Gas nanometer purifier

By integrating the gas storage chamber, gas-liquid separator, and adsorption tower on one side of the mounting plate, and using a nested structure for the vortex assembly and adsorption tower, the valve module enables alternating purification by the two towers. This solves the problems of loose and cumbersome installation of gas purification equipment, and achieves compact integration and high-efficiency purification effect.

CN122076147AActive Publication Date: 2026-05-26HONGRIJIA DEPURATE FACILITY SCI & TECH CO LTD
2 Cites 2 Cited by

Patent Information

Application Number
CN202610539138.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-04-22
Publication Date
2026-05-26
Estimated Expiration
2046-04-22

AI Technical Summary

Technical Problem

Existing gas purification equipment has a loose structure, occupies a large space, is cumbersome to install, has unstable airflow, is prone to leakage, has low integration, and is difficult to use in confined spaces.

Method used

It adopts a gas nano-purifier, integrating a gas storage chamber, gas-liquid separator and adsorption tower on one side of the mounting plate. The exhaust pipe passes through the through hole of the mounting plate. The vortex assembly and adsorption tower adopt a nested structure. The valve module realizes the alternating purification of the two towers, and the sludge collection chamber reduces noise emissions.

Benefits of technology

It achieves a compact and integrated layout, reduces the risk of pipeline damage, has good airflow stability, is easy to install, has high gas-liquid separation efficiency, and high filtration accuracy, making it suitable for industrial applications with high cleanliness requirements.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The invention relates to a gas nano purifier. The gas nano purifier comprises a mounting seat, the gas storage bin is installed on the installation base and used for storing clean gas, the side wall of the upper portion of the gas storage bin extends upwards to form an installation plate, and a gas path through hole is formed in the middle of the installation plate; the gas-water separator is mounted on the mounting plate and is used for carrying out primary purification on to-be-cleaned gas; the adsorption tower is mounted on the mounting plate and is used for carrying out secondary purification on the to-be-cleaned gas; gas to be cleaned sequentially flows through the gas-water separator and the adsorption tower and then enters the gas storage bin; the adsorption tower is communicated with the gas storage bin through an exhaust pipe; and the exhaust pipe penetrates through the gas path through hole. Through the arrangement, the installation operation is greatly simplified, and the integrity and the space utilization rate of equipment are improved.
Need to check novelty before this filing date? Find Prior Art