A cold-heat-power optimal scheduling method and system based on an improved grey goose optimization algorithm

By improving the gray goose optimization algorithm and the heat and power load balancing operation strategy, the problems of heat and power load imbalance and energy supply fluctuation in the combined cooling, heating and power system were solved, and the system was optimized for efficient, economical and environmentally friendly scheduling.

CN123070543APending Publication Date: 2026-11-10HUNAN UNIV OF TECH
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202611166028.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-03
Publication Date
2026-11-10

AI Technical Summary

Technical Problem

Existing combined cooling, heating and power (CCHP) systems do not adequately consider the imbalance between cooling, heating and power loads and fluctuations in energy supply, resulting in waste of excess heat or gaps in heating and cooling supply, making it difficult to guarantee the stability and economy of energy supply.

Method used

An improved grey goose optimization algorithm is adopted, combined with chaotic sequence initialization, adaptive parameter adjustment and differential evolution mutation mechanism, to construct a multi-energy complementary combined cooling, heating and power system architecture. Through the heat and power load balance operation strategy and energy storage penalty cost optimization scheduling, dynamic matching of electric and heat loads and cascade utilization of waste heat are realized.

Benefits of technology

It improves the system's energy efficiency and economy, reduces operating costs and pollutant emissions, enhances the system's stability and adaptability, and is suitable for actual engineering scheduling.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123070543A_ABST
    Figure CN123070543A_ABST
Patent Text Reader

Abstract

The application discloses a cold-heat-power optimization scheduling method and system based on an improved grey goose optimization algorithm, proposes an improved heat and power load balance operation strategy, establishes a multi-energy complementary combined heat and power optimization scheduling model (MEC-CCHP), and solves the model by using an improved grey goose optimization algorithm (MGGO) which fuses a chaotic sequence and a differential variation mechanism; the proposed operation strategy comprehensively considers factors such as price difference and heat storage energy penalty cost. The application can effectively reduce system operation cost and pollutant emission under multiple constraints, and further improves the economy and environmental protection of the system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of combined cooling, heating, and power (CCHP) system optimization technology, and specifically relates to a method for optimizing the scheduling of CCHP based on an improved grey goose optimization algorithm. It also relates to a CCHP optimization scheduling system. Background Technology

[0002] With rapid global population growth and rising living standards, energy demand continues to increase. Meanwhile, environmental pollution and energy shortages have become major challenges of widespread global concern. Against the backdrop of energy transition, the field of new energy power generation has ushered in unprecedented development opportunities. Combined Cooling, Heating, and Power (CCHP) systems integrate cooling, heating, and power generation, significantly improving primary energy efficiency through energy cascade utilization.

[0003] To date, many scholars both domestically and internationally have conducted research on the optimization of CCHP operation. Economic dispatch models for combined cooling, heating, and power (CCHP) microgrids have been constructed from different perspectives, including source-load uncertainty, energy storage complementarity, and carbon trading costs. In 2020, Diao Hanbin et al., in the Journal of Electrical Engineering, proposed an optimization dispatch method for integrated energy systems with energy storage, focusing on the complementary coordination of electricity and thermal energy storage. The coordinated operation of electricity and thermal energy storage effectively absorbs abandoned renewable energy and reduces peak electricity loads, achieving complementary advantages in multi-energy storage.

[0004] The optimal scheduling of combined cooling, heating, and power (CCHP) systems exhibits typical nonlinear characteristics, and various intelligent algorithms have been applied in existing economic optimization scheduling research to address this issue. In 2021, Yao Zhili et al. proposed a network layout and pipeline diameter optimization model based on the Prim algorithm in the Journal of Electrical Engineering, improving the utilization rate of equipment and pipelines and the economic efficiency of regional CCHP systems. In 2024, Chen Cheng et al. used an improved NSGA-II algorithm in Energy Storage Science and Technology to optimize the energy management strategy of CCHP systems, significantly reducing annual operating costs and total annual energy consumption. Also in 2024, Bao Zhe et al. established a flexible operation optimization simulation model for CCHP systems considering thermoelectric decoupling technology based on the BP neural network algorithm in the Journal of System Simulation, effectively addressing the dynamic changes in load-side energy demand and improving the system's economic efficiency. In 2021, Li Jian et al. proposed a sorting crossover optimization algorithm and an improved sparrow search algorithm for optimal scheduling of the output of each unit in their article on power system protection and control. The above literature mainly focuses on the uncertainty of source and load and economic dispatch of CCHP systems, but it gives less consideration to the imbalance of cooling, heating and power load matching and energy supply fluctuations.

[0005] Patent application CN116384584A discloses a multi-objective optimization configuration method for a combined cooling, heating, and power (CCHP) system containing renewable energy, comprising the following steps: establishing a mathematical model of the CCHP system containing renewable energy; constructing the objective function for the multi-objective optimization configuration problem of the CCHP system and determining the decision variables of the optimization problem; determining the constraints of the multi-objective optimization of the CCHP system; adopting an improved power-to-heat strategy as the operating strategy of the CCHP system; using an improved multi-objective snake optimization algorithm to perform multi-objective optimization of the CCHP system; selecting the optimal configuration scheme through the superior-inferior solution distance method; and displaying the optimization results of the CCHP system after multi-objective optimization. The waste heat utilization path of this patent is "high-temperature flue gas from a micro gas turbine → waste heat recovery device → heating or driving absorption refrigeration". It does not set up an organic Rankine cycle (ORC) unit to recover the waste heat of medium and low temperature flue gas for secondary power generation. The remaining low-grade heat energy after heat exchange is directly emitted and cannot be converted into high-grade electricity to supplement the power load gap. The optimization objectives of this patent only include three items: economic cost, energy consumption, and carbon dioxide emissions. There are obvious deficiencies in cost and environmental accounting. Summary of the Invention

[0006] This invention addresses the shortcomings of existing technologies in cogeneration systems, which often lack sufficient consideration for imbalances in load matching and energy supply fluctuations. Furthermore, due to the "thermoelectric coupling" characteristics of gas turbines, the dynamic demands of electrical load and heat / cooling loads are difficult to synchronize in real time, leading to problems such as waste of excess heat or failure to promptly fill heating / cooling gaps during operation. This reduces energy efficiency and makes it difficult to ensure the stability and economy of energy supply. The invention proposes a cogeneration optimization scheduling method and system based on an improved grey goose optimization algorithm.

[0007] A method for optimal scheduling of cold, heat, and electricity based on an improved grey goose optimization algorithm includes the following steps: S1. Construct a multi-energy complementary combined cooling, heating and power (CCHP) system architecture and establish a mathematical model for the output of core equipment; the CCHP system architecture includes a power generation unit, a cooling unit, and a heating unit. The power generation unit includes a gas turbine, photovoltaic power generation equipment, wind power generation equipment, an organic Rankine cycle unit, and an electric energy storage device. The cooling unit includes an absorption chiller unit and a heat pump unit. The heating unit includes a waste heat recovery device connected to the gas turbine, a heat exchange device, a gas boiler, a heat pump unit, and a thermal energy storage device. The output mathematical models of the core equipment include a wind power output power model, a photovoltaic power output power model, and a gas turbine output power model; wherein, the expression for the wind power output power model is:

[0008] In the above formula, the for tWind power output at all times; They are respectively t Real-time wind speed, cut-in wind speed, cut-out wind speed, and rated wind speed; This refers to the rated output power of the fan. The expression for the photovoltaic output power model is:

[0009] In the above formula, the for t The power output of the photovoltaic module at any given time; The radiant power of the incident light; This refers to the rated power of the photovoltaic module under standard conditions. This is the power reduction factor for photovoltaic modules; The temperature coefficient of a photovoltaic module; This represents the battery temperature during actual operation. This refers to the battery temperature during standard testing. The expression for the gas turbine output model is as follows:

[0010]

[0011] In the above formula, the This refers to the amount of heat recovered from the gas turbine. For the efficiency of the waste heat recovery device, For the power generation of gas turbines; This refers to the natural gas consumption of the gas turbine. For gas turbine power generation efficiency; S2. Construct an optimization scheduling objective function that includes the penalty cost of thermal energy storage, with the goal of minimizing the total operating cost within the system scheduling cycle. The expression of the objective function is as follows:

[0012] In the above formula, the For operating energy consumption costs; , These are operating and maintenance costs and pollution control expenses; Costs associated with interacting with the power grid; This represents the equivalent annualized investment cost of energy storage equipment. Penalty costs for thermal energy storage; S3. Set system operation constraints, which include at least power balance constraints, energy storage constraints, heat and cold load balance constraints, grid exchange power constraints, and upper and lower limits of output of each device. S4. Based on the matching relationship between the gas turbine output range and the electrical and thermal loads, implement an improved thermoelectric load balance operation strategy and adjust the output distribution and energy flow of each device according to the operating conditions. S5. An improved grey goose optimization algorithm, which integrates chaotic sequence initialization, adaptive parameter adjustment and differential evolution mutation mechanism, is used to iteratively optimize the objective function under the constraints and output the optimal power scheduling scheme for each device in the system.

[0013] Furthermore, in step S2, the thermal energy storage penalty cost is used to quantify the waste heat utilization efficiency loss, additional costs due to the mismatch between cooling and heating supply and demand, and the energy quality breach loss caused by the deviation of the heat load from the preset standard value. Its calculation formula is as follows:

[0014] In the above formula, the This is the penalty coefficient; A standard line is preset for the heat load; This represents the actual heat load value of the system during time period t. The power of the thermal energy storage device during time period t is taken as a positive value for the heat storage condition and a negative value for the heat release condition.

[0015] Furthermore, in step S2, the formula for calculating the pollutant treatment cost is as follows:

[0016]

[0017] In the above formula, the and These represent the unit treatment cost of pollutants and the emission volume of polluting gases, respectively; k indicates the distinction between polluting gases. , , ; This represents the emission coefficient of pollutant gas k generated by the power grid; , Polluting gases are generated by gas turbines and gas boilers, respectively. k The emission coefficient; The formula for calculating the equivalent annualized investment cost of the energy storage equipment is as follows:

[0018] In the above formula, the The annualized cost of the initial investment; Cost of equipment depreciation over its annual lifespan; This refers to the initial purchase cost; The benchmark rate of return; For service life; Cost of annual lifespan decay; This represents the annual attenuation coefficient of the equipment.

[0019] Furthermore, in step S3, the power balance constraint satisfies the following formula:

[0020] In the above formula, the , To purchase and sell electricity from the power grid; For user electrical load; , These refer to the electrical power released and stored by the energy storage power station, respectively. For the power generation of gas turbines; For photovoltaic output power, This refers to the output power of wind power. Power generation of the organic Rankine cycle unit; The heat pump unit consumes electrical power.

[0021] Furthermore, in step S3, the expression for the energy storage constraint is as follows:

[0022] In the above formula, the , They are respectively k The maximum and minimum allowable capacity of the equipment; the expression for the thermal and cold balance constraints is:

[0023]

[0024]

[0025] In the above formula, the , These are the user's cooling load and the cooling capacity of the heat pump unit, respectively. , These are the user's heat load and the heat pump unit's heating power, respectively; the expression for the exchange power constraint is:

[0026]

[0027] In the above formula, the , These are the minimum and maximum power purchase capacities, respectively. , These represent the upper and lower limits of the gradient rate within any given time period; the expressions for the upper and lower limits of the system equipment output constraints are as follows:

[0028] In the above formula, the , They are respectively r The upper and lower limits of the equipment's output.

[0029] Furthermore, in step S5, the improved grey goose optimization algorithm dynamically adjusts the population ratio of the exploration group and the development group through the fitness improvement rate to balance global exploration and local development capabilities, including the following steps: S51. Initialize the upper and lower limits of output of each device in the flock, and input the system equipment operating parameters and basic data of wind, solar and load. S52. Set the flock size and number of iterations, initialize the population using a Logistic chaotic sequence, and divide the population into an explorer group and a developer group, with the following mapping relationship:

[0030] In the above formula, the These are the control parameters for the Logistic mapping; S53. Input the cooling, heating and power load demand of the multi-energy complementary combined cooling, heating and power (MEC-CCHP) system, optimize the load demand based on the time-of-use electricity price and the penalty cost of thermal energy storage; then optimize the output of each unit of the MEC-CCHP system according to the cooling, heating and power load demand and the heat and power load balance operation strategy. S54. Calculate the operating cost of the MEC-CCHP system based on the objective function, evaluate the fitness of greylag geese, and select the leader goose and sentinel. S55. Determine if the maximum number of iterations has been reached. If it is, output the optimal solution. If not, continue solving. S56. The sizes of the exploration group and the development group are dynamically adjusted based on the fitness improvement rate. The calculation formulas for the fitness improvement rate and the dynamic parameters are as follows:

[0031]

[0032]

[0033] In the above formula, the For the fitness improvement rate; and These are the historical best solution and the current best solution; , To dynamically update parameters; S57. Introduce a differential evolution hybrid mutation strategy: randomly select three distinct individuals from the current population, generate a mutation vector, and use a greedy strategy to select the optimal solution. The expression is:

[0034] In the above formula, It is a variant solution; , , These are three different individuals randomly selected from the population; It is the scaling factor; then return to step S54 to continue the loop; S58. Using the leading goose as the center, conduct a small-scale local search in its vicinity, then use a greedy strategy to obtain a new solution. Compare this new solution with the historical best solution and output the optimal solution.

[0035] Furthermore, in step S4, the improved thermoelectric load balancing operation strategy is divided into five operating conditions based on the matching relationship between the gas turbine output range and the electrical and thermal loads: Operating Condition 1: The aforementioned When the user's electrical load is less than the minimum output of the gas turbine, the gas turbine is shut down, and the electricity demand is supplied by the electric energy storage power station and the power grid, while the heat demand is supplied by the thermal energy storage device and the gas boiler. Operating Condition 2: The aforementioned , When the user's electrical load is between the minimum and maximum output of the gas turbine and the heat load is less than the minimum recoverable heat of the gas turbine, the gas turbine operates at the minimum load rate. The insufficient electrical load is provided by the energy storage power station or the power grid, and the excess heat generated by the gas turbine is stored in the thermal energy storage device. Operating Condition 3: The aforementioned , When the user's electrical load is between the minimum and maximum output of the gas turbine and the thermal load is between the minimum and maximum recoverable heat of the gas turbine, the insufficient electrical energy is supplemented by the organic Rankine cycle unit, the electric energy storage power station or the power grid, and the excess electrical energy drives the heat pump unit to generate heat; the excess heat energy is input into the organic Rankine cycle unit and converted into electrical energy, and the insufficient heat energy is supplemented by the thermal energy storage device and the gas boiler. , These are the minimum and maximum power outputs of the gas turbine when it operates at 25% of its rated load, respectively. To meet the combined needs of heating and cooling loads; , The minimum and maximum heat recoverable by a gas turbine when it is running at 25% of its rated load; Operating Condition 4: The aforementioned , When the user's electrical load is greater than the maximum output of the gas turbine and the thermal load is between the minimum and maximum recoverable heat of the gas turbine, the gas turbine operates at full load. The insufficient electrical energy is supplemented by the organic Rankine cycle unit, the electric energy storage power station or the grid, and the excess thermal energy is converted into electrical energy through the organic Rankine cycle unit. Operating Condition 5: The aforementioned , When the user's electrical load exceeds the maximum output of the gas turbine and the thermal load exceeds the maximum recoverable heat of the gas turbine, the gas turbine operates at full load. The insufficient electrical energy is supplemented by the organic Rankine cycle unit, the electric energy storage power station or the power grid, and the insufficient thermal energy is supplemented by the thermal energy storage device and the gas boiler.

[0036] Furthermore, the flock size is 600, and the maximum number of iterations is 500.

[0037] Furthermore, in step S2, the system operating energy consumption cost The expression is:

[0038] In the formula, , These are the prices for electricity and gas, respectively. The expression for the pollution control cost of the MEC-CCHP system is:

[0039]

[0040] In the formula, and These represent the unit treatment cost of pollutants and the emission volume of polluting gases, respectively; k indicates the distinction between polluting gases. , , ; This represents the emission coefficient of pollutant gas k generated by the power grid; , Polluting gases are generated by gas turbines and gas boilers, respectively. k The emission coefficient.

[0041] A cooling, heating, and power optimization scheduling system based on an improved grey goose optimization algorithm is provided, employing the aforementioned cooling, heating, and power optimization scheduling method based on the improved grey goose optimization algorithm.

[0042] Compared with the prior art, the beneficial effects of the present invention are as follows: 1. This invention proposes an improved thermal power load balancing operation strategy, establishes a multi-energy complementary combined cooling, heating and power (MEC-CCHP) optimal scheduling model, and employs an improved grey goose optimization algorithm that integrates chaotic sequences and differential mutation mechanisms to solve the model. The proposed operation strategy comprehensively considers factors such as electricity price differences and thermal energy storage penalty costs, effectively reducing system operating costs and pollutant emissions under multiple constraints, further improving the system's economic efficiency and environmental friendliness.

[0043] 2. This invention proposes an MGGO algorithm incorporating chaotic initialization, adaptive parameter adjustment, and differential evolution mutation. The algorithm's fitness improvement rate is dynamically and adaptively adjusted according to real-time heating and cooling loads: the search step size is reduced during periods of stable load for refined optimization; the search range is expanded during periods of significant load fluctuations to quickly respond to changes in operating conditions, making it easier to satisfy hard constraints such as heat and power balance and equipment output limits, resulting in higher solution feasibility. Faced with random load disturbances, the improved Grey Goose algorithm exhibits stronger stability and smaller fluctuations compared to the basic Grey Goose algorithm, making it more suitable for practical engineering scheduling. Attached Figure Description

[0044] Figure 1 This is a flowchart of the present invention; Figure 2 This is a flowchart of the MEC-CCHP optimized economic scheduling process based on the MGGO algorithm of this invention. Figure 3 This is a comparison chart of the four algorithms tested in this invention; Figure 4 This is a schematic diagram of the predicted values ​​of cooling, heating, electrical loads and wind and solar power output in Embodiment 3 of the present invention; Figure 5 This is a schematic diagram of the cooling, heating, and electrical load balance in scenario 1 of embodiment 3 of the present invention; Figure 6 This is a schematic diagram of the cooling, heating, and electrical load balance in scenario 2 of embodiment 3 of the present invention; Figure 7 This is a schematic diagram of the cooling, heating, and electrical load balance in scenario 3 of embodiment 3 of the present invention; Figure 8 A comparison of the total costs of different algorithms in Embodiment 3 of the present invention; Figure 9 This is a schematic diagram of the MEC-CCHP system structure of the present invention. Detailed Implementation

[0045] To clearly illustrate the technical features of the present invention, the present invention will be described in detail below through specific embodiments and in conjunction with the accompanying drawings.

[0046] Many specific details are set forth in the following description in order to provide a full understanding of the invention. However, the invention may also be practiced in other ways different from those described herein, and therefore the scope of protection of the invention is not limited to the specific embodiments disclosed below.

[0047] In the description of this specification, references to terms such as "one embodiment," "some embodiments," "example," "specific example," or "some examples," etc., indicate that a specific feature, structure, material, or characteristic described in connection with that embodiment or example is included in at least one embodiment or example of the invention. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples.

[0048] Example 1 like Figure 1 As shown, a method for optimal scheduling of cold, heat, and electricity based on an improved grey goose optimization algorithm includes the following steps: S1. Construct a multi-energy complementary combined cooling, heating and power (CCHP) system architecture and establish a mathematical model for the output of core equipment; the CCHP system architecture includes a power generation unit, a cooling unit, and a heating unit. The power generation unit includes a gas turbine, photovoltaic power generation equipment, wind power generation equipment, an organic Rankine cycle unit, and an electric energy storage device. The cooling unit includes an absorption chiller unit and a heat pump unit. The heating unit includes a waste heat recovery device connected to the gas turbine, a heat exchange device, a gas boiler, a heat pump unit, and a thermal energy storage device. The output mathematical models of the core equipment include a wind power output power model, a photovoltaic power output power model, and a gas turbine output power model; wherein, the expression for the wind power output power model is:

[0049] In the above formula, the for t Wind power output at all times; They are respectively t Real-time wind speed, cut-in wind speed, cut-out wind speed, and rated wind speed; This refers to the rated output power of the fan. The expression for the photovoltaic output power model is:

[0050] In the above formula, the for t The power output of the photovoltaic module at any given time; The radiant power of the incident light; This refers to the rated power of the photovoltaic module under standard conditions. This is the power reduction factor for photovoltaic modules; The temperature coefficient of a photovoltaic module; This represents the battery temperature during actual operation. This refers to the battery temperature during standard testing. In this embodiment, the CCHP system model includes a gas turbine, a heat pump unit, an absorption chiller unit, a heat exchanger, a gas boiler, and an organic Rankine cycle unit. The expression for the gas turbine output model is as follows:

[0051]

[0052] In the above formula, the This refers to the amount of heat recovered from the gas turbine. For the efficiency of the waste heat recovery device, For the power generation of gas turbines; This refers to the natural gas consumption of the gas turbine. For gas turbine power generation efficiency; The heat pump unit consumes electrical energy to generate energy and can be used as a peak-shaving device. The calculation formula is as follows:

[0053] In the formula, the This refers to the power of the heat pump unit; The coefficient of performance (COP) of the heat pump unit; The electrical power consumed by the heat pump unit; The absorption chiller unit uses medium-to-high grade thermal energy as the driving heat source to generate cooling energy. The cooling calculation formula is as follows:

[0054] In the formula, This refers to the cooling capacity of the absorption chiller unit. Coefficient of performance (COP); The heat power absorbed by the absorption chiller unit. The calculation formula for the heat exchange device is:

[0055] In the formula, The load that provides heat energy to the heat exchanger; The heat that has passed through the heat exchange device; For heat transfer efficiency; the Organic Rankine Cycle (ORC) unit converts low-grade thermal energy into high-grade electrical energy, and the calculation formula is as follows:

[0056] In the formula, The electrical power generated by the organic Rankine cycle unit; The heat power consumed; To improve conversion efficiency, the gas-fired boiler supplements the missing heat energy, calculated using the following formula:

[0057] In the formula, The heat power generated by the gas-fired boiler; The amount of natural gas consumed by the gas-fired boiler; The efficiency of heating in a gas-fired boiler.

[0058] S2. Construct an optimization scheduling objective function that includes the penalty cost of thermal energy storage, with the goal of minimizing the total operating cost within the system scheduling cycle. The expression of the objective function is as follows:

[0059] In the above formula, the For operating energy consumption costs; , These are operating and maintenance costs and pollution control expenses; Costs associated with interacting with the power grid; This represents the equivalent annualized investment cost of energy storage equipment. The penalty cost for thermal energy storage; wherein, the energy consumption cost of the system operation. The expression is:

[0060] In the formula, , These are the prices for electricity and gas, respectively. The expression for the pollution control cost of the MEC-CCHP system is:

[0061]

[0062] In the formula, and These represent the unit treatment cost of pollutants and the emission volume of polluting gases, respectively; k indicates the distinction between polluting gases. , , ; This represents the emission coefficient of pollutant gas k generated by the power grid; , Polluting gases are generated by gas turbines and gas boilers, respectively. k The emission coefficient.

[0063] The formula for calculating the equivalent annualized investment cost of the energy storage equipment is as follows:

[0064] In the above formula, the The annualized cost of the initial investment; Cost of equipment depreciation over its annual lifespan; This refers to the initial purchase cost; The benchmark rate of return; For service life; Cost of annual lifespan decay; This represents the annual attenuation coefficient of the equipment.

[0065] S3. Set system operation constraints, which include at least power balance constraints, energy storage constraints, heat and cold load balance constraints, grid exchange power constraints, and upper and lower limits of output of each device. In step S3, the power balance constraint satisfies the following formula:

[0066] In the above formula, the , To purchase and sell electricity from the power grid; For user electrical load; , These refer to the electrical power released and stored by the energy storage power station, respectively. For the power generation of gas turbines; For photovoltaic output power, This refers to the output power of wind power. Power generation of the organic Rankine cycle unit; The heat pump unit consumes electrical power. The expression for the energy storage constraint is as follows:

[0067] In the above formula, the , They are respectively k The maximum and minimum allowable capacity of the equipment; the expression for the thermal and cold balance constraints is:

[0068]

[0069]

[0070] In the above formula, the , These are the user's cooling load and the cooling capacity of the heat pump unit, respectively. , These are the user's heat load and the heat pump unit's heating power, respectively; the expression for the exchange power constraint is:

[0071]

[0072] In the above formula, the , These are the minimum and maximum power purchase capacities, respectively. , These represent the upper and lower limits of the gradient rate within any given time period; the expressions for the upper and lower limits of the system equipment output constraints are as follows:

[0073] In the above formula, the , They are respectively r The upper and lower limits of the equipment's output.

[0074] S4. Based on the matching relationship between the gas turbine output range and the electrical and thermal loads, implement an improved thermoelectric load balance operation strategy and adjust the output distribution and energy flow of each device according to the operating conditions. S5. An improved grey goose optimization algorithm, which integrates chaotic sequence initialization, adaptive parameter adjustment, and differential evolution mutation mechanism, iteratively optimizes the objective function under the system operation constraints, and outputs the optimal power scheduling scheme for each device in the system for each time period. The improved grey goose optimization algorithm generates an initial population through Logistic chaotic mapping to improve the uniformity and diversity of the initial solution; it dynamically adjusts the ratio of explorers to developers in the population through fitness improvement rate to balance global exploration and local development capabilities; and it introduces a differential evolution hybrid mutation strategy to generate mutated individuals, combined with a greedy strategy to retain individuals with better fitness, avoiding the algorithm from getting trapped in local optima.

[0075] In this embodiment, the energy storage device can suppress predicted fluctuations, absorb excess system energy, and provide power support to the system in emergencies. Its capacity at time t+1 is...

[0076] In the formula, , This represents the charging and discharging power of the system during the t-th time period; , These represent the transmission efficiency during the charging and discharging processes, respectively. It is the time interval between one period and the next period.

[0077] Thermal energy storage can store the residual heat energy during system operation, but there will be heat energy loss during the storage process.

[0078]

[0079] In the formula, The total amount of thermal energy stored in the thermal storage tank during time period t; The coefficient of thermal energy loss; The power of the equipment during time period t is taken as a positive value under heat storage conditions and a negative value under heat release conditions.

[0080] To fully leverage the peak-shaving and valley-filling effects of thermal energy storage on heat load, a penalty item for thermal energy storage is implemented. The greater the deviation of the system's remaining heat load from the preset value, the stronger the penalty. Heat load deviation leads to reduced waste heat utilization efficiency, mismatch between heating and cooling supply and demand resulting in additional costs for electric cooling or gas refueling, and losses due to user defaults caused by substandard energy quality. This penalty item quantifies these economic losses and incorporates them into the optimization objective, making the scheduling results more closely reflect actual operating costs.

[0081]

[0082] In the formula, Penalty costs for thermal energy storage; This is the penalty coefficient; A standard line is preset for the heat load.

[0083] Due to the uncertainty of load demand, it is difficult to achieve real-time matching between the gas turbine output and load demand during system operation. Therefore, an improved thermoelectric load balancing operation strategy considering ORC is proposed. Specifically, the improved thermoelectric load balancing operation strategy is divided into five operating conditions according to the matching relationship between the gas turbine output range and the electrical and thermal loads. Operating Condition 1: The aforementioned When the user's electrical load is less than the minimum output of the gas turbine, the gas turbine is shut down, and the electricity demand is supplied by the electric energy storage power station and the power grid, while the heat demand is supplied by the thermal energy storage device and the gas boiler. Operating Condition 2: The aforementioned , When the user's electrical load is between the minimum and maximum output of the gas turbine and the heat load is less than the minimum recoverable heat of the gas turbine, the gas turbine operates at the minimum load rate. The insufficient electrical load is provided by the energy storage power station or the power grid, and the excess heat generated by the gas turbine is stored in the thermal energy storage device. Operating Condition 3: The aforementioned , When the user's electrical load is between the minimum and maximum output of the gas turbine and the thermal load is between the minimum and maximum recoverable heat of the gas turbine, the insufficient electrical energy is supplemented by the organic Rankine cycle unit, the electric energy storage power station or the power grid, and the excess electrical energy drives the heat pump unit to generate heat; the excess heat energy is input into the organic Rankine cycle unit and converted into electrical energy, and the insufficient heat energy is supplemented by the thermal energy storage device and the gas boiler. , These are the minimum and maximum power outputs of the gas turbine when it operates at 25% of its rated load, respectively. To meet the combined needs of heating and cooling loads; , The minimum and maximum heat recoverable by a gas turbine when it is running at 25% of its rated load; Operating Condition 4: The aforementioned , When the user's electrical load is greater than the maximum output of the gas turbine and the thermal load is between the minimum and maximum recoverable heat of the gas turbine, the gas turbine operates at full load. The insufficient electrical energy is supplemented by the organic Rankine cycle unit, the electric energy storage power station or the grid, and the excess thermal energy is converted into electrical energy through the organic Rankine cycle unit. Operating Condition 5: The aforementioned , When the user's electrical load exceeds the maximum output of the gas turbine and the thermal load exceeds the maximum recoverable heat of the gas turbine, the gas turbine operates at full load. The insufficient electrical energy is supplemented by the organic Rankine cycle unit, the electric energy storage power station or the power grid, and the insufficient thermal energy is supplemented by the thermal energy storage device and the gas boiler.

[0084] Example 2 Based on Example 1, this embodiment proposes an improved Grey Goose optimization algorithm by combining global search and local search with a differential evolution mutation strategy, thus avoiding getting trapped in local optima due to a decline in population diversity.

[0085] Specifically, such as Figure 2 As shown, the improved grey goose optimization algorithm dynamically adjusts the population ratio of the exploration group and the development group through the fitness improvement rate, balancing global exploration and local development capabilities, including the following steps: S51. Initialize the upper and lower limits of output of each device in the flock, and input the system equipment operating parameters and basic data of wind, solar and load. S52. Set the goose flock size to 600 and the number of iterations to 500. Initialize the population using a Logistic chaotic sequence and divide the population into an explorer group and a developer group. The mapping relationship is as follows:

[0086] In the above formula, the These are the control parameters for the Logistic mapping; S53. Input the cooling, heating and power load demand of the multi-energy complementary combined cooling, heating and power (MEC-CCHP) system, optimize the load demand based on the time-of-use electricity price and the penalty cost of thermal energy storage; then optimize the output of each unit of the MEC-CCHP system according to the cooling, heating and power load demand and the heat and power load balance operation strategy. S54. Calculate the operating cost of the MEC-CCHP system based on the objective function, evaluate the fitness of greylag geese, and select the leader goose and sentinel. S55. Determine if the maximum number of iterations has been reached. If it is, output the optimal solution. If not, continue solving. S56. The sizes of the exploration group and the development group are dynamically adjusted based on the fitness improvement rate. The calculation formulas for the fitness improvement rate and the dynamic parameters are as follows:

[0087]

[0088]

[0089] In the above formula, the For the fitness improvement rate; and These are the historical best solution and the current best solution; , To dynamically update parameters; S57. Introduce a differential evolution hybrid mutation strategy: randomly select three distinct individuals from the current population, generate a mutation vector, and use a greedy strategy to select the optimal solution. The expression is:

[0090] In the above formula, It is a variant solution; , , These are three different individuals randomly selected from the population; It is the scaling factor; then return to step S54 to continue the loop; S58. Using the leading goose as the center, conduct a small-scale local search in its vicinity, then use a greedy strategy to obtain a new solution. Compare this new solution with the historical best solution and output the optimal solution.

[0091] In this embodiment, GGO, Whale Optimization Algorithm (WOA), Artificial Bee Colony Algorithm (ABC), Dung Beetle Optimization Algorithm (DBO) and MGGO were compared, and four sets of test functions were selected as shown in Table 1.

[0092] Table 1 Test Objective Function

[0093] Figure 3 To compare the convergence curves of the five algorithms under the test function, from... Figure 3 As can be seen, the MGGO algorithm is significantly better than the other four optimization algorithms in terms of both convergence speed and convergence accuracy.

[0094] Example 3 This implementation uses a typical winter day in a county in Shaanxi Province, my country, as a case study. The predicted curves for electricity, cooling, heating loads, and wind and solar power output are shown below. Figure 4 As shown in Table 2, the annualized investment parameters of the equipment are shown in Table 3; the parameters of the operating equipment units included in the MEC-CCHP system are shown in Table 4; the pollutant emission factors and pollution control costs are shown in Table 5; and the system parameters are shown in Table 5.

[0095] Table 2 Annualized Investment Parameters

[0096] Table 3 MEC-CCHP Equipment Parameters

[0097] Table 4 Pollutant Emission Coefficients and Treatment Costs

[0098] Table 5 MEC-CCHP System Parameters

[0099] To verify the advantages of the proposed model, this embodiment sets up three scenarios for simulation comparison. 1) Scenario 1: No energy storage or ORC equipment is configured; excess energy is directly discarded, and insufficient electricity is purchased from the grid; 2) Scenario 2: Based on Scenario 1, heating energy storage is implemented; 3) Scenario 3: Based on Scenario 2, electrical energy storage and ORC equipment are added. The natural gas price in the MEC-CCHP system is 3.12 yuan / m³, and the daily load curves and time-of-use electricity prices for various energy sources are as follows: Figure 4 Table 6 shows the results of solving the model optimization problem using the MGGO algorithm in three classic scenarios. The results indicate that the total cost of scenario 3 is reduced by 28.7% and 18.9% compared to scenarios 1 and 2, respectively, while the pollution control cost is reduced by 29.3% and 17.4%, respectively. Table 6 Electricity Purchase and Sale Prices

[0100] In this embodiment, Figure 5 and Figure 6 These represent the optimized output curves for cooling, heating, and electrical loads of the system in scenarios 1 and 2, respectively. Figure 5 and Figure 6 Figure (a) shows the optimized output curve for electrical load, where electricity is provided by photovoltaic, wind power, and gas turbines. When electricity prices are low, any shortfall is purchased from the grid; when prices are high, gas turbines are prioritized for power supply, and any surplus electricity is sold. Figure (b) shows the optimized output curve for heat load. When heat load demand is low, gas turbines primarily provide heat; when gas turbines cannot meet demand, gas-fired boilers supplement the heat supply. Figure (c) shows the optimized output curve for cooling load. After meeting heat load demand, when there is surplus heat and cooling load demand is low, absorption chillers primarily provide cooling; when absorption chillers cannot fully meet cooling load demand, the surplus cooling is provided by heat pump units.

[0101] in, Figure 7Figure (a) shows the optimized output curves for cooling, heating, and electricity loads of the MEC-CCHP system in Scenario 3. During the periods of 1:00-5:00 and 10:00-17:00, which are off-peak electricity periods, excess electricity is stored in the energy storage station after the electricity load is met, and then used during the peak period of 18:00-20:00. This reduces the amount of electricity purchased during high-price periods, leveraging the peak-shaving and valley-filling function of energy storage to improve system economics. During the periods of 5:00 and 22:00-24:00, while meeting the heating load, the system uses additional heat energy to drive the ORC unit to provide some electricity to users, achieving further cascade utilization of waste heat from the gas turbine and reducing the system's dependence on the power grid. In Figure (b), heat is added when there is surplus heat from 1:00 to 4:00, and released when there is insufficient heat from 2:00, 6:00 to 7:00, and 14:00 to 16:00. This heat storage system transfers waste heat between different time periods, improving waste heat utilization and reducing heat waste. In scenario 3, different optimization algorithms were used to solve the problem. The MGGO algorithm significantly reduced the total operating cost compared to the GGO, WOA, ABC, and DBO systems, with a maximum reduction of 15.2% and a minimum of 2.4%.

[0102] Table 7. MEC-CCHP System Costs in Different Scenarios

[0103] Table 7 compares the operating costs and total costs of the MEC-CCHP system under the MGGO algorithm in three scenarios (including operation and maintenance, grid interaction, operating energy consumption, thermal energy storage penalty costs, and pollution control costs). Compared to scenarios 1 and 2, the total cost of scenario 3 is reduced by 28.7% and 18.9%, respectively. This reduction is mainly due to the optimization of operating energy consumption costs by electricity, thermal energy storage, and ORC through peak shaving and valley filling and optimized energy utilization, which are 17.6% and 10.6% lower than those of scenarios 1 and 2, respectively. Although the operating and maintenance costs of scenario 3 are slightly higher than those of scenarios 1 and 2, its total cost advantage is significant.

[0104] To further demonstrate the advantages of the MGGO algorithm, it was compared with GGO, WOA, ABC, and DBO algorithms in scenario 3. Figure 8 The results are shown in Table 8. The tests show that the operation and maintenance costs decreased by 1.10%, 7.96%, 1.13%, and 9.00%, respectively; the pollution control costs decreased by 2.51%, 3.02%, 19.71%, and 25.63%, respectively; and the total costs decreased by 2.4%, 9.6%, 6.7%, and 15.2%, respectively.

[0105] Table 8. MEC-CCHP System Costs under Different Algorithms

[0106] To address the imbalance between cooling, heating, and power loads and the fluctuation in energy supply in CCHP systems, a multi-energy complementary combined cooling, heating, and power (CCHP) optimization scheduling model was established. An improved heat and power load balancing operation strategy was proposed, and the MGGO algorithm, which integrates chaotic sequences and differential mutation mechanisms, was used to solve the optimization model. To address the significant impact of GGO parameter settings on performance, an MGGO algorithm incorporating chaotic initialization, adaptive parameter adjustment, and differential evolution mutation was proposed. Comparison with GGO, WOA, ABC, and DBO algorithms using test functions showed that the MGGO algorithm converged faster and achieved higher stability and accuracy.

[0107] Obviously, the embodiments described above are merely examples for clearly illustrating the present invention and are not intended to limit the implementation of the present invention. Those skilled in the art can make other variations or modifications based on the above description. It is neither necessary nor possible to exhaustively list all possible implementations. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention should be included within the scope of protection of the claims of the present invention.

Claims

1. A method for optimal scheduling of cold, heat, and electricity based on an improved grey goose optimization algorithm, characterized in that, Includes the following steps: S1. Construct a multi-energy complementary combined cooling, heating and power (CCHP) system architecture and establish a mathematical model for the output of core equipment; the CCHP system architecture includes a power generation unit, a cooling unit, and a heating unit. The power generation unit includes a gas turbine, photovoltaic power generation equipment, wind power generation equipment, an organic Rankine cycle unit, and an electric energy storage device. The cooling unit includes an absorption chiller unit and a heat pump unit. The heating unit includes a waste heat recovery device connected to the gas turbine, a heat exchange device, a gas boiler, a heat pump unit, and a thermal energy storage device. The output mathematical models of the core equipment include a wind power output power model, a photovoltaic power output power model, and a gas turbine output power model; wherein, the expression for the wind power output power model is: In the above formula, the for t Wind power output at any given time; They are respectively t Real-time wind speed, cut-in wind speed, cut-out wind speed, and rated wind speed; This refers to the rated output power of the fan; The expression for the photovoltaic output power model is: In the above formula, the for t The power output of the photovoltaic module at any given time; The radiant power of the incident light; This refers to the rated power of the photovoltaic module under standard conditions. This is the power reduction factor for photovoltaic modules; The temperature coefficient of a photovoltaic module; This represents the battery temperature during actual operation. This refers to the battery temperature during standard testing. The expression for the gas turbine output model is as follows: In the above formula, the This refers to the amount of heat recovered from the gas turbine. For the efficiency of the waste heat recovery device, For the power generation of gas turbines; This refers to the natural gas consumption of the gas turbine. For gas turbine power generation efficiency; S2. Construct an optimization scheduling objective function that includes the penalty cost of thermal energy storage, with the goal of minimizing the total operating cost within the system scheduling cycle. The expression of the objective function is as follows: In the above formula, the For operating energy consumption costs; , These are operating and maintenance costs and pollution control expenses; Costs associated with interacting with the power grid; This represents the equivalent annualized investment cost of energy storage equipment. Penalty costs for thermal energy storage; S3. Set system operation constraints, which include at least power balance constraints, energy storage constraints, heat and cold load balance constraints, grid exchange power constraints, and upper and lower limits of output of each device. S4. Based on the matching relationship between the gas turbine output range and the electrical and thermal loads, implement an improved thermoelectric load balance operation strategy and adjust the output distribution and energy flow of each device according to the operating conditions. S5. An improved grey goose optimization algorithm, which integrates chaotic sequence initialization, adaptive parameter adjustment and differential evolution mutation mechanism, is used to iteratively optimize the objective function under the constraints and output the optimal power scheduling scheme for each device in the system.

2. The method for optimal scheduling of cold, heat, and electricity based on an improved grey goose optimization algorithm according to claim 1, characterized in that, In step S2, the thermal energy storage penalty cost is used to quantify the waste heat utilization efficiency loss, additional costs due to the mismatch between cooling and heating supply and demand, and the energy quality breach loss caused by the deviation of the heat load from the preset standard value. Its calculation formula is as follows: In the above formula, the This is the penalty coefficient; A standard line is preset for the heat load; This represents the actual heat load value of the system during time period t. The power of the thermal energy storage device during time period t is taken as a positive value for the heat storage condition and a negative value for the heat release condition.

3. The method for optimal scheduling of cold, heat, and electricity based on an improved grey goose optimization algorithm according to claim 1, characterized in that, In step S2, the formula for calculating the cost of pollutant treatment is as follows: In the above formula, the and These represent the unit treatment cost of pollutants and the emission volume of polluting gases, respectively; k indicates the distinction between polluting gases. , , ; This represents the emission coefficient of pollutant gas k generated by the power grid; , Polluting gases are generated by gas turbines and gas boilers, respectively. k The emission coefficient; The formula for calculating the equivalent annualized investment cost of the energy storage equipment is as follows: In the above formula, the The annualized cost of the initial investment; Cost of equipment depreciation over its annual lifespan; This refers to the initial purchase cost; The benchmark rate of return; For service life; Cost of annual lifespan decay; This represents the annual attenuation coefficient of the equipment.

4. The method for optimal scheduling of cold, heat, and electricity based on an improved grey goose optimization algorithm according to claim 1, characterized in that, In step S3, the power balance constraint satisfies the following formula: In the above formula, the , To purchase and sell electricity from the power grid; For user electrical load; , These refer to the electrical power released and stored by the energy storage power station, respectively. For the power generation of gas turbines; For photovoltaic output power, This refers to the output power of wind power. Power generation of the organic Rankine cycle unit; The heat pump unit consumes electrical power.

5. A method for optimal scheduling of cold, heat, and electricity based on an improved grey goose optimization algorithm according to claim 1, characterized in that, In step S3, the expression for the energy storage constraint is as follows: In the above formula, the , They are respectively k The maximum and minimum allowable capacity of the equipment; the expression for the thermal and cold balance constraints is: In the above formula, the , These are the user's cooling load and the cooling capacity of the heat pump unit, respectively. , These are the user's heat load and the heat pump unit's heating power, respectively; the expression for the exchange power constraint is: In the above formula, the , These are the minimum and maximum power purchase capacities, respectively. , These represent the upper and lower limits of the ramp rate within any given time period; the expressions for the upper and lower limits of the system equipment output constraints are as follows: In the above formula, the , They are respectively r The upper and lower limits of the equipment's output.

6. The method for optimal scheduling of cold, heat, and electricity based on an improved grey goose optimization algorithm according to claim 1, characterized in that, In step S5, the improved grey goose optimization algorithm dynamically adjusts the population ratio of the exploration group and the development group through the fitness improvement rate to balance global exploration and local development capabilities, including the following steps: S51. Initialize the upper and lower limits of output of each device in the flock, and input the system equipment operating parameters and basic data of wind, solar and load. S52. Set the flock size and number of iterations, initialize the population using a Logistic chaotic sequence, and divide the population into an explorer group and a developer group, with the following mapping relationship: In the above formula, the These are the control parameters for the Logistic mapping; S53. Input the cooling, heating and power load demand of the multi-energy complementary combined cooling, heating and power (MEC-CCHP) system, optimize the load demand based on the time-of-use electricity price and the penalty cost of thermal energy storage; then optimize the output of each unit of the MEC-CCHP system according to the cooling, heating and power load demand and the heat and power load balance operation strategy. S54. Calculate the operating cost of the MEC-CCHP system based on the objective function, evaluate the fitness of greylag geese, and select the leader goose and sentinel. S55. Determine if the maximum number of iterations has been reached. If it is, output the optimal solution. If not, continue solving. S56. The sizes of the exploration group and the development group are dynamically adjusted based on the fitness improvement rate. The calculation formulas for the fitness improvement rate and the dynamic parameters are as follows: In the above formula, the For the fitness improvement rate; and These are the historical best solution and the current best solution; , To dynamically update parameters; S57. Introduce a differential evolution hybrid mutation strategy: randomly select three distinct individuals from the current population, generate a mutation vector, and use a greedy strategy to select the optimal solution. The expression is: In the above formula, It is a variant solution; , , These are three different individuals randomly selected from the population; It is the scaling factor; then return to step S54 to continue the loop; S58. Using the leading goose as the center, conduct a small-scale local search in its vicinity, then use a greedy strategy to obtain a new solution. Compare this new solution with the historical best solution and output the optimal solution.

7. A method for optimal scheduling of cold, heat, and electricity based on an improved grey goose optimization algorithm according to claim 1, characterized in that, In step S4, the improved thermoelectric load balancing operation strategy is divided into five operating conditions based on the matching relationship between the gas turbine output range and the electrical and thermal loads: Operating Condition 1: The aforementioned When the user's electrical load is less than the minimum output of the gas turbine, the gas turbine is shut down, and the electricity demand is supplied by the electric energy storage power station and the power grid, while the heat demand is supplied by the thermal energy storage device and the gas boiler. Operating Condition 2: The aforementioned , When the user's electrical load is between the minimum and maximum output of the gas turbine and the heat load is less than the minimum recoverable heat of the gas turbine, the gas turbine operates at the minimum load rate. The insufficient electrical load is provided by the energy storage power station or the power grid, and the excess heat generated by the gas turbine is stored in the thermal energy storage device. Operating Condition 3: The aforementioned , When the user's electrical load is between the minimum and maximum output of the gas turbine and the thermal load is between the minimum and maximum recoverable heat of the gas turbine, the insufficient electrical energy is supplemented by the organic Rankine cycle unit, the electric energy storage power station or the power grid, and the excess electrical energy drives the heat pump unit to generate heat; the excess heat energy is input into the organic Rankine cycle unit and converted into electrical energy, and the insufficient heat energy is supplemented by the thermal energy storage device and the gas boiler. , These are the minimum and maximum power outputs of the gas turbine when it operates at 25% of its rated load, respectively. To meet the combined needs of heating and cooling loads; , The minimum and maximum heat recoverable by a gas turbine when it is running at 25% of its rated load; Operating Condition 4: The aforementioned , When the user's electrical load is greater than the maximum output of the gas turbine and the thermal load is between the minimum and maximum recoverable heat of the gas turbine, the gas turbine operates at full load. The insufficient electrical energy is supplemented by the organic Rankine cycle unit, the electric energy storage power station or the grid, and the excess thermal energy is converted into electrical energy through the organic Rankine cycle unit. Operating Condition 5: The aforementioned , When the user's electrical load exceeds the maximum output of the gas turbine and the thermal load exceeds the maximum recoverable heat of the gas turbine, the gas turbine operates at full load. The insufficient electrical energy is supplemented by the organic Rankine cycle unit, the electric energy storage power station or the power grid, and the insufficient thermal energy is supplemented by the thermal energy storage device and the gas boiler.

8. A method for optimal scheduling of cold, heat, and electricity based on an improved grey goose optimization algorithm according to claim 6, characterized in that, The flock size is 600, and the maximum number of iterations is 500.

9. A method for optimal scheduling of cold, heat, and electricity based on an improved grey goose optimization algorithm according to claim 1, characterized in that, In step S2, the system operating energy consumption cost The expression is: In the formula, , These are the prices for electricity and gas, respectively. The expression for the pollution control cost of the MEC-CCHP system is: In the formula, and These represent the unit treatment cost of pollutants and the emission volume of polluting gases, respectively; k indicates the distinction between polluting gases. , , ; This represents the emission coefficient of pollutant gas k generated by the power grid; , These are the emission coefficients of pollutant gas k produced by gas turbines and gas boilers, respectively.

10. A cooling, heating, and power optimization scheduling system based on an improved grey goose optimization algorithm, characterized in that, The method for optimizing the scheduling of cold, heat and electricity based on the improved grey goose optimization algorithm described in any one of claims 1 to 9 is adopted.

Citation Information

Patent Citations

  • Multi-objective optimization configuration method for combined cooling heating and power system containing renewable energy sources

    CN116384584A