A pretreatment method and system for waste tire pyrolysis
By combining graded crushing and multi-stage magnetic separation, the problems of insufficient compatibility with large tires and insufficient steel wire separation accuracy in waste tire pretreatment have been solved. This has achieved efficient, stable and environmentally friendly pretreatment results, improved the purity of pyrolysis oil and carbon black, and reduced operation and maintenance costs.
Patent Information
- Application Number
- CN202611627009.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-21
- Publication Date
- 2026-11-17
AI Technical Summary
Existing waste tire pyrolysis pretreatment processes suffer from problems such as poor compatibility with large tires, insufficient steel wire separation precision, unstable production, lack of environmental protection measures, and high operation and maintenance costs, resulting in incomplete pyrolysis reactions and a decline in product quality.
The integrated process of graded crushing, multi-stage magnetic separation and deep purification of steel wire is adopted, including wire drawing pretreatment, graded shredding, multi-stage magnetic separation and deep purification of steel wire. Combined with environmental protection supporting equipment and PLC centralized control system, the process improves raw material adaptability, sorting accuracy and production stability.
It achieves efficient graded crushing of large-size tires and fine separation of steel wires, improves the purity of pyrolysis oil and carbon black, reduces operation and maintenance costs, ensures continuous and stable production and environmental compliance, and meets the needs of large-scale pyrolysis projects.
Smart Images

Figure CN123102710A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of waste tire resource recycling technology, specifically involving a pretreatment method and system for waste tires before pyrolysis. Background Technology
[0002] Waste tire pyrolysis is a mainstream process for realizing the resource utilization of waste rubber and producing pyrolysis oil, carbon black, and high-value recycling of steel wire. Before pyrolysis, the whole tire must be processed into rubber particles with uniform particle size and steel wire impurity content meeting the standards. The quality of the pretreatment process directly affects the completeness of the pyrolysis reaction and the quality of the final product.
[0003] There is already some technological accumulation in the field of waste tire pyrolysis pretreatment. For example, Chinese patent application CN106391658A discloses a waste tire resource recycling and processing system for large-scale customized applications. Its mechanical components consist of a dual-shaft machine, a disc sorter, a steel wire separator, a vibrating screen, a drum magnetic separator, and a crusher, capable of separating steel wires and rubber from waste tires. Chinese patent application CN104002394A discloses a process for producing rubber powder from waste tires, including steps such as bead separation, strip cutting, block cutting, and a first magnetic separation after coarse crushing, followed by a second magnetic separation of coarse rubber particles. Chinese patent application CN118205134A relates to a waste tire resource recycling pretreatment process and its environmentally friendly treatment system. In addition, tire wire drawing machines have also been disclosed in the field of waste tire processing. For example, Chinese patent document CN201399843Y provides a tire hydraulic wire drawing machine that can separate the bead steel wires from the tire.
[0004] However, the existing technologies and current industry conventional pretreatment processes generally only include single-stage shredding and simple magnetic separation processes. In practical applications, the following prominent defects still exist: (1) Poor raw material compatibility, making it difficult to process large tires. The existing process is not adaptable enough to large all-steel radial tires with an outer diameter of 900~1200 mm. The coarse steel wires of the tire bead ring cannot be separated in advance. Large pieces of steel wire are easy to get tangled in the shredder blades, causing equipment jamming, frequent shutdowns, and a significant increase in blade wear. Although there is a wire drawing machine technology, it is limited to the level of independent equipment and has not been integrated with the subsequent crushing and sorting processes. (2) Single crushing and grading, and uneven material particle size. The existing process mostly uses one-time crushing to produce mixed rubber blocks. It lacks a grading and screening and circulating crushing mechanism. Large-sized rubber blocks directly enter the pyrolysis process, resulting in incomplete pyrolysis reaction and a decline in the quality of carbon black and pyrolysis oil. Although Chinese patent application CN106391658A includes a disc sorter and a steel wire separator, its material grading standards and circulation paths differ from the refined control of this invention. (3) Insufficient steel wire separation precision. Conventional single-stage magnetic separation can only achieve coarse separation. It is difficult to effectively remove the fine steel wires wrapped inside the rubber particles, resulting in excessive steel wire content and reduced purity of pyrolysis products. Although Chinese patent application CN104002394A mentions two magnetic separations, it is applied to the field of rubber powder production. The magnetic separation object and process path are different from the pretreatment before pyrolysis of this invention. A large amount of rubber adheres to the surface of the steel wire after magnetic separation, resulting in low sales value of the steel wire. (4) Disordered process connection and unstable production capacity. Each crushing and sorting equipment starts and stops independently, lacks a buffer and uniform material module, has large feed fluctuations, equipment load fluctuates, the overall energy consumption is high, and the single-line processing capacity is difficult to stably reach more than 5 t / h. (5) Lack of environmental protection management. The crushing and pulverizing process lacks systematic negative pressure dust removal, forced cooling, and sound insulation and noise reduction design, resulting in excessive dust on site, high-temperature carbonization of materials, and equipment operating noise exceeding national standard limits. (6) Short life of vulnerable parts and high maintenance costs. The lack of specialized materials and heat treatment processes for graded crushing results in rapid wear of shredding and crushing tools, frequent downtime for replacement, and an annual effective operating time that cannot meet the requirement of 7200 hours of continuous production.
[0005] In summary, existing pretreatment processes cannot simultaneously meet core requirements such as large-size tire compatibility, low steel wire impurities in rubber particles, low rubber content in steel wires, continuous and stable high production capacity, environmental compliance, and low operation and maintenance costs, thus hindering the stable commissioning and operation of large-scale waste tire pyrolysis projects. Therefore, there is an urgent need to develop a pretreatment process that can achieve integrated graded crushing of large-size tires, multi-stage steel wire separation, and deep purification of steel wires, in order to comprehensively improve the raw material compatibility, sorting accuracy, production capacity stability, and environmental protection level of the pretreatment process. Summary of the Invention
[0006] To address the shortcomings of existing technologies, this invention provides a pretreatment method and system for waste tires before pyrolysis. Through an integrated process of graded crushing, multi-stage magnetic separation, and deep purification of steel wires, it achieves broad-spectrum compatibility of waste tire raw materials, efficient and precise separation of rubber particles and steel wires, continuous and stable production operation, and environmental compliance, thereby comprehensively improving resource recovery rate, production efficiency, and overall economic benefits.
[0007] This invention is achieved through the following technical solution:
[0008] A pretreatment method for waste tires before pyrolysis includes the following steps:
[0009] Step 1) Classify the waste tires according to their outer diameter. For tires with an outer diameter of 900~1200 mm, perform wire pulling treatment to pull out the coarse steel wires of the tire bead and collect them. The tires that have completed wire pulling are sent to the next process together with the tires with an outer diameter ≤900 mm.
[0010] Step 2) The tires processed in Step 1) are fed into a dual-shaft shredder for primary shredding to produce mixed rubber blocks; the mixed rubber blocks are fed into a disc sorter for grading and screening. Large rubber blocks with a size larger than a set threshold are returned to the dual-shaft shredder for secondary shredding, while qualified rubber blocks with a size smaller than or equal to the set threshold are sent to a buffer silo for temporary storage and then fed to the next process at a uniform speed by a feeder.
[0011] Step 3) The qualified rubber blocks processed in Step 2) are fed into a steel wire separator for secondary crushing to produce a mixture of rubber particles and steel wires. The mixture is then fed into a first double-roll magnetic separator and a second double-roll magnetic separator for two-stage series magnetic separation to separate the rubber particles and mixed steel wires with attached rubber. The separated rubber particles are sent to a rubber particle buffer bin for temporary storage. The rubber particles temporarily stored in the rubber particle buffer bin are then sent to a third double-roll magnetic separator for magnetic separation. The magnetically separated rubber particles are output as pyrolysis feedstock.
[0012] Step 4) The mixed steel wire with attached rubber obtained in Step 3) is fed into a low-temperature double-roller breaker to peel off the rubber attached to the surface of the steel wire, producing a mixture of steel wire and rubber powder. The mixture is screened and graded, and the undersized material is sent to a three-roller magnetic separator for fine magnetic separation to separate the finished steel wire and rubber powder. The finished steel wire is collected, and the oversized material is returned to the low-temperature double-roller breaker for recycling.
[0013] Preferably, the waste tires in step 1) include passenger car semi-steel tires with an outer diameter ≤ 900 mm and all-steel radial tires with an outer diameter of 900~1200 mm; the wire drawing process is carried out using a tire wire drawing machine.
[0014] Preferably, in step 2), the main shaft of the dual-shaft shredder is made of 42CrMo integral forged alloy steel, and the cutting edges are overlaid with wear-resistant alloy; the grading and screening threshold of the disc sorter is set to 80 mm; and the volume of the buffer hopper is 10 m³. 3 The feeder is a vibrating feeder, used to break up clumps of rubber and feed the material at a uniform speed.
[0015] Preferably, in step 3), the pulverizing screen of the steel wire separator has a mesh size of Φ20 mm, and the particle size of the produced adhesive particles is ≤18 mm; the steel wire separator is equipped with a circulating forced cooling system to control the discharge temperature to ≤70℃; the magnetic field strength of the first double-roller magnetic separator, the second double-roller magnetic separator, and the third double-roller magnetic separator is 2000 Gs, and the total steel wire separation efficiency is ≥98.5%; the steel wire content of the separated adhesive particles is ≤1%.
[0016] Preferably, the low-temperature double-roller breaker in step 4) is a heavy-duty double-roller breaker, employing water-cooled low-temperature crushing of the rollers; the screening and grading are carried out using a main vibrating screen, with the screening standard as follows: coarse rubber powder >1.5 mm and long steel wire >40 mm are returned to the low-temperature double-roller breaker for recycling, while fine rubber powder ≤1.5 mm and short steel wire ≤40 mm enter a three-roller magnetic separator; the magnetic field strength of the three-roller magnetic separator is ≥2000 Gs, and the magnetic separation efficiency is ≥99.5%; the rubber content of the finished steel wire is ≤0.5%.
[0017] Preferably, it also includes environmentally friendly supporting processes:
[0018] A closed negative pressure dust removal system is installed at the twin-shaft shredder, the wire separator, and the low-temperature twin-roller breaker, respectively.
[0019] A soundproof enclosure is installed outside the dual-shaft shredder and the wire separator;
[0020] A circulating cooling water system is installed at the twin-shaft shredder, wire separator, and low-temperature twin-roller breaker to provide forced cooling.
[0021] Preferably, a PLC centralized control system is used for automated and coordinated production; the buffer hopper works in conjunction with the feeder to achieve uniform material buffering and balance the feeding fluctuations of the preceding and following processes; the equipment automatically stops and alarms when overloaded.
[0022] A pretreatment system for waste tire pyrolysis used to implement the above method includes:
[0023] The wire drawing pretreatment unit includes a tire wire drawing machine, which is used to draw coarse steel wires from the tire bead of tires with an outer diameter of 900~1200 mm. The discharge end of the tire wire drawing machine and the feed end of tires with an outer diameter ≤900 mm are both connected to the feed end of the twin-shaft shredder.
[0024] The primary shredding and screening unit includes a twin-shaft shredder, a disc sorter, a buffer hopper, and a vibrating feeder connected in sequence. The discharge end of the twin-shaft shredder is connected to the feed end of the disc sorter. The large rubber block return channel of the disc sorter is connected to the feed end of the twin-shaft shredder. The qualified rubber block discharge end of the disc sorter is connected to the feed end of the buffer hopper. The discharge end of the buffer hopper is connected to the feed end of the wire separator via the vibrating feeder.
[0025] The secondary crushing and primary magnetic separation unit includes a wire separator, a first double-roller magnetic separator, a second double-roller magnetic separator, and a particle buffer bin connected in sequence. The discharge end of the wire separator is connected to the feed end of the first double-roller magnetic separator, and the discharge end of the first double-roller magnetic separator is connected to the feed end of the second double-roller magnetic separator. The particle discharge end of the second double-roller magnetic separator is connected to the feed end of the particle buffer bin. The unit also includes a third double-roller magnetic separator, the discharge end of which is connected to the feed end of the third double-roller magnetic separator. The discharge end of the third double-roller magnetic separator is used to connect to a downstream pyrolysis unit. The wire discharge end of the second double-roller magnetic separator is connected to the feed end of a low-temperature double-roller breaker.
[0026] The steel wire deep purification and secondary magnetic separation unit includes a low-temperature double-roller breaker, a main vibrating screen, and a three-roller magnetic separator connected in sequence. The discharge end of the low-temperature double-roller breaker is connected to the feed end of the main vibrating screen. The oversize material return channel of the main vibrating screen is connected to the feed end of the low-temperature double-roller breaker. The undersize material discharge end of the main vibrating screen is connected to the feed end of the three-roller magnetic separator. The steel wire discharge end of the three-roller magnetic separator is connected to the external pin collection device. The rubber particle discharge end of the three-roller magnetic separator is connected to the feed end of the rubber particle buffer bin.
[0027] Preferably, the system includes three parallel crushing production lines and two sets of steel wire deep purification systems. Each crushing production line includes the wire drawing pretreatment unit, a primary shredding and screening unit, and a secondary crushing and primary magnetic separation unit. Each set of steel wire deep purification systems includes the steel wire deep purification and secondary magnetic separation units. The steel wire discharge end of the second double-roll magnetic separator of the three crushing production lines is evenly connected to the feed end of the low-temperature double-roll breaker in the two sets of steel wire deep purification systems via bidirectional conveyor belts.
[0028] Preferably, the system also includes environmental protection equipment and a PLC centralized control system. The environmental protection equipment includes a closed negative pressure dust removal system installed at the twin-shaft shredder, wire separator, and low-temperature twin-roller debonding machine; soundproof covers installed outside the twin-shaft shredder and wire separator; and circulating cooling water systems installed at the twin-shaft shredder, wire separator, and low-temperature twin-roller debonding machine. The PLC centralized control system is electrically connected to the twin-shaft shredder, disc separator, buffer silo, vibrating feeder, wire separator, first twin-roller magnetic separator, second twin-roller magnetic separator, granule buffer silo, third twin-roller magnetic separator, low-temperature twin-roller debonding machine, main vibrating screen, and three-roller magnetic separator, respectively, for automated linkage control and overload automatic shutdown alarm.
[0029] The beneficial effects of this invention are as follows:
[0030] (1) By adding an independent wire drawing pretreatment process, this invention can pre-strip the coarse steel wires of the tire bead ring of all-steel radial tires with an outer diameter of 900~1200 mm before they enter the shredding equipment. This fundamentally avoids the coarse steel wires from getting tangled in the blades of the dual-shaft shredder, significantly reducing the frequency of equipment jamming and downtime for maintenance, and significantly improving the stability of continuous operation of the entire line. At the same time, the graded crushing design can be adapted to the mixed production of tires of different sizes, eliminating the need for pre-cutting of whole tires, which greatly improves production efficiency and raw material adaptability.
[0031] (2) This invention adopts a graded crushing strategy of primary shredding + disc sorting and circulating screening, followed by secondary fine granulation. Through step-by-step control of the 80 mm screening threshold and Φ20 mm crushing screen, the particle size of the pyrolysis raw material is precisely controlled to be ≤18 mm, ensuring uniform particle size. At the same time, two-stage separation is adopted using double-roller coarse magnetic separation and three-roller fine magnetic separation, so that the steel wire impurity content in the particles is ≤1%, effectively improving the purity of pyrolysis oil and carbon black products. After low-temperature deep purification, the steel wire has a rubber content of ≤0.5%, significantly improving the recycling and sales value of the steel wire and comprehensively enhancing the resource utilization rate.
[0032] (3) The present invention is equipped with a closed negative pressure two-stage dust removal system throughout the process to achieve zero dispersion of fugitive dust; the shredding and crushing host adopts a fully enclosed sound insulation structure, and the noise 1 m outside the equipment sound insulation cover is ≤85 dB; each host is equipped with a circulating water cooling forced cooling system to effectively control the discharge temperature ≤70℃, avoid high temperature carbonization and deterioration of rubber, ensure the quality of pyrolysis raw materials, and significantly improve the workshop operating environment.
[0033] (4) This invention achieves uniform material buffering by cooperating with a buffer hopper and a vibrating feeder, effectively balancing the fluctuations in feed between the preceding and following processes and avoiding equipment idling and overload impact; it adopts a PLC centralized control system to realize the automated linkage of each piece of equipment and automatically adjust the operating parameters according to the load. The processing capacity of a single crushing line is stable at ≥5 t / h, the total processing capacity of the whole system is ≥15 t / h, the total installed power is controlled within 2500 kW, and only 2 operators are required per shift. The labor and energy costs are significantly better than those of traditional single-stage crushing processes.
[0034] (5) The main shafts of the dual-shaft shredder and wire separator of the present invention are made of 42CrMo integral forged alloy steel, and the blades are made of imported wear-resistant alloy weld overlay or D2 high-hardness steel. With special heat treatment process, the blades have a high single crushing capacity and can be repaired multiple times (the blade life of the dual-shaft shredder is 15,000 tons and can be repaired 6 times; the life of the moving blade of the wire separator is 6,000 tons and the life of the fixed blade is 15,000 tons), which greatly reduces the operation and maintenance cost. The annual effective operating time of the complete set of equipment is ≥8,000 h, which meets the continuous production needs of a large-scale waste tire pyrolysis project of 100,000 tons / year, and the overall design service life of the system is ≥10 years.
[0035] (6) This invention modularly separates the crushing process and the steel wire purification process, allowing for the free increase or decrease of the number of crushing production lines and steel wire purification units according to the project's capacity requirements, thus flexibly adapting to production projects of different scales. The control system reserves a DCS interface for the entire plant, adapting to the integrated management and control needs of large-scale circular economy industrial parks, and has strong versatility and broad prospects for promotion and application. Attached Figure Description
[0036] Figure 1 This is a schematic diagram of the overall process of the waste tire pretreatment method and system for pyrolysis according to the present invention;
[0037] In the diagram: 1. Tire wire drawing machine; 2. Metal conveyor belt; 3. Twin-shaft shredder; 4. Disc sorter; 5. Buffer silo; 6. Rubber conveyor belt; 7. Vibrating feeder; 8. Steel wire separator; 9. First double-roller magnetic separator; 10. Second double-roller magnetic separator; 11. Rubber granule buffer silo; 12. Vibrating conveyor; 13. Screw conveyor; 14. Scraper conveyor; 15. PU conveyor belt; 16. Third double-roller magnetic separator; 17. Pyrolysis device; 18. Low-temperature double-roller rubber breaker; 19. Main vibrating screen; 20. Three-roller magnetic separator; 21. Outer sales collection device; 22. Closed negative pressure dust removal system; A. Waste tires with an outer diameter of 900~1200 mm; B. Waste tires with an outer diameter ≤900 mm. Detailed Implementation
[0038] The present invention will now be described in further detail with reference to the accompanying drawings and specific embodiments.
[0039] In the description of this invention, terms such as "top," "bottom," "upper," "lower," "front," and "rear," indicating orientation or positional relationship, are used only based on the orientation shown in the accompanying drawings for the purpose of describing the invention, and are not intended to indicate or imply that the device referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on the invention. Terms such as "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance.
[0040] A pretreatment method for waste tires before pyrolysis, such as Figure 1 As shown, the specific steps are as follows:
[0041] (1) Raw material classification and pretreatment of coarse steel wire for tire bead drawing
[0042] Waste tires are classified according to their outer diameter. Waste tires A with an outer diameter of 900~1200 mm are subjected to wire pulling, and the coarse steel wires of the tire bead are pulled out and collected. Tires that have completed wire pulling are sent to the next process together with waste tires B with an outer diameter ≤900 mm.
[0043] (2) Primary pre-crushing and disc sorting circulating screening
[0044] The tire obtained in step (1) is fed into the dual-shaft shredder 3 for primary shredding to produce mixed rubber blocks; the mixed rubber blocks are fed into the disc sorter 4 for grading and screening; large rubber blocks with a size greater than the set threshold are returned to the dual-shaft shredder 3 for secondary shredding; qualified rubber blocks with a size ≤ the set threshold are sent into the buffer silo 5 for temporary storage, and then fed to the next process at a uniform speed by the vibrating feeder 7.
[0045] (3) Secondary grinding and granulation and primary magnetic separation
[0046] The qualified rubber block obtained in step (2) is sent to the steel wire separator 8 for secondary crushing to produce a mixture of rubber particles and steel wire. The mixture is then sent to the first double roller magnetic separator 9 and the second double roller magnetic separator 10 for two-stage series magnetic separation to separate the rubber particles and the mixed steel wire with attached rubber. The separated rubber particles are sent to the rubber particle buffer bin 11 for temporary storage.
[0047] The colloids temporarily stored in the colloid buffer bin 11 are sent to the third double-roll magnetic separator 16 for magnetic separation. The magnetically separated colloids are output as pyrolysis feedstock.
[0048] (4) Low-temperature deep purification and secondary fine magnetic separation of steel wire
[0049] The mixed steel wire with attached rubber obtained in step (3) is fed into the low-temperature double-roller breaker 18 to peel off the rubber attached to the surface of the steel wire, producing a mixture of steel wire and rubber powder. The mixture is fed into the main vibrating screen 19 for screening and grading. The material under the screen is fed into the three-roller magnetic separator 20 for fine magnetic separation to separate the finished steel wire and rubber powder. The finished steel wire is collected, the rubber powder is sent to the rubber particle buffer bin 11 for temporary storage, and the material over the screen is returned to the low-temperature double-roller breaker 18 for recycling.
[0050] A pretreatment system for waste tire pyrolysis used to implement the above method, such as Figure 1 As shown, it includes the following connected sequentially:
[0051] The wire drawing pretreatment unit includes a tire wire drawing machine 1, which is used to draw coarse steel wire from the tire bead of waste tires A with an outer diameter of 900~1200 mm (after processing, the wire is transferred to the outer pin collection device 21). The discharge end of the tire wire drawing machine 1 and the feed end of waste tires B with an outer diameter ≤900 mm are both connected to the feed end of the twin-shaft shredder 3 in the primary shredding and screening unit through a metal conveyor belt 2.
[0052] The primary shredding and screening unit includes a twin-shaft shredder 3, a disc sorter 4, and a buffer silo 5 connected in sequence. The discharge end of the twin-shaft shredder 3 is connected to the feed end of the disc sorter 4 via a rubber conveyor belt 6. The large rubber block return channel of the disc sorter 4 is connected to the feed end of the twin-shaft shredder 3 via a rubber conveyor belt 6. The qualified rubber block discharge end of the disc sorter 4 is connected to the feed end of the buffer silo 5 via a rubber conveyor belt 6. The discharge end of the buffer silo 5 is connected to the feed end of the wire separator 8 in the secondary crushing and primary magnetic separation unit via a vibrating feeder 7 and a rubber conveyor belt 6.
[0053] The secondary crushing and primary magnetic separation unit includes a wire separator 8, a first double-roll magnetic separator 9, a second double-roll magnetic separator 10, and a granule buffer bin 11 connected in sequence. The discharge end of the wire separator 8 is connected to the feed end of the first double-roll magnetic separator 9 via a vibrating conveyor 12, and the discharge end of the first double-roll magnetic separator 9 is connected to the feed end of the second double-roll magnetic separator 10. The granule discharge end of the second double-roll magnetic separator 10 is connected to the feed end of the granule buffer bin 11 via a screw conveyor 13 and a scraper conveyor 14. The wire discharge end of the second double-roll magnetic separator 10 is connected to the feed end of the low-temperature double-roll granulator 18 in the wire deep purification and secondary magnetic separation unit via a PU conveyor belt 15.
[0054] It also includes a third double-roll magnetic separator 16, the feed end of which is connected to the discharge end of the granule buffer bin 11, and the discharge end of which is connected to the downstream pyrolysis unit 17 via a scraper conveyor 14.
[0055] The steel wire deep purification and secondary magnetic separation unit includes a low-temperature double-roller breaker 18, a main vibrating screen 19, and a three-roller magnetic separator 20 connected in sequence. The discharge end of the low-temperature double-roller breaker 18 is connected to the feed end of the main vibrating screen 19. The oversize material return channel of the main vibrating screen 19 is connected to the feed end of the low-temperature double-roller breaker 18. The undersize material discharge end of the main vibrating screen 19 is connected to the feed end of the three-roller magnetic separator 20. The steel wire discharge end of the three-roller magnetic separator 20 is connected to the external pin collection device 21. The granule discharge end of the three-roller magnetic separator 20 is connected to the feed end of the granule buffer bin 11 via a PU conveyor belt 15.
[0056] It also includes environmental protection equipment and a PLC centralized control system. The environmental protection equipment includes a closed negative pressure dust removal system 22 installed at the twin-shaft shredder 3, the wire separator 8, and the low-temperature twin-roller breaker 18 (see...). Figure 1 (Taking the wire separator 8 as an example), soundproof covers are installed outside the twin-shaft shredder 3 and the wire separator 8, and circulating cooling water systems are respectively installed at the twin-shaft shredder 3, the wire separator 8 and the low-temperature twin-roller debonding machine 18; the PLC centralized control system is electrically connected to the twin-shaft shredder 3, the disc sorter 4, the buffer silo 5, the vibrating feeder 7, the wire separator 8, the first twin-roller magnetic separator 9, the second twin-roller magnetic separator 10, the granule buffer silo 11, the third twin-roller magnetic separator 16, the low-temperature twin-roller debonding machine 18, the main vibrating screen 19 and the three-roller magnetic separator 20, respectively, for automated linkage control and overload automatic shutdown alarm.
[0057] Example 1
[0058] This embodiment describes a 100,000-ton / year waste tire pyrolysis pretreatment production line located in the Changleshan Circular Economy Industrial Park, Xialu District, Huangshi City, Hubei Province. The entire production line is equipped with three parallel crushing production lines (each including a wire drawing pretreatment unit, a primary shredding and screening unit, and a secondary crushing and primary magnetic separation unit) and two sets of steel wire deep purification systems (each including steel wire deep purification and secondary magnetic separation units). It employs the waste tire pyrolysis pretreatment method described in this invention to process mixed waste tires with an outer diameter of 600-1200 mm. Details are as follows:
[0059] 1. Raw material pretreatment and wire drawing section
[0060] The factory's raw material storage yard holds mixed waste tires with an outer diameter of 600-1200 mm. The raw materials are first sorted to separate passenger car semi-steel tires with an outer diameter ≤900 mm from all-steel radial tires with an outer diameter of 900-1200 mm. Six tire wire drawing machines are dedicated to processing 900-1200 mm all-steel radial tires, pulling out the coarse steel wire rings from the tire bead stop. The coarse steel wires are directly collected, packaged, and sold. The large tires that have undergone wire drawing and the small tires with an outer diameter ≤900 mm that have not undergone wire drawing are fed together into the feed end of a twin-shaft shredder via a two-stage metal conveyor belt. Each twin-shaft shredder has a processing capacity of 5 t / h; three shredders operate in parallel, with a total capacity of 15 t / h.
[0061] The main shaft of the dual-shaft shredder is made of 42CrMo integral forged alloy steel, and the cutting edges of the blades are overlaid with imported high-hardness wear-resistant alloy. The entire tire undergoes primary shredding in the dual-shaft shredder, producing mixed rubber blocks. A buried metal conveyor belt provides feed, cushioning the impact of the loader loading.
[0062] 2. Primary pre-crushing and circulating screening section
[0063] After shredding, the material is fed into a disc sorter via an 8 mm thick rubber enclosed conveyor belt for grading and screening. The disc sorter classifies the mixed rubber blocks according to their size: large rubber blocks with a size > 80 mm are returned to the feed end of the twin-shaft shredder through a return channel for secondary shredding; qualified rubber blocks with a size ≤ 80 mm are conveyed into a 10 m... 3 The buffer silo stores the material. The bottom of the buffer silo is equipped with a vibrating feeder to break up the clumps of adhesive and feed them to the next process at a uniform and stable speed.
[0064] 3. Secondary granulation and primary magnetic separation section
[0065] The discharge end of the buffer hopper is connected to the feed end of the wire separator. Qualified rubber blocks ≤80 mm in size are evenly fed into the wire separator for secondary crushing. The main shaft of the wire separator is made of 42CrMo, and the moving and fixed blades are made of D2 wear-resistant alloy steel. The crushing screen has an aperture of Φ20 mm. After crushing, the material produces a mixture of rubber particles ≤18 mm in size and capillary steel wire. The main unit of the wire separator is equipped with a circulating forced cooling system to control the discharge temperature ≤70℃, preventing high-temperature carbonization of the rubber.
[0066] The pulverized mixture is loosened and dispersed by a vibrating conveyor and then sequentially fed into a first double-roller magnetic separator and a second double-roller magnetic separator for two-stage series magnetic separation. The magnetic field strength of both double-roller magnetic separators is 2000 Gs, and the overall steel wire separation efficiency after two-stage series magnetic separation is ≥98.5%. The magnetically separated mixed steel wires (with rubber adhering to their surface) are centrally conveyed to the steel wire purification section via a PU conveyor belt. The steel wire content in the separated rubber particles is ≤1%, and they are conveyed to a 10 m³ / h section by a scraper conveyor. 3 The colloidal particle buffer temporarily stores the particles.
[0067] The discharge end of the granule buffer bin is connected to a third double-roll magnetic separator (magnetic field strength 2000 Gs). After being magnetically separated again by the third double-roll magnetic separator, the granules are transported as pyrolysis feedstock to the downstream pyrolysis section. The third double-roll magnetic separator can further remove residual trace steel wires from the granules and prevent the granules from clogging the conveying device during the conveying process.
[0068] 4. Low-temperature purification and fine sorting section for steel wire
[0069] The mixed steel wires separated by the second double-roll magnetic separator of the three crushing production lines are evenly fed into two sets of steel wire deep purification systems via bidirectional conveyor belts. Each system is equipped with a heavy-duty low-temperature double-roll breaker, with a single unit processing capacity of 1400~1600 kg / h. The low-temperature double-roll breaker uses water-cooled rollers for low-temperature crushing, peeling off the rubber adhering to the surface of the steel wires.
[0070] After the rubber is broken up, the mixture of steel wire and rubber powder is fed into the main vibrating screen for grading and screening. The screening standards are as follows: coarse rubber powder >1.5 mm and long steel wire >40 mm are returned to the feed end of the low-temperature double roller breaker for recycling and reprocessing through the material return channel on the screen; fine rubber powder ≤1.5 mm and short steel wire ≤40 mm are fed into the three-roll magnetic separator via the feeding belt.
[0071] A three-roll magnetic separator (magnetic field strength ≥2000 Gs) performs secondary fine magnetic separation on the undersize material, with a separation efficiency ≥99.5%. The finished steel wire produced after the secondary fine magnetic separation has an internal rubber content ≤0.5%. The finished steel wire is conveyed by a bidirectional belt to a ton bag support for bagging and external sales. The fine rubber powder generated during screening is collected and recovered by a high-pressure blower and a cyclone collector, and temporarily stored in a rubber particle buffer bin. After being magnetically separated again by a third double-roll magnetic separator, it is transported as raw material to the downstream pyrolysis section as feedstock for the pyrolysis unit.
[0072] 5. Environmental protection and automatic control are operated in a coordinated manner.
[0073] Each crushing production line is equipped with an independent cyclone dust collector and pulse dust collector system, forming a fully enclosed negative pressure two-stage dust removal system to prevent fugitive dust from escaping. The twin-shaft shredder and wire separator are fitted with fully enclosed soundproof covers; the fully enclosed soundproof structure of the main unit keeps the noise level 1 meter outside the cover below 85 dB. The twin-shaft shredder, wire separator, and low-temperature twin-roller breaker are each equipped with a circulating cooling water system for forced cooling, stabilizing the discharge temperature at 62~68℃.
[0074] The entire production line utilizes a Siemens S7-1500 PLC centralized control system for automated, coordinated production. A buffer silo works in conjunction with a vibrating feeder to achieve uniform material distribution and balance feed fluctuations between preceding and following processes. The PLC centralized control system is electrically connected to the twin-shaft shredder, disc sorter, buffer silo, vibrating feeder, wire separator, first double-roll magnetic separator, second double-roll magnetic separator, granule buffer silo, third double-roll magnetic separator, low-temperature double-roll de-kneader, main vibrating screen, and three-roll magnetic separator. It automatically adjusts operating parameters based on load and automatically shuts down and alarms when equipment is overloaded. Two operators are required per shift.
[0075] 6. Performance
[0076] After adopting the process in this embodiment, the processing capacity of a single crushing line is stably ≥5 t / h, and the total processing capacity of the entire system is ≥15 t / h, meeting the requirements for large-scale pyrolysis production. The particle size of the pyrolysis particles is ≤18 mm, and the steel wire content in the particles is ≤1%, improving the quality of the pyrolyzed carbon black and greatly reducing steel wire clogging problems during pyrolysis and deep processing of carbon black. The rubber content of the finished steel wire is stably ≤0.5%, increasing the selling price of the steel wire by more than 30%. Monthly downtime for equipment maintenance is reduced by 65%, and the annual effective operating time of the complete set of equipment is 7350 hours, fully meeting the processing requirements of a 100,000-ton / year project. The blade life of the dual-shaft shredder is 15,000 tons and can be repaired 6 times; the life of the moving blade in the steel wire separator is 6,000 tons, and the life of the fixed blade is 15,000 tons. The dust emission concentration in the workshop complies with GB 16297-1996, and the measured noise level 1 m outside the equipment soundproof enclosure is 82 dB. Both dust and noise levels in the workshop meet the standards, eliminating the need for additional noise reduction and dust removal equipment. The overall system is designed to have a service life of ≥10 years.
[0077] The embodiments described above are only some, not all, of the embodiments of the present invention. The detailed description of the embodiments of the present invention is not intended to limit the scope of the claimed invention, but merely to illustrate selected embodiments. The scope of protection of the present invention is determined by the scope claimed in the claims. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention without inventive effort are within the scope of protection of the present invention.
Claims
1. A pretreatment method for waste tires before pyrolysis, characterized in that, Includes the following steps: Step 1) Classify the waste tires according to their outer diameter. For tires with an outer diameter of 900~1200 mm, perform wire pulling treatment to pull out the coarse steel wires of the tire bead and collect them. The tires that have completed wire pulling are sent to the next process together with the tires with an outer diameter ≤900 mm. Step 2) The tires processed in Step 1) are fed into a dual-shaft shredder for primary shredding to produce mixed rubber blocks; the mixed rubber blocks are fed into a disc sorter for grading and screening. Large rubber blocks with a size larger than a set threshold are returned to the dual-shaft shredder for secondary shredding, while qualified rubber blocks with a size smaller than or equal to the set threshold are sent to a buffer silo for temporary storage and then fed to the next process at a uniform speed by a feeder. Step 3) The qualified rubber blocks processed in Step 2) are fed into a steel wire separator for secondary crushing to produce a mixture of rubber particles and steel wires. The mixture is then fed into a first double-roll magnetic separator and a second double-roll magnetic separator for two-stage series magnetic separation to separate the rubber particles and mixed steel wires with attached rubber. The separated rubber particles are sent to a rubber particle buffer bin for temporary storage. The rubber particles temporarily stored in the rubber particle buffer bin are then sent to a third double-roll magnetic separator for magnetic separation. The magnetically separated rubber particles are output as pyrolysis feedstock. Step 4) The mixed steel wire with attached rubber obtained in Step 3) is fed into a low-temperature double-roller breaker to peel off the rubber attached to the surface of the steel wire, producing a mixture of steel wire and rubber powder. The mixture is screened and graded, and the undersized material is sent to a three-roller magnetic separator for fine magnetic separation to separate the finished steel wire and rubber powder. The finished steel wire is collected, and the oversized material is returned to the low-temperature double-roller breaker for recycling.
2. The pretreatment method for waste tires before pyrolysis according to claim 1, characterized in that, Step 1) The waste tires include passenger car semi-steel tires with an outer diameter ≤ 900 mm and all-steel radial tires with an outer diameter of 900~1200 mm; the wire drawing process is carried out using a tire wire drawing machine.
3. The pretreatment method for waste tires before pyrolysis according to claim 1, characterized in that, Step 2) The main shaft of the dual-shaft shredder is made of 42CrMo integral forged alloy steel, and the cutting edges of the blades are overlaid with wear-resistant alloy; the grading and screening threshold of the disc sorter is set to 80 mm; the volume of the buffer hopper is 10 m³. 3 The feeder is a vibrating feeder, used to break up clumps of rubber and feed the material at a uniform speed.
4. The pretreatment method for waste tires before pyrolysis according to claim 1, characterized in that, Step 3) The crushing screen of the steel wire separator has a mesh size of Φ20 mm, and the particle size of the produced rubber particles is ≤18 mm; the steel wire separator is equipped with a circulating forced cooling system to control the discharge temperature ≤70℃; the magnetic field strength of the first double roller magnetic separator, the second double roller magnetic separator and the third double roller magnetic separator are all 2000 Gs, and the total steel wire separation efficiency is ≥98.5%; the steel wire content of the separated rubber particles is ≤1%.
5. The pretreatment method for waste tires before pyrolysis according to claim 1, characterized in that, Step 4) The low-temperature double-roller breaker is a heavy-duty double-roller breaker, which uses water-cooled low-temperature crushing of the rollers; the screening and grading are carried out by a main vibrating screen, and the screening standard is: coarse rubber powder >1.5 mm and long steel wire >40 mm are returned to the low-temperature double-roller breaker for recycling, and fine rubber powder ≤1.5 mm and short steel wire ≤40 mm are sent to a three-roller magnetic separator; the magnetic field strength of the three-roller magnetic separator is ≥2000 Gs, and the magnetic separation efficiency is ≥99.5%; the rubber content of the finished steel wire is ≤0.5%.
6. The pretreatment method for waste tires before pyrolysis according to claim 1, characterized in that, It also includes environmental protection supporting processes: A closed negative pressure dust removal system is installed at the twin-shaft shredder, the wire separator, and the low-temperature twin-roller breaker, respectively. A soundproof enclosure is installed outside the dual-shaft shredder and the wire separator; A circulating cooling water system is installed at the twin-shaft shredder, wire separator, and low-temperature twin-roller breaker to provide forced cooling.
7. The pretreatment method for waste tires before pyrolysis according to claim 1, characterized in that, The system employs a PLC centralized control system for automated and coordinated production; the buffer hopper works in conjunction with the feeder to achieve uniform material buffering and balance the material feeding fluctuations between upstream and downstream processes; the system automatically stops and alarms when the equipment is overloaded.
8. A pretreatment system for waste tire pyrolysis used to implement the method as described in any one of claims 1-7, characterized in that, Including those connected sequentially: The wire drawing pretreatment unit includes a tire wire drawing machine, which is used to draw coarse steel wires from the tire bead of tires with an outer diameter of 900~1200 mm. The discharge end of the tire wire drawing machine and the feed end of tires with an outer diameter ≤900 mm are both connected to the feed end of the twin-shaft shredder. The primary shredding and screening unit includes a twin-shaft shredder, a disc sorter, a buffer hopper, and a vibrating feeder connected in sequence. The discharge end of the twin-shaft shredder is connected to the feed end of the disc sorter. The large rubber block return channel of the disc sorter is connected to the feed end of the twin-shaft shredder. The qualified rubber block discharge end of the disc sorter is connected to the feed end of the buffer hopper. The discharge end of the buffer hopper is connected to the feed end of the wire separator via the vibrating feeder. The secondary crushing and primary magnetic separation unit includes a wire separator, a first double-roller magnetic separator, a second double-roller magnetic separator, and a particle buffer bin connected in sequence. The discharge end of the wire separator is connected to the feed end of the first double-roller magnetic separator, and the discharge end of the first double-roller magnetic separator is connected to the feed end of the second double-roller magnetic separator. The particle discharge end of the second double-roller magnetic separator is connected to the feed end of the particle buffer bin. The unit also includes a third double-roller magnetic separator, the discharge end of which is connected to the feed end of the third double-roller magnetic separator. The discharge end of the third double-roller magnetic separator is used to connect to a downstream pyrolysis unit. The wire discharge end of the second double-roller magnetic separator is connected to the feed end of a low-temperature double-roller breaker. The steel wire deep purification and secondary magnetic separation unit includes a low-temperature double-roller breaker, a main vibrating screen, and a three-roller magnetic separator connected in sequence. The discharge end of the low-temperature double-roller breaker is connected to the feed end of the main vibrating screen. The oversize material return channel of the main vibrating screen is connected to the feed end of the low-temperature double-roller breaker. The undersize material discharge end of the main vibrating screen is connected to the feed end of the three-roller magnetic separator. The steel wire discharge end of the three-roller magnetic separator is connected to the external pin collection device. The rubber particle discharge end of the three-roller magnetic separator is connected to the feed end of the rubber particle buffer bin.
9. The waste tire pretreatment system according to claim 8, characterized in that, It includes three parallel crushing production lines and two sets of steel wire deep purification systems. Each crushing production line includes the wire drawing pretreatment unit, the primary shredding and screening unit, and the secondary crushing and primary magnetic separation unit. Each set of steel wire deep purification systems includes the steel wire deep purification and secondary magnetic separation units. The steel wire discharge end of the second double-roll magnetic separator of the three crushing production lines is evenly connected to the feed end of the low-temperature double-roll breaker in the two sets of steel wire deep purification systems via bidirectional conveyor belts.
10. The waste tire pretreatment system according to claim 8, characterized in that, It also includes environmental protection supporting devices and a PLC centralized control system. The environmental protection supporting devices include a closed negative pressure dust removal system installed at the twin-shaft shredder, the wire separator, and the low-temperature twin-roller breaker, respectively; a soundproof cover installed outside the twin-shaft shredder and the wire separator; and a circulating cooling water system installed at the twin-shaft shredder, the wire separator, and the low-temperature twin-roller breaker, respectively. The PLC centralized control system is electrically connected to the twin-shaft shredder, the disc separator, the buffer silo, the vibrating feeder, the wire separator, the first twin-roller magnetic separator, the second twin-roller magnetic separator, the granule buffer silo, the third twin-roller magnetic separator, the low-temperature twin-roller breaker, the main vibrating screen, and the three-roller magnetic separator, respectively, for automated linkage control and overload automatic shutdown alarm.
Citation Information
Patent Citations
Process for producing rubber powder by utilizing junked tires
CN104002394A
Waste tire resource recovery processing system facing large-scale customization
CN106391658A
Waste tire resource recycling pretreatment process and environment-friendly treatment system thereof
CN118205134A
Tire hydraulic drawing machine
CN201399843Y