Process window determination method, semiconductor process equipment and semiconductor processing method
By measuring the time difference between the flow switching moment and the pressure gauge response moment, the pressure gauge delay is accurately compensated, solving the problem of process window time loss caused by pressure gauge measurement delay, and improving the capacity and process stability of semiconductor process equipment.
Patent Information
- Application Number
- CN202610885123.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2026-06-18
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2046-06-18
AI Technical Summary
In existing technologies, the measurement delay of pressure gauges leads to the loss of process window time, affecting the capacity and product yield of semiconductor processes, especially in scenarios with rapid pressure switching, making it difficult to meet process stability requirements.
By measuring the time difference between the flow switching moment and the pressure gauge response moment, the measurement delay of the pressure gauge can be accurately compensated, the time for the pressure to stabilize in the process chamber can be determined in advance, and the start time of the process window can be corrected.
It effectively eliminates the process window time loss caused by pressure gauge measurement delay, significantly improves equipment capacity, enhances process stability and product yield, and is achieved through software algorithms without any hardware modifications.
Smart Images

Figure CN122421709B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of semiconductor manufacturing technology, specifically to a process window determination method, semiconductor process equipment, and semiconductor processing method. Background Technology
[0002] In semiconductor manufacturing processes, such as atomic layer etching (ALE), the pressure within the chamber needs to be switched rapidly between different target values, and the process can only begin after the pressure has basically stabilized to ensure consistency and repeatability of the process.
[0003] In existing technologies, pressure gauges (also known as vacuum gauges) are typically used to measure the pressure within a chamber, as illustrated in Chinese patent applications CN121122993A, CN121096914A, CN121790264A, and CN121768935A. To protect the pressure gauge from damage caused by high-pressure impacts, high temperatures, or corrosive gases during the process, and to prevent contamination of the pressure gauge by reaction byproducts, the pressure gauge is generally installed outside the chamber and connected to it via a connecting channel. Due to the presence of the connecting channel and the volume of the pressure gauge itself, there is a certain delay in the pressure measurement of changes within the chamber. The longer the connecting channel, the more pronounced the delay. Although the delay can be reduced by shortening the length of the connecting channel, the connecting channel always has a certain volume, which is difficult to eliminate due to limitations imposed by the chamber wall thickness and the pressure gauge's installation and connection requirements. Furthermore, commercially available pressure gauges for process chambers generally have a certain pressure measurement response delay, which is also difficult to eliminate.
[0004] When process pressure changes slowly, or when the control logic is not sensitive to pressure fluctuations, this lag in pressure measurement is acceptable. However, when process pressure needs to be switched rapidly, especially when the switching time and the pressure gauge response time are on the same order of magnitude, this lag becomes unacceptable. For example, in the ALE process, the pressure inside the chamber needs to switch rapidly between high and low pressure repeatedly. After each switch, it is necessary to wait for the pressure to stabilize before the process can begin; that is, the pressure stabilization period corresponds to the process window period. If the pressure stabilization status is determined by the stability of the pressure gauge reading, then due to the measurement delay of the pressure gauge, the pressure inside the chamber may have actually stabilized for some time, but the pressure gauge reading has not yet stabilized. This leads to a loss of process window time. For processes that require hundreds or even thousands of cycles, the loss of tens of milliseconds of process window time per cycle will significantly reduce the equipment's capacity. At the same time, the lag in pressure feedback may cause the process to operate in a non-ideal pressure environment. That is, the actual pressure inside the process chamber has changed, but the pressure gauge has not reported this change in time, which will cause the process to be carried out under non-ideal pressure conditions, thereby reducing product yield.
[0005] Therefore, there is an urgent need for a solution that can more quickly determine the stable pressure state within the chamber in order to solve the aforementioned problems in the existing technology. Summary of the Invention
[0006] The purpose of this invention is to provide a process window determination method and semiconductor process equipment. By measuring the time difference between the flow switching time and the pressure gauge response time, the measurement delay can be accurately compensated, and the actual pressure stabilization time in the process chamber can be determined in advance, effectively increasing the process window time and improving equipment capacity.
[0007] To achieve the above objectives, the present invention provides a method for determining a process window, comprising: A process chamber is provided, the process chamber is connected to an air inlet device, an exhaust device and a pressure gauge, the air inlet device controls the flow rate of the process gas supplied into the process chamber, the exhaust device is used to evacuate the process chamber, and the pressure gauge is used to measure the pressure inside the process chamber and output the measured pressure. The exhaust device is configured to draw a vacuum, and the air intake device is configured to supply air at a first flow rate, so that the measured pressure is stabilized at a first pressure. At a first time, the air intake device is configured to supply air at a second flow rate, and at a second time, the measured pressure begins to change from the first pressure to the second pressure, and the time difference between the second time and the first time is obtained; At the third time, the measured pressure begins to stabilize at the second pressure, and a correction is made to the process window start time of the processing procedure based on the second pressure, based on the time difference between the third time and the second time.
[0008] In some embodiments, the modification is implemented as follows: Subtracting the time difference from the third time yields the actual stabilization time when the actual pressure in the process chamber stabilizes at the second pressure. The actual stabilization time is set as the corrected process window start time.
[0009] In some embodiments, the modification is implemented as follows: Subtracting the time difference from the third time yields the actual stabilization time when the actual pressure in the process chamber stabilizes at the second pressure. Adding a preset safety margin to the actual stabilization time yields the corrected process window start time.
[0010] In some embodiments, the processing process is started at the modified process window start time.
[0011] In some embodiments, the second flow rate is greater than the first flow rate, and the second pressure is higher than the first pressure; or the second flow rate is less than the first flow rate, and the second pressure is lower than the first pressure.
[0012] In some embodiments, the air intake device includes a first air intake valve and a second air intake valve. The first air intake valve is used to control the supply of a first process gas to the process chamber, and the second air intake valve is used to control the supply of a second process gas to the process chamber. When the first air intake valve is in the open state and the second air intake valve is in the closed state, the air intake device supplies gas at the first flow rate, and the target stable pressure of the process chamber is the first pressure. When the second air intake valve is in the open state and the first air intake valve is in the closed state, the air intake device supplies gas at the second flow rate, and the target stable pressure of the process chamber is the second pressure.
[0013] In some embodiments, the exhaust device includes a vacuum valve for controlling the vacuuming rate. By configuring the vacuum valve opening and the air intake flow rate, the first flow rate of air supply corresponds to a first stable pressure, and the second flow rate of air supply corresponds to a second stable pressure.
[0014] In some embodiments, the air intake device includes at least one flow regulating valve, wherein the first flow rate and the second flow rate are controlled by the opening degree of the flow regulating valve.
[0015] In some embodiments, a time difference database under different process conditions is established in advance; When performing the processing technology, the corresponding time difference is retrieved from the time difference database according to the current process conditions.
[0016] In some embodiments, the process conditions include at least one of the following: the first flow rate, the second flow rate, the vacuum rate of the exhaust device, and the type of the process gas.
[0017] In some embodiments, the criterion for determining that the measured pressure begins to stabilize at the second pressure is: Within a preset determination time window, the fluctuation range of the measured pressure is less than a preset pressure threshold.
[0018] The present invention also provides a semiconductor process apparatus, comprising: The process cavity contains a base for supporting the substrate; An air intake device, connected to the process chamber, is used to control the flow rate of the process gas supplied into the process chamber; An exhaust device, connected to the process chamber, is used to evacuate the process chamber; A pressure gauge, connected to the process chamber, is used to measure the pressure inside the process chamber and output the measured pressure; The controller is communicatively connected to the intake device, the exhaust device, and the pressure gauge, respectively, and is configured to execute the process window determination method described above to determine the process window start time.
[0019] In some embodiments, the semiconductor process apparatus further includes a radio frequency (RF) component for exciting plasma within the process cavity, and a controller communicatively connected to the RF component, the controller being configured to control the RF component to exciting plasma only within the process window to process the substrate.
[0020] The present invention also provides a semiconductor processing method, comprising: Provide the aforementioned semiconductor process equipment; The process chamber is operated in a cyclic process, which includes a decision cycle and a process cycle. The decision cycle and the process cycle use the same intake and exhaust control parameters and timing. The process window determination method is implemented in the determination loop to determine the start time of the process window; In the process cycle, the start time is taken as the start time of plasma excitation.
[0021] The beneficial effects of this invention are as follows: This invention measures the time difference between the flow switching moment of the intake device and the start of the pressure gauge response, which accurately reflects the pressure gauge's measurement delay time. This time difference is then used to compensate for the moment when the pressure gauge reading stabilizes, thereby obtaining the actual moment when the pressure in the process chamber stabilizes. Finally, the process window start time is corrected based on this actual stabilization moment. This invention effectively eliminates the process window time loss caused by the pressure gauge measurement delay, significantly improving equipment throughput for semiconductor processes requiring numerous cycles (such as ALE and ALD processes). Furthermore, this invention requires no modification to the hardware structure and can be implemented solely through software algorithms, offering advantages such as low cost and ease of implementation. Attached Figure Description
[0022] To more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings used in the embodiments will be briefly introduced below. It should be understood that the following drawings only show some embodiments of the present invention and should not be regarded as a limitation on the scope of the present invention. For those skilled in the art, other related drawings can be obtained based on these drawings without creative effort.
[0023] Figure 1 This is a flowchart illustrating the process window determination method according to an embodiment of the present invention; Figure 2 This is a schematic diagram of the relationship between measured pressure and flow rate changes in an embodiment of the present invention; Figure 3 This is a schematic diagram of the structure of a semiconductor process equipment according to an embodiment of the present invention.
[0024] Explanation of markings in the diagram: W-Substrate; 100-Process chamber; 101-Base; 200-Inlet device; 201-First inlet valve; 202-Second inlet valve; 300-Exhaust device; 301-Vacuum valve; 302-Vacuum pump; 400-Pressure gauge; 500-Connection channel; 600-Controller; 800-RF components. Detailed Implementation
[0025] In existing technologies, pressure measurement delays primarily stem from two sources: first, the transmission delay of gas within the connecting channel, as pressure waves require time to propagate from the chamber to the pressure gauge; and second, the mechanical or thermal response delay of the pressure gauge sensor itself. Both delays are significantly amplified in low-vacuum, rapid switching scenarios. To avoid inaccurate process pressure readings, the process end signal utilizes the flow switching time point. This prevents the pressure gauge from failing to provide timely feedback after a change in chamber pressure, thus avoiding non-ideal pressure conditions and reduced yield. However, this shortens the process window, necessitating extended process times to meet window requirements, thereby reducing process efficiency.
[0026] Therefore, embodiments of the present invention provide a method for determining a process window. Please refer to [link / reference]. Figure 1 This includes the following steps: S10: Provides a process chamber, which is connected to an air inlet device, an exhaust device and a pressure gauge. The air inlet device controls the flow rate of the process gas supplied to the process chamber, the exhaust device is used to evacuate the process chamber, and the pressure gauge is used to measure the pressure inside the process chamber and output the measured pressure.
[0027] For example, the pressure gauge is connected to the process chamber through a connection channel. The volume of the connection channel and the pressure gauge itself will cause a pressure propagation delay. Combined with the pressure gauge's own measurement response delay, after the pressure in the process chamber changes, it will take a certain amount of time for the pressure gauge to detect the change and output the corresponding measured pressure.
[0028] The air intake device of this invention refers to any device or combination of devices capable of controlling the flow rate of process gas, including but not limited to: a single flow regulating valve, a combination of multiple on / off valves, a combination of multiple flow regulating valves, a combination of on / off valves and flow regulating valves, etc. The exhaust device of this invention refers to any device or combination of devices capable of evacuating the process chamber, including but not limited to: a vacuum pump, a combination of a vacuum pump and a vacuum valve, a multi-stage vacuum pump system, etc.
[0029] S20: Equipped with an exhaust device to create a vacuum, and an intake device to supply air at a first flow rate, so that the measured pressure is stabilized at a first pressure.
[0030] For example, the vacuum valve in the exhaust device is first configured to a target opening. In a preferred embodiment, the vacuum valve maintains this target opening throughout the subsequent pressure switching process, with pressure switching achieved only by adjusting the intake flow rate; in other embodiments, the vacuum valve may also be slightly adjusted according to process requirements, having little impact on the overall pressure within the chamber, with the pressure primarily controlled by the intake flow rate. The intake device is then configured to supply process gas to the process chamber at a first flow rate.
[0031] S30: At the first time, the air intake device is configured to supply air at the second flow rate, and at the second time, the pressure is measured to start changing from the first pressure to the second pressure, and the time difference between the second time and the first time is obtained.
[0032] When it is necessary to switch the pressure in the process chamber from the first pressure to the second pressure, a switching command is sent to the air intake device at the first time t1, causing the air intake device to switch from supplying air at the first flow rate to supplying air at the second flow rate. Due to the pressure propagation delay, the pressure in the process chamber will begin to change immediately, but the measured pressure output by the pressure gauge will not change immediately. Instead, it will begin to change from the first pressure to the second pressure at the second time t2. Therefore, the time difference Δt between the second time t2 and the first time t1 accurately corresponds to the pressure propagation delay caused by the volume and delay of the connecting channel and the pressure gauge itself.
[0033] The second flow rate can be greater than or less than the first flow rate. When the second flow rate is greater than the first flow rate, the pressure inside the process chamber increases, and the second pressure is higher than the first pressure; when the second flow rate is less than the first flow rate, the pressure inside the process chamber decreases, and the second pressure is lower than the first pressure. In particular, the second flow rate can be zero, corresponding to the case where all intake valves are closed; the first flow rate can also be zero, corresponding to the case where the process chamber switches from a closed state to an open state.
[0034] In one specific embodiment, the air intake device includes a first air intake valve and a second air intake valve. The first air intake valve is used to control the supply of a first process gas to the process chamber, and the second air intake valve is used to control the supply of a second process gas to the process chamber. In this case, step S20 specifically involves: configuring an exhaust device to create a vacuum, setting the vacuum valve to the target opening degree; opening the first air intake valve and closing the second air intake valve, allowing the first process gas to be supplied to the process chamber at a first flow rate, and measuring the pressure to stabilize at the first pressure. Step S30 specifically involves: at a first time t1, closing the first air intake valve and opening the second air intake valve, allowing the second process gas to be supplied to the process chamber at a second flow rate; at a second time t2, measuring the pressure to begin changing from the first pressure to the second pressure, and obtaining the time difference Δt = t2 - t1.
[0035] It is understandable that the time difference is the sum of the inherent measurement delay of the pressure gauge and the pressure propagation delay of the connecting channel, which is basically consistent under the same process conditions.
[0036] In this embodiment, the first pressure is primarily controlled by the supply flow rate of the first process gas, and the second pressure is primarily controlled by the supply flow rate of the second process gas. By adjusting the flow rates of the first and second process gases, the values of the first and second pressures can be precisely set, respectively. This embodiment is particularly suitable for cyclic semiconductor processes such as atomic layer etching and atomic layer deposition that require the alternating introduction of different process gases.
[0037] In another specific embodiment, the air intake device includes a flow regulating valve. In this case, step S20 specifically involves: configuring the exhaust device to create a vacuum, setting the vacuum valve to a target opening; adjusting the opening of the flow regulating valve to a first opening, allowing the process gas to be supplied into the process chamber at a first flow rate, and measuring the pressure to stabilize at the first pressure. Step S30 specifically involves: at a first time t1, adjusting the opening of the flow regulating valve to a second opening, allowing the process gas to be supplied into the process chamber at a second flow rate; at a second time t2, the measured pressure begins to change from the first pressure to the second pressure, and obtaining the time difference Δt = t2 - t1.
[0038] S40: At the third time, the measured pressure begins to stabilize at the second pressure, and the process window start time of the processing based on the second pressure is corrected based on the third time and the time difference.
[0039] Specifically, as the pressure within the process chamber gradually changes and eventually reaches a new dynamic equilibrium, the measured pressure output by the pressure gauge will gradually approach the second pressure and eventually stabilize. When the measured pressure meets the preset stability criteria, the time at this moment is recorded as the third time t3.
[0040] Optionally, the criterion for determining that the measured pressure begins to stabilize at the second pressure is: within a preset determination time window, the fluctuation range of the measured pressure is less than a preset pressure threshold. For example, if the preset determination time window is 10 ms and the preset pressure threshold is 1% of the second pressure, then when the fluctuation range of the measured pressure does not exceed 1% of the second pressure within 10 ms, the measured pressure is determined to have begun to stabilize at the second pressure. Of course, the pressure threshold is not unique and depends on the actual process requirements; for example, it could be 0.5% to 5%.
[0041] Since the third time t3 is the time when the pressure gauge reading stabilizes, and the pressure gauge has a measurement delay of Δt, the actual pressure in the process chamber stabilizes at the second pressure in the time t3 - Δt. Based on this, the start time of the process window can be corrected.
[0042] In one embodiment, the correction is implemented as follows: subtract the time difference from the third time to obtain the actual stabilization time when the actual pressure in the process chamber stabilizes at the second pressure; set the actual stabilization time as the corrected process window start time, i.e., the corrected process window start time t. start =t3-Δt.
[0043] In another embodiment, to ensure that the pressure has completely stabilized during the process and to avoid minor fluctuations affecting process quality, a certain safety margin can be added. Specifically, the correction is implemented as follows: subtract the time difference from the third time to obtain the actual stabilization time when the actual pressure in the process chamber stabilizes at the second pressure; add a preset safety margin to the actual stabilization time to obtain the corrected process window start time. That is, the corrected process window start time t. start =t3-Δt+Δt safe , where Δt safe This is a preset safety margin, such as 5ms or 10ms. The safety margin provides time for signal transmission and response from systems such as valves and radio frequency systems, improving process stability and consistency. The specific value can be adjusted according to process requirements.
[0044] Furthermore, the method also includes starting the processing at the modified process window start time. For example, in an atomic layer etching process, when the process window start time arrives, the radio frequency power supply is turned on to excite the plasma for the etching reaction.
[0045] Please see Figure 2 , Figure 2 This is a schematic diagram illustrating the relationship between measured pressure and flow rate changes according to an embodiment of the present invention. The upper curve represents the measured pressure output by the pressure gauge, and the lower curve represents the air supply flow rate of the air intake device. As can be seen from the diagram, after switching the air supply flow rate of the air intake device at time t1, the measured pressure output by the pressure gauge does not change immediately. Instead, it begins to change at time t2 and reaches stability at time t3. The time difference between the two, Δt = t2 - t1, is the measurement delay time of the pressure gauge.
[0046] In existing technologies, time t3 is typically used as the start time of the process window, resulting in process time loss. This invention, however, calculates the actual settling time as (t3-Δt) and uses it as the corrected start time of the process window, thereby effectively increasing the process window time. For semiconductor processes requiring hundreds or even thousands of cycles, saving tens of milliseconds per cycle can significantly improve equipment throughput.
[0047] Furthermore, in practical applications, for the same equipment under the same process conditions, the measurement delay time Δt of the pressure gauge is essentially constant. Therefore, a time difference database under different process conditions can be established in advance. When executing the process, the corresponding time difference can be directly retrieved from the database without having to perform a measurement every time, which can further improve process efficiency.
[0048] Specifically, the method also includes: pre-establishing a time difference database under different process conditions; and retrieving the corresponding time difference from the time difference database according to the current process conditions when executing the processing technology.
[0049] Optionally, the process conditions include at least one of the following: a first flow rate, a second flow rate, the vacuum rate of the exhaust device, and the type of process gas. The time difference Δt under different process conditions can be measured experimentally and stored in a database. During actual production, the controller automatically retrieves the corresponding time difference Δt from the database based on the currently set process parameters to correct the process window start time.
[0050] Please see Figure 3 The present invention also provides a semiconductor process apparatus, including: a process chamber 100, a base 101, an air inlet device 200, an air outlet device 300, a pressure gauge 400, a controller 600, and a radio frequency component 800.
[0051] The process cavity 100 is a sealed cavity used to provide space for semiconductor process handling. The base 101 is disposed inside the process cavity 100 and is used to support the substrate W to be processed.
[0052] The air intake device 200 is connected to the top or side wall of the process chamber 100 and is used to control the flow rate of the process gas supplied to the process chamber 100. Figure 3 In the specific embodiment shown, the air intake device 200 includes a first air intake valve 201 and a second air intake valve 202, which are used to control the supply of two different process gases, respectively.
[0053] An exhaust device 300 is connected to the bottom of the process chamber 100 and is used to evacuate the process chamber 100. Figure 3 In the specific embodiment shown, the exhaust device 300 includes a vacuum valve 301 and a vacuum pump 302. The vacuum valve 301 is connected between the process chamber 100 and the vacuum pump 302, and is used to control the evacuation rate of the process chamber 100. In a preferred embodiment, the vacuum valve 301 remains at a target opening throughout the entire process.
[0054] The pressure gauge 400 is connected to the side wall of the process chamber 100 via the connection channel 500, and is used to measure the pressure inside the process chamber 100 and output the measured pressure.
[0055] The radio frequency (RF) component 800 is connected to the process cavity 100 and is used to excite plasma within the process cavity 100 to process the substrate W. The RF component 800 may include components such as an RF power supply, a matching network, and electrodes.
[0056] The controller 600 is communicatively connected to the air intake device 200, the exhaust device 300, the pressure gauge 400 and the radio frequency component 800, respectively. The controller 600 is configured to execute the aforementioned process window determination method to determine the process window start time and control the radio frequency component 800 to excite plasma only within the process window.
[0057] The semiconductor process equipment in this embodiment of the invention can be a semiconductor process equipment that requires rapid pressure switching, such as an atomic layer etching equipment, an atomic layer deposition equipment, or a plasma etching equipment.
[0058] This invention also provides a semiconductor processing method, applicable to the aforementioned semiconductor process equipment, and particularly suitable for cyclic plasma processing processes such as atomic layer etching and atomic layer deposition. The semiconductor processing method includes the following steps: Step 1: Provide the above-mentioned semiconductor process equipment and place the substrate W to be processed on the base 101 inside the process cavity 100.
[0059] Step 2: Run process chamber 100 in a cyclic process, which includes at least one decision cycle and multiple process cycles. The decision cycle and the process cycles use the same intake and exhaust control parameters and timing. Consistent intake and exhaust control ensures that the pressure changes in the decision cycle and the process cycles have a consistent trend, improving decision accuracy and reusability.
[0060] Step 3: Implement the process window determination method described above in the decision loop to determine the start time t of the process window. start .
[0061] For example, in the decision loop, the controller 600 first configures the exhaust device 300 to evacuate the vacuum, setting the vacuum valve 301 to the target opening; then it configures the intake device 200 to supply air at a first flow rate, stabilizing the measured pressure at the first pressure; next, at a first time t1, it configures the intake device 200 to supply air at a second flow rate, records the second time t2, and calculates the time difference Δt = t2 - t1; then it records the third time t3, and calculates the corrected process window start time t based on t3 and Δt. start .
[0062] Step 4: In subsequent process cycles, directly use the start time t start As the start time of plasma excitation, there is no need to repeat time difference measurements and calculations.
[0063] For example, in each process cycle, the controller 600 repeatedly performs the following operations: configures the air intake device 200 to supply air at a first flow rate, stabilizing the measured pressure at a first pressure; configures the air intake device 200 to supply air at a second flow rate at a first time t1; and at the start time t... start When the process window ends, the radio frequency component 800 is turned on to excite plasma to process the substrate W; when the process window ends, the radio frequency component 800 is turned off to complete one process cycle.
[0064] By setting up an independent decision loop, this invention avoids measuring and calculating the time difference in each process cycle, significantly reducing process control overhead and preventing the problem of inverted process window time determination (i.e., the determination time being later than the target process window start time). Therefore, the independent decision loop, by pre-calibrating the process window within a single loop, can significantly improve the process efficiency of other processes that reuse the same loop, facilitating open-loop control strategies and further increasing equipment capacity. Simultaneously, the decision loop can be executed periodically (e.g., once every 100 substrates processed), or it can be forcibly executed after changing process gases, cleaning pressure gauge connection channels, or equipment maintenance to update the process window start time parameter, compensate for measurement delay changes caused by equipment aging, connection channel contamination, etc., and ensure long-term process stability.
[0065] This invention accurately compensates for the pressure gauge's measurement delay by measuring the time difference between the flow switching moment of the intake device and the start of the pressure gauge's response. This allows for the earlier determination of the actual pressure stabilization time within the process chamber, effectively increasing the process window time. For semiconductor processes requiring numerous cycles, this significantly improves equipment throughput. Furthermore, this invention requires no hardware modifications and can be implemented solely through software algorithms, offering advantages such as low cost and ease of implementation.
[0066] The above description is merely a preferred embodiment of the present invention and is not intended to limit the invention. Various modifications and variations can be made to the present invention by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the scope of protection of the present invention.
Claims
1. A method for determining a process window, characterized in that, include: a. A process chamber is provided, wherein the process chamber is connected to an air inlet device, an exhaust device and a pressure gauge, the air inlet device controls the flow rate of the process gas supplied into the process chamber, the exhaust device is used to evacuate the process chamber, and the pressure gauge is used to measure the pressure inside the process chamber and output the measured pressure. b. Configure the exhaust device to create a vacuum, and configure the air intake device to supply air at a first flow rate, so that the measured pressure is stabilized at a first pressure; c. At a first time, the air intake device is configured to supply air at a second flow rate, and at a second time, the measured pressure begins to change from the first pressure to the second pressure. The time difference between the second time and the first time is obtained, and the time difference is the measurement delay time of the pressure gauge. d. At the third time, the measured pressure begins to stabilize at the second pressure, and a correction of the process window start time of the processing based on the second pressure is implemented based on the time difference between the third time and the second time. The correction is implemented by subtracting the time difference from the third time to obtain the actual stabilization time for the actual pressure inside the process chamber to stabilize at the second pressure; wherein... Set the actual stabilization time to the corrected process window start time; or, Adding a preset safety margin to the actual stabilization time yields the corrected process window start time.
2. The process window determination method as described in claim 1, characterized in that, The processing process is started at the beginning time of the revised process window.
3. The process window determination method as described in claim 1, characterized in that, The second flow rate is greater than the first flow rate, and the second pressure is higher than the first pressure; or the second flow rate is less than the first flow rate, and the second pressure is lower than the first pressure.
4. The process window determination method as described in claim 1, characterized in that, The air intake device includes a first air intake valve and a second air intake valve. The first air intake valve is used to control the supply of a first process gas to the process chamber, and the second air intake valve is used to control the supply of a second process gas to the process chamber. When the first intake valve is open and the second intake valve is closed, the intake device supplies air at the first flow rate, and the target stable pressure of the process chamber is the first pressure; when the second intake valve is open and the first intake valve is closed, the intake device supplies air at the second flow rate, and the target stable pressure of the process chamber is the second pressure.
5. The process window determination method as described in claim 1, characterized in that, The exhaust device includes a vacuum valve for controlling the vacuuming rate. By configuring the vacuum valve opening and the air intake flow rate, the first flow rate of air supply corresponds to the first stable pressure, and the second flow rate of air supply corresponds to the second stable pressure.
6. The process window determination method as described in claim 1, characterized in that, The air intake device includes at least one flow regulating valve, and the first flow rate and the second flow rate are controlled by the opening degree of the flow regulating valve.
7. The process window determination method as described in claim 1, characterized in that, Establish a time difference database under different process conditions in advance; When performing the processing technology, the corresponding time difference is retrieved from the time difference database according to the current process conditions.
8. The process window determination method as described in claim 7, characterized in that, The process conditions include at least one of the following: the first flow rate, the second flow rate, the vacuum rate of the exhaust device, and the type of the process gas.
9. The process window determination method as described in claim 1, characterized in that, The criterion for determining that the measured pressure begins to stabilize at the second pressure is: Within a preset determination time window, the fluctuation range of the measured pressure is less than a preset pressure threshold.
10. A semiconductor process apparatus, characterized in that, include: The process cavity contains a base for supporting the substrate; An air intake device, connected to the process chamber, is used to control the flow rate of the process gas supplied into the process chamber; An exhaust device, connected to the process chamber, is used to evacuate the process chamber; A pressure gauge, connected to the process chamber, is used to measure the pressure inside the process chamber and output the measured pressure; The controller is communicatively connected to the intake device, the exhaust device, and the pressure gauge, respectively, and is configured to perform the process window determination method as described in any one of claims 1-9 to determine the process window start time.
11. The semiconductor process equipment as described in claim 10, characterized in that, It also includes a radio frequency (RF) component for exciting plasma within the process cavity, and the controller is communicatively connected to the RF component and configured to control the RF component to exciting plasma only within the process window to process the substrate.
12. A semiconductor processing method, characterized in that, include: Provide the semiconductor process equipment as described in claim 11; The process chamber is operated in a cyclic process, which includes a decision cycle and a process cycle. The decision cycle and the process cycle use the same intake and exhaust control parameters and timing. The process window determination method is implemented in the determination loop to determine the start time of the process window; In the process cycle, the start time is taken as the start time of plasma excitation.
Citation Information
Patent Citations
System and method for rapid establishment of steady state vacuum chamber pressure
CN121096914A
Rapid gas delivery system and method for atomic layer etching
CN121122993A
Atomic layer etching with single process gas and rapid adjustment of chamber pressure
CN121768935A
Simplified gas delivery system for atomic layer etching
CN121790264A
Vacuum valve and estimation device
CN114542779A