A closed-loop thermal management control method and system for mine tunneling machines

By employing a fully closed-loop thermal management control method, utilizing an internal and external dual-circulation structure and dynamic heat dissipation control, the problem of equipment heat dissipation in high-temperature and highly corrosive mines has been solved, achieving efficient heat dissipation and stable operation of the entire machine, and avoiding bottom plate erosion and equipment corrosion.

CN122792115BActive Publication Date: 2026-11-17NORTHEASTERN UNIV CHINA +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202611239199.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2026-08-17
Publication Date
2026-11-17
Estimated Expiration
2046-08-17

AI Technical Summary

Technical Problem

In underground potash mines with high temperature and high corrosion, traditional open external circulation water spray cooling leads to the dissolution of the bottom plate and accelerated equipment corrosion. Furthermore, it cannot effectively dissipate heat under extreme high temperature conditions, resulting in frequent equipment failures.

Method used

The fully closed-loop thermal management control method is adopted. Through the internal and external dual circulation structure, the feedforward flow active preemption control based on the temperature rise slope difference, and the shutdown tail-delay heat dissipation control based on the thermal inertia dynamic calculation model, the whole machine achieves efficient heat dissipation and stable operation, and eliminates the need for external water spraying.

Benefits of technology

It achieves efficient heat dissipation of the core components of the machine under extreme high temperature conditions, avoids base plate corrosion and equipment corrosion, ensures continuous and stable operation, and eliminates the risk of thermal collision during shutdown.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122792115B_ABST
    Figure CN122792115B_ABST
Patent Text Reader

Abstract

This invention belongs to the field of cooling and heat dissipation technology for mining tunneling equipment, and discloses a closed-loop thermal management control method and system for a mining tunneling machine. The system includes an independent but heat-exchange-coupled internal circulation cooling circuit and an external circulation heat dissipation circuit. The external circulation heat dissipation circuit, after flowing through the electrical control box and the lower drum drive system, completely recycles wastewater back to the mine's main return water network in a closed loop, achieving "zero external spraying" for the entire machine. The internal circulation cooling circuit is divided into two parallel manifolds (left and right) via a three-way electrically controlled proportional diverter valve to dissipate heat for the cutterhead and upper drum drive system. The control methods include: feedforward flow active preemptive control based on temperature rise slope difference; shutdown-based tail-end delay heat dissipation control based on a thermal inertia model; and extreme anti-stall adaptive derating control based on water tank temperature feedforward. This invention can avoid floor erosion and accelerated equipment corrosion caused by external water spraying, ensuring efficient heat dissipation and continuous stable operation of the equipment under extreme high-temperature and off-center load conditions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of cooling and heat dissipation technology for mining tunneling equipment, specifically to a closed-loop thermal management control method and system for a mining tunneling machine. Background Technology

[0002] During the mining of underground potash mines and deep special mines, the mining face usually faces extremely harsh environmental challenges: First, extreme high temperatures (often exceeding 40℃~50℃ year-round) cause high-power core components of the tunneling machine, such as the cutterhead drive motor, main pump station, and hydraulic walking system, to easily experience heat accumulation and overheating failures during continuous high-load operation; second, high corrosivity, with the air filled with high concentrations of salt spray, mine dust, and corrosive gases.

[0003] Traditional tunneling machines typically employ open-loop external circulation water spray cooling, which involves directly spraying large amounts of cooling wastewater onto the machine body or around the cutterhead, relying on the heat absorption through water evaporation to forcibly lower the temperature. While this traditional method is feasible in ordinary mines, it suffers from the following fatal flaws in high-temperature, highly corrosive mines (such as potash mines): 1. Floor erosion and tunnel rheology: Large amounts of open-type water spraying can cause severe erosion of underground salt layers or soft rock floor slabs, leading to large-area rheology of the floor slab, floor heave, and even equipment getting stuck or stuck on rails, seriously threatening construction safety.

[0004] 2. Environmental degradation and accelerated corrosion: The high temperature and humidity environment, coupled with the spread of wastewater, turns the entire tunneling face into a high humidity and salt environment, which accelerates equipment corrosion and greatly accelerates the corrosion and peeling of electrical components, hydraulic pipelines and structural parts of the tunneling machine, resulting in a sharp drop in the mean time between failures of the whole machine.

[0005] If the external water spray is shut off directly, the existing thermal management system will be unable to achieve efficient heat dissipation in the enclosed space with extreme high temperatures, which could easily cause the equipment to stall and shut down. Therefore, how to completely eliminate the rigid constraint of open external water spray (zero external spray) and carry out a fully closed-loop green upgrade based on the original piping accessories of the equipment to build an independent, closed-loop, and highly efficient thermal management system with left-right symmetrical adaptive adjustment capabilities has become a major technical bottleneck that urgently needs to be solved in the industry. Summary of the Invention

[0006] The purpose of this invention is to overcome the shortcomings of existing technologies and provide a fully closed-loop thermal management control method and system for mine tunneling machines. Through an original "internal and external dual-circulation fully closed-loop structure," combined with "feedforward flow active preemption control based on temperature rise slope difference" and "shutdown tail-end delay heat dissipation control based on a dynamic thermal inertia calculation model," the invention ensures efficient heat dissipation and continuous stable operation of the core heat-generating components of the machine under extreme high-temperature environments, while achieving "zero external spraying" of wastewater. Furthermore, it reserves a universal derating intervention standard interface for the entire machine control system.

[0007] To achieve the above objectives, the present invention provides the following technical solution: a fully closed-loop thermal management control method for a mine tunneling machine, comprising the following steps: Step S1: Cross-regional multi-point high-frequency synchronous acquisition of thermal status: Real-time high-frequency acquisition of the instantaneous absolute temperature of each heat-generating component in the internal circulation cooling loop and the internal circulation water temperature of the water tank. The internal circulation cooling circuit is divided into two sides, namely the first internal circulation manifold and the second internal circulation manifold. Step S2: Feedforward flow active preemption control based on temperature rise slope difference: The instantaneous temperature rise slope of the heating component connected to the first internal circulation manifold and the instantaneous temperature rise slope of the heating component connected to the second internal circulation manifold are calculated in real time using the first-order forward differential method, and the difference between the instantaneous temperature rise slopes on both sides is calculated. When the instantaneous temperature rise slope difference When the preset off-center load trigger threshold is exceeded, the opening of the three-way electrically controlled proportional diverter valve is adjusted to reduce the flow rate to the side with a lower instantaneous temperature rise slope and increase the flow rate to the side with a higher instantaneous temperature rise slope. Step S3: Shutdown and Tail-end Delay Heat Dissipation Control Based on Thermal Inertia Dynamic Calculation Model: Upon receiving the host shutdown signal, read the highest absolute temperature of each heat-generating component and the current roadway ambient temperature at the moment of shutdown, and obtain the dynamic delay heat dissipation time based on the thermal inertia dynamic calculation model. ; During dynamic delay of heat dissipation time During this period, the external circulation main control electric ball valve and the internal circulation water pump are kept in the open state to maintain closed-loop heat dissipation until the thermal inertia is released and then the external circulation main control electric ball valve is closed. Step S4: Adaptive derating control for extreme anti-stalling based on water tank temperature feedforward: When the internal circulating water temperature in the water tank is detected... When the water enters a preset critical warning range and the rate of change of the circulating water temperature in the tank exceeds a preset temperature rise trigger threshold, the water tank temperature rise approximation is calculated by combining the current internal circulating water temperature amplitude and the rate of change of the internal circulating water temperature. Based on the water tank temperature rise approximation, the derating level and target power ratio are determined. A derating feedforward intervention command carrying the target power ratio is sent to the whole machine control system through a standard communication interface, and the whole machine control system reduces the power input of each heat-generating component. At the same time, the external circulation heat dissipation circuit is maintained in operation, and the heat accumulated in the internal circulation cooling circuit is continuously removed through the non-contact heat exchanger in the water tank. When the internal circulating water temperature in the water tank falls back to the safe range and the rate of change of the internal circulating water temperature drops below the safe threshold, the output power of the heat-generating components is restored step by step.

[0008] In step S2, the triggering condition for the feedforward flow active preemption control based on the temperature rise slope difference also includes: the absolute temperature of the heating component on the side with the higher instantaneous temperature rise slope must exceed the set reference health temperature threshold of 55°C.

[0009] The preset off-center load trigger threshold is 0.5℃ / s.

[0010] The instantaneous temperature rise slope difference The calculation formula is: ; The instantaneous temperature rise slope of the heating component connected to the first internal circulation manifold; The instantaneous temperature rise slope of the heating component connected to the second internal circulation manifold; The instantaneous absolute temperature of the heating element connected to the first internal circulation manifold at the current sampling moment. The instantaneous absolute temperature of the heating component connected to the second internal circulation manifold at the current sampling moment; This is the absolute temperature of the heating element connected to the first internal circulation manifold at the previous sampling time. The absolute temperature of the heating component connected to the second internal circulation manifold at the previous sampling time; This represents the sampling time step.

[0011] When the three-way electrically controlled proportional flow divider valve performs step S2, it controls the flow rate to the side with a lower instantaneous temperature rise slope to be compressed to 20%~30% of the total flow rate, and controls the remaining 70%~80% to be fully tilted and allocated to the side with a higher instantaneous temperature rise slope.

[0012] The dynamic solution model for thermal inertia is as follows: In the formula: This is the preset minimum delay cutoff time; This represents the highest absolute temperature of each heat-generating component at the moment of shutdown. This refers to the current ambient temperature of the tunnel. This is the thermal inertia conduction correction factor; This refers to the maximum safe transient temperature rise allowed by the material of the heating element. This refers to the dynamic delay time for heat dissipation.

[0013] A closed-loop thermal management control system for a mine tunneling machine is provided to implement the aforementioned closed-loop thermal management control method for a mine tunneling machine. The closed-loop thermal management control system for the mine tunneling machine includes an internal circulation cooling circuit and an external circulation heat dissipation circuit that are independent of each other and coupled in heat exchange. The external circulation cooling circuit is equipped with a self-cleaning backwash filter, a proportional pressure reducing valve, a safety relief valve, and an external circulation main control solenoid valve connected in series along its route. The external circulation main control solenoid valve is connected to the external circulation cooling manifold. The external circulation cooling manifold adopts a parallel topology, with each branch of the external circulation cooling manifold respectively covering the outside of the cooling control box, the outside of the two scraper motors, the outside of the two scraper reducers, the outside of the lower drum motor at the front end of the tunneling machine, and the outside of the lower drum reducer at the front end of the tunneling machine, forming a cooling heat exchange structure. The main control processor collects the operating status signals of the scraper motors and the lower drum motor at the front end of the tunneling machine. When the operation of the lower drum motor or scraper motor at the front end of the tunneling machine is detected, the main control solenoid valve of the external circulation is opened. The outlet of each branch of the external circulation cooling manifold is uniformly connected to a sealed return water collector. The sealed return water collector is connected to the external circulation auxiliary cooling air cooler and connected to the mine water supply network outlet pipe in a closed loop. The mine water supply network inlet pipe is connected to the self-cleaning backwash filter. The internal circulation cooling circuit includes a water tank, an internal circulation water pump, and a three-way electrically controlled proportional flow divider valve; the water tank outlet is connected to the three-way electrically controlled proportional flow divider valve, which divides into two parallel manifolds, namely the first internal circulation manifold and the second internal circulation manifold. The first internal circulation manifold connects to the hydraulic oil plate cooler a. After being split, the coolant flows through the cooling water jacket of the right cutterhead motor, the plate cooler of the right cutterhead reducer, and the water jacket of the upper right cutting drum motor, the cooler of the upper right cutting drum reducer, the water jacket of the upper right middle cutting drum motor, and the cooler of the upper right middle cutting drum reducer located at the upper front end of the tunneling machine. After heat exchange, the coolant merges and enters the main heat dissipation air cooler group. The second internal circulation manifold connects to the hydraulic oil plate cooler b. After being split, the coolant flows through the left cutterhead motor cooling water jacket, the left cutterhead reducer plate cooler, and the upper left cutting drum motor water jacket, the upper left cutting drum reducer cooler, the upper left middle cutting drum motor water jacket, and the upper left middle cutting drum reducer cooler located at the upper front of the tunneling machine. After heat exchange, the coolant merges and enters the main heat dissipation air cooler group. After being cooled by the main cooling air cooler group, the coolant flows back to the water tank via the internal circulating water pump, where it exchanges heat with the external circulating cooling circuit in a non-contact manner.

[0014] The front lower drum of the tunneling machine includes the lower right cutting drum, the lower right middle cutting drum, the lower left middle cutting drum, and the lower left cutting drum, which correspond to the lower drum motor water jacket and the lower drum reducer cooler.

[0015] The beneficial effects of this invention are: truly realizing a green "zero external spray" upgrade of the original hardware: while fully retaining the original machine's filters, pressure reducing valves, pressure relief valves and other high-efficiency pipeline accessories, this invention completely closes the loop of the originally externally sprayed wastewater back into the pipeline network through the return water collection pipe, fundamentally eliminating the severe corrosion of the equipment caused by externally sprayed water, such as the dissolution of the potassium salt mine floor, the rheological changes in the tunnel, and the high concentration of salt spray.

[0016] Refined reconstruction of temperature control balance of "double cutter head and upper and lower four-section double roller": This invention reclassifies the extremely complex front-end 10 cutting units into inner and outer circulation according to the principle of left and right spatial symmetry. It uses "first-order forward differential temperature rise slope" for prediction. When the temperature has not exceeded the standard but local asymmetric load occurs, "active flow grabbing" is carried out through three-way electronically controlled proportional diverter valve, which greatly improves the heat dissipation efficiency under multi-section load conditions.

[0017] Eliminating the risk of "thermal rear-end collision" during shutdown: When a tunneling machine stops under high load, the residual heat inside the motor will surge outward violently due to thermal inertia. This invention utilizes a dynamic thermal inertia calculation model to dynamically delay and shut down the external circulation main control ball valve and the internal circulation water pump, achieving scientific "rear-end heat dissipation" and protecting the core winding from secondary temperature rise damage. Attached Figure Description

[0018] Figure 1 This is a schematic diagram of the tunneling machine structure in the environment in which the present invention is implemented; Figure 2 This is a schematic diagram of an external circulation cooling circuit used in high-temperature mine tunneling machines. Figure 3 This is a schematic diagram of an internal cooling circuit used in a high-temperature mine tunneling machine. Figure 4 This is a flowchart of the shutdown and rear-end collision delay heat dissipation control based on the thermal inertia dynamic calculation model; Figure 5 This is a flowchart of the feedforward flow active preemption control based on the temperature rise slope difference; Figure 6 This is a flowchart of the adaptive derating control for extreme anti-stalling based on water tank temperature feedforward.

[0019] In the diagram: 1. Right rotary cutter head; 2. Left rotary cutter head; 3. Upper roller assembly; 4. Lower roller assembly; 5. Tracked walking mechanism; 6. Machine body; 7. Mine water supply network inlet pipe; 8. Self-cleaning backwash filter; 9. Proportional pressure reducing valve; 10. Safety pressure relief valve; 11. External circulation main control electric ball valve; 12. Cooling control box heat dissipation water jacket; 13. Right scraper motor water jacket; 14. Right scraper reducer heat exchanger; 15. Left scraper motor water jacket; 16. Left scraper reducer heat exchanger; 17. Lower right cutting roller motor water jacket; 18. Lower right cutting roller reducer cooler; 19. Lower right middle cutting roller motor water jacket; 20. Lower right middle cutting roller reducer cooler; 21. Lower left middle cutting roller motor water jacket; 22. Lower left middle cutting roller reducer cooler; 23. Lower left cutting roller motor water jacket; 24. Lower left cutting roller reducer cooler; 25. 26. Water tank; 27. Sealed return water manifold; 28. External circulation auxiliary cooling air cooler; 29. ​​Mine water supply network outlet pipe; 30. Internal circulation water pump; 31. Three-way electrically controlled proportional diverter valve; 32. Right cutter head motor cooling water jacket; 33. Right cutter head reducer plate cooler; 34. Upper right cutting drum motor water jacket; 35. Upper right cutting drum reducer cooler; 36. Upper right middle cutting drum motor water jacket; 37. Upper right middle cutting drum... 37. Cooling water jacket for left cutter head motor; 38. Plate cooler for left cutter head reducer; 39. Water jacket for upper left cutting drum motor; 40. Cooler for upper left cutting drum reducer; 41. Water jacket for upper left middle cutting drum motor; 42. Cooler for upper left middle cutting drum reducer; 43. Main cooling air cooler group; 44. Non-contact heat exchanger; 45. Hydraulic oil plate cooler a; 46. Hydraulic oil plate cooler b. Detailed Implementation

[0020] This invention constructs a fully closed-loop heat dissipation architecture, completely eliminating the need for traditional external water spray nozzles on the tunneling machine body. For example... Figure 1 As shown, the tunneling machine has a left rotating cutterhead 2 and a right rotating cutterhead 1 at the center of its front end; an upper roller device 3 for transverse cutting is located at the upper part of the front end, and a lower roller device 4 for transverse cutting is located at the lower part of the front end. A tracked walking mechanism 5 is arranged under the machine body 6 of this type of tunneling machine to enable forward and backward movement.

[0021] Among them, the upper roller device 3 is finely subdivided from right to left in the axial direction into four parts: upper right cutting roller, upper right middle cutting roller, upper left middle cutting roller, and upper left cutting roller. The lower roller device 4 is also subdivided axially from right to left into four parts: the lower right cutting roller, the lower right middle cutting roller, the lower left middle cutting roller, and the lower left cutting roller.

[0022] Each of the aforementioned cutting drums is driven by an independent motor and reducer. A closed-loop thermal management control method and system for a mine tunneling machine is also provided. The method is implemented based on a closed-loop thermal management control system for the mine tunneling machine. The system includes an independent and heat-exchange-coupled internal circulation cooling circuit and an external circulation heat dissipation circuit. The internal circulation cooling circuit constitutes an airborne closed system, the core of which includes a water tank 25 equipped with high and low water level sensors and dual redundant temperature sensors. The coolant in the water tank 25 is pressurized by the internal circulation water pump 29 and then divided into two parallel internal circulation manifolds through a high-frequency response three-way electrically controlled proportional diverter valve 30: The first internal circulation manifold is arranged in the right cutting system circuit; the right cutting system circuit includes a right cutter head motor cooling water jacket 31, a right cutter head reducer plate cooler 32, a right upper cutting drum motor water jacket 33, a right upper cutting drum reducer cooler 34, a right upper middle cutting drum motor water jacket 35 and a right upper middle cutting drum reducer cooler 36. After the coolant flows through the hydraulic oil plate cooler a45, it is split and flows in parallel through the right cutterhead motor cooling water jacket 31, the right cutterhead reducer plate cooler 32, and the upper right cutting drum motor water jacket 33, the upper right cutting drum reducer cooler 34, the upper right middle cutting drum motor water jacket 35, and the upper right middle cutting drum reducer cooler 36 located at the upper front end of the tunneling machine. The second internal circulation manifold is arranged in the left cutting system circuit; the left cutting system circuit includes a left cutter head motor cooling water jacket 37, a left cutter head reducer plate cooler 38, a left upper cutting drum motor water jacket 39, a left upper cutting drum reducer cooler 40, a left upper middle cutting drum motor water jacket 41, and a left upper middle cutting drum reducer cooler 42. After the coolant flows through the hydraulic oil plate cooler b46, it is split and flows in parallel through the left cutter head motor cooling water jacket 37, the left cutter head reducer plate cooler 38, and the left upper cutting drum motor water jacket 39, the left upper cutting drum reducer cooler 40, the left upper middle cutting drum motor water jacket 41, and the left upper middle cutting drum reducer cooler 42 located at the upper front end of the tunneling machine. After the outflow ends of the two internal circulation manifolds merge, they are connected to a high-power main heat dissipation air cooler group 43 consisting of three air coolers connected in series. The cooled liquid flows back to the water tank 25, and the water tank 25 is equipped with a non-contact heat exchanger 44.

[0023] The external circulation heat dissipation circuit is equipped with a self-cleaning backwash filter 8, a proportional pressure reducing valve 9, a safety pressure relief valve 10, and an external circulation main control electrically controlled ball valve 11 connected in series along the circuit. Cold water enters the self-cleaning backwash filter 8 from the downhole water supply pipe. After filtration and pressure reduction, it is controlled to pass through the external circulation main control electrically controlled ball valve 11 when the lower drum motor or scraper motor is started. It then flows through the parallel heat dissipation manifolds and simultaneously through the cooling control box heat dissipation water jacket 12, the right scraper motor water jacket 13, the right scraper reducer heat exchanger 14, the left scraper motor water jacket 15, the left scraper reducer heat exchanger 16, and the lower right cutting drum motor water jacket 17, the lower right cutting drum reducer cooler 18, and the lower right middle... The machine includes a water jacket 19 for the cutting drum motor, a cooler 20 for the lower right middle cutting drum reducer, a water jacket 21 for the lower left middle cutting drum motor, a cooler 22 for the lower left middle cutting drum reducer, a water jacket 23 for the lower left side cutting drum motor, a cooler 24 for the lower left side cutting drum reducer, and a non-contact heat exchanger 44 in the water tank. The outlet of each external circulation component is connected to a sealed return water manifold 26. The output of the sealed return water manifold 26 is connected to the external circulation auxiliary cooling air cooler 27. Finally, it is directly connected to the mine water supply network outlet pipe 28 through a pressure-bearing hard pipe or a sealed flexible hose, and then flows back to the mine water supply network inlet pipe 7. All open spray nozzles are eliminated from the outside of the machine.

[0024] Furthermore, the monitoring unit and main control processor include high-precision temperature sensors, water tank temperature and water level sensors, and ambient temperature sensors deployed on the surfaces of each core heat-generating component; the main control processor is connected to each control valve and pump electrical signal and integrates a standard network communication interface.

[0025] The closed-loop thermal management control method for mine tunneling machines specifically includes the following steps: Step S1: High-frequency synchronous acquisition of thermal status at multiple points across regions; Using high-precision temperature sensors deployed on the surfaces of each heating component, the main control processor collects the instantaneous absolute temperature of each heating component in real time at high frequency, and simultaneously collects the internal circulating water temperature of the water tank. When the internal circulating water temperature in the water tank is too high or the water level sensor detects that the water level is too low, the system sends a start-prohibition or emergency shutdown protection signal to the entire unit via the network bus.

[0026] For example, when the temperature of the circulating water in the tank exceeds the preset safe temperature threshold (set to 85°C in this embodiment), or when the water level in the tank is lower than the minimum safe water level threshold (set to 20% of the rated water level in this embodiment), the main control processor sends a prohibition to start or emergency shutdown protection signal to the whole machine control system through the network bus.

[0027] Step S2: Active preemptive control of feedforward flow based on temperature rise slope difference; The instantaneous temperature rise slope of the first internal circulation manifold (right-side cut-off loop) and the second internal circulation manifold (left-side cut-off loop) was calculated in real time using the first-order forward difference method. and And calculate the difference in the instantaneous temperature rise slope on both sides. When the instantaneous temperature rise slope difference value Exceeding the preset off-center trigger threshold (Set to 0.5℃ / s), the main control processor adjusts the three-way electronically controlled proportional flow divider valve to limit the coolant flow to the light-load circuit (the side with a lower instantaneous temperature rise slope) to 20%~30% of the total flow, and feeds forward the remaining 70%~80% of the coolant flow to the heavy-load circuit (the side with a higher instantaneous temperature rise slope).

[0028] Furthermore, a judgment condition can be added, such as the difference in instantaneous temperature rise slope. Exceeding the preset off-center trigger threshold Furthermore, when the instantaneous absolute temperature on the side with a higher instantaneous temperature rise slope exceeds the reference healthy temperature (e.g., 55°C), the main control processor begins to adjust the three-way electrically controlled proportional shunt valve.

[0029] Step S3: Shutdown and rear-end collision delay heat dissipation control based on thermal inertia dynamic solution model; The moment the main control processor receives the shutdown signal from the host, it reads the highest absolute temperature of the heat-generating components at the instant of shutdown. and the current ambient temperature of the tunnel The dynamic delay time for heat dissipation is dynamically calculated based on the built-in thermal inertia dynamic solution model. ;exist During this period, the main control processor keeps the external circulation main control electric ball valve 11 and the internal circulation water pump 29 in the open state to maintain the heat exchange intensity of the system until the instantaneous thermal inertia accumulation inside the heat-generating component is completely released, and then closes the external circulation main control electric ball valve 11.

[0030] Step S4: Adaptive derating control based on water tank temperature feedforward to prevent stalling; When the internal circulating water temperature of the water tank reaches the preset critical warning temperature (75℃ in this embodiment) and the rate of change of the internal circulating water temperature exceeds the preset temperature rise rate threshold (0.1℃ / s in this embodiment), the main control processor determines that the current heat load has entered a risk state. It comprehensively evaluates the risk of thermal overload by combining the amplitude and rate of change of the internal circulating water temperature, determines the water tank temperature rise approach, and then determines the derating level and target power ratio; When the internal circulating water temperature of the water tank reaches the ultimate safe temperature threshold (80℃ in this embodiment), the highest level of derating control is executed, and a derating feedforward intervention command carrying the target power ratio is sent to the whole machine control system through the standard communication interface. The whole machine control system reduces the power input of each heat-generating component to prevent the tunneling machine from stalling due to excessive heat load.

[0031] At the same time, the external circulation heat dissipation circuit is maintained in operation, and the internal circulation heat is continuously removed through the non-contact heat exchanger 44 in the water tank; when the internal circulation water temperature in the water tank drops back to the safe range and the rate of change of the internal circulation water temperature drops below the safe threshold, the output power of the heating components is restored step by step.

[0032] This method incorporates multi-stage heat dissipation. The first stage of heat dissipation is achieved through an external circulation closed-loop recovery pipe network comprised of an external circulation heat dissipation circuit, such as... Figure 2 As shown.

[0033] The external circulation water inlet pipe connects to the downhole high-pressure water supply pipe. Along the pipeline, impurities are removed by a self-cleaning backwash filter 8. The pressure in the pipeline network is stabilized within a set safe range by a proportional pressure reducing valve 9 and a safety relief valve 10. Throttling valves are connected in series in each parallel branch to adjust the foundation resistance.

[0034] When the lower drum motor or scraper motor is started, the main control processor drives the external circulation main control electrically controlled ball valve 11 to open. The filtered and depressurized clean water flows through the cooling manifold in a completely parallel topology, simultaneously passing through: the cooling water jacket of the electrical control box, the water jackets of the two scraper motors, the heat exchangers of the two scraper reducers, and the drive system of the lower drum device responsible for bottom excavation and brushing. The drive system of the lower drum device specifically includes: the motor water jacket and reducer cooler of the lower right cutting drum; the motor water jacket and reducer cooler of the lower right middle cutting drum; the motor water jacket and reducer cooler of the lower left middle cutting drum; and the motor water jacket and reducer cooler of the lower left cutting drum.

[0035] This invention eliminates the open water spray nozzles located at the outlet ends of each component in traditional designs. All the heat exchange outlet ends of the aforementioned external circulation components are uniformly connected to a sealed return water manifold 26. The output end of the sealed return water manifold 26 is connected to the external circulation auxiliary cooling air cooler 27 installed at the rear of the vehicle for air cooling. The water outlet is directly connected to the mine's main return water network through a pressurized, sealed pipeline in a closed loop. The entire process results in absolutely zero wastewater discharge to the external environment, thus eliminating the risk of corrosion to the mine floor caused by open water spray nozzles. The cooling fan of the external circulation auxiliary cooling air cooler 27 only operates when the return water temperature is higher than a preset lower limit of the return water temperature. Start at 45℃, higher than the upper limit of return water temperature. Forced air cooling is performed at 60℃, and moderate air cooling is performed when the return water temperature is between the upper and lower limits.

[0036] Secondary heat dissipation is achieved through an internal circulation adaptive distribution pipe network consisting of an internal circulation cooling loop, such as... Figure 3 As shown.

[0037] The internal circulation cooling loop forms an onboard closed system, using distilled water or antifreeze and anticorrosion fluid as the heat exchange medium. The water tank 25 is equipped with a water level sensor and dual temperature sensors. The medium, pressurized and drawn out by the internal circulation water pump 29, directly enters a high-frequency response three-way electrically controlled proportional flow divider valve 30. To cooperate with the dual-sided off-center load prediction algorithm, the internal circulation pipeline divides the two front-end cutter discs and the four-section upper roller of the traditional single cooling channel into two parallel manifolds according to the principle of left-right symmetry. The first and second internal circulation manifolds are connected. The returned water from these two manifolds merges and is then uniformly connected to a high-power main cooling system consisting of three air coolers connected in series for forced air cooling. The water then flows through the water tank, where it undergoes non-contact heat exchange with the cold water in the external circulation cooling circuit. If the water tank temperature is too high or the water level falls below the safety limit, the main control processor sends a lockout protection command to the entire unit via the bus.

[0038] In one embodiment, during the tunneling process, due to the uneven hardness of the underground ore layer (such as frequent encounters with hard rock inclusions on the right side), the cutterheads on the left and right sides and the four-section upper roller assembly often experience extremely asymmetrical loads. Without intervention, the temperature of the heavily loaded components will rise rapidly.

[0039] like Figure 5 As shown, the main control processor uses time steps (In this embodiment) The high-frequency synchronous acquisition of the combined absolute temperature of the right-side cutting group (including the right cutter head, the upper right side roller, and the upper right middle roller) is the instantaneous absolute temperature of the heating components connected to the first internal circulation manifold at the current sampling moment. The combined absolute temperature of the left-side cutting group (including the left cutter head, the upper left roller, and the upper left middle roller), i.e., the instantaneous absolute temperature of the heating components connected to the second internal circulation manifold at the current sampling moment. The instantaneous temperature rise slope of both components was calculated using the first-order forward difference method. and : ; ; This is the absolute temperature of the heating element connected to the first internal circulation manifold at the previous sampling time. The absolute temperature of the heating component connected to the second internal circulation manifold at the previous sampling time; This represents the sampling time step.

[0040] The main control processor calculates the difference in instantaneous temperature rise slope between the two sides: ; When the system detects that the following combined triggering conditions are met: 1) (The off-center load trigger threshold) (Set to 0.5℃ / s). 2) Current absolute temperature on the side with a higher temperature rise slope (assuming it's the right side). (Baseline healthy temperature threshold); The main control processor determines that the right-side cutting group is in a severe "pre-heat accumulation" state and immediately outputs a PWM control signal to the three-way electronically controlled proportional flow divider valve. The flow divider valve quickly acts, limiting (compressing) the coolant flow to the left-side cutting group (light load, slow temperature rise side), allowing it to retain only 20%~30% of the total flow (maintaining basic heat dissipation); at the same time, it feeds forward and fully allocates the remaining 70%~80% of the total coolant flow to the right-side cutting group (heavy load, fast temperature rise side). This "proactive feedforward flow grabbing" before the temperature reaches the original alarm trip line can effectively utilize the low-temperature energy storage of the coolant and nip local thermal overload in the bud.

[0041] It should be noted that during the period when the internal circulation cooling circuit performs feedforward flow active preemption control, the external circulation heat dissipation circuit still maintains normal high-flow circulation based on the motor operating status. The stable low-temperature cold water in the external circulation continuously provides sufficient cooling background to the internal circulation water tank through the non-contact heat exchanger 44 in the water tank 25, thereby supporting the efficient heat exchange on the heavy-load side of the internal circulation cooling circuit.

[0042] In high-temperature mines, due to the small temperature difference between the ambient temperature (often above 45℃) and the internal temperature of the equipment, if the equipment is suddenly stopped after high-load tunneling, the internal and external circulation of the original system is usually cut off instantly. The huge amount of heat accumulated in the core windings of the motor and reducer cannot be discharged. Within 5 to 15 minutes after the shutdown, it will surge outward due to thermal inertia conduction, causing the internal temperature of the components to rise again (i.e., "shutdown thermal tailing"), which can easily lead to insulation aging or even insulation layer burnout.

[0043] In this embodiment, as Figure 4 As shown, when the main control processor receives the "official shutdown signal" from the host via the bus, it does not immediately shut down the cooling system, but instead reads the highest absolute temperature of each core winding at the moment of shutdown. It also reads the current ambient temperature of the tunnel from the ambient temperature sensor. .

[0044] The main control processor inputs the data into the built-in thermal inertia dynamic calculation model: ; In the formula: The calculated dynamic delay time (in seconds) for the external circulation main control electric ball valve and the internal circulation water pump. The preset minimum delay cutoff time is 180 seconds. This is the thermal inertia conduction correction factor (based on experimental measurements of the motor and reducer materials, the value in this embodiment is 120). This is the maximum safe transient temperature rise allowed by the material of the heating element (taken as 15℃).

[0045] The main control processor calculates Keep the external circulation main control electric ball valve and the internal circulation water pump in the open state to maintain the heat exchange intensity of the fully closed-loop system. Until Once the countdown ends, the internal thermal inertia is fully released, and the absolute temperature of the core winding enters a safe steady-state range, the main control processor outputs a signal to shut down the valves and pumps, achieving intelligent and green tail-end cooling.

[0046] When external geological conditions are extremely harsh, the thermal management system is already operating at full capacity, but the internal circulating water temperature in the water tank remains low. It continues to climb and is approaching the critical safety control threshold. (In this embodiment, the ultimate safety threshold) When set to 80℃: the main control processor calculates the rate of change of water temperature in the water tank at high frequency. When it is predicted that the circulating water temperature in the water tank will completely exceed the original vehicle's protection limit within a short period of time, in order to prevent equipment tripping and damage (engine stalling) caused by the overall collapse of the thermodynamic system, the control system intelligently intervenes through adaptive derating judgment, multi-level derating mapping, and a smooth power recovery mechanism. Specifically, the control cycle is as follows: Figure 6 As shown.

[0047] Adaptive deduction triggering and judgment logic: The derating control must be activated simultaneously if the following two feedforward trigger conditions are met: Water temperature has entered the critical warning range: that is, the current water temperature in the tank. satisfy: ; In the formula, The preset temperature approach threshold is set to 5℃ in this embodiment, meaning that the water tank enters the warning zone when the water temperature reaches 75℃.

[0048] Excessive rate of temperature rise: i.e., the rate of change of circulating water temperature in the water tank. Trigger threshold greater than preset temperature rise rate ,satisfy: ; In this embodiment, The value is 0.1℃ / s.

[0049] If neither of the above two conditions is met simultaneously, the control system determines that the current heat load is safe, maintains the current power output to the unit, and continues high-frequency monitoring. If both conditions are met simultaneously, it indicates that the water temperature is rapidly rising, and the main control processor calculates the current water temperature approximation based on the current water temperature and the rate of change. : ; In the formula, and These are the set weights for temperature deviation and temperature rise rate deviation, respectively, both of which are set to 0.5 in this embodiment.

[0050] Multi-level deduction mapping mechanism: The main control processor approximates the calculated water tank temperature rise. Match the corresponding reduction level Ratio to target power In this embodiment, the mapping relationship and the specific actions of the underlying actuator are shown in Table 1 below: Table 1 Multi-level depreciation mapping

[0051] Determine the target power ratio Subsequently, the main control processor sends a standard "derating feedforward intervention command (including suggested derating percentage)" to the overall machine control system through its integrated standard communication interface (such as CANopen bus). After receiving this high-priority command, the overall machine control system uses its underlying actuators to forcibly reduce the power input of the heat-generating components at the source, thereby reducing heat generation at the source and achieving extremely smooth "adaptive derating tunneling". This completely avoids the severe impact on the mine power grid and the mechanical structure of the tunneling machine caused by direct tripping shutdown due to overheating.

[0052] Smooth, step-by-step power output recovery mechanism; After the overall machine power is drated, the heat generated by the source is reduced, and the closed-loop thermal management control system of the mine tunneling machine continues to dissipate heat, thus reducing the temperature of the circulating water in the water tank. and the rate of change of circulating water temperature in the water tank The temperature will gradually drop. When the system detects that the following two recovery conditions are met simultaneously, it determines that the thermal management state has returned to a safe steady state and initiates a smooth "gradual recovery mechanism": 1) Water temperature has safely returned to normal: The current water temperature in the tank has fallen below the safe recovery threshold. That is, satisfying: ; In this embodiment, the safe recovery threshold Set to 70℃.

[0053] 2) The temperature rise trend is gradual: the temperature rise rate is below the temperature rise rate recovery threshold. That is, satisfying: ; In this embodiment, the temperature rise rate recovery threshold is... The value is 0.02℃ / s.

[0054] If the above recovery conditions are met, the main control processor begins to control the power to smoothly recover, reverting to the previous, less severe derating level (e.g., from level 3 to level 2, then from level 2 to level 1, and finally fully recovering to 100% rated power output). The judgment period for each power recovery level is set to 30s~60s. If the derating judgment is triggered again during the recovery process, the recovery program is immediately interrupted and re-entering the derating mode, thereby ensuring that the entire machine can operate continuously under extreme high-temperature environments without overheating, stalling, or electrical damage.

[0055] It should be noted that after the open water spray is removed from this system, for the cutting tool area that cannot be directly cooled by the internal water jacket, it is recommended to optimize the dust removal airflow organization to form an auxiliary air cooling effect in order to improve the thermal environment of the cutting area.

Claims

1. A closed-loop thermal management control method for a mine tunneling machine, characterized in that, The mine tunneling machine adopts a fully closed-loop thermal management and control system; the fully closed-loop thermal management and control system includes an internal circulation cooling circuit and an external circulation heat dissipation circuit that are independent of each other and coupled in heat exchange. The external circulation cooling circuit is equipped with a self-cleaning backwash filter (8), a proportional pressure reducing valve (9), a safety relief valve (10), and an external circulation main control solenoid valve (11) connected in series along the circuit. The external circulation main control solenoid valve (11) is connected to the external circulation cooling manifold. The external circulation cooling manifold adopts a parallel topology, with each branch of the external circulation cooling manifold covering the outside of the cooling control box, the outside of the two scraper motors, the outside of the two scraper reducers, the outside of the lower drum motor at the front end of the tunneling machine, and the outside of the lower drum reducer at the front end of the tunneling machine, forming a cooling heat exchange. Structure: The main control processor collects the operating status signals of the scraper motor and the lower drum motor at the front end of the tunneling machine. When the lower drum motor or scraper motor at the front end of the tunneling machine is detected to be running, it controls the opening of the external circulation main control ball valve (11); the outlet of each branch of the external circulation heat dissipation manifold is uniformly connected to the sealed return water collection manifold (26); the sealed return water collection manifold (26) is connected to the external circulation auxiliary heat dissipation air cooler (27), and the closed loop is connected to the outlet pipe (28) of the mine water supply network; the inlet pipe (7) of the mine water supply network is connected to the self-cleaning backwash filter (8). The internal circulation cooling circuit includes a water tank (25), an internal circulation water pump (29), and a three-way electrically controlled proportional flow divider valve (30); the outlet of the water tank (25) is connected to the three-way electrically controlled proportional flow divider valve (30), which is divided into two parallel manifolds, namely the first internal circulation manifold and the second internal circulation manifold; The first internal circulation manifold connects to the hydraulic oil plate cooler a (45). After being split, the coolant flows through the right cutterhead motor cooling water jacket (31), the right cutterhead reducer plate cooler (32), and the upper right cutting drum motor water jacket (33), the upper right cutting drum reducer cooler (34), the upper right middle cutting drum motor water jacket (35), and the upper right middle cutting drum reducer cooler (36) located at the upper front end of the tunneling machine. After heat exchange, the coolant merges and enters the main heat dissipation air cooler group (43). The second internal circulation manifold connects to the hydraulic oil plate cooler b (46). After being split, the coolant flows through the left cutterhead motor cooling water jacket (37), the left cutterhead reducer plate cooler (38), and the upper left cutting drum motor water jacket (39), the upper left cutting drum reducer cooler (40), the upper left middle cutting drum motor water jacket (41), and the upper left middle cutting drum reducer cooler (42) located at the upper left front end of the tunneling machine. After heat exchange, the coolant merges and enters the main heat dissipation air cooler group (43). After being cooled by the main heat dissipation air cooler group (43), the coolant is returned to the water tank (25) by the internal circulating water pump (29), and non-contact heat exchange is carried out with the external circulating heat dissipation circuit in the water tank (25); The method includes the following steps: Step S1: Cross-regional multi-point high-frequency synchronous acquisition of thermal status: Real-time high-frequency acquisition of the instantaneous absolute temperature of each heat-generating component in the internal circulation cooling loop and the internal circulation water temperature of the water tank. The internal circulation cooling circuit is divided into two sides, namely the first internal circulation manifold and the second internal circulation manifold. Step S2: Feedforward flow active preemption control based on temperature rise slope difference: The instantaneous temperature rise slope of the heating component connected to the first internal circulation manifold and the instantaneous temperature rise slope of the heating component connected to the second internal circulation manifold are calculated in real time using the first-order forward differential method, and the difference between the instantaneous temperature rise slopes on both sides is calculated. When the instantaneous temperature rise slope difference When the preset off-center load trigger threshold is exceeded, the opening of the three-way electrically controlled proportional diverter valve is adjusted to reduce the flow rate to the side with a lower instantaneous temperature rise slope and increase the flow rate to the side with a higher instantaneous temperature rise slope. Step S3: Shutdown and Tail-end Delay Heat Dissipation Control Based on Thermal Inertia Dynamic Calculation Model: Upon receiving the host shutdown signal, read the highest absolute temperature of each heat-generating component and the current roadway ambient temperature at the moment of shutdown, and obtain the dynamic delay heat dissipation time based on the thermal inertia dynamic calculation model. ; During dynamic delay of heat dissipation time During this period, the external circulation main control electric ball valve and the internal circulation water pump are kept in the open state to maintain closed-loop heat dissipation until the thermal inertia is released and then the external circulation main control electric ball valve is closed. Step S4: Adaptive derating control for extreme anti-stalling based on water tank temperature feedforward: When the internal circulating water temperature in the water tank is detected... When the water enters a preset critical warning range and the rate of change of the circulating water temperature in the tank exceeds a preset temperature rise trigger threshold, the water tank temperature rise approximation is calculated by combining the current internal circulating water temperature amplitude and the rate of change of the internal circulating water temperature. Based on the water tank temperature rise approximation, the derating level and target power ratio are determined. A derating feedforward intervention command carrying the target power ratio is sent to the whole machine control system through a standard communication interface, and the whole machine control system reduces the power input of each heat-generating component. At the same time, the external circulation heat dissipation circuit is maintained in operation, and the heat accumulated in the internal circulation cooling circuit is continuously removed through the non-contact heat exchanger in the water tank. When the internal circulating water temperature in the water tank falls back to the safe range and the rate of change of the internal circulating water temperature drops below the safe threshold, the output power of the heat-generating components is restored step by step.

2. The closed-loop thermal management control method for mine tunneling machines according to claim 1, characterized in that, In step S2, the triggering condition for the feedforward flow active preemption control based on the temperature rise slope difference also includes: the absolute temperature of the heating component on the side with the higher instantaneous temperature rise slope must exceed the set reference health temperature threshold of 55°C.

3. The closed-loop thermal management control method for mine tunneling machines according to claim 1, characterized in that, The preset off-center load trigger threshold is 0.5℃ / s.

4. The closed-loop thermal management control method for mine tunneling machines according to claim 1, characterized in that, The instantaneous temperature rise slope difference The calculation formula is: ; The instantaneous temperature rise slope of the heating component connected to the first internal circulation manifold; The instantaneous temperature rise slope of the heating component connected to the second internal circulation manifold; The instantaneous absolute temperature of the heating element connected to the first internal circulation manifold at the current sampling moment. The instantaneous absolute temperature of the heating component connected to the second internal circulation manifold at the current sampling moment; This is the absolute temperature of the heating element connected to the first internal circulation manifold at the previous sampling time. The absolute temperature of the heating component connected to the second internal circulation manifold at the previous sampling time; This represents the sampling time step.

5. The closed-loop thermal management control method for mine tunneling machines according to claim 1, characterized in that, When the three-way electrically controlled proportional flow divider valve performs step S2, it controls the flow rate to the side with a lower instantaneous temperature rise slope to be compressed to 20%~30% of the total flow rate, and controls the remaining 70%~80% to be fully tilted and allocated to the side with a higher instantaneous temperature rise slope.

6. The closed-loop thermal management control method for mine tunneling machines according to claim 1, characterized in that, The front lower drum of the tunneling machine includes the lower right cutting drum, the lower right middle cutting drum, the lower left middle cutting drum, and the lower left cutting drum, which correspond to the lower drum motor water jacket and the lower drum reducer cooler.

Citation Information

Patent Citations

  • SYSTEM FOR MAINTAINING ENGINE OIL AT AN OPTIMAL TEMPERATURE

    ATE239170T1

  • Device and method for managing circulating heat in automobile brake shoe

    CN106838073A