A variable Venturi ammonia injection mixing enhancement device and its control method suitable for boiler low-load conditions
By using a variable Venturi ammonia injection mixing enhancement device in the SCR system, and utilizing adjustable flue gas dampers to form a Venturi flow channel, the problem of poor ammonia injection mixing uniformity under low boiler load conditions was solved, denitrification efficiency was improved and ammonia escape was reduced, achieving stable operation under low load conditions.
Patent Information
- Application Number
- CN202611519933.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-29
- Publication Date
- 2026-11-17
AI Technical Summary
Under low-load boiler conditions, the uniformity of ammonia injection in the SCR system is poor, leading to a decrease in denitrification efficiency and an increase in ammonia escape. Furthermore, existing improvement measures are not effective under low load conditions or may increase equipment pressure drop and wear.
A variable Venturi ammonia injection mixing enhancement device is adopted, which forms a variable Venturi flow channel in the flue through adjustable front and rear flue gas dampers. Combined with boiler load and flue gas velocity measurement, the damper opening is adaptively adjusted to enhance the mixing of reducing agent and flue gas.
It improves denitrification efficiency under low load conditions, reduces ammonia escape, has a simple structure for easy installation, covers a wide load operating range, reduces costs, and ensures stable and reliable mixing and denitrification effects.
Smart Images

Figure CN123102144A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of boiler combustion pollutant control technology, specifically relating to a variable Venturi ammonia injection mixing enhancement device and its control method suitable for boilers under low load conditions. Background Technology
[0002] While ensuring power supply reliability, large coal-fired power plant boilers need to participate more frequently in flexible operating conditions such as deep peak shaving, rapid load increases and decreases, and long-term stable operation at low loads. The operating load range of these units is constantly expanding, and low-load (e.g., 30% BMCR or even 25% BMCR) operation scenarios are becoming increasingly common. Against this backdrop, achieving stable compliance with ultra-low emissions under wide load conditions has become one of the key issues in the operation and environmental management of coal-fired power units.
[0003] Selective Catalytic Reduction (SCR) denitrification technology has become the mainstream process for controlling nitrogen oxides (NOx) in flue gas from coal-fired power plant boilers due to its maturity, reliability, high denitrification efficiency, and applicability to large flue gas volumes. An SCR system typically consists of an ammonia injection system (ammonia preparation and transportation, ammonia injection grid / valve assembly, etc.), a mixing section and static mixer (optional), a reactor body and catalyst bed, a flow equalization device, and related monitoring and control systems. In engineering design, the placement of the ammonia injection grid, reactor cross-sectional dimensions, number of catalyst layers, and flow field rectification scheme are often optimized based on the unit's rated load or stable medium-to-high load conditions to meet requirements such as catalyst inlet velocity, temperature window, ammonia-to-nitrogen molar ratio, and ammonia / flue gas mixing uniformity. During medium-to-high load operation, the flue gas flow rate and velocity are high, and the turbulence intensity and disturbance level are relatively large. After ammonia injection, the ammonia and flue gas can form a relatively uniform concentration and velocity distribution within a certain mixing distance, thereby ensuring denitrification efficiency and suppressing ammonia escape.
[0004] As the proportion of low-load operation increases, the adaptability of SCR systems under low-load conditions is becoming increasingly apparent. Traditional design and control strategies based on medium- and high loads are struggling to consistently meet the requirements of high efficiency and low ammonia slip under low load conditions. Therefore, devices and control methods that are designed for boilers operating at low loads, can enhance ammonia injection mixing, and improve the denitrification efficiency of SCR systems have significant engineering implications and application value.
[0005] Under low-load conditions, the flue gas volume at the boiler tail end decreases significantly, leading to a reduction in the average flow velocity in the SCR inlet flue and reactor. This reduced velocity is typically accompanied by a decrease in Reynolds number, weakened turbulence intensity, and insufficient large-scale disturbances. This slows the development of the shear layer formed after ammonia injection, reducing lateral diffusion and mixing capabilities. For the ammonia injection grid, although the nozzles can still inject ammonia (or ammonia generated from ammonia water atomization) at the set flow rate, the mainstream carrying capacity is reduced, and the jet penetration and diffusion range are limited. Ammonia is more prone to exhibiting both local enrichment and local depletion in the cross-section, resulting in poorer ammonia / flue gas mixing uniformity.
[0006] Reduced mixing uniformity directly weakens the SCR denitrification effect. Firstly, if ammonia and NOx are unevenly distributed before entering the catalyst bed, a low ammonia-to-nitrogen molar ratio in some areas limits the reaction, leading to insufficient local denitrification and increased or fluctuating NOx levels at the outlet. Secondly, a high ammonia-to-nitrogen molar ratio in some areas easily leads to ammonia escape, increasing the risk of salt deposition and blockage in downstream air preheaters, dust collectors, and other equipment, and potentially causing secondary pollution or increased operating and maintenance costs. Thirdly, the problem of uneven flow field is often more pronounced under low flow velocity conditions. Flow deviations caused by flue bends, diffusers, and guide components are more difficult to spontaneously recover under low turbulence conditions, leading to increased velocity field deviation at the catalyst inlet. This further amplifies the coupling effect of uneven ammonia / flue gas mixing and uneven reaction, resulting in a decrease in overall denitrification efficiency and a smaller margin for compliance.
[0007] Currently, common improvement methods in engineering include adding static mixers, adjusting the nozzle angle of the ammonia injection grid and the zone valves, and optimizing the guide vanes or flow equalization devices. However, these measures still have shortcomings. While static mixers and fixed flow guide components can improve the mixing degree, they often bring additional pressure drop and pose wear, ash accumulation, and maintenance burdens in dusty flue gas environments. The zone regulation of ammonia injection mainly affects the distribution of reducing agent and cannot fundamentally compensate for the reduced mixing capacity caused by insufficient mainstream flow and weak disturbance under low load. Some flow field optimization components are based on rated operating conditions, and their effects are unstable at low loads, and may even create low-speed zones that increase the risk of ash accumulation and salt deposition. Therefore, there is an urgent need for a device that can increase the flow velocity and disturbance intensity of the ammonia injection mixing section as needed under low load conditions, while avoiding unnecessary pressure drop and wear under medium and high loads, along with corresponding control methods, to achieve a balance between improving SCR denitrification efficiency and operational reliability under low load conditions. Summary of the Invention
[0008] To address the aforementioned problems, the present invention aims to provide a variable Venturi ammonia injection mixing enhancement device and its control method suitable for boilers operating under low load conditions.
[0009] The specific technical solution is as follows:
[0010] A variable Venturi ammonia injection mixing enhancement device suitable for boiler low-load conditions is installed in the flue of the ammonia injection grid of the SCR denitrification system. It includes a front adjustable flue gas baffle installed upstream of the ammonia injection grid, a rear adjustable flue gas baffle installed downstream of the ammonia injection grid, a flow velocity measuring device installed in the flue upstream of the ammonia injection grid, and an actuator connected to the front adjustable flue gas baffle and the rear adjustable flue gas baffle respectively and used to drive them to rotate.
[0011] The front adjustable flue gas baffle includes two front baffles respectively hinged to the two side walls in the width direction of the flue, and the rear adjustable flue gas baffle includes two rear baffles respectively hinged to the two side walls in the width direction of the flue; each front baffle in the front adjustable flue gas baffle and each rear baffle in the rear adjustable flue gas baffle are flat or slightly arc-shaped structures, each baffle rotates around its pivot located on the side wall of the flue, and the height of each baffle in the height direction of the flue is adapted to the net height of the flue, the length of a single front baffle is 0.5 to 0.65 times the net width of the flue, and the length of a single rear baffle is 0.6 to 0.8 times the net width of the flue;
[0012] Two baffles in the same group are symmetrically arranged about the center line of the flue width and rotate synchronously towards each other. The front adjustable flue baffle and the rear adjustable flue baffle together with the inner wall of the flue form a variable Venturi flow channel that is continuously formed from upstream to downstream, consisting of a contraction section, a throat area and an expansion section.
[0013] The ammonia injection grid is located in the throat region of the variable venturi flow channel, and the multiple ammonia injection headers of the ammonia injection grid are arranged in sections along the width of the flue.
[0014] By controlling the swing of the front and rear adjustable flue gas baffles, an effective throat flow channel is formed at the location of the ammonia injection grid. Only the ammonia injection main pipe with a lateral coverage area located within the projection range of the effective throat flow channel on the cross-section of the ammonia injection grid is opened, so that the reducing agent injection zone is located within the effective throat flow channel.
[0015] Furthermore, the actuator is an electric or pneumatic actuator, and has angle feedback and easing control functions.
[0016] Furthermore, it also includes a controller, which is electrically connected to the flow velocity measuring device (5) and the actuator, and is configured to: use the boiler load signal as the main criterion for mode switching, combine the measurement value of the flow velocity measuring device (5) to perform closed-loop correction of the target rotation angle of the front adjustable flue gas damper (3) and the rear adjustable flue gas damper (4), and automatically switch to the open-loop control mode that calls the preset target rotation angle only based on the boiler load signal when the flow velocity measurement value is abnormal; the preset target rotation angle is determined by the preset correspondence between the boiler load and the damper base rotation angle, and the base rotation angle serves as the initial swing angle when entering the corresponding load range and the open-loop preset swing angle when the flow velocity is abnormal;
[0017] When the boiler load is not lower than the preset load threshold, the target rotation angle of the front and rear baffles is the zero position.
[0018] Furthermore, the reference flow velocity value Vb corresponding to the current boiler load is the flow velocity value corresponding to the boiler load-reference flow velocity curve formed by the flow velocity measuring device (5) at multiple stable load points during the unit commissioning stage, under the conditions of zeroing of the front adjustable flue gas damper (3) and the rear adjustable flue gas damper (4) and full flow of the flue (2). Interpolation is used to determine the relationship between adjacent calibrated load points. The average flue gas velocity of the measuring section obtained by calibrating and converting the measured value of the flow velocity measuring device (5) is recorded as Vm, and the reference flow velocity value corresponding to the current load is recorded as Vb. The controller determines the flow velocity measurement abnormality when any of the following conditions are met: |Vm-Vb| / Vb exceeds 30% and lasts for more than 30 seconds; or the difference between the maximum and minimum values of the boiler load within 3 consecutive minutes is not less than 5% of the rated load, and the ratio of the difference between the maximum and minimum values of Vm during the same period to the average value of Vm within the 3 minutes is not greater than 1%; or the flow velocity measurement signal exceeds the range of the measuring device or the signal is lost.
[0019] A control method for a variable Venturi ammonia injection mixing enhancement device suitable for boiler low-load conditions includes the following steps:
[0020] 1) Acquire the boiler load signal and the flue gas velocity measurement value of the flow velocity measuring device, and feed back the position of the front adjustable flue gas damper and the rear adjustable flue gas damper;
[0021] 2) Determine if the flue gas velocity measurement value is abnormal. If abnormal, stop the closed-loop correction based on the velocity measurement value and call the target angles of the front and rear baffles from the preset boiler load-baffle base angle correspondence according to the current boiler load. When the preset target angle is at the zero position, control the front and rear baffles to return to zero and adhere to the wall, and open all ammonia injection headers. When the preset target angle is the Venturi mixing angle, select the working zone of the ammonia injection header according to the effective flow channel range of the throat corresponding to the target angle, and redistribute the total amount of ammonia injected by the SCR denitrification system among the currently opened ammonia injection headers. After completing this adjustment, return to step 1).
[0022] 3) When the flue gas velocity measurement is normal and the boiler load is lower than the preset load threshold, determine the target velocity coefficient Kv that uniquely corresponds to the current boiler load based on the preset boiler load-target velocity coefficient calibration curve, and use it as... Determine the equivalent flow velocity at the target throat; where Vr is the design average flue gas velocity at the section where the ammonia injection grille (1) is located when the rated load, the front and rear baffles are back to zero, and the flue is flowing through the entire cross section; the measured value of the velocity measuring device (5) is converted into the average flue gas velocity Vm at the measuring section after calibration. Let the area of the measuring section be Am, then the flue gas volume flow rate Q = Vm·Am; let the net width of the rectangular flue with the same cross section where the ammonia injection grille (1) is L, the net height be H, and the total cross section area be A0 = L·H, then the effective flow area of the target throat is... and will The minimum effective flow area corresponding to the mechanically permissible position of the baffle is limited to between A0 and the minimum effective flow area.
[0023] 4) In low-load Venturi mixing mode, determine the effective channel width of the target throat based on the effective flow area of the target throat. Let the length of a single front baffle be L1, the length of a single rear baffle be L2, the angle between the front baffle and its corresponding side wall be α, and the angle between the rear baffle and its corresponding side wall be β. Then, to ensure that the free ends of the front and rear baffles form the same effective target channel width, the following conditions must be met: Based on this, respectively and Determine the target swing angles of the front and rear baffles, and limit the amplitude within the mechanically permissible angle range of the actuator; when the baffle is a micro-arc plate structure, L1 and L2 are calculated based on the chord length from the pivot to the free end, and α and β are calculated based on the angle between the corresponding chord and the side wall.
[0024] 5) In low-load Venturi mixing mode, based on the effective throat channel width Determine the working zone of the ammonia injection main pipe of the ammonia injection grid, and only open the ammonia injection main pipe whose lateral coverage is located within the projection range of the effective flow channel at the throat on the cross section of the ammonia injection grid; the total amount of ammonia injected is still determined by the SCR denitrification system according to the denitrification requirements, and is redistributed among the currently opened ammonia injection main pipes.
[0025] 6) When the boiler load is not lower than the preset load threshold, control the front and rear adjustable flue gas dampers to return to zero and adhere to the wall, and open all ammonia injection headers; when the boiler load is lower than the preset load threshold, control the front and rear adjustable flue gas dampers to form a variable Venturi flow channel according to the target swing angle determined in steps 3) to 5), and based on the current throat equivalent velocity Vt=Q / At and the target throat equivalent velocity... The deviation is used to correct the effective channel width of the target. The value of At is the smaller value of the effective flow area of the free end section of the front and rear baffles calculated based on the real-time position of the front and rear baffles. Then, the target swing angle of the front and rear baffles is corrected in conjunction with the geometric relationship in step 4).
[0026] 1) After one baffle adjustment is completed, return to step 1) and continue to collect data for cyclic control.
[0027] Furthermore, the preset load threshold is 75% of the boiler's rated load; when the boiler load is not lower than 75% of the rated load, it enters the high load mode; when the boiler load is lower than 75% of the rated load, it enters the Venturi mixing mode.
[0028] Furthermore, the relative load is characterized by the ratio λ = P / Pr of the boiler's real-time load P to its rated load Pr. When 50% ≤ λ < 75%, the included angle α of the front baffle foundation is 15°–20°, the included angle β of the rear baffle foundation is 10°–15°, and the target velocity coefficient Kv is 0.75–1.00. When 25% ≤ λ < 50%, the included angle α of the front baffle foundation is 20°–30°, the included angle β of the rear baffle foundation is 15°–20°, and the target velocity coefficient satisfies 0.60 ≤ Kv < 0.75. Kv at each load point is uniquely determined by the preset boiler load-target velocity coefficient calibration curve. Kv = 0.75 is taken at the 50% rated load boundary, and Kv = 0.60 is taken at the 25% rated load boundary. The included angle of the front and rear baffle foundations is determined by the preset... The boiler load and damper base angle correspondence is determined in pairs. The base angle is used as the initial swing angle when entering the corresponding load range and the open-loop preset swing angle when the flow velocity measurement is abnormal. The final target swing angle when the flow velocity measurement is normal is determined according to steps 3) to 6) of claim 7. When λ < 25%, the target flow velocity coefficient Kv = 0.60 corresponding to 25% rated load and the preset base angle are taken as the initial values. When the flow velocity measurement is normal, it is allowed to continue to close the effective throat channel within the mechanical allowable range. If the throat equivalent flow velocity is still lower than 0.60Vr after reaching the minimum allowable effective flow area, the amplitude limit state is maintained and a low flow velocity alarm signal is output. When the flow velocity measurement is abnormal, the preset base angle corresponding to 25% rated load is used for open-loop control.
[0029] The beneficial effects of this invention are as follows:
[0030] 1) This invention uses front adjustable flue gas baffles and rear adjustable flue gas baffles to form a variable Venturi flow channel in the flue. The opening is adaptively adjusted in combination with boiler load and flue gas velocity measurement points to improve low load flow velocity and disturbance, enhance the mixing of reducing agent and flue gas, and improve denitrification efficiency.
[0031] 2) The device of the present invention has a simple structure, is easy to modify and install on existing flues, does not require large-scale civil engineering and equipment replacement, has a short implementation cycle and low cost;
[0032] 3) The control strategy of this invention covers a wide load operating range. It automatically enters the mixing mode under low load and returns to zero under medium and high load to reduce pressure drop and wear. For extremely low load conditions below 25% of the rated load but still within the allowable stable operating range, a limiting enhancement and low flow rate alarm strategy is adopted to achieve stable and reliable mixing and denitrification effects under wide load. Attached Figure Description
[0033] Figure 1 This is a schematic diagram of the device of the present invention under high load conditions;
[0034] Figure 2 This is a schematic diagram of the device of the present invention under medium and low load conditions.
[0035] Figure 3 This is a flowchart of the overall control logic of the device of the present invention.
[0036] In the diagram: 1. Ammonia injection grille; 2. Flue; 3. Front adjustable flue gas baffle; 4. Rear adjustable flue gas baffle; 5. Flow velocity measuring device. Detailed Implementation
[0037] The present invention will be further described below with reference to the accompanying drawings and embodiments, but the scope of protection of the present invention is not limited thereto.
[0038] like Figure 1 and Figure 2 As shown, this invention provides a variable Venturi ammonia injection mixing enhancement device suitable for boilers under low load conditions, installed in the horizontal flue 2 where the ammonia injection grid 1 of the SCR denitrification system is located. The device includes a front adjustable flue gas baffle 3, a rear adjustable flue gas baffle 4, a flow velocity measuring device 5, an actuator, and a controller. Both the front adjustable flue gas baffle 3 and the rear adjustable flue gas baffle 4 include two baffles respectively disposed on both sides of the flue width.
[0039] An adjustable flue gas baffle 3 is located upstream of the ammonia injection grille 1, and a adjustable flue gas baffle 4 is located downstream of the ammonia injection grille 1. The two baffles in the same group are hinged to the two side walls of the flue duct 2 in the width direction via rotating shafts. These rotating shafts are arranged along the height direction of the flue duct 2, allowing the two baffles to rotate synchronously towards each other in the horizontal plane about the center line of the flue duct 2's width. The front and rear baffles, together with the inner wall of the flue duct 2, form a variable Venturi flow channel, which sequentially forms a contraction section, a throat region, and an expansion section from upstream to downstream. The height of each baffle in the flue duct height direction is adapted to the net height of the flue duct. When the baffle is a micro-arc plate structure, the baffle length described below is the chord length from the rotating shaft to the free end, and the baffle angle is the angle between this chord and the side wall where it is located.
[0040] To prevent interference during the rotation of the baffles and ensure the formation of an effective Venturi flow pattern, this invention specifies the length of the baffles: the length L1 of a single baffle of the front adjustable flue gas baffle 3 is 0.5 to 0.65 times the net width L of the flue duct 2, and the length L2 of a single baffle of the rear adjustable flue gas baffle 4 is 0.6 to 0.8 times the net width L of the flue duct 2. If the front baffle is too short, its flow-constricting capacity at low loads will be insufficient; if it is too long, it will easily cause excessively high local flow velocities and pressure drops at large turning angles. The rear baffle can be selected within the above range according to the specific structure to match the length and a smaller swing angle of the front baffle, so that the high-speed flue gas expands and recovers more smoothly, reducing flow separation behind the baffle.
[0041] Ammonia injection grille 1 is installed in the throat region of the Venturi flow channel. Let the net height of flue 2 be H, the angle between the front baffle and its side wall be α, the angle between the rear baffle and its side wall be β, and the effective throat channel width be Bt. When the two baffles in the same group rotate symmetrically about the center line of the flue width, the effective channel widths at the free ends of the front and rear baffles are L⁻²L₁·sinα and L⁻²L₂·sinβ, respectively. The controller adjusts these widths in a coordinated manner to make them both equal to the target effective channel width Bt, thus Bt = L⁻²L₁·sinα = L⁻²L₂·sinβ, and the effective throat flow area At = H·Bt. The ammonia injection grid 1 comprises multiple ammonia injection headers arranged side-by-side along the width of the flue. The controller only activates the ammonia injection headers whose lateral coverage is within the projection range of the effective flow channel at the throat. For equal-width zones, if the width of a single zone is Δb, the number of zones N activated is the largest integer not exceeding Bt / Δb, i.e., N = Bt / Δb, and priority is given to symmetrically selecting the corresponding zones about the centerline of the flue width. The total ammonia injection volume is still determined by the original SCR denitrification system based on denitrification requirements and redistributed among the currently activated ammonia injection headers.
[0042] The actuator is preferably an electric or pneumatic actuator equipped with angle feedback and easing control functions to ensure smooth adjustment of the baffle and avoid causing severe disturbance to the flue gas.
[0043] like Figure 3 As shown, the controller is electrically connected to the flow rate measuring device 5 and the actuator. Figure 3 The overall control logic is shown, and the specific loop control method is as follows:
[0044] Step S1: Data Acquisition: Real-time acquisition of boiler load signal, flue gas velocity measured by flow velocity measuring device 5, and real-time position feedback of front and rear baffles. The measured value of flow velocity measuring device 5 is converted into the average flue gas velocity Vm of its measuring section after on-site calibration, and the area of the measuring section is denoted as Am; the total cross-sectional area of the rectangular flue duct 2 with uniform cross-section where ammonia injection grid 1 is located is denoted as A0=L·H.
[0045] Step S2: Anomaly Diagnosis: The reference flow velocity Vb corresponding to the current boiler load is determined during the unit commissioning phase under the conditions of zeroing the front and rear baffles and full flow through the flue. Multiple stable load points are calibrated using the flow velocity measuring device 5 at its measurement section to form a boiler load-reference flow velocity curve. Interpolation is used to determine the relationship between adjacent calibration points. If |Vm-Vb| / Vb exceeds 30% and persists for more than 30 seconds; or if the difference between the maximum and minimum boiler load values within 3 consecutive minutes is not less than 5% of the rated load, and the ratio of the difference between the maximum and minimum Vm values during the same period to the average Vm value within those 3 minutes is not greater than 1%; or if the flow velocity measurement signal exceeds its range or is lost, an anomaly is determined, and the flow velocity closed-loop correction is stopped. At this point, the target angles of the front and rear baffles are called according to the preset boiler load-baffle base angle correspondence based on the current load. If the target angle is the zero position, the front and rear baffles return to zero and adhere to the wall, and all ammonia injection headers are opened. If the target angle is the Venturi mixing angle, the ammonia injection zone is selected according to the corresponding effective channel range, and the total amount of ammonia injected by the SCR denitrification system is redistributed among the open zones. After completing this adjustment, return to step S1.
[0046] Step S3: Mode Switching and Parameter Determination: If the flow rate is normal, the boiler load is used as the primary criterion, and the load threshold is set to 75% of the rated load. The relative load is represented by the ratio λ = P / Pr of the real-time boiler load P to the rated load Pr. When the load is below 75%, the target flow rate coefficient Kv, uniquely corresponding to the current load, is determined according to the preset boiler load-target flow rate coefficient calibration curve, and then... The target throat equivalent velocity is determined, where Vr is the design average flue gas velocity at the section where ammonia injection grid 1 is located under rated load, with the front and rear baffles at zero and the flue gas flowing through the entire cross-section. The throat equivalent velocity described in this paper is the cross-sectional average velocity control quantity obtained by converting the flue gas volumetric flow rate obtained from the measured cross-section with the effective flow area of the throat. The boiler load-target velocity coefficient calibration curve can be pre-established and stored in the controller based on the unit commissioning test and / or numerical simulation results. The flue gas volumetric flow rate is calculated using Q=Vm·Am, and then... The effective flow area of the target throat is determined and limited according to the minimum mechanically permissible effective flow area and the total cross-sectional area A0 of the flue. The minimum effective flow area is the lower limit of the effective flow area that can be achieved when both the front and rear baffles are within the mechanically permissible range and can be adjusted in conjunction according to the geometric relationship. When the boiler is shut down or the SCR denitrification system is taken out of operation, this control method stops executing, and the front and rear baffles and the ammonia injection system operate according to the original interlocking logic of the unit.
[0047] High load mode (λ≥75%): Control the front and rear baffles to return to zero and adhere to the wall, allow full cross-section flow, open all ammonia injection headers, and do not perform Venturi flow reduction enhancement.
[0048] Low load mode (λ<75%): Enters Venturi mixing mode. When 50%≤λ<75%, the front baffle foundation angle α is 15°~20°, the rear baffle foundation angle β is 10°~15°, and the target velocity coefficient Kv is 0.75~1.00; when 25%≤λ<50%, the front baffle foundation angle α is 20°~30°, the rear baffle foundation angle β is 15°~20°, and the target velocity coefficient satisfies 0.60≤Kv<0.75. Kv at each load point is uniquely determined by the calibration curve, taking Kv=0.75 at the 50% rated load boundary and Kv=0.60 at the 25% rated load boundary. The base angle is determined by a pair of preset boiler load and damper base angle correspondences. The base angle serves as the initial swing angle when entering the corresponding load range and the open-loop preset swing angle when the flow velocity is abnormal. When the flow velocity is normal, the final target swing angle is determined by the effective channel width and geometric relationship of the target throat. When λ < 25%, Kv = 0.60 corresponding to 25% rated load and the preset base angle are taken as the initial values. When the flow velocity is normal, the effective channel can be further reduced within the mechanical allowable range. If the throat equivalent flow velocity is still lower than 0.60Vr after reaching the minimum allowable effective flow area, the amplitude limit state is maintained and a low flow velocity alarm is output. When the flow velocity is abnormal, the preset base angle corresponding to 25% rated load is used for open-loop operation.
[0049] Step S4: Closed-loop correction and linkage: based on calculate Press again Determine the target swing angles of the front and rear baffles. Calculate the actual effective channel widths at the free ends of the front and rear baffles based on their current positions. The current effective channel width Bt at the throat is taken as the smaller of the two values. The current effective flow area at the throat is At = H·Bt, and the current throat equivalent velocity is calculated using Vt = Q / At. Compare Vt with the target throat equivalent velocity. Compare; when correction is needed, first correct the target effective channel width. Then, α and β are recalculated in conjunction with the above geometric relationship to avoid independently correcting the two angles and disrupting the consistency of the width of the front and rear channels. Figure 3 The “target scope” in the text refers to... The target value is the allowable deviation band determined by debugging. Figure 3 The phrase "correcting the angles of the front and rear baffles" indicates that the angles of the two sets of baffles are corrected in conjunction with each other according to the above geometric relationship.
[0050] Step S5: Selecting the working zone of the ammonia injection main pipe: Determine the working zone of the ammonia injection main pipe of the ammonia injection grid 1 according to the corrected effective throat channel width. Only open the ammonia injection main pipe whose lateral coverage is located within the projection range of the effective throat flow channel on the cross section of the ammonia injection grid 1. The total amount of ammonia injected is still determined by the SCR denitrification system according to the denitrification requirements and redistributed among the currently opened ammonia injection main pipes.
[0051] Step S6: Iterative Cycle: After completing one adjustment, return to step S1, continuously monitor and dynamically adjust to achieve closed-loop cyclic control of "load determination - target flow rate determination - effective channel calculation - baffle linkage adjustment - ammonia injection zone linkage".
Claims
1. A variable venturi ammonia injection mixing enhancement device suitable for boiler low-load operation, installed in the flue (2) where the ammonia injection grid (1) of the SCR denitrification system is located, characterized in that, It includes a front adjustable flue gas baffle (3) located upstream of the ammonia injection grid (1), a rear adjustable flue gas baffle (4) located downstream of the ammonia injection grid (1), a flow velocity measuring device (5) located in the flue (2) upstream of the ammonia injection grid (1), and an actuator connected to the front adjustable flue gas baffle (3) and the rear adjustable flue gas baffle (4) respectively and used to drive them to rotate. The front adjustable flue gas baffle (3) includes two front baffles respectively hinged to the two side walls of the flue (2) in the width direction, and the rear adjustable flue gas baffle (4) includes two rear baffles respectively hinged to the two side walls of the flue (2) in the width direction. Two baffles in the same group are symmetrically arranged about the center line of the width of the flue (2) and rotate synchronously towards each other. The front adjustable flue gas baffle (3) and the rear adjustable flue gas baffle (4) together with the inner wall of the flue (2) form a variable Venturi flow channel with a continuous contraction section, throat area and expansion section from upstream to downstream. The ammonia injection grid (1) is located in the throat region of the variable venturi flow channel, and the multiple ammonia injection headers of the ammonia injection grid (1) are arranged in sections along the width direction of the flue (2).
2. The variable Venturi ammonia injection mixing enhancement device suitable for low-load boiler operation as described in claim 1, characterized in that, Each front baffle in the front adjustable flue gas baffle (3) and each rear baffle in the rear adjustable flue gas baffle (4) are flat or slightly arc-shaped structures. Each baffle rotates around its pivot located on the side wall of the flue (2). The height of each baffle in the height direction of the flue (2) is matched with the net height of the flue (2). The length of a single front baffle is 0.5 to 0.65 times the net width of the flue (2), and the length of a single rear baffle is 0.6 to 0.8 times the net width of the flue (2). The actuator is an electric or pneumatic actuator and has angle feedback and slow-motion control functions.
3. The variable Venturi ammonia injection mixing enhancement device suitable for low-load boiler operation as described in claim 1, characterized in that, It also includes a controller, which is electrically connected to the flow velocity measuring device (5) and the actuator, and is configured to: use the boiler load signal as the main criterion for mode switching, combine the measurement value of the flow velocity measuring device (5) to perform closed-loop correction of the target rotation angle of the front adjustable flue gas damper (3) and the rear adjustable flue gas damper (4), and automatically switch to the open-loop control mode that calls the preset target rotation angle only based on the boiler load signal when the flow velocity measurement value is abnormal; the preset target rotation angle is determined by the preset correspondence between the boiler load and the damper base rotation angle, and the base rotation angle serves as the initial swing angle when entering the corresponding load range and the open-loop preset swing angle when the flow velocity is abnormal; When the boiler load is not lower than the preset load threshold, the target rotation angle of the front and rear baffles is the zero position.
4. A variable Venturi ammonia injection mixing enhancement device suitable for low-load boiler operation as described in claim 3, characterized in that, The reference flow velocity value Vb corresponding to the current boiler load is the flow velocity value corresponding to the boiler load-reference flow velocity curve formed by the flow velocity measuring device (5) at multiple stable load points during the unit commissioning stage, under the conditions of zeroing of the front adjustable flue gas damper (3) and the rear adjustable flue gas damper (4) and full flow of the flue (2). Interpolation is used to determine the flow velocity between adjacent calibrated load points. The average flue gas velocity of the measuring section obtained by the calibration conversion of the measured value of the flow velocity measuring device (5) is recorded as Vm, and the reference flow velocity value corresponding to the current load is recorded as Vb. The controller determines the flow velocity measurement abnormality when any of the following conditions are met: |Vm-Vb| / Vb exceeds 30% and lasts for more than 30 seconds; or the difference between the maximum and minimum values of the boiler load within 3 consecutive minutes is not less than 5% of the rated load, and the ratio of the difference between the maximum and minimum values of Vm during the same period to the average value of Vm within 3 minutes is not greater than 1%; or the flow velocity measurement signal exceeds the range of the measuring device or the signal is lost.
5. A control method for a variable Venturi ammonia injection mixing enhancement device suitable for low-load boiler operation as described in claim 4, characterized in that, Includes the following steps: 1) Obtain the boiler load signal and the flue gas velocity measurement value of the flow velocity measuring device (5), and feed back the position of the front adjustable flue gas damper (3) and the rear adjustable flue gas damper (4); 2) Determine if the flue gas velocity measurement value is abnormal. If it is determined to be abnormal, stop the closed-loop correction based on the velocity measurement value, and call the target rotation angle of the front and rear baffles from the preset boiler load-baffle base rotation angle correspondence according to the current boiler load. When the preset target angle is at the zero position, control the front and rear baffles to return to zero and adhere to the wall, and open all ammonia injection headers; when the preset target angle is the Venturi mixing angle, select the working zone of the ammonia injection header according to the effective flow channel range of the throat corresponding to the target angle, and redistribute the total amount of ammonia injected by the SCR denitrification system among the currently opened ammonia injection headers; after completing this adjustment, return to step 1). 3) When the flue gas velocity measurement is normal and the boiler load is lower than the preset load threshold, determine the target velocity coefficient Kv that uniquely corresponds to the current boiler load based on the preset boiler load-target velocity coefficient calibration curve, and use it as... Determine the equivalent flow velocity at the target throat; where Vr is the design average flue gas velocity at the section where the ammonia injection grille (1) is located when the rated load, the front and rear baffles are back to zero, and the flue is flowing through the entire cross section; the measured value of the velocity measuring device (5) is converted into the average flue gas velocity Vm at the measuring section after calibration. Let the area of the measuring section be Am, then the flue gas volume flow rate Q = Vm·Am; let the net width of the rectangular flue with the same cross section where the ammonia injection grille (1) is L, the net height be H, and the total cross section area be A0 = L·H, then the effective flow area of the target throat is... and will The minimum effective flow area corresponding to the mechanically permissible position of the baffle is limited to between A0 and the minimum effective flow area. 4) In low-load Venturi mixing mode, determine the effective channel width of the target throat based on the effective flow area of the target throat. Let the length of a single front baffle be L1, the length of a single rear baffle be L2, the angle between the front baffle and its corresponding side wall be α, and the angle between the rear baffle and its corresponding side wall be β. Then, to ensure that the free ends of the front and rear baffles form the same effective target channel width, the following conditions must be met: Based on this, respectively Determine the target swing angles of the front and rear baffles, and limit the amplitude within the mechanically permissible angle range of the actuator; when the baffle is a micro-arc plate structure, L1 and L2 are calculated based on the chord length from the pivot to the free end, and α and β are calculated based on the angle between the corresponding chord and the side wall. 5) In low-load Venturi mixing mode, based on the effective throat channel width Determine the working zone of the ammonia injection main pipe of the ammonia injection grid (1), and only open the ammonia injection main pipe whose lateral coverage is located within the projection range of the effective flow channel of the throat on the cross section of the ammonia injection grid (1); the total amount of ammonia injection is still determined by the SCR denitrification system according to the denitrification requirements and redistributed among the currently opened ammonia injection main pipes. 6) When the boiler load is not lower than the preset load threshold, control the front adjustable flue gas damper (3) and the rear adjustable flue gas damper (4) to return to zero and adhere to the wall and open all ammonia injection headers; when the boiler load is lower than the preset load threshold, control the front adjustable flue gas damper (3) and the rear adjustable flue gas damper (4) to form a variable Venturi flow channel according to the target swing angle determined in steps 3) to 5), and based on the current throat equivalent flow velocity Vt=Q / At and the target throat equivalent flow velocity The deviation is used to correct the effective channel width of the target. The value of At is the smaller value of the effective flow area of the free end section of the front and rear baffles calculated based on the real-time position of the front and rear baffles. Then, the target swing angle of the front and rear baffles is corrected in conjunction with the geometric relationship in step 4). 7) After one baffle adjustment is completed, return to step 1) and continue to collect data for cyclic control.
6. The control method as described in claim 5, characterized in that, The preset load threshold is 75% of the boiler's rated load; when the boiler load is not lower than 75% of the rated load, it enters the high load mode; when the boiler load is lower than 75% of the rated load, it enters the Venturi mixing mode.
7. The control method as described in claim 5, characterized in that, The relative load is represented by the ratio of the boiler's real-time load P to its rated load Pr, λ = P / Pr. When 50% ≤ λ < 75%, the included angle α of the front baffle foundation is 15°–20°, the included angle β of the rear baffle foundation is 10°–15°, and the target velocity coefficient Kv is 0.75–1.
00. When 25% ≤ λ < 50%, the included angle α of the front baffle foundation is 20°–30°, the included angle β of the rear baffle foundation is 15°–20°, and the target velocity coefficient satisfies 0.60 ≤ Kv < 0.
75. Kv at each load point is uniquely determined by the preset boiler load-target velocity coefficient calibration curve. Kv = 0.75 is taken at the 50% rated load boundary, and Kv = 0.60 is taken at the 25% rated load boundary. The included angles of the front and rear baffle foundations are determined by the preset... The boiler load and damper base angle correspondence is determined in pairs. The base angle serves as the initial swing angle when entering the corresponding load range and the open-loop preset swing angle when the flow velocity measurement is abnormal. The final target swing angle when the flow velocity measurement is normal is determined according to steps 3) to 6) of claim 7. When λ < 25%, the target flow velocity coefficient Kv = 0.60 corresponding to 25% rated load and the preset base angle are taken as the initial values. When the flow velocity measurement is normal, it is allowed to continue to close the effective throat channel within the mechanical allowable range. If the throat equivalent flow velocity is still lower than 0.60Vr after reaching the minimum allowable effective flow area, the amplitude limit state is maintained and a low flow velocity alarm signal is output. When the flow velocity measurement is abnormal, the preset base angle corresponding to 25% rated load is used for open-loop control.