Industrial Process Energy Efficiency Simulation Methods and Systems
By dynamically constructing environmental transmission links and performing virtual energy compensation in industrial processes, the problem that existing energy efficiency simulation methods cannot identify obstructed energy consumption paths is solved. This achieves accurate matching between simulation results and actual energy flow conditions, ensuring the accuracy of energy dispatch and product quality.
Patent Information
- Application Number
- CN202611330303.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-31
- Publication Date
- 2026-11-10
AI Technical Summary
Existing industrial process energy efficiency simulation methods fail to identify obstructed energy consumption paths in the transmission path of plant operations, resulting in discrepancies between simulation outputs and actual energy flow states, misleading energy scheduling, and causing energy waste and product quality deviations.
By analyzing the operational data of process nodes, the environmental transmission links are dynamically constructed, the energy consumption paths that are obstructed are identified, and virtual energy compensation is performed in the digital twin model to generate a corrected energy flow map, ensuring that the simulation results match the actual energy flow state.
Without interfering with the actual production line operation, it accurately identifies and compensates for hidden energy losses, solves the problem of inaccuracy between simulation results and actual energy flow, provides accurate energy scheduling basis, and avoids energy waste and product quality problems.
Smart Images

Figure CN123069697A_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of data processing technology, and in particular to methods and systems for simulating energy efficiency in industrial processes. Background Technology
[0002] During the operation of an industrial production line, when abnormal cooling water flow occurs in upstream process equipment, the resulting thermal disturbances are transmitted to downstream process equipment via shared supply and return air ducts, exhaust channels, and process cooling water circuits. Currently, the industry typically uses static load simulation methods to assess the energy efficiency of production lines, supporting plant energy scheduling and capacity planning.
[0003] However, static load simulation methods calculate total energy consumption based solely on the rated power of each piece of equipment and a fixed process flow, failing to account for hidden energy losses and lag consumption during the transmission of energy across the plant. When downstream process equipment consumes additional energy to offset heat transfer disturbances and maintain process environment stability, the simulation system does not account for this additional energy consumption and still outputs energy consumption data under normal operating conditions. When production managers use these distorted simulation results to plan plant energy scheduling and capacity, they may misjudge the actual energy supply status, causing downstream process equipment to continue operating without sufficient energy replenishment, leading to product quality deviations and batch losses.
[0004] Therefore, existing simulation methods lack the ability to identify obstructions in the transmission path of plant operations, resulting in discrepancies between simulation outputs and actual energy flow states that cannot be located and quantified during routine monitoring. Problems often accumulate until they are exposed at the production end. Furthermore, to mitigate such risks, plant systems are forced to maintain excessive energy redundancy for extended periods, leading to energy waste. Summary of the Invention
[0005] This application provides an industrial process energy efficiency simulation method, which addresses the problem of accurately matching simulation results with actual energy flow status by identifying obstructed energy consumption paths in the transmission path of plant carriers through a digital twin model without interfering with the actual physical operation of the production line, quantifying hidden energy losses and additional energy consumption of target process nodes in the transmission process, and calibrating the simulation output of total production line energy consumption with virtual energy compensation results.
[0006] A first aspect of this application provides an industrial process energy efficiency simulation method, comprising: determining the environmental transmission links between each process node by analyzing the first operating data of each process node in a target production line; Based on the second operating data of each process node, identify the energy-consuming obstruction path in the environmental transmission link; Based on the blocked energy consumption path, environmental energy compensation data is generated. In response to the environmental energy compensation data indicating that the target process node meets the energy compensation requirements, a virtual activation command is output in the digital twin model and virtual energy compensation is executed. Based on the results of the virtual energy compensation, a corrected energy flow map is generated; The compensated energy consumption components of each target process node in the corrected energy consumption flow graph are used to replace the predicted energy consumption components of the corresponding time nodes in the total energy consumption simulation results of the production line, and the total energy consumption simulation results of the production line are output.
[0007] Optionally, in one possible implementation of the first aspect, generating environmental energy compensation data based on the blocked energy consumption path, and responding to the environmental energy compensation data indicating that the target process node meets the energy compensation requirement, outputting a virtual activation command in the digital twin model and performing virtual energy compensation, includes: Based on the energy deficit magnitude of each process node in the energy-depletion path, generate initial energy compensation data for each process node. Based on the link transmission coefficient between each process node in the energy consumption obstruction path, the initial energy compensation data is corrected by path transmission to obtain the environmental energy compensation data. When the environmental energy compensation data indicates that the target process node meets the energy compensation requirements, the virtual activation command carrying the node identifier of the target process node and the corresponding energy compensation level is output in the digital twin model. According to the virtual activation instruction, the virtual energy compensation is performed on the target process node in the digital twin model.
[0008] Optionally, in one possible implementation of the first aspect, the step of correcting the initial energy compensation data based on the link transmission coefficients between process nodes in the energy-depleting path to obtain the environmental energy compensation data includes: Based on the link transmission coefficient between each adjacent process node in the energy-consuming blocking path, determine the path transmission amount to the downstream process node and the node self-consumption amount consumed on the transmission path during the corresponding transmission process. When it is determined that the path transmission amount is greater than the node self-consumption amount, the initial energy compensation data is corrected based on the path transmission amount and the node self-consumption amount to obtain the environmental energy compensation data. When it is determined that the path transmission amount is not greater than the node self-consumption amount, the transmission amount of the blocking energy consumption path at the corresponding node is set to zero, and the initial energy compensation data set to zero is used as the environmental energy compensation data.
[0009] Optionally, in one possible implementation of the first aspect, the step of outputting the virtual activation command carrying the node identifier of the target process node and the corresponding energy compensation level in the digital twin model in response to the environmental energy compensation data indicating that the target process node meets the energy compensation requirements includes: Based on the energy deficit level corresponding to each target process node in the environmental energy compensation data, the compensation activation priority of each target process node is determined. The node identifiers of each target process node are sorted according to the compensation activation priority, and the virtual activation instructions corresponding to each target process node are output sequentially in the digital twin model according to the sorting results.
[0010] Optionally, in one possible implementation of the first aspect, determining the compensation activation priority of each target process node based on the energy deficit magnitude corresponding to each target process node in the environmental energy compensation data includes: The average energy gap magnitude is obtained based on the average energy gap magnitude of each target process node. When the energy gap magnitude is determined to exceed the average gap magnitude, the corresponding target process node is marked as a high-priority compensation node; When it is determined that the energy gap level does not exceed the average gap level, the corresponding target process node is marked as a standard priority compensation node; The compensation activation priority is obtained based on the marking results of the high-priority compensation node and the standard-priority compensation node.
[0011] Optionally, in one possible implementation of the first aspect, identifying the energy-consuming obstruction path in the environmental transmission link based on the second operating data of each of the process nodes includes: The node energy consumption status in the second operating data of each process node is rendered to the corresponding node area in the production line layout image, as well as the pipeline pixel area between each node area, to obtain the production line energy consumption image. In the production line energy consumption image, for each pipeline pixel region corresponding to each environmental transmission link, the pixel points in each pipeline pixel region whose pixel intensity exceeds the average pixel intensity of the starting node region connected to the pipeline pixel region are counted to obtain the set of high energy consumption pixels for each pipeline segment. When it is determined that there are pixels in each set of pixels with high energy consumption that are continuously arranged along the width of the pipeline and penetrate the width of the pipeline pixel region, the corresponding link segment is marked as a candidate blocking path; When it is determined that there are no pixels in each set of pixels with high energy consumption that are continuously arranged along the width of the pipeline and penetrate the width of the pixel region of the pipeline, the corresponding link segment is marked as a normal transmission path; Based on the upstream and downstream positional relationship of the candidate blocking paths in the environmental transmission link, the blocking energy consumption path is determined.
[0012] Optionally, in one possible implementation of the first aspect, determining the blocking energy consumption path based on the upstream and downstream positional relationship of the candidate blocking path in the environmental transmission link includes: Extract the pixel path corresponding to the candidate obstruction path from the energy consumption image of the production line, and obtain the total pixel length of the pixel path and the single-segment pixel length of each pipeline segment; Based on the correspondence between the total pixel length and the single pixel length, the path traversal attribute of the candidate blocking path is determined; Based on the path traversal attribute, the candidate blocking path is determined as the blocking energy consumption path; The path traversal attributes include at least single-segment blocking attributes and cross-node blocking attributes. The single-segment blocking attribute characterizes the state where the candidate blocking path only crosses one segment of the pipeline when the total pixel length is equal to the single-segment pixel length. The cross-node blocking attribute represents the state where the candidate blocking path crosses multiple pipeline segments and carries the node identifiers of each intermediate process node when the total pixel length is greater than the single-segment pixel length.
[0013] Optionally, in one possible implementation of the first aspect, determining the environmental transmission link between each process node by parsing the first operating data of each process node in the target production line includes: Analyze the first operating data of each process node and extract the environmental parameter transmission relationship between each process node; Based on the environmental parameter transmission relationship, a node association matrix is constructed between each of the process nodes; The environmental transmission link is determined based on the association strength between each pair of nodes in the node association matrix.
[0014] Optionally, in one possible implementation of the first aspect, generating the corrected energy flow map based on the result of the virtual energy compensation includes: The simulated energy consumption data of each target process node before and after the virtual energy compensation is executed are collected and rendered to the corresponding node area in the production line layout image to obtain the energy consumption image before compensation and the energy consumption image after compensation. In the energy consumption image before compensation, the pixels whose pixel intensity exceeds the average pixel intensity of the node region within each target process node region are counted to obtain the set of pixels with higher than average pixel intensity before compensation for each node. In the compensated energy consumption image, the pixels whose pixel intensity exceeds the average pixel intensity of the node region within each target process node region are counted to obtain the set of compensated super-average pixels for each node. The total pixel intensity of the newly added pixels in the compensated super-average pixel set of each target process node compared to the uncompensated super-average pixel set is taken as the compensation energy consumption component of the target process node. The corrected energy flow map is generated based on the compensated energy consumption component and the compensated simulated energy consumption data in the simulated energy consumption data.
[0015] Optionally, in one possible implementation of the first aspect, replacing the predicted energy consumption component of the corresponding time node in the total production line energy consumption simulation result with the compensated energy consumption component of each target process node in the corrected energy consumption flow map, and outputting the total production line energy consumption simulation result, includes: Based on the time markers corresponding to each of the compensated energy consumption components in the corrected energy consumption flow graph, each of the compensated energy consumption components is aligned to the corresponding time node of the production line total energy consumption simulation result; The corresponding time node's predicted energy consumption component is replaced by each of the aligned and compensated energy consumption components, and the simulation result of the total energy consumption of the production line is output.
[0016] Optionally, in one possible implementation of the first aspect, generating the corrected energy flow map based on the compensated energy consumption component and the compensated simulated energy consumption data in the simulated energy consumption data includes: When the number of newly added pixels corresponding to the compensated energy consumption component exceeds the average number of newly added pixels of each target process node in the blocked energy consumption path, the target process node is marked with an overcompensation flag in the corrected energy consumption flow graph. When the number of newly added pixels corresponding to the compensated energy consumption component does not exceed the average number of newly added pixels of each target process node in the blocked energy consumption path, the target process node is marked with a normal compensation identifier in the corrected energy consumption flow graph. Based on the over-compensation identifier or normal compensation identifier of each target process node, the compensated energy consumption component is written into the corresponding node position of the corrected energy consumption flow graph to generate the corrected energy consumption flow graph.
[0017] Optionally, in one possible implementation of the first aspect, replacing the predicted energy consumption components at the corresponding time nodes with the aligned and compensated energy consumption components to output the simulation result of the total energy consumption of the production line includes: When it is determined that there are multiple compensated energy consumption components at the corresponding time node, the pixel area of the node region corresponding to each compensated energy consumption component is extracted. The ratio of each compensated energy consumption component to the pixel area of the corresponding node region is used as the unit area compensation intensity. The compensated energy consumption component with the largest unit area compensation intensity is used to replace the predicted energy consumption component of the corresponding time node. When it is determined that there is a unique compensated energy consumption component at the corresponding time node, the compensated energy consumption component replaces the predicted energy consumption component at the corresponding time node. Based on the compensated energy consumption components after substitution at each corresponding time point, the simulation results of the total energy consumption of the production line are output.
[0018] A second aspect of this application provides an industrial process energy efficiency simulation system, comprising: a link construction module, used to determine the environmental transmission links between each process node by parsing the first operating data of each process node in the target production line; The path identification module is used to identify the energy-consuming obstruction paths in the environmental transmission link based on the second operating data of each process node. The compensation execution module is used to generate environmental energy compensation data based on the blocked energy consumption path, and in response to the environmental energy compensation data indicating that the target process node meets the energy compensation requirements, outputs a virtual activation command in the digital twin model and executes virtual energy compensation. The map generation module is used to generate a corrected energy flow map based on the results of the virtual energy compensation. The simulation output module is used to replace the predicted energy consumption component of the corresponding time node in the total energy consumption simulation result of the production line with the compensated energy consumption component of each target process node in the corrected energy consumption flow graph, and output the total energy consumption simulation result of the production line.
[0019] The industrial process energy efficiency simulation method provided in this application has the following beneficial effects: This application renders production line operation data onto a production line layout image, uses the inherent geometric properties of pipeline pixel areas to identify obstructed energy consumption paths, and performs virtual energy compensation after path transmission correction on each target process node in the obstructed path in a digital twin model. The compensated energy consumption component replaces the corresponding predicted energy consumption component in the total production line energy consumption simulation result. Without interfering with the actual physical operation of the production line, it accurately incorporates the hidden energy loss in the plant carrier transmission process and the additional energy consumption of downstream nodes into the simulation calculation. This fundamentally solves the problem of long-term inaccuracy between simulation output and actual energy flow state in static load simulation methods, enabling the total production line energy consumption simulation result to truly reflect the actual operating state of the production line under obstructed transmission scenarios, and providing accurate simulation basis for plant energy scheduling and capacity planning. Attached Figure Description
[0020] Figure 1 This is a flowchart illustrating the industrial process energy efficiency simulation method provided in the embodiments of this application; Figure 2 This is a schematic diagram of the process of outputting virtual activation instructions and executing virtual energy compensation in the industrial process energy efficiency simulation method provided in this application embodiment; Figure 3 This is an application scenario diagram of the industrial process energy efficiency simulation system provided in the embodiments of this application; Figure 4 This is a schematic diagram of the hardware structure of an electronic device provided in an embodiment of this application. Detailed Implementation
[0021] To make the objectives, technical solutions, and advantages of the embodiments of this application clearer, the technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, and not all embodiments. Based on the embodiments of this application, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of this application.
[0022] The technical solutions of this application will be described in detail below with specific embodiments. The following specific embodiments can be combined with each other, and the same or similar concepts or processes may not be described again in some embodiments.
[0023] The industrial process energy efficiency simulation method provided in this application embodiment can be applied to, for example... Figure 3 In the application environment shown, each process node in the target production line continuously generates operational data during operation. The energy efficiency simulation system collects the operational data of each process node via network or direct connection and completes simulation calculations in a digital twin model corresponding to the target production line. The digital twin model can be deployed on a local industrial control server, or on a factory private cloud or public cloud platform. Historical and real-time operational data of each process node can be stored in a local database or a cloud data storage system.
[0024] The energy efficiency simulation system dynamically constructs environmental transmission links between process nodes by analyzing the first operating data of each process node, capturing the transmission relationships between process nodes due to shared cooling water pipes, air supply and exhaust pipes, and other plant pipelines. Based on this, combined with the second operating data of each process node, it identifies energy-consuming paths with heat disturbance accumulation in the environmental transmission links on the production line layout image. For the identified energy-consuming paths, environmental energy compensation data is generated through path transmission correction. In the digital twin model, virtual activation commands are output to the target process nodes that meet the energy compensation requirements, and virtual energy compensation is executed without interfering with the physical operation of the actual production line. After the virtual energy compensation is completed, the compensated energy consumption components of each target process node are extracted by comparing the simulated energy consumption images before and after compensation, generating a corrected energy consumption flow map. Finally, the compensated energy consumption components in the corrected energy consumption flow map replace the predicted energy consumption components of the corresponding time nodes in the total energy consumption simulation results of the production line, outputting the total energy consumption simulation results of the production line that reflect the actual energy flow status of the production line, providing an accurate simulation basis for factory energy efficiency management.
[0025] The execution entities of the energy efficiency simulation system can include, but are not limited to, industrial control computers, edge computing devices, and factory energy efficiency management servers. Servers can be independent physical servers, clusters or distributed systems composed of multiple servers, or cloud servers deployed on industrial cloud platforms.
[0026] See Figure 1 This is a flowchart illustrating the industrial process energy efficiency simulation method provided in this application embodiment. Figure 1 The execution entity of the method shown can be a software and / or hardware device. The execution entity of this application can include, but is not limited to, at least one of the following: user equipment, network equipment, etc. User equipment can include, but is not limited to, computers, smartphones, personal digital assistants (PDAs), and the aforementioned electronic devices. Network equipment can include, but is not limited to, a single network server, a server group consisting of multiple network servers, or a cloud based on cloud computing consisting of a large number of computers or network servers. Cloud computing is a type of distributed computing, consisting of a super virtual computer composed of a group of loosely coupled computers. This embodiment does not impose any limitations on this.
[0027] The industrial process energy efficiency simulation method provided in this application includes steps S1 to S4, as detailed below: S1 determines the environmental transmission links between process nodes by analyzing the first operating data of each process node in the target production line.
[0028] It should be noted that in traditional production line energy efficiency assessments, the relationships between process nodes are typically described using manually configured static topology tables. When the production line process layout is adjusted or plant piping is modified, the static topology table cannot reflect the new transmission relationships between nodes in a timely manner, leading to inaccurate link structures used to identify energy-consuming pathways. This step addresses the lag problem of static configuration methods in dynamic production line scenarios by analyzing the initial operating data of each process node and dynamically extracting the environmental parameter transmission relationships between nodes at the data level. Based on this, an environmental transmission link is constructed.
[0029] The first set of operating data refers to a structured set of operating parameters characterizing the transmission relationship of environmental parameters between process nodes. This can include parameters that reflect the energy exchange pattern between nodes, such as the supply and return temperature difference of cooling water, the pressure difference in supply and return air ducts, and the flow rate of exhaust channels. This differs from data reflecting the real-time load status of the nodes themselves. The environmental transmission link is a structured relationship established based on the first set of operating data, describing the paths of mutual influence of environmental parameters between process nodes. This provides a topological foundation for subsequently identifying energy-consuming pathways.
[0030] It is easy to understand that when the cooling water supply and return temperature difference of an upstream node in the production line fluctuates, the downstream node that shares the cooling water circuit with it will inevitably be affected. This relationship is what the environmental transmission link describes. By analyzing the first operating data, this implicit information can be extracted to provide a basis for the accurate location of the obstruction path in subsequent steps.
[0031] In some embodiments, step S1 includes steps S11 to S13: Step S11: Analyze the first operating data of each process node and extract the environmental parameter transmission relationship between each process node.
[0032] It should be noted that the environmental parameter transfer relationship is a correlation description extracted from the first operating data, describing the way environmental parameters influence each other between two process nodes. For example, if node A and node B share the same cooling water circuit, when the cooling water outlet temperature of node A increases, the inlet water temperature of node B also increases. This follow-up relationship constitutes the environmental parameter transfer relationship between node A and node B. By analyzing the first operating data, it is possible to identify which nodes have this follow-up relationship from the historical operating parameters of multiple process nodes.
[0033] It is understandable that after aligning the first operating data of each process node according to the time series, the parameter changes between each node are analyzed one by one to see if there is a consistent follow-up relationship. The node pairs with follow-up relationships are recorded as node pairs with environmental parameter transmission relationships, thus obtaining the set of environmental parameter transmission relationships between each process node.
[0034] Extracting environmental parameter transmission relationships avoids the lag caused by relying on manual configuration of topology tables, enabling the construction of environmental transmission links to truly reflect the current physical connection status of the production line and providing accurate topological basis for identifying energy-consuming obstructions.
[0035] Step S12: Based on the environmental parameter transmission relationship, construct the node association matrix between each process node.
[0036] It should be noted that the correlation strength refers to the tightness of the environmental parameter transmission relationship between two process nodes, calculated from the historical data of the parameter sequences of the two nodes in the first operating data. The specific calculation method is as follows: Within a certain historical time window, extract the time series of similar environmental parameters of the two process nodes, calculate the proportion of the number of times the two sequences change in the same direction on the time axis to the total number of samples, and use this proportion as the correlation strength between the two nodes. The value ranges from 0 to 1. The closer the value is to 1, the higher the frequency of the environmental parameter changes in the same direction between the two nodes, and the tighter the transmission relationship; a value of 0 indicates that the two sequences have no relationship of change in the same direction, and there is no effective environmental parameter transmission relationship between the two nodes. Node pairs with a non-zero correlation strength are included in the environmental transmission link, and node pairs with a zero correlation strength are excluded, thereby determining the topology range of the environmental transmission link.
[0037] It is understandable that a matrix is constructed using each process node as a row and column index, and the correlation strength between each node pair extracted in step S11 is filled into the corresponding position in the matrix. The corresponding position of node pairs without a transitive relationship is filled with zero value, thus obtaining a complete node correlation matrix.
[0038] Step S13: Determine the environmental transmission link based on the association strength between each pair of nodes in the node association matrix.
[0039] It is understandable that by traversing each node pair in the node association matrix, the transmission paths corresponding to node pairs with non-zero association strength are included in the environmental transmission link, and the actual pipeline routes between nodes are organized into a directed link structure, thus obtaining the environmental transmission link that describes the transmission path of environmental parameters between each process node of the target production line.
[0040] Through steps S11 to S13, environmental transmission links between process nodes are dynamically established from the first operating data, transforming the implicit physical coupling relationship formed in the production line due to shared plant pipelines into a structured topology that can be computed and processed, providing an accurate link basis for identifying energy-consuming obstructions in step S2.
[0041] S2 identifies energy-consuming obstructions in the environmental transmission link based on the second operating data of each process node.
[0042] It should be noted that existing energy efficiency simulation methods typically identify production line anomalies based on whether the energy consumption of each node exceeds the rated value. This approach can only detect nodes that are already significantly overloaded and cannot capture the abnormal accumulation of thermal disturbances within the pipeline sections themselves as they propagate along the plant's pipelines. When an upstream node experiences abnormal cooling water flow, thermal disturbances gradually accumulate in the corresponding pipeline section, creating a state of energy transfer obstruction before downstream nodes perceive obvious energy consumption anomalies. This step renders the node energy consumption status from the second operating data of each process node onto the production line layout image. By processing the image of the pipeline pixel area, the accumulation location of thermal disturbances is identified at the pipeline section level, thereby locating the energy-obstructing path before downstream node energy consumption deviations become apparent.
[0043] The second set of operational data refers to the set of real-time operational parameters reflecting the current actual energy supply and demand status of each process node, including parameters such as real-time energy consumption power and actual cooling water flow rate of each node. The production line layout image is a graphical representation of the spatial layout of the target production line, with each process node corresponding to a fixed node area, and the plant pipelines between each node area corresponding to fixed pipeline pixel areas.
[0044] In some embodiments, step S2 includes steps S21 to S25: Step S21: Render the node energy consumption status in the second running data of each process node to the corresponding node area in the production line layout image, as well as the pipeline pixel area between each node area, to obtain the production line energy consumption image.
[0045] The node energy consumption status is a quantitative description of the energy consumption level of each process node, extracted from the second operating data of each process node. It can be the ratio of the node's current real-time energy consumption power to its rated energy consumption power, or it can be the absolute value of the current real-time energy consumption power, depending on the data collection method of each node in the production line energy efficiency management system. When rendering to the production line layout image, the node energy consumption status values of each node are normalized in the following way: using the maximum value of the current node energy consumption status of all process nodes in the production line as the upper limit and the minimum value as the lower limit, the node energy consumption status values of each node are linearly mapped to the pixel intensity range, so that the node with the largest value corresponds to the highest pixel intensity, the node with the smallest value corresponds to the lowest pixel intensity, and the intermediate nodes are linearly distributed proportionally. This allows the node energy consumption status of different orders of magnitude to have a comparable visual expression in the image, supporting the cross-node comparison of pixel intensity in the pipeline pixel area in step S22.
[0046] It should be noted that, similarly, in the subsequent step S41, when rendering the simulated energy consumption data before and after compensation onto the production line layout image, the same normalization method as in step S21 is adopted to ensure that the energy consumption image before and after compensation has a directly comparable benchmark at the pixel intensity level, and to ensure that the comparison results of the set of super-mean pixels in steps S42 to S44 accurately reflect the energy consumption changes introduced by virtual energy compensation.
[0047] The node region is the fixed pixel region corresponding to each process node in the production line layout image, and the pipeline pixel region is the pixel region corresponding to the plant pipelines between the node regions. The rendering operation maps the energy consumption status values of each node and pipeline segment to the pixel intensity values of the corresponding regions. The higher the value, the greater the corresponding pixel intensity, so that the visual brightness of each region in the production line energy consumption image directly reflects the real-time energy consumption level of the corresponding location.
[0048] Understandably, the second operating data of each process node is normalized according to the node correspondence and mapped to pixel intensity. This is then filled into the corresponding node area in the production line layout image. The pixel intensity of the pipeline pixel area between each node area is filled in the same way as the pixel intensity of the starting node area connected to it, so that the initial pixel intensity level of the pipeline pixel area corresponds to the energy consumption status of the upstream node. After rendering, the production line energy consumption image is obtained.
[0049] Step S22: In the production line energy consumption image, for the pipeline pixel area corresponding to each environmental transmission link, count the pixels in each pipeline pixel area whose pixel intensity exceeds the average pixel intensity of the starting node area connected to the pipeline pixel area, and obtain the set of pixels with high energy consumption for each pipeline segment.
[0050] It should be noted that the starting node region refers to the node region corresponding to the process node located upstream of the pipeline segment in the environmental transmission link. The average pixel intensity of the starting node region is the result of averaging the pixel intensity of all pixels within the starting node region. The average pixel intensity of the starting node region, rather than the average pixel intensity of the ending node region, is used as a reference because the direction of thermal disturbance transmission is from the upstream node to the downstream node. The energy accumulation in the pipeline segment originates from the abnormal output of the upstream node. If the pixel intensity in the pipeline segment exceeds the average of the upstream starting node, it indicates that there is abnormal energy accumulation in the pipeline segment that exceeds the normal output level of the upstream node, corresponding to a physical state in which blockage is forming. If the average of the ending node is used as a reference, the energy consumption of the ending node itself may be higher due to the influence of upstream blockage, making the reference value itself inaccurate and the judgment basis unreliable.
[0051] Understandably, each pipeline pixel region is scanned pixel by pixel, and pixels whose pixel intensity exceeds the average pixel intensity of the corresponding starting node region are classified into the set of high energy consumption pixels for that pipeline segment, thus completing the statistics of the high energy consumption pixel set for each pipeline segment.
[0052] Step S23: When it is determined that there are pixels in each set of pixels with high energy consumption that are continuously arranged along the width of the pipeline and penetrate the width of the pipeline pixel area, the corresponding link segment is marked as a candidate blocking path.
[0053] Step S24: When it is determined that there are no pixels in each set of pixels with high energy consumption that are continuously arranged along the width of the pipeline and penetrate the width of the pipeline pixel area, the corresponding link segment is marked as a normal transmission path.
[0054] It should be noted that the branch design of steps S23 and S24 is based on the following: when thermal disturbance forms a true transmission blockage in the pipeline section, excessive heat energy will accumulate uniformly in the cross-sectional direction of the pipeline. This manifests as high-energy-consumption pixels continuously arranged along the width of the pipeline and penetrating the entire width of the pipeline, forming a high-intensity pixel band spanning the pipeline. Physically, this corresponds to the truncation effect of thermal disturbance on the pipeline transmission channel. If the high-energy-consumption pixels are only dispersed on one side of the pipeline and fail to penetrate the entire width of the pipeline, it indicates that there is only local fluctuation at that point, the transmission channel is not interrupted, and no blockage is formed.
[0055] The reason for using the width of the through-pipe as the criterion is that the plant's pipelines have a fixed pixel width in the production line layout image. This geometric attribute is a direct mapping of the pipeline's physical cross-section. By replacing numerical threshold comparisons with whether the pipeline penetrates, the criterion is bound to the physical structure of the pipeline itself, avoiding the problem of threshold universality caused by differences in energy consumption levels at different nodes. Compared with the traditional method of setting a fixed energy consumption over-limit threshold for alarms, the criterion in this step comes from the geometric attributes of the pipeline's pixel area itself. It does not require separate threshold calibration for different nodes, making it more applicable in scenarios with diverse production line node types.
[0056] Step S25: Determine the energy-consuming blocking path based on the upstream and downstream positional relationship of the candidate blocking path in the environmental transmission link.
[0057] In some embodiments, step S25 includes steps S251 to S253: Step S251: Extract the pixel path corresponding to the candidate obstruction path from the production line energy consumption image, and obtain the total pixel length of the pixel path and the single-segment pixel length of each pipeline segment.
[0058] It should be noted that the pixel path is a continuous sequence of pixels corresponding to the candidate obstruction path in the production line energy consumption image, extending from the boundary of the starting node region to the boundary of the ending node region of the candidate obstruction path. The total pixel length is the number of complete pixels from the starting end to the ending end of the pixel path, and the single segment pixel length is the number of pixels corresponding to a single pipe segment in the pixel path. Both are directly obtained from the fixed geometric properties of the production line layout image and do not involve any runtime calculations.
[0059] Understandably, pixel paths are extracted segment by segment from the production line energy consumption image along the direction of the candidate obstruction path, and the total pixel length is obtained by accumulating the number of pixels in each pipeline segment. At the same time, the single-segment pixel length of each pipeline segment is recorded for use in step S252.
[0060] Step S252: Determine the path crossing attribute of the candidate blocking path based on the correspondence between the total pixel length and the single segment pixel length.
[0061] It should be noted that the path traversal attribute includes at least single-segment blocking attributes and cross-node blocking attributes. The single-segment blocking attribute indicates that when the total pixel length equals the single-segment pixel length, the candidate blocking path only traverses one pipe segment, indicating that the spatial distribution of thermal disturbance is limited to within a single pipe segment, and there is a one-to-one direct transmission relationship between upstream and downstream nodes. The cross-node blocking attribute indicates that when the total pixel length is greater than the single-segment pixel length, the candidate blocking path traverses multiple pipe segments and carries the node identifiers of each intermediate process node, indicating that the spatial distribution of thermal disturbance spans multiple pipe segments and multiple intermediate nodes. The node identifiers of each intermediate node are appended to the path description for use in step S3 when calculating the path transmission correction segment by segment based on the node identifier.
[0062] Understandably, the total pixel length of the candidate blocking path is compared with the pixel length of a single pipe segment contained in the candidate blocking path: when the total pixel length is equal to the pixel length of a single pipe segment in the candidate blocking path, the path crossing attribute is determined to be a single-segment blocking attribute; when the total pixel length is greater than the pixel length of a single pipe segment in the candidate blocking path, it indicates that the pixel path crosses more than one pipe segment. Each intermediate process node is identified segment by segment according to the direction of the pixel path, and the node identifier of each intermediate process node is attached to the path description to determine the path crossing attribute as a cross-node blocking attribute.
[0063] Step S253: Based on the path crossing attributes, the candidate blocking path is determined as the blocking energy consumption path.
[0064] It is understandable that the candidate blocking path carrying the path crossing attribute is the blocking energy consumption path. The intermediate process node identifier attached to the path crossing attribute will be called in the path transmission correction in step S3 to calculate the path transmission amount and node self-consumption at each intermediate node segment by segment.
[0065] By introducing the path crossing attribute in step S25, the energy-consuming obstruction path not only carries the start and end position information, but also the intermediate process node information it crosses. This provides the necessary structured input for the path transmission correction to be carried out segment by segment according to the node identifier in step S3, and avoids the correction error caused when multiple obstruction paths are processed as single segments.
[0066] Through steps S21 to S25, the problem of identifying production line operation data is transformed into a geometric determination problem on the production line layout image. By using the fixed geometric attributes of the pipeline pixel area to replace the empirical threshold, the accurate location of the energy consumption obstruction path is achieved, which solves the problem of missed and false alarms caused by improper threshold setting in the traditional method, and provides accurate path input for the virtual energy compensation in step S3.
[0067] S3 generates environmental energy compensation data based on the blocked energy consumption path. In response to the environmental energy compensation data indicating that the target process node meets the energy compensation requirements, it outputs a virtual activation command in the digital twin model and executes virtual energy compensation.
[0068] It should be noted that in traditional energy efficiency simulation schemes, when an energy deficit is identified at a node, a compensation amount is usually directly superimposed on the simulation model. This approach ignores the energy loss in the plant pipelines during the transfer of energy from the compensation source to the target node, resulting in a discrepancy between the compensation amount and the actual energy received by the target node, and the simulation results remain inaccurate. This step corrects the initial energy compensation data by using a link transfer coefficient, incorporating the path transfer amount and node self-consumption during the pipeline transfer process into the calculation, obtaining environmental energy compensation data that accurately reflects the actual compensation amount received by the target node. Then, virtual energy compensation is performed in the digital twin model according to the node identifier and energy compensation level, ensuring that the virtual compensation result is consistent with the real physical process.
[0069] The digital twin model is a virtual simulation model that corresponds to the physical state of the target production line. Virtual energy compensation is performed in the digital twin model without interfering with the actual operation of the production line. All compensation operations are completed at the simulation level, and the output is the compensated simulation energy consumption data.
[0070] In some embodiments, step S3 includes steps S31 to S34, such as... Figure 2 As shown, it includes: Step S31: Generate initial energy compensation data for each process node based on the energy gap magnitude of each process node in the energy consumption blocking path.
[0071] It should be noted that the energy gap magnitude is a quantitative expression of the degree of insufficient energy supply at each process node in the energy consumption bottleneck path due to upstream obstruction. The energy gap magnitude is calculated as follows: the historical average energy consumption of each process node under normal operating conditions without obstruction is used as the rated energy consumption benchmark. The rated energy consumption benchmark is statistically obtained from the historical operating data of the production line, specifically the average energy consumption of each node during a period of unobstructed operation in the past; the difference between the current actual energy consumption of each node and the rated energy consumption benchmark is used as the energy gap magnitude. A positive difference indicates that the process node has insufficient energy supply, while a difference of zero or negative indicates that the current energy consumption of the node is not lower than the rated level, and the energy gap magnitude is recorded as zero, and no initial energy compensation data is generated. This method ensures that compensation data is generated only for nodes with actual energy gaps, avoiding unnecessary virtual compensation for nodes with normal energy consumption.
[0072] It is understandable that, for each process node in the energy consumption blockade path, corresponding initial energy compensation data is generated based on the energy gap level of each node. The initial energy compensation data is numerically equal to the energy gap level of the corresponding node, and serves as the baseline compensation amount before path propagation correction.
[0073] Step S32: Based on the link transmission coefficient between each process node in the energy consumption obstruction path, the initial energy compensation data is corrected by path transmission to obtain environmental energy compensation data.
[0074] In some embodiments, step S32 includes steps S321 to S323: Step S321: Based on the link transmission coefficient between adjacent process nodes in the energy consumption blocking path, determine the path transmission amount reaching the downstream process node and the node self-consumption amount consumed on the transmission path during the corresponding transmission process.
[0075] It should be noted that the link transfer coefficient is a parameter describing the transfer characteristics between adjacent process nodes in an energy-consuming path via plant infrastructure, reflecting the energy transfer status between the node pair under the current production line operating conditions. The link transfer coefficient consists of two components: path transfer amount, which is the amount of energy actually reaching the downstream process node during the transfer process; and node self-consumption, which is the amount of energy consumed along the transfer path during the transfer process. The sum of the path transfer amount and the node self-consumption constitutes the total energy input of the node pair during the transfer process.
[0076] In some embodiments, the link transmission coefficient can be calculated as follows: within a certain time window, the energy output from the upstream process node to the plant carrier and the energy received by the downstream process node from the plant carrier are collected respectively. The ratio of the energy received by the downstream process node to the energy output of the upstream process node is used as the corresponding proportion of the path transmission amount of the upstream and downstream process nodes within the current time window. The ratio of the difference between the energy output of the upstream process node and the energy received by the downstream process node to the energy output of the upstream process node is used as the corresponding proportion of the node self-consumption. The average of the collection results from multiple time windows is taken to obtain a stable link transmission coefficient, which is decomposed into two components: path transmission amount and node self-consumption amount, for use in steps S322 and S323.
[0077] For example, within a certain time window of continuous data collection, if the upstream node outputs an average of 100 units of energy to the plant carrier and the downstream node receives an average of 70 units, then the path transmission component corresponds to 70 units and the node self-consumption component corresponds to 30 units.
[0078] It is understandable that, for each pair of adjacent process nodes in the energy-consuming obstruction path, the path transmission amount and node self-consumption amount are determined according to the corresponding link transmission coefficient, providing a calculation basis for steps S322 and S323.
[0079] Step S322: When the path transmission amount is determined to be greater than the node self-consumption amount, the initial energy compensation data is corrected based on the path transmission amount and the node self-consumption amount to obtain the environmental energy compensation data.
[0080] Step S323: When it is determined that the path transmission amount is not greater than the node self-consumption amount, the transmission amount of the energy-blocking path at the corresponding node is set to zero, and the initial energy compensation data set to zero is used as the environmental energy compensation data.
[0081] It should be noted that the branch design of steps S322 and S323 is based on the following: When the path transmission amount is greater than the node self-consumption amount, it indicates that there is a net energy transfer to the downstream node in the transmission path. The difference between the path transmission amount and the node self-consumption amount is the net transmission amount that the downstream node can actually obtain. The net transmission amount replaces the corresponding transmission amount in the initial energy compensation data to complete the path transmission correction. The resulting environmental energy compensation data accurately reflects the compensation amount that the target node can actually obtain after transmission loss. When the path transmission amount is not greater than the node self-consumption amount, it indicates that the consumption of the transmission path in the transmission process has exhausted all the input energy. The transmission of thermal disturbance at this node has been completely interrupted. Continuing to calculate the compensation amount to the downstream node has no physical meaning. Therefore, the transmission amount at the corresponding node is set to zero, and the initial energy compensation data with a zero value is output as the environmental energy compensation data to avoid transmitting invalid compensation amount to subsequent nodes.
[0082] Compared with traditional methods that ignore path losses and directly use the energy gap as the compensation amount, this step incorporates the physical losses in the transmission path into the calculation through path transmission correction, so that the environmental energy compensation data truly reflects the compensation amount that the target node can actually obtain, avoiding the problem of artificially high simulation output caused by overestimation of compensation amount.
[0083] Step S33: In response to the environmental energy compensation data indicating that the target process node meets the energy compensation requirements, output a virtual activation command carrying the node identifier of the target process node and the corresponding energy compensation level in the digital twin model.
[0084] It should be noted that energy compensation demand refers to the demand for external virtual compensation input for a target process node due to insufficient energy supply caused by upstream obstruction, and is characterized by the magnitude of environmental energy compensation data. When the value corresponding to a target process node in the environmental energy compensation data is not zero, it indicates that the node still has a net energy gap after path propagation correction, i.e., there is an energy compensation demand. When the corresponding value is zero, it indicates that path propagation has completely consumed the compensation amount from the upstream input, the process node has no effective compensation to obtain, does not meet the energy compensation demand, and does not trigger the output of the virtual activation command. Using whether the environmental energy compensation data is non-zero as the criterion, rather than introducing an independent judgment parameter, ensures a direct correlation between the compensation triggering condition and the path propagation correction result.
[0085] In some embodiments, step S33 includes steps S331 and S332: Step S331: Based on the energy gap magnitude corresponding to each target process node in the environmental energy compensation data, determine the compensation activation priority of each target process node.
[0086] It should be noted that when there are multiple target process nodes in the energy consumption bottleneck path, the virtual energy compensation resources in the digital twin model are limited per unit time and cannot simultaneously complete compensation calculations for all target process nodes. Therefore, it is necessary to determine the compensation order for each node. If a fixed order is used to compensate nodes one by one without prioritizing them, the node with the largest energy deficit may not receive compensation for a long time due to being ranked lower in the queue. This would lead to a continuous accumulation of energy consumption deviations for that node in the simulation results, affecting the accuracy of the total energy consumption simulation results for the production line. This step determines the compensation activation priority based on the inherent distribution of the energy deficit magnitude, prioritizing the processing of nodes with larger energy deficit magnitudes to ensure that simulation errors converge as quickly as possible.
[0087] In some embodiments, step S331 includes steps S3311 to S3314: Step S3311: Obtain the average energy gap magnitude based on the average energy gap magnitude of each target process node.
[0088] Understandably, the average energy gap magnitude of target process nodes with non-zero energy gaps in the energy consumption blocking path is taken to obtain the average gap magnitude. Nodes with zero energy gap magnitudes are not included in the average calculation because they have no compensation needs and do not participate in the determination of the current compensation activation priority. Including them in the average calculation would lower the average, causing some nodes with actually large gaps to be mistakenly judged as high-priority compensation nodes due to a lower average, affecting the accuracy of priority ranking. The average gap magnitude is derived entirely from the energy gap magnitude data of each effective target process node in the current compensation task and does not depend on any external preset parameters.
[0089] Step S3312: When the energy gap exceeds the average gap level, mark the corresponding target process node as a high-priority compensation node.
[0090] Step S3313: When it is determined that the energy gap level does not exceed the average gap level, the corresponding target process node is marked as a standard priority compensation node.
[0091] It should be noted that the branches of steps S3312 and S3313 are divided by the boundary between exceeding and not exceeding the average gap level. Target process nodes whose energy gap level exceeds the average gap level are marked as high-priority compensation nodes, and target process nodes whose energy gap level does not exceed the average gap level are marked as standard-priority compensation nodes. When the energy gap level is exactly equal to the average gap level, it is classified as a standard-priority compensation node. The lower boundary of the closed interval is used to ensure that all target process nodes are classified into a uniquely determined priority category and there is no situation where they cannot be classified.
[0092] The mean value is used as the dividing line, rather than an externally preset threshold, because the mean value itself is determined by the energy gap magnitude of each node in the current compensation task, and can automatically adapt to the overall level changes in the node gap magnitude under different hindrance scenarios. Nodes with energy gap magnitudes exceeding the mean value have larger gaps compared to other nodes in this compensation task, and prioritizing their processing helps reduce overall simulation errors; nodes with gap magnitudes not exceeding the mean value have relatively smaller gaps, and their processing after high-priority node compensation is completed will not lead to a significant accumulation of simulation errors.
[0093] Step S3314: Based on the marking results of high-priority compensation nodes and standard-priority compensation nodes, the compensation activation priority is obtained.
[0094] It is understandable that high-priority compensation nodes are arranged before standard-priority compensation nodes to form a compensation activation priority sequence, which serves as the basis for the order of outputting virtual activation instructions in step S332.
[0095] By using steps S3311 to S3314, the compensation activation order is determined based on the inherent distribution relationship of the energy gap magnitude of each node, ensuring that the node with the largest energy gap in the simulation model is processed first, and effectively controlling the overall error level of the simulation results in the scenario of multiple nodes coexisting and causing hindrance.
[0096] Step S332: Sort the node identifiers of each target process node according to the compensation activation priority, and output the virtual activation instructions corresponding to each target process node in the digital twin model in sequence according to the sorting results.
[0097] It should be noted that the node identifier is a unique identifier for the target process node carried in the virtual activation command, used to locate the execution object of virtual energy compensation in the digital twin model. The virtual activation command carries both the node identifier and the corresponding energy compensation level. The digital twin model uses the node identifier to determine which node to perform compensation on, and uses the energy compensation level to determine the compensation amount. These two pieces of information together ensure that virtual compensation is performed on the correct object at the correct level.
[0098] Understandably, the node identifiers of each target process node are sorted according to the compensation activation priority sequence, with the node identifiers corresponding to high-priority compensation nodes listed first and the node identifiers corresponding to standard-priority compensation nodes listed last. Virtual activation instructions carrying node identifiers and energy compensation levels are generated and output in the digital twin model in this order.
[0099] Step S34: Perform virtual energy compensation on the target process node in the digital twin model according to the virtual activation instruction.
[0100] Understandably, after receiving the virtual activation command, the digital twin model parses the node identifier in the command to locate the target process node, adjusts the energy input state of the target process node in the simulation model according to the energy compensation level, completes virtual energy compensation, and outputs the compensated simulation energy consumption data of each target process node for use in step S4.
[0101] Through steps S31 to S34, this step completes the entire process from energy gap identification and path transmission correction to virtual compensation execution in the digital twin model without interfering with the actual physical operation of the production line. After path transmission correction, the environmental energy compensation data truly reflects the energy loss in the plant pipeline. The node identifier and energy compensation level carried by the virtual activation command enable the compensation operation to be accurately located at the target node, fundamentally solving the problems of ignoring pipeline transmission loss and the inconsistency between the compensation amount and the actual amount obtained in traditional simulation methods.
[0102] S4, based on the results of virtual energy compensation, generates a corrected energy flow map.
[0103] It is important to note that after completing the virtual energy compensation in step S3, it is necessary to accurately extract the additional energy consumption introduced by the compensation operation from the simulation output and distinguish it from the original baseline energy consumption of the node. This is crucial for accurately integrating the compensation effect into the total production line energy consumption simulation result in step S5. If the compensated simulation energy consumption data is used directly without differentiation, it will be impossible to distinguish which part belongs to the original simulation prediction and which part belongs to the newly introduced energy consumption through virtual compensation, resulting in a lack of accurate input basis for subsequent replacement operations. This step accurately extracts the compensated energy consumption component of each target process node by comparing the set of super-mean pixels in the simulation energy consumption images before and after compensation, providing quantitative data for direct replacement in step S5.
[0104] In some embodiments, step S4 includes steps S41 to S45: Step S41: Collect the simulated energy consumption data of each target process node before and after the virtual energy compensation is executed, and render it to the corresponding node area in the production line layout image to obtain the energy consumption image before compensation and the energy consumption image after compensation.
[0105] The number of pixels occupied by each target process node region in the production line layout image is the node region pixel area. The node region pixel area is determined by the fixed geometric properties of the production line layout image and corresponds to the physical footprint of each node device. It does not change with the production line operating status and will be called in the alternative decision in step S5.
[0106] It should be noted that the simulated energy consumption data includes two parts: the simulated energy consumption data of each target process node before virtual energy compensation is executed, and the simulated energy consumption data of each target process node after execution. The former is called the simulated energy consumption data before compensation, and the latter is called the simulated energy consumption data after compensation. The two sets of simulated energy consumption data are rendered onto the node regions corresponding to each target process node in the production line layout image, and the rendering method is the same as in step S21. The pixel intensity value of the node region reflects the magnitude of the corresponding simulated energy consumption data, thus obtaining the energy consumption image before compensation and the energy consumption image after compensation, respectively.
[0107] Step S42: In the energy consumption image before compensation, count the pixels whose pixel intensity exceeds the average pixel intensity of the node region in each target process node region, and obtain the set of pixels with higher than average pixel intensity before compensation for each node.
[0108] Step S43: In the compensated energy consumption image, count the pixels whose pixel intensity exceeds the average pixel intensity of the node region within each target process node region, and obtain the set of compensated super-average pixels for each node.
[0109] It should be noted that the average pixel intensity of the node region is the result of averaging the pixel intensity of all pixels within each target process node region. The average pixel intensity of the node region itself is used as a reference because the physical size and energy consumption of each node are different. Using a uniform external threshold as the basis for judging the over-limit cannot adapt to the differences in magnitude between different nodes. However, by using the average pixel intensity of the node region itself as a reference, the higher part of each node within its own magnitude range can be accurately extracted, avoiding the error caused by the difference in magnitude across nodes.
[0110] Understandably, each target process node region in the energy consumption image before and after compensation is scanned pixel by pixel, and pixels whose pixel intensity exceeds the average pixel intensity of the corresponding node region are classified into the corresponding set of super-average pixels, thus obtaining the set of super-average pixels before compensation and the set of super-average pixels after compensation for each node.
[0111] Step S44: The total pixel intensity of the newly added pixels in the super-average pixel set after compensation of each target process node compared with the super-average pixel set before compensation is used as the compensation energy consumption component of the target process node.
[0112] Understandably, for each target process node, the set of pixels exceeding the average value after compensation is compared with the set of pixels exceeding the average value before compensation, based on the position coordinates of the pixels in the production line layout image. Pixels whose position coordinates appear in the set of pixels exceeding the average value after compensation but not in the set of pixels exceeding the average value before compensation are identified as new pixels. The pixel intensities of all new pixels are accumulated to obtain the compensated energy consumption component for that target process node. Using position coordinates as the matching basis can exclude pixels that were already in an exceeding-average state before compensation, ensuring that the compensated energy consumption component only includes the additional energy consumption newly introduced by the virtual energy compensation operation, and does not repeatedly include the exceeding-average energy consumption that already existed before compensation.
[0113] The total pixel intensity of the newly added pixels constitutes the compensation energy consumption component. At the same time, the number of newly added pixels serves as an additional attribute reflecting the influence range of virtual compensation at the image level. Both are recorded in the compensation results of each target process node for use in the classification and judgment of compensation identifiers in step S45.
[0114] Step S45: Based on the compensated energy consumption component and the compensated simulated energy consumption data in the simulated energy consumption data, generate a corrected energy consumption flow map.
[0115] In some embodiments, step S45 includes steps S451 to S453: Step S451: When it is determined that the number of newly added pixels corresponding to the compensated energy consumption component exceeds the average number of newly added pixels of each target process node in the blocked energy consumption path, mark the target process node with an over-compensation flag in the corrected energy consumption flow graph.
[0116] Step S452: When it is determined that the number of newly added pixels corresponding to the compensated energy consumption component does not exceed the average number of newly added pixels of each target process node in the blocked energy consumption path, mark the target process node with a normal compensation identifier in the corrected energy consumption flow graph.
[0117] It should be noted that the branches of steps S451 and S452 are divided by the number of newly added pixels exceeding or not exceeding the average number of newly added pixels. When the number of newly added pixels is exactly equal to the average, it is classified as normal compensation. The number not exceeding is treated as the lower boundary of the closed interval. When the number of newly added pixels of a target process node is zero, it means that the virtual energy compensation has not introduced any extra energy consumption pixels exceeding the average at this node. The corresponding compensation energy consumption component is zero. This node is still classified as normal compensation, and the zero-value compensation energy consumption component is recorded when writing the corrected energy consumption flow map. This indicates that the virtual energy compensation effect of this node has not produced a measurable change at the image level, which is used to identify and skip this node during the replacement operation in the subsequent step S5.
[0118] The number of newly added pixels reflects the influence range of virtual energy compensation in the image region of each node. The more pixels added, the wider the coverage of the compensation effect at the image level, and the greater the compensation magnitude for that node. By using the average number of newly added pixels at each node within the path as a reference, it is possible to identify which nodes have compensation magnitudes exceeding the overall average level of the path. The average value is calculated from the number of newly added pixels at all target process nodes in the energy consumption retardation path, and is entirely based on the data of this compensation task itself, without relying on external preset parameters.
[0119] Nodes marked with an over-compensation flag indicate that the additional energy consumption introduced by virtual energy compensation is relatively high relative to the overall path at that node. When performing the substitution operation in step S5, it is necessary to pay attention to whether the compensated energy consumption component at that node accurately reflects the actual demand. Nodes marked with a normal compensation flag indicate that the compensation magnitude is at a reasonable level for the overall path, and the compensation result can be directly used for substitution operations. This classification and marking provides additional quality labeling information for substitution decisions when multiple nodes coexist in subsequent step S5.
[0120] Step S453: Based on the over-compensation flag or normal compensation flag of each target process node, write the compensation energy consumption component into the corresponding node position of the corrected energy consumption flow graph to generate the corrected energy consumption flow graph.
[0121] Understandably, based on the node identifier of each target process node, the compensation energy consumption component and the corresponding over-compensation identifier or normal compensation identifier are written into the corresponding node position of the corrected energy consumption flow map, thus obtaining the corrected energy consumption flow map that records the compensation energy consumption distribution and compensation quality label of each target process node.
[0122] Through steps S41 to S45, the corrected energy flow map records the actual additional energy consumption distribution introduced by each target process node after virtual energy compensation. The extraction of the compensation energy consumption component is based on the difference between the set of super-mean pixels in the images before and after compensation, which accurately distinguishes the original simulation prediction part from the compensation-introduced part. This provides a reliable quantitative input for the precise substitution operation in step S5 and avoids inaccurate simulation results caused by the overlap of compensation effect and original prediction value.
[0123] S5 replaces the predicted energy consumption component of the corresponding time node in the total energy consumption simulation result of the production line with the compensated energy consumption component of each target process node in the corrected energy consumption flow graph, and outputs the total energy consumption simulation result of the production line.
[0124] It should be noted that in traditional energy efficiency simulation methods, when an energy deficit is identified at a node, compensation is usually directly added to the original simulated energy consumption data. This approach accumulates the original predicted value and the compensation value, resulting in the energy consumption value at the same time point in the simulation output containing the superposition of two calculations. This violates the principle of energy conservation and may lead to an artificially inflated total energy consumption in the simulation. This step replaces the original predicted energy consumption component with the compensated energy consumption component, rather than adding them together. This ensures that the simulated energy consumption value at each time point uniquely corresponds to the state after virtual compensation and calibration, guaranteeing that the simulation results are physically self-consistent.
[0125] In some embodiments, step S5 includes steps S51 and S52: Step S51: Based on the time markers corresponding to each compensated energy consumption component in the corrected energy consumption flow graph, align each compensated energy consumption component to the corresponding time node of the simulation result of the total energy consumption of the production line.
[0126] It should be noted that the time stamps are the time positioning information corresponding to each compensated energy consumption component in the corrected energy consumption flow graph. They record the simulation time when each target process node completes virtual energy compensation and are obtained from the simulation timing data of the digital twin model. Using the time stamps as the alignment basis, each compensated energy consumption component is precisely associated with the corresponding time node in the simulation result of the total energy consumption of the production line, ensuring that the substitution operation is performed at the correct time position.
[0127] Step S52: Replace the predicted energy consumption components at the corresponding time nodes with the aligned and compensated energy consumption components, and output the simulation results of the total energy consumption of the production line.
[0128] In some embodiments, step S52 includes steps S521 to S523: Step S521: When it is determined that there are multiple compensated energy consumption components at the corresponding time node, extract the node region pixel area of the target process node region corresponding to each compensated energy consumption component, use the ratio of each compensated energy consumption component to the corresponding node region pixel area as the unit area compensation intensity, and replace the predicted energy consumption component of the corresponding time node with the compensated energy consumption component with the largest unit area compensation intensity.
[0129] It is important to note that the pixel area of the node region is a fixed number of pixels in the target process node region of the production line layout image. It is determined by the physical footprint of each process node device when the production line layout image is drawn. Each process node occupies at least one pixel in the production line layout image. The pixel area of the node region must be a positive integer and cannot be zero. Therefore, the calculation of the unit area compensation intensity by the ratio of the compensated energy consumption component to the pixel area of the node region is always numerically defined and will not result in a division by zero.
[0130] Step S522: When it is determined that there is a unique compensated energy consumption component at the corresponding time node, the compensated energy consumption component replaces the predicted energy consumption component at the corresponding time node.
[0131] Step S523: Based on the compensated energy consumption components after substitution at each corresponding time node, output the simulation results of the total energy consumption of the production line.
[0132] It should be noted that the branch design of steps S521 and S522 is based on the following: when multiple compensated energy consumption components correspond to the same time node, it indicates that multiple target process nodes in the digital twin model have simultaneously completed virtual energy compensation at that simulation moment, and the compensated energy consumption components of each node are aligned to that time node. If one component is arbitrarily selected for replacement, the replacement value may not accurately reflect the overall compensation effect of the production line at that moment because a node component with a large physical footprint but low energy density per unit area is selected.
[0133] The pixel area of a node region is a fixed number of pixels in the target process node region of the production line layout image. It directly reflects the physical footprint of the corresponding process node equipment, is obtained from the geometric attributes of the production line layout image, and does not change with the operating state. Using the ratio of each compensated energy consumption component to the pixel area of the corresponding node region as the unit area compensation intensity allows for comparison of the compensated energy consumption density of each node per unit physical footprint, excluding the influence of differences in node physical dimensions. The node with the highest unit area compensation intensity indicates that it bears the highest compensated energy consumption load under the same physical conditions, and has the greatest unit impact on the simulation results of the total energy consumption of the production line. Replacing the predicted energy consumption component with its compensated energy consumption component most accurately reflects the most representative compensation state at that moment.
[0134] When there is only one compensated energy consumption component at the corresponding time node, there is no selection problem. The predicted energy consumption component at the corresponding time node is directly replaced by the unique compensated energy consumption component.
[0135] After the replacement of each time node is completed, the predicted energy consumption component in each corresponding time node is replaced with the compensated energy consumption component after virtual compensation calibration. The energy consumption components after the replacement of all time nodes are summarized, and the simulation result of the total energy consumption of the production line is output.
[0136] Through steps S51 and S52, the virtual compensation results are integrated into the total energy consumption simulation results of the production line in a substitution rather than superposition manner, ensuring the physical self-consistency of the simulation output. When multiple compensation components coexist, the pixel area of the node region is used as the normalization basis, linking the selection of substitution values to the physical properties of the nodes, avoiding substitution errors caused by differences in node size, and enabling the total energy consumption simulation results of the production line to accurately reflect the actual energy flow state of the production line after virtual energy compensation calibration.
[0137] Based on the above steps, this application also includes the following embodiments: See Figure 3 This is a timing diagram of the industrial process energy efficiency simulation system provided in the embodiments of this application, including: The link construction module is used to determine the environmental transmission links between process nodes by parsing the first operating data of each process node in the target production line. The path identification module is used to identify energy-consuming obstructions in the environmental transmission link based on the second operating data of each process node. The compensation execution module is used to generate environmental energy compensation data based on the blocked energy consumption path. When the environmental energy compensation data indicates that the target process node meets the energy compensation requirements, it outputs a virtual activation command in the digital twin model and executes virtual energy compensation. The map generation module is used to generate a corrected energy flow map based on the results of virtual energy compensation. The simulation output module is used to replace the predicted energy consumption components of the corresponding time nodes in the total energy consumption simulation results of the production line with the compensated energy consumption components of each target process node in the corrected energy consumption flow graph, and output the total energy consumption simulation results of the production line.
[0138] The industrial process energy efficiency simulation system provided in this application embodiment can be used to execute... Figure 1 The steps in the method embodiments shown are implemented in a similar manner and have similar technical effects, and will not be repeated here.
[0139] See Figure 4 This is a schematic diagram of the hardware structure of an electronic device provided in an embodiment of this application. The electronic device 40 includes: a processor 41, a memory 42, and a computer program; wherein, The memory 42 is used to store the computer program, and the memory may also be flash memory. The computer program is, for example, an application program or functional module that implements the above method.
[0140] The processor 41 is configured to execute the computer program stored in the memory to implement the various steps performed by the device in the above method. For details, please refer to the relevant descriptions in the preceding method embodiments.
[0141] Alternatively, the memory 42 can be either standalone or integrated with the processor 41.
[0142] When the memory 42 is a device independent of the processor 41, the device may further include: Bus 43 is used to connect the memory 42 and the processor 41.
[0143] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of this application, and are not intended to limit them. Although this application has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some or all of the technical features therein. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of this application.
Claims
1. An industrial process energy efficiency simulation method, characterized in that, include: By analyzing the first operating data of each process node in the target production line, the environmental transmission links between each process node are determined. Based on the second operating data of each process node, identify the energy-consuming obstruction path in the environmental transmission link; Based on the blocked energy consumption path, environmental energy compensation data is generated. In response to the environmental energy compensation data indicating that the target process node meets the energy compensation requirements, a virtual activation command is output in the digital twin model and virtual energy compensation is executed. Based on the results of the virtual energy compensation, a corrected energy flow map is generated; The compensated energy consumption components of each target process node in the corrected energy consumption flow graph are used to replace the predicted energy consumption components of the corresponding time nodes in the total energy consumption simulation results of the production line, and the total energy consumption simulation results of the production line are output.
2. The method according to claim 1, characterized in that, The step of generating environmental energy compensation data based on the blocked energy consumption path, and responding to the environmental energy compensation data indicating that the target process node meets the energy compensation requirements, outputting a virtual activation command in the digital twin model and executing virtual energy compensation, includes: Based on the energy deficit magnitude of each process node in the energy-depletion path, generate initial energy compensation data for each process node. Based on the link transmission coefficient between each process node in the energy consumption obstruction path, the initial energy compensation data is corrected by path transmission to obtain the environmental energy compensation data. When the environmental energy compensation data indicates that the target process node meets the energy compensation requirements, the virtual activation command carrying the node identifier of the target process node and the corresponding energy compensation level is output in the digital twin model. According to the virtual activation instruction, the virtual energy compensation is performed on the target process node in the digital twin model.
3. The method according to claim 2, characterized in that, The initial energy compensation data is corrected based on the link transmission coefficients between process nodes in the energy-delaying path to obtain the environmental energy compensation data, including: Based on the link transmission coefficient between each adjacent process node in the energy-consuming blocking path, determine the path transmission amount to the downstream process node and the node self-consumption amount consumed on the transmission path during the corresponding transmission process. When it is determined that the path transmission amount is greater than the node self-consumption amount, the initial energy compensation data is corrected based on the path transmission amount and the node self-consumption amount to obtain the environmental energy compensation data. When it is determined that the path transmission amount is not greater than the node self-consumption amount, the transmission amount of the blocking energy consumption path at the corresponding node is set to zero, and the initial energy compensation data set to zero is used as the environmental energy compensation data.
4. The method according to claim 2, characterized in that, When the environmental energy compensation data indicates that the target process node meets the energy compensation requirements, the virtual activation command carrying the node identifier of the target process node and the corresponding energy compensation level is output in the digital twin model, including: Based on the energy deficit level corresponding to each target process node in the environmental energy compensation data, the compensation activation priority of each target process node is determined. The node identifiers of each target process node are sorted according to the compensation activation priority, and the virtual activation instructions corresponding to each target process node are output sequentially in the digital twin model according to the sorting results.
5. The method according to claim 4, characterized in that, The step of determining the compensation activation priority of each target process node based on the energy deficit level corresponding to each target process node in the environmental energy compensation data includes: The average energy gap magnitude is obtained based on the average energy gap magnitude of each target process node. When the energy gap magnitude is determined to exceed the average gap magnitude, the corresponding target process node is marked as a high-priority compensation node; When it is determined that the energy gap level does not exceed the average gap level, the corresponding target process node is marked as a standard priority compensation node; The compensation activation priority is obtained based on the marking results of the high-priority compensation node and the standard-priority compensation node.
6. The method according to claim 1, characterized in that, The identification of energy-consuming obstructions in the environmental transmission link based on the second operating data of each process node includes: The node energy consumption status in the second operating data of each process node is rendered to the corresponding node area in the production line layout image, as well as the pipeline pixel area between each node area, to obtain the production line energy consumption image. In the production line energy consumption image, for each pipeline pixel region corresponding to each environmental transmission link, the pixel points in each pipeline pixel region whose pixel intensity exceeds the average pixel intensity of the starting node region connected to the pipeline pixel region are counted to obtain the set of high energy consumption pixels for each pipeline segment. When it is determined that there are pixels in each set of pixels with high energy consumption that are continuously arranged along the width of the pipeline and penetrate the width of the pipeline pixel region, the corresponding link segment is marked as a candidate blocking path; When it is determined that there are no pixels in each set of pixels with high energy consumption that are continuously arranged along the width of the pipeline and penetrate the width of the pixel region of the pipeline, the corresponding link segment is marked as a normal transmission path; Based on the upstream and downstream positional relationship of the candidate blocking paths in the environmental transmission link, the blocking energy consumption path is determined.
7. The method according to claim 6, characterized in that, The step of determining the energy-consuming obstruction path based on the upstream and downstream positional relationship of the candidate obstruction path in the environmental transmission link includes: Extract the pixel path corresponding to the candidate obstruction path from the energy consumption image of the production line, and obtain the total pixel length of the pixel path and the single-segment pixel length of each pipeline segment; Based on the correspondence between the total pixel length and the single pixel length, the path traversal attribute of the candidate blocking path is determined; Based on the path traversal attribute, the candidate blocking path is determined as the blocking energy consumption path; The path traversal attributes include at least single-segment blocking attributes and cross-node blocking attributes. The single-segment blocking attribute characterizes the state where the candidate blocking path only crosses one segment of the pipeline when the total pixel length is equal to the single-segment pixel length. The cross-node blocking attribute represents the state where the candidate blocking path crosses multiple pipeline segments and carries the node identifiers of each intermediate process node when the total pixel length is greater than the single-segment pixel length.
8. The method according to claim 1, characterized in that, The step of determining the environmental transmission links between process nodes by analyzing the first operating data of each process node in the target production line includes: Analyze the first operating data of each process node and extract the environmental parameter transmission relationship between each process node; Based on the environmental parameter transmission relationship, a node association matrix is constructed between each of the process nodes; The environmental transmission link is determined based on the association strength between each pair of nodes in the node association matrix.
9. The method according to claim 1, characterized in that, The step of generating a corrected energy flow map based on the results of the virtual energy compensation includes: The simulated energy consumption data of each target process node before and after the virtual energy compensation is executed are collected and rendered to the corresponding node area in the production line layout image to obtain the energy consumption image before compensation and the energy consumption image after compensation. In the energy consumption image before compensation, the pixels whose pixel intensity exceeds the average pixel intensity of the node region within each target process node region are counted to obtain the set of pixels with higher than average pixel intensity before compensation for each node. In the compensated energy consumption image, the pixels whose pixel intensity exceeds the average pixel intensity of the node region within each target process node region are counted to obtain the set of compensated super-average pixels for each node. The total pixel intensity of the newly added pixels in the compensated super-average pixel set of each target process node compared to the uncompensated super-average pixel set is taken as the compensation energy consumption component of the target process node. The corrected energy flow map is generated based on the compensated energy consumption component and the compensated simulated energy consumption data in the simulated energy consumption data.
10. The method according to claim 1, characterized in that, The step of replacing the predicted energy consumption component of the corresponding time node in the total production line energy consumption simulation result with the compensated energy consumption component of each target process node in the corrected energy consumption flow map, and outputting the total production line energy consumption simulation result, includes: Based on the time markers corresponding to each of the compensated energy consumption components in the corrected energy consumption flow graph, each of the compensated energy consumption components is aligned to the corresponding time node of the production line total energy consumption simulation result; The corresponding time node's predicted energy consumption component is replaced by each of the aligned and compensated energy consumption components, and the simulation result of the total energy consumption of the production line is output.
11. The method according to claim 9, characterized in that, The step of generating the corrected energy flow map based on the compensated energy consumption component and the compensated simulated energy consumption data in the simulated energy consumption data includes: When the number of newly added pixels corresponding to the compensated energy consumption component exceeds the average number of newly added pixels of each target process node in the blocked energy consumption path, the target process node is marked with an overcompensation flag in the corrected energy consumption flow graph. When the number of newly added pixels corresponding to the compensated energy consumption component does not exceed the average number of newly added pixels of each target process node in the blocked energy consumption path, the target process node is marked with a normal compensation identifier in the corrected energy consumption flow graph. Based on the over-compensation identifier or normal compensation identifier of each target process node, the compensated energy consumption component is written into the corresponding node position of the corrected energy consumption flow graph to generate the corrected energy consumption flow graph.
12. The method according to claim 10, characterized in that, The step of replacing the predicted energy consumption components at the corresponding time nodes with the aligned and compensated energy consumption components, and outputting the simulation results of the total energy consumption of the production line, includes: When it is determined that there are multiple compensated energy consumption components at the corresponding time node, the pixel area of the node region corresponding to each compensated energy consumption component is extracted. The ratio of each compensated energy consumption component to the pixel area of the corresponding node region is used as the unit area compensation intensity. The compensated energy consumption component with the largest unit area compensation intensity is used to replace the predicted energy consumption component of the corresponding time node. When it is determined that there is a unique compensated energy consumption component at the corresponding time node, the compensated energy consumption component replaces the predicted energy consumption component at the corresponding time node. Based on the compensated energy consumption components after substitution at each corresponding time point, the simulation results of the total energy consumption of the production line are output.
13. An industrial process energy efficiency simulation system, employing the industrial process energy efficiency simulation method as described in any one of claims 1 to 12, characterized in that, include: The link construction module is used to determine the environmental transmission links between each process node by parsing the first operating data of each process node in the target production line. The path identification module is used to identify the energy-consuming obstruction paths in the environmental transmission link based on the second operating data of each process node. The compensation execution module is used to generate environmental energy compensation data based on the blocked energy consumption path, and in response to the environmental energy compensation data indicating that the target process node meets the energy compensation requirements, outputs a virtual activation command in the digital twin model and executes virtual energy compensation. The map generation module is used to generate a corrected energy flow map based on the results of the virtual energy compensation. The simulation output module is used to replace the predicted energy consumption component of the corresponding time node in the total energy consumption simulation result of the production line with the compensated energy consumption component of each target process node in the corrected energy consumption flow graph, and output the total energy consumption simulation result of the production line.