that may exist on the 0-meter floor above it and directly transmit these loads to the inner and middle ring cylinder walls 3, and then through the cylinder walls to the long pile area of the foundation slab.
[0035] The 0-meter floor slab 5 is a reinforced concrete floor slab. Reinforced concrete is a conventional and mature material for constructing floor slabs in building engineering. The use of reinforced concrete structure can withstand tensile stress through the internal steel bars, giving the floor slab good bending and shear resistance to meet the uniformly distributed loads and local concentrated loads that the 0-meter floor may bear as an operating or equipment floor.
[0036] The outer ring wall 2, the middle ring wall 3, and the inner ring wall 4 are all reinforced concrete structures. Due to their excellent compressive and tensile strength, reinforced concrete is the standard and ideal choice for constructing load-bearing walls of large silos.
[0037] The foundation slab 1 of the silo is a cast-in-place reinforced concrete circular or annular slab. Cast-in-place construction ensures a firm connection between the foundation slab and the upper silo wall, as well as the lower pile foundation cap or pile top, enabling overall coordinated operation. The circular or annular planar shape matches the circular planar shape of the upper silo, which is the most logical choice in terms of stress distribution and allows for more even load transfer.
[0038] In summary, the large concrete silo foundation structure of the present invention has the following advantages: Setting it around the outer perimeter of the silo foundation slab 1 can avoid the impact of liquefied soil on the horizontal bearing capacity of the pile foundation. The horizontal bearing capacity of the pile foundation does not need to be reduced due to the influence of liquefied soil, thus saving the number of piles and reducing the project cost.
[0039] A reinforced concrete floor slab is installed within the inner ring wall 3 of the 0-meter layer. The area from the top slab 5 of the 0-meter layer to the top of the silo foundation slab 1 within the inner ring wall 3 can be replaced with hollow soil to form a load optimization zone 6 for the foundation slab, thereby reducing the load transmitted to the foundation slab, thus reducing the number of piles required and the amount of pile foundation work.
[0040] Based on the stress distribution of the foundation slab 1 of the large concrete silo, the central area is divided into a long pile distribution area 10, using relatively long piles. Medium-length pile distribution areas 9 and short pile distribution areas 8 are then arranged outwards in sequence. This arrangement not only meets the bearing capacity requirements of different areas but also significantly reduces the total pile length and lowers the project cost.
[0041] While the specific embodiments of the present invention have been described above, they are not intended to limit the scope of protection of the present invention. Those skilled in the art should understand that various modifications or variations that can be made by those skilled in the art without creative effort based on the technical solutions of the present invention are still within the scope of protection of the present invention.
Claims
1. A foundation structure for a large concrete silo, wherein an outer ring wall, a middle ring wall, and an inner ring wall are sequentially arranged from the outside to the inside on the foundation slab, characterized in that: The upper side of the silo foundation base plate has a foundation base plate load optimization zone, which is the area from the 0-meter top plate to the top of the silo foundation base plate inside the inner ring wall of the silo. The foundation base plate load optimization zone is a hollow area. The outer ring wall, middle ring wall, and inner ring wall are all annular thin-walled structures, with the diameter of the three walls decreasing sequentially. The three walls are nested and concentrically arranged. The 0-meter top plate is fixed to the inner ring wall and middle ring wall as supports. The underside of the silo foundation slab consists of, from the outside to the inside, a pile distribution area, a short pile distribution area, a medium-long pile distribution area, and a long pile distribution area, with the piles in each area becoming progressively longer from the outside to the inside.
2. The large concrete silo foundation structure as described in claim 1, characterized in that, The protective pile distribution area is located on the outer perimeter of the lower side of the silo foundation slab.
3. The large concrete silo foundation structure as described in claim 1, characterized in that, The short pile distribution area is located on the edge area below the foundation slab of the silo.
4. The large concrete silo foundation structure as described in claim 1, characterized in that, The distribution area of the medium and long piles is located in the area corresponding to the outer ring wall of the silo foundation slab.
5. The large concrete silo foundation structure as described in claim 1, characterized in that, The long pile distribution area is located in the middle area below the bottom plate of the silo foundation, corresponding to the middle ring wall and inner ring wall areas.
6. The large concrete silo foundation structure as described in claim 1, characterized in that, The 0-meter floor slab is a reinforced concrete floor slab.
7. The large concrete silo foundation structure as described in claim 1, characterized in that, The outer ring wall, middle ring wall, and inner ring wall are all reinforced concrete structures.
8. The large concrete silo foundation structure as described in claim 1, characterized in that, The silo foundation slab is a cast-in-place reinforced concrete circular or annular slab.
Citation Information
Patent Citations
Cast-in-place hollow floor type reinforced concrete storage tank base
CN203625917U
Reduce large -scale storage tank soft soil foundation foundation structure of differential settlement
CN207176716U
Novel large-diameter silo foundation structure
CN213508551U