Integrated, washable adhesive spraying equipment and control method for segmental beam splicing based on twin-screw pump.

By using an integrated spraying equipment based on a twin-screw pump, the problems of inaccurate mixing ratios, incomplete channel cleaning, and poor adaptability to high-altitude construction in segmental beam construction have been solved, achieving efficient colloid spraying and cleaning, and improving construction quality and efficiency.

CN123102533APending Publication Date: 2026-11-17CCCC SECOND HARBOR ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611596958.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-15
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In the construction of segmental beams, the spraying equipment for two-component structural adhesives has problems such as difficulty in ensuring the mixing ratio, incomplete cleaning of the flow channels, easy curing and pipe blockage, and poor adaptability to high-altitude construction, which affect the construction quality and efficiency.

Method used

It adopts an integrated spraying equipment based on a twin-screw pump, which integrates A and B material storage tanks, screw pump, cleaning module and air compressor. The colloid is mixed through a three-way connector. The cleaning pump and spray gun share the same air source. The electrical control system controls the spraying and cleaning process and is compatible with high-altitude construction platforms.

Benefits of technology

It achieves precise control of the mixing ratio, thorough cleaning of the flow channel, avoids clogging due to colloid solidification, improves construction efficiency and quality, and is suitable for high-altitude construction conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123102533A_ABST
    Figure CN123102533A_ABST
Patent Text Reader

Abstract

This invention provides a washable integrated spraying device and control method for segmental beam splicing adhesive based on a twin-screw pump. Two sets of screw pump feeding modules are integrated into the vehicle body. Material A and material B storage tanks are connected to a T-junction via a first screw pump, a second screw pump, and a feed pipe, respectively. The outlet of the T-junction is connected to the spray gun via an agitator and a feed pipe. The vehicle body also integrates a cleaning module. The inlet of the cleaning pump is connected to a cleaning water tank, and the outlet is connected to two feed pipes via a cleaning pipeline. An air compressor is connected to the pneumatic drive end of the cleaning pump and the atomization interface of the spray gun. The control method involves setting parameters after the equipment is in place, feeding materials proportionally by the twin-screw pump, mixing them in the agitator, and then spraying them through the spray gun. After spraying, the spray gun is placed in the cleaning water tank, and the cleaning pump is activated for circulation cleaning. This solves the problems of incomplete cleaning of the flow channels after mixing, easy curing and pipe blockage, and poor adaptability to high-altitude construction in existing two-component structural adhesive spraying technologies.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of segmental beam construction technology, and in particular to a washable integrated spraying equipment and control method for segmental beam splicing adhesive based on a twin-screw pump. Background Technology

[0002] Concrete segmental beams are widely used in bridges, elevated roads and other projects due to their advantages such as convenient construction and structural stability. The application of structural adhesive to the beam end face is the core process of segmental assembly, which directly affects the bonding strength and structural durability after splicing.

[0003] Currently, most construction sites rely on manual scraping for coating, lacking specialized integrated spraying equipment suitable for outdoor construction environments. This results in low work efficiency and poor adhesive layer quality stability. The structural adhesives used in segmental beam construction are mostly two-component, high-viscosity materials that require mixing in a fixed ratio before use. Conventional pneumatic application methods present numerous difficulties for these adhesives, often leading to unstable feeding and uneven spraying. Some existing spraying designs use a pre-mixed, single-pump delivery method, which not only makes it difficult to guarantee the accuracy of the mixing ratio but also easily causes premature curing of the adhesive within the pump, making cleaning and maintenance difficult. Furthermore, the rapid curing speed of two-component adhesives means that if the mixing channels are not cleaned effectively and promptly after spraying, the cured residual adhesive can easily clog the pipelines and nozzles. Existing equipment cleaning structures often require flushing the entire supply pipeline, resulting in high solvent consumption and incomplete cleaning. In addition, segmental beam assembly often takes place on high-altitude construction platforms, and the low integration of existing equipment makes hoisting and relocation inconvenient, further impacting construction quality and work efficiency. Summary of the Invention

[0004] The main objective of this invention is to provide a washable integrated spraying equipment and control method for segmental beam splicing adhesive based on a twin-screw pump, which solves the problems of incomplete cleaning of the flow channels after mixing, easy curing and pipe blockage, and poor adaptability to high-altitude construction in existing two-component structural adhesive spraying technology.

[0005] To solve the above-mentioned technical problems, the technical solution adopted by the present invention is: a washable integrated spraying equipment for segmental beam splicing adhesive based on a twin-screw pump, wherein two sets of screw pump feeding modules are integrated on the vehicle body, and material A storage tank and material B storage tank are fixed on the vehicle body. The feed ends of the first screw pump and the second screw pump are respectively connected to material A storage tank and material B storage tank, and the discharge ends are respectively connected to the two feed ports of the three-way connector through the first feed pipe and the second feed pipe. The discharge port of the three-way connector is connected to the spray gun through the agitator and the feed pipe. The vehicle body also integrates a cleaning module. The inlet of the cleaning pump is connected to the cleaning water tank, and the outlet is connected to the first conveying pipe and the second conveying pipe through the cleaning pipeline. The air compressor's outlet is connected to the pneumatic drive end of the cleaning pump and the atomization interface of the spray gun, respectively.

[0006] In the preferred embodiment, a first check valve is provided on the first conveying pipe, a second check valve is provided at the connection between the first conveying pipe and one inlet of the tee connector, a third check valve is provided on the second conveying pipe, and a fourth check valve is provided at the connection between the second conveying pipe and the other inlet of the tee connector. The conduction direction of each check valve is from the corresponding screw pump to the outlet of the tee connector.

[0007] In the preferred embodiment, the cleaning pipeline includes a first cleaning branch pipe and a second cleaning branch pipe. The first cleaning branch pipe is connected to the first material conveying pipe section between the first check valve and the second check valve, and the second cleaning branch pipe is connected to the second material conveying pipe section between the third check valve and the fourth check valve. The first cleaning branch pipe is equipped with a fifth check valve, and the second cleaning branch pipe is equipped with a sixth check valve. The conduction direction of the fifth check valve and the sixth check valve is from the cleaning pump to the discharge port of the three-way connector. The first cleaning branch pipe and the second cleaning branch pipe are also equipped with a first solenoid valve and a second solenoid valve, respectively, for controlling the opening and closing of the cleaning branch.

[0008] In the preferred embodiment, the outlet of the tee connector is connected to the inlet of the mixing cage via a pipe, and the mixing cage is equipped with spiral guide vanes to uniformly mix the A and B component adhesives that are output through the tee connector. The spray gun body has an atomization port on its side wall, which is connected to the air outlet of the air compressor through the first air pipe.

[0009] In the preferred embodiment, the cleaning water tank includes a first water tank and several second water tanks separated by an overflow assembly. The overflow assembly includes a baffle and an overflow plate. A water passage gap is left between the lower end of the baffle and the bottom of the cleaning water tank. The top of the overflow plate is lower than the height of the side wall of the cleaning water tank. Liquid flows into the space between the baffle and the overflow plate through the water passage gap at the lower end of the baffle, and then overflows into the adjacent water tank through the top of the overflow plate. Both the first and second water tanks have sloping ramps at the bottom, and drain valves are installed at the bottom of the ramps respectively. The first water tank is equipped with a liquid extraction port at the bottom of the slope, which is connected to the inlet of the cleaning pump through a liquid extraction pipe.

[0010] In the preferred embodiment, the cleaning pump is a pneumatic plunger pump, whose pneumatic drive end is connected to the air outlet of the air compressor through a second air pipe, and the compressed air output by the air compressor drives the cleaning pump to pump the cleaning agent. The outlet of the cleaning pump is connected to the first cleaning branch pipe and the second cleaning branch pipe, respectively.

[0011] In the preferred embodiment, the vehicle body includes several flip-top shells, which are correspondingly located on the top of the A material storage tank, the B material storage tank, and the cleaning water tank. The flip-top shells are hinged to the vehicle body and are used to add A material, B material, and cleaning solvent after being opened. The top of the vehicle is equipped with several lifting lugs for hoisting the entire equipment to the high-altitude construction platform; The bottom of the vehicle is equipped with several casters with brakes, which are used to push and move the vehicle on the construction platform.

[0012] In the preferred embodiment, an electrical control box is also integrated inside the vehicle body, which contains a PLC controller, and a control panel is installed on the corresponding side wall of the vehicle body; The PLC controller is connected to the drive motors of the first screw pump and the second screw pump, as well as the first and second solenoid valves on the cleaning pipeline, to control the speed ratio of the twin screw pumps and the start-up sequence of the cleaning operation. The equipment also includes an industrial wireless remote controller, which communicates with the wireless receiving module in the electrical control box to remotely control the start and stop of spraying and cleaning. The control panel is used to set the speed ratio between the first and second screw pumps, as well as the parameters for simultaneous cleaning and individual cleaning of the first and second solenoid valves.

[0013] A control method for a washable integrated spraying device for segmental beam splicing adhesive based on a twin-screw pump, the method comprising: S1. Pour the A and B component adhesives into the A material storage tank and the B material storage tank respectively. Pour the cleaning solvent into the cleaning water tank. Close the flip-top shell. Check the connection and sealing of each material conveying pipe, cleaning pipe and air pipe. Start the air compressor and adjust the output air pressure. Power on the equipment for self-test. S2. Use the lifting lugs on the vehicle body to lift the entire equipment to the high-altitude construction platform, push the vehicle body along the casters to move it to the vicinity of the section beam to be sprayed, and lock the casters; S3. Set the speed ratio of the first screw pump and the second screw pump on the control panel, and adjust the atomizing air pressure of the spray gun. S4. Set a template or apply a film or tape to the outline edge of the segmental beam splice surface to define the spraying boundary; S5. Start the first screw pump and the second screw pump. The A and B components of the adhesive are fed into the tee joint through the first and second feed pipes according to the set ratio. After being evenly mixed by the agitator, they are atomized and sprayed onto the splicing surface of the segment beam by the spray gun. The spraying is carried out in the order of bottom to top and from left to right. During the spraying process, the vehicle body is pushed to move along the cross-sectional span direction of the segment beam to cover the entire splicing surface. S6. After spraying, put the spray gun into the cleaning water tank, start the cleaning pump for circulation cleaning, and after cleaning, turn off the cleaning pump and air compressor, open the drain valve of the cleaning water tank to drain the deposited impurities, and take out the spray gun to clean the nozzle of residual adhesive.

[0014] In the preferred embodiment, in step S6, the spray gun is placed below the surface of the cleaning solvent in the first water tank, the cleaning pump draws the cleaning solvent from the first water tank, and injects it into the first feed pipe and the second feed pipe through the first cleaning branch pipe and the second cleaning branch pipe respectively. Under the reverse shut-off action of the first one-way valve and the third one-way valve, the cleaning agent flows towards the outlet of the three-way connector, flows through the three-way connector, the agitator and the spray gun and then flows back to the first water tank to form a circulating cleaning loop. Impurities in the reflux cleaning solvent are filtered multiple times by the overflow assembly and deposited at the bottom of the slope of the first water tank and several second water tanks.

[0015] This invention provides a washable integrated spraying equipment and control method for segmental beam splicing adhesive based on a twin-screw pump. This equipment integrates two-component feeding, online mixing and on-site cleaning into the same vehicle body. No additional cleaning device is required during construction. After spraying, the mixed flow channel can be circulated and flushed immediately to prevent the two-component adhesive from curing and clogging in the pipeline, reducing the amount of on-site pipeline connection work, and is suitable for the working conditions of high-altitude construction platforms.

[0016] Twin screw pumps are used to independently deliver the A and B component adhesives. The adhesives only come into contact and mix at the downstream tee and agitator, preventing a curing reaction within the pump body and reducing pump maintenance difficulty. The screw pumps are positive displacement pumps, well-suited for high-viscosity structural adhesives, and provide stable output pressure. The mixing ratio of the two components can be precisely controlled by adjusting the speed of the two pumps, ensuring accurate mixing.

[0017] Two check valves are installed on each of the two feed pipes. The cleaning branch pipe connects to the section between the two check valves, ensuring that the cleaning agent can only flow in the tee direction and cannot flow back to the screw pump. This achieves localized circulation cleaning of the mixed flow channel, ensuring cleaning effectiveness, preventing solidification and pipe blockage, and avoiding waste of cleaning agent and unnecessary rinsing of the single-component feed section. Check valves on the cleaning branch pipe prevent the colloid from flowing back into the cleaning pipeline during spraying. Solenoid valves control the opening and closing of the cleaning branch and its timing, allowing for differentiated cleaning based on the difference in residual amounts on both sides. The solenoid valves respond quickly and can be linked to spraying shutdown, avoiding manual operation delays that could lead to colloid solidification.

[0018] The cleaning tank employs a double-plate overflow structure consisting of a baffle plate and an overflow plate. Liquid enters the sedimentation chamber between the two plates from the bottom of the baffle plate and overflows from the top of the overflow plate. Gel residue and impurities settle within the sedimentation chamber. Compared to direct overflow from a single overflow plate, this design provides a longer sedimentation path and better separation, allowing for the recycling of the cleaning agent. A bottom slope and drain valve facilitate regular sludge removal, and a suction port located at the bottom of the slope allows for complete removal of the cleaning agent.

[0019] The cleaning pump is a pneumatic plunger pump, directly driven by an air compressor. It shares the same air compressor as the spray gun's atomizing air source, simplifying the air circuit configuration and making it suitable for outdoor construction sites. The vehicle body features an integrated flip-top shell for easy direct tilting and filling. Lifting lugs allow for overall hoisting to high-altitude construction platforms, and the bottom casters enable flexible movement and pushing on platforms, facilitating continuous spraying operations along the span of segmental beams. The electrical control box supports both manual and remote control modes. The industrial wireless remote control allows operators to remotely control the system near the spraying point, improving work efficiency and construction continuity. Attached Figure Description

[0020] The present invention will be further described below with reference to the accompanying drawings and embodiments: Figure 1 This is a general appearance and structural diagram of the present invention; Figure 2 This is a structural diagram of the pumping and mixing path of components A and B of the adhesive in this invention; Figure 3 This is a diagram showing the pipe connection structure of the cleaning operation equipment in this invention; Figure 4 This is a structural diagram of the cleaning solvent circulation path of the present invention; Figure 5 This is a structural diagram of the cleaning water tank of the present invention; Figure 6 This is a structural diagram of the electronic control component of the present invention; Figure 7 This is a system flowchart of the equipment control method of the present invention; Figure 8 This is a block diagram of the communication and electrical control system of the electrical control box of the present invention.

[0021] In the diagram: 1. Vehicle body; 2. Material A storage tank; 3. Material B storage tank; 4. First screw pump; 401. First conveying pipe; 402. First one-way valve; 403. Second screw pump; 5. Second conveying pipe; 501. Third one-way valve; 502. Fourth one-way valve; 503. T-joint; 6. Agitator; 7. Spiral guide vane; 701. Feeding pipe; 8. Spray gun; 9. Atomizing interface; 901. Cleaning pump; 10. Liquid extraction pipe; 1001. Cleaning pipeline; 11. First cleaning branch pipe; 1101. Second cleaning branch pipe; 1102; 1103; 1104; 1105; 1106; 12; 1201; 1202; 13; 1301; 1302; 1303; 1304; 1305; 1306; 14; 14; 15; 16; 17; 18; 19; 10; 10; 1102; 1103; 12; 1304; 1305; 1306; 14; 15; 16; 17; 18; 19; 10; 10; 11; 12; 13; 13; 14; 15; 16; 19; 10; 10; 11; 12; 13; 14; 15; 19; 10; 11; 12; 13; 14; 15; 19; 10; 11; 12; 13; 14; 15; 19; 10; 11; 12; 19; 12; 19; 10; 11; 12; 19; 12; 19; 19; 12; 19; 19; 10; 19; 12; 19; 19; 10; 19; 19; 12; 19; 19; 19; 10 ... Detailed Implementation

[0022] Example 1 like Figure 1-6As shown, a washable integrated spraying device for segmental beam splicing adhesive based on a twin-screw pump is provided. Two sets of screw pump feeding modules are integrated on the vehicle body 1. Material A storage tank 2 and material B storage tank 3 are fixed on the vehicle body 1. The feed ends of the first screw pump 4 and the second screw pump 5 are connected to the material A storage tank 2 and the material B storage tank 3, respectively. The discharge ends are connected to the two feed ports of the three-way connector 6 through the first feed pipe 401 and the second feed pipe 501, respectively. The discharge port of the three-way connector 6 is connected to the spray gun 9 through the agitator 7 and the feed pipe 8. The vehicle body 1 also integrates a cleaning module. The inlet of the cleaning pump 10 is connected to the cleaning water tank 13, and the outlet is connected to the first conveying pipe 401 and the second conveying pipe 501 respectively through the cleaning pipeline 11. The air outlet of the air compressor 12 is connected to the pneumatic drive end of the cleaning pump 10 and the atomization interface 901 of the spray gun 9.

[0023] This equipment integrates the material supply, mixing, spraying, cleaning, air supply, and electrical control systems into a single vehicle body 1. The overall dimensions are approximately 1.7 meters long, 1 meter wide, and 1.25 meters high, with a weight of approximately 750 kilograms. During application, components A and B of the adhesive are injected into their respective storage tanks. A twin-screw pump delivers the two components to a T-joint 6 at a set ratio, where they converge. After being thoroughly mixed by a stirring cage 7, the mixture is sprayed onto the end face of the segmental beam using a spray gun 9. After spraying, there is no need to disassemble the pipeline; simply place the spray gun 9 into the cleaning water tank 13 and start the cleaning pump 10 to circulate and flush the mixed flow channels. The advantage of this integrated design is that cleaning can be performed immediately after spraying, preventing the adhesive from curing in the pipeline and eliminating the need for additional transfer equipment to connect to the cleaning device. This is particularly suitable for working conditions on high-altitude construction platforms. The equipment integrates two-component material supply, online mixing, and on-site cleaning into one unit, reducing the workload of on-site pipeline connections and lowering the risk of adhesive curing and clogging.

[0024] The reason for using screw pumps for material feeding is that the two-component structural adhesive used for segmental beam splicing has a high viscosity, making it difficult to achieve stable output using conventional gear pumps or pneumatic feeding methods. The screw pumps in this equipment are equipped with a 7-2.5 type bushing, approximately 270 mm x 89 mm in size. Each pump is paired with a 3000 watt rated power drive motor, and the pipeline pressure resistance can reach 3.5 MPa. Screw pumps are positive displacement pumps, relying on the volume change of the sealed cavity between the rotor and stator to move and transport the adhesive. They have good adaptability to high-viscosity materials, stable output pressure, and the flow rate is basically proportional to the rotational speed. Therefore, by controlling the speed of the two pumps, the ratio of components A and B can be precisely controlled. In actual use, the default ratio is 3:1, corresponding to an operating frequency of approximately 15 Hz for the first screw pump 4 and approximately 5 Hz for the second screw pump 5. The ratio accuracy error is around 10%. The control panel 1401 allows adjustment of the speed of the two pumps within the range of 0 to 60 Hz to adapt to the ratio requirements of different brands of structural adhesives. Material A storage bin 2 has a volume of approximately 20 liters, and material B storage bin 3 has a volume of approximately 60 liters, matching the usage ratio of 3:1 to avoid having too much material left in one bin after the other bin is emptied.

[0025] In the preferred embodiment, a first check valve 402 is provided on the first feed pipe 401, a second check valve 403 is provided at the connection between the first feed pipe 401 and one inlet of the three-way connector 6, a third check valve 502 is provided on the second feed pipe 501, and a fourth check valve 503 is provided at the connection between the second feed pipe 501 and the other inlet of the three-way connector 6. The conduction direction of each check valve is from the corresponding screw pump to the outlet of the three-way connector 6.

[0026] The feeding path is as follows: Material A enters the first screw pump 4 from the Material A storage tank 2, and after being pressurized, it is conveyed to one inlet of the tee connector 6 via the first conveying pipe 401; Material B enters the second screw pump 5 from the Material B storage tank 3, and is conveyed to the other inlet of the tee connector 6 via the second conveying pipe 501. The tee connector 6 adopts a 6-point specification, and the two inlets meet inside the connector. The A and B adhesives begin to come into initial contact and mix here, and then enter the mixing cage 7 through the outlet via the pipe.

[0027] In the preferred embodiment, the cleaning pipeline 11 includes a first cleaning branch pipe 1101 and a second cleaning branch pipe 1102. The first cleaning branch pipe 1101 is connected to the first conveying pipe 401 section between the first one-way valve 402 and the second one-way valve 403, and the second cleaning branch pipe 1102 is connected to the second conveying pipe 501 section between the third one-way valve 502 and the fourth one-way valve 503. The first cleaning branch pipe 1101 is equipped with a fifth check valve 1103, and the second cleaning branch pipe 1102 is equipped with a sixth check valve 1104. The conduction direction of the fifth check valve 1103 and the sixth check valve 1104 is from the cleaning pump 10 to the discharge port of the three-way connector 6. The first cleaning branch pipe 1101 and the second cleaning branch pipe 1102 are respectively equipped with a first solenoid valve 1105 and a second solenoid valve 1106, which are used to control the opening and closing of the cleaning branch.

[0028] Two check valves are connected in series on the first feed pipe 401: the first check valve 402 is located near the screw pump, and the second check valve 403 is located near the feed inlet of the tee connector 6. Similarly, on the second feed pipe 501, the third check valve 502 is located near the pump, and the fourth check valve 503 is located near the tee connector 6. The conduction direction of all four check valves is from the screw pump to the tee connector 6.

[0029] The reason for the connection position of cleaning pipe 11 is that adhesives A and B have already begun to mix inside the tee joint 6. Injecting the cleaning agent from a slightly forward position allows the area where the tee intersects to be included in the cleaning range, while preventing it from reaching the screw pump side. During cleaning, after the cleaning agent is injected through the cleaning branch pipe, the first one-way valve 402 and the third one-way valve 502 are reversed and cut off, preventing the cleaning agent from flowing towards the screw pump. It can only flow to the tee joint 6 through the second one-way valve 403 and the fourth one-way valve 503, and then flow through the agitator 7, the feed pipe 8, and the spray gun 9. After being sprayed out by the spray gun, it flows back to the cleaning water tank 13, forming a circulation loop. This cleaning path only washes the mixed flow channels of the tee joint 6, the agitator 7, and the spray gun 9. The pipes between the screw pump and the first one-way valve 402 and the third one-way valve 502 only come into contact with the single-component adhesive, and the two-component curing does not occur, so deep cleaning is not required.

[0030] The fifth and sixth check valves are directed from the cleaning pump 10 to the feed pipe to prevent the adhesive in the feed pipe from flowing back into the cleaning pipeline during spraying. The two solenoid valves are controlled by a PLC controller, which can set the cleaning sequence. For example, both valves can be opened simultaneously for a period of time, then the first solenoid valve 1105 can be opened separately to clean the A-side, and the second solenoid valve 1106 can be opened separately to clean the B-side, allowing for differentiated cleaning based on the difference in residual amounts on both sides. The default parameters are 8 seconds for simultaneous cleaning with both valves, 5 seconds for cleaning the A-side separately, and 3 seconds for cleaning the B-side separately. All these durations can be adjusted on the control panel 1401. Solenoid valves are used instead of manual ball valves because the two-component adhesive cures quickly, making the cleaning timing crucial. The solenoid valves respond rapidly and can be linked to the spraying shutdown; pressing the cleaning button automatically completes the cleaning according to the preset program, avoiding delays caused by manual operation that could lead to adhesive curing.

[0031] In the preferred embodiment, the outlet of the three-way connector 6 is connected to the inlet of the mixing cage 7 via a pipe. The mixing cage 7 is equipped with a spiral guide vane 701, which is used to uniformly mix the A and B component adhesives that are output through the three-way connector 6. The spray gun 9 has an atomization port 901 on its side wall, and the atomization port 901 is connected to the air outlet of the air compressor 12 through the first air pipe 1201.

[0032] The stirring cage 7 is a static mixer, approximately 500 mm long and 17 mm in inner diameter. It contains multiple sets of staggered spiral guide vanes 701. As the colloid flows through the stirring cage 7 under conveying pressure, it is continuously divided, redirected, and merged by the guide vanes, achieving uniform mixing without additional stirring power. The mixed colloid then reaches the spray gun 9 via the feed pipe 8. Compressed air is connected to the atomization port 901 on the side wall of the spray gun 9, dispersing the colloid flow into a mist that is sprayed onto the workpiece surface. The atomization air pressure is adjustable from 6 to 8 bar.

[0033] In a preferred embodiment, the cleaning water tank 13 includes a first water tank 1301 and several second water tanks 1302 separated by an overflow assembly. The overflow assembly includes a partition 1303 and an overflow plate 1304. A water passage gap is left between the lower end of the partition 1303 and the bottom of the cleaning water tank 13. The top height of the overflow plate 1304 is lower than the side wall height of the cleaning water tank 13. Liquid flows into the space between the partition 1303 and the overflow plate 1304 through the water passage gap at the lower end of the partition 1303, and then overflows into the adjacent water tank through the top of the overflow plate 1304. The bottom of both the first water tank 1301 and the second water tank 1302 is provided with an inclined ramp, and a drain valve 1306 is provided at the bottom of the ramp respectively. The first water tank 1301 is also equipped with a liquid extraction port 1305 at the bottom of the slope. The liquid extraction port 1305 is connected to the liquid inlet of the cleaning pump 10 through the liquid extraction pipe 1001.

[0034] In this embodiment, the cleaning water tank 13 is preferably divided into a first water tank 1301 and two second water tanks 1302, for a total of three compartments. The size of the water tanks would increase the weight of the cleaning solvent, affecting the economic efficiency of hoisting; the two second water tanks are sufficient for sedimentation and separation, and the increase in weight and volume from adding more compartments is relatively limited compared to the improvement in sedimentation effect. Each compartment has individual dimensions of approximately 295 mm x 346 mm x 398 mm.

[0035] A sedimentation chamber is formed between the two plates of the overflow assembly. The cleaning agent enters the sedimentation chamber from the first water tank 1301 through the bottom of the partition 1303, flows slowly upward in the chamber, and the heavier glue residue settles downward. The clearer liquid on top overflows from the top of the overflow plate 1304 into the second water tank 1302. Compared with direct overflow from a single overflow plate, this bottom-in, top-out double-plate structure has a longer sedimentation path, more sufficient sedimentation time for impurities, and better separation effect. The two second water tanks 1302 use the same overflow assembly to form a two-stage sedimentation. Each compartment has a slope at the bottom that slopes towards the drain end. A drain valve 1306 is installed at the bottom of the slope. The deposited glue residue can be collected along the slope to the valve port, and the valve can be opened to discharge it. The bottom of the slope of the first water tank 1301 also has a liquid extraction port 1305, which is arranged adjacent to the drain valve 1306. The liquid extraction port 1305 is connected to the inlet of the cleaning pump 10 through the liquid extraction pipe 1001, through which the cleaning pump extracts the cleaning agent. The reason for placing the liquid extraction port at the bottom of the slope is that the liquid level is lowest there, which allows the cleaning agent in the water tank to be extracted as thoroughly as possible. Furthermore, its proximity to the drain valve facilitates centralized pipework installation.

[0036] In the preferred embodiment, the cleaning pump 10 is a pneumatic plunger pump, and its pneumatic drive end is connected to the air outlet of the air compressor 12 through the second air pipe 1202. The compressed air output by the air compressor 12 drives the cleaning pump 10 to pump the cleaning agent. The outlet of the cleaning pump 10 is connected to the first cleaning branch pipe 1101 and the second cleaning branch pipe 1102, respectively.

[0037] The cleaning pump 10 is a CY46 type pneumatic plunger pump. Its working process is as follows: Compressed air enters the pump's pneumatic chamber through the second air pipe 1202, pushing the piston to drive the plunger in a reciprocating motion. When the plunger pushes forward, it forces the cleaning agent out of the pump chamber; when the plunger retracts, it creates a negative pressure, drawing the cleaning agent from the first water tank 1301 through the suction pipe 1001. Continuous pumping is achieved through reciprocating suction and pressurization. The pneumatic plunger pump does not require a power source and operates solely on compressed air. It has a high output pressure and is suitable for conveying low-viscosity cleaning agents such as acetone. Furthermore, it shares the same air compressor as the spray gun, simplifying the air circuit configuration. The outlet of the cleaning pump 10 is connected to both the first cleaning branch pipe 1101 and the second cleaning branch pipe 1102, supplying the pumped cleaning agent to both cleaning branches simultaneously.

[0038] The air supply system uses a single air compressor 12 to supply air to both the cleaning pump 10 and the spray gun 9. The air compressor 12 has two outlets: one connects to the atomization port 901 of the spray gun 9 via a first air pipe 1201, providing compressed air for atomization; the other connects to the pneumatic drive end of the cleaning pump 10 via a second air pipe 1202, driving the plunger pump. The cleaning air source pressure is adjusted between 0.4 and 0.6 MPa, and the atomization air pressure is individually adjusted to 6 to 8 bar via a regulating valve on the spray gun. The advantage of using a single air compressor is the simplified air supply configuration; outdoor construction only requires one air source device, reducing the number of on-site supporting equipment.

[0039] In the preferred embodiment, the vehicle body 1 includes several flip-top shells 15, which are correspondingly disposed on the top of the A material storage tank 2, the B material storage tank 3, and the cleaning water tank 13. The flip-top shells 15 are hinged to the vehicle body 1 and are used to add A material, B material and cleaning solvent after being flipped open. The top of the vehicle body 1 is equipped with several lifting lugs 16 for hoisting the equipment as a whole to the high-altitude construction platform; The bottom of the vehicle body 1 is equipped with several universal wheels 17 with brakes, which are used to push and move the vehicle on the construction platform.

[0040] The vehicle body 1 is equipped with four lifting lugs 16 on its top. During hoisting, steel wire ropes are attached to these lugs to lift the entire equipment to the high-altitude construction platform. The bottom of the vehicle body 1 is equipped with four casters 17 with brakes. After the equipment is in place, releasing the brakes allows it to be pushed and moved along the span of the segmental beam for spraying. Once in position, the brakes are engaged to secure it. This configuration allows the equipment to be hoisted and moved as a whole, as well as moved within a small area on the platform, adapting to continuous spraying operations on segmental beams with different cross-sections.

[0041] In the preferred embodiment, the vehicle body 1 also integrates an electrical control box 14, which contains a PLC controller, and a control panel 1401 is provided on the corresponding side wall of the vehicle body 1. The PLC controller is connected to the drive motors of the first screw pump 4 and the second screw pump 5, as well as the first solenoid valve 1105 and the second solenoid valve 1106 on the cleaning pipeline 11, to control the speed ratio of the twin screw pumps and the start-up sequence of the cleaning operation. The equipment also includes an industrial wireless remote controller, which communicates with the wireless receiving module in the electrical control box 14 to remotely control the start and stop of spraying and cleaning. The control panel 1401 is used to set the speed ratio of the first screw pump 4 and the second screw pump 5, as well as the parameters for the simultaneous cleaning time and the individual cleaning time of the first solenoid valve 1105 and the second solenoid valve 1106.

[0042] The vehicle body 1 houses an electrical control box 14, which uses a Siemens 200smartST20 PLC controller. A control panel 1401 is located on the side wall of vehicle body 1, featuring an emergency stop button, a manual / remote control knob, a spray start button, a cleaning start button, and a parameter display area. The PLC is connected to the drive motors of the two screw pumps, the first solenoid valve 1105, and the second solenoid valve 1106, controlling the speed ratio of the two pumps and the opening sequence of the cleaning valves. The equipment is equipped with an industrial wireless remote control with a remote control distance of at least 50 meters in open areas, allowing operators to operate the equipment near the spraying point without having to travel to and from the main unit. The control panel 1401 allows setting the speed ratio of the two screw pumps, the simultaneous cleaning time of the two solenoid valves, and the individual cleaning time. Switching to manual mode allows for the individual activation of a single pump or cleaning valve, facilitating equipment debugging and parameter calibration.

[0043] Example 2 Further explanation in conjunction with Example 1, such as Figure 1-8 As shown, a control method for a washable integrated spraying device for segmental beam splicing adhesive based on a twin-screw pump is disclosed. The method includes: S1. Pour the A and B component splicing adhesives into the A material storage tank 2 and the B material storage tank 3 respectively. Pour the cleaning solvent into the cleaning water tank 13. Close the flip-top outer shell 15. Check the connection and sealing of each material conveying pipe, cleaning pipe and air pipe. Start the air compressor 12 and adjust the output air pressure. Power on the equipment for self-test. S2. The equipment is hoisted to the high-altitude construction platform by means of the lifting lugs 16 on the vehicle body 1, and the vehicle body 1 is moved along the universal wheels 17 to the vicinity of the section beam to be sprayed and the universal wheels are locked. S3. Set the speed ratio of the first screw pump 4 and the second screw pump 5 on the control panel 1401, and adjust the atomizing air pressure of the spray gun 9. S4. Set a template or apply a film or tape to the outline edge of the segmental beam splice surface to define the spraying boundary; S5. Start the first screw pump 4 and the second screw pump 5. The A and B components of the adhesive are fed into the tee connector 6 through the first feed pipe 401 and the second feed pipe 501 according to the set ratio. After being evenly mixed by the stirring cage 7, they are atomized and sprayed onto the splicing surface of the segment beam by the spray gun 9. The spraying is carried out in the order of bottom to top and from left to right. During the spraying process, the vehicle body 1 is pushed to move along the cross-sectional span direction of the segment beam to cover the entire splicing surface. S6. After spraying, put the spray gun 9 into the cleaning water tank 13, start the cleaning pump 10 for circulation cleaning, and after cleaning, turn off the cleaning pump 10 and the air compressor 12, open the drain valve 1304 of the cleaning water tank 13 to discharge the deposited impurities, and take out the spray gun 9 to clean the nozzle of residual adhesive.

[0044] In the preferred embodiment, in step S6, the spray gun 9 is placed below the cleaning solvent level in the first water tank 1301. The cleaning pump 10 draws the cleaning solvent from the first water tank 1301 and injects it into the first feed pipe 401 and the second feed pipe 501 through the first cleaning branch pipe 1101 and the second cleaning branch pipe 1102, respectively. Under the reverse shut-off action of the first one-way valve 402 and the third one-way valve 502, the cleaning agent flows towards the outlet of the three-way connector 6. After flowing through the three-way connector 6, the agitator 7 and the spray gun 9, it flows back to the first water tank 1301, forming a circulating cleaning loop. Impurities in the reflux cleaning solvent are filtered multiple times by the overflow assembly and deposited at the bottom of the slope of the first water tank 1301 and several second water tanks 1302.

[0045] During the pre-construction preparation stage, inject the A and B component adhesives into the A component storage tank 2 and the B component storage tank 3 respectively. Check for lumps or foreign objects in the tanks during injection. If possible, stir the adhesives thoroughly. Acetone is used as the cleaning solvent and injected into the first water tank 1301 of the cleaning water tank 13, filling it to more than half its depth to ensure that the spray gun 9 and the suction pipe 1001 are always submerged below the liquid surface during circulating cleaning. After injection, close the flip-top outer shell 15 and check whether the joints of each material delivery pipe, cleaning pipeline, and air pipe are loose, and whether the seals are aged or damaged. Connect the power supply to the AC 380V, 50Hz field distribution box, with a power not exceeding 3 kW. Before wiring, ensure the main power switch is in the off position. Connect the air compressor outlet to the equipment inlet interface, adjust the exhaust pressure to 0.4 to 0.6 MPa, start the air compressor, and after the pressure stabilizes, use soapy water or leak detection fluid to check for air leaks at the pipeline joints. After the equipment is powered on, the PLC automatically completes a self-test. The control panel 1401 enters the main interface to check whether the status of each sensor and valve is normal.

[0046] The hoisting and positioning of the equipment should comply with safety regulations. Steel wire ropes are attached to the four lifting lugs 16 on the top of the vehicle body 1. The entire piece of equipment weighs approximately 750 kg. The rated load of the hoisting steel wire ropes and shackles should have a safety margin. Before hoisting, confirm that the lifting points are evenly stressed and that the equipment is not tilted. After hoisting to the high-altitude construction platform, push the vehicle body 1 along the casters 17 to the vicinity of the section of the segmental beam to be sprayed. Once aligned, depress the caster brakes to secure it. The platform ground should be flat and free of protruding debris or significant slopes to prevent equipment displacement during spraying. If the platform is in a windy environment, monitor the stability of the equipment; if necessary, use ropes to temporarily secure the vehicle body to the platform structure.

[0047] Parameter settings should be adjusted according to the brand of structural adhesive used and the ambient temperature. On the control panel 1401, set the speed ratio of the first screw pump 4 and the second screw pump 5. The default 3:1 ratio corresponds to pump A at 15 Hz and pump B at 5 Hz. If a different brand of adhesive is used or the ambient temperature is too low, causing the adhesive viscosity to increase, the pump speed can be appropriately increased or the mixing ratio adjusted. Adjust the atomizing air pressure of the spray gun 9 to 6-8 bar. Too low an air pressure will result in poor adhesive atomization and coarse particles, while too high an air pressure will easily cause scattering and waste. Before formal spraying, test spray on a scrap panel to check if the atomization effect and adhesive output are normal. Only spray onto the segmental beam after confirming the mixing ratio is correct.

[0048] Edge treatment of the segmental beam splice surfaces is a necessary procedure. Before formal spraying, masking tape or adhesive tape should be applied to the edges of the splice surface outline. Alternatively, a template can be placed against the edge to define the spraying boundary and prevent adhesive splatter from contaminating non-spraying areas. The end faces of segmental beams typically have a serrated texture; the edges of the grooves and tips of the teeth should be properly adhered, and the areas around holes should also be protected. When applying the tape, it should be tightly adhered to the concrete surface without gaps; otherwise, the adhesive will seep underneath the tape. After spraying, remove the tape promptly before the adhesive cures to ensure neat edges.

[0049] The spraying operation is carried out from bottom to top and from left to right. First, turn on the atomizing gas, then start the twin-screw pump to deliver the material, avoiding dripping caused by un-atomized initial glue. Maintain a distance of 20 to 30 cm between the spray gun 9 and the splicing surface, moving at a uniform speed, overlapping the fan-shaped area by about one-third to ensure consistent coating thickness. Control the overall spray thickness of the cross-section to 3 to 5 mm, with an additional thicker coat around the edges and holes to ensure a sealing effect. For the uneven parts of the toothed splicing surface, the spray gun angle should be adjusted according to the surface shape, extending into and covering the inside of the tooth grooves, avoiding spraying only the top of the teeth. During the spraying process, one person operates the spray gun while another monitors the equipment's operating status and the remaining material in the hopper. The two communicate via hand gestures or walkie-talkies. The spraying time for a single segment beam cross-section is approximately 13 to 15 minutes. During the spraying process, the vehicle body 1 needs to be moved along the cross-sectional span to cover the entire splicing surface. If the splicing surface is wide, it can be completed in multiple moves, realigning the spraying area after each move.

[0050] The following points should be noted during construction: First, constantly observe the operating frequency and current of the two pumps on control panel 1401. If the frequency of one pump is normal but the adhesive output is significantly reduced, it may be due to wear on the screw pump stator, and the machine should be stopped for inspection and replacement. Second, pay attention to the remaining amount in the material tanks. Tanks A and B should be emptied approximately simultaneously at a 3:1 ratio. Avoid leaving one tank running after the other has been emptied, as this will cause a mixing imbalance. Third, the structural adhesive cures quickly after mixing, so the area sprayed at one time should not be too large. Assembly should be completed within the adhesive's pot life. Refer to the product instructions for the specific pot life; higher ambient temperatures will shorten the pot life. Fourth, the construction site should be well-ventilated. Acetone and the volatile components in the structural adhesive have an irritating odor; operators should wear goggles, chemical-resistant gloves, protective clothing, and protective masks. Open flames are prohibited in the work area.

[0051] After spraying, first drain the residual adhesive from the spray gun 9, then place the spray gun 9 below the acetone level in the first water tank 1301. Press the cleaning button on the control panel or the cleaning key on the remote control, and the equipment will automatically clean according to the set sequence. The default sequence is that the first solenoid valve 1105 and the second solenoid valve 1106 open simultaneously for 8 seconds, rinsing both channels simultaneously; then the first solenoid valve 1105 opens alone for 5 seconds to rinse the A material side, and the second solenoid valve 1106 opens alone for 3 seconds to rinse the B material side. If there is a lot of residual adhesive in the pipeline, the cleaning time can be extended on the control panel. The entire cleaning process generally takes 5 to 10 minutes. During cleaning, the cleaning agent circulates between the first water tank 1301, cleaning pump 10, cleaning branch pipe, conveying pipe, tee, agitator, and spray gun, dissolving and carrying away the residual adhesive in the mixed channels. The returned cleaning agent, carrying adhesive residue, returns to the first water tank 1301 and enters the sedimentation chamber through the bottom of the partition 1303. The adhesive residue settles in the sedimentation chamber and the second water tank 1302. The supernatant can be reused, with a solvent recycling rate of approximately 70% to 85%. After cleaning, the cleaning pump 10 and air compressor 12 are turned off. The spray gun 9 is removed, and the nozzle is disassembled. Residual adhesive is cleaned from the gun head and joints with a brush. Then, the drain valves 1306 at the bottom of each compartment are opened to discharge the deposited adhesive residue and waste solvent into a dedicated collection container. Direct discharge to the ground is prohibited. Waste acetone and adhesive-containing waste residue are recycled and disposed of in accordance with hazardous waste management regulations.

[0052] Special attention is needed during construction in low-temperature winter environments. Lower ambient temperatures increase the viscosity of the structural adhesive, increasing the load on the screw pump. In such cases, the pump speed can be appropriately increased, or insulation measures can be taken for the material hopper, such as wrapping it with insulating cotton or installing heating belts. Acetone has a low freezing point and generally does not freeze, but its evaporation rate slows down at very low temperatures, reducing the cleaning effect. The cleaning time can be appropriately extended. When the equipment is to be out of service for an extended period, residual adhesive in the pipelines should be thoroughly cleaned, all remaining adhesive in the material hopper should be removed, waste solvent in the water tank should be drained, all moving parts should be coated with anti-rust oil, and the equipment should be stored in a dry, well-ventilated place. The screw pump stator is a wear part and should be inspected regularly. If a drop in discharge pressure, a deviation in the mixing ratio, or unstable flow is found, it should be replaced promptly. After replacement, the output ratio of both pumps should be recalibrated.

[0053] The above embodiments are merely preferred technical solutions of the present invention and should not be considered as limitations on the present invention. The scope of protection of the present invention should be limited to the technical solutions described in the claims, including equivalent substitutions of the technical features described in the claims. That is, equivalent substitutions and improvements within this scope are also within the scope of protection of the present invention.

Claims

1. A washable integrated spraying device for segmental beam splicing adhesive based on a twin-screw pump, characterized in that: Two sets of screw pump feeding modules are integrated on the vehicle body (1). A material storage tank (2) and B material storage tank (3) are fixed on the vehicle body (1). The feed ends of the first screw pump (4) and the second screw pump (5) are connected to the A material storage tank (2) and the B material storage tank (3) respectively. The discharge ends are connected to the two feed ports of the three-way connector (6) through the first conveying pipe (401) and the second conveying pipe (501) respectively. The discharge port of the three-way connector (6) is connected to the spray gun (9) through the stirring cage (7) and the feeding pipe (8). The vehicle body (1) is also equipped with a cleaning module. The inlet of the cleaning pump (10) is connected to the cleaning water tank (13), and the outlet is connected to the first conveying pipe (401) and the second conveying pipe (501) respectively through the cleaning pipeline (11). The air outlet of the air compressor (12) is connected to the pneumatic drive end of the cleaning pump (10) and the atomization interface (901) of the spray gun (9).

2. The twin screw pump based segmental beam splicing glue washable integrated type spraying apparatus according to claim 1, characterized in that: The first feed pipe (401) is provided with a first check valve (402), the first feed pipe (401) is provided with a second check valve (403) at one inlet of the three-way connector (6), the second feed pipe (501) is provided with a third check valve (502), and the second feed pipe (501) is provided with a fourth check valve (503) at the other inlet of the three-way connector (6). The conduction direction of each check valve is from the corresponding screw pump to the outlet of the three-way connector (6).

3. The washable integrated spraying equipment for segmental beam splicing adhesive based on a twin-screw pump according to claim 2, characterized in that: The cleaning pipeline (11) includes a first cleaning branch pipe (1101) and a second cleaning branch pipe (1102). The first cleaning branch pipe (1101) is connected to the first conveying pipe (401) section between the first check valve (402) and the second check valve (403). The second cleaning branch pipe (1102) is connected to the second conveying pipe (501) section between the third check valve (502) and the fourth check valve (503). The first cleaning branch pipe (1101) is equipped with a fifth check valve (1103), and the second cleaning branch pipe (1102) is equipped with a sixth check valve (1104). The conduction direction of the fifth check valve (1103) and the sixth check valve (1104) is from the cleaning pump (10) to the discharge port of the three-way connector (6). The first cleaning branch pipe (1101) and the second cleaning branch pipe (1102) are respectively equipped with a first solenoid valve (1105) and a second solenoid valve (1106) to control the opening and closing of the cleaning branch.

4. The washable integrated spraying equipment for segmental beam splicing adhesive based on a twin-screw pump according to claim 1, characterized in that: The outlet of the three-way connector (6) is connected to the inlet of the stirring cage (7) via a pipe. The stirring cage (7) is equipped with spiral guide vanes (701) for uniformly mixing the A and B component adhesives that are output through the three-way connector (6). The spray gun (9) has an atomization port (901) on its side wall. The atomization port (901) is connected to the air outlet of the air compressor (12) through the first air pipe (1201).

5. The washable integrated spraying equipment for segmental beam splicing adhesive based on a twin-screw pump according to claim 1, characterized in that: The cleaning water tank (13) includes a first water tank (1301) and several second water tanks (1302) separated by an overflow assembly. The overflow assembly includes a baffle (1303) and an overflow plate (1304). A water passage gap is left between the lower end of the baffle (1303) and the bottom of the cleaning water tank (13). The top height of the overflow plate (1304) is lower than the side wall height of the cleaning water tank (13). Liquid flows into the space between the baffle (1303) and the overflow plate (1304) through the water passage gap at the lower end of the baffle (1303), and then overflows into the adjacent water tank through the top of the overflow plate (1304). Both the first water tank (1301) and the second water tank (1302) have sloping ramps at the bottom, and drain valves (1306) are respectively provided at the bottom of the ramps. The first water tank (1301) is also equipped with a liquid extraction port (1305) at the bottom of the slope. The liquid extraction port (1305) is connected to the liquid inlet of the cleaning pump (10) through the liquid extraction pipe (1001).

6. The washable integrated spraying equipment for segmental beam splicing adhesive based on a twin-screw pump according to claim 1, characterized in that: The cleaning pump (10) is a pneumatic plunger pump. Its pneumatic drive end is connected to the air outlet of the air compressor (12) through the second air pipe (1202). The compressed air output by the air compressor (12) drives the cleaning pump (10) to pump the cleaning agent. The outlet of the cleaning pump (10) is connected to the first cleaning branch pipe (1101) and the second cleaning branch pipe (1102) respectively.

7. The washable integrated spraying equipment for segmental beam splicing adhesive based on a twin-screw pump according to claim 1, characterized in that: The vehicle body (1) includes several flip-top shells (15), which are respectively located on the top of the A material storage tank (2), the B material storage tank (3), and the cleaning water tank (13). The flip-top shells (15) are hinged to the vehicle body (1) and are used to add A material, B material and cleaning solvent after being flipped open. The top of the vehicle body (1) is equipped with several lifting lugs (16) for hoisting the equipment as a whole to the high-altitude construction platform; The bottom of the vehicle body (1) is equipped with several universal wheels (17) with brakes, which are used to push and move the vehicle on the construction platform.

8. The washable integrated spraying equipment for segmental beam splicing adhesive based on a twin-screw pump according to claim 1, characterized in that: The vehicle body (1) also integrates an electrical control box (14), which is equipped with a PLC controller. A control panel (1401) is provided on the corresponding side wall of the vehicle body (1). The PLC controller is connected to the drive motors of the first screw pump (4) and the second screw pump (5) and the first solenoid valve (1105) and the second solenoid valve (1106) on the cleaning pipeline (11) respectively, and is used to control the speed ratio of the twin screw pumps and the start-up sequence of the cleaning operation. The equipment also includes an industrial wireless remote controller, which is connected to the wireless receiving module in the electrical control box (14) for remote control of spraying start and stop and cleaning start and stop. The control panel (1401) is used to set the speed ratio of the first screw pump (4) and the second screw pump (5), as well as the parameters for the simultaneous cleaning time and the individual cleaning time of the first solenoid valve (1105) and the second solenoid valve (1106).

9. A control method for a washable integrated spraying device for segmental beam splicing adhesive based on a twin-screw pump, as described in any one of claims 1-8, characterized in that: The method includes: S1. Pour the A and B component splicing adhesives into the A material storage tank (2) and the B material storage tank (3) respectively. Pour the cleaning solvent into the cleaning water tank (13), close the flip-top shell (15), check the connection and sealing of each material conveying pipe, cleaning pipeline and air pipe, start the air compressor (12) and adjust the output air pressure, and power on the equipment for self-test. S2. The equipment is hoisted to the high-altitude construction platform by means of the lifting lugs (16) on the vehicle body (1), and the vehicle body (1) is moved along the universal wheels (17) to the vicinity of the section beam to be sprayed and the universal wheels are locked. S3. Set the speed ratio of the first screw pump (4) and the second screw pump (5) on the control panel (1401) and adjust the atomizing air pressure of the spray gun (9); S4. Set a template or apply a film or tape to the outline edge of the segmental beam splice surface to define the spraying boundary; S5. Start the first screw pump (4) and the second screw pump (5). The A and B components of the adhesive are fed into the tee connector (6) through the first feed pipe (401) and the second feed pipe (501) according to the set ratio. After being evenly mixed by the agitator (7), the adhesive is atomized and sprayed onto the splicing surface of the segment beam by the spray gun (9). The spraying is carried out in the order of bottom to top and from left to right. During the spraying process, the vehicle body (1) is pushed to move along the cross-sectional span direction of the segment beam to cover the entire splicing surface. S6. After spraying, put the spray gun (9) into the cleaning water tank (13), start the cleaning pump (10) for circulation cleaning, and after cleaning, turn off the cleaning pump (10) and the air compressor (12), open the drain valve (1304) of the cleaning water tank (13) to discharge the deposited impurities, take out the spray gun (9) and clean the nozzle of residual adhesive.

10. The control method for a washable integrated spraying equipment for segmental beam splicing adhesive based on a twin-screw pump according to claim 9, characterized in that: In step S6, the spray gun (9) is placed below the cleaning solvent level in the first water tank (1301). The cleaning pump (10) draws the cleaning solvent from the first water tank (1301) and injects it into the first feed pipe (401) and the second feed pipe (501) through the first cleaning branch pipe (1101) and the second cleaning branch pipe (1102) respectively. Under the reverse shut-off action of the first check valve (402) and the third check valve (502), the cleaning agent flows towards the outlet of the three-way connector (6), flows through the three-way connector (6), the agitator (7) and the spray gun (9) and then flows back to the first water tank (1301) to form a circulating cleaning circuit. Impurities in the reflux cleaning solvent are filtered multiple times by the overflow assembly and deposited at the bottom of the slope of the first water tank (1301) and several second water tanks (1302).