A port portal crane grab linkage atomization dust removal control method and system

By establishing multi-source environmental sensing equipment and a closed-loop control system in the coal unloading operation of the port gantry crane, and dynamically adjusting the spray pressure, the problem of the dust removal system not being synchronized with the unloading time in the existing technology was solved, and the stability and efficient dust suppression of the spray system were achieved.

CN123105329APending Publication Date: 2026-11-17ZHEJIANG GUOHUA ZHENENG POWER GENERATION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611278369.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-21
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In existing port gantry crane coal unloading operations, the spray dust suppression system lacks comprehensive linkage of various operational information such as grab height, grab opening, dust concentration, ambient wind speed, and coal humidity. This results in the dust suppression action being out of sync with the unloading time, unstable spray pressure, and problems such as insufficient dust suppression or excessive water spraying.

Method used

A dust removal control system is established, which uses multi-source environmental sensing devices to monitor data such as grab bucket height, grab bucket opening, dust concentration and ambient wind speed in real time. Combined with frequency converters and high-pressure centrifugal pump sets, closed-loop control is achieved to dynamically adjust the spray pressure, ensuring that spraying and unloading are synchronized and avoiding mis-spraying or response lag.

Benefits of technology

This system synchronizes dust removal with unloading, improving the stability of spray pressure and dust removal effect, avoiding excessive water spraying or insufficient dust suppression, and enhancing the reliability and environmental efficiency of the spray system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123105329A_ABST
    Figure CN123105329A_ABST
Patent Text Reader

Abstract

This invention relates to the field of intelligent control and environmental dust removal technology for port loading and unloading equipment, specifically a method and system for controlling atomized dust removal via a grab bucket linkage in a port gantry crane. The method relies on a dust removal system comprising a frequency converter, a high-pressure centrifugal pump unit, dust suppression nozzles, a water supply pipeline, multi-source environmental sensing equipment, a pressure sensor, and a closed-loop control unit. The controller receives grab bucket height and grab bucket opening status in real time. When the grab bucket is in unloading operation, it collects dust concentration, ambient wind speed, and coal moisture data, calculates the target pressure command, and adjusts the frequency converter and high-pressure centrifugal pump unit to atomize filtered water through the dust suppression nozzles into atomized particles. Simultaneously, based on the pressure feedback signal, the frequency converter output control quantity is updated, forming a closed-loop atomized dust removal control loop during the unloading process, achieving synchronous adjustment of dust removal and unloading actions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of intelligent control and environmental dust removal technology for port loading and unloading equipment, specifically a method and system for controlling dust removal via atomization linkage between a port gantry crane grab bucket and a port gantry crane. Background Technology

[0002] In existing port gantry crane coal unloading operations, a spray dust suppression system is usually installed in the gantry crane grab bucket unloading area. The spray dust suppression system includes a water tank, a filter device, a water pump, a water supply pipeline, and nozzles. The water pump is connected to the water supply pipeline, and the nozzles are set around the coal unloading dust area. The system can suppress the dust generated during the coal unloading process by manually starting and stopping the pump, by linkage with grab bucket action signals, or by driving the water pump according to a fixed pressure. Some systems will also collect dust or environmental information at the work site and make simple adjustments to the spray status accordingly to ensure that the spray dust suppression device can work continuously during the coal unloading process.

[0003] However, existing spray dust suppression methods typically control the dust removal equipment as a single actuator, lacking comprehensive linkage of various operational information such as grab height, grab opening, dust concentration, ambient wind speed, and coal moisture. This leads to a lack of synchronization between dust removal actions and unloading times, easily resulting in mis-spraying during non-unloading phases or delayed response during the dust-generating phase of unloading. Furthermore, existing technologies often use fixed spray pressure or empirically set frequency to control water pump operation, failing to adaptively adjust the spray pressure based on the intensity of dust and environmental changes. The lack of closed-loop correction based on pressure feedback results in large fluctuations in spray pressure and unstable atomization effects, leading to insufficient dust suppression or excessive water spraying. This results in problems such as water volume exceeding dust removal requirements, nozzle clogging, and unstable output parameters of the dust removal system. Summary of the Invention

[0004] The purpose of this invention is to provide a method and system for controlling dust suppression by linkage between the grab bucket of a port gantry crane, which avoids mis-spraying or delayed response during non-unloading phases caused by the asynchrony between dust suppression action and unloading time. It can also adaptively adjust the spray pressure according to the intensity of dust and environmental changes on site and perform closed-loop correction based on the pressure, thus solving problems such as insufficient dust suppression or excessive water spraying caused by unstable atomization effect.

[0005] The objective of this invention can be achieved through the following technical solutions:

[0006] A method for controlling dust suppression via atomization in a port gantry crane grab bucket is based on a dust suppression system. The dust suppression system includes a water tank, a filter, a frequency converter, a high-pressure centrifugal pump unit, dust suppression nozzles, a water supply pipeline connecting the high-pressure centrifugal pump unit and the dust suppression nozzles, multi-source environmental sensing equipment, a pressure sensor, and a closed-loop control unit. The closed-loop control unit includes a controller and a frequency converter. The pressure sensor is located at the end of the water supply pipeline. The controller executes the following steps:

[0007] Based on the coal unloading operation scenario of the port gantry crane grab bucket, the control object is determined, and a dust removal control system model corresponding to the high-pressure centrifugal pump group, dust suppression nozzle, multi-source environmental sensing equipment, pressure sensor and linkage closed-loop control unit is established.

[0008] Real-time reception of gantry crane grab signals, including grab height and grab opening status;

[0009] When the grab bucket height signal is within the preset unloading height range and the grab bucket opening state is open, it is determined that the unloading operation state is in place, and the dust concentration data, ambient wind speed data and coal moisture data of the operation area are collected as real-time environmental data.

[0010] The target output pressure of the high-pressure centrifugal pump set is determined based on real-time environmental data, and the target pressure command is obtained.

[0011] Adjust the frequency converter and high-pressure centrifugal pump set according to the target pressure command, and collect the pressure feedback signal output by the pressure sensor for atomization dust removal;

[0012] Closed-loop control is performed based on the pressure feedback signal, and the inverter output control quantity is updated.

[0013] Furthermore, in different implementation methods, a dust removal control system model is established, including:

[0014] The water tank, filter, high-pressure centrifugal pump set and water supply pipeline are configured together to obtain the pressure supply basic unit;

[0015] By configuring the high-pressure centrifugal pump set, water pipeline and dust suppression nozzle in a related manner, an atomization execution unit is obtained;

[0016] Construct a multi-source environmental sensing unit corresponding to the multi-source environmental sensing device, as well as a linkage closed-loop control unit composed of a controller and a frequency converter;

[0017] By combining the pressure supply basic unit, atomization execution unit, multi-source environmental sensing unit, and linkage closed-loop control unit, a dust removal control system model is obtained.

[0018] Furthermore, in different implementations, a multi-source environmental sensing unit corresponding to the multi-source environmental sensing device is constructed, including:

[0019] Dust concentration sensors and wind speed sensors are deployed in the work area, and humidity sensors are deployed in the grab bucket material area. The data collection points of each sensor are combined to obtain a multi-source environmental sensing unit.

[0020] Furthermore, in different implementations, the target output pressure of the high-pressure centrifugal pump set is determined based on real-time environmental data to obtain a target pressure command, including:

[0021] The pressure compensation coefficient is determined based on the deviation between the real-time dust concentration and the preset dust concentration benchmark threshold in the real-time environmental data, the real-time environmental wind speed, and the real-time coal moisture content.

[0022] The target output pressure is obtained by combining the preset basic design water pressure and pressure compensation coefficient, and the target pressure command is generated.

[0023] Furthermore, in different implementations, generating the target pressure command includes:

[0024] The target output pressure is limited between a preset minimum holding pressure and a preset maximum allowable pressure, and a target pressure command is generated based on the limited target output pressure.

[0025] Furthermore, in different implementations, closed-loop control is performed based on the pressure feedback signal to update the inverter output control quantity, including:

[0026] The pressure deviation is obtained by comparing the target pressure command with the pressure feedback signal;

[0027] The real-time frequency control quantity of the frequency converter is generated and output based on the pressure deviation.

[0028] Furthermore, in different implementations, before generating the real-time frequency control value of the frequency converter, the following steps are also included:

[0029] If the unloading working conditions are met, based on generate ;

[0030] If the unloading working conditions are not met, then output... Stop the high-pressure centrifugal pump unit from running.

[0031] Furthermore, in different implementation methods, atomization dust removal is performed, including:

[0032] Based on the target pressure command, the high-pressure centrifugal pump set is driven to pressurize the filtered water and deliver it to the dust suppression nozzle;

[0033] The dust suppression nozzle atomizes the pressurized filtered water into atomized particles.

[0034] A port gantry crane grab bucket linkage atomization dust removal control system includes a frequency converter, a high-pressure centrifugal pump set, dust suppression nozzles, a water supply pipeline connecting the high-pressure centrifugal pump set and the dust suppression nozzles, a multi-source environmental sensing device, a pressure sensor, a memory, and a processor. The pressure sensor is located at the end of the water supply pipeline. The memory stores a computer program. When the processor executes the computer program, it implements the steps of the port gantry crane grab bucket linkage atomization dust removal control method.

[0035] The beneficial effects of this invention are:

[0036] 1. This invention establishes a unified dust removal control system model by integrating a high-pressure centrifugal pump set, dust suppression nozzles, water pipelines, multi-source environmental sensing devices, pressure sensors, and a linkage closed-loop control unit composed of a controller and a frequency converter. The unloading operation is triggered by the grab bucket height signal being within a preset unloading height range and the grab bucket opening state. This allows the working object, sensing object, and execution object to be processed synchronously within the same control link, achieving linkage between dust removal actions and unloading periods. This effectively avoids the problems of accidental spraying during non-unloading stages and delayed response during the unloading dust stage.

[0037] 2. This invention constructs a multi-source environmental sensing unit by configuring dust concentration collection points, ambient wind speed collection points, and coal moisture collection points. It combines command buffer, sliding time window, and multi-frame data averaging to generate real-time environmental data, enabling dust concentration, ambient wind speed, and coal moisture to jointly participate in the judgment of coal unloading dust status. At the same time, it eliminates instantaneous data failure and fluctuation errors caused by physical delay in dust spatial transmission, thereby improving the accuracy of identifying the degree of dust and environmental influencing factors on site, and avoiding the spray volume being too large or too small due to relying solely on a single grab bucket action signal.

[0038] 3. This invention establishes a dynamic target pressure calculation process based on the preset segmented value relationships corresponding to the basic design water pressure, dust concentration benchmark threshold, dust concentration deviation, real-time ambient wind speed, and real-time coal humidity. In the target pressure command generation stage, upper and lower limits of the maximum allowable pressure and the minimum maintenance pressure are added, so that the spray pressure can be adaptively adjusted according to the intensity of dust, wind speed, and coal humidity, and always within the safe range that the high-pressure centrifugal pump group and dust suppression nozzle can execute, thereby avoiding the problems of insufficient dust suppression, excessive water spraying, or atomization failure under the fixed pressure mode.

[0039] 4. This invention introduces the pressure feedback signal collected by the pressure sensor at the end of the water pipeline into the closed-loop control process. It performs proportional, integral, and derivative adjustments on the pressure deviation between the target pressure and the actual pressure, generating a real-time frequency control quantity for the frequency converter. Combined with sampling period not less than the water pressure transmission delay time and frequency change rate limiting logic, it performs timing constraints and stable output, enabling the output pressure of the high-pressure centrifugal pump group to continuously approach the target pressure. This reduces closed-loop oscillations and water hammer impacts caused by pipeline resistance changes, water flow fluctuations, and physical hysteresis, significantly improving the stability of spray pressure and the reliability of dust removal control. Attached Figure Description

[0040] Other features, objects, and advantages of the invention will become more apparent from the following detailed description of non-limiting embodiments with reference to the accompanying drawings:

[0041] Figure 2 This diagram illustrates a block diagram of a port gantry crane grab bucket linkage atomization dust removal control system according to an embodiment of the present disclosure;

[0042] Figure 1 This is a flowchart of an embodiment of a port gantry crane grab bucket linkage atomization dust removal control method. Detailed Implementation

[0043] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0044] Please see Figure 1 A method for controlling dust suppression via atomization in a port gantry crane grab bucket is disclosed. This method relies on a dust suppression system, which includes a water tank, a filter, a frequency converter, a high-pressure centrifugal pump unit, dust suppression nozzles, a water supply pipeline connecting the high-pressure centrifugal pump unit and the dust suppression nozzles, multi-source environmental sensing equipment, a pressure sensor, and a closed-loop control unit. The closed-loop control unit includes a controller and a frequency converter. The pressure sensor is located at the end of the water supply pipeline. The controller executes the following steps:

[0045] Based on the coal unloading operation scenario of the port gantry crane grab bucket, the control object is determined, and a dust removal control system model corresponding to the high-pressure centrifugal pump group, dust suppression nozzle, multi-source environmental sensing equipment, pressure sensor and linkage closed-loop control unit is established.

[0046] Real-time reception of gantry crane grab signals, including grab height and grab opening status;

[0047] When the grab bucket height signal is within the preset unloading height range and the grab bucket opening state is open, it is determined that the unloading operation state is in place, and the dust concentration data, ambient wind speed data and coal moisture data of the operation area are collected as real-time environmental data.

[0048] The target output pressure of the high-pressure centrifugal pump set is determined based on real-time environmental data, and the target pressure command is obtained.

[0049] Adjust the frequency converter and high-pressure centrifugal pump set according to the target pressure command, and collect the pressure feedback signal output by the pressure sensor for atomization dust removal;

[0050] Closed-loop control is performed based on the pressure feedback signal, and the inverter output control quantity is updated.

[0051] Establish a dust removal control system model, including: configuring the water tank, filter, high-pressure centrifugal pump set and water supply pipeline to obtain the basic unit of pressure supply;

[0052] By configuring the high-pressure centrifugal pump set, water pipeline and dust suppression nozzle in a related manner, an atomization execution unit is obtained;

[0053] Construct a multi-source environmental sensing unit corresponding to the multi-source environmental sensing device, as well as a linkage closed-loop control unit composed of a controller and a frequency converter;

[0054] By combining the pressure supply basic unit, atomization execution unit, multi-source environmental sensing unit, and linkage closed-loop control unit, a dust removal control system model is obtained;

[0055] Constructing a multi-source environmental sensing unit corresponding to the multi-source environmental sensing equipment includes: deploying dust concentration sensors and wind speed sensors in the work area, deploying humidity sensors in the grab bucket material area, and combining the collection points of each sensor to obtain the multi-source environmental sensing unit.

[0056] This embodiment provides the overall implementation process of a port gantry crane grab bucket linkage atomization dust suppression control method; the controller uses the gantry crane grab bucket signal as the operation trigger basis. After determining that the grab bucket has entered the unloading working state, it reads dust concentration data, ambient wind speed data and coal humidity data, calculates the target pressure required by the high-pressure centrifugal pump group, and then controls the frequency converter to adjust the speed of the high-pressure centrifugal pump group so that the filtered water forms atomized particles at the dust suppression nozzle and acts on the coal unloading dust area;

[0057] Meanwhile, the pressure sensor at the end of the water pipeline continuously returns a pressure feedback signal. The controller corrects the output control quantity of the frequency converter based on the feedback signal, so that the spray pressure is adjusted according to the operating status and environmental conditions.

[0058] Furthermore, based on the above embodiments, the process of establishing the system model is described; the coal unloading operation of the port gantry crane grab bucket is obtained, and according to the corresponding requirements of water supply, spraying, environmental monitoring and control adjustment, the equipment in the dust removal system is configured in association to generate a dust removal control system model.

[0059] Among them, the dust removal control system model refers to the set of equipment connection relationships and control relationships established for the coal unloading operation of the gantry crane, such as the water circuit relationship from the water tank to the filter to the high-pressure centrifugal pump group and then to the dust suppression nozzle, and the control relationship from the controller to the frequency converter to the high-pressure centrifugal pump group;

[0060] In practical implementation, the controller can be a programmable logic controller; the gantry crane grab signal can be provided by the original control circuit of the gantry crane, the grab height signal can be connected through a quantity input channel, and the grab opening status can be connected through a switch quantity input channel;

[0061] Dust concentration sensor, wind speed sensor and microwave humidity sensor can be connected to the controller via industrial communication interface; the feedback value of pressure sensor can be written into the internal register area of ​​the controller via the data acquisition channel, and read by the control program according to the system cycle, and used for the calculation of the current cycle after reading;

[0062] This implementation method first establishes the correspondence between the pressure supply basic unit, the atomization execution unit, the multi-source environmental sensing unit, and the linkage control unit, so that the work object, the sensing object, and the execution object are processed uniformly within the same control link, and the response sluggishness caused by independent processing is transformed into synchronous adjustment capability for coal unloading.

[0063] Furthermore, based on the above embodiments, the construction method of the pressure supply base unit and the atomization execution unit is described; a water tank, a fully automatic self-cleaning filter, a precision filter, a high-pressure centrifugal pump set and a water supply pipeline are obtained, and the components are connected sequentially according to the water supply execution requirements to generate the pressure supply base unit;

[0064] Among them, the pressurization base unit refers to the water circuit part that completes water storage, filtration, pressurization and transportation. For example, the raw water first passes through a self-cleaning filter to remove impurities above the first preset particle size, then passes through a precision filter to remove impurities above the second preset particle size, and then enters the high-pressure centrifugal pump group.

[0065] Furthermore, a high-pressure centrifugal pump set, water supply pipeline and dust suppression nozzle are obtained. According to the dust suppression requirements, the pressurization end and atomization end are connected to generate an atomization execution unit. The atomization execution unit refers to the execution part that converts pressurized water into atomized particles and releases them into the dust area. For example, filtered water pressurized by the high-pressure centrifugal pump set enters the nozzle orifice through a stainless steel pipeline to form atomized particles.

[0066] This implementation method first ensures the water quality entering the nozzle through two-stage filtration, and then provides the pressure conditions required for atomization by a high-pressure centrifugal pump set, so that the spray formation process matches the water supply quality, thereby reducing the impact of nozzle clogging on the dust removal effect.

[0067] Furthermore, based on the above embodiments, the construction method of the multi-source environmental sensing unit is described; the working area and the grab bucket material area are obtained, and the sensors are deployed according to the coal unloading dust status, airflow influence and coal status to generate the multi-source environmental sensing unit.

[0068] Among them, dust concentration collection points refer to monitoring points used to reflect the intensity of dust, such as those set within the dust impact range of unloading; ambient wind speed collection points refer to monitoring points used to reflect on-site airflow conditions, such as those set in locations in the work area that are significantly affected by airflow disturbances; and coal moisture collection points refer to monitoring points used to reflect the moisture content of materials in the grab bucket, such as the location of microwave humidity sensors that scan the coal in the grab bucket.

[0069] In practical implementation, considering the physical space airflow transmission delay between the release of dust from the grab bucket and its dispersal to the dust concentration collection point, if a single reading is performed only at the moment the grab bucket is determined to open, the obtained data is often the ambient background concentration that has not yet increased, resulting in a timing conflict between physical lag and logical triggering.

[0070] Therefore, the data output from each acquisition point continuously enters the instruction buffer inside the controller. The controller establishes a sliding time window based on the physical transmission delay time calculated in conjunction with the maximum ambient wind speed. The calculation formula is:

[0071]

[0072] in, The distance between the dust release point from the grab bucket and the dust concentration collection point is the straight-line distance in space. The projected component velocity of the ambient wind speed vector along the line connecting the release point and the collection point is the wind speed. At that time, a preset natural diffusion empirical hysteresis constant is used. To account for the inherent response delay of the sensor, multiple frames of data from the same system cycle and previous time windows are extracted and averaged to generate real-time environmental data that eliminates fluctuation errors caused by time differences. After the current cycle operation is completed, the buffer data is updated and overwritten according to the first-in-first-out principle.

[0073] This implementation incorporates dust concentration, ambient wind speed, and coal humidity into the judgment criteria. Furthermore, the aforementioned sliding time window processing effectively eliminates the problem of instantaneous data failure caused by the physical lag in spatial dust transmission. Through the coordinated changes of multi-source data, it more accurately reflects the degree of dust generation during coal unloading, transforming the single triggering method with insufficient sensitivity into a comprehensive judgment method oriented towards on-site working conditions.

[0074] Furthermore, based on the above embodiments, the signal triggering logic of the gantry crane grab bucket is explained; the gantry crane grab bucket signal is obtained, and the current working condition of the grab bucket is judged according to the grab bucket height signal and the grab bucket opening status to determine the unloading working status;

[0075] Among them, the grab height signal refers to the height of the grab relative to the unloading area; the preset unloading height range refers to the pre-set effective unloading height range, such as the allowable opening height range near the hopper or unloading point; and the grab opening status refers to whether the grab is in the open or closed state.

[0076] When the grab height signal is within the preset unloading height range and the grab opening state is open, the controller sets the unloading judgment bit in the input register and triggers the reading of the corresponding data from the multi-source environmental sensing device.

[0077] To compensate for the delay in dust transport, the controller initially sets the unloading judgment position. During the time period, the pressure command or preset basic command of the previous effective working cycle is maintained. After the sliding time window captures the dust peak that is aligned with the current unloading action in time sequence, the dynamic closed-loop pressure calculation is then initiated. If any condition is not met, the judgment bit is not set.

[0078] This implementation uses both height and opening conditions as triggering criteria, and only initiates pressure calculation and spray adjustment during the unloading period, transforming accidental triggering during irrelevant action phases into targeted spray intervention.

[0079] In some possible implementations, the target output pressure of the high-pressure centrifugal pump set is determined based on real-time environmental data to obtain a target pressure command, including:

[0080] The pressure compensation coefficient is determined based on the deviation between the real-time dust concentration and the preset dust concentration benchmark threshold in the real-time environmental data, the real-time environmental wind speed, and the real-time coal moisture content.

[0081] The target output pressure is obtained by combining the preset basic design water pressure and pressure compensation coefficient, and the target pressure command is generated.

[0082] The process of generating a target pressure command includes: limiting the target output pressure to between a preset minimum holding pressure and a preset maximum allowable pressure, and generating a target pressure command based on the limited target output pressure.

[0083] In this embodiment, after confirming that the grab bucket is in the unloading working state, the controller performs pressure calculation on the real-time environmental data to obtain the target pressure command of the high-pressure centrifugal pump set.

[0084] Changes in dust concentration, wind speed, and coal moisture content are converted into pressure setpoints, and the spray pressure is dynamically adjusted according to changes in operation.

[0085] Furthermore, based on the above embodiments, the dynamic target pressure calculation process is explained; real-time environmental data is acquired, and the target output pressure is determined by calculating the real-time environmental data according to the preset basic design water pressure and dust concentration benchmark threshold.

[0086] Among them, the basic design water pressure refers to the basic pressure value required for the nozzle to normally form atomized particles, such as 4MPa as the design benchmark; the dust concentration benchmark threshold refers to the reference value used to determine whether the dust on site is too high, such as the control benchmark set according to the port environmental protection operation requirements.

[0087] In the specific calculation, the real-time dust concentration in the real-time environmental data is calculated. Compared with the dust concentration benchmark threshold The difference in dust concentration between them, i.e. ;

[0088] This deviation is used to characterize the difference between the degree of dust on site and the baseline threshold of dust concentration, and this difference is positively correlated with the positive adjustment amount of the target output pressure;

[0089] In practical implementation, the target output pressure of the high-pressure centrifugal pump unit within the current system cycle is calculated by the following formula:

[0090]

[0091] in, The target output pressure that the high-pressure centrifugal pump unit should achieve; The initial basic design water pressure is required to ensure that the spray nozzle has basic atomization capability; To reflect the impact of the current comprehensive environmental conditions on the foundation design water pressure regulation ratio, a pressure compensation coefficient is required to determine this pressure compensation coefficient. Each influencing factor can be determined separately according to the preset segmented value relationship and then comprehensively calculated. The calculation method is as follows:

[0092]

[0093] in, This is a dust compensation factor; when the dust concentration deviation... The value is 0 when it is in the state of The value is 0.2 when the value is within the specified range, and 0.4 when the value is greater than 50 mg / m³. This is the wind speed compensation factor; it takes a value of 0 when the real-time ambient wind speed v ≤ 3 m / s, and a value of 0 when the ambient wind speed v is ≤ 3 m / s. The value is 0.15 when the speed is within the specified interval, and 0.3 when the speed is greater than 8 m / s. This refers to the corresponding humidity compensation factor;

[0094] For humidity attenuation factor When the real-time coal moisture content The value is 0 when it is in the state of The value is 0.1 when the interval is greater than 1. The value is 0.25; if the comprehensive calculation results are... If the result is less than 1, its lower limit can be set to 1 to ensure the basic dust suppression effect;

[0095] To avoid abrupt changes in the target pressure command due to step variations in various compensation factors, which could trigger output pulse spikes in the derivative term of the proportional-integral-derivative control and cause water hammer effects in the pipeline, the controller uses a first-order low-pass filter to filter the calculated target pressure command before generating the final target pressure command. The sequence is smoothed to ensure the continuous differentiability of the pressure setpoint;

[0096] This ensures that the greater the dust concentration deviation and the greater the real-time ambient wind speed, the greater the pressure compensation coefficient, while the greater the real-time coal moisture content, the smaller the pressure compensation coefficient.

[0097] The specific threshold values ​​and factor values ​​for the above-mentioned segmented intervals can be determined by fitting historical on-site operation data, so that different environmental intervals correspond to different pressure multiple compensation degrees.

[0098] This implementation method incorporates dust deviation, wind speed, and humidity into the target pressure calculation, so that the pressure setting corresponds to the on-site dust conditions. It can capture changes in working conditions during the coal unloading process and transform the problem of insufficient dust suppression or excessive water spraying under fixed pressure into a problem of on-demand adjustment.

[0099] Furthermore, based on the above embodiments, the preset segmented value relationship is explained; the dust concentration deviation, real-time ambient wind speed and real-time coal humidity are obtained, and the pressure compensation coefficient is determined according to their respective preset segmented value relationships to generate a pressure compensation result for calculating the target output pressure.

[0100] Among them, the preset segmented value relationship refers to the rule of setting different compensation intensities according to different value ranges. For example, the dust concentration deviation is divided into multiple ranges from low to high, the wind speed is divided into multiple ranges from small to large, and the coal moisture is divided into multiple ranges from low to high. The function of this segmented relationship is to enable the controller to select the compensation level according to the operating condition range, instead of relying solely on a single fixed increment.

[0101] The greater the dust concentration deviation and the greater the ambient wind speed, the greater the pressure compensation coefficient; the greater the coal moisture content, the smaller the pressure compensation coefficient; the compensation results obtained reflect the combined influence of dust enhancement factors and dust reduction factors on spray pressure.

[0102] When the ambient wind speed is greater than the preset wind speed threshold and the dust concentration is greater than the dust concentration benchmark threshold, if fixed pressure spraying is used, the movement trajectory of the atomized particles will be deviated due to the wind speed, resulting in the system dust suppression rate being lower than the preset standard. When the coal moisture content is greater than the preset moisture content threshold and the dust concentration is within the allowable error range of the dust concentration benchmark threshold, using fixed pressure spraying will cause the water volume to exceed the operational requirements.

[0103] By using segmented value relationships, this implementation method quantitatively distinguishes different working conditions, enabling pressure regulation to cover both high dust conditions and low dust conditions, thus reducing ineffective water spraying.

[0104] Furthermore, based on the above embodiments, the process of generating the target pressure command is described; the target output pressure is obtained, and the target output pressure is limited according to the preset maximum allowable pressure and the preset minimum maintaining pressure to generate the target pressure command;

[0105] Among them, the preset maximum allowable pressure refers to the upper limit of pressure that the equipment and nozzle can safely withstand, for example, 6MPa can be used as the upper limit control value; the preset minimum holding pressure refers to the lower limit of pressure required for the nozzle to maintain effective atomization, for example, 3MPa can be used as the lower limit control value, and this lower limit is lower than the upper limit.

[0106] When the target output pressure is greater than the preset maximum allowable pressure, the target output pressure is limited to the preset maximum allowable pressure; when the target output pressure is less than the preset minimum holding pressure, the target output pressure is limited to the preset minimum holding pressure; when the target output pressure is between the two, the original calculated value is maintained; the limited pressure value is written into the pressure command register inside the controller and output to the subsequent pressure regulation stage within the current system cycle;

[0107] This implementation adds upper and lower limits during the pressure generation stage, so that the calculation results can reflect environmental changes without deviating from the working range of the high-pressure centrifugal pump set and dust suppression nozzles, thus limiting the environmentally driven pressure changes within an executable range.

[0108] In some possible implementations, closed-loop control is performed based on the pressure feedback signal to update the inverter output control quantity, including: comparing the target pressure command with the pressure feedback signal to obtain the pressure deviation;

[0109] The real-time frequency control quantity of the frequency converter is generated and output based on the pressure deviation.

[0110] Before generating the real-time frequency control value of the frequency converter, the following steps are also included: if the unloading working conditions are met, based on... generate ;

[0111] If the unloading working conditions are not met, then output... Stop the high-pressure centrifugal pump unit;

[0112] Atomized dust removal includes: pressurizing the filtered water and delivering it to the dust suppression nozzles based on the target pressure command;

[0113] The dust suppression nozzle atomizes the pressurized filtered water into atomized particles;

[0114] A port gantry crane grab bucket linkage atomization dust removal control system includes a frequency converter, a high-pressure centrifugal pump set, dust suppression nozzles, a water supply pipeline connecting the high-pressure centrifugal pump set and the dust suppression nozzles, a multi-source environmental sensing device, a pressure sensor, a memory, and a processor. The pressure sensor is located at the end of the water supply pipeline. The memory stores a computer program. When the processor executes the computer program, it implements the steps of the port gantry crane grab bucket linkage atomization dust removal control method.

[0115] In this embodiment, after receiving the target pressure command, the controller does not directly drive the high-pressure centrifugal pump group at a fixed frequency, but instead combines the pressure feedback signal returned by the pressure sensor at the end of the water pipeline to adjust the output control quantity of the frequency converter.

[0116] By adjusting the feedback to compensate for the effects of changes in pipeline resistance and water flow fluctuations on the spray pressure, the output pressure of the high-pressure centrifugal pump set is made closer to the target pressure command.

[0117] Meanwhile, the filtered water is pressurized, conveyed, and atomized through nozzles to form atomized particles that capture dust particles, thus completing the dust suppression operation in the coal unloading dust area; the system is used to carry out the above control process.

[0118] Furthermore, based on the above embodiments, the pressure deviation calculation and frequency control generation process will be explained; pressure deviation The calculation formula is as follows:

[0119]

[0120] in, Pressure deviation indicates the amount by which the pressure at the end of the pipeline is insufficient or exceeds the target pressure within the current system cycle. Target pressure command; Pressure feedback signal;

[0121] like A positive value indicates low pressure, and the inverter output frequency should be increased; if... A negative value indicates that the pressure is too high, and the inverter output frequency should be reduced.

[0122] To convert the aforementioned pressure deviation into an adjustable quantity that the frequency converter can execute, this embodiment uses proportional, integral, and derivative control for calculation, thereby obtaining the frequency setpoint output to the frequency converter within the current system cycle, i.e., the real-time frequency control quantity. The formula for its calculation is:

[0123]

[0124] in, For time variables, The integral time variable; the proportionality coefficient This value reflects the intensity of the direct impact of the current pressure deviation on frequency regulation; the larger the value, the faster the inverter responds to the pressure deviation.

[0125] Integral coefficient Used to reflect the corrective effect of cumulative pressure deviation on frequency regulation, in order to eliminate small deviations that have persisted for a long time; differential coefficient It is used to reflect the suppressive effect of pressure deviation change trend on frequency regulation, so as to reduce the fluctuation caused by excessive frequency regulation when the pressure changes rapidly.

[0126] During the process of adjusting the speed of the high-pressure centrifugal pump unit to the pressure change at the end of the water pipeline, there is a hydraulic response delay within a preset time threshold due to the fluid inertia and volume buffering effect inside the pipeline. When the system command update cycle is less than the hydraulic response delay time, the integral adjustment that precedes the physical feedback signal will cause a mismatch between the control output and the physical system state.

[0127] Therefore, during deployment, the aforementioned proportional coefficients... Integral coefficient and differential coefficients The specific value is determined by the on-site step response method. The method is as follows: under the condition of no wind speed and low dust in the system, a step pressure command is given, the pressure response curve is recorded, and the pressure is gradually increased. Record the critical oscillation gain until the response exhibits constant amplitude oscillation. and oscillation period Determine the basic parameters according to the Ziegler-Nichols tuning rule, for example, set... , , This binds abstract control parameters to specific system dynamic characteristics;

[0128] The controller is set to have a sampling period for proportional-integral-derivative (PI-DI) operations that is not less than the actual water pressure transmission delay time measured on site. A rate-limiting logic is added to the final real-time frequency control quantity to limit the maximum frequency increment within a single cycle.

[0129] The frequency control quantity, after being aligned by timing and constrained against sudden changes, is written into the output buffer after being processed by the controller. After reading the set value in the buffer, the inverter smoothly adjusts the speed of the high-pressure centrifugal pump motor, thereby effectively avoiding the water hammer effect in the pipeline caused by sudden change commands. The output buffer is overwritten by the result of the next cycle after the current cycle is completed.

[0130] This implementation utilizes pressure feedback in the calculation and focuses on matching the fluid physical hysteresis constraint with the electrical execution update cycle, so that the adjustment amount is determined by the current steady-state trend of pressure rather than high-frequency transient fluctuations, and the error caused by pipeline fluctuations is transformed into a control input that can be corrected and matches the physical response law.

[0131] Furthermore, based on the above embodiments, the judgment conditions before the generation of real-time frequency control quantity are explained; the gantry crane grab signal, target pressure command and pressure feedback signal are obtained, and the generation of real-time frequency control quantity is judged according to the unloading working status conditions, pressure constraint range and pressure sensor validity, and the output mode of the frequency converter is determined.

[0132] Among them, the unloading working status condition is still based on the grab bucket height signal being in the preset unloading height range and the grab bucket opening state being open.

[0133] The preset pressure constraint range refers to the allowable range consisting of the preset minimum holding pressure and the preset maximum allowable pressure; a valid pressure sensor means that the communication is normal and the feedback value is within the range of the pressure sensor, for example, the feedback value does not exceed the pressure range that the sensor can measure.

[0134] In practice, the controller first reads the gantry crane grab signal from the input register, then reads the target pressure value from the pressure command register, and then reads the pressure feedback value from the quantity acquisition register. If all three conditions are met, the pressure deviation calculation process is allowed.

[0135] If the unloading working conditions are not met, the controller writes a shutdown control quantity into the output buffer, and the frequency converter stops the high-pressure centrifugal pump set accordingly.

[0136] This implementation adds operation status judgment, pressure range judgment and sensor validity judgment before frequency generation, so that the controller only adjusts the frequency when the execution conditions are met, transforming the risk of malfunction into a conditional controlled action.

[0137] Furthermore, based on the above embodiments, the dust removal execution process is described; water supply is obtained, and the water supply is filtered according to the self-cleaning filtration and precision filtration process to generate filtered water for atomization; wherein, the self-cleaning filtration is used to remove larger impurities, and the precision filtration is used to remove finer particles to reduce the possibility of nozzle clogging; furthermore, a target pressure command is obtained, and according to the frequency control quantity output by the frequency converter, the high-pressure centrifugal pump group is driven to pressurize the filtered water and deliver it to the dust suppression nozzles through the water supply pipeline;

[0138] Furthermore, pressurized filtered water is obtained and atomized by the dust suppression nozzle to generate atomized particles. The particle size of the atomized particles can form a water mist range suitable for capturing dust particles in the air, such as forming atomized particles of 3μm to 15μm, which come into contact with and adsorb dust particles in the coal unloading dust area, causing the dust particles to aggregate, increase in size, and then settle.

[0139] When the spray pressure is lower than the preset minimum maintaining pressure, the average particle size of the atomized particles is larger than the particle size of the dust particles, and the dust adsorption and settling rate is lower than the preset standard; when the spray pressure is continuously at the preset maximum allowable pressure and the dust concentration is lower than the dust concentration benchmark threshold, the system spray water volume exceeds the working condition requirement.

[0140] This implementation method connects the steps of filtration, pressurization, conveying and atomization in a continuous manner. The formation conditions of atomized particles change with the on-site working conditions, making it more suitable for the needs of coal unloading dust areas.

[0141] In a set of port gantry crane grab bucket linkage atomization dust removal control system, the memory pre-stores the computer program that executes the above control method. After the processor calls the computer program, it first reads the gantry crane grab bucket signal from the input interface, then receives dust concentration data, ambient wind speed data and coal moisture data from the multi-source environmental sensing device, and writes each data into the data area in the memory.

[0142] In each system cycle, the processor reads the current cycle data from the data area, calculates the target pressure command and real-time frequency control quantity, and then writes the real-time frequency control quantity into the output data area; the frequency converter reads the frequency set value from the corresponding interface of the output data area and adjusts the high-pressure centrifugal pump group.

[0143] The pressurized water output by the high-pressure centrifugal pump unit is sent to the dust suppression nozzle through the water supply pipeline to form atomized particles; the pressure sensor returns the pressure at the end of the water supply pipeline to the processor for the next system cycle to continue to participate in the adjustment; thus forming a complete working process from grab bucket action recognition, environmental data input, pressure calculation, frequency conversion adjustment to atomization dust removal and pressure feedback.

Claims

1. A method for controlling dust suppression via atomization in a port gantry crane grab bucket, which relies on a dust removal system. The dust removal system includes a water tank, a filter, a frequency converter, a high-pressure centrifugal pump unit, dust suppression nozzles, a water supply pipeline connecting the high-pressure centrifugal pump unit and the dust suppression nozzles, multi-source environmental sensing equipment, a pressure sensor, and a closed-loop control unit. The closed-loop control unit includes a controller and the frequency converter. The pressure sensor is located at the end of the water supply pipeline. The method is characterized in that... The controller performs the following steps: Based on the coal unloading operation scenario of the port gantry crane grab bucket, the control object is determined, and a dust removal control system model corresponding to the high-pressure centrifugal pump group, the dust suppression nozzle, the multi-source environmental sensing equipment, the pressure sensor, and the linkage closed-loop control unit is established. Real-time reception of gantry crane grab signals, including grab height and grab opening status; When the grab height signal is within the preset unloading height range and the grab opening state is open, it is determined that the unloading operation state is in effect, and the dust concentration data, ambient wind speed data and coal moisture data of the operation area are collected as real-time environmental data. Based on the real-time environmental data, the target output pressure of the high-pressure centrifugal pump set is determined, and the target pressure command is obtained. The frequency converter and the high-pressure centrifugal pump set are adjusted according to the target pressure command, and the pressure feedback signal output by the pressure sensor is collected for atomization dust removal; Closed-loop control is performed based on the pressure feedback signal, and the inverter output control quantity is updated.

2. The port gantry crane grab bucket linkage atomization dust removal control method according to claim 1, characterized in that, Establishing the dust removal control system model includes: The water tank, filter, high-pressure centrifugal pump set and water supply pipeline are configured together to obtain the pressure supply basic unit; The high-pressure centrifugal pump set, the water pipeline and the dust suppression nozzle are configured together to obtain the atomization execution unit; Construct a multi-source environmental sensing unit corresponding to the multi-source environmental sensing device, and a linkage closed-loop control unit composed of the controller and the frequency converter; The dust removal control system model is obtained by combining the pressure supply basic unit, atomization execution unit, multi-source environmental sensing unit, and linkage closed-loop control unit.

3. The port gantry crane grab bucket linkage atomization dust removal control method according to claim 2, characterized in that, Constructing a multi-source environment sensing unit corresponding to the multi-source environment sensing device includes: Dust concentration sensors and wind speed sensors are installed in the work area, and humidity sensors are installed in the grab bucket material area. The multi-source environmental sensing unit is obtained by combining the data collection points of each sensor.

4. The port gantry crane grab bucket linkage atomization dust removal control method according to claim 1, characterized in that, Based on the real-time environmental data, the target output pressure of the high-pressure centrifugal pump set is determined, and the target pressure command is obtained, including: The pressure compensation coefficient is determined based on the deviation between the real-time dust concentration and the preset dust concentration benchmark threshold in the real-time environmental data, the real-time environmental wind speed, and the real-time coal humidity. The target output pressure is obtained by combining the preset basic design water pressure with the pressure compensation coefficient, and the target pressure command is generated.

5. The port gantry crane grab bucket linkage atomization dust removal control method according to claim 4, characterized in that, Generating the target pressure command includes: The target output pressure is limited between a preset minimum maintaining pressure and a preset maximum allowable pressure, and the target pressure command is generated based on the limited target output pressure.

6. The port gantry crane grab bucket linkage atomization dust removal control method according to claim 1, characterized in that, Based on the pressure feedback signal, closed-loop control is performed to update the inverter output control quantity, including: The pressure deviation is obtained by comparing the target pressure command with the pressure feedback signal; The real-time frequency control quantity of the frequency converter is generated and output based on the pressure deviation.

7. The port gantry crane grab bucket linkage atomization dust removal control method according to claim 6, characterized in that, Before generating the real-time frequency control value of the inverter, the following steps are also included: If the unloading working conditions are met, the real-time frequency control quantity is generated based on the pressure deviation. If the unloading working conditions are not met, a shutdown control quantity is output to stop the high-pressure centrifugal pump unit.

8. The port gantry crane grab bucket linkage atomization dust removal control method according to claim 1, characterized in that, Atomized dust removal includes: Based on the target pressure command, the high-pressure centrifugal pump group is driven to pressurize the filtered water and deliver it to the dust suppression nozzle; The dust suppression nozzle atomizes the pressurized filtered water into atomized particles.

9. A port gantry crane grab bucket linkage atomizing dust suppression control system, comprising a frequency converter, a high-pressure centrifugal pump set, dust suppression nozzles, a water supply pipeline connecting the high-pressure centrifugal pump set and the dust suppression nozzles, a multi-source environmental sensing device, a pressure sensor, a memory, and a processor, wherein the pressure sensor is disposed at the end of the water supply pipeline, and the memory stores a computer program, characterized in that, When the processor executes the computer program, it implements the steps of the port gantry crane grab bucket linkage atomization dust removal control method as described in any one of claims 1 to 8.