Portable emergency communication multi-source power supply controlled access and continuous power supply system and method

By using isolated capability testing and energy storage status coordination control, the problem of confirming the load-carrying capacity of external power sources in emergency communication power supply was solved, ensuring the stability of external power supply access and continuous support of energy storage, and realizing continuous power supply for emergency communication systems.

CN123074094APending Publication Date: 2026-11-10CHINA TOWER CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202611579602.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-13
Publication Date
2026-11-10

AI Technical Summary

Technical Problem

In emergency communication power supply, the actual load capacity of the power supply to be connected is difficult to accurately determine, and the coordination and control between energy storage and external power supply is insufficient, resulting in insufficient energy storage support capacity or bus voltage fluctuations during the takeover process. Existing technologies cannot guarantee continuous power supply.

Method used

The load-carrying capacity of the external power supply is verified by using an isolated capacity testing component. By combining the energy storage status and load requirements, a controlled access and takeover sequence is established to ensure coordinated control of energy storage and external power supply, and to prevent energy storage compensation from masking power insufficiency. Mechanical coding and measured electrical parameters are used to verify the stability and safety of power supply access.

Benefits of technology

This reduces the risk of busbar instability and power outage during external power supply access, ensures continuous power supply to communication loads, avoids power outages caused by insufficient energy storage capacity or power supply load capacity mismatch, and improves the stability and reliability of emergency communication systems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123074094A_ABST
    Figure CN123074094A_ABST
Patent Text Reader

Abstract

This invention discloses a portable emergency communication multi-source power supply controlled access and continuous power supply system and method, belonging to the field of emergency communication power supply technology. The system includes a housing, a generator, an external power supply access branch, a unified DC bus, an energy storage bridging component, a tiered load output component, and a controller. The controller performs power supply identification and electrical verification, determines the allowable bridging power and remaining bridging energy based on the energy storage status, and verifies the backup power supply requirements after successful takeover and failure exit, including verification time. Verification is authorized only after constraints are met. During verification, the connection between the branch to be connected and the bus is disconnected, and the power supply to be connected independently drives the test load to determine the upper limit of the power supply and the load level. After successful verification, the power supply is pre-charged and connected to the bus, transferring power according to the level that meets the bridging constraints, and the energy storage compensates for the measured power shortfall. This invention reduces the interference of energy storage compensation on power supply capability judgment, limits the consumption of backup energy during verification, and reduces the risk of power outage for communication loads.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of emergency communication power supply and multi-source power control technology, specifically to a portable emergency communication multi-source power controlled access and continuous power supply system and method. Background Technology

[0002] During disaster relief and temporary communication base deployment, portable power supply equipment needs to adapt to operating environments with mains power outages, temporary external power connections, and changes in power supply conditions, and maintain power supply to the communication load during power connection, disconnection, and switching. For equipment using generators and energy storage batteries for coordinated power supply, generators require a certain amount of time to start up and reach stable output, and their sudden load increase capacity is limited. Therefore, energy storage batteries need to undertake the power supply task during the transition period. Whether the external power source meets the connection conditions and whether the energy storage can continuously support the external power source until it actually undertakes the load are technical requirements that need to be coordinated in emergency communication power supply.

[0003] Patent document CN106849343A discloses a "Wind-Solar-Diesel-Storage Independent Power Supply Switching System and Power Supply Switching Method for Communication Base Stations," which connects wind power generation, photovoltaic power generation, batteries, and diesel generator sets to the DC bus through corresponding converters. The power supply status is controlled according to power output, load demand, and battery charge. The control mode of the battery-side converter is adjusted when the diesel generator set is connected or disconnected to maintain DC bus voltage stability. This document provides a technical solution for multi-source power supply to communication base stations and energy storage participation in bus voltage stabilization. Patent document CN215907951U discloses a "Control System for an Energy Storage Diesel Generator Set," including a diesel generator set, energy storage battery, inverter, bidirectional DC converter, and energy management system. The energy storage battery is connected to the DC bus via the bidirectional DC converter. In emergency power supply, the energy storage battery supplies power to the bus; when the load suddenly increases, the energy storage battery first compensates for the increased power demand. After operation stabilizes, the power supplied by the diesel generator set is gradually increased while the output of the energy storage battery is reduced. This document utilizes the rapid response of energy storage to alleviate the problem of insufficient dynamic load-carrying capacity of generators and realizes gradual power transfer between generators and energy storage. Patent document CN121546527A discloses a "Communication Power Supply Expansion and Distribution Management System," which achieves online access and power distribution coordination of power modules through hot-swappable expansion units, intelligent power distribution units, and system collaborative management units. Its live connection interface is equipped with pilot contacts, power contacts, signal contacts, and a pre-charge circuit, and performs identity authentication, parameter synchronization, and voltage matching during the access process. The system also acquires the module's rated power, current output capacity, and health status, controls the power to gradually increase according to the state transition process, and suspends or terminates expansion when stability indicators exceed the allowable range. This document primarily focuses on the online expansion and power distribution management of standardized power modules.

[0004] The aforementioned documents provide technical means for multi-source bus power supply, energy storage compensation, gradual power transfer, and controlled access of power modules. However, for external power supplies temporarily connected on-site with unconfirmed actual load capacity, correct interface identification, normal no-load voltage, or declared power meeting requirements do not necessarily mean that the power supply can stably bear the target load under the current operating conditions. If the power supply to be connected and energy storage jointly support the same DC bus, and the capability of the power supply to be connected is judged solely based on the stability of the bus voltage or the normality of the load power supply, the compensation effect of energy storage may mask the insufficient output of the power supply to be connected itself, leading to an overestimation of its power capacity and loading speed. Furthermore, during the phase before the power supply to be connected provides effective power to the bus, the communication load still needs to be borne by the existing power supply branch. When this phase mainly relies on energy storage to maintain power supply, power capacity verification, stabilization waiting, pre-charging, and exit and retry after failure all consume the time that energy storage can continuously support the load. If operations continue solely based on the completion conditions or fixed timeouts of each stage, without considering whether the remaining energy storage is sufficient to support backup power takeover after an operational failure, situations may arise where backup takeover conditions are met before verification, but fail to be completed after additional waiting or repeated verification. In this case, even if the backup power eventually returns to normal, communication load power interruption may occur because the energy storage reaches its discharge cutoff condition prematurely. Furthermore, low temperatures affect the discharge capacity and usable capacity of energy storage batteries, further limiting their actual support capabilities. When the allowable output power of the energy storage is lower than the real-time load gap, even with ample remaining energy, it cannot meet instantaneous power supply demands; conversely, when the allowable output power of the energy storage can meet the load gap, but the remaining energy is insufficient, it cannot support the entire waiting and takeover process. Therefore, relying solely on remaining power, current output power, or fixed takeover time is insufficient to fully reflect the feasibility of transitional power supply. For generator takeover, a slow power increase will prolong the energy storage discharge time, while a rapid power increase may exceed the generator's dynamic load-carrying capacity; if both cannot be simultaneously met, continuing operation according to the original takeover process may trigger energy storage protection actions or bus voltage fluctuations. Similarly, a rise in battery temperature does not necessarily mean that it has recovered the power and energy required to handle the next full transition power supply process. Summary of the Invention

[0005] To address the challenges of accurately confirming the actual load-carrying capacity of the power source to be connected during existing multi-source power supply processes for emergency communications, the lack of coordination between capacity verification and retesting time and energy storage support capacity leading to insufficient energy required for backup takeover, and the difficulty in balancing the allowable output power of energy storage, remaining energy, and the dynamic load-carrying capacity of the generator during power takeover, this invention provides a portable emergency communication multi-source power source controlled access and continuous power supply system and method. Under the joint constraints of allowable bridging power of energy storage and remaining bridging energy, the isolated capacity verification, controlled access, and backup takeover of the external power source are coordinated and controlled. The verification authorization is determined by verifying the feasibility of backup power supply after verification failure. Based on the verified power supply capacity, real-time energy storage status, and load demand, the access sequence, takeover power change rate, and load operating status are adjusted to reduce the risk of bus instability and power outage during power verification, access, and takeover processes, ensuring continuous power supply to the pre-reserved communication load under specified operating conditions.

[0006] The technical solution adopted in this invention is as follows: A portable emergency communication multi-source power control access and continuous power supply system includes a housing, a generator, and a whole-machine controller, a unified DC bus, multiple external power access branches, an energy storage bridging component, and a graded load output component installed in the housing. Each of the aforementioned external power supply access branches is sequentially connected along the power transmission direction to a quick-connect interface with identification contacts, an input protection circuit, a pre-converter, and a bus-controlled access component, wherein the bus-controlled access component is connected to the unified DC bus; an isolated capability testing component is connected across the positive and negative terminals of the local DC output of the pre-converter and is located on one side of the pre-converter of the bus-controlled access component; the generator is connected to one of the aforementioned external power supply access branches; the energy storage bridging component includes an energy storage battery pack connected to the unified DC bus via a bidirectional DC-DC converter; and the graded load output component is connected to the unified DC bus. The overall controller is configured to: verify the power supply to be connected based on interface identification information and measured electrical parameters; determine the allowable bridging power and remaining bridging energy on the bus side based on the energy storage status; before capability verification, establish a successful takeover sequence and a failure exit backup power supply sequence, including verification time; in the failure exit backup power supply sequence, set the bus power supply of the power supply to be connected to zero and adopt a backup power supply process independent of the power supply to be connected; and authorize verification only when the bridging power demand in each time period of each sequence does not exceed the corresponding allowable bridging power and the sum of the bridging energy demand and reserved energy in each time period does not exceed the remaining bridging energy. After electrical verification is passed and authorization is obtained, the bus control access component corresponding to the power supply to be connected is kept disconnected, and the power supply to be connected independently supplies power to the isolated capability testing component, so that the energy storage can supplement the test power to the isolated capability testing component through the unified DC bus; the target power, candidate loading level and time boundary used for successful takeover are associated with the qualification conditions of the same candidate verification scheme; After the capability verification is passed, the remaining access process and failure backup process are re-verified based on the actual confirmed continuous power supply limit, the verified loading level and the current remaining bridging energy. After the verification is passed, the power is connected to the unified DC bus through voltage matching and pre-charging. The power is transferred according to the verified loading level that meets the bridging power and bridging energy constraints, and the energy storage bridging component compensates for the measured power gap on the bus side.

[0007] Furthermore, the plug and socket of the quick-connect interface are provided with mutually cooperating mechanical coding bosses and mechanical coding grooves, and are provided with main power contacts, insertion status contacts and locking detection switches; the identification contact is turned on before the main power contact, the insertion status contact is turned on last and is turned off before the main power contact, and the disconnection signal of the insertion status contact triggers the branch hardware shutdown circuit to cancel the power switch drive and trigger the contactor to disconnect; The busbar controlled access component includes a bipolar main contactor and a pre-charge branch connected in parallel with it. The pre-charge branch includes a bipolar pre-charge contactor and a pre-charge resistor. When the voltage difference and pre-charge current between the local DC output terminal of the front-end converter and the unified DC bus do not exceed the corresponding preset threshold and remain for a preset time, and the plug-in state, lock-in state and protection state are normal, the bipolar main contactor is closed, and the pre-charge branch is disconnected after obtaining the closure feedback.

[0008] Furthermore, the isolated capability testing assembly includes a series-connected testing contactor, testing power switch, and resistive load group, as well as a testing current sensor, a temperature sensor, and an independent over-temperature disconnect device; a local output capacitor is connected in parallel between the positive and negative terminals of the local DC output of the front-end converter, and the front-end converter is equipped with sampling circuits for input voltage, input current, local output voltage, and the voltage of the main internal DC energy storage nodes; The busbar controlled access component includes a main path, a pre-charge path, and a fast isolation and anti-backflow switch. The fast isolation and anti-backflow switch is located upstream of the main path and the pre-charge path at the local DC output positive terminal. During capability verification, the main path, the pre-charge path, and the fast isolation and anti-backflow switch are all kept open. The overall controller confirms the isolation status based on contactor feedback, switch status, and busbar access branch current. Probing is prohibited when the command and feedback are inconsistent. The probe power switch adjusts the probe power according to the candidate load level. The probe power is not included in the busbar power supply power of the power supply to be connected.

[0009] Furthermore, the housing is equipped with a handling handle, and the interior is divided into a power conversion dry area, an energy storage dry area, and a control dry area by partitions. A recessed interface cavity is provided on the front side, which is separated from each of the dry areas. The interface cavity is equipped with a rain shield, a lateral fold-back water-blocking edge, an upward-opening protective cover, and a bottom drainage hole. The lowest conductive part of the quick-connect interface is higher than the drainage bottom surface of the interface cavity. The interface power conductor and signal conductor enter the corresponding dry area through a sealed through-chamber connector. The energy storage battery pack is installed on a pull-out tray at the bottom of the box. The pull-out tray cooperates with the guide rail in the energy storage dry area and is fixed in the operating position.

[0010] A method for controlled access and continuous power supply of multi-source power for portable emergency communication includes the following steps: S1: Collect the status and load power of the energy storage battery pack, determine the allowable bridging power and remaining bridging energy on the unified DC bus side, and verify the power supply to be connected based on the interface identification information and measured electrical parameters. S2, before capability verification, establish candidate verification schemes, and use the target power, candidate loading level, and time boundary of the candidate verification schemes simultaneously for predicting the successful takeover sequence and determining the pass / fail of capability verification; establish a successful takeover sequence and a failure exit backup power supply sequence, including verification time, respectively; in the failure exit backup power supply sequence, set the bus power supply of the power supply to be connected to zero, and adopt a backup power supply process independent of the power supply to be connected; authorize verification only when the bridging power demand in each time period of each sequence does not exceed the corresponding allowable bridging power, and the sum of the bridging energy demand and reserved energy in each sequence does not exceed the remaining bridging energy; S3. After the electrical verification is passed and the verification is authorized, the pre-amplifier corresponding to the power supply to be connected is disconnected from the unified DC bus. The power supply to be connected independently supplies power to the test load connected across the positive and negative terminals of the local DC output of the pre-amplifier. The test power is not included in the bus power supply power. The upper limit of the continuous power supply and the verified load level are confirmed according to the candidate verification scheme. S4. After the capability verification is passed, based on the actual confirmed continuous power supply limit, verified load level, actual elapsed time and current remaining bridging energy, re-verify the remaining access process and failure backup process; after verification is passed, disconnect the test load, connect it to the unified DC bus after voltage matching and pre-charging, select the verified load level transfer power that meets the bridging power and bridging energy constraints, and compensate the measured power gap on the bus side through a bidirectional DC converter; S5. During the execution of steps S2 to S4, the remaining bridging energy is continuously updated based on the measured discharge and anomalies are monitored. Step S2 is re-executed before additional verification, extended connection, re-pre-charging, or generator restart. If the constraint is not met, the corresponding operation is not started or stopped. The allowed load branches are disconnected in a preset order. Disconnection feedback is obtained and the exit is confirmed by the measured current before re-verification.

[0011] Furthermore, based on the lowest measuring point temperature, single cell voltage, state of charge, and health status of the energy storage battery pack, the calibration data for the corresponding operating conditions are queried, and the allowable bridging power on the bus side is determined in conjunction with the limitations of the battery management system, the bidirectional DC-DC converter, and the connection path; when the measurement uncertainty range covers multiple calibration zones, the minimum values ​​are taken for the lower limit of the allowable current, the lower limit of the battery terminal voltage, and the lower limit of the output energy on the bus side for each effective zone covered. The initial remaining bridging energy of a bridging cycle is determined as the lower bound of the calibrated remaining energy for the corresponding operating condition, and updated within that bridging cycle using the following formula:

[0012] in, ; To update the serial number; and For adjacent update times; The remaining bridging energy; This is the lower bound of the calibrated remaining energy corresponding to the current operating condition; The measured energy storage power on the bus side is taken as positive for discharging and negative for charging. The additional verification, recharging, and control cycle update within a single bridging round do not reinitialize the remaining bridging energy, and the charging energy and expected temperature gain in this round do not increase the remaining bridging energy; the initial energy for the next bridging round is established only after the external power supply stably supplies power to the bus, the current bridging round ends, and the battery status is reconfirmed.

[0013] Furthermore, the successful takeover sequence and the failed exit sequence of backup power supply are divided into time periods according to the serial and parallel relationship of the actual operation. The upper limit of the power consumption, the lower limit of the external power supply, and the lower limit of the allowable bridging power of energy storage are used for verification in each time period. The bus power supply of the power source that has not yet been connected is zero in the corresponding time period. The failed exit sequence of backup power supply ends when the independent backup power source completes the takeover or the energy storage maintains the load until the preset task endpoint. The preset task endpoint is fixed before the authorization round and will not be recalculated due to retry. When the positive power gap borne by energy storage remains constant during the serial execution, verification, and decommissioning of capability verification and backup power supply processes, and the backup bridging energy demand after decommissioning is a fixed value or a uniform conservative upper bound applicable to the entire candidate verification duration, the upper limit of the verification duration for this round is:

[0014] in, This represents the current remaining bridging energy at the time the authorization was granted in this round of verification. To reserve energy; The bridging energy required to complete the backup power supply process after exiting verification, or its uniform conservative upper bound; To verify and maintain a constant bridging power gap during the exit period; Time required to exit verification; This is the maximum verification time for this round; Verification is performed only when the planned verification duration is greater than zero, does not exceed the upper limit of the duration, and step S2 passes the verification. The verification time is accumulated from the first operation of this round of authorized scheme. When the upper limit of the duration is reached, the test load is shut down and the pre-verified backup power supply process is executed. Before verification again, the remaining bridging energy is updated and re-verified.

[0015] Furthermore, step S3 includes verification of continuous power supply capability and verification of dynamic loading capability; In the continuous power supply capability verification, the absolute value of the change rate of energy storage in the local output capacitor is kept within a preset threshold and maintained for a preset duration. The continuous power supply capability is confirmed by combining the measured power and the test power on the input side. The upper limit of the continuous power supply is determined by combining the path efficiency, derating factor, front-end converter limit and connection path limit. In the dynamic loading capability verification, the input power, the test power and the status of the main DC energy storage nodes inside the front-end converter are sampled synchronously. The internal energy storage release part is deducted from the test power, and the conversion loss and the internal energy storage increase part are deducted from the input power. The lower limit of the bus-side power supply is obtained by combining the smaller value of the two with the power error limit and the path efficiency, and then compared with the preset power lower limit trajectory of the candidate loading level segment by segment. Only when the upper limit of the continuous power supply is not lower than the candidate target power, the lower limit of the bus-side power supply meets the preset lower limit trajectory, and the holding time and electrical status conform to the corresponding candidate verification scheme, the candidate loading position is converted into a verified loading position; the execution command curve, power supply lower limit trajectory and applicable operating conditions of the verified loading position are saved respectively. If the actual confirmed upper limit of the continuous power supply is lower than the candidate target power, or if the actual confirmed lower limit of the bus-side power supply is lower than the corresponding value of the preset lower limit trajectory of the candidate loading position in at least one verification time period, the candidate verification scheme is re-established based on the actual confirmation result and step S2 is executed.

[0016] Furthermore, under the conditions that the net load after deducting other verified power supplies remains constant, the initial bus power of the generator can be maintained during the delay phase, the upper limit of the verified continuous power supply of the generator is sufficient to bear the net load, and the bridging power constraint is satisfied throughout the process, the connection slope is determined using the verified lower bound of linear power growth:

[0017] The calculation conditions are as follows and Select the one that meets the requirements from the verified load profiles. The gear; in, ; The net load power; The bus power already provided by the generator and able to be maintained during the delay phase; This represents the initial positive power gap. This represents the current remaining bridging energy. To reserve energy; The remaining time before the generator actually begins to increase the bus power; To satisfy the minimum growth slope of the remaining bridging energy constraint; The lower bound slope of the power increase for the selected verified gear; The upper limit of the slope is determined jointly by the verified loading capacity and the limitations of the preceding converter. The power command curve bound to the selected gear is executed by the generator branch pre-stage converter, and no arbitrary interpolation extrapolation is performed on unverified gears; when the calculation conditions are not met, segmented budget is used; when there are no verified gears that meet the bridging constraints, the load exit is allowed and re-verified or switched to the verified backup power supply process.

[0018] Furthermore, the energy storage battery pack is equipped with an electric heating element connected to the unified DC bus via a power regulation switch; a first temperature threshold and a second temperature threshold higher than the first temperature threshold are set. When the lowest measuring point temperature is lower than the first temperature threshold, it enters a low-temperature restricted state and discharge is restricted according to the battery management system and calibration data; after entering the low-temperature restricted state, it remains in this state until the lowest measuring point temperature reaches the second temperature threshold and remains so for a preset time. After the above recovery conditions are met, the state is released, and the charge and discharge restrictions are updated according to the charging and discharging permissions of the battery management system; the determination of the recovery conditions is not based on the premise that the electric heating element is heating. When the generator is not running and the main power supply is supplying power normally, assuming that the main power supply is out of service, the bridging power margin and bridging energy margin required for generator startup and takeover are checked; if either margin is not higher than the corresponding preset startup threshold, a generator startup request is made. After the startup and access process to be executed is checked and passed according to step S2, the generator is started through the remote start / stop interface, and the capability confirmation and controlled access are completed according to steps S3 and S4. When the low-temperature limited state is under which the external power supply is stable, the remaining power after satisfying the requirements of load retention, necessary auxiliary power, charging allowance, and power reserve is allocated to the electric heating element, and the increase in heating power is subject to the verified load capacity; after the low-temperature limited state is lifted, the power command for this low-temperature recovery heating is set to zero. When the generator is running, the generator will be stopped only when another verified power source is stably supplying power to the bus, and under the assumption that the power source is out of service, the bridging power margin and bridging energy margin corresponding to the generator restart and takeover are both non-negative, both reach the corresponding preset recovery threshold and continue for a preset time; when the generator is the only continuous power source, the generator will not be stopped because the temperature at the lowest measuring point reaches the second temperature threshold.

[0019] Compared with the prior art, the present invention has the following beneficial effects: 1. This invention, under the condition that the pre-converter of the power supply to be connected is disconnected from the unified DC bus, allows the power supply to independently drive the test load, avoiding the masking of insufficient load-carrying capacity of the power supply to be connected by energy storage compensation. Continuous power supply capability is confirmed by maintaining stability through the measured input power, test power, and changes in local output capacitor energy storage. Dynamic loading capability is obtained by synchronously measuring input power, test power, and internal energy storage changes, correcting for short-term energy release, conversion losses, and measurement errors, and then comparing this lower limit with the lower limit trajectory of candidate load levels. The upper limit of continuous power supply is used to limit the power that the branch can handle, while the lower limit of dynamic power supply is used to calculate the bridging requirements during takeover. These two are formed and used separately to reduce the risk of authorizing takeover based solely on declared parameters, commanded power, or short-term capacitor support results.

[0020] 2. Based on battery temperature, individual cell voltage, state of charge (SOC), and state of health (SOC), and considering the limitations of the battery management system, bidirectional DC-DC converter, and connection paths, the allowable bridging power and remaining bridging energy are determined separately, allowing instantaneous power constraints and overall energy constraints to participate in power supply decisions independently. This allows for the identification of situations where remaining energy is sufficient but low-temperature discharge power is insufficient, as well as situations where instantaneous power meets requirements but is insufficient to support the complete takeover process, reducing the risk of making incorrect takeover decisions based solely on SOC or current output power. During bridging, energy is deducted based on measured discharge, and the expected temperature rise gain and current charging energy are not pre-calculated, helping to prevent unconfirmed energy storage capacity from being used in the takeover budget.

[0021] 3. Before capability verification, establish separate success takeover and failure exit backup power supply sequences, including verification time. In the event of a failure, reset the bus power supply of the power source to be connected to zero. This ensures that verification authorization depends not only on the verification process itself but also on whether the energy storage is sufficient to support exit and backup power supply after verification failure. Additional verification, extended pre-connection dwell time, or re-verification before recharging ensure that the increased operation time is promptly reflected in the remaining bridging budget. For cases where verification and backup power supply are sequential and the power gap is constant, further determine the upper limit of verification time to limit the consumption of backup power supply reserves by extended verification and repeated operations, reducing the risk of "meeting takeover conditions before verification but experiencing power outage due to insufficient energy storage after verification."

[0022] 4. Under the condition of constant net load and a verified linear power growth trajectory, the minimum takeover slope is determined based on the remaining bridging energy, pre-takeover delay, and power gap. The upper limit of the slope is determined based on the verified loading capacity of the generator and the upstream converter. This ensures that the takeover process is simultaneously constrained by the continuous support capacity of energy storage and the dynamic load-carrying capacity of the generator, reducing the risk of premature energy depletion due to slow takeover and output fluctuations of the generator due to excessively fast takeover. During power transfer, energy storage compensates for the measured power gap on the bus side, reducing the power supply gap caused by premature output reduction of energy storage before the external power command power is realized. When there is no load level that meets the constraints, the system is re-verified by sequentially disconnecting allowed loads and confirming the actual disconnection results, ensuring continuous power supply to the preset reserved communication loads while meeting the preset operating boundaries.

[0023] 5. By combining mechanical coding with identification information and verifying measured electrical parameters, a hierarchical access condition is formed, from interface matching to electrical compatibility confirmation. The contact in the plugged-in state is the first to disconnect and trigger the branch hardware shutdown, ensuring that plugging abnormalities are promptly converted into protective actions. The main circuit closure is limited by the voltage difference between the local DC output and the bus, the pre-charge current, and the duration. After receiving feedback from the main contactor closure, the pre-charge branch is exited, reducing the impact caused by direct connection when potential mismatch or pre-charge is incomplete, and mitigating the electrical risks associated with incorrect connection and plugging abnormalities.

[0024] 6. During low-temperature operation, the generator startup is correlated with the bridging power margin and energy margin after the main power supply is disconnected, ensuring that the generator startup timing aligns with actual backup power requirements. Under low-temperature constraints, after the external power supply stabilizes, the remaining power after meeting requirements for reserved loads, necessary auxiliary power, permitted charging, and power reserves is used for battery heating, limiting the impact of heating on communication power supply and regulation margin. Once the temperature recovery conditions are consistently met, the low-temperature recovery heating is cancelled, and the restrictions are updated based on charging and discharging permits. The temperature recovery judgment continues without interruption due to temporary lack of heating conditions. The generator is only stopped when another verified power source is stably supplying power, and the generator restart power margin and energy margin after its disconnection both meet the recovery conditions. This distinguishes between temperature recovery, heating disconnection, and backup power capacity recovery, reducing the risk of prematurely stopping the generator when the battery has warmed up but the bridging capacity has not yet recovered.

[0025] 7. By centrally housing the quick-connect interfaces within a recessed interface cavity separated from the power conversion dry area, energy storage dry area, and control dry area, external wiring can be completed within the interface cavity without opening the internal dry area. Rain guards, lateral water-repellent structures, bottom drainage holes, and interface arrangements above the drainage surface collectively form a water-blocking and drainage path. Sealed through-chamber connectors reduce the risk of moisture entering the dry area along the conductor through-chamber locations, improving the adaptability of on-site wiring to rainy environments. The enclosure's handling handles and the lower pull-out energy storage tray facilitate equipment transport and the disassembly and maintenance of energy storage battery packs, meeting the needs of emergency communication deployment and maintenance. Attached Figure Description

[0026] To more clearly illustrate the technical solutions in the embodiments of the present invention, the accompanying drawings used in the specific embodiments are briefly described below.

[0027] Figure 1 This is a block diagram of the overall structure of the portable emergency communication multi-source power supply controlled access and continuous power supply system in Embodiment 1 of the present invention; Figure 2 This is a schematic diagram of the electrical connections of the single-path external power supply access branch, the isolated capability testing component, and the busbar controlled access component in Embodiment 1 of the present invention. Figure 3 This is a schematic diagram of the dry and wet partitioning of the enclosure, the interface cavity, and the installation position of the energy storage battery pack in Embodiment 1 of the present invention; Figure 4 This is a schematic diagram of the quick-connect interface and plug-in interlock in Embodiment 1 of the present invention, wherein, Figure 4 (a) is a schematic diagram of the plug and socket mating structure. Figure 4 (b) is a schematic diagram of the contact and disconnection sequence. Figure 4 (c) is a schematic diagram showing the connection relationship between the plug-in state, locking detection and branch hardware shutdown; Figure 5 This is a schematic diagram showing the connection relationship between the energy storage bridging component, the graded load output component, the uninterruptible auxiliary power supply component, the electric heating element, and the unified DC bus in Embodiment 1 of the present invention. Figure 6 This is a flowchart illustrating the overall process of the portable emergency communication multi-source power controlled access and continuous power supply method in Embodiment 2 of the present invention. Figure 7 This is a flowchart of the process for verifying bridging power and bridging energy and authorizing candidate operations based on the successful takeover sequence and the failed exit backup power supply sequence in Embodiment 2 of the present invention. Figure 8 This is a flowchart illustrating the isolation capability verification, continuous power supply limit confirmation, and verification load level formation in Embodiment 2 of the present invention. Figure 9 This is a timing diagram illustrating the capability verification, pre-charge access, and generator takeover process in Embodiment 2 of the present invention, wherein... Figure 9 (a) is a schematic diagram showing the change of power distribution on the bus side over time. Figure 9 (b) is a schematic diagram showing the change of remaining bridging energy over time; Figure 10 This is a control flowchart for low-temperature discharge limitation, battery heating, backup capacity recovery, and generator start-up / stop in Embodiment 2 of the present invention. Figure 10 (a) is a flowchart of low-temperature discharge limitation and battery heating control. Figure 10 (b) is the flowchart for backup capacity verification and generator start-stop control.

[0028] In the diagram: 1-Enclosure; 2-Energy generator; 3-External power supply access branch; 4-Quick-connect interface; 5-Input protection circuit; 6-Pre-converter; 7-Isolation capacity testing component; 8-Controlled bus access component; 9-Unified DC bus; 10-Energy storage bridge component; 11-Graded load output component; 12-System controller; 13-Uninterruptible power supply component; 14-Branch hardware shutdown circuit. 101 - Power conversion dry area; 102 - Energy storage dry area; 103 - Control dry area; 104 - Interface cavity; 105 - Partition; 401 - Plug; 402 - Socket; 409 - Protective grounding contact; 410 - Identification contact; 411 - Main power contact; 412 - Plug-in status contact; 1001 - Energy Storage Battery Pack. Detailed Implementation

[0029] The following two embodiments illustrate the structural composition, connection relationship, control process and working principle of the present invention.

[0030] Example 1: A portable emergency communication multi-source power supply controlled access and continuous power supply system: It should be noted that in this embodiment, "power supply to be connected" refers to an external power supply that has been connected to the corresponding quick-connect interface 4 but has not yet been authorized to supply power to the unified DC bus 9. "Reserved load" refers to an external load that is supplied with power through the graded load output component 11 and remains connected in the current operating state. "Necessary auxiliary power" refers to the power consumption for overall machine control, sampling, contactor drive, and heat dissipation that is not included in the above-mentioned load output branches. Battery heating power and charging power of energy storage battery pack 1001 are counted separately, and the same electrical equipment and the same part of conversion loss are not counted repeatedly. "Bridging" refers to the process by which the energy storage bridging component 10 compensates for the power supply gap when the external power supply has not yet formed sufficient bus power supply. One round of bridging includes one or more rounds of authorized power capacity verification. Additional verification, recharging, and controller cycle updates do not reinitialize the remaining energy of this round of bridging. "Upper limit of power supply" is used to limit the maximum power supply that the access branch can bear; "Lower limit of power supply" is used to calculate the minimum power supply that can be included in each time period of a specific loading process; "Power command" is the target that the controller requires to execute; "Measured power" is the power actually obtained at the corresponding measurement point. The above four are stored and used separately and do not substitute for each other. The power and energy used for the power supply budget below are uniformly converted to the DC bus side, and the unified DC bus 9 is hereinafter referred to as the bus. The electrical energy consumed by the isolated capability testing component 7 is borne by the power supply to be connected and is not included in the electrical energy supplied by the power supply to the bus; the energy storage consumed by maintaining the reserved load and necessary auxiliary power during the capability verification period is included in the bridging budget.

[0031] like Figure 1 As shown, the system in this embodiment includes a housing 1, a generator 2 separately installed from the housing 1, and multiple external power supply access branches 3, an isolated capacity testing component 7, a unified DC bus 9, an energy storage bridging component 10, a graded load output component 11, and a system controller 12 installed in the housing 1. The system also includes an uninterruptible auxiliary power supply component 13, an operation display component, and a fault recording component.

[0032] Generator 2 is an engine-driven generator set with electric start capability. External power supply branch 3 includes an AC mains power supply branch, an AC power supply branch for generator 2, and an external energy storage DC power supply branch. The AC power sources are not directly connected in parallel on the AC input side, but are converted to DC output by their respective pre-converters 6 before being connected to the bus.

[0033] like Figure 2As shown, each external power supply branch 3 is sequentially connected along the power transmission direction to a quick-connect interface 4, an input protection circuit 5, a pre-converter 6, and a bus-controlled access component 8. A local output capacitor is connected in parallel between the positive and negative terminals of the local DC output of the pre-converter 6, and an isolated capability testing component 7 is connected across it. The isolated capability testing component 7 is located on the pre-converter 6 side of the bus-controlled access component 8.

[0034] Figure 2 The electrical symbols in the code are used according to the following meanings: To test the contactor, To test the power switching transistor, For resistive load group, For rapid isolation and backflow prevention switches, It is a bipolar main contactor. It is a bipolar precharge contactor. For pre-charge resistor, For local output capacitor, To test the branch current measurement symbols, This is a symbol for measuring the current in the branch circuit connected to the busbar. and Each positive and negative contact is indicated by a corresponding symbol followed by "+" or "-", and the two poles of the same contactor are mechanically linked. The bus capacitor bank is... The above device codes and measurement symbols are used in conjunction with the digital component markings.

[0035] The energy storage bridging component 10 is connected to the bus via a bidirectional DC-DC converter. The load output branches of the graded load output component 11 are connected in parallel to the bus to supply power to their respective external loads.

[0036] This portable emergency communication multi-source power control access and continuous power supply system forms three distinct power paths: Normal power supply path: External power is supplied to the bus via quick-connect interface 4, input protection circuit 5, pre-converter 6, and bus control access component 8, and then supplied through the load output branch. Capability verification path: The power supply to be connected supplies power to the isolated capability testing component 7 via quick-connect interface 4, input protection circuit 5, and pre-converter 6, while the corresponding bus control access component 8 remains disconnected. Energy storage bridging path: The energy storage battery pack 1001 supplies power to the bus via a bidirectional DC-DC converter to compensate for the power gap caused by reserved loads and necessary auxiliary power.

[0037] like Figure 3 As shown, the structure of cabinet 1 and the dry / wet partition is as follows: The enclosure 1 adopts a rectangular load-bearing frame, with an outer shell plate fixed to the outside of the frame and a continuous partition 105 fixed inside. The inspection opening is equipped with a maintenance cover with a sealing strip. The enclosure 1 has a handling handle connected to the load-bearing frame, support legs at the bottom, and casters at the rear. Inside the enclosure 1, partitions 105 divide the space into a power conversion dry area 101, an energy storage dry area 102, and a control dry area 103. The energy storage dry area 102 is located at the bottom of the enclosure 1, the power conversion dry area 101 is located above or behind it, and the control dry area 103 is located to the side of the power conversion dry area 101. A metal partition 105 is installed between the power conversion dry area 101 and the control dry area 103, allowing for the separate arrangement of the main power conductors and sampling control circuits. A recessed interface cavity 104 is provided on the front of the enclosure 1. The interface cavity 104 is separated from the dry areas by a complete partition 105, and the bottom plate slopes outwards and downwards, with drainage holes at the bottom. The interface mounting plate is fixed inside the interface cavity 104, with the lowest conductive part of the interface higher than the drainage bottom surface. The top of the interface cavity 104 has an outward-extending rain shield, and the sides have staggered, folded-back water-blocking edges. An upward-opening protective cover is installed on the outer side. When closed, the protective cover presses against the opening of the interface cavity 104 through a circumferential sealing strip; when open, it forms a shielding surface above the interface. Unused interfaces are equipped with sealed protective covers. The interface power conductor and signal conductor enter their respective dry areas through sealed through-chamber connectors. The through-chamber connectors are fixed to the rear wall of the interface cavity 104 by flanges, fasteners, and gaskets, with the power conductor and signal conductor passing through the chamber separately. The heat sinks of the pre-converter 6 and the test load are installed close to the rear wall of the enclosure 1, and heat is transferred to the external heat sink fins via a heat-conducting structure. The external heat dissipation duct does not directly connect to the energy storage dry area 102 and the control dry area 103. A heat insulation gap is provided between the high-temperature surface of the test load and the energy storage dry area 102, and a protective cover is installed on its outer side. The metal frame, housing, and interface mounting plate connect to the protective grounding busbar. The protective grounding path is not connected in series with the normal power supply switching contactor; the busbar working conductor and the protective grounding conductor are arranged separately. This structure allows external wiring to be completed within the interface cavity 104 without opening the main electrical dry area. The drainage structure of the interface cavity 104 is used to reduce rainwater intrusion into the dry area and is not intended to allow live plugging and unplugging under arbitrary conditions.

[0038] like Figure 2 and Figure 4 As shown, the structure and connection relationship of the quick-connect interface 4, the input protection circuit 5, and the pre-converter 6 are as follows: like Figure 4As shown in (a), the quick-connect interface 4 consists of a panel socket 402 and a cable plug 401. The socket 402 is equipped with a mounting flange and a circumferential sealing ring, while the plug 401 is equipped with a gripping housing, a locking sleeve, and a cable fixing sleeve. The insulating bases of the plug 401 and the socket 402 are equipped with mating mechanical coding bosses and grooves. Different mechanical coding is used for the AC and DC branches to prevent mismatched plugs 401 from fully engaging. The interface is equipped with an identification contact 410, a main power contact 411, and a connection status contact 412. The AC interface also includes a protective grounding contact 409. Figure 4 As shown in (b), during insertion, the protective grounding contact 409 connects first, followed by the identification contact 410, then the main power contact 411, and finally the insertion status contact 412. During withdrawal, the insertion status contact 412 disconnects before the main power contact 411. The locking sleeve engages with the locking part of the socket 402, and the socket 402 is equipped with a locking detection switch. The locking detection signal and the insertion status signal are used together to confirm the fully inserted state. The identification contact 410 connects to an isolated low-voltage identification sampling circuit. A resistor encoding element is installed inside the plug 401, and the identification sampling circuit reads the corresponding power declaration information according to the encoding. The declaration information includes the power category, nominal input parameters, and branch parameter configuration number. The identification sampling circuit is powered by the uninterruptible auxiliary power supply component 13 and does not depend on the power supply to be connected having already been powered. After the main power contact 411 makes mechanical contact, the input contactor and the bus controlled access component 8 remain controlled disconnected. Figure 4 As shown in (c), the plug-in state contact 412 and the lock-up detection switch are simultaneously connected to the main controller 12 and the branch hardware shutdown circuit 14. When the plug-in state contact 412 is abnormally disconnected, the hardware shutdown circuit cancels the power switch drive and triggers the contactor to disconnect. Declaration identification and electrical compatibility verification are performed separately. The declaration information is used to select the verification range, and the actual electrical parameters are used to confirm whether the input voltage, AC / DC attributes, DC polarity, and AC frequency conform to the corresponding range. It distinguishes between mains power and generator 2 not only based on similar AC voltage and frequency.

[0039] The AC input protection circuit 5 includes an input fuse, a bipolar input contactor, a surge suppression circuit, a filter circuit, and an input current limiting power-on circuit. The DC input protection circuit 5 includes an input fuse, a reverse connection detection and protection circuit, a bipolar input contactor, and an input current limiting power-on circuit. The input protection devices are installed near the corresponding power bay terminals. The input voltage sampling branch is located on the power supply side of the input contactor, and provides a measurement signal to the overall controller 12 through a protected high-impedance sampling and isolation circuit, enabling electrical verification to be performed even when the input contactor is disconnected.

[0040] The pre-converter 6 adopts a rectangular metal module structure, internally housing power conversion circuits, magnetic components, drive circuits, a local controller, and local output capacitors, with a heat-conducting mounting surface at the bottom. The AC pre-converter 6 includes a rectification and input current regulation stage and an isolated DC-DC conversion stage; the DC pre-converter 6 employs an isolated buck-boost DC-DC conversion circuit. Each pre-converter 6 is equipped with input current limits, local output voltage limits, output power limits, and a power command interface. The pre-converter 6 is fixed to the metal mounting plate of the power conversion trunk area 101, with power components connected to a heat dissipation structure via a heat-conducting insulating layer. The main power terminals and control connectors are arranged separately. The local output voltage, input current, input voltage, and internal main DC energy storage node voltage of the pre-converter 6 are connected to a sampling circuit to distinguish between continuous external power input and short-term energy release from the converter's internal storage. When the generator 2 is connected to the mains, the main controller 12 adjusts the power drawn from the generator 2 via the generator 2 branch pre-converter 6, while the generator 2's original speed regulation and excitation mechanisms maintain unit operation. The power command of generator 2 is not directly counted as the already realized bus power supply.

[0041] like Figure 2 As shown, the structure of the isolated capability probing component 7 is as follows: The isolated capability testing assembly 7 includes a series-connected testing contactor, a testing power switch, and a resistive load group, as well as a testing current sensor, a testing temperature sensor, and a testing independent over-temperature disconnect device. The series-connected testing branch is connected across the positive and negative terminals of the corresponding local DC output of the upstream converter 6. The resistive load group consists of elongated power resistors fixed to a metal heat sink. The testing power switch is mounted in a separate area of ​​the heat sink through a thermally conductive insulating layer. The testing current sensor is installed in the testing branch, and the testing temperature sensor is installed near the mounting surface of the resistor group. The testing independent over-temperature disconnect device is connected to the enable circuit of the testing contactor or the testing power switch. During capability verification, the main contactor, pre-charge contactor, and fast disconnect switch remain open. The overall controller 12 simultaneously checks the contactor feedback, switch status, and bus input branch current. Testing is prohibited when the command and feedback are inconsistent; a zero bus current is not used alone as a criterion for determining that the mechanical contactor has been disconnected. The test power is adjusted by the duty cycle of the power switch, and the measured local output voltage and test current are used for power feedback. Each candidate load level has a specified target power, loading process, holding time, and qualification criteria. In this embodiment, there is no busbar-to-load power supply path between the power supply to be connected and the energy storage. Therefore, energy storage compensation will not mask the insufficient output of the power supply to be connected itself.

[0042] like Figure 2 and Figure 5 As shown, the structure of the busbar controlled access component 8 and the unified DC bus 9 is as follows: The busbar controlled access component 8 includes a bipolar main contactor, a bipolar precharge contactor, a precharge resistor, a fast isolation and backflow prevention switch, a busbar access current sensor, and voltage sampling circuits on both sides of the switch. The fast isolation and backflow prevention switch is composed of back-to-back power switching transistors and is equipped with reverse current detection and independent shutdown drive. The positive terminal of the local DC output is first connected to the fast isolation and backflow prevention switch, and then divided into a main path and a precharge path. The main path is connected to the positive terminal of the busbar through the positive contact of the main contactor; the precharge path is connected to the positive terminal of the busbar through the positive contact of the precharge contactor and the precharge resistor. The fast isolation and backflow prevention switch is located upstream of the common path of the two paths, and the precharge path does not bypass this switch. The negative terminal of the local DC output is connected to the negative terminal of the busbar through the negative contact of the main contactor and the negative contact of the precharge contactor. The main access and precharge paths form complete positive and negative circuits respectively. The main contactor and the precharge contactor are equipped with auxiliary feedback contacts. The pre-charge branch exits only after receiving feedback from the main contactor's closure, not only based on the coil drive command confirming the establishment of the main circuit. When the bus is energized, the upstream converter 6 first adjusts the local output voltage in isolation to bring it close to the bus voltage. Then, while keeping the main contactor open, it enables the rapid isolation and anti-backflow switch and closes the pre-charge contactor to establish the pre-charge circuit. The voltage difference comparison object is the local DC output terminal and the bus terminal, not the unconverted external AC voltage or DC input voltage.

[0043] The unified DC bus 9 includes positive and negative copper busbars, insulating supports, a protective cover, bus capacitor banks, a voltage sampling unit, and an overvoltage protection circuit. Each external power supply branch, energy storage branch, and load branch is connected to the bus via protection devices. The bus capacitors are positioned near the output of the energy storage converter and the load bus junction to handle short-term power gaps before a rapid control response. The energy storage bridging assembly 10 handles subsequent continuous power gaps. The bus overvoltage protection is connected to the fast power reduction interface of the upstream converter 6. After the energy storage charging permit is revoked, the transient power excess caused by a sudden load drop is handled by external power reduction and bus protection, without forced battery absorption.

[0044] like Figure 3 and Figure 5 As shown, the energy storage bridging component 10 and the temperature control structure are as follows: The energy storage bridging assembly 10 includes an energy storage battery pack 1001, a battery management system (BMS), fuses, a battery main contactor, a battery-side pre-charge circuit, a bidirectional DC-DC converter, a single-cell voltage sampling unit, a battery temperature sensor, and a current sensor. The energy storage battery pack 1001 consists of cells, insulating supports, end plates, and clamping components, and is mounted on a rectangular pull-out tray. The tray's sides mate with guide rails in the energy storage dry area 102, and a handle is provided on the front. The operating position is fixed by limiting components and fasteners. The energy storage battery pack 1001 is connected to the battery-side main path and the pre-charge branch via a fuse. The battery main contactor is located in the main path, and the battery-side pre-charge circuit forms a current-limiting pre-charge branch connected in parallel with this main path. The outputs of both paths are connected to the battery-side input of the bidirectional DC-DC converter, and the return conductors are connected to form a complete circuit. During startup, the pre-charge branch first completes controlled charging of the battery-side input capacitor. After meeting the preset pre-charge conditions, the battery main contactor closes, and after obtaining closure feedback, the pre-charge branch exits, allowing normal charging and discharging to proceed through the main path. The bidirectional DC-DC converter's bus side is connected to a unified DC bus 9. The aforementioned fuses, battery main contactors, and battery-side pre-charge circuit are located in... Figure 5 The middle section represents the battery-side protection and pre-charging circuit. Energy storage power deactivation and electrical disconnection are completed before the tray is removed.

[0045] The bidirectional DC-DC converter employs a bidirectional power conversion structure consisting of a battery-side power bridge, a high-frequency isolation transformer, and a bus-side power bridge. The local controller executes current and bus voltage closed-loop control, while the overall controller 12 issues charge / discharge limits and operating status. Battery temperature sensors are distributed at the expected lowest temperature location, the middle of the battery pack, and near the heating elements. The lowest measuring point temperature is used to determine low-temperature capability, and the highest measuring point temperature is used for over-temperature limiting. Individual cell voltage sampling lines are connected to the measuring points of each series-connected cell. The electric heating elements are installed at the bottom or side of the battery pack and are connected to the cells via a heat spreader and thermally conductive insulation layer. The electric heating elements are powered by the bus through independent protection devices and a power regulation switch, and are equipped with independent over-temperature disconnect devices. The battery management system's charging permission, discharging permission, current limit, and protection status take precedence over the overall scheduling commands. The overall controller 12 does not bypass the battery management system limits by increasing the scheduling power.

[0046] like Figure 1 and Figure 5 As shown, the structure of the load output, generator 2 control, and auxiliary power supply is as follows: The graded load output component 11 includes multiple output branches connected in parallel to the bus, each equipped with an output protection device, an output contactor, a current sampling unit, and a load interface. Branches requiring output voltage changes are equipped with output converters. The bus input power of each output branch is measured separately. For branches whose output power is converted, the corresponding conversion efficiency is used for calculation, without adding the conversion losses already included in the branch's calculation. The overall controller 12 stores the retention level and allowed exit sequence of each branch. After issuing a load reduction command, contactor disconnection feedback and confirmation of a decrease in branch current are required before the branch is removed from the retained load.

[0047] Generator 2 has an independent starting battery, a unit controller, an AC output protection device, and a remote start / stop interface. The unit's starter motor is powered by an independent starting battery and does not occupy the energy storage bridging path of the communication load. Generator 2 is connected to the generator 2 access branch via an independent power line and to the unit controller 12 via an isolated control line.

[0048] The uninterruptible auxiliary power supply (UPS) assembly 13 includes a bus step-down power supply, an independent auxiliary battery, and a reverse-feedback protection power selection circuit. The bus is powered by the step-down power supply when it is normal; when the bus has not yet been established or experiences a short-term abnormality, it is powered by the auxiliary battery. The auxiliary battery supplies power to the control, sampling, protection, and contactor drive systems, but does not handle the main communication load.

[0049] The overall controller 12 is installed in the control dry area 103 and includes a processor, program memory, parameter memory, isolated sampling interface, communication interface, drive interface, and independent watchdog. The parameter memory stores battery calibration records, candidate verification schemes, verified load levels, timing parameters, and load configurations. Connection errors, severe overcurrent, severe bus overvoltage, over-temperature testing, and battery protection signals are sent to the independent hardware protection link. Hardware protection is executed first, without waiting for the program to complete.

[0050] like Figure 1 , Figure 6 and Figure 7 As shown, the working principle of the system in this embodiment is as follows: After the system starts up, the auxiliary power supply enables the controller and protection circuits to operate. When the energy storage meets the discharge conditions, a bus is established and loads are connected according to priority.

[0051] After the power supply to be connected passes the declaration identification and electrical verification, the controller does not immediately authorize it to enter the bus. Instead, it calculates the takeover requirements after successful capability verification and the exit and backup power supply requirements after verification failure. Only after both scenarios meet the energy storage capacity and energy constraints will isolated capability verification be performed.

[0052] The target power, load level, and maximum operating time used in the candidate verification scheme constitute both the prerequisites for successful takeover prediction and the qualification conditions for actual verification. If the actual results do not meet these prerequisites, the original successful prediction becomes invalid.

[0053] After successful verification, the system is recalibrated based on the actual verification results and the current energy storage status, and voltage matching, pre-charging, and takeover are then performed. Energy storage is compensated for according to the measured power shortfall on the bus side, without prematurely reducing output based on the declared or commanded power of the external power source.

[0054] The remaining bridging budget is continuously updated when verification, waiting, precharging, or takeover is delayed. If no takeover process satisfies the constraints, the power demand is changed by actually disconnecting the allowed takeover loads, and recalculated after the takeover is confirmed.

[0055] Example 2: A method for controlled access and continuous power supply of multi-source power for portable emergency communication: like Figure 6 As shown, this embodiment applies to the system of Embodiment 1. The whole machine controller 12 executes steps S1 to S5, and coordinates the power supply of the DC bus 9 through the external power access branch 3, the energy storage bridge component 10, and the hierarchical load output component 11. Step S1 is used for status acquisition and power verification, step S2 is used for candidate operation authorization, step S3 is used for isolation capability verification, and step S4 is used for access and power transfer. The measured discharge integration, anomaly monitoring, and budget update in step S5 continue to run during the execution of steps S2 to S4, and do not start with the completion of takeover.

[0056] In the following text, power is expressed in W, energy in J, time in s, voltage in V, current in A, resistance in Ω, and capacitance in F; when using kW and kJ in design calculations, the units should remain consistent. Definitions ,in For real numbers involved in the calculation, and These represent taking the maximum and minimum values, respectively. The superscript " " indicates a control command, indicated by the superscript " The superscript "" indicates the measured value. The horizontal line above the variable indicates the conservative upper bound, and the horizontal line below the variable or the minus sign in the upper right corner of the variable indicates the conservative lower bound. " indicates a candidate template, indicated by the superscript " "" indicates the target value. The component labels, process step numbers, and variable subscripts in the attached diagrams are used separately and do not substitute for each other.

[0057] S1, Acquire status, determine bridging capability, and verify the power supply to be connected: 1. Establish battery partition calibration records: like Figure 5As shown, the state data of the energy storage battery pack 1001 is obtained through the battery management system, the single-cell voltage sampling unit, and the battery temperature sensor. Discrete calibration zones are established according to the lowest measuring point temperature, state of charge, health status, and bus-side discharge power range. Each zone also records the applicable single-cell voltage range, single-cell voltage difference upper limit, load change rate range, and valid version. The whole machine controller 12 calls the corresponding records according to the current state.

[0058] Temperature, state of charge, and health status are each divided by a set of increasing boundaries. Internal intervals are left-closed and right-open, with the highest interval including the upper boundary. When a measurement uncertainty interval crosses a zone boundary, all covered valid zones are selected simultaneously. The minimum values ​​are taken for the lower bounds of the allowable current, battery terminal voltage, and bus-side output energy for these valid zones; that is, the same parameter is compared and the minimum value is taken across different valid zones.

[0059] The discharge power partition records not only a constant power point, but also the allowed peak value and rate of change range. If a candidate bridging trajectory exceeds the peak value or rate of change range of a certain record, that record will not be invoked to support this authorization.

[0060] For the first Each zone is tested under boundary and representative internal operating conditions, with corresponding discharge calibrations performed. The tests include constant load and varying load processes specified for that zone. The second calibration yielded:

[0061] in, To assign partition numbers; Number the calibration records within this partition; This represents the actual output energy on the busbar side. The time required to meet the safety cutoff conditions; The measured discharge power is on the bus side. This is the time variable for integration.

[0062] Safety cutoff conditions are determined based on the minimum permissible voltage of the individual cells, temperature boundaries, and battery management system limitations. The lower limit of the zoned energy is:

[0063] in, This is the lower bound of the partition energy. Allowance is provided to cover measurement errors, repeatability differences, and variations within zones.

[0064] The lower bound and allowance of a zone are checked through independent verification of operating conditions. If the verification fails, the lower bound of the record is lowered or the zone is subdivided; zones that fail verification are not used as authorization criteria. The entire intermediate zone cannot be deemed covered simply because two endpoints have been measured, without verification.

[0065] Each record saves: partition boundary, applicable battery configuration, individual cell constraints, load peak and rate of change range, lower limit of allowable current, lower limit of battery terminal voltage, lower limit of bus-side output energy, and effective status.

[0066] 2. Select the calibration record according to the current status: The controller determines the set of records covering the current state based on the current measurement value and error range. And check whether the candidate load trajectories are within the scope of these records.

[0067] The current calibrated remaining energy is:

[0068] in, To control the update sequence number; This is the currently valid set of records; This is the lower bound of the current calibrated remaining energy.

[0069] For varying loads, records covering the predicted maximum bridging power and rate of change are selected, and energy from constant low loads is not directly used for high-power takeovers. When multiple zones are applicable, the minimum lower bound of the bus-side output energy for each applicable zone is used. No new operations are authorized if there are uncovered states, invalid records, or records exceeding the individual unit consistency range.

[0070] After the candidate timing changes the load peak or rate of change range, the records are rematched and the budget is recalculated. If none of the finite candidate timings meet the conditions, the process switches to load adjustment or backup handling, avoiding infinite iteration to search for uncalibrated parameters.

[0071] 3. Calculate the allowable bridging power: The minimum and maximum measuring point temperatures are:

[0072] in, Number the temperature measurement points; The corresponding measuring point temperature; and These are the lowest and highest temperatures, respectively.

[0073] The allowable discharge current is:

[0074] in, The allowable discharge current; Limit the discharge current output by the battery management system; The discharge current limit is corresponding to the temperature constraint. This is the discharge current limit corresponding to the undervoltage constraint of a single unit; This specifies the discharge current limit for the battery-side connection path; all current values ​​are in amperes (A). When the battery management system revokes a discharge permit, the allowable discharge current is zero. Used for calculating temperature-dependent current limits, not related to Figure 2 The symbol for test current measurement in Mixed use.

[0075] The allowable bridging power on the bus side is:

[0076] in, Output power limitation for bidirectional DC-DC converters; This is the lower bound of the discharge conversion efficiency; This represents the lower bound of the battery terminal voltage under the corresponding discharge conditions. Power limitation for the bus-side energy storage connection path.

[0077] When the prediction process enters a more unfavorable temperature, state of charge, or individual cell voltage range, the lower limit of the allowable power for the corresponding range will be adopted, instead of continuing to use the current higher limit.

[0078] At the start of this round of bridging:

[0079] in, This represents the initial remaining energy for this round of bridging. Subsequent updates will follow the S5 pattern and will not be reset with each new test.

[0080] 4. Standardize load statistics: In this embodiment, power is measured at the bus inlet of each load output branch:

[0081] in, This represents the total number of load output branches; Number the branch roads; To retain the state, keep it as 1, and confirm exit as 0; This is the inlet power of the branch bus; To preserve load power.

[0082] Necessary auxiliary power is denoted as The battery heating power is denoted as The actual power consumption on the busbar side is:

[0083] in, The charging power of the energy storage battery pack itself is not included repeatedly. If a branch uses output-side measurements, only the efficiency is calculated for that branch, and the bus inlet measurements of the same branch are not superimposed.

[0084] 5. Perform power claim identification and electrical verification: When using resistance encoding:

[0085] in, To identify the resistor; Used as a reference resistor; To identify the sampling voltage at the node; To identify the circuit reference voltage.

[0086] The controller will identify the resistance value and compare it with preset non-overlapping ranges to obtain a declaration information. Sampling results that are close to an open circuit or short circuit are judged as abnormal.

[0087] After confirming the plug-in and lock-in status, compare the actual input electrical parameters with the corresponding allowable range. Generators that have not yet started are marked as pending pressure build-up; compatibility verification is performed after pressure is built up. Energy consumption already incurred during identification and waiting periods is reflected in the current remaining bridging energy; subsequent budgets do not restart from the initial, undeducted energy level.

[0088] S2, Establish candidate verification schemes and dual-case timing sequences, and determine operation authorization: 1. Link the prediction premises with the verification qualification conditions: like Figure 7 As shown, the overall controller 12 establishes candidate verification schemes before authorizing the power supply to perform capability verification, and verifies the successful takeover sequence and the failure exit backup power supply sequence respectively. Each candidate verification scheme corresponds to a record, which includes at least the power supply and branch identification, target bus power supply, candidate loading level, trial command curve, minimum hold time, maximum operation time, allowable input range, local voltage range, power error range, and exit method.

[0089] The candidate load levels each store the execution command curve and the expected lower bound of the power supply. The two curves are not in the same field; the command curve takes into account conversion losses and tracking compensation, while the lower bound of the power supply is used for bridging budget.

[0090] Successful takeover timing is established based on the target power, load level, and time boundaries recorded in the log. Only when the actual verification results meet these conditions is the candidate solution considered verified.

[0091] If the actual confirmed continuous power supply limit is lower than the target power of the current candidate verification scheme, or if the actual confirmed lower limit of the bus-side power supply is lower than the corresponding value of the preset lower limit trajectory of the current candidate loading position during at least one verification period, the authorization of the original candidate verification scheme will not be used. The controller will establish a new candidate verification scheme based on the actual confirmation results, update the remaining bridging energy, and re-verify the successful takeover sequence and the failure exit backup power supply sequence.

[0092] Before the power source passes verification, its power supply in the actual bus is set to zero. The non-zero power in the successful prediction only represents the conditional branch of "after the conditions are verified and the connection is completed", and does not constitute advance power supply authorization.

[0093] 2. Define the timing boundaries for each state:

[0094] Input power-on, stabilization wait, cooling wait, contactor action, and control tracking delay are all included in the above-mentioned state classification. Time already included in a certain state is not added again; unrecorded serial time cannot be ignored.

[0095] Parallel operations are divided into time periods based on their actual overlap. If a backup generator has already started in parallel, only the remaining startup time is counted after a failure; if the backup generator has not yet started, its required time is not deducted in advance.

[0096] Failure branches are established for each state boundary and decision point during operation, and the most unfavorable power and energy results are taken. Under constant load, serial operation, and when the backup process does not change with the time of failure, the latest failure case is used as a conservative representative of the corresponding stage.

[0097] 3. Bridging requirements and licensing conditions: like Figure 7 As shown, each predicted time series is divided into continuous time periods according to state boundaries and actual serial / parallel relationships. For the case... The For each time period, calculate:

[0098] in, This is the number of the successful outcome or a failed branch; Number the time period within this situation; The total number of branches connected to external power supply; Number the branch roads; This represents the bridging power requirement for that time period. , and These are the upper limits for reserved load, necessary auxiliary power, and heating power during that time period, respectively. This is the lower limit of the bus power supply for the external power supply branch. When no heating is scheduled, the heating power is zero.

[0099] Each time period uses the upper limit of power consumption within that period, the lower limit of external power supply, and the lower limit of permissible bridging power, without using the instantaneous value at the start of the time period to represent the state of the entire period. Let this situation have a total of The time period, the first The actual length of the segment is ,calculate:

[0100]

[0101]

[0102] in, This represents the lower bound of the allowable bridging power for the corresponding time period; This represents the minimum power margin for this situation; This is the bridging energy requirement for this situation; This represents the energy margin for this situation; The current remaining bridging energy at the time of verification; To reserve energy, when using equal time intervals, each Take the same value.

[0103] Reserved energy coverage includes error and protection margins not calculated separately within the time sequence. Exit, waiting, and load shedding energy consumption already included in the time sequence are not repeated as reserved items. Only when both the successful scenario and all failed branches included in the verification meet the requirements... and Only then will the candidate operation be authorized.

[0104] In the event of a failure, the standby power supply to the bus is set to zero for the entire corresponding time sequence. The backup power supply is independent of the failed standby power supply; the generator 2 being verified is not considered an independent backup power supply in the event of its own failure. When the independent power supply takeover is the endpoint, the lower limit of the power supply at the endpoint should be sufficient to handle the bus power consumption; when energy storage is used to maintain the reserved load until the preset task endpoint, the task endpoint is fixed before the authorization round, does not restart due to retry, and does not shorten the already determined protection task.

[0105] 4. Maximum verification time: When the positive power shortfall undertaken by energy storage remains constant during the serial execution, verification, and decommissioning of the capability verification and backup power supply process, and the backup bridging energy demand after decommissioning is a fixed value or a uniform conservative upper bound applicable to the entire candidate verification duration, the upper limit of the verification duration for this round is:

[0106] in, This represents the current remaining bridging energy at the time the authorization was granted in this round of verification. To reserve energy; The bridging energy required for the backup power supply process after exiting verification, or its uniform conservative upper bound; To verify and maintain a constant bridging power gap during the exit period; This is the time for exiting verification; This is the maximum verification time for this round.

[0107] The planned verification duration must be greater than zero and not exceed this duration limit. Furthermore, the successful takeover sequence and all included failed branches must still pass the aforementioned power and energy verification. The duration limit only restricts the time available for the candidate verification and does not replace the full budget for successful takeover and failure backup.

[0108] The cumulative verification time is counted from the first operation of the current authorized scheme, including the controlled power-on, stable waiting, loading, and holding time of the inputs within the scheme; the moment when the probe switch begins loading is not mistakenly taken as the starting point of all verifications. When the time limit is reached or any authorized prerequisite fails, the probe load is shut down and the pre-verified exit and backup process is executed.

[0109] Before re-verification, step S2 is re-executed with the remaining bridging energy after deducting the energy from the already discharged energy. Software loops, additional verifications, and re-pre-charging do not re-initialize the energy ledger for this round of bridging. In actual operations where parallel relationships exist, power gaps change, or backup energy varies with the time of failure, preventing the use of a unified upper bound, calculations are performed based on complete segmented timing sequences, rather than directly applying the simplified formula described above.

[0110] S3, perform capability verification to establish continuous power limits and dynamic loading records: 1. Graded loading and measurement of actual input power: like Figure 2 and Figure 8 As shown, after electrical verification is passed and step S2 is authorized, the bipolar main contactor, bipolar precharge contactor, and fast isolation and anti-backflow switches are kept open, and the contactor feedback, switch status, and bus connection current sensor measurement results are checked. After confirming the isolation status, input current limiting power-on is performed. The power supply to be connected establishes a partial DC output through quick-connect interface 4, input protection circuit 5, and pre-converter 6, and is connected to the test branch consisting of test contactor, test power switch tube, and resistive load group. The whole machine controller 12 controls the test power according to the candidate scheme, and the unified DC bus 9 and energy storage bridge component 10 do not provide test power to the test load.

[0111] The command reference relationship for probing average power is as follows:

[0112] in, To test the duty cycle of the power switch; This is the local DC output voltage; This is the equivalent test resistor to be applied. Actual control uses measured voltage and current feedback, not just calculations based on duty cycle.

[0113] The actual active power input to AC is:

[0114] Among them, superscript Indicates the measured value; For power statistics window; and These are the input instantaneous voltage and current, respectively; This is the integral variable. The AC statistical window covers the complete power frequency cycle, while the DC input uses the average value of the product of synchronous voltage and current.

[0115] 2. Continuous power supply determination: The energy stored in the local output capacitor is:

[0116] The rate of change of energy storage within the window is:

[0117] in, For local output capacitance; To store its energy; The average rate of change of stored energy within the window.

[0118] During the target power maintenance phase, the following requirements must be met:

[0119] in, This is a preset threshold for the rate of change of energy storage.

[0120] Simultaneously, the input voltage, input current, AC frequency, local output voltage, and test temperature are all within their respective allowable ranges and continuously maintain the minimum holding time specified in the candidate scheme. The actual input active power, after deducting the corresponding losses, should match the continuous test power consumption.

[0121] If the trial duration is insufficient to complete the minimum holding time, a satisfactory result should not be obtained by shortening the holding time.

[0122] The verified maximum continuous power supply capacity is calculated based on the path loss from the local output to the bus and branch limits:

[0123] in, The upper limit of power supply to the busbar side; To maintain the verified local output power continuously; This serves as a lower bound for the efficiency of the connection path. and These are the power limits for the converter and connection path referred to the bus side, respectively; The reduction factor is no greater than 1.

[0124] 3. Obtaining the lower bound of dynamic power supply: A passing continuous power rating does not directly equate to a passing load setting. Dynamic determination is made using the measured input power, trial power, and changes in the main internal energy storage nodes throughout the entire loading process.

[0125] Let the first The main DC capacitor energy storage included in the measurement of the front-end converter is:

[0126]

[0127] in, This represents the total number of capacitors included in the measurement. Number the capacitors; and These are the capacitance and the voltage at the corresponding measurement time, respectively. Total energy storage; To measure the length of a time period; This represents the rate of change in energy storage; a positive value indicates an increase in energy storage, while a negative value indicates the release of energy storage.

[0128] The main intermediate DC capacitors and local output capacitors are all included in the measurement. The changes in high-frequency magnetic energy storage and sampling errors that are not measured item by item are included by the verified power error limit; if the upper limit of their influence cannot be determined, dynamic loading records will not be issued based on this.

[0129] The lower bound of the external power contribution during the same time period is calculated as follows:

[0130] in, To test the power; This represents the actual input active power. This is the upper bound of the power loss between the input measurement point and the local output terminal. The power error limit is determined by measurement, filtering, energy storage changes that are not measured item by item, and response discreteness. The lower bound of the power contribution from external power sources referred to the bus side.

[0131] The first term is calculated by subtracting the released internal energy from the test power, and the second term is calculated by subtracting losses and the increase in internal energy from the input power; the smaller of the two values ​​is taken. Control power supplied by an independent auxiliary power source has already been included. The loss is not included again in this formula.

[0132] The calculation uses a synchronous window. The lower bound of the time period used for budgeting also deducts the verified fluctuation margin within the window; faster transients within the switching cycle are handled by converter local control and short-term bus holding structures.

[0133] 4. Convert candidate gear positions to verified gear positions: like Figure 8 As shown, each candidate load level pre-saves a lower bound trajectory of the bus-side power supply to be verified. For linearly increasing load levels, the candidate template is represented as:

[0134] in, Number the branch circuit for external power supply access; Assign a candidate loading slot number; This is the time relative to the start time of loading at this gear level; This represents the target bus power for this gear. This is the lower bound of the initial power supply for load conversion to the bus side; The slope of the lower bound of the power growth to be verified; Response latency included in the template; This serves as a template for the lower bound of candidate power. This template indicates the lower limit of power supply allowed for budgeting after successful verification and completion of connection; it does not indicate that power was supplied to the bus during the isolation test.

[0135] Based on the aforementioned internal energy storage and power error correction results, the overall controller 12 checks segment by segment whether the lower limit of the actually confirmed power supply is not lower than the template requirement for that segment, and checks whether the continuous power, holding time, longest operating time, and electrical status meet the same candidate verification scheme. Only when the upper limit of the continuous power supply is not lower than the target power, the dynamic loading process meets the template lower limit, and all holding and time conditions are met, will the candidate loading level be converted into a verified loading level.

[0136] If the continuous power is qualified but the dynamic lower bound is insufficient, the loading level will not be confirmed. If the actual confirmed upper limit of the continuous power supply is lower than the target power of the current candidate verification scheme, or if the actual confirmed lower bound of the bus-side power supply is lower than the corresponding value of the preset lower bound trajectory of the current candidate loading level during at least one verification period, a new candidate verification scheme will be established based on the actual confirmation result. After updating the remaining bridging energy, the successful takeover sequence and the failed exit backup power supply sequence will be re-verified, and the authorization of the original candidate scheme will not be used.

[0137] The verified gear position records respectively save the execution command curve, the corrected lower limit trajectory of the power supply, the applicable input range, the local voltage range, the device temperature range, the initial energy storage node status, and the valid version. The execution command curve is used to control the front-end converter 6, and the lower limit trajectory of the power supply is used for bridging budget; the trial power command and the target power are not directly used as the realized bus power supply.

[0138] 5. Verification of the applicability of the results to busbar connections: The same input current inner loop, power limiting, and interface are used for both the isolation testing phase and the bus power supply phase. The external power control methods and state switching for the two phases are verified during calibration using a test load and a bus load simulation device.

[0139] The verification process includes loading, unloading, state recovery, potential matching, and reloading. Response deviations in both stages are factored into the power error limit and tracking delay.

[0140] After the on-site testing, the input voltage, AC frequency, local voltage, device temperature, and internal energy storage nodes were reconfirmed to be within the applicable range of the verified range. The time required for the status to recover was included in the connection sequence. If the applicable range is exceeded, the original range will not be directly used for busbar connection.

[0141] S4, Update access conditions, Perform pre-charging and constrained power transfer: 1. Verify again before connection: like Figure 2 and Figure 9 As shown, after the capability verification is passed, the overall controller 12 uses the actually confirmed continuous power supply limit, the verified load level, the actual elapsed time, and the current remaining bridging energy to recalculate the incomplete access process and the failure backup process. The verification includes the remaining time for trial exit, power state recovery, voltage matching, pre-charging, main path closure confirmation, control tracking delay, and power takeover.

[0142] Subsequent access operations will only be executed if both the remaining successful takeover process and the corresponding failed backup process meet the power and energy conditions. Figure 9 Power distribution in (a) and Figure 9The remaining bridging energy in (b) uses the same timing reference; this verification uses the current energy storage value after deducting the actual discharge, and does not use the undeducted value at the beginning of the verification.

[0143] 2. Trial exit, voltage matching, and pre-charge: like Figure 2 As shown, the test power is reduced to zero, the test power switch is turned off, the disconnection feedback of the test contactor is obtained, and the test current decrease is confirmed by the test current sensor. After confirming the recovery of the state after power unloading, with the bipolar main contactor, bipolar precharge contactor, fast isolation and anti-backflow switch all open, the local output voltage of the front-end converter 6 is adjusted to be close to the voltage of the unified DC bus 9.

[0144] The pre-charge resistor should be selected based on the maximum voltage difference and allowable current considered at the start of pre-charge:

[0145] in, For the first The pre-charge resistance of the branch circuit; The maximum differential pressure to consider at the start of pre-charge; To allow pre-charge current.

[0146] After confirming that the voltage matching, plug-in status, locking status, and protection status meet the access conditions, keep the double-pole main contactor open, enable the fast isolation and anti-reverse current switch, and close the double-pole pre-charge contactor to form a controlled pre-charge circuit via the pre-charge resistor. The reverse current detection and independent shutdown protection of the fast isolation and anti-reverse current switch remain effective during pre-charge, and the pre-charge path does not bypass this switch.

[0147] After connecting the precharge branch, check:

[0148] in, This is the local DC output voltage of the pre-converter 6; To unify the voltage of DC bus 9; To allow for closed differential pressure; This is the measured pre-charge current; The threshold for allowable closed current.

[0149] The above pressure difference and current conditions must be met continuously for a preset time. After the connection, locking, and protection states are normal, close the bipolar main contactor, obtain its closing feedback, then disconnect the bipolar pre-charge contactor and confirm pre-charge exit. All voltage regulation, holding, contactor operation, and feedback waiting time are included in the corresponding timing sequence. If any state is not met or the operation times out, stop the connection and process it according to the verified exit and backup procedures. Do not use coil drive commands or zero current as the sole basis for the contactor to have completed its operation.

[0150] 3. Calculation of pipe slope: like Figure 9 As shown in (a), under normal operating conditions, the whole machine controller 12 performs segmented budgeting of the lower limit trajectory of the power supply for each verified load level, and verifies the power constraint and energy constraint with the same load and external power supply assumptions.

[0151] When the net load after deducting other verified power supplies is constant, the verified continuous power supply limit of generator 2 is sufficient to handle the net load, the bridging power constraint is satisfied throughout the process, and a verified linearly increasing lower bound is adopted, the following definition is made:

[0152] in, The net load power is shared by the generator 2 and the energy storage bridging assembly 10; This refers to the bus power that generator 2 is currently providing and can maintain during the delay phase; This represents the initial positive power gap. The corresponding bridging energy requirements are:

[0153] in, The remaining time from the current moment until the generator 2 actually begins to increase the bus power, including unfinished unloading recovery, voltage matching, pre-charging, contactor confirmation and tracking delays; This represents the lower bound slope of the linear power growth for the corresponding verified gear.

[0154] when and When the minimum slope that satisfies the residual bridging energy constraint is:

[0155] Select the verified gear that meets the requirements. The gears, among which, The verified lower bound slope of the power increase for the selected gear. The slope upper limit is jointly determined by the verified load capacity of the generator and the limitation of the pre-converter 6. During execution, the power command curve bound to the selected gear is invoked through the pre-converter 6 of the generator branch. The conservative power lower limit is not directly used as the uncalibrated input power command, and arbitrary interpolation extrapolation is not performed on the unverified gear.

[0156] The above formula is not required to determine the minimum slope for increasing power. When load changes occur, the initial power supply during the delay phase cannot be maintained, or the actual response does not conform to the linear lower bound, segmented budgeting should be used instead. If no verified taps meet the conditions, allowable loads to be removed according to a preset sequence and re-verified after confirmation, or the verified backup power supply process should be executed. The above slope selection does not replace the verification of the failed backup sequence.

[0157] 4. Measured power gap compensation: No. The power supply capacity of the busbar is:

[0158] in, The measured current of the branch connected to the busbar is used to energize the busbar and the result is positive. The test current is not substituted into this formula.

[0159] The energy storage converter employs power gap feedforward and bus voltage feedback:

[0160]

[0161] in, For energy storage power commands, positive is used for discharging and negative is used for charging; The current allowed charging power; The target voltage for the bus; For voltage deviation; and These are the proportional and integral coefficients, respectively. Indicates that you will input Limit to the lower limit and upper limit between.

[0162] The integral loop is equipped with limiting and anti-saturation measures. External branches operate at authorized power, while the energy storage local control loop is responsible for rapid bus voltage stabilization.

[0163] The short-time energy check of the bus capacitor is applicable to , The operating condition. The upper bound of the positive power gap before the fast response is completed is denoted as... Then the effective capacity of the busbar satisfies:

[0164] in, This represents the effective electrical capacity of the busbar, expressed in F. This is the upper limit of the positive power gap during the verified response period, in W; The time required for the busbar to maintain structural support before the energy storage current is established or necessary rapid load reduction is completed, measured in seconds; This represents the bus voltage before the fault. Minimum bus voltage is allowed, all in volts (V). When the gap varies over time, the upper bound should cover the entire response period; a smaller gap at a single sampling point should not replace the entire demand. Additional margins are allowed for capacitor series resistance voltage drop, capacitance tolerance, and aging. This short-time check does not replace the continuous bridging budget.

[0165] S5 continuously updates the budget, performs anomaly handling, and restores backup capabilities: like Figure 6 and Figure 10 As shown, the overall controller 12 continuously performs energy updates and anomaly monitoring during candidate operation authorization, capability verification, and power takeover; after the external power supply is stable, it continues to perform low temperature limiting, heating regulation, backup capability verification, and start / stop control of the generator 2. The limitations of the battery management system and independent hardware protection links take precedence over scheduling commands.

[0166] 1. Measured energy update: Within the same round of bridging:

[0167] in, and For adjacent update times; The measured energy storage power on the bus side is taken as positive for discharge and negative for charging.

[0168] The short-term charging and expected temperature rise gain in this round do not increase the bridging budget. The smaller value between the measured result after deduction and the current calibration lower bound is taken; the same discharge energy is not deducted twice.

[0169] Only after the external power source stably supplies power to the bus, the current bridging cycle ends, and the battery status is reconfirmed, can the initial energy for the next bridging cycle be established.

[0170] 2. Abnormalities and Load Reduction Handling: Before additional verification, extended dwell time, recharging, or generator restart, re-execute S2. If load changes, BMS power limit updates, input anomalies, or actual power falls below the gear lower limit occur during operation, immediately trigger budget updates and corresponding protection.

[0171] If the verification fails, no new operation will be initiated, and any unfinished probes or pre-charges will be terminated in a safe sequence. Non-faulty branches that are already stably powered will not be disconnected without cause due to the rejection of other candidate operations.

[0172] The controller first suspends new loads, unnecessary heating, and charging, and then disconnects loads that are allowed to be disconnected in a preset sequence. The load disconnection time is included in the prediction; the original load power is maintained until confirmation, and the load reduction value is applied only after confirmation.

[0173] If load removal fails, the backup process is redefined based on the original load. If the critical load still exceeds the power or energy boundary, an insufficient power supply alarm is issued and protection remains effective, without raising battery or generator limits to meet the budget requirements.

[0174] 3. Early start of the generator and low-temperature heating: like Figure 10 As shown in (b), the overall controller 12 first determines the operating status of generator 2. When generator 2 is not running and the main power supply is supplying power normally, it periodically assumes that the main power supply is out of service, and uses the current reserved load and energy storage capacity, according to the timing division and power and energy statistics of step S2, to calculate the bridging power margin and bridging energy margin required for generator 2 to start, capacity confirmation and takeover. When any margin is not higher than the corresponding preset start threshold, a generator 2 start request is issued, without requiring that the margin be observed to cross the threshold first. Then, according to the current actual power supply status and the start, verification and access process to be executed, step S2 is re-executed; after successful takeover and corresponding failure backup processes meet the constraints, generator 2 is started through the remote start / stop interface, and capacity confirmation and controlled access are completed according to steps S3 and S4. Existing power supplies that have not yet been deactivated and are in normal status are included in the operation verification according to the actual operating conditions; power supplies that are assumed to have been deactivated are not included in the power supply in the corresponding power failure situation. The relevant criteria do not exempt the requirement for the independence of the failure backup process. When the main power supply has been disconnected, the takeover or backup handling steps S2 to S5 are executed directly based on the current remaining bridging capacity, without waiting for the early start criterion to be triggered again. If generator 2 is already running, the process switches to operation monitoring and shutdown condition judgment, without issuing a start command again.

[0175] like Figure 10 As shown in (a), a low-temperature entry threshold is set. and recovery threshold ,satisfy The lowest measuring point temperature is below Upon entering a cryogenically limited state, the discharge of energy storage battery pack 1001 is restricted according to the battery management system and corresponding calibration records, and a cryogenic recovery heating request is generated. After entering the cryogenically limited state, the temperature at the lowest measuring point reaches... And maintain this state until the preset time. The lowest measuring point temperature reaches... After a preset time, the low-temperature restriction state is lifted, the current low-temperature recovery heating request is cancelled, and the charge and discharge limits are updated separately according to the battery management system's charging and discharging permissions. The restoration of discharge capacity is not equated with the restoration of charging permissions. The above temperature recovery judgment is executed in each control cycle, and is not contingent on the electric heating element being energized or the external power supply having heating capacity.

[0176] This embodiment uses low-temperature recovery as the heating objective. The energy required for heating is defined as... The value is 1 when there is a low-temperature recovery heating request, the external power supply is stable, and the heating protection is enabled; otherwise, it is 0. The value is 0 when low-temperature recovery is complete, the external power supply fails, or the over-temperature protection is activated. The power command for the electric heating element is:

[0177] in, This is a heating power command; Due to heater power limitations; This represents the maximum total continuous power supply capacity that has been verified by the connected power source. To preserve load power; For necessary auxiliary power; For bus-side charging power commands within the limits permitted by the battery management system; Reserved power for dynamic adjustment; .

[0178] When heating reduces the energy to 1 but there is no available residual power, the heating power command remains zero. This formula determines the static heating allowance. Increases in heating power still adhere to the verified load setting and the limitations of the preceding converter 6, and are executed by the power regulation switch; the independent over-temperature disconnect device remains active. In the event of a bus voltage drop, deterioration of the generator response, or unexpected energy storage discharge, heating is preferentially reduced or suspended. Temperature recovery judgment continues during heating pauses; if recovery conditions are met, the heating request is cancelled, and the low-temperature restricted state is not maintained due to temporary lack of heating. The expected temperature gain and current charging energy caused by heating do not increase the residual energy budget of the current bridging cycle.

[0179] 4. Engine stop and safe exit: like Figure 10As shown in (b), when generator 2 is running, it only enters the shutdown condition judgment after another verified power source has stably taken over the bus power supply. Assuming that power source has exited, based on the current energy storage state and the predetermined reserved load, the bridging power margin and bridging energy margin for restarting and taking over generator 2 are recalculated. Generator 2 is only stopped when both margins are non-negative, reach the corresponding preset recovery threshold, and remain for a preset time. The power margin and power threshold use the same unit, and the energy margin and energy threshold use the same unit; they are compared separately and not substituted for each other. The threshold and holding time should be adapted to the actual control response and the predetermined backup sequence. When generator 2 is the only continuous power source, generator 2 will not stop because the temperature of the energy storage battery pack 1001 reaches the recovery threshold or heating has stopped.

[0180] Before unlocking quick-connect interface 4, first verify the power supply conditions after the branch is disconnected, then reduce the branch power and confirm the current decrease, then sequentially turn off the quick isolation and anti-backflow switch, the double-pole main contactor, and the input circuit, and then release the lock. In the event of a connection abnormality, the branch hardware shutdown circuit 14 will prioritize protection without waiting for the budget procedure to complete. The disconnection of the contactor inside the box does not indicate that the external cable source side has lost power; the source side status is confirmed by the corresponding power supply disconnection device and the detection results.

[0181] This embodiment provides a design calculation example covering successful verification, failure backup, and actual takeover. Power allocation during the successful process is as follows: Figure 9 As shown in (a), the change in residual bridging energy is as follows Figure 9 As shown in (b); the two subplots use the same time starting point and the same stage boundary, and the curves shown are drawn according to the following design parameters.

[0182] The following set of assumed parameters illustrates the complete execution process. These parameters are for design calculations only and do not represent actual test results obtained by the battery, generator, or converter. The backup power supply after a failure exit uses a backup branch independent of the generator 2 to be connected, and does not use the generator 2 currently being verified as its backup power supply in case of its own failure.

[0183] 1. Initial state and candidate solutions: Assuming the nominal voltage of the bus is The bus inlet power reserved for external loads is Necessary auxiliary power supply is Heating and charging are both suspended, therefore the net power consumption of the busbar is .

[0184] Assuming the current valid calibration record gives the allowable bridging power Remaining bridging energy Reserve energy .

[0185] The power source to be connected is a generator, whose input has been established and electrical verification passed, but it remains isolated from the bus. Another independent external energy storage power source serves as a backup branch; its verification record is still valid, but it is not currently connected to the bus. Upon receiving the start-up command, this backup branch will experience voltage matching, pre-charging, contactor confirmation, and tracking delays. Then press The verified lower bound increases the power to .

[0186] The candidate verification scheme for the generator to be connected is: target bus power supply. Candidate growth lower bound ; Controlled power-on input Loading response delay growth process Ultimately maintain Total verification time .

[0187] Uninstallation and status restoration after verification Voltage matching, pre-charge, and closure confirmation Takeover tracking delay ,total Actual takeover increases according to the same effective level. Duration Failure exit time is taken .

[0188] The candidate record also specifies the electrical allowable range, minimum holding time, and dynamic lower limit after energy storage correction. Only if all conditions are met is the candidate gearing position considered approved.

[0189] 2. Pre-validation success and failure budget: Before the successful process begins to increase bus power, the following is required: ; Successful takeover and bridging requirements are:

[0190] Including reserved energy:

[0191] After the oil receiver verification fails and the process is completed, the bridging energy required for the independent backup branch to take over the connection is:

[0192] Among them, 4 s is the remaining preparation time before the independent backup branch starts to increase the bus power, and 0.20 kW / s is the lower bound slope of the verified power growth of the branch; the 1 s exit energy consumption after the failure of the oil receiving unit verification is separately included in the corresponding failure sequence and is not included in the above 24.0 kJ.

[0193] This round of verification is in When it fails:

[0194] Both scenarios satisfy the energy requirements. The maximum bridging power is [value missing] in both cases. lower than .

[0195] To cover anomalies that may occur during pre-charge or takeover after successful verification, this design employs a more conservative fault envelope: until the expected end of the takeover period. The power supply to the generator is not considered within the scope of this process, and then the process is terminated. And execute independent backup takeover. The corresponding requirement is:

[0196] Therefore, the verification authorization in this example not only covers failed attempts but also leaves room for handling subsequent access anomalies.

[0197] The maximum duration for this round of isolation verification failure is:

[0198] plan If the budget does not exceed the upper limit and both the complete success and failure budgets are approved, execution is permitted.

[0199] 3. Assume the verification results meet the candidate requirements: To continue demonstrating the successful process, let's assume that, after testing, it is confirmed that the upper limit of the power supply is not lower than... The dynamic lower bound, after inputting measured power, internal energy storage changes, and error correction, is not lower than the candidate template; ultimately, the conditions are maintained. The entire verification process is underway. End of section.

[0200] Only then can the candidate slot be converted into a verified slot. If the actual confirmed upper limit of the continuous power supply is lower than the target power of the candidate verification scheme in this example, or if the actual confirmed lower limit of the bus-side power supply is lower than the corresponding value of the preset lower limit trajectory of the candidate loading slot in this example during at least one verification period, then this example will not continue to use the subsequent calculations, but should re-establish the candidate verification scheme based on the actual confirmation results and execute step S2.

[0201] During the verification period, the bus power supply will still be provided by energy storage, and the remaining energy will be:

[0202] This assumes that the updated calibration lower bound is not lower than If the updated calibration lower bound is lower than this value, the updated calibration lower bound should be used for recalibration.

[0203] 4. Verify again based on the actual results: The energy requirements for the remaining successful process, including reserves, are:

[0204] Below .

[0205] From this moment forward, continue according to "remaining" Prepare, The generator power supply was not considered during the takeover, and then the process was terminated. Then execute the conservative fault envelope of "independent backup":

[0206] Also lower .

[0207] The minimum pipe slope is:

[0208] Verified The gear position meets the energy storage constraints and is within the allowable load range corresponding to the unit, therefore this gear position is executed.

[0209] 5. Pre-charge and takeover sequence: The event sequence used in this example is as follows:

[0210] For example, design the closing differential pressure threshold as The closed current threshold is designed as follows: Condition hold time is designed as The main circuit is closed only when these conditions and switch feedback are met. The values ​​above are the design settings for this example, and their actual applicability is determined by the corresponding capacitor, contactor, and converter parameters.

[0211] Upon completion of the takeover, the cumulative expenditure on energy storage will be... Remaining:

[0212] The entire process is updated based on measured power and actual duration. If any stage exceeds the listed boundary, the actual power falls below the verified lower limit, or a load change occurs, the above prediction results become invalid, and S5 is executed immediately.

[0213] 6. Handling delays and load shedding time: If the takeover process requires load reduction, the controller 12 cannot use the reduced load power when issuing the disconnect command for the output contactor. Only after obtaining disconnection feedback and confirming through the current sampling unit that the corresponding load has actually been removed, will the new reserved load power be used to calculate the remaining process.

[0214] For example, if load disconnection confirmation takes 1 second, and the actual bus power consumption during this 1 second is still 2.40 kW, and no other external power source provides any power that can be included in the calculation, the bridging energy borne by the energy storage is 2.40 kJ. If an external power source is supplying power during this time period, the actual energy storage discharge is determined by integrating the positive power gap after deducting the actual external power supply from the bus power consumption.

[0215] If the 1-second waiting period is not yet included in the candidate timing sequence, it should be added to the prediction budget; if it is already included in the candidate timing sequence or has been deducted from the remaining bridging energy through measured discharge, it should not be included again. When load exit fails, the actual load that has not been exited is re-verified. Thus, load action and detection time are entered into the same timing and energy ledger, and a false budget margin is not obtained based on loads that have not actually been exited.

[0216] In summary, the core of this portable emergency communication multi-source power controlled access and continuous power supply system and method lies in using isolated capability verification and backup power budget after verification failure as joint operating authorization conditions. Physical isolation of the test loop prevents energy storage compensation from masking the capability of the power source to be connected; binding candidate targets, actual verification criteria, and takeover timing avoids using successful predictions inconsistent with measured results. By separately determining the allowable bridging power and remaining bridging energy, the system distinguishes between instantaneous power insufficiency and sustained energy insufficiency. Verification, waiting, pre-charging, exit, and load disconnection are all timed according to actual events, sharing a continuously updated bridging budget, reducing the risk of additional operation time encroaching on backup reserves. Through continuous power verification and dynamic load verification, the upper and lower power limits are obtained respectively, and the takeover budget no longer depends on declared power, test commands, or short-term capacitor support results. The minimum takeover slope and the verified load upper limit jointly limit the takeover process; when no suitable load condition exists, the operating conditions are changed by actual load exit or backup power supply. By separately judging battery temperature recovery and the next bridging capability recovery, the generator is prevented from stopping simply because the temperature meets the standard. Dry and wet zoning, plug-in interlocking, pre-charging, and independent auxiliary power supply provide the corresponding structure and power supply foundation for the above control process. Therefore, the continuous power supply achieved by this portable emergency communication multi-source power supply controlled access and continuous power supply system and method is based on preset reserved load, effective calibration range, energy storage power and energy boundary, verified operating range of external power supply, and specified backup sequence, and does not replace actual performance verification under all operating conditions with assumed calculations.

[0217] The above embodiments are used to illustrate the structure, connection relationships, and control process of the present invention. The scope of protection of the present invention is determined by the claims, and the specification and drawings are used to interpret the claims.

Claims

1. A portable emergency communication multi-source power supply controlled access and continuous power supply system, characterized in that, It includes a housing, a generator, and a complete unit controller, a unified DC bus, multiple external power supply access branches, an energy storage bridging component, and a graded load output component, all installed in the housing. Each of the aforementioned external power supply access branches is sequentially connected along the power transmission direction to a quick-connect interface with identification contacts, an input protection circuit, a pre-converter, and a bus-controlled access component, wherein the bus-controlled access component is connected to the unified DC bus; an isolated capability testing component is connected across the positive and negative terminals of the local DC output of the pre-converter and is located on one side of the pre-converter of the bus-controlled access component; the generator is connected to one of the aforementioned external power supply access branches; the energy storage bridging component includes an energy storage battery pack connected to the unified DC bus via a bidirectional DC-DC converter; and the graded load output component is connected to the unified DC bus. The overall controller is configured to: verify the power supply to be connected based on interface identification information and measured electrical parameters; determine the allowable bridging power and remaining bridging energy on the bus side based on the energy storage status; before capability verification, establish a successful takeover sequence and a failure exit backup power supply sequence including verification time; in the failure exit backup power supply sequence, set the bus power supply of the power supply to be connected to zero, and adopt a backup power supply process independent of the power supply to be connected. Verification is authorized only when the bridging power requirement for each time period in each time series does not exceed the corresponding allowable bridging power, and the sum of the bridging energy requirement and the reserved energy for each time series does not exceed the remaining bridging energy. After electrical verification is passed and authorization is obtained, the bus control access component corresponding to the power supply to be connected is kept disconnected, and the power supply to be connected independently supplies power to the isolated capability testing component, so that the energy storage can supplement the test power to the isolated capability testing component through the unified DC bus; the target power, candidate loading level and time boundary used for successful takeover are associated with the qualification conditions of the same candidate verification scheme; After the capability verification is passed, the remaining access process and failure backup process are re-verified based on the actual confirmed continuous power supply limit, the verified loading level and the current remaining bridging energy. After the verification is passed, the power is connected to the unified DC bus through voltage matching and pre-charging. The power is transferred according to the verified loading level that meets the bridging power and bridging energy constraints, and the energy storage bridging component compensates for the measured power gap on the bus side.

2. The portable emergency communication multi-source power supply controlled access and continuous power supply system according to claim 1, characterized in that, The quick-connect interface has a plug and socket with mutually cooperating mechanical coding bosses and mechanical coding grooves, and is equipped with a main power contact, a plug-in status contact and a locking detection switch; the identification contact is turned on before the main power contact, the plug-in status contact is turned on last and is turned off before the main power contact, and the disconnection signal of the plug-in status contact triggers the branch hardware shutdown circuit to cancel the power switch drive and trigger the contactor to disconnect. The busbar controlled access component includes a bipolar main contactor and a pre-charge branch connected in parallel with it. The pre-charge branch includes a bipolar pre-charge contactor and a pre-charge resistor. When the voltage difference and pre-charge current between the local DC output terminal of the front-end converter and the unified DC bus do not exceed the corresponding preset threshold and remain for a preset time, and the plug-in state, lock-in state and protection state are normal, the bipolar main contactor is closed, and the pre-charge branch is disconnected after obtaining the closure feedback.

3. The portable emergency communication multi-source power supply controlled access and continuous power supply system according to claim 1, characterized in that, The isolated capability testing assembly includes a series-connected testing contactor, a testing power switch, and a resistive load group, as well as a testing current sensor, a temperature sensor, and an independent over-temperature disconnect device; a local output capacitor is connected in parallel between the positive and negative terminals of the local DC output of the front-end converter; the front-end converter is equipped with sampling circuits for input voltage, input current, local output voltage, and the voltage of the main internal DC energy storage nodes. The busbar controlled access component includes a main path, a pre-charge path, and a fast isolation and anti-backflow switch. The fast isolation and anti-backflow switch is located upstream of the main path and the pre-charge path at the local DC output positive terminal. During capability verification, the main path, the pre-charge path, and the fast isolation and anti-backflow switch are all kept open. The overall controller confirms the isolation status based on contactor feedback, switch status, and busbar access branch current. Probing is prohibited when the command and feedback are inconsistent. The probe power switch adjusts the probe power according to the candidate load level. The probe power is not included in the busbar power supply power of the power supply to be connected.

4. The portable emergency communication multi-source power supply controlled access and continuous power supply system according to claim 1, characterized in that, The enclosure is equipped with a carrying handle, and the interior is divided into a power conversion dry area, an energy storage dry area, and a control dry area by partitions. A recessed interface cavity is provided on the front side, which is separated from each of the dry areas. The interface cavity is equipped with a rain shield, a lateral fold-back water-blocking edge, an upward-opening protective cover, and a bottom drainage hole. The lowest conductive part of the quick-connect interface is higher than the drainage bottom surface of the interface cavity. The interface power conductor and signal conductor enter the corresponding dry area through a sealed through-chamber connector. The energy storage battery pack is installed on a pull-out tray at the bottom of the box. The pull-out tray cooperates with the guide rail in the energy storage dry area and is fixed in the operating position.

5. A method for controlled access and continuous power supply of multiple power sources for portable emergency communication, characterized in that, Includes the following steps: S1: Collect the status and load power of the energy storage battery pack, determine the allowable bridging power and remaining bridging energy on the unified DC bus side, and verify the power supply to be connected based on the interface identification information and measured electrical parameters. S2, before capability verification, establish candidate verification schemes, and use the target power, candidate loading level and time boundary of the candidate verification schemes simultaneously for prediction of successful takeover timing and qualification determination of capability verification. Establish a successful takeover sequence and a failed exit backup power supply sequence, respectively, including verification time. In the failed exit backup power supply sequence, set the bus power supply of the power supply to be connected to zero and adopt a backup power supply process independent of the power supply to be connected. Verification is authorized only when the bridging power requirement for each time period in each time series does not exceed the corresponding allowable bridging power, and the sum of the bridging energy requirement and the reserved energy for each time series does not exceed the remaining bridging energy. S3. After the electrical verification is passed and the verification is authorized, the pre-amplifier corresponding to the power supply to be connected is disconnected from the unified DC bus. The power supply to be connected independently supplies power to the test load connected across the positive and negative terminals of the local DC output of the pre-amplifier. The test power is not included in the bus power supply power. The upper limit of the continuous power supply and the verified load level are confirmed according to the candidate verification scheme. S4. After the capability verification is passed, the remaining access process and failure backup process are re-verified based on the actual confirmed continuous power supply limit, verified load level, actual time consumed and current remaining bridging energy. After verification, the test load is disconnected, and after voltage matching and pre-charging, it is connected to the unified DC bus. The verified load level transfer power that meets the bridging power and bridging energy constraints is selected, and the measured power gap on the bus side is compensated through a bidirectional DC converter. S5. During the execution of steps S2 to S4, the remaining bridging energy is continuously updated based on the measured discharge and anomalies are monitored. Step S2 is re-executed before additional verification, extended connection, re-pre-charging, or generator restart. If the constraint is not met, the corresponding operation is not started or stopped. The allowed load branches are disconnected in a preset order. Disconnection feedback is obtained and the exit is confirmed by the measured current before re-verification.

6. The portable emergency communication multi-source power supply controlled access and continuous power supply method according to claim 5, characterized in that, Based on the lowest measuring point temperature, single cell voltage, state of charge, and health status of the energy storage battery pack, the calibration data for the corresponding operating conditions are queried. Combined with the limitations of the battery management system, the bidirectional DC-DC converter, and the connection path, the allowable bridging power on the bus side is determined. When the measurement uncertainty range covers multiple calibration zones, the minimum values ​​are taken for the lower limit of the allowable current, the lower limit of the battery terminal voltage, and the lower limit of the output energy on the bus side for each effective zone covered. The initial remaining bridging energy of a bridging cycle is determined as the lower bound of the calibrated remaining energy for the corresponding operating condition, and updated within that bridging cycle using the following formula: in, ; To update the serial number; and For adjacent update times; The remaining bridging energy; This is the lower bound of the calibrated remaining energy corresponding to the current operating condition; The measured energy storage power on the bus side is taken as positive for discharging and negative for charging. The additional verification, recharging, and control cycle update within a single bridging round do not reinitialize the remaining bridging energy, and the charging energy and expected temperature gain in this round do not increase the remaining bridging energy; the initial energy for the next bridging round is established only after the external power supply stably supplies power to the bus, the current bridging round ends, and the battery status is reconfirmed.

7. The portable emergency communication multi-source power supply controlled access and continuous power supply method according to claim 5, characterized in that, The successful takeover sequence and the failed exit sequence for backup power supply are divided into time periods according to the serial and parallel relationship of the actual operation. The upper limit of the power consumption, the lower limit of the external power supply, and the lower limit of the allowable bridging power of energy storage are used for verification in each time period. The bus power supply of the power source that has not yet been connected is zero in the corresponding time period. The failed exit sequence for backup power supply ends when the independent backup power source completes the takeover or the energy storage maintains the load until the preset task endpoint. The preset task endpoint is fixed before the authorization round and will not be recalculated due to retry. When the positive power gap borne by energy storage remains constant during the serial execution, verification, and decommissioning of capability verification and backup power supply processes, and the backup bridging energy demand after decommissioning is a fixed value or a uniform conservative upper bound applicable to the entire candidate verification duration, the upper limit of the verification duration for this round is: in, This represents the current remaining bridging energy at the time the authorization was granted in this round of verification. To reserve energy; The bridging energy required to complete the backup power supply process after exiting verification, or its uniform conservative upper bound; To verify and maintain a constant bridging power gap during the exit period; Time required to exit verification; This is the maximum verification time for this round; Verification is performed only when the planned verification duration is greater than zero, does not exceed the upper limit of the duration, and step S2 passes the verification. The verification time is accumulated from the first operation of this round of authorized scheme. When the upper limit of the duration is reached, the test load is shut down and the pre-verified backup power supply process is executed. Before verification again, the remaining bridging energy is updated and re-verified.

8. The portable emergency communication multi-source power supply controlled access and continuous power supply method according to claim 5, characterized in that, Step S3 includes verification of continuous power supply capability and verification of dynamic loading capability; In the continuous power supply capability verification, the absolute value of the change rate of energy storage in the local output capacitor is kept within a preset threshold and maintained for a preset duration. The continuous power supply capability is confirmed by combining the measured power and the test power on the input side. The upper limit of the continuous power supply is determined by combining the path efficiency, derating factor, front-end converter limit and connection path limit. In the dynamic loading capability verification, the input power, the test power and the status of the main DC energy storage nodes inside the front-end converter are sampled synchronously. The internal energy storage release part is deducted from the test power, and the conversion loss and the internal energy storage increase part are deducted from the input power. The lower limit of the bus-side power supply is obtained by combining the smaller value of the two with the power error limit and the path efficiency, and then compared with the preset power lower limit trajectory of the candidate loading level segment by segment. Only when the upper limit of the continuous power supply is not lower than the candidate target power, the lower limit of the bus-side power supply meets the preset lower limit trajectory, and the holding time and electrical status conform to the corresponding candidate verification scheme, the candidate loading position is converted into a verified loading position; the execution command curve, power supply lower limit trajectory and applicable operating conditions of the verified loading position are saved respectively. If the actual confirmed upper limit of the continuous power supply is lower than the candidate target power, or if the actual confirmed lower limit of the bus-side power supply is lower than the corresponding value of the preset lower limit trajectory of the candidate loading position in at least one verification time period, the candidate verification scheme is re-established based on the actual confirmation result and step S2 is executed.

9. The portable emergency communication multi-source power supply controlled access and continuous power supply method according to claim 5, characterized in that, Under the conditions that the net load after deducting other verified power supplies is constant, the initial bus power of the generator can be maintained during the delay phase, the upper limit of the verified continuous power supply of the generator is sufficient to bear the net load, and the bridging power constraint is satisfied throughout the process, the connection slope is determined by the verified lower bound of linear power growth: The calculation conditions are as follows and Select the one that meets the requirements from the verified load profiles. The gear; in, ; The net load power; The bus power already provided by the generator and able to be maintained during the delay phase; This represents the initial positive power gap. This represents the current remaining bridging energy. To reserve energy; The remaining time before the generator actually begins to increase the bus power; To satisfy the minimum growth slope of the remaining bridging energy constraint; The lower bound slope of the power increase for the selected verified gear; The upper limit of the slope is determined jointly by the verified loading capacity and the limitations of the preceding converter. The power command curve bound to the selected gear is executed by the generator branch pre-stage converter, and no arbitrary interpolation extrapolation is performed on unverified gears; when the calculation conditions are not met, segmented budget is used; when there are no verified gears that meet the bridging constraints, the load exit is allowed and re-verified or switched to the verified backup power supply process.

10. The portable emergency communication multi-source power supply controlled access and continuous power supply method according to claim 6, characterized in that, The energy storage battery pack is equipped with an electric heating element connected to the unified DC bus via a power regulation switch; a first temperature threshold and a second temperature threshold higher than the first temperature threshold are set. When the lowest measuring point temperature is lower than the first temperature threshold, it enters a low-temperature restricted state and discharge is restricted according to the battery management system and calibration data; after entering the low-temperature restricted state, it remains in this state until the lowest measuring point temperature reaches the second temperature threshold and remains so for a preset time. After the above recovery conditions are met, the state is released, and the charge and discharge restrictions are updated according to the charging and discharging permissions of the battery management system; the determination of the recovery conditions is not based on the premise that the electric heating element is heating. When the generator is not running and the main power supply is supplying power normally, assuming that the main power supply is out of service, the bridging power margin and bridging energy margin required for generator startup and takeover are checked; if either margin is not higher than the corresponding preset startup threshold, a generator startup request is made. After the startup and access process to be executed is checked and passed according to step S2, the generator is started through the remote start / stop interface, and the capability confirmation and controlled access are completed according to steps S3 and S4. When the low-temperature limited state is under which the external power supply is stable, the remaining power after satisfying the requirements of load retention, necessary auxiliary power, charging allowance, and power reserve is allocated to the electric heating element, and the increase in heating power is subject to the verified load capacity; after the low-temperature limited state is lifted, the power command for this low-temperature recovery heating is set to zero. When the generator is running, the generator will be stopped only when another verified power source is stably supplying power to the bus, and under the assumption that the power source is out of service, the bridging power margin and bridging energy margin corresponding to the generator restart and takeover are both non-negative, both reach the corresponding preset recovery threshold and continue for a preset time; when the generator is the only continuous power source, the generator will not be stopped because the temperature at the lowest measuring point reaches the second temperature threshold.

Citation Information

Patent Citations

  • Wind, light and diesel storage independent power supply switching system and method for communication base station

    CN106849343A

  • Communication power supply capacity expansion and power distribution management system

    CN121546527A

  • Energy storage type diesel generating set control system

    CN215907951U