Bleed air temperature control system
By introducing a precooler and heat exchange design in the bleed air system, the problem of excessively low temperature of the actuating gas at the pneumatic valve was solved, improving the system's operational stability and reliability while reducing complexity and cost.
Patent Information
- Application Number
- CN202611419314.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-14
- Publication Date
- 2026-11-17
AI Technical Summary
In aircraft bleed air systems, excessively low temperatures of the actuating gas at pneumatic valves can lead to slower response speeds, reduced control precision, and potential icing, affecting the system's operational stability and reliability.
The system introduces a main exhaust gas pipeline, a cold side channel, and exhaust gas branches. The precooler exchanges heat with the cold side channel to cool the gas, while the exhaust gas branches exchange heat with the pneumatic pipeline to heat the actuating gas, thus avoiding water vapor condensation and freezing, and eliminating the need for additional electric heating devices.
It improves the stability and reliability of the bleed air temperature control system under extreme conditions such as low-temperature cruise, simplifies the system structure, reduces manufacturing costs, and reduces potential failure points.
Smart Images

Figure CN123104931A_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of bleed air system technology, and in particular to bleed air temperature control system. Background Technology
[0002] The cold-side air source for an aircraft engine bleed air system typically originates from the bleed air from its outer bypass fan. Therefore, the cold-side passage is usually located in a low-temperature hanging area. The temperature in this area fluctuates significantly due to environmental and flight conditions; during prolonged cruise flights in low-temperature environments, the temperature in this area can even drop below zero degrees Celsius. Furthermore, the cold-side passage often has pneumatic valves to regulate the airflow rate within it. However, if the actuating gas temperature is too low, it not only slows down the response speed of the pneumatic valves and reduces control accuracy, but it can also cause residual moisture inside the pneumatic lines to condense and freeze, blocking the lines or even causing the pneumatic valves to jam and fail, severely impacting the operational stability and reliability of the bleed air temperature control system. Summary of the Invention
[0003] Therefore, it is necessary to provide a bleed gas temperature control system to address the above problems, aiming to solve the problem of excessively low actuating gas temperature at the pneumatic valve and improve the working stability and reliability of the bleed gas temperature control system.
[0004] This application provides a bleed air temperature control system, including:
[0005] The bleed air main pipeline has a first inlet end configured to connect to the bleed air port of the engine compressor, a first outlet end configured to connect to the air consumption system, and a precooler provided in the bleed air main pipeline.
[0006] A cold-side channel is configured to exchange heat with the main bleed air pipeline via the precooler to cool the airflow flowing through the main bleed air pipeline, and the cold-side channel has a pneumatic valve configured to control the airflow rate of the cold-side airflow flowing through the cold-side channel; and
[0007] A bleed air branch, at least the second inlet end of the bleed air branch is connected to the main bleed air branch, and the second inlet end is located between the precooler and the first inlet end. The bleed air branch is configured to exchange heat with the pneumatic pipeline of the pneumatic valve to heat the actuating gas flowing through the pneumatic pipeline.
[0008] In one embodiment, the second outlet end of the bleed air branch is connected to the bleed air main branch.
[0009] In one embodiment, the second outlet end of the bleed air branch is located between the precooler and the first outlet end.
[0010] In one embodiment, the third inlet end of the pneumatic pipeline is connected to the main air intake pipeline, and the third inlet end is located downstream of the precooler.
[0011] In one embodiment, the second outlet end of the bleed air branch is connected to the bleed air main branch, the second outlet end is located between the precooler and the first outlet end, and the third inlet end is located downstream of the second outlet end.
[0012] In one embodiment, the pneumatic line is provided with a water vapor separator, which is configured to separate moisture from the actuating gas.
[0013] In one embodiment, the pneumatic pipeline has a regenerator, the exhaust gas branch exchanges heat with the pneumatic pipeline through the regenerator, and the regenerator is located downstream of the water vapor separator.
[0014] In one embodiment, the flow area of the bleed air branch is smaller than the flow area of the bleed air main branch.
[0015] In one embodiment, the bleed air temperature control system further includes a temperature detector and a controller, the controller being electrically connected to the temperature detector and the pneumatic valve, respectively. The temperature detector is configured to detect the outlet air temperature of the bleed air main pipeline, and the controller is configured to control the opening degree of the pneumatic valve according to the outlet air temperature, so as to control the airflow rate of the cold side airflow through the cold side channel.
[0016] In one embodiment, the temperature detector is configured as a temperature sensor; and / or,
[0017] The temperature detector is provided with the first outlet end; and / or,
[0018] The second outlet end of the bleed air branch is connected to the main bleed air branch, and the temperature detector is located between the second outlet end and the first outlet end.
[0019] The aforementioned bleed air temperature control system includes a main bleed air pipeline, a cold side passage, and bleed air branch lines. The first inlet end of the main bleed air pipeline is configured to connect to the engine compressor bleed air port, and the first outlet end of the main bleed air pipeline is configured to connect to the air consumption system. The main bleed air pipeline is equipped with a precooler. The cold side passage is configured to exchange heat with the main bleed air pipeline via the precooler to cool the airflow flowing through the main bleed air pipeline. The cold side passage has a pneumatic valve configured to control the airflow rate of the cold side airflow flowing through the cold side passage. The bleed air branch lines include at least one bleed air branch line. The second inlet end is connected to the main bleed air pipeline, and the second inlet end is located between the precooler and the first inlet end. The bleed air branch is configured to exchange heat with the pneumatic pipeline of the pneumatic valve, thereby effectively heating the actuating gas flowing through the pneumatic pipeline, so that the temperature of the actuating gas is raised to above the dew point temperature before reaching the pneumatic valve, effectively preventing water vapor in the actuating gas from condensing into liquid water or freezing, thereby ensuring the actuating valve's sensitivity, response speed and control accuracy, and significantly improving the working stability and reliability of the bleed air temperature control system under extreme conditions such as low temperature cruise.
[0020] Furthermore, since the second inlet of the bleed air branch is directly drawn from the high-temperature bleed air upstream of the precooler, its heat source temperature is sufficient and there is no need to add an additional electric heating device or independent heat source. Therefore, this application solves the problem of low-temperature condensation / icing of pneumatic pipelines without increasing the aircraft's power load, and there is no need to design complex heater automatic control and fault diagnosis logic. This greatly simplifies the system structure, reduces manufacturing costs, and reduces additional failure points introduced by electric heating components, which is conducive to improving the reliability of the system throughout its entire life cycle. Attached Figure Description
[0021] Figure 1 This is a schematic diagram of the bleed air temperature control system in one embodiment of this application.
[0022] Figure label:
[0023] 1. Bleed air temperature control system; 11. Bleed air main pipeline; 111. First inlet end; 112. First outlet end; 113. Precooler; 12. Cold side channel; 121. Pneumatic valve; 122. Pneumatic pipeline; 123. Third inlet end; 124. Third outlet end; 125. Water vapor separator; 126. Regenerator; 13. Bleed air branch; 131. Second inlet end; 132. Second outlet end; 14. Temperature detector; 15. Controller. Detailed Implementation
[0024] To make the above-mentioned objectives, features, and advantages of this application more apparent and understandable, the specific embodiments of this application are described in detail below with reference to the accompanying drawings. Many specific details are set forth in the following description to provide a thorough understanding of this application. However, this application can be implemented in many other ways different from those described herein, and those skilled in the art can make similar modifications without departing from the spirit of this application. Therefore, this application is not limited to the specific embodiments disclosed below.
[0025] In the description of this application, it should be understood that if terms such as "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential" appear, these terms indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, and are only for the convenience of describing this application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this application.
[0026] Furthermore, where the terms "first" and "second" appear, these terms are for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined with "first" or "second" may explicitly or implicitly include at least one of that feature. In the description of this application, where the term "multiple" appears, "multiple" means at least two, such as two, three, etc., unless otherwise explicitly specified.
[0027] In this application, unless otherwise expressly specified and limited, the terms "installation," "connection," "joining," and "fixing," etc., should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components, unless otherwise expressly limited. Those skilled in the art can understand the specific meaning of the above terms in this application based on the specific circumstances.
[0028] In this application, unless otherwise expressly specified and limited, the use of descriptions such as "above" or "below" the second feature indicates that the first and second features are in direct contact or indirect contact via an intermediate medium. Furthermore, "above," "on top of," and "over" the second feature can mean that the first feature is directly above or diagonally above the second feature, or simply that the first feature is at a higher horizontal level than the second feature. Similarly, "below," "below," and "under" the second feature can mean that the first feature is directly below or diagonally below the second feature, or simply that the first feature is at a lower horizontal level than the second feature.
[0029] It should be noted that if an element is referred to as being "fixed to" or "set on" another element, it can be directly on the other element or there may be an intervening element. If an element is considered to be "connected to" another element, it can be directly connected to the other element or there may be an intervening element. If so, the terms "vertical," "horizontal," "upper," "lower," "left," "right," and similar expressions used in this application are for illustrative purposes only and do not represent the only possible implementation.
[0030] The cold-side air source for an aircraft's engine bleed air system typically originates from the bleed air from its outer bypass fan. Therefore, the cold-side passage is usually located in a low-temperature mounting area. The temperature in this area fluctuates significantly due to environmental and flight conditions; during extended cruise flights in low-temperature environments, the temperature in this area can even drop below zero degrees Celsius. Furthermore, the cold-side passage often features pneumatic valves to regulate the airflow within it. These valves are driven by a dedicated actuating gas through pneumatic piping, thus controlling the airflow within the cold-side passage. Furthermore, the flow rate of pneumatic pipelines is often relatively small. Since the pneumatic valve is located in the low-temperature region along with the cold-side channel, the temperature of the actuating gas gradually decreases as it flows towards the actuating valve. As the small flow rate of actuating gas flows towards the actuating valve, its temperature will rapidly condense below the dew point, precipitating liquid water. This will cause the pneumatic valve to slow down its response speed and reduce its control accuracy. If the actuating valve is in a sub-zero environment after these water-gas mixtures reach it, ice crystals are very likely to form in the pneumatic pipeline, blocking the pipeline or even causing the actuating valve to jam and fail, seriously affecting the working stability and reliability of the bleed air temperature control system.
[0031] In the existing technology, in order to solve this problem, an electric heating device is often added to the surface of the pneumatic valve. However, this solution increases the power load of the aircraft and requires a large heating power. It also requires a series of additional designs such as automatic control and fault diagnosis of the heater. This not only increases the overall structural complexity and manufacturing cost of the system, but also increases the difficulty of subsequent maintenance and repair. At the same time, the additional electrical components will also bring more potential faults, which is not conducive to improving the overall reliability of the system.
[0032] In view of this, this application proposes a bleed gas temperature control system, which aims to solve the problem of excessively low actuating gas temperature at the pneumatic valve, improve the working stability and reliability of the bleed gas temperature control system, and control the overall complexity and cost of the bleed gas temperature control system.
[0033] See Figure 1 , Figure 1 This diagram illustrates the structure of a bleed air temperature control system 1 according to an embodiment of this application. The bleed air temperature control system 1 provided in this embodiment includes a main bleed air pipeline 11, a cold side channel 12, and a bleed air branch 13. The first inlet end 111 of the main bleed air pipeline 11 is configured to connect to the bleed air port of the engine compressor, and the first outlet end 112 of the main bleed air pipeline 11 is configured to connect to the air consumption system. The main bleed air pipeline 11 is equipped with a precooler 113. The cold side channel 12 is configured to connect to the main bleed air pipeline 11 through the precooler 113. 1. Heat exchange is performed to cool the airflow flowing through the main air intake pipe 11, and the cold side channel 12 has a pneumatic valve 121, which is configured to control the airflow rate of the cold side airflow flowing through the cold side channel 12; at least the second inlet end 131 of the air intake branch 13 is connected to the main air intake pipe 11, and the second inlet end 131 is located between the precooler 113 and the first inlet end 111. The air intake branch 13 is configured to exchange heat with the pneumatic pipe 122 of the pneumatic valve 121 to heat the actuating gas flowing through the pneumatic pipe 122.
[0034] Specifically, the bleed air main pipeline 11, as the core airflow channel of the entire bleed air temperature control system 1, is configured to transport the high-temperature, high-pressure bleed air introduced from the engine compressor bleed air inlet to downstream air-using systems (such as air conditioning components, wing anti-icing systems, or cabin pressurization systems in the aircraft environmental control system). Since the bleed air temperature at the engine compressor outlet typically far exceeds the safe temperature range that downstream air-using systems can withstand, it is essential to effectively cool this high-temperature bleed air during its transport. To this end, a precooler 113 is installed on the bleed air main pipeline 11. This precooler 113, as the main heat exchange unit, utilizes the low-temperature cold-side airflow provided by the cold-side channel 12 to cross-exchange heat with the high-temperature bleed air flowing through the bleed air main pipeline 11, thereby reducing the bleed air temperature to a preset target temperature range to ensure the normal operating conditions of downstream air-using systems and the thermal safety of pipeline accessories.
[0035] Furthermore, the cold-side channel 12 is used to circulate cold-side airflow. This cold-side airflow can originate from the bleed air of the aircraft engine's outer bypass duct (i.e., cryogenic gas from the outer bypass duct of a turbofan engine with a high bypass ratio), or it can be a separately provided ram air or other airborne cryogenic gas source. The cold-side channel 12 passes through the precooler 113 via thermal coupling (e.g., through a surface heat exchanger, tube-fin heat exchanger, or plate-fin heat exchanger), allowing the cold-side airflow flowing through the precooler 113 to exchange heat with the hot bleed air in the main bleed air pipe 11. The heated cold-side airflow then exits through the exhaust port of the cold-side channel 12 to the outside of the aircraft or into the engine exhaust area, thereby continuously removing heat from the bleed air and achieving real-time regulation of the bleed air temperature. It is worth noting that the specific structural form of the precooler 113 is not limited to the aforementioned surface or tube-fin structure. A compact and efficient heat exchange structure such as a stacked, corrugated plate, or microchannel type can also be selected according to the actual installation space and heat exchange requirements to achieve sufficient heat exchange efficiency within a limited hanging area.
[0036] The cold side channel 12 is equipped with a pneumatic valve 121, which can adjust the flow cross-sectional area of the cold side channel 12, thereby changing the flow rate of the cold side airflow passing through the precooler 113, and thus controlling the outlet temperature of the main air intake pipeline 11. Specifically, the actuating gas flows to the pneumatic valve 121 through the pneumatic pipeline 122 to drive the pneumatic valve 121 to move and control the opening degree of the pneumatic valve 121. Furthermore, to address the issue of excessively low temperatures or even freezing in the pneumatic pipeline 122, the bleed air branch 13 is connected to the main bleed air pipeline 11. The second inlet end 131 is located between the precooler 113 and the first inlet end 111 of the main bleed air pipeline 11, and can exchange heat with the pneumatic pipeline 122. That is, the second inlet end 131 directly draws high-temperature bleed air from upstream of the precooler 113, making the airflow in the bleed air branch 13 a high-temperature gas with a relatively high temperature. This effectively heats the actuating gas flowing through the pneumatic pipeline 122, raising its temperature above the dew point temperature before it reaches the pneumatic valve 121. This effectively prevents water vapor in the actuating gas from condensing into liquid water or freezing, thereby ensuring the actuation sensitivity, response speed, and control accuracy of the pneumatic valve 121. This significantly improves the working stability and reliability of the bleed air temperature control system 1 under extreme conditions such as low-temperature cruise.
[0037] Furthermore, since the second inlet end 131 of the bleed air branch 13 is directly drawn from the high-temperature bleed air upstream of the precooler 113, its heat source temperature is sufficient and there is no need to add an electric heating device or an independent heat source. Therefore, this application solves the problem of low-temperature condensation / icing of the pneumatic pipeline 122 without increasing the aircraft's power load, and there is no need to design complex heater automatic control and fault diagnosis logic. This greatly simplifies the system structure, reduces manufacturing costs, and reduces additional failure points introduced by the electric heating components, which is conducive to improving the reliability of the system throughout its entire life cycle.
[0038] Optionally, the heat exchange position between the induced draft branch 13 and the pneumatic pipeline 122 can be set as close as possible to the pneumatic valve 121. This shortens the distance the actuating gas travels through the low-temperature pipe section after heating, reducing the heat dissipation of the heated actuating gas in the low-temperature environment. This ensures that the actuating gas maintains sufficient temperature margin when it reaches the pneumatic valve actuator, further reducing the probability of condensation and icing, and maximizing the heating efficiency of the induced draft branch. In actual engineering design, the heat exchange position can be flexibly adjusted according to the overall routing of the pneumatic pipeline and the installation space of the hanging area, taking into account both heating effect and system integration requirements, achieving the design goal of anti-icing heating without changing the original main pipeline layout.
[0039] In one embodiment, the pneumatic pipeline 122 has a regenerator 126. An exhaust gas branch 13 exchanges heat with the pneumatic pipeline 122 through the regenerator 126. The exhaust gas branch 13 is arranged along the pipeline within the regenerator 126, forming a counter-current or co-current heat exchange structure with the pneumatic pipeline 122. The high-temperature exhaust gas in the exhaust gas branch 13 can continuously transfer heat to the actuating gas in the pneumatic pipeline 122 through the heat exchange wall of the regenerator 126. This achieves efficient heat exchange without altering the original flow paths of the two airflows. Furthermore, this heat exchange process requires no additional power input, relying entirely on the temperature difference of the exhaust gas itself to complete the heat transfer. The structure is simple and the heat exchange efficiency is stable. The regenerator 126 can be configured as a surface heat exchanger, a tube-fin heat exchanger, or a plate-fin heat exchanger, or it can be configured as a stacked, corrugated plate, or microchannel type, etc., compact and efficient heat exchange structure.
[0040] The second inlet end 131 can also be directly located at the first inlet end 111, that is, it can directly draw air from the engine compressor air intake port, and can also obtain a high-temperature air source that meets the heating requirements, adapting to the layout design and installation space limitations of different air intake main pipelines 11.
[0041] Optionally, the flow area of the bleed gas branch 13 is smaller than that of the bleed gas main line 11. This arrangement ensures that the bleed gas branch 13 can draw enough high-temperature bleed gas to heat the actuating gas, while avoiding the drawing of too much high-temperature bleed gas, which would affect the normal gas supply from the bleed gas main line 11 to the downstream gas system. At the same time, it avoids an unnecessary increase in the heat exchange load of the precooler 113, thus ensuring the overall efficiency of bleed gas temperature regulation.
[0042] To further reduce energy waste, in one embodiment, refer to Figure 1The second outlet end 132 of the induced draft branch 13 is connected to the induced draft main branch 11. That is, the heated induced draft gas after the induced draft branch 13 has completed heat exchange can be re-infused into the induced draft main branch 11. This avoids the energy waste caused by the direct discharge of high temperature induced draft gas and will not increase the overall gas supply load of the induced draft system. It makes full use of the heat and pressure energy of the induced draft gas itself and improves the overall energy utilization efficiency of the system.
[0043] Furthermore, the second outlet end 132 of the exhaust gas branch 13 is located between the precooler 113 and the first outlet end 112, that is, the second outlet end 132 of the exhaust gas branch 13 is located downstream of the precooler 113, so that the exhaust gas after heat exchange and cooling is returned to the exhaust gas main pipeline 11 to recover some heat and balance the total airflow of the system. When the exhaust gas after heat exchange and heating merges into the exhaust gas main pipeline 11, it will not have an additional impact on the temperature of the high-temperature exhaust gas upstream of the precooler 113, thus avoiding increasing the heat exchange burden of the precooler 113 and ensuring the working efficiency and temperature control capability of the precooler 113.
[0044] In other embodiments, the second outlet end 132 can also be selected with various suitable flow directions according to the actual system architecture and energy management requirements. For example, the second outlet end 132 of the bleed air branch 13 can be directly connected to the exhaust port of the cold side channel 12, so that the heat-exchanged airflow is discharged outside the engine along with the cold side airflow, thereby avoiding interference with the mainstream airflow of the bleed air main branch 11, and the hot airflow can be used to assist in anti-icing at the outlet of the cold side channel 12, reducing the risk of icing at the exhaust port. As another example, the second outlet end 132 of the bleed air branch 13 can also be connected to the low-pressure cavity in the engine nacelle or the mounting area, so as to use the waste heat of the hot airflow to locally heat the mounting area, help improve the low-temperature environment of the mounting area, and further improve the working reliability of the surrounding accessories under low-temperature conditions.
[0045] In some embodiments of this application, the third inlet end 123 of the pneumatic pipeline 122 is connected to the bleed air main pipeline 11, and the third inlet end 123 is located downstream of the precooler 113. That is, the gas source for the actuation gas required by the pneumatic valve 121 is not taken from a traditional independent gas supply pipeline, but is directly provided by the medium-temperature gas flow in the bleed air main pipeline 11 after being cooled by the precooler 113. Compared with the method of bleeding gas from upstream of the precooler 113, this design places the third inlet end 123 downstream of the precooler 113, so that the temperature of the actuation gas introduced into the pneumatic pipeline 122 has been initially adjusted to a relatively mild range by the precooler 113. This avoids the upstream ultra-high temperature gas directly acting on the pneumatic actuator of the pneumatic valve 121, which would cause its internal seals or elastic elements to age, deform or fail due to long-term excessive heat load. At the same time, it also avoids the low temperature environment in the cold side channel 12 area causing the temperature of the actuation gas to drop sharply below the dew point. More importantly, since the third inlet end 123 is located downstream of the precooler 113, the bleed air temperature there has been kept relatively stable by the real-time closed-loop regulation of the precooler 113 and the cold side channel 12. Therefore, the temperature fluctuation of the actuating gas introduced from there with the flight conditions is significantly reduced, which helps to improve the consistency of the pneumatic valve 121 in different flight stages (such as ground taxiing, climb, cruise, descent, etc.) and control accuracy.
[0046] Based on this, the pneumatic pipeline 122 can guide the actuating gas introduced from the third inlet end 123 to the pneumatic actuator of the pneumatic valve 121. After being heated by heat exchange in the bleed air branch 13, the temperature of the actuating gas has been adjusted by the precooler 113 to a level much higher than the ambient temperature of the cold side channel 12 area. In addition, the bleed air branch 13 further heats it up, ensuring that the actuating gas maintains sufficient temperature margin throughout its entire flow through the pneumatic pipeline 122. Even under extremely low temperature cruise conditions, where the ambient temperature in the hanging area is as low as tens of degrees below zero Celsius, the temperature of the actuating gas can still be stably maintained above the dew point temperature, eliminating the possibility of water leaching and ice crystal formation at the source.
[0047] Furthermore, refer to again Figure 1The second outlet 132 of the induced draft branch 13 is connected to the induced draft main pipeline 11. The second outlet 132 is located between the precooler 113 and the first outlet 112, and the third inlet 123 is located downstream of the second outlet 132. That is, the gas intake point of the pneumatic pipeline 122 is located after the confluence point of the induced draft branch 13 returning into the induced draft main pipeline 11. Although the temperature of the return gas in the induced draft branch 13 decreases after heat exchange through the pneumatic pipeline 122, its temperature is still significantly higher than the low-temperature ambient temperature of the cold side channel 12 region. Therefore, when the return gas flows into the induced draft main pipeline 11 and mixes, it can raise the overall airflow temperature of the induced draft main pipeline 11 by a certain margin, so that the temperature of the actuating gas at the downstream third inlet 123 is higher than the outlet temperature of the precooler 113 alone, thereby providing a higher temperature actuating gas source for the pneumatic valve 121. Furthermore, the third inlet end 123 is located downstream of the second outlet end 132, creating a series connection between the heat exchange process of the bleed air branch 13 and the gas intake process of the pneumatic pipeline 122. The bleed air branch 13 first heats the pneumatic pipeline 122 with high-temperature gas, and the heat-exchanged gas is then mixed with the gas flow from the bleed air main branch 11. The mixed gas flow is then introduced into the pneumatic pipeline 122 through the third inlet end 123, continuing to heat the pneumatic pipeline 122 (especially the end section near the pneumatic valve 121). This further ensures that the inner wall temperature of the pneumatic pipeline 122 is maintained above the safe threshold, thereby reducing the possibility of icing inside the pneumatic pipeline 122. Moreover, since the gas intake temperature at the third inlet end 123 is affected by the combined effect of the bleed air branch 13's backflow mixing, the temperature at this intake point has higher temperature stability and resistance to disturbances.
[0048] The third inlet end 123 can be directly located at the first outlet end 112, meaning it draws air directly from the outlet of the bleed gas main pipeline 11 to the gas supply system. This location is compatible with the end layout requirements of most bleed gas systems, eliminating the need for additional opening modifications to the main pipeline body, reducing the difficulty of processing and modification, and facilitating system maintenance and inspection. Furthermore, drawing air at this location fully utilizes the temperature regulation effect of the precooler 113, ensuring that the operating gas temperature remains within a reasonable range that the pneumatic valve 121 can withstand.
[0049] To further reduce the possibility of icing in the actuating gas, in one embodiment, the pneumatic pipeline 122 is equipped with a water vapor separator 125, which is configured to separate moisture from the actuating gas. Specifically, the water vapor separator 125 can separate and discharge the liquid moisture that has precipitated in the actuating gas before it enters the actuator, preventing moisture from accumulating in low-lying areas of the pipeline and freezing and clogging the pipeline in a low-temperature environment. This design, together with the heating scheme of the bleed air branch 13, forms a double protection, further improving the reliability of the system in extreme low-temperature and high-humidity environments. The separated liquid moisture can be discharged outside the machine through a dedicated drainage pipeline, or the moisture can be blown downstream to the pipeline area that has been designed with anti-icing by the pressure of the bleed air system itself, preventing moisture residue from affecting the smoothness of the pipeline and the normal operation of the pneumatic valve 121.
[0050] Furthermore, the pneumatic pipeline 122 includes a regenerator 126, and the exhaust gas branch 13 exchanges heat with the pneumatic pipeline 122 through the regenerator 126, with the regenerator 126 located downstream of the water vapor separator 125. That is, the actuating gas first passes through the water vapor separator 125 to separate the precipitated liquid water, then the exhaust gas branch 13 heats the actuating gas in the pneumatic pipeline 122, and finally the heated and dehydrated actuating gas is delivered to the pneumatic valve 121 actuator. This pipeline arrangement allows for the removal of precipitated water before the actuating gas is heated, preventing an increase in water vapor solubility after heating and reducing unnecessary water re-evaporation and mixing into the actuating gas. This improves the efficiency of water vapor separation, prevents the separated dry actuating gas from entering the heat exchange stage, further reducing the risk of icing, and also reduces corrosion of the heat exchange wall of the regenerator 126 by water vapor impurities, extending the service life of the regenerator 126. In practical use, a multi-stage water vapor separator 125 can be added according to the humidity characteristics of the induced air and the operating range to further improve the water removal effect and ensure the working stability of the pneumatic valve 121.
[0051] In practical work, refer to Figure 1Once the engine enters a stable bleed air state, the high-temperature bleed air from the compressor outlet first enters the first inlet end 111 of the main bleed air pipeline 11, then flows through the hot side passage of the precooler 113, where it exchanges heat with the low-temperature cold side airflow in the cold side passage 12. After being cooled to the required temperature range, it is then delivered to the downstream air systems such as wing anti-icing and cockpit pressurization via the first outlet end 112. Simultaneously, the bleed air branch 13 draws a small amount of high-temperature airflow from the high-temperature bleed air upstream of the precooler 113. As it flows along the bleed air branch 13, it continuously exchanges heat with the actuating gas in the pneumatic pipeline 122, maintaining the temperature of the actuating gas above the dew point temperature to prevent water vapor from condensing and freezing. After heat exchange, the airflow from the bleed air branch 13 can flow into the bleed air main branch 11 downstream of the precooler 113. It mixes with the cooled bleed air that has completed the main heat exchange and is then transported to the downstream air system, making full use of the remaining heat and pressure energy and avoiding energy waste. On the other hand, the actuating gas required by the pneumatic valve 121 is drawn from the bleed air main branch 11 by the third inlet end 123 downstream of the precooler 113. After temperature regulation, the actuating gas flows along the pneumatic pipeline 122 to the actuator of the pneumatic valve 121. When it flows through the heat exchange area, it is further heated by the high-temperature airflow from the bleed air branch 13, maintaining the temperature above the dew point throughout the process. This stably drives the pneumatic valve 121 to adjust the opening and change the flow area of the cold side channel 12, thereby realizing real-time closed-loop regulation of the outlet temperature of the bleed air main branch 11. This ensures that the downstream air system obtains bleed air that meets the temperature requirements and ensures that the entire system operates stably and reliably under different flight conditions.
[0052] In some embodiments of this application, the bleed air temperature control system 1 further includes a temperature detector 14 and a controller 15. The controller 15 is electrically connected to the temperature detector 14 and the pneumatic valve 121, respectively. The temperature detector 14 is configured to detect the outlet temperature of the bleed air main pipeline 11, and the controller 15 is configured to control the opening of the pneumatic valve 121 according to the outlet temperature to control the flow rate of the cold side airflow through the cold side channel 12. Specifically, when the outlet temperature detected by the bleed air main pipeline 11 is higher than a set threshold, the controller 15 increases the opening of the pneumatic valve 121, increases the flow cross-sectional area of the cold side channel 12, increases the flow rate of the cold side air through the precooler 113, and enhances the heat exchange effect between the precooler 113 and the bleed air in the main pipeline, thereby rapidly reducing the outlet temperature of the bleed air. Conversely, when the outlet temperature is lower than the set threshold, the controller 15 decreases the opening of the pneumatic valve 121, reduces the flow cross-sectional area of the cold side channel 12, reduces the flow rate of the cold side air, weakens the heat exchange intensity, and avoids excessive reduction in the bleed air temperature. Through this closed-loop control logic, the bleed air temperature control system 1 can quickly and accurately stabilize the bleed air outlet temperature within the target range according to the actual needs of the downstream air-consuming system, without the need for manual intervention, and adapt to the bleed air temperature adjustment needs under different flight altitudes, flight speeds, and engine operating conditions.
[0053] Furthermore, the temperature detector 14 is equipped with a first outlet end 112, which means that the temperature detector 14 is located downstream of the second outlet end 132 and the third outlet end 124, that is, directly arranged at the final outlet position of the bleed gas main pipeline 11. It can accurately obtain the actual temperature of the gas supplied to the downstream gas system, providing an accurate temperature adjustment reference for the controller 15, avoiding temperature control errors caused by detection position deviations, and ensuring that the input data of the closed-loop control logic truly reflects the actual gas supply status, thereby improving the overall accuracy and response speed of temperature control. At the same time, this arrangement also facilitates the installation, calibration, and replacement maintenance of the temperature detector 14. When the temperature detector 14 malfunctions and needs to be repaired or replaced, there is no need to disassemble the precooler 113 or the main structure of the bleed gas main pipeline 11. Maintenance work can be completed only at the outlet end, which greatly reduces the time cost and operational difficulty of system maintenance.
[0054] In another embodiment, the second outlet 132 of the bleed air branch 13 is connected to the bleed air main pipeline 11, and the temperature detector 14 is located between the second outlet 132 and the first outlet 112. Specifically, this arrangement allows the temperature detector 14 to simultaneously acquire the actual temperature of the mixture of the main bleed air in the bleed air main pipeline 11 and the return bleed air in the bleed air branch 13, fully considering the impact of the return flow of the bleed air branch 13 on the overall temperature of the main pipeline, further improving the consistency between the temperature detection result and the actual output temperature, avoiding the controller 15 acquiring incorrect temperature signals due to the return temperature difference of the bleed air branch 13, and ensuring the accuracy of the closed-loop control logic. In addition, this position also avoids the complex flow field interference in the core heat exchange area of the precooler 113, resulting in a more stable flow field state, smaller fluctuations in the detected temperature data, and making it easier for the controller 15 to make accurate opening adjustment judgments, thereby improving the stability of the entire bleed air temperature control system 1. When the return flow of the bleed gas branch 13 is large and has a significant impact on the temperature of the main pipeline, the detection advantages of this arrangement are more prominent. It can better adapt to the system architecture of the large-flow bleed gas branch 13 and ensure that the temperature control accuracy meets the requirements of the downstream gas system.
[0055] Optionally, the temperature detector 14 is configured as a temperature sensor. This type of sensor is characterized by its small size, fast response, high measurement accuracy, and stable output signal. It is also suitable for the vibration and temperature range requirements of the aircraft's airborne environment, enabling long-term stable operation without frequent calibration. This meets the reliability and lifespan requirements of airborne equipment and facilitates integration with existing airborne systems' signal interfaces, reducing the technical difficulty of modification and integration. In practical applications, other types of temperature detection devices can be selected based on the system's accuracy requirements, installation space, and cost budget to adapt to the design needs of different levels of bleed air temperature control systems 1.
[0056] The technical features of the above embodiments can be combined in any way. For the sake of brevity, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0057] The above embodiments merely illustrate several implementation methods of this application, and while the descriptions are relatively specific and detailed, they should not be construed as limiting the scope of the patent application. It should be noted that those skilled in the art can make various modifications and improvements without departing from the concept of this application, and these all fall within the protection scope of this application. Therefore, the protection scope of this patent application should be determined by the appended claims.
Claims
1. A bleed air temperature control system, characterized in that, The bleed air temperature control system includes: The bleed air main pipeline has a first inlet end configured to connect to the bleed air port of the engine compressor, a first outlet end configured to connect to the air consumption system, and a precooler provided in the bleed air main pipeline. A cold-side channel is configured to exchange heat with the main bleed air pipeline via the precooler to cool the airflow flowing through the main bleed air pipeline, and the cold-side channel has a pneumatic valve configured to control the airflow rate of the cold-side airflow flowing through the cold-side channel; and A bleed air branch, at least the second inlet end of the bleed air branch is connected to the main bleed air branch, and the second inlet end is located between the precooler and the first inlet end. The bleed air branch is configured to exchange heat with the pneumatic pipeline of the pneumatic valve to heat the actuating gas flowing through the pneumatic pipeline.
2. The bleed air temperature control system according to claim 1, characterized in that, The second outlet end of the bleed air branch is connected to the bleed air main branch.
3. The bleed air temperature control system according to claim 2, characterized in that, The second outlet end of the bleed air branch is located between the precooler and the first outlet end.
4. The bleed air temperature control system according to claim 1, characterized in that, The third inlet end of the pneumatic pipeline is connected to the main air intake pipeline, and the third inlet end is located downstream of the precooler.
5. The bleed air temperature control system according to claim 4, characterized in that, The second outlet end of the bleed air branch is connected to the bleed air main branch. The second outlet end is located between the precooler and the first outlet end, and the third inlet end is located downstream of the second outlet end.
6. The bleed air temperature control system according to claim 1, characterized in that, The pneumatic pipeline is equipped with a water vapor separator, which is configured to separate the moisture in the actuating gas.
7. The bleed air temperature control system according to claim 6, characterized in that, The pneumatic pipeline has a regenerator, the exhaust gas branch exchanges heat with the pneumatic pipeline through the regenerator, and the regenerator is located downstream of the water vapor separator.
8. The bleed air temperature control system according to claim 1, characterized in that, The flow area of the bleed air branch is smaller than that of the bleed air main branch.
9. The bleed air temperature control system according to any one of claims 1 to 8, characterized in that, The bleed air temperature control system further includes a temperature detector and a controller. The controller is electrically connected to the temperature detector and the pneumatic valve, respectively. The temperature detector is configured to detect the outlet air temperature of the bleed air main pipeline. The controller is configured to control the opening degree of the pneumatic valve according to the outlet air temperature, so as to control the airflow rate of the cold side airflow through the cold side channel.
10. The bleed air temperature control system according to claim 9, characterized in that, The temperature detector is configured as a temperature sensor; and / or, The temperature detector is provided with the first outlet end; and / or, The second outlet end of the bleed air branch is connected to the main bleed air branch, and the temperature detector is located between the second outlet end and the first outlet end.