Pier column maintenance cotton-padded clothes mounting device and mounting method thereof
By constructing an "exoskeleton" structure with a rigid frame for the pier maintenance cotton clothing installation device, the problems of high labor costs and low installation efficiency in traditional installation methods are solved, and stable installation is achieved under severe weather conditions, improving construction efficiency and safety.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-03-02
- Publication Date
- 2026-04-14
AI Technical Summary
Traditional methods of installing cotton-padded garments for pier maintenance are labor-intensive, inefficient, and difficult to maintain a stable posture under adverse weather conditions, making installation work challenging.
A device for installing cotton clothing for pier maintenance is adopted, including a top lifting part and an opening and closing control part. An "exoskeleton" structure is constructed through a rigid frame, and the opening and closing seams are automatically controlled and stably installed by using clamping connection parts and locking mechanisms.
It significantly improved construction efficiency, reduced labor costs, enhanced installation stability and accuracy under adverse weather conditions, and reduced the risks of working at heights.
Smart Images

Figure CN121853480A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of pier maintenance, and in particular to a device for installing cotton-padded clothing for pier maintenance and its installation method. Background Technology
[0002] In winter construction and maintenance of bridge piers, to prevent concrete from freezing and ensure normal hydration, it is usually necessary to wrap and insulate the piers with protective cotton coverings. Existing protective cotton coverings are mostly made of flexible materials, including a top protective cap and an integrally formed pier body protective cover, with vertical openings on the pier body cover to wrap the pier from the side. However, because the protective cotton covering is a large-sized flexible structure with low rigidity, it is prone to deformation and swaying during installation. Traditional installation methods typically require lifting equipment to hoist the protective cotton covering while multiple workers use ropes to pull and stretch the sides of the openings for alignment. This human-machine collaborative operation mode is not only labor-intensive and inefficient, but also difficult to maintain stability in severe weather conditions such as strong winds, making installation extremely difficult or even impossible. Therefore, this paper proposes a pier protective cotton covering installation device and its installation method to solve the above problems. Summary of the Invention
[0003] The main objective of this invention is to provide a device and method for installing cotton-padded clothing for pier maintenance, which solves the problems of high labor costs and low installation efficiency in traditional operation modes, as well as the difficulty in maintaining a stable posture due to the large wind-exposed area of the flexible cover when encountering severe weather conditions such as strong winds, making the installation operation extremely difficult or even impossible.
[0004] To solve the above-mentioned technical problems, the technical solution adopted by the present invention is: a pier maintenance cotton-padded garment installation device and its installation method, including a maintenance cotton-padded garment, the maintenance cotton-padded garment including a top maintenance cap and a pier body maintenance cover connected to the bottom of the top maintenance cap, the pier body maintenance cover having an opening and closing slit in the vertical direction, and also including an installation device, the installation device including a top lifting part fitted outside the top maintenance cap, the bottom of the top maintenance cap being connected to a plurality of opening and closing control parts through a connecting frame, the opening and closing control parts being sequentially fitted outside the pier body maintenance cover, for controlling the opening and closing of the opening and closing slit.
[0005] In the preferred embodiment, both the top curing cap and the pier curing cover are equipped with connecting straps on their exteriors for connection to the installation device; Both the top lifting section and the bottom of the opening and closing control section are equipped with clamping connection sections for clamping the connecting belt.
[0006] In the preferred embodiment, the opening and closing control unit specifically includes a fixed arc-shaped seat, with opening and closing arc-shaped arms hinged to both ends of the fixed arc-shaped seat. The ends of the two opening and closing arc-shaped arms are located on both sides of the opening and closing seam. A first hinge seat extending outward is provided at the center of the outer side of the fixed arc-shaped seat. A second hinge seat extending outward is provided on the outer side of the end of the opening and closing arc-shaped arm near the fixed arc-shaped seat. An opening and closing telescopic cylinder is hinged between the second hinge seat and the first hinge seat. The connecting frame is fixed on the fixed arc-shaped seat of each opening and closing control unit. The bottom of the opening and closing control unit is provided with three clamping connection parts. The three clamping connection parts are located at the bottom of the fixed arc-shaped seat and the two opening and closing arc-shaped arms, respectively. The position of the connecting strip is corresponding to it, and the opposite ends of the connecting strips located at the bottom of the two opening and closing arc-shaped arms are close to the opening and closing seam.
[0007] In the preferred embodiment, a sealing strip is provided on one side of the opening and closing joint of the pier body maintenance cover. The inner side of the sealing strip and the outer side of the other side of the opening and closing joint are respectively provided with mutually cooperating hook and loop surfaces.
[0008] In the preferred embodiment, a receiving groove is provided on the inner side of the opening and closing arc-shaped arm end corresponding to the closing strip, and a temporary adhesive surface corresponding to the hook side or the rough side of the hook and loop fastener is provided on the inner wall of the receiving groove.
[0009] In the preferred embodiment, the connecting frame is rotatably mounted at the bottom of the top lifting section.
[0010] In the preferred embodiment, the top lifting part includes a ring that can be fitted onto the outside of the top maintenance cap. Two connecting seats are provided on the outside of the ring. A rotating guide rod is connected between the bottoms of the two connecting seats. The top of the connecting frame is U-shaped and is slidably mounted on the rotating guide rod. An arc-shaped rack is provided on the outside of the top crossbeam of the connecting frame. A driving device is provided on the outside of the connecting seats. A transmission gear is installed on the output shaft of the driving device, and the transmission gear meshes with the arc-shaped rack. The outside of the ring is also equipped with multiple lifting lugs for lifting.
[0011] In a preferred embodiment, the clamping connection part specifically includes a clamping telescopic cylinder built into the opening and closing control part or the top lifting part. The telescopic end of the clamping telescopic cylinder moves through the opening and closing control part or the top lifting part and is connected to a clamping plate. The clamping plate can extend and retract to clamp the connecting belt between itself and the bottom of the opening and closing control part or the top lifting part.
[0012] In the preferred embodiment, a locking mechanism is provided at the docking ends of the two opening and closing arc arms to lock them together; The locking mechanism specifically includes a mounting seat and a locking seat respectively set on the outer side of the ends of the two opening and closing arc-shaped arms. An electric screw-type telescopic cylinder is fixedly installed on the mounting seat. The telescopic end of the electric screw-type telescopic cylinder moves through the mounting seat and connects to the locking part. The side of the locking seat near the mounting seat is an open structure, and locking blocks are symmetrically arranged on its two opposite inner wall surfaces. The locking part can be inserted into the locking seat and form a locking engagement structure with the locking blocks. The locking part includes a housing, in which an inner cavity with openings at both ends is provided. An electromagnet is provided in the middle of the inner cavity, and a telescopic spring is provided at both ends of the electromagnet. The other end of the telescopic spring is connected to a locking block that can pass through the opening. The locking block is configured to extend outward from the openings at both ends of the inner cavity under the elastic restoring force of the telescopic spring in its natural state, and to retract inward under the magnetic pull of the electromagnet when it is energized to release the lock. Limiting grooves are symmetrically provided on the opposite inner wall surfaces of the inner cavity, and a limiting block that slides with the limiting groove is provided at the inner end of the locking block. The protruding end of the locking block and the corresponding surface of the locking block are respectively provided with mutually compatible wedge-shaped slopes.
[0013] The method includes: S1. Put the maintenance cotton clothing into the installation device on the ground, so that each connecting strap corresponds to the clamping connection of the top lifting part and the pier maintenance cover, and make the clamping connection clamp the corresponding connecting strap. At the same time, flip the connecting strap and stick it on the temporary pasting surface. S2. The installation device and the maintenance cotton garment connected inside it are lifted by the lifting device and kept vertical. Then, the opening and closing of the maintenance cotton garment is opened by opening and closing the opening and closing of each opening and closing control part. S3. The maintenance cotton clothing is hoisted onto the pier using a lifting device, so that the top maintenance cap is fitted onto the top of the pier, and the pier body enters the pier body maintenance cover through the open opening and closing joint. S4. Close each opening and closing control part to seal the opening and closing seam, then disconnect the opening and closing control part from each connecting strip, and rotate the connecting frame and all opening and closing control parts by driving them to rotate, so that the connecting strips complete the initial bonding after flipping and pressing. S5. Disconnect the top lifting part from each connecting strip, use the lifting device to lift the installation device upward, and make sure the height is the same as the distance between each opening and closing control part. Then, by rotating the rear opening and closing arc arm to press the connecting strip together, the overall bonding of the connecting strip is completed. S6. Finally, open all opening and closing control parts, and after the top lifting part is separated from the top maintenance cap and the pier, the installation device can be horizontally lifted and moved.
[0014] This invention provides a device and method for installing a flexible protective cotton-padded garment on a pier. The device constructs a rigid "exoskeleton" installation structure on the outside of the flexible protective cotton-padded garment, fundamentally changing the traditional operation mode that relies on manual assistance to hoist the flexible cover. This significantly improves construction efficiency and environmental adaptability. The "exoskeleton" structure uses a rigid frame to provide a stable support skeleton for the flexible protective cotton-padded garment, enabling it to maintain a preset unfolded shape during hoisting. This effectively overcomes the defects of large-sized flexible materials, such as easy swaying, easy deformation, and large wind-exposed area. It enables precise, stable, and rapid positioning even in adverse weather conditions such as wind. This greatly reduces the reliance on rope traction and coordination by multiple workers, lowering labor costs and the risks of high-altitude operations. At the same time, the automatic closure problem of the opening and closing joints is solved by rotating the outward connecting belt, connecting frame, and various opening and closing control parts. Attached Figure Description
[0015] The present invention will be further described below with reference to the accompanying drawings and embodiments: Figure 1 This is an overall structural diagram of the invention; Figure 2 This is the present invention. Figure 1 Another perspective on the structure diagram; Figure 3 This is a structural diagram of the cotton clothing maintenance method of this invention; Figure 4 This is the present invention. Figure 3 Another perspective on the structure diagram; Figure 5 This is a structural diagram of the installation device of the present invention; Figure 6 This is the present invention. Figure 5 Another perspective on the structure diagram; Figure 7 This is the present invention. Figure 6 Another perspective on the structure diagram; Figure 8 This is a structural diagram of the opening and closing control unit of the present invention; Figure 9 This is a structural diagram of the opening and closing state of the opening and closing control unit of the present invention; Figure 10 This is an exploded structural diagram of the opening and closing control part and the clamping connection part of the present invention; Figure 11 This is a structural diagram of the receiving groove of the present invention; Figure 12 This is a structural diagram of the connection between the top lifting part and the connecting frame of the present invention; Figure 13 This is a front view of the locking mechanism structure of the present invention; Figure 14 This is a half-sectional view of the locking part of the present invention.
[0016] In the diagram: 1. Maintenance cotton coat; 10. Top maintenance cap; 11. Body maintenance cover; 110. Opening and closing seam; 111. Sealing strip; 112. Hook and loop fastener; 113. Connecting strap; 12. Installation device; 20. Top lifting part; 200. Ring body; 201. Lifting lug; 202. Connecting seat; 203. Rotating guide rod; 204. Drive device; 205. Transmission gear; 21. Connecting frame; 210. Arc rack; 22. Opening and closing control part; 220. Fixed arc seat; 221. First hinge. 222; second hinge seat 223; opening and closing telescopic cylinder 224; mounting seat 225; locking seat 226; locking block 227; electric screw telescopic cylinder 228; locking part 229; housing 2290; inner cavity 2291; electromagnet 2292; telescopic spring 2293; locking block 2294; limiting groove 2295; limiting block 2296; receiving groove 2210; temporary adhesive surface 2211; clamping connection part 23; clamping telescopic cylinder 230; clamping plate 231; pier column 3. Detailed Implementation
[0017] like Figure 1-14 As shown, a device for installing a protective covering for a pier column includes a pier column 3 and a protective covering 1 to be fitted over the pier column 3. In this embodiment, the pier column 3 is cylindrical, and the size of the protective covering 1 is adapted to the size of the pier column 3. Specifically, it includes a top protective cap 10 and a pier body protective cover 11. The top protective cap 10 is designed to be fitted onto the top of the pier column 3, and the pier body protective cover 11 is connected to the bottom of the cap and integrally formed with it. To achieve the covering installation of the pier column 3, the pier body protective cover 11 has an opening and closing slit 110 in the vertical direction. During construction, the pier body protective cover 11 can be unfolded through the opening and closing slit 110 and wrapped around the outer periphery of the pier column 3. The above structure is a conventional technical means in this field and will not be described in detail here.
[0018] In this embodiment, a sealing strip 111 is provided on one side of the opening and closing joint 110 of the pier body maintenance cover 11. The inner side of the sealing strip 111 and the outer side of the other side of the opening and closing joint 110 are respectively provided with mutually cooperating hook and loop fastener surfaces 112 and hook and loop fastener surfaces 113. Thus, after the pier body maintenance cover 11 is installed on the outside of the pier column 3, the opening and closing joint 110 can be sealed by the fastening of the hook and loop fastener surfaces 112 and 113.
[0019] Because the maintenance cotton garment 1 is a large-sized flexible structure with low rigidity, it is prone to deformation or swaying during hoisting. In existing technology, it is typically necessary to use lifting equipment to raise the maintenance cotton garment 1 while multiple construction workers use ropes to pull and tension the maintenance cover 11 on both sides of the joint 110 to assist in alignment and installation. This method is not only labor-intensive and inefficient, but also makes it difficult to maintain a stable posture under complex weather conditions such as wind, as the flexible cover has a large wind-exposed area, potentially making installation impossible.
[0020] In view of the problems of installation difficulties and poor environmental adaptability in the existing technology, this embodiment provides an installation device 2 to realize the installation of the maintenance cotton coat 1.
[0021] The installation device 2 includes a top lifting part 20 that is fitted onto the outside of the top maintenance cap 10. The bottom of the top maintenance cap 10 is connected to a plurality of opening and closing control parts 22 via a connecting frame 21. The opening and closing control parts 22 are fitted onto the outside of the pier body maintenance cover 11 in sequence and are used to control the opening and closing of the opening and closing joint 110.
[0022] In order to enable the maintenance cotton coat 1 to be connected to the installation device 2, the top maintenance cap 10 and the outside of the pier maintenance cover 11 are both provided with connecting straps 12.
[0023] Meanwhile, both the top lifting part 20 and the opening and closing control part 22 are provided with clamping connecting parts 23 for clamping the connecting belt 12 at their bottoms.
[0024] Specifically, the top maintenance cap 10 is provided with a set of connecting straps 12 connected to the top lifting part 20. The top maintenance cap 10 is provided with the same number of connecting straps 12 as the opening and closing control part 22. The circumferential positioning of the connecting straps 12 satisfies the effect of controlling the opening and closing of the opening and closing seam 110. In this embodiment, there are four opening and closing control parts 22, which are equidistantly distributed. Due to structural limitations, the opening and closing angle at the top of the opening and closing seam 110 is small, and the significance of opening and closing control is small. Therefore, the uppermost opening and closing control part 22 is located in the upper middle position of the opening and closing seam 110. At the same time, the opening and closing degree of each opening and closing control part 22 is adjusted according to its position to avoid tearing of the maintenance cotton coat 1.
[0025] In the preferred embodiment, the opening and closing control unit 22 specifically includes a fixed arc-shaped seat 220, with opening and closing arc-shaped arms 221 hinged at both ends of the fixed arc-shaped seat 220. When the two opening and closing arc-shaped arms 221 are combined, they can form a closed mechanism that is adapted to the shape of the pier 3 with the fixed arc-shaped seat 220. The ends of the two opening and closing arc-shaped arms 221 are located on both sides of the opening and closing joint 110. It should be noted that when the fixed arc-shaped seat 220 is closed, it will not form a clamping and locking relationship with the pier 3.
[0026] It should be noted that the bottom of the opening and closing control unit 22 is provided with three clamping connecting parts 23. The three clamping connecting parts 23 are respectively located at the bottom of the fixed arc-shaped base 220 and the two opening and closing arc-shaped arms 221. The position of the connecting strip 12 corresponds to it, and the opposite end of the connecting strip 12 located at the bottom of the two opening and closing arc-shaped arms 221 is close to the opening and closing seam 110. Thus, the opening and closing control of the opening and closing seam 110 can be realized by opening and closing the two opening and closing arc-shaped arms 221.
[0027] To control the opening and closing of the arc-shaped arm 221, a first hinge seat 222 extending outward is provided at the center of the outer side of the fixed arc-shaped seat 220. A second hinge seat 223 extending outward is provided on the outer side of the end of the arc-shaped arm 221 near the fixed arc-shaped seat 220. An opening and closing telescopic cylinder 224 is hinged between the second hinge seat 223 and the first hinge seat 222. The opening and closing of the corresponding arc-shaped arm 221 can be controlled by the extension and retraction of the opening and closing cylinder 224, thereby controlling the opening and closing of the opening and closing seam 110. The opening and closing telescopic cylinder 224 is preferably a hydraulic cylinder.
[0028] To achieve the effect of automatically closing the sealing strip 111, a receiving groove 2210 is provided on the inner side of the end of the opening and closing arc arm 221 corresponding to the sealing strip 111, and a temporary adhesive surface 2211 corresponding to the hook and loop surface 112 or hook and loop surface 113 is provided on the inner wall of the receiving groove 2210, so that the sealing strip 111 is in the open state in the receiving groove 2210 and is attached to the temporary adhesive surface 2211. This state is maintained to prevent unnecessary adhesion of the sealing strip 111 during the process of closing the opening and closing joint 110 by the opening and closing control part 22, which would affect the closing of the opening and closing joint 110.
[0029] The connecting frame 21 is fixed on the fixed arc-shaped seat 220 of each opening and closing control part 22, thereby avoiding affecting the opening and closing of the opening and closing arc arm 221. At the same time, the connecting frame 21 is rotatably set at the bottom of the top lifting part 20. With this design, the rotation of the connecting frame 21 can drive the rotation of all the opening and closing control parts 22 in the closed state, thereby driving the sealing strip 111 to flip towards the bonding side and detach it from the temporary adhesive surface 2211. Under the pressing action of the inner side of the opening and closing arc arm 221, the hook and loop surface 112 and the hook and loop fabric surface 113 are bonded together.
[0030] Specifically, the top lifting part 20 includes a ring 200 that can be fitted onto the outside of the top maintenance cap 10. The ring 200 has multiple lifting lugs 201 for lifting and two connecting seats 202. In this embodiment, the number of lifting lugs 201 is four arranged in a ring array on the outside of the ring 200, which facilitates the connection of the lifting device. The connecting seats 202 are L-shaped, and a rotating guide rod 203 is connected between their bottoms. The length of the rotating guide rod 203 meets the above-mentioned rotation distance requirements. The top of the connecting frame 21 is U-shaped and is slidably mounted on the rotating guide rod 203. An arc-shaped rack 210 is provided on the outer side of the top crossbeam of the connecting frame 21. A driving device 204 is provided on the outside of the connecting seat 202. The driving device 204 is composed of a motor and a reducer. A transmission gear 205 is installed on the output shaft of the driving device 204, and the transmission gear 205 meshes with the arc-shaped rack 210.
[0031] With this design, the transmission gear 205 can be driven to rotate by the drive device 204, thereby driving the connecting frame 21 and its opening and closing control part 22 to rotate by meshing with the arc rack 210. It should be noted that the installation positions of the drive device 204 and the arc rack 210 meet the above-mentioned rotation requirements.
[0032] In this embodiment, the clamping connection part 23 specifically includes a clamping telescopic cylinder 230 built into the opening and closing control part 22 or the ring body 200. The telescopic end of the clamping telescopic cylinder 230 moves through the opening and closing control part 22 or the ring body 200 and is connected to a clamping plate 231. The clamping plate 231 can be telescopically extended and extended to clamp the connecting strap 12 between itself and the bottom of the opening and closing control part 22 or the ring body 200.
[0033] In the preferred embodiment, in order to avoid the opening and closing telescopic cylinder 224 needing to output thrust for a long time after the two opening and closing arc arms 221 have closed, a locking mechanism is provided at the docking end of the two opening and closing arc arms 221 to lock each other.
[0034] The locking mechanism specifically includes a mounting base 225 and a locking base 226 respectively disposed on the outer sides of the ends of the two opening and closing arc-shaped arms 221. An electric screw-type telescopic cylinder 228 is fixedly mounted on the mounting base 225. The telescopic end of the electric screw-type telescopic cylinder 228 moves through the mounting base 225 and connects to the locking part 229. The locking base 226 has an open structure on the side near the mounting base 225, and locking blocks 227 are symmetrically arranged on its two opposite inner wall surfaces. The locking part 229 can be inserted into the locking base 226 and form a locking engagement structure with the locking blocks 227.
[0035] The locking part 229 includes a housing 2290, in which an inner cavity 2291 with openings at both ends is provided. An electromagnet 2292 is provided in the middle of the inner cavity 2291. A telescopic spring 2293 is provided at both ends of the electromagnet 2292. The other end of the telescopic spring 2293 is connected to a locking block 2294 that can pass through the opening. The locking block 2294 is configured to extend outward from the openings at both ends of the inner cavity 2291 under the elastic restoring force of the telescopic spring 2293 in its natural state, and to retract inward under the magnetic pull of the electromagnet 2292 when the electromagnet 2292 is energized to release the lock. The magnetic circuit of the electromagnet 2292 only acts on the locking block 2294. Limiting grooves 2295 are symmetrically provided on the opposite inner wall surfaces of the inner cavity 2291. A limiting block 2296 that slides with the limiting groove 2295 is provided at the inner end of the locking block 2294.
[0036] The protruding end of the locking block 2294 and the corresponding surface of the locking block 227 are respectively provided with mutually adapted wedge-shaped slopes; the wedge-shaped slopes are constructed such that when the locking block 2294 moves with the device and initially abuts against the locking block 227, the inclined force forces the locking block 2294 to overcome the spring force and retract axially to make room; after the locking block 2294 slides past the locking block 227, it automatically resets and pops out under the action of the telescopic spring 2293, thereby forming a locking engagement with the locking block 227.
[0037] With this design, after the two opening and closing arc arms 221 are closed, the locking part 229 can be pushed into the locking seat 226 by the electric screw telescopic cylinder 228, and a locking engagement can be formed with the locking block 227. When unlocking is required, the locking block 2294 can be retracted by the electromagnet 2292, and the electric screw telescopic cylinder 228 can be retracted.
[0038] In another embodiment, in conjunction with the pier maintenance cotton-padded clothing installation device proposed in the above embodiments, an installation method for the pier maintenance cotton-padded clothing installation device is proposed, the method comprising: S1. On the ground, put the maintenance cotton coat 1 into the installation device 2, so that each connecting strap 12 corresponds to the clamping connection part 23 of the top lifting part 20 and the pier body maintenance cover 11, and make the clamping connection part 23 clamp the corresponding connecting strap 12. At the same time, flip the connecting strap 12 and stick it on the temporary adhesive surface 2211. At this time, the installation device 2 forms an "exoskeleton" structure on the outside of the maintenance cotton coat 1.
[0039] S2. Connect the lifting rope of the lifting device to the lifting lug 201 on the top lifting part 20, lift the installation device 2 and the maintenance cotton coat 1 connected inside it, and keep it vertical. Then, through the opening and closing of each opening and closing control part 22, the opening and closing seam 110 of the maintenance cotton coat 1 is opened. At this time, the installation device 2 can prevent the maintenance cotton coat 1 from swinging irregularly.
[0040] It should be noted that the opening and closing angles of each opening and closing control unit 22 increase sequentially from top to bottom.
[0041] S3. The maintenance cotton coat 1 is hoisted onto the pier 3 by the hoisting device, so that the top maintenance cap 10 is fitted onto the top of the pier 3, and the pier body enters the pier body maintenance cover 11 through the open opening and closing seam 110.
[0042] S4. Close each opening and closing control part 22 to close the opening and closing seam 110. Then, disconnect the opening and closing control part 22 from each connecting strip 12. Drive the connecting frame 21 and all opening and closing control parts 22 to rotate through the driving device 204. After the connecting strip 12 is flipped and pressed, the initial bonding is completed.
[0043] S6. Disconnect the top lifting part 20 from each connecting belt 12, and use the lifting device to lift the installation device 2 upwards. The height should be the same as the distance between each opening and closing control part 22. Then, by rotating the rear opening and closing arc arm 221 to press the connecting belt 12 together, the overall bonding of the connecting belt 12 is completed.
[0044] S7. Finally, open all opening and closing control parts 22, and after the top lifting part 20 is separated from the top maintenance cap body 10 and the pier 3, the installation device 2 can be horizontally lifted and moved.
[0045] The above embodiments are merely preferred technical solutions of the present invention and should not be considered as limitations on the present invention. The scope of protection of the present invention should be limited to the technical solutions described in the claims, including equivalent substitutions of the technical features described in the claims. That is, equivalent substitutions and improvements within this scope are also within the scope of protection of the present invention.
Claims
1. A device for installing a protective cotton garment for pier columns, comprising a protective cotton garment (1), the protective cotton garment (1) comprising a top protective cap (10) and a pier body protective cover (11) connected to the bottom of the top protective cap (10), the pier body protective cover (11) having an opening and closing slit (110) in the vertical direction, characterized in that: It also includes an installation device (2), which includes a top lifting part (20) fitted outside the top maintenance cap (10). The bottom of the top maintenance cap (10) is connected to multiple opening and closing control parts (22) via a connecting frame (21). The opening and closing control parts (22) are fitted outside the pier body maintenance cover (11) in sequence to control the opening and closing of the opening and closing joint (110).
2. The device for installing cotton-padded clothing for pier maintenance according to claim 1, characterized in that: Both the top maintenance cap (10) and the pier maintenance cover (11) are equipped with connecting straps (12) for connecting to the installation device (2); Both the top lifting part (20) and the opening and closing control part (22) are provided with clamping connecting parts (23) for clamping the connecting belt (12) at their bottoms.
3. The device for installing cotton-padded clothing for pier maintenance according to claim 2, characterized in that: The opening and closing control unit (22) specifically includes a fixed arc-shaped seat (220), with opening and closing arc-shaped arms (221) hinged at both ends of the fixed arc-shaped seat (220). The ends of the two opening and closing arc-shaped arms (221) are located on both sides of the opening and closing seam (110). A first hinge seat (222) extending outward is provided at the center of the outer side of the fixed arc-shaped seat (220). A second hinge seat (223) extending outward is provided on the outer side of the end of the opening and closing arc-shaped arm (221) close to the fixed arc-shaped seat (220). An opening and closing telescopic cylinder (224) is hinged between the second hinge seat (223) and the first hinge seat (222). The connecting frame (21) is fixed on the fixed arc-shaped seat (220) of each opening and closing control unit (22). The bottom of the opening and closing control unit (22) is provided with three clamping connection parts (23). The three clamping connection parts (23) are located at the bottom of the fixed arc-shaped seat (220) and the two opening and closing arc-shaped arms (221), respectively. The position of the connecting strip (12) is corresponding to it, and the opposite end of the connecting strip (12) located at the bottom of the two opening and closing arc-shaped arms (221) is close to the opening and closing seam (110).
4. The device for installing cotton-padded clothing for pier maintenance according to claim 3, characterized in that: The pier body maintenance cover (11) is provided with a sealing strip (111) on one side of the opening and closing joint (110). The inner side of the sealing strip (111) and the outer side of the other side of the opening and closing joint (110) are respectively provided with a hook and loop fastener (112) and a hook and loop fastener (113) that cooperate with each other.
5. The device for installing cotton-padded clothing for pier maintenance according to claim 4, characterized in that: A receiving groove (2210) is provided on the inner side of the end of the opening and closing arc arm (221) corresponding to the closing strip (111), and a temporary adhesive surface (2211) corresponding to the hook and loop surface (112) or the hook and loop surface (113) is provided on the inner wall of the receiving groove (2210).
6. The device for installing cotton-padded clothing for pier maintenance according to claim 5, characterized in that: The connecting frame (21) is rotatably mounted at the bottom of the top lifting part (20).
7. The device for installing cotton-padded clothing for pier maintenance according to claim 6, characterized in that: The top lifting part (20) includes a ring (200) that can be fitted onto the outside of the top maintenance cap (10). Two connecting seats (202) are provided on the outside of the ring (200). A rotating guide rod (203) is connected between the bottoms of the two connecting seats (202). The top of the connecting frame (21) is in the shape of a door and is slidably mounted on the rotating guide rod (203). An arc-shaped rack (210) is provided on the outside of the top crossbeam of the connecting frame (21). A driving device (204) is provided on the outside of the connecting seat (202). A transmission gear (205) is installed on the output shaft of the driving device (204). The transmission gear (205) meshes with the arc-shaped rack (210). The outer side of the ring (200) is also provided with multiple lifting lugs (201) for lifting.
8. The device for installing cotton-padded clothing for pier maintenance according to claim 5, characterized in that: The clamping connection part (23) specifically includes a clamping telescopic cylinder (230) built into the opening and closing control part (22) or the top lifting part (20). The telescopic end of the clamping telescopic cylinder (230) moves through the opening and closing control part (22) or the top lifting part (20) and is connected to a clamping plate (231). The clamping plate (231) can be telescopically extended and clamped between itself and the bottom of the opening and closing control part (22) or the top lifting part (20) by clamping the connecting belt (12).
9. The pier maintenance cotton clothing installation device according to any one of claims 3-8, characterized in that: The two opening and closing arc-shaped arms (221) are provided with a locking mechanism at their mating ends to lock each other; The locking mechanism specifically includes a mounting base (225) and a locking base (226) respectively disposed on the outer side of the ends of the two opening and closing arc-shaped arms (221). An electric screw-type telescopic cylinder (228) is fixedly mounted on the mounting base (225). The telescopic end of the electric screw-type telescopic cylinder (228) moves through the mounting base (225) and connects to the locking part (229). The side of the locking base (226) near the mounting base (225) is an open structure, and locking blocks (227) are symmetrically arranged on its two opposite inner wall surfaces. The locking part (229) can be inserted into the locking base (226) and form a locking engagement structure with the locking block (227). The locking part (229) includes a housing (2290), and the housing (2290) is provided with an inner cavity (2291) with both ends open. An electromagnet (2292) is provided in the middle of the inner cavity (2291). A telescopic spring (2293) is provided at both ends of the electromagnet (2292). The other end of the telescopic spring (2293) is connected to a locking block (2294) that can pass through the opening. The locking block (2294) is configured to extend outward from the openings at both ends of the inner cavity (2291) under the elastic restoring force of the telescopic spring (2293) in its natural state, and to retract inward under the magnetic force when the electromagnet (2292) is energized to release the lock. Limiting grooves (2295) are symmetrically provided on the opposite inner wall surfaces of the inner cavity (2291). A limiting block (2296) that slides with the limiting groove (2295) is provided at the inner end of the locking block (2294). The protruding end of the locking block (2294) and the corresponding surface of the locking block (227) are respectively provided with mutually compatible wedge-shaped slopes.
10. The installation method of the pier maintenance cotton clothing installation device according to any one of claims 5-8, characterized in that: The method includes: S1. On the ground, put the maintenance cotton clothing (1) into the installation device (2), so that each connecting strip (12) corresponds to the clamping connection part (23) of the top lifting part (20) and the pier body maintenance cover (11), and make the clamping connection part (23) clamp the corresponding connecting strip (12), while flipping the connecting strip (12) open and sticking it on the temporary adhesive surface (2211); S2. The installation device (2) and the maintenance cotton garment (1) connected inside it are lifted by the lifting device and kept vertical. Then, the opening and closing seams (110) of the maintenance cotton garment (1) are opened by opening and closing each opening and closing control part (22). S3. The maintenance cotton coat (1) is hoisted onto the pier (3) by the hoisting device, so that the top maintenance cap (10) is fitted onto the top of the pier (3), and the pier body enters the pier body maintenance cover (11) through the open opening and closing seam (110); S4. Close each opening and closing control part (22) to close the opening and closing seam (110), then disconnect the opening and closing control part (22) from each connecting strip (12), and rotate the connecting frame (21) and all opening and closing control parts (22) to make the connecting strip (12) complete the initial bonding after flipping and pressing. S5. Disconnect the top lifting part (20) from each connecting strip (12), and use the lifting device to lift the installation device (2) upwards. The height should be the same as the distance between each opening and closing control part (22). Then, by rotating the rear opening and closing arc arm (221) to press the connecting strip (12), the overall bonding of the connecting strip (12) is completed. S6. Finally, open all opening and closing control parts (22), and after the top lifting part (20) is separated from the top maintenance cap (10) and the pier (3), the horizontal lifting and moving installation device (2) can be performed.