Crusher Feed Control Method Based on Particle Size Load Matching
By using a particle size load matching method, the material in the crusher is separated into bypass and inlet materials, and a particle size quality balance relationship is established. This solves the problem of load prediction deviation in the crusher feed control and achieves more accurate feed rate control and load management.
Patent Information
- Application Number
- CN202611620354.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-20
- Publication Date
- 2026-11-17
AI Technical Summary
In the existing technology, the crusher feeding control method is difficult to accurately predict the particle size quality entering the cavity and its arrival time. There is a deviation between the prediction and the load, which leads to the problems of load superposition and overfeeding.
By using a particle size load matching method, the material is separated into bypass material and in-cavity material, a particle size mass balance relationship is established, the diversion results of in-cavity material are retained, and an appropriate feeding speed is selected in combination with the current load of the crusher to ensure that the load does not exceed the allowable range, and the diversion calculation is updated.
It reduces the load superposition caused by the concentrated arrival of materials in transit and new materials, improves the accuracy and stability of feeding control, and reduces error accumulation.
Smart Images

Figure CN123102485A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of material crushing and supporting feeding control technology, and discloses a crusher feeding control method based on particle size load matching. Background Technology
[0002] In mining and aggregate production, crushing operations typically involve continuously feeding bulk materials from hoppers into the crusher using feeding equipment. The incoming material includes coarse particles requiring further crushing and fine particles that can bypass the current crushing stage. To reduce the amount of fine particles entering the crushing chamber, the production line can employ a vibrating feeder with pre-screening capabilities. After falling into the feed trough, the material moves along the trough surface under vibration and gradually stratifies. Upon entering the bar screening area, particles that can pass through the gaps between the bars are discharged through a bypass channel, while the material remaining on the screen surface continues into the crushing chamber. The bar gaps are determined based on the feed requirements of the crushing process and the bypass particle size, and the feed rate is controlled by adjusting the vibration drive speed. The bypass material can either merge with the crushed material or enter subsequent processing stages, forming a material conveying process that connects pre-screening and crushing.
[0003] In the aforementioned production line, feed control can be adjusted in conjunction with the operating power of the crusher's main motor. The controller collects the motor power, uses power changes as feedback on crushing load changes, and adjusts the drive speed of the feeder accordingly; when the load is high, the feed is reduced, and when the load decreases, the feed is restored. For control methods incorporating particle size information, the particle size distribution of the incoming material can be obtained through sampling screening or online particle size detection, and the subsequent crushing load can be estimated in conjunction with the material flow rate. In the simplified calculation of the feed-load relationship, the pre-screening stage can convert the amount of material entering the crusher according to a fixed diversion ratio, while the conveying stage is delayed based on the time it takes for the material to reach the crushing chamber from the feed position. The controller generates speed adjustment commands based on the converted feed amount and load feedback, and continues to adjust the feed speed according to load changes during subsequent operation.
[0004] When a fixed splitting ratio is used and the overall feed rate is delayed, changes in screen retention and particle size distribution caused by variations in feed rate are difficult to reflect synchronously in the infeed load calculation. After speed adjustment, material still on the screen surface will continue to be split according to the changed movement and screening process, while material that has left the feeding section will maintain its original splitting direction and continue to be conveyed into the crushing chamber. If both types of material are converted according to the new feed rate, the infeed mass already en route may be prematurely deducted, or fine material that has actually bypassed may continue to be included in the mass to be crushed. At the same time, the arrival time of different materials in the crushing chamber varies with the actual conveying process, and the current motor load has not yet reflected the load contribution of subsequent en route materials. Therefore, there is a corresponding deviation between the infeed particle size mass and its arrival sequence and the load prediction. The feed command may repeatedly increase the feed while there is still material in transit, causing subsequent crushing load to be superimposed. Summary of the Invention
[0005] The purpose of this invention is to provide a crusher feeding control method based on particle size load matching, which can effectively solve the problems in the background art.
[0006] To achieve the above objectives, the technical solution adopted by the present invention is as follows:
[0007] The crusher feeding control method based on particle size load matching divides the material into bypass material and cavity material in the speed-regulated pre-screening feeding section.
[0008] Based on the particle size and conveying process of each material, a particle size accounting system including changes in screen retention is established to obtain the undiverted controlled material and the material that has left the feeding section and is still in the cavity.
[0009] The diversion results of the material entering the cavity in transit are retained, and the diversion and arrival process of the controlled material and the newly added material are calculated according to the candidate feeding rate. The diversion and arrival process are combined with the material entering the cavity in transit according to the arrival time to form the cavity particle size flow sequence.
[0010] Based on the current load of the crusher, the sequence input is established by the particle size load relationship between the measured inlet particle size flow rate and the load. A candidate feed rate that predicts the load will not exceed the allowable load of the crusher is selected and executed. The flow distribution calculation and the particle size load relationship are updated according to the measured inlet particle size flow rate and load of the corresponding material.
[0011] Preferably, establishing the particle size mass accounting includes: according to the conveying process of the raw material flowing through the feeding section, tracing the detection records of bypass material and inlet material back to the diversion time, and accumulating the inlet mass and outlet mass according to particle size;
[0012] The current screen retention mass is obtained by subtracting the bypass exit mass and the exit mass in the direction of entry from the sum of the screen retention mass and the entry mass of each particle size at the previous moment.
[0013] The mass retained on the screen surface is associated with the entry record of the corresponding material, and the sum of the mass retained by each particle size is constrained by the actual mass of material stored on the screen surface.
[0014] Preferably, when the material leaves the feeding section, the mass of the corresponding particle size is deducted from the mass retained on the screen surface, and a bypass record or a record of material entering the cavity in transit is recorded.
[0015] Each candidate feed rate shares the in-transit entry record, keeping the registered particle size quality unchanged, and only updating the arrival time according to the actual conveying process.
[0016] Preferably, calculating the diversion and arrival process includes: deducing the screen surface movement process of the controlled material based on the correspondence between the candidate feeding speed and the measured material moving speed;
[0017] Based on the amount of material stored on the screen surface during the movement and the cumulative residence time of each particle size, the screening relationship established by the measured diversion record is called to calculate the mass of each particle size entering the bypass and the mass leaving along the screen surface.
[0018] The mass leaving along the screen surface is included in the new in-transit entry record corresponding to the candidate feed rate, and merged with the shared in-transit entry record according to the arrival time to form the entry particle size flow sequence.
[0019] Preferably, for materials with particle obstruction, the online particle size detection results are verified using the sampling and sieving results, and the particle size ranges whose unique mass ratio cannot be determined are recorded as mass ratio ranges.
[0020] By combining the mass ratio range with the measured total mass of the logistics, a candidate allocation is generated that satisfies the non-negativity of the mass of each particle size and the sum of the mass of each particle size equals the total mass.
[0021] Substitute the candidate allocations into the particle size mass balance and eliminate allocations that result in negative sieve surface retention mass or exceed the sieve surface material retention measurement range.
[0022] The system retains the allocation of raw material entry records and bypass and cavity exit records simultaneously, forming a set of particle size quality states. Within each state, the system retains the particle size quality correspondence between different material flows, and registers the controlled materials and materials entering the cavity in transit according to the correspondence.
[0023] Preferably, updating the arrival time includes: accumulating the conveying progress based on the time when the material leaves the feeding section and the measured moving speed along the way, and recording the remaining conveying path;
[0024] When the conveying speed changes, the estimated arrival time is recalculated based on the remaining conveying path, while keeping the particle size mass in the in-transit entry record unchanged.
[0025] The measured particle size mass at the inlet is allocated according to the proportion of the mass of the same particle size record expected to arrive in the current detection period. The allocation is capped at the uncancelled mass of each record, and the allocated mass is cancelled from the corresponding in-transit entry cavity record.
[0026] For quality samples that have not yet been cancelled, the conveying process will be updated and included in the next candidate feed rate evaluation.
[0027] Preferably, when the sieve penetration relationship is invoked, the non-zero residual mass of each particle size that has not yet penetrated the sieve is associated with the sieve surface retention process that has already been experienced;
[0028] Divide the cumulative sieve penetration ratio increment by the unsieved ratio at the previous moment, and use the quotient as the subsequent sieve penetration ratio of the remaining mass. Deduct the corresponding bypass amount from the remaining mass, and update the subsequent sieve penetration calculation according to the total material inventory after deduction.
[0029] When the candidate feed rate changes, the dwell time that has already been experienced is retained, and the screening amount corresponding to the subsequent movement process is recalculated.
[0030] Preferably, after executing the candidate feeding speed, the screening relationship is first corrected based on the measured bypass particle size and inlet particle size of the corresponding material, and then the inlet particle size flow rate sequence is corrected based on the measured arrival process.
[0031] The updated record is constructed using the corrected inlet particle size flow rate sequence and the corresponding measured load, and the entry and exit records of the corresponding materials are associated in the updated record;
[0032] After the diversion mass budget is closed and the corresponding conveying process is completed, the particle size loading relationship is corrected by updating the records;
[0033] Unclosed records retain association information but are not temporarily included in the correction of particle size loading relationships.
[0034] Preferably, for each state in the set of particle size quality states, the diversion and arrival process under the same candidate feed rate is deduced, and the correspondence between the controlled material and the material entering the cavity in each state is maintained until the load prediction ends;
[0035] Only retain candidate feed rates whose predicted load does not exceed the allowable load in all states of the set;
[0036] For the retained candidate feeding speeds, calculate the cumulative in-cavity mass for each state within the same prediction period, use the minimum cumulative in-cavity mass as the comparison value, and select the candidate feeding speed with the largest comparison value for execution;
[0037] If there are no candidate feed rates to retain, stop adding new feeds and continue updating the material record in transit.
[0038] Preferably, based on the load response process of each particle size recorded according to the particle size loading relationship, the measured inlet time period is mapped to the load response time period, and the material records with overlapping load response time periods are associated as joint update records;
[0039] After the shunting quality budget involved in the joint update record is closed and the corresponding transport process is completed, the cavity particle size flow sequence is synthesized according to the actual arrival order, and the joint predicted load is calculated with the measured load at the beginning of the corresponding observation period as the initial state.
[0040] The difference between the measured load and the joint predicted load during the same observation period is used as a correction amount to jointly update the particle size load relationship, and the load correction of individual material records in the joint update record is stopped.
[0041] Compared with the prior art, the beneficial effects of the present invention are as follows:
[0042] 1. By incorporating particle size distribution data that includes changes in screen retention, controlled materials that have not yet been diverted and materials already en route into the cavity that have left the feeding section can be recorded separately. When evaluating candidate feeding rates, the particle size distribution and diversion destination of materials already formed in transit are retained. The diversion process is recalculated only for controlled materials and newly added materials, and an in-cavity particle size flow sequence is synthesized according to the arrival time, so that load prediction is based on the diverted in-cavity materials. When the conveying speed changes, the in-transit record is updated with the arrival time according to the remaining conveying path, and the mass that has already been detected entering the cavity is deregistered from the record; the screen material retains the residence process it has already undergone, and the remaining mass of the material passing through the screen is calculated. The above processing ensures that candidate feeding actions are constrained by both the existing in-transit mass and the subsequent diversion results, reducing the situation of repeated material addition based solely on the current load decrease, and suppressing the load superposition caused by the concentrated arrival of in-transit materials and newly added materials.
[0043] 2. To address the uncertainty in particle size distribution caused by particle obstruction, the corresponding particle size states are maintained by considering the total mass of the material and the material remaining on the screen surface. The same candidate feed rate is evaluated under each state, allowing the feed load corresponding to different feasible particle size compositions to be incorporated into the feed decision, reducing overfeeding caused by single estimation biases. After speed adjustment, the screening relationship is corrected based on measured bypass and feed records, and the feed sequence is further corrected based on the actual arrival process, ensuring that diversion errors and conveying timing errors are addressed before updating the particle size load relationship. Load correction is temporarily suspended for records where the mass balance is not yet closed, and records with overlapping load response periods are jointly updated. This reduces the inclusion of incomplete responses from preceding materials into subsequent materials and the repeated correction of the same load response, ensuring that the particle size load relationship used for subsequent feed decisions corresponds to the verified material records and reducing the accumulation of errors during continuous speed adjustment. Attached Figure Description
[0044] Figure 1 This is a flowchart of the pre-screening, diversion, and particle size load matching feeding control process of the present invention;
[0045] Figure 2 This is a cumulative check chart of the particle size distribution of the sieve surface in this invention.
[0046] Figure 3 This is a diagram showing the cavity loading process under different candidate velocities according to the present invention;
[0047] Figure 4 This is a comparison chart of candidate peak values under the complete grain size state of the present invention;
[0048] Figure 5 This is a flowchart of the joint update process for shunt correction and overlapping load response of the present invention. Detailed Implementation
[0049] In one embodiment, a crusher feeding control method based on particle size load matching is adopted. The material is divided into bypass material and infeed material in the speed-adjustable pre-screening feeding section. The pre-screening feeding section adopts existing vibrating feeder and bar screener. The material passing through the bar gap is conveyed along the original bypass channel, and the material that does not pass through the bar gap and leaves from the end of the screen surface enters the crusher. The controlled object is the speed command of the feeding equipment. The mechanical structure of the crusher and the material channel remain in their original form. The control calculation uses the actual material flow detection record to distinguish the location of the material, and includes the material still on the screen surface and the material that has left the screen surface in the subsequent calculation. The infeed material in this article includes the material conveyed along the infeed direction but has not yet entered the crushing chamber. Its actual state of entering the crushing chamber is confirmed by the inlet detection record. Even if the bypass material merges with the crushed product downstream, it is no longer included in the infeed mass of this stage crusher.
[0050] Please refer to Figure 1 In this embodiment, based on the particle size and conveying process of each material stream, a particle size calculation including changes in screen retention is established to obtain the controlled material that has not been diverted and the material that has left the feeding section and is in transit. The controlled material refers to the remaining material that is still within the screen area under speed regulation and whose final outlet destination has not yet been determined. The material in transit refers to the material that has passed through the end of the screen and entered the upstream conveying path of the crusher. The particle size calculation is based on the record of the actual detection position of the material. The time difference between the detection position and the screening boundary is converted according to the conveying process. The data of different positions obtained at the same time are not directly subtracted. The material on the screen is allowed to stay across multiple control cycles. Each cycle only adds the newly entered mass and deducts the actual exit mass. The mass that has not yet left is retained in the subsequent cycle to continue to participate in the diversion calculation.
[0051] In this embodiment, the diversion results of materials entering the cavity in transit are retained. The diversion and arrival process of controlled materials and newly added materials are calculated according to the candidate feeding speed. This process is combined with the materials entering the cavity in transit according to their arrival time to form an inlet particle size flow sequence. The candidate feeding speed is an alternative instruction that has not yet been executed. Each alternative instruction is deduced from the same confirmed material record. The bypass mass that has already occurred and the inlet direction mass that has already left the screen surface are not changed by the write-back of the alternative instructions. The alternative instructions only change the movement, residence and screening calculation of the remaining material on the screen surface and the subsequent newly added materials. The particle size composition of the newly added materials adopts the current raw material detection results and the detected raw material records that are still on the conveying path. Subsequent incoming materials that have not yet been covered by the detection information participate in the calculation according to the valid particle size composition range. Material attributes that have not yet been obtained are not used as definite inputs.
[0052] In this embodiment, based on the current load of the crusher, the sequence input is established by the particle size load relationship between the measured inlet particle size flow rate and the load. A candidate feeding speed that predicts the load does not exceed the allowable load of the crusher is selected and executed. The diversion calculation and particle size load relationship are updated according to the measured inlet particle size flow rate and load of the corresponding material. The actual operating load is represented by the active power of the main motor. The allowable load reads the existing operating limits of the production line. After the feeding command is sent to the original drive control module, the actual execution process is confirmed by drive feedback and material movement detection. If the command has not yet been implemented, the actual speed is used to advance the material record. The sent command cannot be equated with the material displacement that has been completed. The updated calculation uses the mass record of the diversion outlet, the arrival record of the crushing chamber inlet, and the corresponding electric power record respectively, and saves the source association between each record.
[0053] Specifically, the total mass of raw material flow and each outgoing material flow is obtained using existing weighing and metering on the production line or calibrated mass flow rate detection. Online particle size detection uses conventional imaging or profile measurement results. Electrical power is measured using the main motor's electrical measurement results. The amount of material stored on the screen can be obtained using existing weighing information from the equipment or calculated from the material layer volume and the bulk density confirmed by sampling. The selection of detection methods follows the existing metering conditions on site and does not change the structure of the feed chute, bars, or crushing chamber. Flow rate detection data simultaneously records the acquisition location and metering time. Particle size detection data simultaneously records the material range covered by sampling or imaging. When weighing and imaging do not cover the same material range, a correspondence is established according to the material movement trajectory before calculating the particle size mass. Data lacking a correspondence is only retained as a record to be verified.
[0054] In one embodiment, the particle size distribution follows the existing screening particle size distribution in the production process. Visible particles in the online image are first classified into the corresponding particle size distribution according to their outline and spatial scale. Then, the relationship between the volume ratio and the mass ratio is checked by the screening results of simultaneous sampling. For materials with similar density and complete particle outlines, the mass of each particle size distribution can be calculated using visible volume statistics and total mass constraints. For materials with obstructions or fine materials covered by coarse materials, the visible area ratio in the image is not directly used as the mass ratio. Instead, the ratio range supported by sampling verification is retained. The particle size distribution in the bypass material is detected independently. It is not assumed in advance that all bypass materials belong to a certain fixed particle size distribution. The mass of larger particle sizes formed by slender particles accidentally passing through the sieve is also recorded according to the measured results so that the total inlet mass and the total outlet mass can be checked under the same particle size distribution.
[0055] Furthermore, all detection records are time-stamped using the same production clock. Detection records form original intervals based on actual start and end times. Control calculations are summarized using a unified time grid adopted by existing operation records. Mass crossing grid boundaries is allocated based on concurrent flow records. For cumulative weighing records, the interval mass is obtained by the difference between the readings at the end and start points of the interval. For flow records, the interval mass is obtained by integrating the record duration. For particle size ratio records, the total mass actually passed within the covered interval is used as the conversion basis. Data with duplicate timestamps are merged after verification by data source number. Data whose time sequence has not yet been confirmed enters the set to be verified. Data already used to form quality records retains its source mark and is replaced or supplemented when supplementary records are received later. The same weighing change is not calculated twice. All supplementary operations correspond to the original material interval.
[0056] Specifically, the controller establishes material records for the continuous material intervals of the raw materials passing through the feeding section, and associates the particle size and entry time with the record number. The material records on the screen surface can be mixed with other records for conveying. Therefore, the record number indicates the quality source interval and does not require identification of each physical particle. The remaining mass on the screen surface and the mass that has left the screen surface are stored separately for each particle size. The mass that has left the screen surface continues to be stored according to the bypass direction and the direction of entry into the crushing chamber. The mass that enters the crushing chamber is deregistered from the in-transit section and transferred to the arrived record. The record also retains the basis for acquisition and whether the metering verification has been completed. The predictive calculation uses an independent copy to store the results generated by the candidate actions. The actual record only receives the detection facts that have occurred and the corrections after the quality balance verification, and does not receive the predictive results that have not yet been executed.
[0057] In an initialization embodiment, after the feeding section is confirmed to be emptied by on-site detection, the mass of each particle size screen and the corresponding in-transit mass are registered from 0. When the production line starts with material or the controller resumes operation, the mass record saved before the shutdown is read, and the remaining mass is checked using the current total material on the screen, the inlet arrival record, and the actual material position on the conveying path. Restarting the software should not be equated with the material being emptied. When the unique particle size allocation cannot be restored, an initial mass state set is established according to the current total mass and the available particle size observations. Each state in the set must meet the measured material storage range. The old in-transit mass that has not yet been checked continues to be retained. It is only cancelled after the corresponding material is detected and confirmed to have entered the cavity or left the conveying path of this level. Before the check is completed, the low predicted load caused by the missing records will not be used to issue a material increase action.
[0058] In this embodiment, the feeding speed command and the actual material movement speed are processed separately. The vibration drive frequency or the speed displayed by the equipment is only used as a control input. The material movement speed on the screen surface is determined by the material surface displacement in adjacent images, the displacement of trackable particles, or the existing speed detection results. The correspondence between the control input and the actual movement speed is established using historical operation records of similar materials and comparable material layer states. When a candidate action falls between existing records, the adjacent records are interpolated. When a candidate action exceeds the existing observation coverage, no unfounded extrapolation is made. Instead, the corresponding action is temporarily not listed as a material addition candidate. The correspondence is expanded after new speed and movement records are obtained from actual operation. The transition process after the drive action changes is recorded according to the actual movement detection. The screen surface material cannot be directly translated as a whole according to the final stable speed.
[0059] Specifically, the mass of new material added under a candidate action is determined by the expected throughput at the inlet of the controlled feeding section. When using volume detection, the throughput volume is calculated by combining the actual material layer cross-section at the inlet with the material movement distance corresponding to the candidate action. Then, the mass is converted using the bulk density checked at the same time. When using existing weighing data, interpolation is performed using the corresponding records of instructions and measured throughput under the same inlet storage conditions. The expected entry mass cannot exceed the available mass that has been confirmed upstream to be able to reach the inlet. After the material enters, it is added to the corresponding source record and participates in the screen surface storage update. Changes in the screen surface storage affect the subsequent screening ratio and movement process. Therefore, the calculation of inlet entry, screen surface remaining update, and outlet exit is alternately advanced within the prediction interval. It is not possible to only modify the screening ratio under the condition that the inlet volume remains unchanged. When the candidate action stops adding new material, the remaining mass already on the screen surface continues to be processed.
[0060] Furthermore, the conveying path before the crusher is recorded separately from the controlled feeding section. After the material passes through the end of the screen, its particle size has been determined by the diversion fact. Subsequent calculations only consider the advancing position and arrival time. The speed on the conveying path can change with the operation of the production line. Therefore, the controller records the cumulative distance traveled by the material according to the actual speed and corrects the cumulative progress when the material passes through the intermediate position. For the material passing through the chute, the actual passage time distribution can be established using the inlet and outlet passage records. When the record cannot correspond to a single arrival time, the possible arrival time interval is retained. The predicted sequence allocates the mass according to the time interval and maintains the total mass. After the material has left the feeding section upstream, even if the new feeding command decreases, the mass that has not yet reached the crushing chamber is not deducted from the in-transit record.
[0061] In a data processing example, the total mass of a certain raw material zone is 100 kg. Of this, 25 kg has already left through the bypass, and another 35 kg has left the screen surface along the inlet direction. 40 kg remains on the screen surface. The controller treats the 40 kg as material that can continue to be affected by the feeding action, and the 35 kg as material in transit with a determined destination. If subsequent speed adjustment causes 10 kg of the remaining material on the screen surface to enter the bypass, the new inlet mass in the candidate calculation is determined only based on the subsequent destination and arrival process of the remaining 30 kg. The original 35 kg will not be reassigned to the bypass due to speed adjustment. If 12 kg of this material has already been confirmed by the inlet detection to have entered the crushing chamber, then the in-transit record retains 23 kg. The 12 kg that have already entered the chamber participate in the current and subsequent load response calculations. The mass values only illustrate the operational relationship between different records.
[0062] In a further embodiment, establishing the particle size distribution includes: according to the conveying process of the raw material flowing through the feeding section, tracing back the detection records of bypass material and inlet material to the diversion time, and accumulating the inlet and outlet mass by particle size; subtracting the bypass outlet mass and the outlet mass by the sum of the screen surface retention mass and inlet mass of each particle size at the previous moment, to obtain the current screen surface retention mass; associating the screen surface retention mass with the inlet record of the corresponding material, and constraining the sum of the retention mass of each particle size by the actual material mass stored on the screen surface, tracing back the actual conveying records between the detection position and the diversion boundary, and retaining unclosed records when there is a time delay in the outlet detection, and checking the same material interval after the corresponding outlet mass arrives. The discrete distribution of the screen surface particle size is expressed by the following formula.
[0063] ;
[0064] Where g is the particle size number, k is the calculation interval number arranged in chronological order of production time, and k+1 represents the next interval boundary. This represents the mass of the corresponding particle size retained on the sieve surface at the beginning of the interval. The retention mass at the next interval boundary, This represents the mass of the corresponding particle size entering the sieve within the specified range. This represents the corresponding particle size mass that leaves the interval via a bypass. The corresponding particle size mass leaving the screen surface along the crusher inlet direction within the interval is represented by kilograms. The plus sign indicates that the mass enters or the original mass is retained, and the minus sign indicates that the mass has left through the corresponding outlet. The same time interval and the same particle size boundary are used on both sides of the equal sign. The mass retained on the screen surface cannot be negative. In this embodiment, the material condition during the pre-screening period does not have identifiable particle size transfer. When particle size migration is detected due to breakage or agglomeration, the corresponding record is checked separately and its load relationship update is suspended. The closure is not confirmed by unchecked particle size income and expenditure.
[0065] Specifically, if a particle size is retained at 120 kg at the beginning of the interval, 80 kg enters within the interval, 30 kg leaves via the bypass, and 50 kg leaves via the inlet direction, then 120 kg will remain at the end of the interval. If the outlet record changes the bypass mass to 35 kg, and other measurements have been confirmed, then the corrected retained mass is 115 kg. The correction is attributed to the remaining mass on the screen surface and is not deducted from the already measured mass entering the cavity. If the cumulative mass recorded at the outlet exceeds the sum of the initial retained mass and the incoming mass, the controller retains the record conflict marker and checks the time alignment, duplicate data, and detection source. It cannot directly truncate the negative value to zero and continue to confirm the mass closure. After the input and output of each particle size are completed, they are checked against the total material storage on the screen surface. If the total amount can be closed but the particle size distribution is still not unique, multiple feasible particle size distributions are retained.
[0066] Please refer to Figure 2 The above-mentioned particle size distribution can also be cumulatively verified on a common time grid. Taking the initial stock of 100 kg of material on the screen surface and a coarse-to-fine particle size ratio of 65:35 as an associated state, and advancing at a material movement speed of 0.18 m / s, 6 kg / s enters for the first 30 seconds at the inlet, then stops adding new material and continues processing the existing stock; these calculation conditions are used to illustrate... , , and The correspondence. Figure 2 The solid line represents the sum of the initial stock and the cumulative inflow; the dashed line represents the cumulative mass leaving the chamber along the inflow direction; the dotted line represents the cumulative bypass mass; the dotted line represents the mass retained on the screen surface; the horizontal axis represents the prediction time; and the vertical axis represents kilograms. At any given time, the sum of the last three curves should match the solid line. The cumulative outflow is not the instantaneous flow rate, and leaving along the inflow direction does not necessarily mean that the material has reached the crushing chamber.
[0067] For example, at 20 seconds, the initial and cumulative input totals 220.00 kg, of which 32.50 kg is bypassed, 140.01 kg is discharged along the inlet direction, and 47.49 kg remains on the screen. These three amounts add up to the same total. After 30 seconds, the solid line remains at 280 kg, while the cumulative output continues to increase because the previously input material has not yet completely left the screen. By 60 seconds, the bypass input is 51.20 kg, the discharge along the inlet direction is 228.80 kg, and the screen retention is reduced to zero. Each time step proceeds according to the original formula, and the coarse and fine mass are recorded separately, gradually reducing the maximum residual value of input and output to less than 10⁻. 9 kilogram.
[0068] In this embodiment, the detection of the total material storage on the screen surface is cross-checked with the particle size distribution. When using weighing information, the structural self-weight and the measured components corresponding to the periodic motion are first deducted based on the normal no-load operation record of the equipment. Then, the mass is summarized within the corresponding time interval of the material passage. When using material layer volume conversion, the material volume is accumulated according to the observation area of the screen surface and the mass is converted using the same period's bulk density record. The highest material layer height of the isolated image is not used to replace the total storage volume. The total storage volume only constrains the sum of the mass retained by each particle size and does not determine the mass of each particle size separately. When the outlet detection of a certain particle size is missing, the total difference cannot be assigned to any other particle size. Instead, the missing particle size and related material flow are included in the mass constraint. The feasible allocation range is then narrowed after the supplementary measurement record is obtained.
[0069] In a further embodiment, when material leaves the feeding section, the corresponding particle size mass is deducted from the mass retained on the screen surface, and a bypass record or an in-transit entry record is registered. Each candidate feeding speed shares the in-transit entry record, keeping the registered particle size mass unchanged. The arrival time is updated only according to the actual conveying process. Registration is triggered by the exit passage record. Deducting the screen surface mass and adding the corresponding exit mass are completed in the same record submission. Before submission, it is checked whether the same exit record has been processed. After submission, the corresponding material source is saved. Bypass records are included in the material income and expenditure of this level but not in the load prediction sequence of this level. In-transit entry records are included in the subsequent arrival calculation. When the corresponding raw material interval cannot be determined by the exit record, the unassigned mass is retained by particle size and allocated among the source intervals that meet the conveying process and mass income and expenditure requirements.
[0070] Specifically, sharing the in-transit entry record means that each candidate calculation reads the same confirmed quality version. It does not mean that multiple candidate results can overwrite each other. When the controller evaluates different actions of reducing, maintaining or increasing the feed rate, each calculation copy retains the same existing in-transit quality. Only the new in-transit quality derived from the candidate action is added. Candidate results that have not been executed are not converted into actual records after the current selection. The next calculation rereads the exit detection facts that have already occurred. The prediction results of the previously selected action cannot be directly used as new quality facts. When the detection record is retransmitted and causes a change in the confirmed version, the candidate calculations that are still to be evaluated start again with the new version. The quality that has entered the crushing chamber continues to maintain the actual value. Its response is retained through the load status and actual entry history.
[0071] In a further embodiment, updating the arrival time includes: accumulating the conveying progress based on the time the material leaves the feeding section and the measured moving speed along the way, and recording the remaining conveying path; when the conveying speed changes, recalculating the expected arrival time based on the remaining conveying path, keeping the particle size mass in the in-transit entry record unchanged; allocating the measured particle size mass at the inlet according to the proportion of the same particle size record expected to arrive in the current detection period, with the uncancelled mass of each record as the upper limit of allocation, and canceling the allocated mass from the corresponding in-transit entry record; continuing to update the conveying progress for the uncancelled mass and including it in the next candidate feeding speed evaluation, wherein the remaining path is determined by the known conveying path and the accumulated progress, and when the actual path changes on site, it is updated based on the new path record of the production line, without imposing new structural requirements on the feeding or conveying equipment.
[0072] In a quality cancellation example, there are two records in transit of the same particle size that are expected to arrive during the current detection period, with expected arrival masses of 30 kg and 20 kg respectively. The inlet of the crushing chamber confirms that 10 kg has arrived during this period. Therefore, they are allocated to 6 kg and 4 kg according to their respective mass proportions and cancelled from the corresponding records. If the actual mass of a record that has not yet been cancelled is less than the amount allocated in this instance, only its remaining mass is cancelled. The unallocated portion continues to be allocated among other records of the same particle size that meet the arrival conditions. If all the records that meet the conditions still cannot accommodate the actual measured mass at the inlet, the remaining amount is saved as a record to be assigned to the chamber and the arrival time is checked. It is not allowed to reduce any in transit record to a negative value. Although the source of the mass to be assigned cannot be determined at present, it still participates in the load history record as a fact that it has actually entered the chamber.
[0073] Furthermore, the material source is determined by a combination of actual location observation and mass allocation. For material flow intervals that can be continuously tracked, the expected arrival range is determined based on the conveyor belt displacement or material surface movement records. For materials that are mixed in the chute and cannot be tracked segment by segment, the source interval is constrained by the passage time range previously formed by the path through records. Mass allocation is only performed between records of the same particle size that meet the time range. The exit mass of materials that have arrived at the crushing chamber earlier cannot be explained by materials that entered the feeding section later. When early or late arrival records appear consecutively at the actual inlet, the passage process of the corresponding conveying path is corrected first, and then the records that have not yet been assigned are reallocated. The total inlet mass that has been confirmed in history remains unchanged. The correction targets are the material source and the time assignment of the mass that has not yet arrived.
[0074] In this embodiment, the particle size load relationship is established through actual inlet records and electrical power records. The input is the inlet mass flow rate of each particle size in each calculation interval, and the output is the active power of the main motor in the corresponding interval. The load state that already exists at the beginning of the interval is recorded. The model sample is based on the moment when the material actually passes through the crushing chamber inlet, and the moment when the feeding command is issued is not used as a substitute. The electrical power obtained after the equipment is normally emptied is used as the no-load loss record. When the no-load loss changes due to changes in the lubrication, transmission and motor body operating states, the no-load record under the corresponding operating state is used for verification. The no-load loss change is not entirely attributed to the crushing load of a certain particle size. When forming samples, the comparability of the crusher operating states is checked at the same time. Samples that are in abnormal shutdown or missing inlet detection are retained but not included in this relationship fitting.
[0075] Specifically, the load relationship can be implemented using a non-negative regression form with actual load state terms. The contribution of each particle size to the load is retained according to the inflow time sequence. The power changes that occur later than the inflow time are explained using historical lag flow. The historical length is determined based on the closed material records and the repeatable load response process. If the newly added historical interval cannot continue to improve the prediction deviation in the reserved operating segment, the corresponding input term will not be added. The current measured load as the initial state includes the load of the previously inflowed material that is still in effect. The future sequence only adds the material that is expected to enter at the corresponding time. During the prediction process, the load state at the previous prediction time is used. After obtaining the new actual power, the subsequent prediction starts again with the actual state. One implementation of the load relationship is as follows.
[0076] ;
[0077] in, For the predicted active power in the next calculation interval, This represents the actual active power in the current interval. and The no-load loss power used in the corresponding interval is uniformly expressed in kilowatts. This is a dimensionless load condition duration coefficient. This represents the actual influent mass flow rate of the g-th particle size within the corresponding historical interval, expressed in kilograms per second. Where L is the lag interval index, L is the maximum lag index retained, and G is the total number of particle sizes. The power response coefficients for the corresponding particle size and hysteresis interval are expressed in kilowatt-seconds per kilogram. The summation symbol represents the cumulative contribution of the response to each particle size and each hysteresis interval. The subtraction in parentheses represents the deduction of the current no-load loss. When the prediction exceeds the next interval, the actual power in the state term is replaced by the predicted power that has been formed. The meanings of the other symbols remain unchanged.
[0078] In a load calculation example, only two granular inputs in the current cavity interval are retained. The current measured power is 120 kW, and the no-load loss used in both the preceding and following intervals is 20 kW. The state continuity coefficient obtained from data fitting is 0.5. The flow rates of the coarse-grained and fine-grained stages are 5 kg / s and 2 kg / s, respectively, with corresponding power response coefficients of 6 kW / s / kg and 1 kW / s / kg, respectively. After deducting the no-load, the current load forms a state quantity of 100 kW, with a continuity portion of 50 kW. The coarse-grained and fine-grained stages contribute 30 kW and 2 kW of input, respectively. The predicted power for the next calculation interval is 102 kW. If the candidate flow derivation increases the fine-grained cavity flow rate while keeping the coarse-grained stage unchanged, the change only enters the corresponding flow rate term and does not modify the already measured current load. The values are for model calculation examples and are not used as equipment operating specifications or drive configurations.
[0079] Furthermore, the model fitting arranges the closed continuous operation records by time, using the current power after deducting no-load and the historical flow of each size level as the input column for each sample, and the actual power after deducting no-load in the next interval as the output. The sum of squared residuals is used as the fitting quantity. The sum of the product of the input and the remaining residual can be calculated column by column, and then divided by the corresponding input sum of squares to obtain the coefficient correction. After adding the correction back to the original coefficient, the coefficient's allowable range is checked. When all input columns are zero, the original coefficient is retained. The power response coefficient is limited to non-negative, and the state continuation coefficient is limited to between 0 and 1 and does not include 1. The updated result recalculates the load using the complete operation segment that did not participate in the fitting. When the residual increases or the input columns cannot be distinguished from each other, the previous verified relationship is retained. The same operation segment cannot be used as the fitting and the verification data is retained at the same time to avoid mistaking the splitting error or duplicate records as new load patterns.
[0080] In this embodiment, candidate actions are determined by the speed range allowed by the existing feeding drive and the correspondence between the currently verified control inputs. The controller sends actions to maintain the current speed, reduce the speed, and increase the speed with data support to the material simulation. The candidate results include the newly added inlet mass and its occurrence time. The total load at each moment in the prediction interval must be checked. Candidates that exceed the existing allowable load at a certain moment will not be selected for execution. When the raw material composition cannot be determined, it must be checked by all feasible components. The output command only executes the actions that need to be implemented at present. The parts that have not yet been executed in the future will be recalculated after the new detection record arrives. The drive limit, start-stop interlock and crusher self-protection continue to work according to the original control conditions of the production line. The candidate calculation must not bypass these conditions.
[0081] In a further embodiment, the calculation of the diversion and arrival process includes: deduce the screen surface movement process of the controlled material based on the correspondence between the candidate feeding speed and the measured material movement speed; according to the amount of material stored on the screen surface and the cumulative residence process of each particle size during the movement, call the screening relationship established by the measured diversion record, and calculate the mass of each particle size entering the bypass and the mass leaving along the screen surface; include the mass leaving along the screen surface in the new in-transit entry record of the corresponding candidate feeding speed, and merge it with the shared in-transit entry record according to the arrival time to form the entry particle size flow sequence; establish a new source record for the material newly entering the feeding section in the calculation, with its initial screen surface residence time being 0, and retain the residence history of the original remaining material on the screen surface. The two types of materials together form the amount of material stored on the screen surface at the candidate time.
[0082] Specifically, the screen surface simulation divides the observation intervals according to the actual movement direction of the material. The interval boundaries are derived from positions that can be distinguished by existing imaging or position detection, without altering the screen surface structure. Material records enter the corresponding observation intervals according to the actual distributed mass. The candidate feeding speed provides the expected movement speed of the material through the established correspondence. The controller accumulates the time required to pass through each interval and advances the mass position. After calculating the through-screen mass within the interval, the remaining mass continues to advance along the movement direction. The remaining mass reaching the end of the screen surface is registered as a new in-transit entry record. For materials that cross the boundary of the calculation interval, the mass is allocated according to the actual movement process experienced in each time interval. It is not possible to register all the mass that has not yet moved to the end as the leaving mass at the beginning of the entire time interval.
[0083] In this embodiment, the screening relationship is established based on the corresponding raw material and outlet records. The material's particle size, the state of material on the screen, and the residence process already experienced are used as search conditions. The bypass departure ratio of the corresponding material in the subsequent passage process is used as the observation result. For material intervals with continuous position detection, the interval screening ratio is obtained by using the mass income and expenditure from entering a certain screen observation interval to leaving the interval. For mixed materials that cannot uniquely correspond to a single source record, the ratio range that satisfies the total income and expenditure is retained. The ratio obtained by any allocation is not used as the unique training value. When forming the relationship, the cumulative screening ratio is restricted to not decreasing with the screening process already experienced by the material. The screening ratio is between 0 and 1. Measurement combinations that exceed these physical boundaries are returned to the record verification stage.
[0084] Furthermore, the material state on the screen surface can be described by the mass and material layer volume of each observation interval. After the candidate feeding action changes the material passage time, the time occupied on the screen surface by the same mass changes accordingly. Therefore, each simulation re-summarizes the mass remaining on the screen surface of each record, and then retrieves the screening relationship according to the corresponding material state. The candidate speed and screening ratio are not pre-specified to always increase or always decrease in a single direction. The changes in stratification, retention and screening shown by the existing records are reflected by the data correspondence. When the candidate state is located between multiple verified records, the ratio is obtained by interpolation according to the proximity of the material state and the residence process. When there are no comparable records, the adjacent supportable ratio range is retained. The obtained range and the quality income and expenditure enter the candidate evaluation together. New material addition permission cannot be directly generated by arbitrary extrapolation.
[0085] In a simulation example, two candidate actions correspond to the same existing material in transit. One action causes a certain particle size on the screen to reach the end earlier, while the other action causes the corresponding particle size to remain and pass through the screen in the subsequent time. The controller calculates these two material paths separately. The candidate record that leaves earlier forms the new inbound mass at the corresponding arrival time. The candidate record that continues to stay is first deducted from the subsequent actual predicted bypass mass, and then the remaining part is registered as leaving. When comparing the load, the respective inbound time series are used. It is not possible to compare only the total feed amount of the raw materials generated by the two actions, nor can all candidates be uniformly applied to the same bypass ratio. This comparison allows actions with similar raw material feed amounts to form different inbound particle size compositions and load distributions.
[0086] Please refer to Figure 3 The impact of the two material paths on the load depends not only on the total outlet volume but also on the outlet formation and the timing of material entry into the cavity. Under the same coarse-to-fine ratio of 65:35, starting from an initial power of 120 kW, the 60-second entry sequence was calculated for three moving speeds: 0.12, 0.18, and 0.24 m / s. The three curves are derived from the corresponding... Advance The results are represented by solid dotted lines, dashed square dots, and dotted-triangle dots, respectively; sparse dot markings are only used to identify the series, and all calculation records per second are retained. Horizontal dotted lines represent the 100 kW allowable power configuration of this input.
[0087] This time, a historical lag period is retained, with an unloaded power of 20 kilowatts. The coarse-grained current and hysteresis response coefficients are 6 and 0.8 kW / s per kilogram, respectively, while the fine-grained coefficients are 1 and 0.2 kW / s per kilogram, respectively. Taking the 6th second as an example of a candidate with a response time of 0.18 m / s, the previous power was 90.825 kW, the current coarse and fine flow rates are 5.000 and 2.000 kg / s, respectively, and the previous interval flow rates are 5.000 and 2.000 kg / s, respectively. Substituting these values into the equation... It yielded 91.812 kilowatts. and These represent the actual influent mass flow rates of the coarse-grained stage, and These represent the actual inflow mass flow rate at the fine-grained level.
[0088] The peak values for the three candidates are 153.12 kW at 14 seconds (0.12 m / s), 197.36 kW at 9 seconds (0.18 m / s), and 230.19 kW at 9 seconds (0.24 m / s). The faster movement causes the initial stock to leave earlier and more concentratedly, and the new inlet mass is advanced at 4, 6, and 8 kg / s respectively. Therefore, the three curves cannot be replaced by the same fixed bypass ratio or simple time shift. The decline in the latter part of the curve is a result of the decay of the state term after the material has been gradually processed; it does not mean that the in-transit mass can be ignored before the decline.
[0089] In a further embodiment, when invoking the screening relationship, the non-zero remaining mass of each particle size that has not yet been screened is associated with the screen dwell process that has already been experienced; the cumulative screening ratio increment is divided by the unscreened ratio at the previous moment, and the quotient is used as the subsequent screening ratio of the remaining mass. The corresponding bypass amount is deducted from the remaining mass, and the subsequent screening calculation is updated according to the total material quantity after deduction; when the candidate feeding speed changes, the dwell process that has already been experienced is retained, and the screening amount corresponding to the subsequent movement process is recalculated. The cumulative screening ratio is defined according to the cumulative screening experience of the same source material. When switching candidate actions, the completed part at the previous moment is used as a common starting point, and only the subsequent conditional screening process under the new action is added. The completed curve part cannot be directly replaced by the cumulative curve starting from zero at another speed.
[0090] ;
[0091] Where b is the material source record number. This refers to the remaining mass of the g-th particle size in the corresponding source record that is still within the sieve surface at the beginning of the current interval and can continue to pass through the sieve. The bypass mass formed from the remaining mass in the current extrapolation interval, both in kilograms. The corresponding materials are screened according to the cumulative screening ratio formed by the previous processes. The cumulative screening ratio is the result of the current candidate process. Both are dimensionless quantities. Subtraction in the numerator yields the newly added cumulative screening ratio in this interval, and subtraction in the denominator yields the ratio that has not yet been screened. The fraction represents the conditional screening ratio calculated for the remaining material. Multiplication converts the conditional ratio into the bypass mass in this interval. Only records with non-zero remaining mass and a denominator greater than 0 are included in the calculation.
[0092] In a screening calculation example, a certain source record shows 60 kg of particle size material remaining on the screen surface. The previous cumulative screening ratio was 0.4, and the cumulative screening ratio after the candidate process is 0.55. The newly added cumulative ratio is 0.15, the previous unscreened ratio is 0.6, and the conditional screening ratio is 0.25. In this interval, 15 kg of bypass mass should be formed from the 60 kg of remaining mass, and 45 kg should be retained to continue moving. If the subsequent candidate speed is changed at this time, the 15 kg of bypass mass already formed will not return to the screen surface. Subsequent calculations start from 45 kg and the corresponding cumulative experience. If the cumulative screening ratio has reached 1, the corresponding mass that can continue to be screened should be 0. When the detection record still shows a non-zero remaining mass, it is checked as a record inconsistency, and the division by zero operation is not performed.
[0093] Specifically, the cumulative screening ratio under the candidate process is obtained segment by segment through conditional ratios. The controller extracts the proportion of unscreened material leaving the bypass when it passes through the subsequent observation interval in the current particle size and material layer state from the historical records. The previous unscreened ratio is multiplied by the subsequent unscreened conditional ratio to obtain the subsequent unscreened ratio. Then, it is subtracted from 1 to obtain the new cumulative screening ratio. The subsequent conditional ratio is limited to 0 and 1. Therefore, the subsequent cumulative ratio will not be less than the previous cumulative ratio. For the mass that has already left the end of the screen surface, the screening process is terminated at the time of departure and transferred to the in-transit entry record. The bypass diversion cannot be calculated for the mass that has left the screen surface just because the model still has a screening curve with a long residence time. The cumulative experience is always attached to the source mass that is still on the screen surface.
[0094] In a further embodiment, for material streams with particle obstruction, the online particle size distribution results are verified using sampling and sieving results. Particle sizes whose unique mass ratios cannot be determined are recorded as mass ratio intervals. The mass ratio intervals are combined with the measured total mass of the material stream to generate candidate allocations that satisfy the non-negative mass of each particle size and the sum of the particle sizes equals the total mass. The candidate allocations are substituted into the particle size mass calculation to eliminate allocations that result in negative mass retention on the sieve surface or exceed the measurement range of material retention on the sieve surface. Allocations that simultaneously satisfy the records of raw material entry and bypass / entry direction exit are retained to form a set of particle size mass states. Within each state, the particle size mass correspondence between different material streams is retained, and controlled materials and materials entering the cavity in transit are registered according to the correspondence. The states in the set represent the complete mass allocation allowed by the same set of actual observations.
[0095] In this embodiment, the mass ratio range is obtained from the observed deviation range between online detection and simultaneous sampling and sieving, and is verified in conjunction with the uncertainty range of the measurement results themselves. The total mass adopts the measurement results of the corresponding material flow, and the measurement range of material stored on the screen surface adopts the mass range after verification by the corresponding measurement method. These ranges retain their data sources and cannot be arbitrarily expanded in order to close the calculation. Each candidate allocation simultaneously constrains the inlet mass, bypass mass, and inlet cavity direction mass. When the mass of a certain particle size at the inlet increases, the mass of other particle sizes under the same total mass needs to be reduced accordingly. When the bypass mass increases, the mass of material retained on the screen surface and the mass of material leaving the inlet cavity direction also need to change accordingly according to the inflow and outflow. The calculation retains these related changes and does not directly splice the independent maximum values of each quantity into a material state.
[0096] In a particle size distribution example, the raw material mass is 100 kg at a certain time period, and the fine particle mass is between 30 kg and 40 kg. The bypass has been confirmed to be entirely fine particle with a mass of 20 kg. The total amount retained on the screen remains unchanged before and after the time period. When the fine particle mass is 30 kg, it can form a state where 70 kg of coarse particle and 10 kg of fine particle enter the cavity. When the fine particle mass is 40 kg, it can form a state where 60 kg of coarse particle and 20 kg of fine particle enter the cavity. The total mass of the cavity entering the cavity in both states is 80 kg. If the 70 kg of coarse particle in the first state is combined with the 20 kg of fine particle in the second state, it will result in a mass of 90 kg entering the cavity, which violates the total budget. Therefore, such a combination is not included in the state set, and the load calculation only uses the particle size combination that satisfies the total budget.
[0097] Furthermore, the calculation of the state set can be performed by simultaneously establishing linear quality constraints within each particle size quality interval. For each particle size to be determined, the remaining feasible range is first calculated using the total mass and the allowable range of other particle sizes. Then, the range is propagated to the bypass and screen surface material storage constraints. When a certain range is empty, the corresponding allocation branch is removed. When all ranges are valid, the interrelated allocations are retained. When the detection resolution supports discrete quality records, the corresponding quality combinations can be enumerated. For states that still have continuous intervals, interval branching is used to subdivide them instead of directly taking a median. When the upper bound of a candidate load on a certain branch has met the allowable load, it can be retained as a whole. If it cannot be proven that it meets the requirements, further subdivision or abandonment of the corresponding candidate material addition action is required. When there is no feasible solution to the quality constraint, the original record is returned for verification and the material addition selection dependent on inconsistent records is paused.
[0098] In this embodiment, the same candidate action is calculated for each feasible state in the state set. The raw material particle size distribution, screen surface remaining distribution, and in-transit distribution in the state maintain the original correspondence. The candidate action only advances the state along the subsequent material process and cannot arbitrarily switch to non-corresponding material source distributions at different prediction times. For cases where the screening ratio has a range, the corresponding ratio is associated with the material layer and particle size state that form the ratio. When a certain outlet quality is confirmed in subsequent detection, the state that is incompatible with the outlet quality is deleted from all states, and a new candidate evaluation is performed. The determined bypass quality and the quality that has actually entered the cavity are recorded as a common record for all retained states. When the state range is narrowed, the prediction is re-predicted through a new record version without retrospectively changing the physical feeding process that has already been executed.
[0099] In a further embodiment, for each state in the set of particle size quality states, the diversion and arrival process under the same candidate feed rate is deduced, and the correspondence between the controlled material and the material entering the cavity in each state is maintained until the load prediction ends; only the candidate feed rate in which the predicted load does not exceed the allowable load in all states in the set is retained; for the retained candidate feed rates, the cumulative in-cavity mass of each state in the same prediction period is calculated, and the minimum cumulative in-cavity mass is used as the comparison value, and the candidate feed rate with the largest comparison value is selected for execution; when there is no retained candidate feed rate, the addition of new feed is stopped and the record of material entering the cavity in transit is updated. Each candidate action adopts the same prediction start point and end point, and the bypass mass is not included in the cumulative in-cavity mass. The comparison process is expressed by the following formula.
[0100] ;
[0101] Where v is the candidate feed rate command. The currently selected feed rate command is being calculated. This is the set of candidate instructions that have passed the load check and are allowed to be executed. This is the set of particle-level mass states supported by current observations. Let r represent a complete material state, r be the sequence number of the future calculation interval, and H be the number of intervals included in the common forecast period. This represents the predicted inlet mass flow rate for the corresponding particle size under the given candidate command and material condition. The duration of the corresponding calculation interval is expressed in seconds. The product represents the mass of the interval entering the cavity. Two summation symbols accumulate the mass of each particle size and each interval. The inner minimum operation selects the minimum accumulated mass of the same candidate under all feasible states. The outer maximum operation selects the candidate with the largest comparison value from the operation corresponding to the instruction. Its output is the speed instruction rather than the accumulated mass.
[0102] Specifically, the set of candidate instructions that can be executed is formed by checking the load of each material state and each predicted time. The load check calls the aforementioned particle size load relationship and uses the current measured load as a common initial state. For state branches with continuous intervals, the inlet flow limit is first propagated according to the value range of the sieve relationship within the corresponding material layer range. Then, the upper limit of the load is obtained using the non-negative response coefficient in the load relationship. When the upper limit does not exceed the allowable load, the corresponding branch can be confirmed to have passed. When the limit crosses the allowable load, the corresponding particle size quality interval is further subdivided. Branches that cannot be judged to have passed do not support the permission to add material. The minimum value of the cumulative inlet quality is also calculated within the complete associated state. After each candidate is compared to reach the quality resolution that the detection data can distinguish, candidates that cannot be further distinguished are selected according to the smaller instruction change amount.
[0103] In a candidate comparison case, a candidate maintaining the feed rate obtains a cumulative influent mass of 420 kg and 400 kg under two feasible material states, respectively, while another candidate obtains 450 kg and 410 kg, respectively. Both candidates pass the load check at all predicted times, so the comparison values are 400 kg and 410 kg, respectively. The controller selects the latter candidate. If a third candidate can obtain a larger cumulative influent mass, but any feasible state has a calculation result exceeding the allowable load at a certain predicted time, then the third candidate will not participate in the mass comparison. If the comparison values of the two retained candidates are the same, then the one with the smaller change relative to the current actual command is selected. The mass is only used to illustrate the comparison calculation within the common prediction period and does not represent the experimental yield or the percentage increase in effect.
[0104] Please refer to Figure 4 The aforementioned candidate comparison requires the formation of an allowed set first. Then, the cumulative feed mass is used for selection. Using the same initial screen inventory, 35 kg of shared in-transit records, and a 60-second prediction range, calculations are performed for three complete associated states with fine particle mass ratios of 30%, 35%, and 40%. The coarse particle ratio for each state is taken as the value rounded up to 100%, thus the screen surface area and the total mass of newly added raw material remain unchanged for the same state. These three states are the discrete state set registered this time, and it is not claimed that all continuous allocations within the coverage interval are covered. The horizontal axis represents the candidate moving speed, and the vertical axis represents the maximum power of each state within the entire prediction range. Diagonal textures, dot textures, and solid gray bars correspond to the 30%, 35%, and 40% fine particle states, respectively, while dashed lines correspond to 100 kW of allowable power. The bar height is derived from hourly load recursion, not feed rate conversion.
[0105] With a fine-grained ratio of 30%, the three candidate peak values are 161.82, 207.69, and 242.50 kW; with a fine-grained ratio of 40%, they are 144.41, 187.03, and 217.89 kW, respectively. The former has a higher coarse-grained ratio, resulting in a higher load under the configuration with a larger coarse-grained power response coefficient. Taking a candidate of 0.18 m / s as an example, the cumulative in-cavity mass of the three complete states are 269.19, 263.80, and 258.38 kg, respectively, with the minimum comparison value of the inner layer being 258.38 kg; the cumulative amount includes the common in-transit mass, but bypass mass is not included. The maximum values of coarse and fine masses from different states cannot be combined to form a new input, nor can the average peak value replace the check of all states.
[0106] Furthermore, when there are no permitted candidates for execution, the new feeding command is stopped from being sent to the existing feeding execution module, and the actual response of the module continues to be monitored. The stop command may simultaneously change the movement process of existing materials on the screen surface. Therefore, the controlled materials are still updated according to their actual movement status and cannot be directly regarded as cleared. Materials that have left the controlled feeding section continue to advance along their conveying path and the load entering the cavity is calculated. If the existing materials in transit have already formed a prediction that does not meet the permitted load, the controller records the corresponding materials and the expected arrival process, and maintains the original load protection and interlocking functions of the production line. Subsequent resumption of feeding requires obtaining candidates that have passed the load check again. The check of materials in transit cannot be bypassed simply because the current main motor power has dropped, nor can the stop of new feeding be interpreted as the load of materials that have not yet arrived disappearing.
[0107] Please refer to Figure 5 In a further embodiment, after executing the candidate feeding rate, the screening relationship is first corrected based on the measured bypass particle size and inlet particle size of the corresponding material, and then the inlet particle size flow rate sequence is corrected based on the measured arrival process. The corrected inlet particle size flow rate sequence and the corresponding measured load constitute an update record, and the corresponding material entry record and exit record are associated in the update record. After the diversion mass inflow and outflow are closed and the corresponding conveying process is completed, the particle size load relationship is corrected based on the update record. Unclosed records retain the associated information and do not participate in the correction of the particle size load relationship. The correction is carried out sequentially according to the same material source and actual time record. The screening ratio and crushing load response coefficient cannot be arbitrarily changed at the same time due to the inconsistency between the predicted power and the measured power.
[0108] Specifically, the diversion correction compares the predicted bypass quality of the same source and particle size with the final verified bypass quality. For the incomplete part still on the screen surface, the original record is retained. For the part that has left, the predicted result is replaced by the measured diversion result. When using the interval screening ratio table, the new closed record is added to the data set of the same particle size and comparable material layer state. The corresponding condition ratio is recalculated, and the non-reducibility of the cumulative ratio and the quality boundary are checked. After the diversion correction is completed, the arrival sequence is adjusted according to the actual inlet record. The predicted quality originally allocated to the wrong time interval is moved to the actual arrival interval. The total mass of the corresponding material before and after the adjustment remains consistent. When the bypass quantity correction causes the total inlet cavity predicted quality to change, the change is attributed to the part that has not yet been measured in the cavity. The confirmed actual inlet cavity quality does not change with the model correction.
[0109] In this embodiment, the quality payment closure includes both record integrity and quantity consistency. Record integrity means that the inlet data, the quality that has left, and the quality that is still remaining in the corresponding source interval all have corresponding basis. Quantity consistency means that these quantities can meet the particle-level payment and total payment within their respective measurement ranges. If an outlet record has not yet arrived, even if the estimated value can make the books equal, the corresponding record will not be marked as closed. When only part of the material in the source interval has been transported, the confirmed leaving part can be formed into a sub-record with the original source number. After it passes through the crushing chamber inlet, it will participate in the corresponding update. The remaining quality of the original record will continue to be retained. The sum of the sub-record and the remaining record quality is still constrained by the total quality of the original source. Unchecked quality cannot be converted into checked quality by splitting records.
[0110] Furthermore, the load relationship correction uses the actual input sequence after shunting and arrival correction. First, the previously verified load relationship is fixed, and the predicted power for the corresponding observation period is recalculated according to the corrected actual input. Then, the difference between the prediction and the measurement is used to form a residual. Only when the input sequence has been verified and the equipment operating status is comparable is the residual submitted to the response coefficient fitting. If the original power deviation has been explained after the correction arrival time, the original deviation is not reused to increase the response coefficient of a certain particle size. If the particle size input change is insufficient to distinguish the contribution of multiple coefficients, the indistinguishable coefficients are retained, and only new comparable records are accumulated. For particle sizes that lack independent changes, it is not claimed that their unit mass load has changed. The control command continues to be generated based on the currently verified relationship.
[0111] In a further embodiment, based on the load response process of each particle size recorded in the particle size loading relationship, the measured inlet cavity time period is mapped to the load response time period, and the material records with overlapping load response time periods are associated as a joint update record; after the flow-off mass inflow and outflow involved in the joint update record are closed and the corresponding conveying process is completed, the particle size flow rate sequence inlet cavity is synthesized according to the actual arrival order, and the joint predicted load is calculated with the measured load at the beginning of the corresponding observation time period as the initial state; the difference between the measured load and the joint predicted load in the same observation time period is used as the correction amount, the particle size loading relationship is jointly updated, and the load correction of individual material records in the joint update record is stopped. The joint record saves the source association of all participating materials, and the same power observation value only forms a joint residual record once.
[0112] Specifically, the load response period is determined based on the verified lag input items and the state continuation process. The calculator collects inlet records that can affect the window within a limited actual power observation window and merges records that overlap in response within the window. Loads that existed before the window enter the state item through the measured power at the beginning of the window. Inlet inputs that still belong to the historical length are retained as historical flow. Joint records that are extended indefinitely are not established on the grounds that all materials are interconnected in continuous production. Source records that cross the window boundary are segmented and associated according to the corresponding inlet interval. Historical inputs can be read by subsequent predictions, but the power residual at the same moment is only updated once. When a certain shunt record required by the window has not yet been closed, the joint record remains in a waiting state. Other closed windows that do not depend on the corresponding record can still be calculated.
[0113] In a joint update example, the coarse-grained portion of source record 31 enters the crushing chamber first, followed by the fine-grained portion of source record 32. Both records have load responses within a certain power observation window. The controller merges the two measured entry sequences according to the actual arrival interval and calculates the total predicted power from the actual load state at the beginning of the window. If the predicted power within the window is 118 kW and the actual record is 124 kW, a joint residual of 6 kW is formed. No independent correction of 6 kW is registered to source record 31 and source record 32 respectively. If the bypass quality of source record 32 is subsequently transmitted and has not yet completed the closure, the original observed power is retained and the corresponding shunt check is awaited. The input sequence after the check generates a new joint prediction. Only the recalculated residual participates in the update. The power value explains the attribution and calculation method of the residual.
[0114] In this embodiment, after a new load relationship is formed, the continuous closed record that was not updated is used for playback calculation according to the same time grid. The playback retains the actual entry sequence and initial load state at that time, and compares it with the corresponding measured power interval by interval. If the new relationship cannot be verified by playback, the previous version is used. At the same time, the current diversion, arrival and residual records are retained for subsequent material status verification. When there is no available load relationship during the first run, the comparable records formed during the original load feedback control of the production line are collected to complete the initial fitting. Before a verifiable relationship is formed, the feed is not increased based on unverified particle size extrapolation. The screening relationship, load relationship and material record used each time during the operation are all saved with version association. The next control calculation starts from the actual feedback of the executed command and the currently confirmed material quality, and continues to generate candidate actions and verify the actual particle size flow rate reaching the crushing chamber.
Claims
1. A crusher feed control method based on particle size load matching, characterized by, The material is divided into bypass material and cavity material in the speed-adjustable pre-screening feeding section; Based on the particle size and conveying process of each material, a particle size accounting system including changes in screen retention is established to obtain the undiverted controlled material and the material that has left the feeding section and is still in the cavity. The diversion results of the material entering the cavity in transit are retained, and the diversion and arrival process of the controlled material and the newly added material are calculated according to the candidate feeding rate. The diversion and arrival process are combined with the material entering the cavity in transit according to the arrival time to form the cavity particle size flow sequence. Based on the current load of the crusher, the sequence input is established by the particle size load relationship between the measured inlet particle size flow rate and the load. A candidate feed rate that predicts the load will not exceed the allowable load of the crusher is selected and executed. The flow distribution calculation and the particle size load relationship are updated according to the measured inlet particle size flow rate and load of the corresponding material.
2. The particle size-based load match-based feeder control method according to claim 1, characterized by, Establishing the particle size quality accounting includes: according to the conveying process of the raw material through the feeding section, tracing the detection records of bypass material and inlet material back to the diversion time, and accumulating the inlet and outlet quality by particle size; The current screen retention mass is obtained by subtracting the bypass exit mass and the exit mass in the direction of entry from the sum of the screen retention mass and the entry mass of each particle size at the previous moment. The mass retained on the screen surface is associated with the entry record of the corresponding material, and the sum of the mass retained by each particle size is constrained by the actual mass of material stored on the screen surface.
3. The particle size-based load match-based feeder control method of claim 2, wherein, When the material leaves the feeding section, the mass of the corresponding particle size is deducted from the mass retained on the screen surface, and the bypass record or the in-transit entry record is recorded. Each candidate feed rate shares the in-transit entry record, keeping the registered particle size quality unchanged, and only updating the arrival time according to the actual conveying process.
4. The particle size-based load match-based feeder control method according to claim 1, characterized by, The calculation of the diversion and arrival process includes: based on the correspondence between the candidate feeding speed and the measured material moving speed, deducing the screen surface movement process of the controlled material; Based on the amount of material stored on the screen surface during the movement and the cumulative residence time of each particle size, the screening relationship established by the measured diversion record is called to calculate the mass of each particle size entering the bypass and the mass leaving along the screen surface. The mass leaving along the screen surface is included in the new in-transit entry record corresponding to the candidate feed rate, and merged with the shared in-transit entry record according to the arrival time to form the entry particle size flow sequence.
5. The particle size-based load match-based feeder control method for a crusher according to claim 1, characterized by, For logistics with particle obstruction, the online particle size detection results are verified using the sampling and sieving results, and the particle size ranges whose unique mass ratio cannot be determined are recorded as mass ratio ranges. By combining the mass ratio range with the measured total mass of the logistics, a candidate allocation is generated that satisfies the non-negativity of the mass of each particle size and the sum of the mass of each particle size equals the total mass. Substitute the candidate allocations into the particle size mass balance and eliminate allocations that result in negative sieve surface retention mass or exceed the sieve surface material retention measurement range. The system retains the allocation of raw material entry records and bypass and cavity exit records simultaneously, forming a set of particle size quality states. Within each state, the system retains the particle size quality correspondence between different material flows, and registers the controlled materials and materials entering the cavity in transit according to the correspondence.
6. The particle size-based load match-based feeder control method according to claim 3, characterized by, Updating the arrival time includes: accumulating the conveying progress based on the time the material leaves the feeding section and the measured moving speed along the way, and recording the remaining conveying path; When the conveying speed changes, the estimated arrival time is recalculated based on the remaining conveying path, while keeping the particle size mass in the in-transit entry record unchanged. The measured particle size mass at the inlet is allocated according to the proportion of the mass of the same particle size record expected to arrive in the current detection period. The allocation is capped at the uncancelled mass of each record, and the allocated mass is cancelled from the corresponding in-transit entry cavity record. For quality samples that have not yet been cancelled, the conveying process will be updated and included in the next candidate feed rate evaluation.
7. The particle size-based load match-based feeder control method according to claim 4, characterized by, When the sieve penetration relationship is invoked, the non-zero residual mass of each particle size that has not yet penetrated the sieve is associated with the sieve surface retention process that has already been experienced; Divide the cumulative sieve penetration ratio increment by the unsieved ratio at the previous moment, and use the quotient as the subsequent sieve penetration ratio of the remaining mass. Deduct the corresponding bypass amount from the remaining mass, and update the subsequent sieve penetration calculation according to the total material inventory after deduction. When the candidate feed rate changes, the dwell time that has already been experienced is retained, and the screening amount corresponding to the subsequent movement process is recalculated.
8. The particle size-based load match-based feeder control method of claim 7, wherein, After executing the candidate feeding speed, the screening relationship is first corrected based on the measured bypass particle size and inlet particle size of the corresponding material, and then the inlet particle flow rate sequence is corrected based on the measured arrival process. The updated record is constructed using the corrected inlet particle size flow sequence and the corresponding measured load, and the entry and exit records of the corresponding materials are associated in the updated record; After the diversion mass budget is closed and the corresponding conveying process is completed, the particle size loading relationship is corrected by updating the records; Unclosed records retain association information but are not temporarily included in the correction of particle size loading relationships.
9. The particle size-based load match-based feeder control method for a crusher according to claim 5, characterized by, For each state in the set of particle size quality states, the diversion and arrival process under the same candidate feed rate is deduced, and the correspondence between the controlled material and the material entering the cavity in each state is maintained until the load prediction ends. Only retain candidate feed rates whose predicted load does not exceed the allowable load in all states of the set; For the retained candidate feeding speeds, calculate the cumulative in-cavity mass for each state within the same prediction period, use the minimum cumulative in-cavity mass as the comparison value, and select the candidate feeding speed with the largest comparison value for execution; If there are no candidate feed rates to retain, stop adding new feeds and continue updating the material record in transit.
10. The crusher feeding control method based on particle size loading matching according to claim 1, characterized in that, Based on the particle size loading relationship record, the load response process of each particle size is recorded, the measured inlet time period is mapped to the load response time period, and the material records with overlapping load response time periods are associated as joint update records; After the shunting quality budget involved in the joint update record is closed and the corresponding transport process is completed, the cavity particle size flow sequence is synthesized according to the actual arrival order, and the joint predicted load is calculated with the measured load at the beginning of the corresponding observation period as the initial state. The difference between the measured load and the joint predicted load during the same observation period is used as a correction amount to jointly update the particle size load relationship, and the load correction of individual material records within the joint update record is stopped.