Device and method for rapid replacement and mixing of mixed gases without power supply for GIS equipment

By using a rapid gas replacement and mixing device for GIS equipment that does not require power outages, and by combining recovery, replenishment and refill pipelines to achieve real-time gas mixing, the problems of power outages and complex operations in the gas mixing retrofit of GIS equipment are solved. This achieves rapid gas replacement and uniformity, improving efficiency and safety.

CN123102185APending Publication Date: 2026-11-17STATE GRID ANHUI ELECTRIC POWER CO LTD ELECTRIC POWER SCI RES INST
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202611509390.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-28
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

The existing GIS equipment requires a power outage during the gas mixing retrofit process, which leads to a decrease in power supply capacity. The operation is also complex, inefficient, and increases the risk of equipment leakage. Furthermore, the lack of a gas mixing device makes the process time-consuming.

Method used

A rapid gas replacement and mixing device using GIS equipment without power interruption is employed. Through the combination of recovery pipelines, gas replenishment pipelines, transfer pipelines, and refill pipelines, gas is exchanged and distributed in real time, and the required amount of N2 is calculated to achieve a rapid reduction and uniform mixing of SF6 gas in the gas chamber.

Benefits of technology

It enables rapid replacement and homogenization of mixed gases without power interruption, improving replacement efficiency, reducing equipment downtime and operational complexity, and minimizing equipment leakage risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123102185A_ABST
    Figure CN123102185A_ABST
Patent Text Reader

Abstract

This invention discloses a rapid gas replacement and mixing device and method for GIS equipment without power outages, comprising: a recovery pipeline connecting a gas chamber and a mixing container, used to recover a portion of the SF6 gas in the gas chamber to the mixing container under non-shutdown conditions; a gas replenishment pipeline connected to the recovery pipeline, used to replenish nitrogen gas into the recovery pipeline during SF6 recovery and mix it with the SF6; and a transfer pipeline connecting the mixing container and the transfer container, used to transfer the mixed gas in the mixing container to the transfer container. In this invention, by recovering the high proportion of SF6 gas in the gas chamber to the lower pressure limit of the gas chamber, replacement can be performed under non-shutdown conditions. The real-time mixing of the recovered gas and replenished N2 avoids the need for cyclic mixing and gas distribution, greatly improving replacement efficiency. The required amount of N2 is calculated to determine whether the mixing ratio meets the requirements, and the complete mixing of the mixed gas in the gas chamber is achieved through circulation between the gas chamber, the mixing container, and the transfer container.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of gas displacement technology, and more specifically to a device and method for rapid displacement and mixing of mixed gases in GIS equipment without power interruption. Background Technology

[0002] SF6 gas has a strong greenhouse effect, with a global warming potential 23,500 times that of carbon dioxide, and it can persist in the atmosphere for approximately 3,200 years. It is one of the six greenhouse gases globally recognized as requiring regulated control. Statistics show that 70% of SF6 gas in China is used as insulation and arc-quenching gas in high-voltage GIS equipment in the power industry. To achieve its "dual carbon" goals, the State Grid Corporation of China is actively promoting mixed gas reform, replacing traditional SF6 with a 30% SF6:70% N2 mixture.

[0003] The "SF6 / N2 Mixed Gas GIS Equipment Application Guide" specifies the workflow for mixed gas retrofitting. First, the pressure of the adjacent gas chambers of the retrofitted GIS equipment needs to be reduced by half. Then, the SF6 gas in the retrofitted gas chamber is recovered and evacuated. After that, a 30% SF6:70% N2 mixed gas is introduced into the retrofitted gas chamber to the rated pressure. Finally, the mixture is left to stand for 24 hours and the mixing ratio of the mixed gas is retested. Only after passing the test can the power be switched on. The retrofitting process takes about one week.

[0004] The above-mentioned modification process has the following defects: (1) The replacement process requires a power outage, which generally takes 4-6 days. This will reduce the power supply capacity of the power grid, especially during peak electricity consumption periods or in areas supplied to important users. Power outages may cause serious social and economic losses. (2) The modification process is complicated. First, special tools and equipment are needed to reduce the pressure of the adjacent gas chamber by half. Then, the SF6 gas in the modified gas chamber is recovered and vacuumed (the pressure is maintained for at least 5 hours, and the next step is carried out after it is qualified). Then, the mixed gas is prepared by the mixed gas filling device and the gas is filled. The operation steps are complicated and the efficiency is low. During the operation, the pipes and joints need to be disassembled and reinstalled many times, which increases the risk of equipment leakage. (3) The lack of a gas mixing device means that the SF6 / N2 mixed gas can only be mixed in the equipment in advance or rely on natural diffusion after being filled, which is time-consuming and inefficient.

[0005] The aforementioned retrofit process not only requires power outages and shutdowns of the GIS equipment, but also involves numerous steps and necessitates the use of multiple large pieces of equipment, including SF6 gas recovery units, vacuum pumping units, and mixed gas filling units. The transportation, installation, and commissioning of this equipment are complex and time-consuming, placing high demands on the on-site working environment and the technical skills of the operators. This not only increases transportation costs but also risks delays due to road conditions and weather, further increasing retrofit costs and safety risks. Therefore, the aforementioned mixed gas GIS equipment retrofit process, to some extent, reduces the enthusiasm of power systems to promote mixed gas equipment.

[0006] Patent document CN118896244A discloses a method and system for modifying high-voltage switchgear without power interruption using mixed gas. Under operating voltage conditions, when the gas chamber of the high-voltage switchgear operates at a standard gas pressure, a preset proportion of pure SF6 gas is recovered from the high-voltage switchgear until the preset proportion of pure SF6 gas is completely recovered. After the preset proportion of pure SF6 gas is recovered, N2 gas of the same volume as the recovered pure SF6 gas is introduced into the high-voltage switchgear, and the gas chamber of the high-voltage switchgear returns to the standard operating gas pressure. The uniformity of the mixing of SF6 gas and N2 gas in the high-voltage equipment is tested. When the uniformity of the mixing of SF6 gas and N2 gas reaches a preset standard, the modification of the high-voltage switchgear is completed.

[0007] However, it does not circulate; it directly extracts SF6 to 30% at once. Under ideal conditions, the equipment can still operate normally with 30% SF6, but under actual conditions, extracting SF6 to 30% at once will cause a power outage. Summary of the Invention

[0008] The technical problem to be solved by this invention is how to improve the replacement efficiency and ensure uniform mixing in the gas chamber without interrupting power supply.

[0009] This invention solves the above-mentioned technical problems through the following technical means: a rapid replacement and mixing device for mixed gas in GIS equipment without power interruption, comprising: The recovery pipeline connects the gas chamber and the mixing container, and is used to recover part of the SF6 gas in the gas chamber to the mixing container without shutting down the machine. The make-up gas pipeline is connected to the recovery pipeline and is used to add nitrogen gas to the recovery pipeline during SF6 recovery and mix it with SF6 gas. The transfer pipeline connects the mixing container and the transfer container, and is used to transfer the mixed gas in the mixing container to the transfer container. The refill line connects the recovery line and the transfer container, and is used to refill the mixed gas in the transfer container back to the gas chamber through the recovery line. Calculate the amount of N2 required to prepare a mixture of SF6 gas in the gas chamber to the target proportion of SF6. Recover the high proportion of SF6 gas in the gas chamber to the lower limit of the gas chamber pressure. Based on the proportion of SF6 in the recovered gas, prepare the N2 output flow rate required for the target proportion of SF6. After the recovery is completed, refill the gas in the transfer container back into the gas chamber. Repeat the recovery and refilling to reduce the proportion of SF6 gas in the gas chamber. When the amount of N2 replenished is equal to the calculated amount of N2, stop the gas mixing. Circulate the mixed gas between the gas chamber, the mixing container, and the transfer container until the proportion of SF6 in the refilled gas reaches the set pressure. The lower limit of the gas chamber pressure includes the gas chamber alarm pressure or the equivalent insulation strength pressure under the current gas chamber mixing ratio. Repeated refilling to the set pressure includes the rated pressure after the gas mixing modification or the upper limit of the gas chamber pressure.

[0010] As a preferred technical solution, the SF6 gas density in the first pre- and post-recovery gas chambers is calculated based on the SF6 gas pressure and temperature in the pre- and post-recovery gas chambers, respectively; the SF6 gas density in the post-recovery mixing container is calculated based on the pressure and temperature inside the post-recovery mixing container; the mass of the first recovered SF6 gas is calculated based on the SF6 gas density in the post-recovery mixing container and the effective volume of the mixing container; the effective volume of the gas chamber is calculated based on the SF6 gas density in the pre- and post-recovery gas chambers and the mass of the first recovered SF6 gas; the mass of SF6 gas in the gas chamber and the volume corresponding to the mass of SF6 gas in the gas chamber are calculated based on the effective volume of the gas chamber and the SF6 gas density in the pre-recovery gas chamber; and the amount of N2 required to prepare a mixture of SF6 with the target proportion is calculated based on the volume corresponding to the mass of SF6 gas in the gas chamber.

[0011] As a preferred technical solution, the SF6 gas density in the pre-recovery chamber is calculated using equation (1). SF6 gas density in the gas chamber after the first recovery SF6 gas density in the mixing container after the first recovery ; (1) In the formula, P is the absolute pressure of SF6 gas, and the unit is MPa; This is the density of SF6 gas, in kg / m³. 3 T represents the temperature of SF6 gas, in Kelvin (K). The mixing container was evacuated before the first recovery. The mass of SF6 gas recovered in the first recovery was calculated using equation (2). : (2) The effective volume V of the air chamber is calculated using equation (3). S : (3) The mass of the original SF6 gas in the gas chamber is calculated using equation (4). : (4) The mass is calculated using equation (5). SF6 gas volume under standard conditions (20°C, standard atmosphere) : (5) In the formula, The density of SF6 gas under standard conditions is taken as 6.08 kg / m³. 3 ; The standard volume V of N2 required to prepare a 30% SF6 mixture is calculated using equation (6). n for: (6).

[0012] As a preferred technical solution, a flow control component is installed on the gas supply line to control the N2 output flow rate.

[0013] As a preferred technical solution, the pressure change caused by supplementing N2 is calculated by the pressure change of the mixing container per unit time, and the N2 output flow rate is calculated in real time by the pressure change caused by supplementing N2 and the target proportion of SF6 in the mixed gas.

[0014] As a preferred technical solution, the pressure change caused by supplementing N2 is calculated using formula (7). : (7) Calculate the recovered gas flow rate using formula (8). : (8) judge / and The value of w% is the allowable deviation; if it is less than this range, then increase it. Conversely, it decreases. The amount of N2 replenished during this recycling process is calculated using equation (9). : (9).

[0015] As a preferred technical solution, the cumulative amount of N2 replenished after each replacement is... ;when Stop supplementing N2 when the time comes.

[0016] As a preferred technical solution, pressure sensors and temperature sensors are installed at the end of the recovery pipeline near the gas chamber interface and on the mixing container. A mixing ratio detection unit is installed on the mixing ratio detection branch, and a frequency conversion compression unit is installed on the recovery branch.

[0017] A method for rapid gas replacement and homogenization of GIS equipment without power interruption involves using a rapid gas replacement and homogenization device for GIS equipment without power interruption. The method calculates the amount of N2 required to prepare a 30% SF6:70% N2 mixture from the SF6 gas in the gas chamber. The high proportion of SF6 gas in the gas chamber is recovered to the lower pressure limit. The N2 output flow rate is adjusted according to the SF6 percentage in the recovered gas to achieve the target SF6 percentage, and the amount of N2 replenished is calculated. After recovery, the gas in the transfer container is refilled into the gas chamber. Through recovery and refilling, the SF6 percentage in the gas chamber is reduced. Gas mixing stops when the amount of N2 replenished equals the calculated required amount. The mixture is then circulated between the gas chamber, mixing container, and transfer container until the SF6 percentage in the refilled gas meets the requirements.

[0018] The beneficial effects of this invention are as follows: (1) In this invention, by reducing the high proportion of SF6 gas in the recovery chamber to the lower limit of the chamber pressure, the replacement can be carried out without stopping the machine. By real-time mixing of the recovered gas and the supplemented N2, the process of circulating mixing and gas distribution is avoided, which greatly improves the replacement efficiency. The required amount of N2 is calculated to determine whether the mixing ratio meets the requirements. The gas mixture in the chamber is completely mixed by circulating between the chamber and the mixing container and the transfer container. Attached Figure Description

[0019] Figure 1 This is a schematic diagram of the overall structure provided for an embodiment of the present invention; Reference numerals: 1. Gas chamber interface; 2. Pressure sensor one; 3. Temperature sensor one; 4. Mixing ratio detection unit; 5. Variable frequency compression unit; 6. Mixing tank one; 7. Pressure sensor two; 8. Temperature sensor two; 9. Flow control component; 10. Nitrogen cylinder; 11. Mixing tank two; 12. Recovery pipeline; 13. Make-up gas pipeline; 14. Refill pipeline; 15. Mixing ratio detection branch; 16. Transfer branch; 17. Connection branch. Detailed Implementation

[0020] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below in conjunction with the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0021] See Figure 1 The GIS equipment uninterrupted gas rapid replacement and mixing device includes a gas chamber interface 1, a recovery pipeline 12, a mixing tank 6, a gas replenishment pipeline 13, a refill pipeline 14, and a connecting pipeline 15. The gas chamber interface 1 is connected to the mixing tank 6 through the recovery pipeline 12. A pressure sensor 2 and a temperature sensor 3 are provided at one end of the recovery pipeline 12 near the gas chamber interface 1. A pressure sensor 7 and a temperature sensor 8 are provided on the mixing tank 6. A mixing ratio detection branch 15 is provided on the recovery pipeline 12, and a mixing ratio detection unit 4 is provided on the mixing ratio detection branch 15. A frequency conversion compression unit 5 is also provided on the recovery branch 12. One end of the gas supply line 13 is connected to the nitrogen source, and the other end is connected to the recovery line 12. In this embodiment, the nitrogen source is a nitrogen cylinder 10. The function of connecting the gas supply line 13 and the recovery line 12 is to directly supply nitrogen into the recovery line through the gas supply line 13 during the recovery process of drawing SF6 gas from the gas chamber interface 1 to the mixing tank 6. The gas supply line 13 is equipped with a flow control component 9. Mixing tank 1 6 is connected to mixing tank 2 11 via transfer pipe 16. Mixing tank 2 11 is connected to recovery pipe 12 via recharge pipe 14, thereby achieving connection with gas chamber interface 1. A connecting branch 17 is also provided between transfer pipe 16 and recovery pipe 12. One end of connecting branch 17 is connected to transfer pipe 16, and the other end of connecting branch 17 is connected to recovery pipe 12. The connection end of connecting branch 17 and recovery pipe 12 is located between the connection end of frequency conversion compression unit 5 and replenishment pipe 13 and recovery pipe 12.

[0022] The connection end of the recharge line 14 and the recovery line 12 is located upstream of the variable frequency compression unit 5 and downstream of the connection end of the mixture ratio detection branch 15 and the recovery line 14. The connection end of the gas replenishment line 13 and the recovery line 12 is located downstream of the variable frequency compression unit 5. It should be noted that in this embodiment, the mixing ratio detection unit can be a mixing ratio detector, which is a commercially available component; the frequency conversion compression unit can be a frequency conversion compressor; and the flow control component can be a mass flow controller (which can control the output target flow rate of SF6 gas). In this embodiment, the gas chamber is a single storage space; the mixing container includes a mixing tank 6, and the transfer container includes... Since GIS equipment is generally designed with a certain margin of insulation strength, the insulation strength of the mixed gas with a low SF6 content still meets the operating requirements for a short period of time during the uninterrupted power replacement process.

[0023] A rapid displacement mixing method includes the following steps, performed without shutting down the machine: S1. Recover a portion of the SF6 gas in the gas chamber to the lower limit of the gas chamber pressure; The variable frequency compression unit 5 recovers a portion of the SF6 in the gas chamber to the mixing tank 6 until the pressure sensor 2 detects that the gas chamber pressure has reached the set lower limit. The pressure sensor 2 and the temperature sensor 3 measure the values ​​P before and after the recovery. 1ka and T 1ka P 1kb and T 1kb , where P 1ka The first subscript "1" indicates pressure sensor 2, the second subscript "k" indicates the kth recovery, and the third subscripts "a" and "b" indicate before and after recovery, respectively. S2. Calculate the effective volume of the gas chamber and the amount of nitrogen required to mix the mixed gas in the mixing tank 6 to the set ratio; During the first recovery, the SF6 gas pressure P in the gas chamber measured by pressure sensor-2 before recovery will be used. 11a The temperature T in the gas chamber measured by temperature sensor 3 before recovery. 11a The pressure P of SF6 gas in the gas chamber measured by pressure sensor 2 after recovery. 11b The temperature T in the gas chamber measured by temperature sensor 3 after recovery. 11b Substituting into equation (1), i.e., the Betty Bridgeman equation, to calculate the SF6 gas density in the pre-recovery chamber. SF6 gas density in the chamber after the first recovery ; (1) In the formula, P is the absolute pressure of SF6 gas, and the unit is MPa; This is the density of SF6 gas, in kg / m³. 3 T is the thermodynamic temperature of SF6 gas, in K. It should be noted that the first recovery is of pure SF6 gas. Before recovery, the mixing tank 1-6 and mixing tank 2-11 were evacuated to an initial pressure of 0. The pressure P in mixing tank 1-6 was measured by pressure sensor 2-7 after the first recovery. 21b The temperature T in mixing tank 6 measured by temperature sensor 28 after the first recovery. 21b Substituting into equation (1), i.e., the Betty Bridgeman equation, we can calculate the SF6 gas density in mixing tank 6 after the first recovery. Given that the effective volume of the mixing tank is V1, the mass of SF6 gas recovered in the first operation is calculated using equation (2). ; (2) Since the gas recovered in the first instance is pure SF6 gas and all of it enters the mixing tank 6, the SF6 gas density in the gas chamber before the first recovery, calculated by equation (1), will be used. SF6 gas density in the chamber after the first recovery Substitute into equation (3) to calculate the effective volume V of the air chamber. q : (3) Calculate the mass of SF6 gas in the gas chamber : (4) Calculation quality SF6 gas volume under standard conditions (20°C, standard atmosphere) for: (5) In the formula, The density of SF6 gas under standard conditions is taken as 6.08 kg / m³. 3 ; With mass The standard volume V of N2 required to prepare a 30% SF6:70% N2 mixture (i.e., a 30% SF6 mixture) of SF6 gas. n for: (6) S3. A mixed gas with an SF6 content of X% is prepared during the recovery process; Flow control component 9 controls the nitrogen gas from the make-up gas line 13 to meet the recovered SF6 gas on the recovery line 12 and enter the mixing tank 6 together. Flow control component 9 controls the output flow rate. The calculation method is as follows: The pressure change per unit time in mixing tank 6 is calculated using pressure sensor 27. Then calculate the pressure change caused by the addition of N2. : (7) Mixing ratio monitoring module 4 monitors the proportion of SF6 gas in the recovered gas in real time. The required recovery gas flow rate for preparing a mixed gas with an SF6 content of X% With supplemental N2 flow The relationship between them satisfies equation (8): (8) According to Dalton's law of partial pressures, the volume ratio (i.e., flow ratio) of the gas entering the mixing tank 6 per unit time is equal to the ratio of pressure changes. Therefore, when / Should be in w% represents the allowable deviation; if it is less than this range, increase it. Conversely, it decreases. Since the two gases are mixed and prepared in real time, the mixed gas entering the mixing tank 6 has a good degree of uniformity and the SF6 content is around X%. After the recycling is completed, the amount of N2 replenished during this recycling process is calculated using equation (9). : (9) S4. Transfer and refilling of mixed gas with SF6 content of X% in mixing tank 6; The gas in mixing tank 16 is transferred to mixing tank 21 by the variable frequency compression unit 5; after the transfer is completed, the mixed gas with SF6 content of X% in mixing tank 21 is returned to the filling chamber to the rated pressure by the variable frequency compression unit 5. S5. Judgment based on whether the gas mixing ratio in the gas chamber meets the requirements; The recovery in step S1, the gas distribution in step S3, and the transfer and recharging in step S4 are considered as one replacement. The cumulative amount of N2 replenished after each replacement is recorded. ; when When N2 replenishment is stopped, the average percentage of SF6 gas in the overall space consisting of the gas chamber, mixing tank 1 (6), and mixing tank 2 (11) is X%. S6. Gas circulation and mixing; The variable frequency compression unit 5 continuously recovers the gas in the gas chamber into the mixing tank 6 to the lower pressure limit, and then returns the gas in the mixing tank 11 to the gas chamber to the rated pressure. During this recovery and refilling process, the gas path between the mixing tank 6 and the mixing tank 11 is always connected and can be regarded as a single container. If the proportion of SF6 gas is detected to be between 29% and 31% during a continuous recovery and refilling process, it is considered that the mixing is completed, the gas chamber is refilled to the rated pressure, and the replacement is completed.

[0024] It should be noted that, When the lower limit of the recovery pressure in S1 is the recovery to the alarm pressure of the gas chamber, the recharge to the set pressure in S4 refers to the recharge to the rated pressure after the gas mixing modification. In this embodiment, the rated pressure after the gas mixing modification is 1.33 times the rated pressure of the original SF6 gas equipment. When the lower limit of the recovery pressure in S1 is the equivalent insulation strength pressure at the current gas chamber mixing ratio, the recharge to the set pressure in S4 refers to recharge to the upper limit of the gas chamber pressure.

[0025] The above embodiments are only used to illustrate the technical solutions of the present invention, and are not intended to limit it. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A rapid gas replacement and mixing device for GIS equipment without power interruption, characterized in that, include: The recovery pipeline connects the gas chamber and the mixing container, and is used to recover part of the SF6 gas in the gas chamber to the mixing container without shutting down the machine. The make-up gas pipeline is connected to the recovery pipeline and is used to add nitrogen gas to the recovery pipeline during SF6 recovery and mix it with SF6 gas. The transfer pipeline connects the mixing container and the transfer container, and is used to transfer the mixed gas in the mixing container to the transfer container. The refill line connects the recovery line and the transfer container, and is used to refill the mixed gas in the transfer container back to the gas chamber through the recovery line. Calculate the amount of N2 required to prepare a mixture of SF6 gas in the gas chamber to the target proportion of SF6. Recover the high proportion of SF6 gas in the gas chamber to the lower limit of the gas chamber pressure. Based on the proportion of SF6 in the recovered gas, prepare the N2 output flow rate required for the target proportion of SF6. After the recovery is completed, refill the gas in the transfer container back into the gas chamber. Repeat the recovery and refilling to reduce the proportion of SF6 gas in the gas chamber. When the amount of N2 replenished is equal to the calculated amount of N2, stop the gas mixing. Circulate the mixed gas between the gas chamber, the mixing container, and the transfer container until the proportion of SF6 in the refilled gas reaches the set pressure. The lower limit of the gas chamber pressure includes the gas chamber alarm pressure or the equivalent insulation strength pressure under the current gas chamber mixing ratio. Repeated refilling to the set pressure includes the rated pressure after the gas mixing modification or the upper limit of the gas chamber pressure.

2. The GIS equipment uninterrupted power-off rapid gas replacement and mixing device according to claim 1, characterized in that, The SF6 gas density in the first recovery chamber is calculated by measuring the SF6 gas pressure and temperature in the chambers before and after recovery, respectively. The SF6 gas density in the mixing container after recovery is calculated by measuring the pressure and temperature inside the mixing container. The mass of SF6 gas recovered in the first recovery is calculated by measuring the SF6 gas density in the mixing container after recovery and the effective volume of the mixing container. The effective volume of the chamber is calculated by measuring the SF6 gas density in the chambers before and after recovery and the mass of SF6 gas recovered in the first recovery. The mass of SF6 gas in the chamber and the corresponding volume of SF6 gas in the chamber are calculated by measuring the effective volume of the chamber and the SF6 gas density in the chamber before recovery. Finally, the amount of N2 required to prepare a mixture of SF6 with the target proportion is calculated by measuring the volume of SF6 gas in the chamber.

3. The GIS equipment uninterrupted power-off rapid gas replacement and mixing device according to claim 1, characterized in that, The SF6 gas density in the pre-recovery chamber was calculated using equation (1). SF6 gas density in the gas chamber after the first recovery SF6 gas density in the mixing container after the first recovery ; (1) In the formula, P is the absolute pressure of SF6 gas, and the unit is MPa; This is the density of SF6 gas, in kg / m³. 3 T represents the temperature of SF6 gas, in Kelvin (K). The mass of SF6 gas recovered in the first recovery is calculated using equation (2). : (2) The effective volume V of the air chamber is calculated using equation (3). S : (3) The mass of the original SF6 gas in the gas chamber is calculated using equation (4). : (4) The mass is calculated using equation (5). SF6 gas volume under standard conditions (20°C, standard atmosphere) : (5) In the formula, The density of SF6 gas under standard conditions is taken as 6.08 kg / m³. 3 ; The standard volume V of N2 required to prepare a 30% SF6 mixture is calculated using equation (6). n for: (6)。 4. The GIS equipment uninterrupted power-off rapid gas replacement and mixing device according to claim 1, characterized in that, The gas supply line is equipped with a flow control component, which controls the output flow of N2.

5. The GIS equipment uninterrupted power-off rapid gas replacement and mixing device according to claim 1 or 4, characterized in that, The pressure change caused by supplementing N2 is calculated by the pressure change per unit time in the mixing container, and the N2 output flow rate is calculated in real time by the pressure change caused by supplementing N2 and the target proportion of SF6 in the mixed gas.

6. The GIS equipment uninterrupted power-off rapid gas replacement and mixing device according to claim 4, characterized in that, The flow control component is a flow controller.

7. The GIS equipment uninterrupted power-off rapid gas replacement and mixing device according to claim 1, characterized in that, The pressure change caused by supplementing N2 is calculated using formula (7). : (7) Calculate the recovered gas flow rate using formula (8). : (8) judge / and The value of w% is the allowable deviation; if it is less than this range, then increase it. Conversely, it decreases. The amount of N2 replenished during this recycling process is calculated using equation (9). : (9)。 8. The GIS equipment uninterrupted power-off rapid gas replacement and mixing device according to claim 4, characterized in that, The cumulative amount of N2 replenished after each replacement ;when Stop supplementing N2 when the time comes.

9. The GIS equipment uninterrupted power-off rapid gas replacement and mixing device according to claim 1, characterized in that, Pressure and temperature sensors are installed at the end of the recovery pipeline near the gas chamber interface and on the mixing container. A mixing ratio detection unit is installed on the mixing ratio detection branch, and a frequency conversion compression unit is installed on the recovery branch.

10. A method for rapid displacement and mixing of mixed gases in GIS equipment without power interruption, characterized in that, Using the GIS equipment uninterrupted gas rapid replacement and mixing device as described in any one of claims 1-9, the amount of N2 required to prepare a 30%SF6:70%N2 mixture of SF6 gas in the gas chamber is calculated. The high proportion of SF6 gas in the gas chamber is recovered to the lower pressure limit. The N2 output flow rate required to prepare the target SF6 proportion is adjusted according to the SF6 proportion in the recovered gas, and the amount of N2 that has been replenished is calculated. After the recovery is completed, the gas in the transfer container is refilled into the gas chamber. The proportion of SF6 gas in the gas chamber is reduced through recovery and refilling. When the amount of N2 that has been replenished is equal to the calculated amount of N2, the gas mixing is stopped. Then, the mixture is circulated between the gas chamber, the mixing container, and the transfer container until the SF6 proportion in the refilled gas meets the requirements.