A construction method for a mountain tunnel with no external construction conditions at the exit, allowing for unidirectional exit.

By using the funnel-shaped excavation method and combined advanced pre-support method, the support interference and collapse risk at the exit of the mountain tunnel were solved, achieving efficient and safe tunnel construction and protecting the environment.

CN123064485APending Publication Date: 2026-11-10SHANDONG JIAOTONG UNIV +2
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202611570946.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-12
Publication Date
2026-11-10

AI Technical Summary

Technical Problem

Under conditions where there is no external construction at the exit of a mountain tunnel, the existing one-way exit method has problems such as mutual interference between circumferential anchors and advanced support, poor support conditions at the front end of the pipe roof, high risk of collapse, and long exposure time of the surrounding rock face.

Method used

The construction method adopts a funnel-shaped excavation platform, composite support, and combined advanced pre-support, including funnel-shaped excavation, anchor bolts, double-layer steel mesh shotcrete, and steel arch support. Combined with one-time hole-forming segmented grouting, small pipe grouting, and three-layer pipe roof support, an integral support structure is formed to ensure that the excavation height meets the conditions for slope stability and surrounding rock self-stability.

Benefits of technology

It improves the support stability under eccentric terrain, reduces the construction conditions outside the tunnel, lowers construction risks, protects the environment, and avoids slope instability caused by blind expansion and excavation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123064485A_ABST
    Figure CN123064485A_ABST
Patent Text Reader

Abstract

This invention proposes a construction method for unidirectional exit of mountain tunnels where there are no external construction conditions at the exit. The method includes S1, construction of a funnel-shaped excavation platform; S2, composite support in the excavation zone; S3, construction of combined advanced pre-support; and S4, excavation after grouting consolidation. This invention controls the excavation height through mechanical calculations and combines a composite advanced support system of segmented grouting, small-diameter pipe reinforcement, and a three-layer pipe roof to solve the problems of traditional pipe roofs being suspended at the front end, mutual interference between support and anchor bolts, and poor adaptability to bias pressure. This achieves safe unidirectional exit and maximizes the protection of the original topography.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of tunnel construction technology and relates to a construction method for a one-way exit of a mountain tunnel where there are no external construction conditions at the exit. Background Technology

[0002] When the exit of a mountain tunnel is located on a steep slope, cliff, near existing railway lines, or in an ecologically sensitive area, making it impossible to work or construct a temporary access road or platform, a one-way exit method must be used for tunnel breakthrough. Although existing technologies include pilot tunnel exit methods, these methods have the following problems when facing extremely thin overburden layers, fractured rock zones, and exposed cliff faces: 1. Traditional pre-support systems consisting of advanced pipe roofs, grouting pipes, and circumferential anchors will cause interference between the circumferential anchors and the advanced support, and the front-end support conditions of the pipe roof are poor, resulting in a high risk of collapse, especially due to insufficient applicability to eccentric terrain. 2. When using excavation methods such as the step method or reserving core soil, the exposed surface of the surrounding rock is exposed for a long time, and the demolition of the temporary retaining structure causes great disturbance.

[0003] Therefore, how to efficiently and safely complete a tunnel that requires one-way exit has become an urgent problem to be solved. Summary of the Invention

[0004] Based on the technical problems existing in the prior art, the present invention provides a construction method for a one-way exit of a mountain tunnel where there are no external construction conditions at the exit.

[0005] According to a first aspect of the present invention, a construction method for a mountain tunnel with no external construction conditions at the exit is provided for one-way exit.

[0006] The method includes the following steps: S1. Construction of the funnel-shaped excavation platform: The tunnel is excavated in one direction until it stops 10m from the designed exit. Then, it is widened in a funnel shape from the arch foot to the arch crown along the tunnel circumference. No widening is carried out in the area below the arch foot. The front end of the widening faces the outside of the tunnel and the rear end is located inside the tunnel, forming a funnel-shaped widening operation platform that is narrow at the front and wide at the back. S2, Composite support for widened excavation zone: Initial support was provided for the funnel-shaped excavation platform formed by the widening excavation, using a combination of anchor bolts, double-layer steel mesh shotcrete, and steel arch support. The surface of the platform was sealed with shotcrete. Later, the widening excavation area was simultaneously constructed with reinforced concrete secondary lining at the tunnel entrance section. S3. Combined advanced pre-support construction: Three layers of advanced support were constructed in sequence in front of the excavation platform: one-time hole-forming segmented grouting, small pipe grouting reinforcement, and three-layer pipe roof support. S4. Excavate the hole after grouting has solidified: After the grout reaches the designed strength, tunnel excavation will proceed, with formal initial support being installed as excavation progresses, and surrounding rock deformation will be monitored. Excavation will proceed in one direction to exit the tunnel.

[0007] Based on the above scheme, the allowable excavation height of the funnel-shaped excavation in step S1 The slope must simultaneously meet two necessary conditions: slope stability and surrounding rock self-stability. This is determined by the following formula:

[0008] in, The excavation height under slope stability control. The excavation height is controlled by the self-stabilizing capacity of the surrounding rock.

[0009] Based on the above scheme, the excavation height under slope stability control Calculations based on the wedge slip model according to the principle of virtual work, with a safety factor introduced. On cohesion and internal friction angle After reduction, the critical value of the actual cover layer is obtained. Then by Conclusion:

[0010] In the formula, This refers to the height before tunnel widening. It is the vertical distance from the slope at the working face to the bottom of the inverted arch.

[0011] Based on the above scheme, the excavation height under the control of the surrounding rock's self-stabilizing capacity. It is determined according to the BQ indicator, as follows: First, calculate the basic quality indicators of the rock mass:

[0012] in, Uniaxial saturated compressive strength of rock (MPa). Rock mass integrity coefficient (0-1); This leads to an empirical formula for the enlargement height controlled by the self-stabilizing height:

[0013] in, It is the initial geostress correction factor. It is the structural surface correction factor.

[0014] Based on the above scheme, the excavation height under the control of the surrounding rock's self-stabilizing capacity. The self-stabilizing height is determined according to the GSI self-stabilizing height formula, as follows:

[0015] Where B is the tunnel span. Uniaxial compressive strength, The weight of the rock mass; This reflects the dramatic impact of the degree of fragmentation on the self-stabilizing height.

[0016] Based on the above scheme, step S3 involves sequentially constructing three layers of advance support in front of the excavation platform, including the following steps: S301, One-time drilling and segmented grouting: Drill holes below the designed location of the pipe roof, construct a grout stop wall, and use the one-time drilling and segmented grouting process to reinforce the surrounding rock in front, forming the diffusion range of the grout from the one-time drilling and segmented grouting. S302, Small pipe grouting reinforcement: Small pipe grouting pipes are arranged at intervals in the weak grout diffusion range formed in step S301. Cement-water glass double liquid grout is injected through the small pipe grouting pipes. After the grout diffuses, the small pipe grout diffusion range is formed, filling the blind area of ​​segmented grouting. After the grouting is completed, the tail end of the small pipe grouting pipe is welded and fixed to the steel arch frame. S303, Three-layer pipe shed support: Pipe sheds are installed in the arch area, and the tail of the pipe shed is welded to the steel arch frame to form an integral support structure.

[0017] Based on the above scheme, in step S302, the small guide grouting pipe is made of hot-rolled seamless steel pipe with a diameter of 42~50mm, a length of 3.5~5.0m, a circumferential spacing of 30~40cm, and an external insertion angle of 10°~15°.

[0018] Based on the above scheme, in step S302, the grouting material is a cement-water glass dual-liquid grout with a mixing ratio of cement grout:water glass = 1:0.8~1:1, and the grouting pressure is controlled at 0.5~1.5MPa.

[0019] Based on the above scheme, step S303 includes the following steps; Within a 120°~180° range at the front arch of the excavation platform, a pipe roofing machine is used to construct the pipe roof. After the pipe roofing machine is in place, it jumps through the hole to drill, and after the hole is formed, the pipe roof is pushed in. Then, grouting is carried out through the pipe. The tail of the pipe roof is welded to the steel arch frame to form a whole, forming a high-rigidity advanced support shell.

[0020] Based on the above scheme, the pipe shed adopts hot-rolled seamless perforated pipe with a diameter of 80~120mm, a circumferential spacing of 30~50cm, a single length of 10~20m, and an overlap length of not less than 1.5m between adjacent pipe sheds.

[0021] The technical solutions provided by the embodiments of the present invention may include the following beneficial effects: This invention controls the excavation height through mechanical calculations, avoiding the risk of slope instability caused by blind excavation; it adopts a combination of single-hole segmented grouting, small-diameter pipe grouting, and three-layer pipe roof advanced support, solving the problems of the traditional pipe roof front end being suspended and the mutual interference between the support and the anchor rod, thus significantly improving the support stability under eccentric terrain; the entire process is carried out inside the tunnel, without the need for external construction conditions, reducing vegetation damage and waste disposal, and significantly reducing the risk of construction outside the tunnel.

[0022] It should be understood that the above general description and the following detailed description are exemplary and explanatory only, and are not intended to limit the invention. Attached Figure Description

[0023] The accompanying drawings, which are incorporated in and form part of this specification, illustrate embodiments consistent with the invention and, together with the description, serve to explain the principles of the invention.

[0024] Figure 1 This is a longitudinal section view of a tunnel before widening, according to an exemplary embodiment. Figure 2 This is a schematic diagram of the cross-sectional structure of an excavated tunnel and an enlarged section along the excavation direction, according to an exemplary embodiment. Figure 3 This is a schematic diagram of a cross-section of a tunnel funnel-shaped excavation according to an exemplary embodiment; Figure 4 This is a simplified coordinate system diagram of a model illustrated according to an exemplary embodiment; Figure 5 This is a schematic diagram illustrating the diffusion range of grout in a single-stage drilling segmented grouting process, according to an exemplary embodiment. Figure 6 This is a schematic diagram illustrating the diffusion range of grout in a small-diameter pipe according to an exemplary embodiment; Figure 7 This is a schematic cross-sectional view of the diffusion range of grouting in a single hole-forming segment and small-diameter pipe grouting, according to an exemplary embodiment. Figure 8 This is a schematic diagram of the longitudinal section structure of a pipe roof according to an exemplary embodiment (showing the pipe roof machine operating on the excavation work platform). Detailed Implementation

[0025] The following description and accompanying drawings fully illustrate specific embodiments of this application to enable those skilled in the art to practice them. Some parts and features of some embodiments may be included in or replace parts and features of other embodiments.

[0026] Where there is no conflict, the embodiments and features in the embodiments of the present invention can be combined with each other.

[0027] Example 1

[0028] This invention provides a construction method for a one-way exit of a mountain tunnel where there are no external construction conditions at the exit.

[0029] Specifically, the method includes the following steps: S1. Construction of the funnel-shaped excavation platform: The tunnel is excavated in one direction until it stops 10m from the designed exit. The tunnel is then widened in a funnel shape from the arch foot to the arch crown along the tunnel circumference. No widening is carried out in the area below the arch foot. The front end of the widening faces the outside of the tunnel and the rear end is located inside the tunnel, forming a funnel-shaped widening operation platform 2 that is narrow at the front and wide at the back. S2, Composite support for widened excavation zone: The funnel-shaped excavation platform 2 formed by the excavation is initially supported by anchor bolts, double-layer steel mesh shotcrete and steel arch frame. The surface of the excavation platform 2 is sealed with shotcrete, and the excavation area is later constructed with reinforced concrete secondary lining. S3. Combined advanced pre-support construction: Three layers of advance support were installed sequentially in front of the excavation platform 2: S301, One-time drilling and segmented grouting: Drill holes below the designed location of the pipe roof, construct a grout stop wall, and use the one-time drilling and segmented grouting process to reinforce the surrounding rock in front, forming the diffusion range of the grout from the one-time drilling and segmented grouting. S302, Small pipe grouting reinforcement: Small pipe grouting pipes are arranged at intervals in the weak grout diffusion range formed in step S301. Cement-water glass double liquid grout is injected through the small pipe grouting pipes. After the grout diffuses, the small pipe grout diffusion range is formed, filling the blind area of ​​segmented grouting. After the grouting is completed, the tail end of the small pipe grouting pipe is welded and fixed to the steel arch frame. S303, Three-layer pipe shed support: Pipe sheds are installed in the arch area, and the tail of the pipe shed is welded to the steel arch frame to form an integral support structure.

[0030] S4. Excavate the hole after grouting has solidified: After the grout reaches the designed strength, tunnel excavation will proceed, with formal initial support being installed as excavation progresses, and surrounding rock deformation will be monitored. Excavation will proceed in one direction to exit the tunnel.

[0031] This invention provides a specific implementation method for a one-way exit construction method of a mountain tunnel where there are no external construction conditions at the exit.

[0032] The construction of the S1 funnel-shaped excavation platform specifically includes the following steps: like Figures 1-2As shown, specifically, tunnel excavation proceeds in one direction until it reaches 10 meters from the designed exit, at which point excavation stops, preserving the stability of the already excavated tunnel face 1. Along the tunnel's circumference, from the arch foot to the arch crown, the excavation platform 2 (pre-support system working platform) is constructed. The area below the arch foot is not excavated, creating a funnel-shaped working space that is narrow at the front and wide at the back. The working platform is used for pre-reinforcement of the tunnel face and the surrounding rock ahead.

[0033] Tunnel excavation is a process of disturbing the surrounding rock, and widening excavation further intensifies the disturbance to the surrounding rock, making accidents more likely to occur during construction. Therefore, in order to ensure safe construction, it is necessary to determine a safe widening excavation height. like Figure 3 As shown, determining the excavation height requires comprehensive consideration of factors such as slope safety, surrounding rock grade, and self-stabilizing capacity. A comprehensive calculation model with slope stability and surrounding rock strength as the core control is constructed to ensure the rapid determination of a safe excavation height under different working conditions during tunnel excavation.

[0034] The allowable excavation height must simultaneously meet two necessary conditions: slope stability and surrounding rock self-stability.

[0035] (1) To achieve the above results, the following derivations are made respectively. and The calculation formula is as follows: Among them, the excavation height under slope stability control ( ): For ease of calculation, the problem is simplified to wedge failure, with the following assumptions: (1) Shape of the sliding body: by Figure 4 The angle between the ABC sliding surface shown in the figure and the horizontal plane is θ, which satisfies ( (where the slope direction is the internal friction angle), and the slope angle is the same as the tunneling direction. The tunnel face is vertical. The height of the tunnel after widening is... The height of the tunnel before widening was The total height H after widening the excavation This refers to the height of the top excavation. The excavated area extends from the arch foot towards the arch crown; no excavation is required below the arch foot. (2) The slope of the slope at the exit point in front of the tunnel face is constant. .

[0036] Establish a coordinate system: The x-axis points outwards along the tunnel axis, and the z-axis points vertically upwards. The tunnel face is located at x=0, and the front bottom angle of the tunnel face is at coordinates (0, 0). See details for coordinate system establishment. Figure 4 As shown.

[0037] Among them, the bottom elevation of the inverted arch The bottom elevation of the tunnel face is recorded as (0, 0); the arch crown elevation after widening is... The elevation of the highest point after widening the excavation at the tunnel face is denoted as A(0, H); the elevation of the slope outside the tunnel is... , which is the elevation of the slope directly above the excavation face at the location of the widening, denoted here as D(0, C).

[0038] C represents the thickness of the overburden layer at the top of the tunnel. ,in It is the vertical distance from the slope at the tunnel face to the bottom of the invert arch; Establish the equations for the slope surface and the sliding surface AB. Slope equation: Equation AB of the sliding surface ,in The intersection point of the sliding surface and the hillside can be determined by combining the two equations. ; The relevant quantities of the sliding body ABD can be calculated: cross-sectional area. Length of the smooth surface AB; (2) (3) The external power is provided by the weight of the rock mass, while the internal energy dissipation occurs only on the sliding surface and is provided by friction. The virtual work equation is constructed as follows: (4) Based on the above conditions: External force power (the power of work done by gravity during descent). Internal energy dissipation power (power of work done by friction on the sliding surface) The expression: (5) (6) Substituting parameters such as slope angle and tunnel size into equation (4) and eliminating velocity, the critical state equation can be obtained: (7) Substitute equations (2) and (3) into the virtual work equation (4) and eliminate... We can conclude that: (8) when The slope was damaged, so the actual excavation height was adjusted. Make restrictions so that all The above conditions are not met. Because... Therefore, a limit is placed on the actual cover layer thickness C. The critical value of the actual cover layer can be obtained from equation (8): (9) make .Depend on Get a station This is a maximum value. Compare the endpoints of the interval. It can directly determine the accurate relation: As long as the thickness of the overlying soil is guaranteed This ensures slope stability; (10) Therefore, the excavation height under the influence of slope stability can be determined. : (11) Because the slope stability equation is derived from the critical state using the principle of virtual work, the result is relatively large and can be considered as the upper limit of the allowable range. The actual allowable excavation height must be strictly reduced from this, therefore a safety factor must be introduced. To ensure the safety of the project.

[0039] (12) (13) Therefore, the above results are revised. (14) Among them, the excavation height controlled by the self-stabilizing capacity of the surrounding rock ( ): The above obtained This ensures that the wedge above the tunnel face will not experience overall sliding failure along a single slip surface after the excavation. However, even so, if the rock mass itself is of extremely poor quality, the significant free height created by the excavation may still cause localized instability in the surrounding rock within a short period of unsupported conditions, such as arch collapse and tunnel face extrusion. Such failures do not form a continuous slip surface. Therefore, additional restrictions on the excavation height are necessary based on the rock mass's self-stabilizing capacity. The following section uses the BQ index from the "Engineering Rock Mass Classification Standard" and empirical relationships to provide the allowable self-stabilizing height of the surrounding rock. .

[0040] (15) in, Uniaxial saturated compressive strength of rock (MPa); Rock mass integrity coefficient (0-1).

[0041] This leads to an empirical formula for the enlargement height controlled by the self-stabilizing height: (16) in: It is the initial geostress correction factor; It is the structural surface correction factor; Cohesion The expression additionally contains This factor is usually related to And related to the fitting range, in many existing techniques it can be approximated as 1, or determined by the exact value. Reverse reasoning; As D increases, the rock mass strength decreases. , Reduce, thus The value also decreases accordingly.

[0042] (17) in: B represents the tunnel span. Uniaxial compressive strength, The weight of the rock mass; This reflects the dramatic impact of the degree of fragmentation on the self-stabilizing height; The lower the GSI, the smaller the coefficient, and the smaller the allowable excavation height. GSI is a geological strength index (0-100, where 100 represents intact rock and the lower the value, the more fractured the rock).

[0043] The final allowable excavation height is the intersection of all constraints: (18) The S2, widened excavation zone composite support specifically includes the following steps: Immediately after the excavation is completed, construct the support structure: install steel arch frame 3 on the outline of the excavation platform 2.

[0044] The lining on the working platform formed by the excavation platform 2 is designed as a composite lining, with double-layer steel mesh shotcrete as the initial support 11, plus steel arch frame 3 as temporary support. After the pre-support system working platform is used, it is backfilled and a secondary lining is added to form a permanent load-bearing structure.

[0045] Traditional advanced support technologies, such as advanced pipe roofs, encounter several problems during construction. First, the pipe roof design is too long. Since the pipe roof is only fixed to the steel arch frame at the tail end, the overall structure can be regarded as a cantilever structure, resulting in poor support effect at the front end. Second, shortening the length of the pipe roof and increasing the number of pipe roofs will cause the construction process to become complicated.

[0046] To address this issue, this embodiment proposes a pre-support construction method combining three support forms. The difference from traditional pre-support is that a trumpet-shaped pre-support platform with a small front end and a large rear end is constructed at the location where the pre-support system is to be constructed. This increases the angle between the pipe roof and the working face, providing sufficient operating space for further reinforcement treatment under the pipe roof and enhancing the pre-support effect of the pipe roof.

[0047] The S3, combined advanced pre-support construction, specifically includes the following steps: The advanced support adopts a combination of single-hole segmented grouting, small-diameter pipe grouting, and three-layer pipe roof construction. The construction sequence is as follows: first, single-hole segmented grouting is carried out, then small-diameter pipe grouting is carried out to reinforce the insufficient areas, and finally, three-layer pipe roof is driven in and grouting is carried out.

[0048] (1) One-time hole formation and segmented grouting: In order to improve the pre-support effect of the pipe roof and reduce the strong disturbance to the surrounding rock during the segmented grouting negative drilling process, it is chosen to first use a single-stage drilling and segmented grouting at the lower part of the pipe roof design location to enhance the reinforcement effect.

[0049] Before performing segmented grouting in a single drilling operation, all preparatory work must be completed. First, the grouting hole positions are accurately measured and located on the working face (the inclined surface of the excavated area). The grouting position is below the designed position of the pipe roof. Then, a concrete or shotcrete grout stop wall is constructed to seal the working face and establish an effective grouting pressure environment. After the grout stop wall is constructed, the segmented grouting device is installed into the borehole, and then grouting is carried out.

[0050] The segmented grouting device in this application refers to the patent application number 202610342894.5, entitled "A Retractable Segmented Grouting Device and Grouting Method for Molding Bags".

[0051] like Figure 5 As shown, after the preparation work is completed, the segmented grouting cycle is carried out. First, the drill rod is used to drill to the designed section length in one go through the borehole pipe, and then the drill rod is withdrawn. The referenced one-time hole-forming segmented grouting pipe 5 is installed, followed by the connection of the grouting equipment 4. The hole is sealed with a flange or grout stop plug to ensure that the hole is sealed tightly and without leakage. Grouting is carried out according to the steps of the referenced patent (application number 202610342894.5, title: A retractable segmented grouting device and grouting method for mold bags) until the entire designed length is grouted. Figure 6 As shown, the grout diffuses in the fissures of the surrounding rock, forming a grout diffusion range of 6 for a single-stage drilling and segmented grouting, which effectively reinforces the broken surrounding rock in front of the tunnel face and eliminates the risk of hole collapse before pipe roof construction.

[0052] (2) Grouting reinforcement with small guide tubes: After the grouting is completed in one hole and segment, small-diameter pipe grouting is used to reinforce the interstitial areas.

[0053] Small-diameter grouting pipes 7 are interspersed in the weak areas of the grout diffusion range 6 of the segmented grouting. Cement-water glass dual-liquid grout is injected through the small-diameter grouting pipes 7. After the grout diffuses, the small-diameter grout diffusion range 8 is formed, which fills the blind area of ​​the segmented grouting and further improves the integrity of the surrounding rock in front. After the grouting is completed, the tail end of the small-diameter grouting pipe 7 is welded and fixed to the steel arch frame 3 to form a joint force-bearing system.

[0054] Specifically, the small-diameter grouting pipe 7 is made of hot-rolled seamless steel pipe with a diameter of 42~50mm, a length of 3.5~5.0m, a circumferential spacing of 30~40cm, and an external insertion angle adjusted according to the surrounding rock conditions, generally 10°~15°. The grouting material is a cement-water glass dual-liquid grout with a mixing ratio of cement grout:water glass = 1:0.8~1:1, and the grouting pressure is controlled at 0.5~1.5MPa.

[0055] like Figure 7 As shown, before construction, the initial support working face 11 is sealed with shotcrete, and the hole positions are marked according to the design spacing. Holes are drilled using a pneumatic drill or rock drill, with the hole diameter 20-30mm larger than the steel pipe diameter. After the hole depth reaches the design length, the hole is cleaned and the pre-processed small guide grouting pipe 7 is inserted. The hole opening is sealed tightly with quick-setting cement or anchoring agent. After connecting the grouting equipment 4, a water pressure test is conducted to confirm that the pipeline is unobstructed and the hole opening is well sealed before grouting begins. The grouting sequence proceeds from bottom to top and from both sides to the middle, using a combination of quantitative and constant pressure control. Grouting can be stopped when the grouting pressure reaches the design final pressure and stabilizes for 10-15 minutes, or when the grouting volume reaches the design value. After grouting, the pipeline is cleaned promptly, and the hole opening valve is closed to prevent backflow of grout. After the grout has initially set, the excess pipe head is cut off, and the tail of the small guide grouting pipe 7 is welded and fixed to the steel arch frame 3 to form an integral load-bearing system.

[0056] (3) Three-layer pipe roof support: Before constructing the pipe roof, the working face and surrounding rock are sealed with shotcrete before proceeding with the pipe roof construction.

[0057] like Figure 8 As shown, within the 120°~180° range of the arch at the front end of the excavation platform 2, pipe roof 9 is constructed using pipe roof builder 10. Pipe roof 9 is made of hot-rolled perforated pipe. After the pipe roof builder 10 is in place, it is drilled in a skip-hole manner. After the hole is formed, the pipe roof 9 is pushed in, and then grout is injected through the pipe. The tail end of the pipe roof 9 is welded to the steel arch frame 3 to form a high-rigidity advanced support shell.

[0058] To prevent borehole collapse and shrinkage, a skip-drilling method is used to drill sequentially. After reaching the designed depth, the borehole is cleaned to ensure there is no sediment or debris inside. After the borehole is cleaned and approved, steel pipes with perforated joints are inserted into the borehole section by section. The steel pipes are connected with threaded joints and staggered joints. The borehole openings are sealed tightly with hemp fiber, quick-setting cement, and other materials. A grout stop valve is installed and connected to the grouting pipeline. Grouting is carried out in a bottom-up, intermittent sequence, using cement-water glass dual-liquid grout. Construction is controlled according to the design pressure and grouting volume. Grouting is completed after reaching the final pressure and stabilizing it for a period of time, and the valve is closed to prevent grout backflow. After the grout has initially set, the pipeline is removed, the borehole openings are sealed, and the tail of pipe roof 9 is firmly welded to steel arch frame 3 to form an integral support structure.

[0059] After the grout has solidified, tunnel excavation and subsequent initial support work will be carried out. During the construction process, the excavation progress will be strictly controlled to ensure the stability of the surrounding rock.

[0060] Specifically, the pipe shed 9 is set in the arch area (above the arch line, within the range of 120°~180° of the center circle) using hot-rolled perforated pipes with a diameter of 80~120mm, L=10~20m, a spacing of 30~50cm, an overlap length of not less than 1.5m, a grouting mix ratio of 1:1, and a grouting pressure of about 2.5MPa.

[0061] Before constructing the pipe roof, the working face and surrounding rock are sealed with shotcrete before proceeding with the pipe roof construction. Hot-rolled perforated pipes are used, with a diameter of 80~120mm, a length of 10~20m, a spacing of 30~50cm, an overlap length of not less than 1.5m, a grouting mix ratio of 1:1, and a grouting pressure of approximately 2.5MPa.

[0062] Example 2

[0063] Based on Example 1, this invention provides a construction method for a mountain tunnel with a steep cliff exit, a slope of 65° to 75°, no access road, Class V surrounding rock at the exit section, a burial depth of 8 to 12m, and significant bias pressure.

[0064] Based on the common excavation height of mountain highway tunnels, two working conditions are assumed (Working Condition 1: B=11m Operating Condition 2: B=13m The permissible excavation height is calculated under different grades of surrounding rock. Table 1 provides the basic parameters for different grades of surrounding rock (Grade IV), and Table 2 provides the correction factors and safety factors required for the calculation, as detailed below: Table 1 Basic parameters of different grades of surrounding rock (Grade IV)

[0065] Table 2. Mechanical parameters of surrounding rock of different grades (Grade IV)

[0066] Substituting the parameters of the two working conditions into the above formula, we can obtain the permissible excavation height for the two working conditions under different surrounding rock grades. Among them, Class I-III surrounding rock is almost never found near the exit area, and construction is rarely carried out under these conditions, so it is not considered. The permissible excavation height data for Class IV-V surrounding rock are shown in Table 3, as follows: Table 3 Permissible excavation height data for different surrounding rock grades (Class IV, Class V)

[0067] The height of the pipe roof machine described in Example 1 naturally meets the requirement of providing sufficient excavation height for construction operation space and does not need to be verified.

[0068] Analysis of the calculation results shows that; It can be found that under Class IV surrounding rock conditions, the permissible excavation height is only 0.63m. In this case, support needs to be provided immediately after excavation to ensure that the tunnel does not collapse after the collapse arch fails. Under Class V surrounding rock conditions, the permissible excavation height is 0.1m. However, in actual engineering, an excavation height of 0.1m is not practically meaningful. Therefore, after obtaining the result, the surrounding rock needs to be reinforced in advance. For example, excavation can be carried out when the surrounding rock is reinforced to Class IV.

[0069] The method of this invention has been verified under two typical working conditions corresponding to five surrounding rock grades from I to V. It provides clear and reasonable results for determining the excavation height in terms of slope stability, surrounding rock self-stability, and construction space, proving that the method has a rigorous mechanical basis and wide applicability.

[0070] Slope stability control By employing the principle of virtual work and starting from the perspective of energy conservation, the critical state equation is directly established by setting the work done by gravity equal to the shear dissipation on the slip surface. This greatly simplifies the calculation and facilitates rapid determination based on different working conditions on the construction site. Compared with the traditional slice method, it avoids iterative solutions and significantly reduces the amount of computation.

[0071] Surrounding rock self-stability control Comprehensive use of empirical self-stabilizing height and correction factor ( , The safety factor method and GSI sensitivity analysis verified the effect of rock mass fracturing degree on... The influence of this can be used to accurately calculate the tunnel widening height under the self-stabilizing capacity of the surrounding rock.

[0072] This invention eliminates the need to construct an external platform at the tunnel entrance, and significantly reduces the need to dismantle temporary support structures inside the tunnel. It can effectively control the deformation of the surrounding rock at the tunnel exit, prevent disasters such as rockfalls, collapses, and landslides at the tunnel entrance, and protect the original landform to the greatest extent while ensuring safe excavation.

[0073] Finally, it should be noted that the various embodiments in this specification are described in a progressive manner, with each embodiment focusing on the differences from other embodiments. The same or similar parts between the various embodiments can be referred to each other.

[0074] The above embodiments are only used to illustrate the technical solutions of the present invention and not to limit them; although the present invention has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications can still be made to the specific implementation of the present invention or equivalent substitutions can be made to some technical features without departing from the spirit of the technical solutions of the present invention, and all such modifications and substitutions should be covered within the scope of the technical solutions claimed in the present invention.

Claims

1. A construction method for a unidirectional exit tunnel in a mountainous area where there are no external construction conditions at the exit, characterized in that, The method includes the following steps: S1. Construction of the funnel-shaped excavation platform: The tunnel is excavated in one direction until it stops 10m from the designed exit. Then, it is widened in a funnel shape from the arch foot to the arch crown along the tunnel circumference. No widening is carried out in the area below the arch foot. The front end of the widening faces the outside of the tunnel and the rear end is located inside the tunnel, forming a funnel-shaped widening operation platform that is narrow at the front and wide at the back. S2, Composite support for widened excavation zone: Initial support was provided for the funnel-shaped excavation platform formed by the expansion excavation, using a combination of anchor bolts, double-layer steel mesh shotcrete, and steel arch support. The surface of the expansion excavation platform was sealed with shotcrete. Later, the expansion area was simultaneously constructed with reinforced concrete secondary lining at the tunnel entrance section. S3. Combined advanced pre-support construction: Three layers of advanced support were constructed in sequence in front of the excavation platform: one-time hole-forming segmented grouting, small pipe grouting reinforcement, and three-layer pipe roof support. S4. Excavate the hole after grouting has solidified: After the grout reaches the designed strength, tunnel excavation will proceed, with formal initial support being constructed simultaneously with excavation, monitoring of surrounding rock deformation, and unidirectional tunneling to exit the tunnel.

2. The construction method for a one-way exit tunnel in a mountain tunnel with no external construction conditions at the exit, as described in claim 1, is characterized in that... The allowable excavation height for the funnel-shaped excavation described in step S1 The slope must simultaneously meet two necessary conditions: slope stability and surrounding rock self-stability. This is determined by the following formula: in, The excavation height under slope stability control. The excavation height is controlled by the self-stabilizing capacity of the surrounding rock.

3. The construction method for a one-way exit tunnel in a mountain tunnel with no external construction conditions at the exit, as described in claim 2, is characterized in that... Excavation height under slope stability control Calculations based on the wedge slip model according to the principle of virtual work, with a safety factor introduced. On cohesion and internal friction angle After reduction, the critical value of the actual cover layer is obtained. Then by Conclusion: In the formula, This refers to the height before tunnel widening. It is the vertical distance from the slope at the working face to the bottom of the inverted arch.

4. The construction method for a one-way exit tunnel in a mountain tunnel with no external construction conditions at the exit, as described in claim 2, is characterized in that... Excavation height controlled by the self-stabilizing ability of the surrounding rock It is determined according to the BQ indicator, as follows: First, calculate the basic quality indicators of the rock mass: in, The uniaxial saturated compressive strength of rock is expressed in MPa. This is the rock mass integrity coefficient; This leads to an empirical formula for the enlargement height controlled by the self-stabilizing height: in, This is the initial geostress correction factor. This is the structural surface correction factor.

5. The construction method for a one-way exit tunnel in a mountain tunnel with no external construction conditions at the exit, as described in claim 2, is characterized in that... Excavation height controlled by the self-stabilizing ability of the surrounding rock The self-stabilizing height is determined according to the GSI self-stabilizing height formula, as follows: Where B is the tunnel span. Uniaxial compressive strength, The weight of the rock mass; This reflects the dramatic impact of the degree of fragmentation on the self-stabilizing height.

6. The construction method for a one-way exit tunnel in a mountain tunnel with no external construction conditions at the exit, as described in claim 1, is characterized in that... In step S3, three layers of advance support are constructed sequentially in front of the excavation platform, including the following steps: S301, One-time drilling and segmented grouting: Drill holes below the designed location of the pipe roof, construct a grout stop wall, and use the one-time drilling and segmented grouting process to reinforce the surrounding rock in front, forming the diffusion range of the grout from the one-time drilling and segmented grouting. S302, Small pipe grouting reinforcement: Small pipe grouting pipes are arranged at intervals in the weak grout diffusion range formed in step S301. Cement-water glass double liquid grout is injected through the small pipe grouting pipes. After the grout diffuses, the small pipe grout diffusion range is formed, filling the blind area of ​​segmented grouting. After the grouting is completed, the tail end of the small pipe grouting pipe is welded and fixed to the steel arch frame. S303, Three-layer pipe shed support: A pipe shed is installed in the arch area, and the tail of the pipe shed is welded to the steel arch frame to form an integral support structure.

7. The construction method for a one-way exit tunnel in a mountain tunnel with no external construction conditions at the exit, as described in claim 6, is characterized in that... In step S302, the small-diameter grouting pipe is made of hot-rolled seamless steel pipe with a diameter of 42mm~50mm, a length of 3.5m~5.0m, a circumferential spacing of 30cm~40cm, and an external insertion angle of 10°~15°.

8. The construction method for a one-way exit tunnel in a mountain tunnel with no external construction conditions at the exit, as described in claim 6, is characterized in that... In step S302, the grouting material is a cement-water glass dual-liquid grout with a mixing ratio of cement grout:water glass = 1:0.8~1:1, and the grouting pressure is controlled at 0.5MPa~1.5MPa.

9. The construction method for a one-way exit tunnel in a mountain tunnel with no external construction conditions at the exit, as described in claim 6, is characterized in that... Step S303 includes the following steps; Within a 120°~180° range at the front arch of the excavation platform, a pipe roofing machine is used to construct the pipe roof. After the pipe roofing machine is in place, it jumps through the hole to drill, and after the hole is formed, the pipe roof is pushed in. Then, grouting is carried out through the pipe. The tail of the pipe roof is welded to the steel arch frame to form a whole, forming a high-rigidity advanced support shell.

10. The construction method for a one-way exit tunnel in a mountain tunnel with no external construction conditions at the exit, as described in claim 9, is characterized in that... The pipe shed uses hot-rolled seamless perforated pipes with a diameter of 80mm~120mm, a circumferential spacing of 30cm~50cm, a single length of 10m~20m, and an overlap length of not less than 1.5m between adjacent pipe sheds.

Citation Information

Patent Citations

  • A backward type mold bag sectional grouting device and a grouting method

    CN121875735B