A dual-flue gas collection system for an electrolytic cell and its control method

By using a dual-flue gas collection system for the electrolytic cell to collect flue gas from the fire port and U-shaped port of the aluminum electrolytic cell in sections, and combining this with electromagnetic valves to adjust the suction force, the problem of gas dilution in traditional gas collection systems is solved, achieving efficient waste heat utilization and carbon dioxide capture.

CN123108665APending Publication Date: 2026-11-17ZHENGZHOU NON FERROUS METALS RES INST CO LTD OF CHALCO +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611193292.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-07
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Traditional aluminum electrolysis cell gas collection systems mix the high-temperature, high-concentration anode gas generated at the burner opening with low-temperature air, resulting in gas dilution and affecting waste heat utilization and carbon dioxide capture efficiency.

Method used

An electrolytic cell dual-flue gas collection system is adopted, which collects flue gas from the burner and U-shaped inlet through the first and second gas collection components respectively, and combines the suction force with the solenoid valve to achieve zoned collection and differentiated control.

Benefits of technology

It effectively avoids the dilution of high-temperature, high-concentration anode gas, improves the efficiency of waste heat utilization and carbon dioxide capture, and optimizes resource utilization and environmental protection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123108665A_ABST
    Figure CN123108665A_ABST
Patent Text Reader

Abstract

This invention discloses a dual-flue gas collection system for an electrolytic cell and its control method. The dual-flue gas collection system includes: an electrolytic cell assembly having multiple U-shaped ports for securing anode guide rods and multiple flame ports for adding materials; a first gas collection assembly positioned above the flame ports, and having multiple first air intakes corresponding to the flame ports; and a second gas collection assembly arranged parallel to the first gas collection assembly, and having multiple second air intakes corresponding to the U-shaped ports. The dual-flue gas collection system of this invention, by using the first and second gas collection assemblies to separately collect gas from the flame ports and U-shaped ports, avoids the dilution of high-temperature, high-concentration anode gas by a large amount of low-temperature air, reduces flue gas overflow from the U-shaped ports, and facilitates subsequent waste heat utilization and carbon dioxide capture.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of aluminum electrolysis technology, and in particular to a dual-flue gas collection system for an electrolytic cell and its control method. Background Technology

[0002] Aluminum electrolysis cells generate large amounts of high-temperature flue gas containing fluorides and carbon dioxide during production. This flue gas needs to be collected and treated through a gas collection system to meet environmental emission requirements and achieve waste heat utilization and carbon dioxide capture. The composition and concentration of flue gas vary significantly between different parts of the electrolysis cell: the anolyte produces high-temperature, high-concentration anode reaction gas, rich in carbon dioxide, carbon monoxide, and fluorides, which has high recycling value; while the flue gas escaping from the U-shaped inlet and other locations is mixed with a large amount of low-temperature air, resulting in lower carbon dioxide concentrations and flue gas temperatures.

[0003] Currently, traditional aluminum electrolysis cell gas collection systems mostly adopt a single flue structure, uniformly mixing and collecting flue gas from all parts. This collection method mixes the high-temperature, high-concentration anode gas generated at the burner opening with a large amount of low-temperature air, resulting in a significant dilution of the high-temperature, high-concentration anode gas. This leads to a significant decrease in flue gas temperature and carbon dioxide concentration, which is detrimental to subsequent waste heat utilization and carbon dioxide capture. Summary of the Invention

[0004] The purpose of this invention is to overcome the shortcomings of the prior art and provide a dual-flue gas collection system for an electrolytic cell and its control method. This solves the technical problem in the prior art where the high-temperature, high-concentration anode gas generated at the burner opening is mixed with a large amount of low-temperature air, resulting in a significant dilution of the high-concentration gas, a significant decrease in flue gas temperature and carbon dioxide concentration, which is not conducive to subsequent waste heat utilization and carbon dioxide capture.

[0005] To achieve the above objectives, the present invention adopts the following technical solution: In a first aspect, the present invention provides a dual-flue gas collection system for an electrolytic cell, comprising: an electrolytic cell assembly having a plurality of U-shaped openings for securing anode guide rods and a plurality of flame openings for adding materials; a first gas collection assembly disposed above the flame openings, and the first gas collection assembly having a plurality of first air intakes, the plurality of first air intakes corresponding to the plurality of flame openings; and a second gas collection assembly disposed parallel to the first gas collection assembly, and the second gas collection assembly having a plurality of second air intakes, the plurality of second air intakes corresponding to the plurality of U-shaped openings.

[0006] In some embodiments, the first gas collection assembly includes a first gas collection pipe and a plurality of first gas collection hoods; the first air intake is opened on the side of the first gas collection pipe facing the flame opening, and one first gas collection hood is connected to one first air intake and extends toward the flame opening.

[0007] In some embodiments, the first gas collecting hood is located between the first gas collecting pipe and the electrolytic cell assembly; one end of the first gas collecting hood is connected to the first gas inlet, and the other end is covered by the fire hole.

[0008] In some embodiments, the second gas collection assembly includes a second gas collection pipe and a plurality of second gas collection hoods; the second air intake is opened on the side of the second gas collection pipe facing the U-shaped opening, and one second gas collection hood is connected to one second air intake and extends in the direction of the U-shaped opening.

[0009] In some embodiments, the second gas collecting hood is located between the second gas collecting pipe and the electrolytic cell assembly; one end of the second gas collecting hood is connected to the second gas inlet, and the other end is covered by the U-shaped opening.

[0010] In some embodiments, a third air intake is provided on the side of the second gas collection pipe facing the electrolytic cell assembly, and the third air intake is used to draw in residual flue gas inside the electrolytic cell assembly.

[0011] In some embodiments, the third air intake is located between the first air intake and the second air intake.

[0012] In some embodiments, the first gas collection component is connected to a carbon dioxide recovery system and / or a waste heat recovery system; and / or, the second gas collection component is connected to a purification system.

[0013] In a second aspect, the present invention provides a control method applied to the dual-flue gas collection system of the electrolytic cell described in the first aspect, comprising: Obtain the current operating status of the electrolytic cell assembly; The suction force of the first gas collecting component and the second gas collecting component is determined based on the current working state.

[0014] In some embodiments, determining the suction force of the first gas collecting component and the second gas collecting component based on the current operating state includes: When the electrolytic cell assembly is in normal working condition, the first gas collecting assembly is controlled to operate with a first suction force, and the second gas collecting assembly is controlled to operate with a second suction force. When the electrolytic cell assembly is in the anodic effect state, the first gas collecting assembly is controlled to operate with a third suction force, and the second gas collecting assembly is controlled to operate with a second suction force; wherein, the third suction force is greater than the first suction force; When the electrolytic cell assembly is in an open operation state, the first gas collecting assembly is controlled to operate with a first suction force, and the second gas collecting assembly is controlled to operate with a fourth suction force; wherein the fourth suction force is greater than the second suction force.

[0015] The electrolytic cell dual-flue gas collection system of the present invention collects gas in sections at the fire hole and the U-shaped port through the first gas collection component and the second gas collection component, respectively. This avoids the high-temperature, high-concentration anode gas being diluted by a large amount of low-temperature air, reduces the leakage of flue gas from the U-shaped port, and is beneficial to subsequent waste heat utilization and carbon dioxide capture.

[0016] The above description is merely an overview of the technical solution of the present invention. In order to better understand the technical means of the present invention, it can be implemented according to the contents of the specification. In order to make the above and other objects, features and advantages of the present invention more obvious and understandable, preferred embodiments are described in detail below. Attached Figure Description

[0017] Figure 1 This is a first structural schematic diagram of the dual-flue gas collection system of the electrolytic cell according to an embodiment of the present invention; Figure 2 This is a schematic diagram of the structure of the first gas collection component in the dual-flue gas collection system of the electrolytic cell according to an embodiment of the present invention; Figure 3 This is a schematic diagram of the structure of the second gas collection component in the dual-flue gas collection system of the electrolytic cell according to an embodiment of the present invention; Figure 4 This is a schematic diagram of the second structure of the dual-flue gas collection system of the electrolytic cell according to an embodiment of the present invention; Figure 5 This is a flowchart of the control method according to an embodiment of the present invention; Figure 6 This is a sub-flowchart of the control method according to an embodiment of the present invention.

[0018] Explanation of reference numerals in the attached figures: 10. First gas collecting assembly; 11. First gas collecting pipe; 12. First gas collecting hood; 13. First solenoid valve; 20. Second gas collecting assembly; 21. Second gas collecting pipe; 22. Second gas collecting hood; 23. Second solenoid valve; 24. Third air intake port; 25. Manifold; 30. Electrolytic cell assembly; 31. Flame port; 32. U-shaped port. Detailed Implementation

[0019] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.

[0020] Aluminum electrolysis cells generate large amounts of high-temperature flue gas containing fluorides and carbon dioxide during production. This flue gas needs to be collected and treated through a gas collection system to meet environmental emission requirements and achieve waste heat utilization and carbon dioxide capture. The composition and concentration of flue gas vary significantly between different parts of the electrolysis cell: the anolyte produces high-temperature, high-concentration anode reaction gas, rich in carbon dioxide, carbon monoxide, and fluorides, which has high recycling value; while the flue gas escaping from the U-shaped inlet and other locations is mixed with a large amount of low-temperature air, resulting in lower carbon dioxide concentrations and flue gas temperatures.

[0021] Currently, traditional aluminum electrolysis cell gas collection systems mostly adopt a single flue structure, uniformly mixing and collecting flue gas from all parts. This collection method mixes the high-temperature, high-concentration anode gas generated at the burner opening with a large amount of low-temperature air, resulting in a significant dilution of the high-temperature, high-concentration anode gas. This leads to a significant decrease in flue gas temperature and carbon dioxide concentration, which is detrimental to subsequent waste heat utilization and carbon dioxide capture.

[0022] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0023] Please see Figures 1-4 In a first aspect, the present invention provides a dual-flue gas collection system for an electrolytic cell, comprising: an electrolytic cell assembly 30 having a plurality of U-shaped openings 32 for securing anode guide rods and a plurality of flame openings 31 for adding materials; a first gas collection assembly 10 disposed above the flame openings 31, and the first gas collection assembly 10 having a plurality of first air intakes, the plurality of first air intakes corresponding to the plurality of flame openings 31; and a second gas collection assembly 20 disposed parallel to the first gas collection assembly 10, and the second gas collection assembly 20 having a plurality of second air intakes, the plurality of second air intakes corresponding to the plurality of U-shaped openings 32.

[0024] For example, the electrolytic cell assembly 30 is the main structure of an aluminum electrolytic cell, with a flame port 31 and a U-shaped inlet 32 ​​respectively provided at its bottom and on both sides. The flame port 31 is arranged along the length of the electrolytic cell assembly 30 at its bottom and is used to add materials such as alumina and fluoride salts into the electrolytic cell; the U-shaped inlets 32 are arranged along the length of the electrolytic cell assembly 30 on both sides and are used to hold the anode guide rod and fix the anode guide rod to the electrolytic cell. The specific structure of the electrolytic cell assembly 30 is prior art and will not be described in detail here.

[0025] For example, the flame port 31 is a through hole opened at the bottom of the electrolytic cell assembly 30, evenly distributed along the length of the electrolytic cell assembly 30, used to add materials into the electrolytic cell, and also serves as the main channel for the escape of anode reaction gas. The number and position of the flame ports 31 are determined according to the specifications and process requirements of the electrolytic cell; for example, eight flame ports 31 can be set for each electrolytic cell.

[0026] For example, the U-shaped opening 32 is a U-shaped groove formed on both sides of the electrolytic cell assembly 30, evenly distributed along the length of the electrolytic cell assembly 30, used to hold the anode guide rod; the anode guide rod passes through the U-shaped opening 32 and extends into the electrolytic cell, the shape of the U-shaped opening 32 is adapted to the shape of the anode guide rod so as to fix the anode guide rod on the electrolytic cell. Since there is a gap at the U-shaped opening 32, a small amount of flue gas may escape from here.

[0027] For example, the first gas collecting assembly 10 is disposed above the electrolytic cell assembly 30, spaced apart from the side where the anolyte 31 is located. The first gas collecting assembly 10 is provided with multiple first gas intake ports, each corresponding to a anolyte 31, for directional collection of high-concentration anolyte gas generated at the anolyte 31 into the first gas collecting assembly 10.

[0028] For example, the second gas collection assembly 20 is arranged side by side with the first gas collection assembly 10, located on both sides of the first gas collection assembly 10. The second gas collection assembly 20 is provided with multiple second air intakes, each of which corresponds to a U-shaped opening 32, for collecting the flue gas escaping from the U-shaped opening 32 into the second gas collection assembly 20.

[0029] It is understood that in this embodiment, the first gas collection component 10 and the second gas collection component 20 respectively collect the flame port 31 and the U-shaped port 32 in separate zones, which avoids the high temperature and high concentration of anode gas being diluted by a large amount of low temperature air, and is beneficial to the subsequent utilization of waste heat and capture of carbon dioxide.

[0030] In some embodiments, the first gas collection assembly 10 includes a first gas collection pipe 11 and a plurality of first gas collection hoods 12; a first air intake is opened on the side of the first gas collection pipe 11 facing the flame port 31, and a first gas collection hood 12 is connected to a first air intake and extends toward the flame port 31.

[0031] For example, the first gas collecting pipe 11 is a tubular structure extending along the length of the electrolytic cell assembly 30 and is made of metal. For example, the cross-sectional shape of the first gas collecting pipe 11 can be circular, rectangular, or trapezoidal, forming a gas flow channel inside. For example, the first gas collecting pipe 11 has multiple first gas intake ports along its length on the side facing the flame opening 31, the number of first gas intake ports corresponding to the number of flame openings 31, and the position of each first gas intake port aligned with the position of each flame opening 31.

[0032] For example, the first gas collection hood 12 is a funnel-shaped or trumpet-shaped hood structure, which can be formed by stamping thin metal sheets.

[0033] Understandably, in this embodiment, the high-concentration anolyte gas generated at the burner opening 31 is directionally collected into the first gas collecting pipe 11 by the first gas collecting hood 12, thus preventing the anolyte gas from diluting after spreading to the surrounding area. For example, the covering effect of the first gas collecting hood 12 forms a relatively closed collection channel between the burner opening 31 and the first gas collecting pipe 11, reducing the mixing of cold air and helping to maintain the high temperature and high concentration of flue gas.

[0034] In some embodiments, the first gas collecting hood 12 is located between the first gas collecting pipe 11 and the electrolytic cell assembly 30; one end of the first gas collecting hood 12 is connected to the first gas inlet, and the other end is covered by the fire hole 31.

[0035] For example, the first gas collecting hood 12 is disposed on the side of the first gas collecting pipe 11 facing the electrolytic cell assembly 30, and its entirety is located in the space between the first gas collecting pipe 11 and the electrolytic cell assembly 30. The small end of the first gas collecting hood 12 is connected to the first air intake at the bottom of the first gas collecting pipe 11 and communicates with the internal channel of the first gas collecting pipe 11; the large end of the first gas collecting hood 12 extends toward the flame opening 31 and covers the flame opening 31 above or around it, so that the flame opening 31 is within the coverage area of ​​the first gas collecting hood 12.

[0036] For example, a certain vertical distance is maintained between the first gas collecting hood 12 and the flame port 31 to avoid interference with the moving parts of the electrolytic cell assembly 30, while ensuring that the anolyte gas generated at the flame port 31 can be effectively drawn into the first gas collecting hood 12. For example, the lower opening area of ​​the first gas collecting hood 12 is larger than the opening area of ​​the flame port 31 to ensure that the flame port 31 is completely enclosed, preventing gas from escaping laterally.

[0037] It is understood that in this embodiment, by setting the first gas collecting hood 12 between the first gas collecting pipe 11 and the electrolytic cell assembly 30, and by connecting one end of the first gas collecting hood 12 to the first gas intake port and covering the other end of the flame port 31, a closed collection channel is formed from the flame port 31 to the first gas collecting pipe 11.

[0038] In some embodiments, a first solenoid valve 13 is provided in the first gas collecting pipe 11, and the first solenoid valve 13 is used to regulate the gas flow rate in the first gas collecting pipe 11.

[0039] For example, the first solenoid valve 13 is an electrically operated or pneumatically operated regulating valve, installed on the pipeline of the first gas collecting pipe 11. It adjusts the valve opening by receiving a control signal, thereby controlling the gas flow rate and negative pressure in the first gas collecting pipe 11. For example, the opening of the first solenoid valve 13 can be continuously adjusted between 0% and 100% to meet the requirements of flue gas collection intensity at the burner opening 31 under different operating conditions.

[0040] It is understood that this embodiment achieves flexible adjustment of the flue gas collection intensity at the burner 31 by setting a first solenoid valve 13 inside the first gas collecting pipe 11. Dynamically adjusting the opening of the first solenoid valve 13 according to different operating conditions maintains stable collection efficiency under normal conditions and provides rapid response under special operating conditions such as the anode effect, preventing the overflow of high-concentration gas and avoiding energy waste under a fixed negative pressure mode.

[0041] In some embodiments, the second gas collection assembly 20 includes a second gas collection pipe 21 and a plurality of second gas collection hoods 22; a second air intake is opened on the side of the second gas collection pipe 21 facing the U-shaped opening 32, and a second gas collection hood 22 is connected to a second air intake and extends in the direction of the U-shaped opening 32.

[0042] For example, the second gas collecting pipe 21 is a tubular structure extending along the length of the electrolytic cell assembly 30, made of metallic material, and possessing sufficient structural strength and corrosion resistance. For example, the cross-sectional shape of the second gas collecting pipe 21 can be circular, rectangular, or trapezoidal, forming a gas flow channel inside. For example, the second gas collecting pipe 21 has multiple second suction ports along its length on the side facing the U-shaped opening 32, the number of second suction ports corresponding to the number of U-shaped openings 32, and the position of each second suction port aligned with the position of each U-shaped opening 32.

[0043] For example, the second gas collecting hood 22 is a funnel-shaped or trumpet-shaped hood structure, formed by stamping thin metal sheets. One second gas collecting hood 22 is provided at each second air intake.

[0044] In some embodiments, the second gas collecting hood 22 is located between the second gas collecting pipe 21 and the electrolytic cell assembly 30; one end of the second gas collecting hood 22 is connected to the second gas inlet, and the other end is covered by the U-shaped opening 32.

[0045] For example, the second gas collecting hood 22 is disposed on the side of the second gas collecting pipe 21 facing the electrolytic cell assembly 30, and its entirety is located in the space between the second gas collecting pipe 21 and the electrolytic cell assembly 30. The small end of the second gas collecting hood 22 is connected to the second air intake at the bottom of the second gas collecting pipe 21 and communicates with the internal channel of the second gas collecting pipe 21; the large end of the second gas collecting hood 22 extends towards the U-shaped opening 32 and covers the outside or periphery of the U-shaped opening 32, so that the U-shaped opening 32 is within the coverage area of ​​the second gas collecting hood 22.

[0046] For example, a certain distance is maintained between the second gas collecting hood 22 and the U-shaped opening 32 to avoid interference with the movement of the anode guide rod. The lower opening area of ​​the second gas collecting hood 22 is larger than the opening area of ​​the U-shaped opening 32 to ensure that the U-shaped opening 32 is completely covered, preventing the flue gas from laterally escaping into the workshop environment.

[0047] It is understood that in this embodiment, by setting the second gas collecting hood 22 between the second gas collecting pipe 21 and the electrolytic cell assembly 30, and by connecting one end of the second gas collecting hood 22 to the second gas inlet and covering the other end of the U-shaped opening 32, a closed collection channel from the U-shaped opening 32 to the second gas collecting pipe 21 is formed. This allows the flue gas escaping from the U-shaped opening 32 to be directly and directionally collected into the second gas collecting pipe 21, effectively preventing the spread of flue gas into the workshop environment, improving the working environment, and at the same time avoiding the dilution of the high-concentration anode gas collected by the first gas collecting assembly 10 by the overflowing flue gas.

[0048] In some embodiments, a third air intake 24 is provided on the side of the second gas collection pipe 21 facing the electrolytic cell assembly 30. The third air intake 24 is used to draw in residual flue gas inside the electrolytic cell assembly 30.

[0049] For example, the third suction port 24 is located on the side of the second gas collecting pipe 21 facing the electrolytic cell assembly 30, specifically at the bottom or base plate of the second gas collecting pipe 21. For example, the third suction port 24 is an elongated or circular hole, distributed along the length of the second gas collecting pipe 21. The third suction port 24 is used to draw in residual flue gas inside the electrolytic cell assembly 30, that is, flue gas that has not been drawn in by the first gas collecting assembly 10 and has escaped from the U-shaped opening 32.

[0050] In some embodiments, the second gas collection assembly 20 includes two second gas collection pipes 21 and a manifold 25. The two second gas collection pipes 21 are arranged side by side with the first gas collection pipe 11 and the first gas collection pipe 11 is located between the two second gas collection pipes 21. The two second gas collection pipes 21 are respectively connected to the manifold 25.

[0051] For example, the two second gas collecting pipes 21 are the left second gas collecting pipe 21 and the right second gas collecting pipe 21, respectively, extending along the length of the electrolytic cell assembly 30 and symmetrically arranged on both sides of the first gas collecting pipe 11. The first gas collecting pipe 11 is located in the middle, and the two second gas collecting pipes 21 are located on the left and right sides of the first gas collecting pipe 11, respectively, arranged in parallel. The left second gas collecting pipe 21 is used to collect the flue gas escaping from the left U-shaped opening 32 of the electrolytic cell assembly 30, and the right second gas collecting pipe 21 is used to collect the flue gas escaping from the right U-shaped opening 32 of the electrolytic cell assembly 30.

[0052] For example, the manifold 25 is a tubular structure extending along the length of the electrolytic cell assembly 30 and is located at one end of the two second gas collecting pipes 21. The ends of the two second gas collecting pipes 21 are connected to the manifold 25 through tee connectors or elbows, so that the flue gas collected in the two second gas collecting pipes 21 is collected into the manifold 25 and then uniformly transported to the subsequent purification system for treatment.

[0053] In some embodiments, the second gas collection assembly 20 further includes a second solenoid valve 23, which is disposed in the manifold 25 and is used to regulate the gas flow rate in the manifold 25.

[0054] For example, the second solenoid valve 23 is an electrically operated or pneumatically operated regulating valve, installed on the manifold 25. It receives control signals to adjust the valve opening, thereby controlling the gas flow rate and negative pressure within the manifold 25. For example, the opening of the second solenoid valve 23 can be continuously adjusted between 0% and 100% to meet the requirements of flue gas collection intensity at the U-shaped port 32 under different operating conditions.

[0055] It is understood that this embodiment achieves unified regulation of the gas flow rate in the second gas collecting pipe 21 by setting a second solenoid valve 23 on the manifold 25. By adjusting the opening of the second solenoid valve 23, the collection intensity of the flue gas in the U-shaped port 32 can be flexibly adjusted according to different operating conditions of the electrolytic cell assembly 30. For example, the opening can be increased during open operation to prevent flue gas from overflowing, and moderate suction can be maintained under normal conditions to save energy.

[0056] In some embodiments, the third air intake 24 is located between the first air intake and the second air intake.

[0057] For example, the third intake port 24 is located in the area between the first gas collecting assembly 10 and the second gas collecting assembly 20. This area is where the high-concentration anode gas generated at the burner 31 is collected by the first gas collecting assembly 10, and a small amount of uncollected gas is lost. The third intake port 24, through suction, collects this residual flue gas again into the second gas collecting pipe 21, further reducing the escape of flue gas into the workshop environment.

[0058] In some embodiments, the first gas collection assembly 10 is connected to a carbon dioxide recovery system and / or a waste heat recovery system; and / or, the second gas collection assembly 20 is connected to a purification system.

[0059] For example, the first gas collection assembly 10 is connected to a carbon dioxide recovery system via a first gas collection pipe 11, transporting the high-concentration carbon dioxide-containing flue gas collected at the burner opening 31 to the carbon dioxide recovery system for capture and utilization; and / or, the first gas collection assembly 10 is connected to a waste heat recovery system via the first gas collection pipe 11, transporting the high-temperature flue gas collected at the burner opening 31 to the waste heat recovery system for heat energy recovery and utilization. Because the flue gas collected by the first gas collection assembly 10 has the characteristics of high carbon dioxide concentration and high temperature, transporting it to the carbon dioxide recovery system and the waste heat recovery system has high economic value.

[0060] For example, the second gas collection assembly 20 is connected to the purification system via a manifold 25, and transports the flue gas collected at the U-shaped port 32 and the residual flue gas drawn in by the third intake port 24 to the purification system for dust removal, defluorination and other purification treatments before being discharged in compliance with standards. The flue gas collected by the second gas collection assembly 20 has a low carbon dioxide concentration and low temperature, making it unsuitable for carbon dioxide recovery or waste heat utilization. Therefore, it is directly transported to a conventional purification system for treatment.

[0061] It is understood that this embodiment achieves graded treatment and resource utilization of flue gas of different qualities by connecting the first gas collection component 10 to the carbon dioxide recovery system and / or the waste heat recovery system, and connecting the second gas collection component 20 to the purification system. High-concentration, high-temperature anode gas is preferentially used for carbon dioxide capture and waste heat recovery, creating economic benefits; low-concentration, low-quality overflow flue gas directly enters the purification system for treatment to meet standards before being discharged, avoiding unnecessary energy consumption. This graded treatment method fully utilizes the value of flue gas of different qualities, maximizing resource utilization.

[0062] Please see Figure 5 and Figure 6 Secondly, the present invention provides a control method applied to the dual-flue gas collection system of the electrolytic cell in the first aspect, comprising the following steps S100-S200: S100: Obtain the current working status of the electrolytic cell assembly 30.

[0063] For example, the current operating status of the electrolytic cell assembly 30 can be obtained through communication with the cell control unit of the electrolytic cell assembly 30. For example, the main control unit establishes a data connection with the cell control unit through a communication bus. The cell control unit monitors the operating parameters of the electrolytic cell assembly 30 in real time and sends operating condition signals to the main control unit. The operating condition signals include normal operation signals, anode effect trigger signals, and open-top operation signals such as anode replacement or aluminum tapping.

[0064] S200: Determine the suction force of the first gas collecting component 10 and the second gas collecting component 20 based on the current working state.

[0065] It is understandable that this embodiment achieves differentiated control for different operating conditions by acquiring the current operating state of the electrolytic cell assembly 30 and dynamically determining the suction force of the first gas collecting assembly 10 and the second gas collecting assembly 20 based on the current operating state. Compared with the traditional fixed negative pressure suction mode, this embodiment can allocate suction force as needed according to the actual operating conditions of the electrolytic cell, avoiding the drawbacks of blindly using a large air volume for uniform suction. It reduces system energy consumption while ensuring that flue gas does not overflow, and at the same time improves the adaptability to different operating conditions.

[0066] In some embodiments, S200 includes S210-S230: S210. When the electrolytic cell assembly 30 is in normal working condition, the first gas collecting assembly 10 is controlled to operate with the first suction force, and the second gas collecting assembly 20 is controlled to operate with the second suction force.

[0067] For example, the normal operating state refers to the normal electrolytic production state in which the electrolytic cell assembly 30 does not experience an anode effect and is not subjected to open-top operations such as anode replacement or aluminum tapping. In the normal operating state, the cell cover plate of the electrolytic cell assembly 30 is in the closed state, and both the fire port 31 and the U-shaped port 32 are in normal operating mode, and the generation and dissipation of anode gas are relatively stable.

[0068] For example, the first suction force can be the suction force generated when the first solenoid valve 13 in the first gas collecting assembly 10 is at a first preset opening degree, which is preferably 40% to 50%. This opening degree can maintain a stable micro-negative pressure state in the first gas collecting assembly 10, effectively draw in the high-concentration anode gas generated at the flame port 31, and at the same time limit the mixing of cold air from outside the tank to the greatest extent, so as to maintain the high temperature and high concentration of flue gas.

[0069] For example, the second suction force can be the suction force generated when the second solenoid valve 23 in the second gas collection assembly 20 is at a second preset opening degree, which is preferably 50% to 60%. This opening degree can maintain a moderate negative pressure suction state in the lateral gas collection hood in the second gas collection assembly 20, and assist in the suction of any trace amount of smoke that may be generated at the U-shaped opening 32, ensuring that there are no odors or trace amounts of smoke in the workshop.

[0070] S220. When the electrolytic cell assembly 30 is in the anodic effect state, the first gas collecting assembly 10 is controlled to operate with a third suction force, and the second gas collecting assembly 20 is controlled to operate with a second suction force; wherein, the third suction force is greater than the first suction force.

[0071] For example, the anodic effect state refers to the special operating state of the electrolytic cell assembly 30 when the anodic effect occurs. The anodic effect is a common phenomenon in the aluminum electrolysis process, characterized by a sharp increase in the interfacial resistance between the electrolyte and the anode, a sudden increase in the cell voltage, and the generation of a large amount of high-temperature, high-concentration carbon fluoride-containing gas.

[0072] For example, the third suction force can be the suction force generated when the first solenoid valve 13 in the first gas collection assembly 10 is fully open, i.e., 100% open. This opening can increase the suction negative pressure of the first gas collection assembly 10 to the maximum, preferentially and quickly introducing a large amount of high-temperature, high-concentration gas generated instantaneously by the anodic effect into the first gas collection assembly 10.

[0073] It is understandable that the anodic effect generates a large amount of high-concentration fluorocarbon-containing gases, which have high recycling value and potential environmental hazards. Therefore, they need to be rapidly captured by the first gas collection component 10. In this embodiment, by maximizing the suction force of the first gas collection component 10, efficient recovery of the anodic effect gases is achieved, while maintaining the suction force of the second gas collection component 20 unchanged, thus avoiding interference with the normal collection process.

[0074] S230. When the electrolytic cell assembly 30 is in an open operation state, the first gas collecting assembly 10 is controlled to operate with a first suction force, and the second gas collecting assembly 20 is controlled to operate with a fourth suction force; wherein, the fourth suction force is greater than the second suction force.

[0075] For example, the open-top operation state refers to the operation state of the electrolytic cell assembly 30, such as changing the anode or tapping aluminum, which requires a large area of ​​the cell cover to be opened. In this state, because the cell cover is opened over a large area, the upper part of the electrolytic cell assembly 30 is in an open state, and a large amount of flue gas may escape from the open area, causing pollution to the workshop environment.

[0076] For example, the fourth suction force can be the suction force generated when the second solenoid valve 23 in the second gas collection assembly 20 is fully open, i.e., 100% open. This opening can put the second gas collection assembly 20 in a strong suction state, and through the side gas collection hood and the third air intake 24, all the outflowing flue gas generated in the open area is sucked up, preventing the flue gas from escaping into the workshop.

[0077] Understandably, due to the large-area opening of the duct cover during open-air operation, a large amount of flue gas may overflow from the open area. In this case, the second gas collection assembly 20 undertakes the primary task of flue gas capture. In this embodiment, by maximizing the suction power of the second gas collection assembly 20, a strong negative pressure is used to draw all the flue gas generated in the open area into the second gas collection assembly 20 and introduce it into the purification system, effectively preventing flue gas overflow and ensuring a safe workshop environment during operation. Simultaneously, the first gas collection assembly 10 maintains its normal suction power and continues to collect the anode gas generated at the burner opening 31.

[0078] In the description of this invention, it should be understood that the terms "center," "longitudinal," "lateral," "length," "width," "thickness," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," "clockwise," and "counterclockwise," etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this invention.

[0079] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of this invention, "a plurality of" means two or more, unless otherwise explicitly specified.

[0080] In this invention, unless otherwise explicitly specified and limited, the terms "installation," "connection," "linking," and "fixing," etc., should be interpreted broadly. For example, they can refer to a connection, a detachable connection, or an integral part; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components. Those skilled in the art can understand the specific meaning of the above terms in this invention according to the specific circumstances.

[0081] In this invention, unless otherwise explicitly specified and limited, "above" or "below" the second feature can include direct contact between the first and second features, or contact between the first and second features through another feature between them. Furthermore, "above," "over," and "on top" of the second feature includes the first feature directly above or diagonally above the second feature, or simply indicates that the first feature is at a higher horizontal level than the second feature. "Below," "below," and "under" the second feature includes the first feature directly below or diagonally below the second feature, or simply indicates that the first feature is at a lower horizontal level than the second feature.

[0082] In the description of this specification, references to terms such as "one embodiment," "some embodiments," "example," "specific example," or "some examples," etc., indicate that a specific feature, structure, material, or characteristic described in connection with that embodiment or example is included in at least one embodiment or example of the invention. The illustrative expressions of the above terms in this specification should not be construed as necessarily referring to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples.

[0083] The above examples are merely illustrative of the technical content of the present invention to facilitate easier understanding by the reader, but do not imply that the implementation of the present invention is limited to these examples. Any technical extensions or re-creations made based on the present invention are protected by the present invention. The scope of protection of the present invention is defined by the claims.

Claims

1. A cell dual flue gas collection system, characterized in that, include: The electrolytic cell assembly has multiple U-shaped openings for securing the anode guide rods and multiple fire holes for adding materials; The first gas collecting component is disposed above the flame opening, and the first gas collecting component is provided with a plurality of first air intakes, the plurality of first air intakes being disposed corresponding to the plurality of flame openings; The second gas collection component is arranged in parallel with the first gas collection component, and the second gas collection component is provided with a plurality of second air intakes, which are arranged in correspondence with a plurality of U-shaped ports.

2. The cell double flue gas collection system of claim 1, wherein, The first gas collection assembly includes a first gas collection pipe and a plurality of first gas collection hoods; the first air intake is opened on the side of the first gas collection pipe facing the flame opening, and one first gas collection hood is connected to one first air intake and extends toward the flame opening.

3. The cell double flue gas collection system of claim 2, wherein, The first gas collecting hood is located between the first gas collecting pipe and the electrolytic cell assembly; one end of the first gas collecting hood is connected to the first gas inlet, and the other end is covered by the fire hole.

4. The cell double flue gas collection system of claim 1, wherein, The second gas collection assembly includes a second gas collection pipe and a plurality of second gas collection hoods; the second air intake is opened on the side of the second gas collection pipe facing the U-shaped opening, and one second gas collection hood is connected to one second air intake and extends in the direction of the U-shaped opening.

5. The cell double flue gas collection system of claim 4, wherein, The second gas collecting hood is located between the second gas collecting pipe and the electrolytic cell assembly; one end of the second gas collecting hood is connected to the second gas inlet, and the other end is covered by the U-shaped opening.

6. The cell double flue gas collection system of claim 4, wherein, The second gas collecting pipe is also provided with a third air intake on the side facing the electrolytic cell assembly. The third air intake is used to draw in residual flue gas inside the electrolytic cell assembly.

7. The cell double flue gas collection system of claim 6, wherein, The third air intake is located between the first air intake and the second air intake.

8. The cell double flue gas collection system of any one of claims 1-7, wherein, The first gas collection component is connected to a carbon dioxide recovery system and / or a waste heat recovery system; and / or, the second gas collection component is connected to a purification system.

9. A control method characterized by, The electrolytic cell dual-flue gas collection system according to any one of claims 1-8 comprises: Obtain the current operating status of the electrolytic cell assembly; The suction force of the first gas collecting component and the second gas collecting component is determined based on the current working state.

10. The control method according to claim 9, characterized by Determining the suction force of the first gas collecting component and the second gas collecting component based on the current operating state includes: When the electrolytic cell assembly is in normal working condition, the first gas collecting assembly is controlled to operate with a first suction force, and the second gas collecting assembly is controlled to operate with a second suction force. When the electrolytic cell assembly is in the anodic effect state, the first gas collecting assembly is controlled to operate with a third suction force, and the second gas collecting assembly is controlled to operate with a second suction force; wherein, the third suction force is greater than the first suction force; When the electrolytic cell assembly is in an open operation state, the first gas collecting assembly is controlled to operate with a first suction force, and the second gas collecting assembly is controlled to operate with a fourth suction force; wherein the fourth suction force is greater than the second suction force.