A type of inclined pile foundation for transmission line towers with arrow-shaped anchoring structure
The arrow-shaped anchoring structure of the transmission line tower root-type inclined pile foundation solves the problem of insufficient pull-out and overturning resistance under complex terrain and geological conditions, realizes efficient and environmentally friendly transmission line foundation construction, and reduces construction and operation and maintenance costs.
Patent Information
- Application Number
- CN202611588305.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-14
- Publication Date
- 2026-11-17
AI Technical Summary
Existing transmission line tower foundations suffer from problems such as insufficient uplift and overturning resistance under complex terrain and geological conditions, poor terrain adaptability, large earthwork excavation volume, and high construction and maintenance costs.
The transmission line tower root-type inclined pile foundation adopts an arrow-shaped anchoring structure. The anchoring petals are driven to open outward around the movable hinge by the push rod inside the inclined pile body, forming a reliable interlock with the soil and creating a composite resistance system. Combined with the flexible adjustment of the tilt angle of the inclined pile body, it can adapt to complex terrain.
It significantly improves pull-out and overturning resistance, reduces earthwork excavation, lowers construction and operation and maintenance costs, and meets the development needs of green construction and safe and efficient operation.
Smart Images

Figure CN123109198A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of power transmission line tower foundation engineering, specifically relating to a root-type inclined pile foundation for power transmission line towers with an arrow-shaped anchoring structure. Background Technology
[0002] Transmission lines are the lifeline of power transmission, traversing extremely complex terrains. As power grid construction continues to extend into high-altitude, mountainous, hilly, and loosely geological areas, the stability of transmission tower foundations directly affects the safe operation of the power grid and the reliability of power supply. Especially under conditions of strong winds, icing, earthquakes, and complex geological formations, tower foundations need to possess excellent uplift resistance, overturning resistance, and long-term load-bearing capacity.
[0003] Currently, transmission line tower foundations commonly employ straight pile foundations and ordinary inclined pile foundations. Straight pile foundations primarily rely on the lateral skin friction between the pile and the soil, as well as the pile's own weight, to bear the load, resulting in limited uplift and overturning resistance. When situated in loose soil layers, soft foundations, or under extreme loads, straight pile foundations are prone to problems such as pile tilting, displacement, and even uplift. While ordinary inclined pile foundations can distribute some horizontal loads through their inclined arrangement, their uplift resistance still mainly depends on the lateral skin friction of the pile, limiting their load-bearing capacity improvement. Furthermore, they are poorly suited for complex conditions such as steep mountain slopes and fractured rock formations.
[0004] To improve load-bearing capacity, improved foundations such as expanded-base piles and prestressed piles have emerged in existing technologies. These foundations typically increase load-bearing capacity by increasing the bearing area at the pile tip or by applying prestress, but they often have high requirements for construction equipment and site conditions, and significantly increase material consumption and construction costs. Under complex geological conditions, the improvement in their pull-out and overturning resistance is still relatively limited, making it difficult to balance structural stability and economy.
[0005] Furthermore, traditional transmission tower foundation construction typically requires large-scale site leveling and deep pit excavation, resulting in substantial earthwork, long construction periods, and potential damage to surface vegetation and soil erosion. This is incompatible with the green construction and environmentally friendly development requirements of transmission line projects. In terms of operation and maintenance, existing foundations are prone to instability in areas with frequent extreme weather events, necessitating regular reinforcement and maintenance, leading to high operating costs. In the event of tower tilting or collapse, it could trigger widespread power outages, causing severe economic losses and social impact.
[0006] Meanwhile, although there are some attempts to apply the mechanical anchoring principle to geotechnical engineering in existing technologies, there are few structures that deeply integrate it with the inclined pile foundation of transmission line towers. In particular, there is a lack of anchoring structures that can actively open at the bottom of the pile and form a reliable mechanical interlock with the soil, thereby significantly improving the pull-out resistance and overturning resistance.
[0007] In summary, existing transmission tower foundations still suffer from problems such as insufficient uplift and overturning resistance, poor terrain adaptability, large earthwork excavation volume, and high construction and maintenance costs under complex terrain and geological conditions. Therefore, how to provide a transmission line tower foundation structure that combines high load-bearing stability, adaptability to complex terrain, and green economy has become an urgent technical problem to be solved in this field. Summary of the Invention
[0008] This invention provides a root-type inclined pile foundation for transmission line towers with an arrow-shaped anchoring structure to solve the problems mentioned in the background art.
[0009] The present invention adopts the following technical solution: A type of inclined pile foundation for transmission line towers with an arrow-shaped anchoring structure includes: The inclined pile body is inclined and has an insertion channel extending along its axial direction. A push rod, which passes through the insertion channel and slides in cooperation with the inclined pile body, and the lower end of the push rod can extend out of the lower end of the inclined pile body; A movable hinge is provided at the lower end of the push rod; An anchoring petal, which is hinged to the movable hinge; The push rod can move upward relative to the inclined pile body to drive the anchoring petals to open outward around the movable hinge, so that the anchoring petals engage with the soil.
[0010] Furthermore, it also includes steps, with the inclined pile body located below the steps.
[0011] Furthermore, the upper end of the push rod is provided with a handle.
[0012] Furthermore, the push rod is a concrete push rod, and the handle extends into the push rod along a preset assembly direction, and is encased in concrete to form an inseparable integral structure with the push rod.
[0013] Furthermore, the outer diameter of the push rod is adapted to the inner diameter of the insertion channel, and the gap between the outer diameter of the push rod and the inner diameter of the insertion channel is less than 3mm.
[0014] Furthermore, the number of anchoring petals is two, and the two anchoring petals are symmetrically arranged on both sides of the movable hinge, and can rotate freely around the movable hinge.
[0015] Furthermore, a limiting structure is provided on the movable hinge, which is used to limit the maximum rotation angle of the anchoring petal.
[0016] Furthermore, the push rod and the movable hinge are connected by a pin locking structure; a steel anchor with a shaft hole is pre-embedded at the lower end of the push rod, and the steel anchor is connected to the movable hinge by a pin, the end of which is provided with an axial limiting component; a reinforcing steel plate is provided at the joint between the steel anchor and the push rod.
[0017] Compared with the prior art, the present invention has the following beneficial effects: Once the anchoring petals open, they form a reliable interlock with the soil, effectively resisting the uplift force and overturning moment caused by extreme loads such as strong winds and icing, reducing the risk of pile tilting, displacement, or even uplift.
[0018] The inclined pile body can flexibly adjust the tilt angle according to the actual terrain slope such as mountains and hills, so as to achieve "following the shape and terrain" and bury it without large-scale site leveling. It is especially suitable for complex working conditions such as loose geology and steep slopes.
[0019] Because of the high load-bearing efficiency of the anchoring structure, the pile diameter and pile length can be reduced accordingly when the same load-bearing capacity is achieved. Only a narrow hole needs to be excavated to complete the installation, thereby reducing the amount of earthwork excavation and reducing the damage to surface vegetation and the ecological environment.
[0020] The amount of construction materials used is reduced, and the costs of excavation, transportation and site modification are lowered; the risk of foundation instability during operation is small, and the frequency of reinforcement and maintenance and operation and maintenance costs are significantly reduced, taking into account both the initial construction costs and the later operation and maintenance costs.
[0021] The handle and the concrete push rod form an inseparable integrated structure. The push rod and the movable hinge are connected by a pin lock and are equipped with a limiting structure and a reinforcing steel plate to ensure stable transmission of pushing and pulling forces, limit the rotation amplitude of the anchoring petal, and avoid stress concentration or failure at the connection point.
[0022] This invention can effectively solve the problems of insufficient uplift and overturning resistance of existing power transmission tower foundations, poor adaptability to complex terrain, large earthwork excavation volume, and high construction and operation and maintenance costs, and meet the development needs of safe, efficient and green construction of modern power transmission line projects. Attached Figure Description
[0023] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0024] Figure 1 This is a schematic diagram of the inclined pile foundation in an embodiment of the present invention; Figure 2This is a schematic diagram of the structure in an embodiment of the present invention, showing the separation of the inclined pile body from the push rod; Figure 3 This is a schematic diagram of the structure of the inclined pile body and the push rod assembly in an embodiment of the present invention; Figure 4 This is a schematic diagram of the anchoring lobe closure structure in an embodiment of the present invention; Figure 5 This is a schematic diagram of the structure where the anchoring petals open in an embodiment of the present invention.
[0025] Explanation of reference numerals in the attached figures: 1. Inclined pile body; 2. Push rod; 3. Handle; 4. Movable hinge; 5. Anchoring petal; 6. Step. Detailed Implementation
[0026] The technical solution of the present invention will be described in detail below with reference to specific embodiments. Those skilled in the art should understand that the following embodiments are only used to further illustrate the technical solution of the present invention and are not intended to limit the scope of protection of the present invention. All equivalent transformations, simple modifications, or substitutions made based on the essential principles of the above-described technical solution of the present invention should be covered within the scope of protection of the present invention.
[0027] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention pertains. The terminology used herein in the description of this invention is for descriptive purposes only and is not intended to limit the scope of the invention.
[0028] Example 1 like Figure 1-5 As shown, this embodiment provides a root-type inclined pile foundation for a transmission line tower with an arrow-shaped anchoring structure, including an inclined pile body 1, a push rod 2, a handle 3, a movable hinge 4, an anchoring petal 5, and a step 6. The entire inclined pile is located below the step 6.
[0029] The inclined pile body 1 is constructed of reinforced concrete with a concrete strength grade of C40 to meet the load-bearing and deformation resistance requirements of the inclined pile. The inclined pile body 1 contains an HRB400 grade steel cage, which, through a pre-designed reinforcement scheme, works in tandem with the concrete substrate to enhance the overall mechanical properties and structural stability of the inclined pile. The inclined pile body 1 can adaptively adjust its tilt angle according to the actual slope of the construction area. This angle adjustment allows for stable installation of the pile foundation at the target construction location, thereby reducing the amount of earthwork excavation required for terrain modification from the outset, while also lowering the difficulty and cost of terrain modification.
[0030] The inclined pile body 1 has an insertion channel extending along its axial direction. The shape parameters and cross-sectional specifications of the push rod 2 are adapted to the insertion channel of the inclined pile body 1, ensuring that the push rod 2 can be inserted into the inclined pile body 1 precisely. Specifically, the diameter of the push rod 2 is adapted to the corresponding interface size preset on the inclined pile body 1; the adaptation accuracy is controlled so that the gap between the outer diameter of the push rod 2 and the inner diameter of the interface is less than 3mm, to ensure a reliable fitting connection between the push rod 2 and the interface. This dimensional fit design ensures that there is no displacement deviation during the process of the push rod 2 transmitting the jacking force or supporting force to the inclined pile body 1, avoiding the impact on the strength of the inclined pile due to excessive gap between the push rod 2 and the interface, and further ensuring the construction quality of stable installation of the inclined pile.
[0031] Handle 3, made of metal, is installed on the top of push rod 2. It extends into the pre-set mounting position of the concrete push rod 2 along a predetermined assembly direction. After the concrete push rod 2 is poured and cured, handle 3, through the binding effect of the cured concrete, forms an integral and inseparable whole with the push rod 2. This connection structure makes handle 3 a dedicated operating component of the push rod 2. Operators can apply pushing and pulling forces by gripping handle 3. This force is directly and without loss transmitted to the push rod 2, preventing force transmission failure or component detachment due to loose connection between handle 3 and push rod 2. This ensures the stability and reliability of push rod 2 in subsequent operations.
[0032] A movable hinge 4 is mounted on top of the push rod 2. The movable hinge 4 is connected to the concrete push rod 2 via a pre-designed fitting structure, and the movable hinge 4 and the push rod 2 form a cohesive whole with synergistic mechanical properties. Anchoring petals 5 are connected to the movable hinge 4. There are two anchoring petals 5, made of low-alloy high-strength structural steel; the anchoring petals 5 are connected to the movable hinge 4 and can rotate freely around the movable hinge 4. The anchoring petals 5 can open outwards as the push rod 2 is pulled upwards. The movable hinge 4 can limit the maximum rotation angle of the anchoring petals 5 hinged to it, thereby constraining the rotation amplitude of the anchoring petals 5 and preventing excessive rotation.
[0033] Example 2 The anchoring petal 5 is made of low-alloy high-strength structural steel, which can effectively withstand the compressive stress and shear stress generated by soil compression and friction during the interlocking process of the anchoring petal 5, and prevent the anchoring petal 5 from deforming or breaking due to stress overload. At the same time, the material has good structural stability, can be adapted to most non-corrosive geological environments, maintains its own mechanical properties during long-term contact with the soil, ensures the reliable interlocking state between the anchoring petal 5 and the soil, and provides stable support for the overall pull-out and overturning resistance of the inclined pile.
[0034] A movable hinge 4 is positioned at a predetermined connection point between the two anchoring petals 5, forming a predetermined rotational connection with each of the two anchoring petals 5. This movable hinge 4 serves as the common rotation center of the two anchoring petals 5, providing structural support for their rotational movement. Specifically, the two anchoring petals 5 can rotate within a predetermined angle range around the axis of the movable hinge 4, with their rotational stroke adapting to the opening, closing, and unfolding actions of the anchoring petals 5 to engage the soil. Through the rotational constraint of the movable hinge 4, the stability of the anchoring petals 5's posture during rotation is ensured, preventing deviation or jamming, thereby guaranteeing the synchronization and coordination of the two anchoring petals 5's movements and laying a structural foundation for reliable soil engagement and the transmission of composite resistance. Figure 3 This shows the anchoring lobe in closed state. Figure 4 This shows the anchoring lobe in the open state.
[0035] Example 3 When the operator pulls the push rod 2 upwards using handle 3, the anchoring petals 5 are driven to open and close as preset, thus anchoring the inclined pile at the target construction location. In the anchored state, the anchoring petals 5 form a reliable interlocking action with the surrounding soil, upgrading the pull-out resistance and overturning resistance of the inclined pile from the traditional single "pile side friction resistance" to a composite resistance system of "mechanical interlocking resistance of the anchoring petals + shear resistance of the soil itself." This composite resistance system significantly improves the bearing efficiency per unit length of the pile and effectively enhances the anchoring stability of the inclined pile under complex geological conditions.
[0036] Example 4 The push rod 2 and the movable hinge 4 are reliably connected using a pin-locking structure. At the end of the concrete push rod 2, a steel anchor with a shaft hole is pre-installed and embedded. The shaft hole size of this steel anchor precisely matches the size of the pin on the movable hinge 4, ensuring no radial clearance during connection. A high-strength pin passes through the shaft hole of the steel anchor along a pre-set axis and the corresponding mounting hole of the movable hinge 4, forming the core connection between the two. To prevent axial movement or detachment of the pin during stress, an annular groove is machined at one end of the pin. A cotter pin, a spring retainer, or a snap ring, or any one or more combinations thereof, are fitted into the annular groove. The pin shaft is axially constrained; at the same time, a reinforcing steel plate is fixedly installed at the joint between the steel anchor and the concrete push rod 2. The reinforcing steel plate can effectively disperse the shear stress at the joint, significantly enhance the shear resistance of the connection, and prevent the anchor and the concrete push rod 2 from separating or being damaged due to stress concentration. This pin-locking connection structure can not only ensure the stable transmission of force between the push rod 2 and the movable hinge 4, but also improve the reliability and durability of the connection through multiple anti-detachment designs and shear reinforcement designs, adapting to the stress requirements during the inclined pile anchoring process.
[0037] Example 5 Below each foundation step 6, 4 to 8 inclined piles as described in this invention can be installed according to a preset layout scheme. The synergistic effect of multiple inclined piles forms a stable bearing system to ensure the overall bearing reliability, overturning stability, and pull-out resistance of the foundation. The placement of the inclined piles can be adapted and adjusted according to the stress distribution characteristics and foundation size to ensure that each inclined pile evenly shares the load transmitted by the foundation and avoids overloading of a single pile. At the same time, the multi-pile layout structure can maintain the overall stability of the foundation through the redundant bearing capacity of the remaining inclined piles when local piles are abnormal, further improving the safety redundancy and long-term reliability of the foundation.
[0038] This invention utilizes a composite resistance system of "pile side friction + anchoring mesh mechanical interlocking + soil shear resistance," resulting in pull-out force and overturning moment resistance more than three times higher than traditional straight piles. It can reduce earthwork excavation by 40%-60%, shorten construction time by 20%-30%, reduce operation and maintenance costs by over 80%, and lower construction costs by 40%-50% compared to expanded-base piles. It is suitable for complex conditions such as mountainous terrain and loose geology, balancing stability, environmental friendliness, and economy. This invention is adaptable to complex conditions such as mountainous terrain, hills, and loose geology, simultaneously considering structural stability, environmental friendliness during construction, and overall lifecycle economic efficiency, meeting the development needs of modern power transmission line engineering for "green construction, safety, and efficiency." The frequency of reinforcement and maintenance during operation is reduced to less than 1 / 5 of traditional foundations, and the overall construction cost is 40%-50% lower than expanded-base piles and prestressed piles, and only 10%-15% higher than traditional straight piles.
[0039] The embodiments described above are merely preferred embodiments of the present invention and are not intended to limit the present invention. Various modifications and variations can be made to the present invention by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the scope of protection of the present invention.
Claims
1. A type of inclined pile foundation for transmission line towers with an arrow-shaped anchoring structure, characterized in that, include: The inclined pile body is inclined and has an insertion channel extending along its axial direction. A push rod, which passes through the insertion channel and slides in cooperation with the inclined pile body, and the lower end of the push rod can extend out of the lower end of the inclined pile body; A movable hinge is provided at the lower end of the push rod; An anchoring petal, which is hinged to the movable hinge; The push rod can move upward relative to the inclined pile body to drive the anchoring petals to open outward around the movable hinge, so that the anchoring petals engage with the soil.
2. The root-type inclined pile foundation of a transmission line tower with an arrow-shaped anchoring structure according to claim 1, characterized in that, It also includes steps, with the inclined pile body located below the steps.
3. The root-type inclined pile foundation of a transmission line tower with an arrow-shaped anchoring structure according to claim 1, characterized in that, The push rod has a handle at its upper end.
4. The root-type inclined pile foundation of a transmission line tower with an arrow-shaped anchoring structure according to claim 3, characterized in that, The push rod is a concrete push rod, and the handle extends into the push rod along a preset assembly direction and is encased in concrete to form an inseparable integral structure with the push rod.
5. The root-type inclined pile foundation of a transmission line tower with an arrow-shaped anchoring structure according to claim 1, characterized in that, The outer diameter of the push rod is adapted to the inner diameter of the insertion channel, and the gap between the outer diameter of the push rod and the inner diameter of the insertion channel is less than 3mm.
6. The root-type inclined pile foundation of a transmission line tower with an arrow-shaped anchoring structure according to claim 1, characterized in that, The number of anchoring petals is two, and the two anchoring petals are symmetrically arranged on both sides of the movable hinge, and can rotate freely around the movable hinge.
7. The root-type inclined pile foundation of a transmission line tower with an arrow-shaped anchoring structure according to claim 1, characterized in that, The movable hinge is provided with a limiting structure, which is used to limit the maximum rotation angle of the anchoring petal.
8. The root-type inclined pile foundation of a transmission line tower with an arrow-shaped anchoring structure according to claim 1, characterized in that, The push rod and the movable hinge are connected by a pin locking structure; a steel anchor with a shaft hole is pre-embedded at the lower end of the push rod, and the steel anchor is connected to the movable hinge by a pin, the end of which is provided with an axial limiting component; a reinforcing steel plate is provided at the joint between the steel anchor and the push rod.