A cluster control and management system and method for level crossings during railway track laying stage

Through a cluster control system at the level crossing, train, and server ends, vehicle and train information is monitored in real time, and the opening and closing of level gates are managed automatically. This solves the problems of low efficiency and high safety hazards of manual identification at level crossings during the railway track laying construction phase, and improves construction safety and efficiency.

CN123104737APending Publication Date: 2026-11-17CHINA RAILWAY FIRST GROUP CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611536132.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-30
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

The management of level crossings during the railway track laying construction phase suffers from low efficiency and significant safety hazards due to manual identification, a high risk of construction vehicles competing with trains for track space, and a lack of intelligent management, leading to frequent potential safety accidents.

Method used

A cluster control system is adopted at the level crossing end, train end, and server end. The license plate recognition and train positioning subsystem monitors vehicle and train information in real time, and the server-side data processing subsystem determines the gate opening and closing commands to achieve automated management.

Benefits of technology

This improved the intelligence level of level crossings, reduced safety hazards caused by human error and delayed operations, and ensured the safety and efficiency of the construction process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123104737A_ABST
    Figure CN123104737A_ABST
Patent Text Reader

Abstract

This invention discloses a cluster control and management system and method for level crossings during railway track laying, including a level crossing end, a train end, and a server end. Multiple level crossing ends and multiple train ends are communicatively connected to the server end. The level crossing end includes a lifting control subsystem, a data transmission subsystem, and a license plate recognition subsystem. The train end includes a train positioning subsystem. The server end includes a level crossing management subsystem, a data processing subsystem, and a data storage subsystem. The train positioning subsystem collects train approach information; the license plate recognition subsystem collects vehicle structure information; and the data processing subsystem periodically reads train information from the data storage subsystem and receives vehicle structure information. This invention monitors train approach information and vehicle structure information in real time through the data processing subsystem and determines whether to open the barrier gate based on the level crossing conditions and a vehicle whitelist. This solves the problem of low manual recognition rates, which easily leads to construction vehicles and trains competing for track at level crossings, and avoids potential safety hazards.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of rail transit technology, and in particular to a cluster control and management system and method for level crossings during the railway track laying stage. Background Technology

[0002] Currently, during the railway track laying phase, level crossings are managed manually for vehicle passage. This manual management method requires two managers to rotate at each crossing, using signal flags for direction. This method is outdated. While some level crossings have installed vehicle barriers to replace signal flags, manual control is still used to direct vehicle passage, posing significant safety hazards. Specifically: First, because level crossings are located at the construction site boundary, personnel and vehicles can pass freely without proper management measures or methods. Second, it is difficult to distinguish between construction vehicles and other vehicles, resulting in low efficiency for manual identification. Third, when locomotives pass through the crossing, relying solely on visual identification to intercept passing vehicles leads to a low safety guarantee. Finally, the use of manual barrier control is prone to delays and staff absences, potentially leading to safety accidents.

[0003] In addition, most railway crossings during construction currently lack interception measures, making it easy for construction vehicles and trains to compete for the tracks, posing safety hazards. In previous track-laying projects, there have been numerous cases of collisions between vehicles, livestock, or pedestrians at level crossings. The use of manual control of level gates, including single and double gates, increases the operational difficulty for on-site personnel. In particular, when operators temporarily leave the site, eat, or rest at night, the level crossings are not effectively monitored, making accidents more likely. Therefore, there is an urgent need to implement reduced-staff and intelligent management of level crossings. Summary of the Invention

[0004] The purpose of this invention is to overcome the shortcomings of the prior art and provide a cluster control and management system and method for railway track laying stage level crossings. The system collects vehicle structure information through a license plate recognition subsystem at the level crossing, and a positioning subsystem on the track laying train periodically collects and uploads the track laying train's position information. The data processing subsystem on the server side monitors the train's approach distance to the level crossing and vehicle structure information in real time, and determines whether to open the barrier gate based on the level crossing conditions and the vehicle whitelist. This solves the problem of low manual recognition rate, which easily leads to construction vehicles and trains competing for the road at level crossings, and avoids potential safety hazards.

[0005] To achieve the above objectives, the technical solution adopted by the present invention is: a railway track-laying stage level crossing cluster control and management system, comprising: a level crossing end, a train end, and a server end, wherein there are multiple level crossing ends and multiple train ends, all of which are communicatively connected to the server end. Each level crossing end includes a lifting control subsystem, a data transmission subsystem, and a license plate recognition subsystem. Each train end includes a train positioning subsystem. The server end includes a level crossing management subsystem, a data processing subsystem, and a data storage subsystem. The train positioning subsystem is used to collect train approach information and send the train approach information to the level crossing management subsystem. The level crossing management subsystem stores the received train approach information in the data storage subsystem. The license plate recognition subsystem is used to collect vehicle structure information of entering and exiting vehicles and send the vehicle structure information to the data transmission subsystem. The data processing subsystem is used to periodically read train information from the data storage subsystem and receive vehicle structure information sent by the data transmission subsystem, so that the data processing subsystem can send switching commands to the lifting control subsystem based on the train information and vehicle structure information.

[0006] Preferably, the train positioning subsystem is installed on the track-laying construction train and sends train approach information to the level crossing management subsystem at equal time intervals; the lifting control subsystem and the license plate recognition subsystem are installed at the level crossing, and both the lifting control subsystem and the license plate recognition subsystem are communicatively connected to the data transmission subsystem, which is communicatively connected to the data processing subsystem. The lifting control subsystem is also connected to the lifting motor to facilitate the control of the lifting motor.

[0007] Preferably, the level crossing management subsystem configures at least one level crossing information, each level crossing information including at least a level crossing number, level crossing name, level crossing installation latitude and longitude, level crossing installation mileage, a first associated lifting control mechanism, a second associated lifting control mechanism, a first associated license plate recognizer, and a second associated license plate recognizer. The level crossing management subsystem stores the level crossing information in a data storage subsystem. The level crossing management subsystem also configures at least one train information, the train information including at least a train number and a train terminal network number. The level crossing management subsystem stores the train information in a data storage subsystem. The train approach information includes the train number, latitude and longitude coordinates, train speed, and direction of travel. The vehicle structure information includes the license plate number, vehicle direction of travel, and vehicle photograph. The switch commands include the motor operating mode and switch status.

[0008] Preferably, the data processing subsystem determines the relative position change between the train and the level crossing based on the train approach information; based on the relative position change, if it is determined that the train is approaching the level crossing, then it is determined that the train is heading towards the level crossing.

[0009] Preferably, the data processing subsystem determines the road and direction of travel of the motor vehicle based on the vehicle structure information; if it is determined that the motor vehicle is approaching a level crossing based on the road and direction of travel, then it is determined that the motor vehicle is heading towards the level crossing; the data processing subsystem determines whether the motor vehicle has the conditions to pass; if the motor vehicle has the conditions to pass, the data processing subsystem sends an open lift command to the lift control subsystem through the data transmission subsystem; otherwise, the data processing subsystem sends a close lift command to the lift control subsystem through the data transmission subsystem.

[0010] Preferably, the passage conditions include: there are no other trains traveling within 2km of the level crossing in the direction of the level crossing, and the vehicle structure information collected by the license plate recognition subsystem is in the vehicle whitelist of the data storage subsystem.

[0011] Preferably, the data processing subsystem determines the relative position change between the train and the level crossing based on the train approach information; if it is determined that the train is leaving the level crossing based on the relative position change, then the data processing subsystem determines that the train is leaving the level crossing; the data processing subsystem sends an opening command for the lift to the lifting control subsystem through the data transmission subsystem according to a preset waiting time.

[0012] Preferably, the data processing subsystem determines the road and direction of travel of the motor vehicle based on the vehicle structure information; if it is determined that the motor vehicle is leaving the level crossing based on the road and direction of travel, then the data processing subsystem determines that the motor vehicle is leaving the level crossing; the data processing subsystem sends a command to close the lift to the lift control subsystem through the data transmission subsystem according to a preset waiting time.

[0013] This invention also discloses a management method for a level crossing cluster control and management system during the railway track laying stage, comprising: collecting train approach information and sending the train approach information to a level crossing management subsystem; the level crossing management subsystem storing the received train approach information to a data storage subsystem; collecting vehicle structure information of entering and exiting vehicles and sending the vehicle structure information to a data transmission subsystem; periodically reading train information from the data storage subsystem and receiving vehicle structure information sent by the data transmission subsystem; and sending a switching command to a lifting control subsystem based on the train information and vehicle structure information.

[0014] Compared with the prior art, the present invention has the following advantages:

[0015] 1. This invention collects vehicle structure information through a license plate recognition subsystem at the level crossing, and a positioning subsystem on the track-laying train periodically collects and uploads the track-laying train's location information. The data processing subsystem on the server side monitors the train's approach distance to the level crossing and vehicle structure information in real time, and determines whether to open the barrier gate based on the level crossing conditions and the vehicle whitelist. This solves the problem of low manual recognition rate, which easily leads to construction vehicles and trains competing for the road at level crossings, and avoids potential safety hazards.

[0016] 2. This invention achieves cluster control of level crossings and trains by deploying level crossing terminals at level crossings and train terminals on track-laying trains, and simultaneously connecting multiple level crossing terminals and multiple train terminals through a server terminal. This improves the level of railway intelligence and solves the problem of ineffective supervision of level crossings when operators temporarily leave the site, have meals, or rest.

[0017] 3. This invention opens the barrier after a preset time has elapsed since the track-laying train passed through it, ensuring that the train is completely out of the level crossing's influence area. This effectively avoids interference accidents caused by misjudgment or premature opening of the lifting device, eliminates safety hazards and traffic obstruction caused by untimely manual operation or delayed judgment, and significantly improves the intelligence level and traffic safety of level crossing management.

[0018] The present invention will now be described in further detail with reference to the accompanying drawings and embodiments. Attached Figure Description

[0019] Figure 1 This is a schematic diagram of the composition of the cluster control and management system of the present invention;

[0020] Figure 2 This is a flowchart of the cluster control and management system of the present invention. Detailed Implementation

[0021] like Figure 1 , Figure 2 As shown, the railway track laying stage level crossing cluster control and management system of the present invention includes: a level crossing end, a train end, and a server end. There are multiple level crossing ends and multiple train ends, and all multiple level crossing ends and multiple train ends are communicatively connected to the server end. Each level crossing end includes a lifting control subsystem 13, a data transmission subsystem 14, and a license plate recognition subsystem 15. Each train end includes a train positioning subsystem 16. The server end includes a level crossing management subsystem 17, a data processing subsystem 18, and a data storage subsystem 19.

[0022] The level crossing end is deployed at level crossings during the railway track laying stage to collect data on passing motor vehicles and perform level crossing lifting control; the train end is deployed on the running trains during the railway track laying stage to acquire and report the train's dynamic position information; the server end is deployed in the monitoring center to centrally summarize, store, analyze, and output control commands for data from multiple level crossing ends and multiple train ends.

[0023] The train positioning subsystem 16 is used to collect train approach information 22 and send the train approach information 22 to the level crossing management subsystem 17. The level crossing management subsystem 17 stores the received train approach information 22 to the data storage subsystem 19.

[0024] The license plate recognition subsystem 15 is used to collect vehicle structure information 20 of vehicles entering and exiting, and send the vehicle structure information 20 to the data transmission subsystem 14;

[0025] The data processing subsystem 18 is used to periodically read train information from the data storage subsystem 19 and receive vehicle structure information 20 sent by the data transmission subsystem 14, so that the data processing subsystem 18 can send a switch command 21 to the lifting control subsystem 13 according to the train information and vehicle structure information 20.

[0026] Train approach information 22 includes a dataset of the train's current position coordinates and travel status, used to characterize the relative spatial relationship between the train and the level crossing; vehicle structure information 20 is used to provide identification credentials for vehicles waiting to pass; switch command 21 is control information generated by the server and sent to the level crossing, used to drive the level crossing lifting mechanism to perform opening or closing actions; the level crossing, train, and server are connected via a wireless communication network; the train positioning subsystem 16 can be installed in the train cab, collecting train approach information 22 through the train's built-in GPS sensors or manually triggered by the operator, and sending the train approach information 22 to the level crossing management subsystem 17; after receiving the train approach information 22, the level crossing management subsystem 17 stores it in the data storage subsystem 19; the license plate recognition subsystem 15 is deployed on the level crossing. On both sides of the level crossing, optical cameras are used to capture license plate images of vehicles entering and exiting, extract vehicle structure information 20, and send it to the data processing subsystem 18 via the data transmission subsystem 14. The data processing subsystem 18 reads the train data stored in the data storage subsystem 19 at a fixed frequency, and simultaneously receives the vehicle structure information 20 sent by the data transmission subsystem 14. The fixed frequency can be once every 1 second, or once every 2 seconds or 3 seconds, depending on the site conditions. The data processing subsystem 18 processes the timestamp and location data of the vehicle structure information 20 and the train approach information 22 stored in the data storage subsystem 19. When it is determined that the train is within the set range, a switch command 21 is sent to the lifting control subsystem 13 via the data transmission subsystem 14, and the lifting control subsystem 13 triggers the lifting motor to operate.

[0027] By constructing a cluster communication architecture at the level crossing, train, and server ends, centralized interaction and collaborative processing of vehicle information and engineering train operation status at level crossings were achieved. This ensured the timeliness and automation of level crossing opening and closing control when trains passed, eliminated blind spots and risks of absenteeism in manual supervision, and improved the management efficiency and safety protection level of level crossings during railway track laying construction.

[0028] The train positioning subsystem 16 is installed on the track-laying construction train and sends train approach information 22 to the level crossing management subsystem 17 at equal time intervals; the lifting control subsystem 13 and the license plate recognition subsystem 15 are installed at the level crossing, and both the lifting control subsystem 13 and the license plate recognition subsystem 15 are communicatively connected to the data transmission subsystem 14. The data transmission subsystem 14 is communicatively connected to the data processing subsystem 18. The lifting control subsystem 13 is also connected to the lifting motor to facilitate the control of the lifting motor.

[0029] The train positioning subsystem 16, as the sensing unit at the train end, can be deployed in the head of the track-laying construction train or in the on-board electrical cabinet to facilitate real-time capture of the train's dynamic operating status. The train positioning subsystem 16 can use Beidou satellite positioning modules, GPS positioning modules, etc., to ensure continuous acquisition of the train's high-precision spatial position in complex construction environments. The time-interval transmission can be set by triggering a timer, and the transmission interval can be adjusted according to the train's running speed to ensure data timeliness while reasonably controlling the communication load. The lifting control subsystem 13 and the license plate recognition subsystem 15, as the execution unit and sensing unit at the level crossing end, are deployed on the columns, housings, or gantry facilities on both sides of the level crossing. The license plate recognition subsystem 15 is used to capture optical images of motor vehicles entering and exiting the level crossing in real time. The lifting control subsystem 13 is connected to the lifting motor of the level crossing barrier equipment and directly drives the lifting motor to perform lifting and lowering actions by outputting forward and reverse drive signals.

[0030] This application utilizes a train positioning subsystem 16 deployed on track-laying construction trains to continuously synchronize train approach status with the server at fixed time intervals, ensuring the continuity and reliability of the server's spatial position perception of construction trains across the entire line. Furthermore, by deploying a license plate recognition subsystem 15, a lifting control subsystem 13, and a data transmission subsystem 14 at level crossings, it achieves rapid uploading of environmental perception data at the crossing and efficient dissemination of lifting motor drive control, effectively overcoming the safety risks caused by traditional manual monitoring due to limited visibility, delayed communication, or absenteeism, and improving the automation level and response accuracy of track-laying construction level crossing management.

[0031] The level crossing management subsystem 17 is configured with at least one level crossing information. Each level crossing information includes at least the level crossing number, level crossing name, level crossing installation latitude and longitude, level crossing installation mileage, first associated lifting control mechanism, second associated lifting control mechanism, first associated license plate recognition device, and second associated license plate recognition device. The level crossing management subsystem 17 stores the level crossing information in the data storage subsystem 19.

[0032] Each level crossing is given a unique logical identifier through its level crossing number and name; the level crossing installation latitude and longitude and the level crossing installation mileage provide a dual geospatial reference; the first associated lifting control mechanism and the second associated lifting control mechanism correspond to the lifting barrier devices deployed on both sides of the level crossing; the first associated license plate recognition device and the second associated license plate recognition device correspond to the license plate recognition subsystem 15 deployed in both directions of the level crossing; the configuration of level crossing information can be manually entered and bound through the visual management interface provided by the level crossing management subsystem 17, and then stored in the database of the data storage subsystem 19 to establish a precise mapping relationship between the level crossing spatial coordinates and the control nodes.

[0033] The level crossing management subsystem 17 is also configured with at least one train information, which includes at least a train number and a train terminal network number. The level crossing management subsystem 17 stores the train information in the data storage subsystem 19.

[0034] The train number is a unique ID for the train. Train information can be statically registered and assigned during system initialization through the level crossing management subsystem 17, which facilitates the establishment of a safe and reliable data interaction channel between the train end and the server end. The level crossing management subsystem 17 is connected to the data storage subsystem 19 to configure level crossing information and train information, and to display the status of each level crossing lifting controller and the latest vehicle entry and exit information.

[0035] The train approach information 22 includes the train number, latitude and longitude coordinates, train speed, and direction of travel;

[0036] Train number is used to establish the association between dynamic data and static train information; latitude and longitude coordinates are used to reflect the absolute spatial position of the train in real time; train speed and direction of travel together constitute the train's motion vector; during train operation, the train positioning subsystem 16 collects the train's position coordinates, instantaneous heading angle and speed of travel in real time, and sends them to the level crossing management subsystem 17 at preset time intervals.

[0037] The vehicle structure information 20 includes the license plate number, vehicle direction of travel, and vehicle photograph;

[0038] Vehicle structure information 20 is used to characterize the identity attributes of engineering vehicles passing through level crossings in multiple dimensions. The license plate number is used to provide identification. The vehicle's direction of travel is used to determine whether the motor vehicle is entering or exiting the level crossing. The vehicle photo is used to provide vehicle appearance image data.

[0039] The switching command 21 includes the motor operating mode and the switching status.

[0040] The motor operating modes include forward rotation lifting mode, reverse rotation lowering mode, emergency stop lock mode, etc. The switch status is used to clearly indicate the target closed or open state of the lifting mechanism.

[0041] The data processing subsystem 18 determines the relative position change between the train and the level crossing based on the train approach information 22;

[0042] Based on the change in relative position, if it is determined that the train is approaching the level crossing, then it is determined that the train is heading towards the level crossing.

[0043] Based on the train approach information 22, the relative position change between the train and the level crossing is determined, and it is determined that the train is approaching the level crossing. In one possible embodiment, the data processing subsystem 18 continuously extracts the train's spatial positioning coordinates received in adjacent time sequences and calculates the geometric distance difference between the positioning coordinates and the latitude and longitude coordinates of the level crossing. When the distance difference at multiple consecutive time nodes shows a monotonically decreasing trend, it is determined that the train is approaching the level crossing. In another possible embodiment, the data processing subsystem 18 analyzes the current motion vector direction of the train and performs projection angle calculation between it and the line vector connecting the train to the level crossing. When the angle is within the acute angle range and the relative displacement shows a convergence state, it is determined that the train is approaching the level crossing.

[0044] The data processing subsystem 18 determines the road and direction of travel of the motor vehicle based on the vehicle structure information 20;

[0045] Based on the road and direction of travel of the motor vehicle, if it is determined that the motor vehicle is approaching a level crossing, then it is determined that the motor vehicle is heading towards the level crossing.

[0046] Based on the vehicle structure information 20, the road and direction of travel of the motor vehicle are determined and it is determined that the motor vehicle is approaching the level crossing. The license plate recognition subsystem 15 continuously collects the vehicle structure information 20. The data processing subsystem 18 performs spatial mapping comparison between the vehicle photos captured by the camera components of different orientations in the license plate recognition subsystem 15 and the pre-made level crossing topology map, thereby accurately locking the positional relationship between the motor vehicle and the train track.

[0047] The data processing subsystem 18 determines whether the motor vehicle has the conditions to pass; if the motor vehicle has the conditions to pass, the data processing subsystem 18 sends an open lift command to the lift control subsystem 13 through the data transmission subsystem 14; otherwise, the data processing subsystem 18 sends a close lift command to the lift control subsystem 13 through the data transmission subsystem 14.

[0048] The conditions for passing include: there are no other trains traveling within 2km of the level crossing in the direction of the level crossing, and the vehicle structure information 20 collected by the license plate recognition subsystem 15 is in the vehicle whitelist list of the data storage subsystem 19.

[0049] When determining whether a motor vehicle is eligible to pass, the data processing subsystem 18 first checks whether there are other track-laying trains within 2km of the level crossing to prevent accidents caused by track-laying trains crossing with motor vehicles. In one possible embodiment, each track-laying train is equipped with a positioning terminal and sends its approach information 22 to the level crossing management subsystem 17 at preset time intervals. The road management subsystem 17 stores the approach information 22 in the data storage subsystem 19. The data processing subsystem 18 reads the latitude and longitude positioning data of each track-laying train stored in the data storage subsystem 19 at preset time intervals and dynamically calculates the distance between each track-laying train and the level crossing based on the current geographical coordinates of the level crossing and the line topology, thereby determining whether there are other track-laying trains in motion within 2km of the level crossing. Then, the data processing subsystem 18 checks whether the vehicle structure information 20 is in the vehicle whitelist of the data storage subsystem 19 to facilitate identity verification of ground vehicles at the level crossing and ensure the safety of the construction area. To ensure compliance and controllability of traffic flow, in one possible embodiment, the data storage subsystem 19 pre-configures and stores a database table containing license plate numbers of authorized construction vehicles as a vehicle whitelist. The license plate recognition subsystem 15 uses a high-definition camera to capture images of passing vehicles and extract license plate information. The data processing subsystem 18 compares and verifies the extracted license plate number with the vehicle whitelist to determine whether the vehicle is on the whitelist. In another optional embodiment, the vehicle whitelist is pre-stored in the data storage subsystem 19. The vehicle whitelist records a multi-dimensional feature set of authorized vehicles, such as license plate number, body color, and vehicle structure. The license plate recognition subsystem 15 collects vehicle structure information 20, and the data processing subsystem 18 matches the collected vehicle structure information 20 with the vehicle whitelist in the data storage subsystem 19 to verify the vehicle's identity. If there are no other track-laying trains approaching within 2km of the level crossing, and the collected vehicle structure information 20 is on the vehicle whitelist, then the vehicle is allowed to pass.

[0050] When a motor vehicle is ready to pass, the data processing subsystem 18 sends an open lift command to the lift control subsystem 13 via the data transmission subsystem 14. At the same time, it updates the data storage subsystem 19 to show that the barrier gate at the level crossing is in the open state. After receiving the open lift command, the lift control subsystem 13 first determines whether the lift motor is in the open state. If it is, the lift control subsystem 13 does not execute the open lift command; otherwise, the lift control subsystem 13 sends an open barrier gate signal to the lift mechanism, causing the lift mechanism to control the barrier gate to open, allowing the motor vehicle to pass.

[0051] When a motor vehicle does not meet the crossing conditions, i.e., no other track-laying trains are approaching within 2km of the level crossing and vehicle structure information 20 is in the vehicle whitelist, at least one condition is not met. If vehicle structure information 20 is not in the vehicle whitelist, the data processing subsystem 18 sends a command to close the lift mechanism to the lifting control subsystem 13 via the data transmission subsystem 14, and simultaneously updates the gate of the level crossing in the data storage subsystem 19 to be in the closed state. After receiving the command to close the lift mechanism, the lifting control subsystem 13 first determines whether the lifting motor is in the closed state. If it is, the lifting control subsystem 13 does not execute the command to close the lift mechanism; otherwise, the lifting control subsystem 13 sends a signal to the lifting mechanism to close the gate, causing... The lifting mechanism controls the gate to close, prohibiting the vehicle from passing. If the vehicle structure information 20 is in the vehicle whitelist, but another track-laying train enters the level crossing within 2km, the current vehicle continues to wait. The data processing subsystem 18 continuously reads the train approach information 22 of the entering track-laying train from the data storage subsystem 19. After the entering track-laying train leaves the level crossing, the data processing subsystem 18 continues to determine whether there are other track-laying trains entering the level crossing within 2km. If not, it sends an open lifting device command to the lifting control subsystem 13 through the data transmission subsystem 14 and updates the gate of the level crossing in the data storage subsystem 19 to the open state. Otherwise, the current vehicle continues to wait.

[0052] By effectively combining the safety status of the surrounding environment of the level crossing with the access permissions of passing vehicles, a dual safety constraint judgment mechanism is formed. First, it limits the distance to no other track-laying trains within 2km of the level crossing in the direction of the level crossing. This can proactively isolate the impact of potential motor vehicles in the surrounding area before the track-laying train approaches the level crossing, preventing the track-laying train from being stuck in the track area of ​​the level crossing due to untimely avoidance or blind spots, thus eliminating the risk of collision between track-laying trains and construction motor vehicles. Second, it compares and verifies the vehicle structure information 20 collected by the license plate recognition subsystem 15 with the vehicle whitelist list pre-stored in the data storage subsystem 19, making the legality and compliance of the vehicle a prerequisite for the level crossing to allow passage, and preventing unrelated external vehicles and unauthorized engineering vehicles from arbitrarily entering the level crossing and causing blind spots in the control. This improves the active defense capability and automated control reliability of the level crossing during the train approach process, ensuring the safe and efficient operation of the level crossing cluster control during the railway track-laying stage.

[0053] The data processing subsystem 18 determines the relative position change between the train and the level crossing based on the train approach information 22;

[0054] Based on the change in relative position, if it is determined that the train is leaving the level crossing, then it is determined that the train is leaving the level crossing.

[0055] In one possible embodiment, the data processing subsystem 18 calculates the real-time Euclidean distance or straight-line distance sequence between the train's latitude and longitude coordinates and the level crossing's reference latitude and longitude coordinates based on multiple continuously received time nodes. When the distance sequence shows a continuous increasing trend, it is determined that the train is moving away from the level crossing, i.e., the train is leaving the level crossing. In another possible embodiment, the data processing subsystem 18 combines the train's speed and direction vector in the train approach information 22 and projects it onto the railway line mileage axis. By calculating the relative displacement change trend of the train relative to the level crossing's installation mileage, it accurately determines whether the train is moving away from the level crossing, thereby accurately determining that the train is leaving the level crossing.

[0056] The data processing subsystem 18 sends an opening command for the lift to the lifting control subsystem 13 via the data transmission subsystem 14 according to a preset waiting time.

[0057] The preset waiting time is used to provide a delay buffer for actions after the train is determined to have departed. In one possible embodiment, the preset waiting time is a fixed safety time threshold pre-configured by the system. After the train is determined to have departed, a timer is started, and the command to open the elevator is triggered when the countdown ends. In another possible embodiment, the preset waiting time is a variable delay amount dynamically calculated by the data processing subsystem 18 based on the real-time speed of the train and the current train body length or number of trains. For example, the waiting time is dynamically generated based on the ratio of train length to train speed and the set safety redundancy margin. When the waiting time is met, the data processing subsystem 18 sends the command to open the elevator to the corresponding elevator control subsystem 13 through the data transmission subsystem 14.

[0058] The data processing subsystem 18 analyzes the train approach information 22 in real time to accurately capture the dynamic divergence changes in the relative position between the train and the level crossing, thereby accurately identifying the dynamic stage when the train has completely passed the level crossing. After determining that the train has left, the system combines a preset waiting time to perform a delayed opening control, realizing automated and precise management of the safe opening of the level crossing after the train has passed.

[0059] The data processing subsystem 18 determines the road and direction of travel of the motor vehicle based on the vehicle structure information 20;

[0060] Based on the road and direction of travel of the motor vehicle, if it is determined that the motor vehicle is leaving the level crossing, then it is determined that the motor vehicle is leaving the level crossing.

[0061] In one possible embodiment, the data processing subsystem 18 determines the positional relationship between the motor vehicle and the geometric center of the level crossing based on the vehicle structure information 20. When the vehicle photo and the vehicle's direction of travel in the vehicle structure information 20 are the rear of the vehicle, it is determined that the motor vehicle is leaving.

[0062] The data processing subsystem 18 sends a command to shut down the elevator to the lifting control subsystem 13 via the data transmission subsystem 14 according to a preset waiting time.

[0063] The preset waiting time provides sufficient time for the motor vehicle to completely leave the crossing clearance. In one possible embodiment, the preset waiting time is a fixed safety delay threshold stored in the data storage subsystem 19. After the data processing subsystem 18 confirms that the motor vehicle has left, it triggers the start of the internal timer and sends a command to close the lift to the lift control subsystem 13 through the data transmission subsystem 14 when the timer ends.

[0064] The data processing subsystem 18 calculates vehicle structure information 20 in real time, which facilitates accurate capture of the dynamic process of motor vehicles leaving the level crossing. After the motor vehicle leaves, it performs delayed closing control in combination with a preset waiting time to ensure that the motor vehicle is completely out of the level crossing's influence area before performing the closing action. This effectively avoids interference accidents caused by misjudgment or premature closing of the lift, and significantly improves the intelligence level and traffic safety of level crossing management.

[0065] The management methods of the railway track-laying stage level crossing cluster control management system include:

[0066] Collect train approach information 22 and send the train approach information 22 to the level crossing management subsystem 17;

[0067] The level crossing management subsystem 17 stores the received train approach information 22 into the data storage subsystem 19;

[0068] Collect vehicle structure information 20 of vehicles entering and exiting, and send the vehicle structure information 20 to the data transmission subsystem 14;

[0069] The system reads train information from the data storage subsystem 19 at intervals and receives vehicle structure information 20 from the data transmission subsystem 14.

[0070] Based on the train information and vehicle structure information 20, a switching command 21 is sent to the lifting control subsystem 13.

[0071] The train positioning subsystem 16 sends the collected train approach information 22 to the level crossing management subsystem 17 at equal intervals. The level crossing management subsystem 17 converts the latitude and longitude coordinates in the train approach information 22 into mileage and stores it in the data storage subsystem 19. The data processing subsystem 18 reads the train information from the data storage subsystem 19 at preset time intervals. At the same time, the data processing subsystem 18 receives the vehicle structure information 20 sent by the data transmission subsystem 14, which facilitates the data processing subsystem 18 to grasp the real-time relative movement of railway construction trains and passing motor vehicles at the level crossing. Then, it sends a switch command 21 to the lifting control subsystem 13 through the data transmission subsystem 14. This overcomes the problems of absenteeism, slow response and misjudgment that exist in traditional manual duty, eliminates the safety hazards of construction motor vehicles and track laying trains competing for the track, and improves the reliability and automation level of the clustered management of level crossings during the railway track laying stage.

[0072] The passing condition is the standard for judging whether a level crossing is safe to pass. Before a motor vehicle passes through the level crossing, it must first ensure that no other track-laying trains are approaching within 2km of the level crossing, and that the vehicle structure information 20 is in the vehicle whitelist. Otherwise, the motor vehicle does not meet the passing condition.

[0073] In a railway track-laying construction area, multiple level crossing terminals are arranged along the railway line. Train terminals are installed on the track-laying trains operating on the line. Both the level crossing terminals and the train terminals are connected to a server via a network. The server's level crossing management subsystem 17 configures level crossing information and train information, and stores this information in the data storage subsystem 19. After train A departs, the train positioning subsystem 16 installed on train A collects train approach information 22 at fixed time intervals and sends it to the level crossing management subsystem 17. The level crossing management subsystem 17 stores the received train approach information 22 in the data storage subsystem 19. When a motor vehicle approaches level crossing A, the license plate recognition subsystem installed at level crossing A... 15. Collect vehicle structure information 20 of vehicles entering and exiting the station, and send the vehicle structure information 20 to the data transmission subsystem 14. The data transmission subsystem 14 then transmits the information to the data processing subsystem 18. The data processing subsystem 18 periodically reads the train approach information 22 from the data storage subsystem 19 and makes a comprehensive judgment based on the received vehicle structure information 20. The data processing subsystem 18 calculates the relative position change between train A and level crossing A based on the train approach information 22, and determines the real-time distance between train A and level crossing A and the travel trend of train A. When the data processing subsystem 18 detects that train A is approaching level crossing A and that train A is within a preset safe distance (e.g., 2 km) from level crossing A, the data processing subsystem 18... The data processing subsystem 18 determines that the conditions for passing motor vehicles on the highway are not met, and sends a command to close the lift gate to the lift control subsystem 13 at level crossing A via the data transmission subsystem 14. Upon receiving the command, the lift control subsystem 13 checks if the lift motor is in the off state. If so, it does not execute the closing command; otherwise, it sends a closing command to the lift motor, which then lowers and closes the barrier gate to intercept the motor vehicle. After train A passes level crossing A, the data processing subsystem 18 determines that train A is leaving level crossing A based on the train approach information 22. After a preset waiting time has elapsed, the data processing subsystem 18 again sends a command to open the lift gate to the lift control subsystem 13 via the data transmission subsystem 14. The command causes level crossing A to be released from control. If the data processing subsystem 18 determines that no train is approaching within 2km of level crossing A, and the vehicle structure information 20 collected by the license plate recognition subsystem 15 matches the vehicle whitelist in the data storage subsystem 19, then the conditions for highway motor vehicle passage are met. The data processing subsystem 18 sends an open lift command to the lifting control subsystem 13 through the data transmission subsystem 14. After receiving the open lift command, the lifting control subsystem 13 determines whether the lifting motor is in the open state. If it is, the open command is not executed; otherwise, the lifting control subsystem 13 sends an open command to the lifting motor, and the lifting motor controls the barrier gate to rise and open, facilitating the passage of motor vehicles.Through the data linkage between the train positioning subsystem 16 and the license plate recognition subsystem 15, the data processing subsystem 18 performs centralized analysis and conditional logic judgment on the multi-source data and sends the switch command 21 to control the lifting mechanism. This realizes the automated cluster control of multiple level crossings and multiple trains during the track laying stage, avoiding the lag and omissions that exist in manual vehicle identification and manual opening and closing of the gate.

[0074] The above description is merely a preferred embodiment of the present invention and does not constitute any limitation on the present invention. Any simple modifications, alterations, or equivalent structural transformations made to the above embodiments based on the technical essence of the present invention shall still fall within the protection scope of the present invention.

Claims

1. A railway track-laying phase-level crossing cluster control management system, characterized in that, include: The system comprises a level crossing end, a train end, and a server end. There are multiple level crossing ends and multiple train ends, all of which are communicatively connected to the server end. Each level crossing end includes a lifting control subsystem, a data transmission subsystem, and a license plate recognition subsystem. Each train end includes a train positioning subsystem. The server end includes a level crossing management subsystem, a data processing subsystem, and a data storage subsystem. The train positioning subsystem is used to collect train approach information and send the train approach information to the level crossing management subsystem. The level crossing management subsystem stores the received train approach information to the data storage subsystem. The license plate recognition subsystem is used to collect vehicle structure information of vehicles entering and exiting, and send the vehicle structure information to the data transmission subsystem; The data processing subsystem is used to periodically read train information from the data storage subsystem and receive vehicle structure information sent by the data transmission subsystem, so that the data processing subsystem can send switching commands to the lifting control subsystem based on the train information and vehicle structure information.

2. A railway track-laying phase-level crossing cluster control management system according to claim 1, characterised in that, The train positioning subsystem is installed on the track-laying construction train and sends train approach information to the level crossing management subsystem at regular time intervals. The lifting control subsystem and the license plate recognition subsystem are installed at the level crossing. Both the lifting control subsystem and the license plate recognition subsystem are communicatively connected to the data transmission subsystem. The data transmission subsystem is communicatively connected to the data processing subsystem. The lifting control subsystem is also connected to the lifting motor to facilitate the control of the lifting motor.

3. A railroad track phasing grade crossing cluster control management system according to claim 1 wherein, The level crossing management subsystem is configured with at least one level crossing information. Each level crossing information includes at least the level crossing number, level crossing name, level crossing installation latitude and longitude, level crossing installation mileage, first associated lifting control mechanism, second associated lifting control mechanism, first associated license plate recognition device, and second associated license plate recognition device. The level crossing management subsystem stores the level crossing information in the data storage subsystem. The level crossing management subsystem is also configured with at least one train information, which includes at least the train number and the train terminal network number. The level crossing management subsystem stores the train information in the data storage subsystem. The train approach information includes the train number, latitude and longitude coordinates, train speed, and direction of travel; The vehicle structure information includes license plate number, vehicle direction of travel, and vehicle photograph; The switching commands include the motor operating mode and the switching status.

4. A railroad track phasing grade crossing cluster control management system according to claim 1 wherein, The data processing subsystem determines the relative position change between the train and the level crossing based on the train approach information; Based on the change in relative position, if it is determined that the train is approaching the level crossing, then it is determined that the train is heading towards the level crossing.

5. A railway track-laying stage level crossing cluster control and management system according to claim 1, characterized in that, The data processing subsystem determines the road and direction of travel of the motor vehicle based on the vehicle structure information; Based on the road and direction of travel of the motor vehicle, if it is determined that the motor vehicle is approaching a level crossing, then it is determined that the motor vehicle is heading towards the level crossing. The data processing subsystem determines whether the motor vehicle meets the conditions for passage; if the motor vehicle meets the conditions for passage, the data processing subsystem sends an open lift command to the lift control subsystem through the data transmission subsystem; otherwise, the data processing subsystem sends a close lift command to the lift control subsystem through the data transmission subsystem.

6. A railway track-laying stage level crossing cluster control and management system according to claim 4 or 5, characterized in that, The conditions for passing include: there are no other trains traveling within 2km of the level crossing in the direction of the level crossing, and the vehicle structure information collected by the license plate recognition subsystem is in the vehicle whitelist of the data storage subsystem.

7. A railway track-laying stage level crossing cluster control and management system according to claim 4, characterized in that, The data processing subsystem determines the relative position change between the train and the level crossing based on the train approach information; Based on the change in relative position, if it is determined that the train is leaving the level crossing, then it is determined that the train is leaving the level crossing. The data processing subsystem sends an instruction to open the lift to the lifting control subsystem via the data transmission subsystem according to a preset waiting time.

8. A railway track-laying stage level crossing cluster control and management system according to claim 5, characterized in that, The data processing subsystem determines the road and direction of travel of the motor vehicle based on the vehicle structure information; Based on the road and direction of travel of the motor vehicle, if it is determined that the motor vehicle is leaving the level crossing, then it is determined that the motor vehicle is leaving the level crossing. The data processing subsystem sends a command to shut down the lift to the lifting control subsystem via the data transmission subsystem according to a preset waiting time.

9. The management method of the railway track laying stage level crossing cluster control and management system according to any one of claims 1-8, characterized in that, include: Collect train approach information and send the train approach information to the level crossing management subsystem; The level crossing management subsystem stores the received train approach information into the data storage subsystem; Collect vehicle structure information of vehicles entering and exiting, and send the vehicle structure information to the data transmission subsystem; It reads train information from the data storage subsystem at intervals and receives vehicle structure information from the data transmission subsystem. Based on train information and vehicle structure information, the system sends switching commands to the lifting control subsystem.