Pipeline dredging system

The pipeline blockage dredging system utilizes control equipment and rigid blockage devices to precisely open and dredge cement and stone blockages. Combined with water hammer safety analysis, it solves the problem of low dredging efficiency of PVC drainage pipes in the bottom slab of the Yellow River Tunnel, achieving efficient and safe dredging results.

CN123109267APending Publication Date: 2026-11-17HENAN BRANCH OF CHINA SOUTH TO NORTH WATER TRANSFER GRP MIDDLE LINE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611074671.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-07-20
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

The PVC drainage pipes in the bottom slab of the tunnel through the Yellow River are clogged with cement and stone, resulting in low dredging efficiency and failing to meet the needs of large-scale, routine management. Furthermore, existing dredging methods suffer from limited working space and insufficient efficiency.

Method used

A pipe blockage clearing system is used to obtain data on the base plate structure and the pressure inside the pipe through control equipment, accurately determine the location and size of the target opening, and clear the blockage using hard blockage clearing equipment. Ground-penetrating radar is used to identify restricted areas to avoid damaging the pipe wall, and a repair plan is developed based on water hammer safety analysis.

Benefits of technology

It achieves efficient unblocking of cement and stone blockages, reduces the risk of damage to pipe walls and internal components, improves unblocking efficiency and safety, and ensures the stability and safety of tunnel structures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109267A_ABST
    Figure CN123109267A_ABST
Patent Text Reader

Abstract

This invention relates to the field of pipeline dredging technology, specifically to a pipeline blockage dredging system. The pipeline blockage dredging system includes: a rigid blockage dredging device, a drilling device, and a control device; wherein: the control device is used to acquire the base plate structure data and internal pressure data of the pipeline to be dredged; based on the base plate structure data and internal pressure data, it determines the location and size of each target opening in the pipeline; the drilling device is used to cut and form target holes at each target opening location according to the target opening location and corresponding target opening size; the rigid blockage dredging device is used to dredge the pipeline starting from the target holes. This achieves efficient dredging of cement and stone blockages in the pipeline.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of pipeline dredging technology, specifically to a pipeline blockage dredging system. Background Technology

[0002] The Yellow River tunnel adopts a typical double-layer lining composite structure. The PVC drainage network embedded in its bottom slab is a key auxiliary facility of the tunnel system. It is mainly used to drain water seepage in the lining interlayer in real time, reduce the pressure of the surrounding groundwater, and reduce the structural seepage deformation load. It plays an irreplaceable role in controlling the seepage pressure of the tunnel structure and ensuring the long-term safe and stable operation of the double-layer lining structure.

[0003] In long-term engineering practice, high-strength cement-stone blockage is a common problem in the PVC drainage pipes of tunnels crossing the Yellow River. This problem mainly stems from two causes: first, residual cement grout from the lining grouting work during tunnel construction seeps into the drainage pipes and solidifies to form a hard stone matrix; second, during the operation phase, tunnel seepage continuously carries fine cement particles and surrounding rock debris, which deposit and harden within the pipes, gradually forming a dense, high-hardness composite blockage that easily leads to partial or complete blockage of the drainage pipes. After the drainage pipes become blocked, the seepage pressure in the tunnel lining interlayer cannot be released normally, easily causing safety hazards such as water seepage, deformation, and stress concentration in the lining structure, seriously threatening the structural stability and safety of the Yellow River tunnel during long-term water transport operation.

[0004] Currently, the dredging techniques for cement and stone blockages in pipelines under the Yellow River Tunnel are still relatively traditional. In practical applications, there is a core contradiction: limited working space and insufficient dredging efficiency. The construction area under the Yellow River Tunnel is narrow and the working surface is enclosed, making it impossible for large-scale mechanized dredging equipment to enter the site. Existing dredging operations mostly rely on manual simple crushing and flushing methods, which are labor-intensive, have long dredging cycles, and do not thoroughly clear blockages, resulting in extremely low overall dredging efficiency and failing to meet the needs of large-scale, routine pipeline blockage management.

[0005] Therefore, how to efficiently dredge cement and stone blockages in pipes has become an urgent technical problem to be solved. Summary of the Invention

[0006] This invention provides a pipe blockage dredging system to solve the problem of how to efficiently dredge cement and stone blockages in pipes.

[0007] In a first aspect, the present invention provides a pipe blockage dredging system, comprising: a rigid blockage dredging device, a hole-drilling device, and a control device; wherein: the control device is used to acquire the base plate structure data and the internal pressure data of the pipe to be dredged; and to determine the target hole positions and target hole sizes corresponding to each target hole position of the pipe to be dredged based on the base plate structure data and the internal pressure data; the hole-drilling device is used to cut and form target holes at each target hole position according to the target hole position and the corresponding target hole size; and the rigid blockage dredging device is used to dredge the pipe to be dredged starting from the target holes.

[0008] The pipe blockage clearing system provided in this application embodiment uses control equipment to acquire the base plate structure data and internal pressure data of the pipe to be cleared. This avoids areas unsuitable for drilling, such as the main reinforcement bars, structural joints, and reinforcement layers of the tunnel base plate, and prioritizes drilling in pipe sections with relatively stable pressure. The control equipment determines the target drilling location and size based on the base plate structure data and internal pressure data. The drilling equipment cuts to form the target hole according to the target coordinates and size, reducing damage to the pipe wall caused by excessive cutting and eccentric cutting. The hard blockage clearing equipment enters the pipe through the target hole and removes cement and stone blockages through a combination of central core drilling and peripheral ring grinding. The roller centering structure limits the radial deviation of the drill bit, thereby reducing the risk of the drill bit and grinding disc damaging the pipe wall and internal components, achieving efficient clearing of hard blockages in the pipe to be cleared.

[0009] In one optional embodiment, the pipe blockage clearing system further includes: a ground-penetrating radar; the ground-penetrating radar is communicatively connected to a control device; wherein: the ground-penetrating radar is used to scan the pipe to be cleared, obtaining a radar profile image and electromagnetic wave reflection waveform corresponding to the pipe to be cleared; the control device is used to determine the base plate structure data corresponding to the pipe to be cleared based on the radar profile image and electromagnetic wave reflection waveform; the base plate structure data includes at least one of the following: base plate main reinforcement, transverse drainage branch pipes, structural expansion joints, carbon fiber or steel plate reinforcement layer; the control device is used to acquire a three-dimensional geometric model corresponding to the pipe to be cleared, and calculate the pipe pressure data at each detection location corresponding to the pipe to be cleared based on the three-dimensional geometric model; the control device is used to determine the pressure risk level corresponding to at least one detection location of the pipe to be cleared based on the pipe pressure data corresponding to each detection location; the control device is also used to determine multiple candidate opening locations based on the base plate structure data and the pressure risk level corresponding to each detection location; and determine the target opening location from the candidate opening locations.

[0010] The pipeline blockage clearing system provided in this application embodiment uses ground-penetrating radar to scan the pipeline to be cleared, obtaining radar profile images and electromagnetic wave reflection waveforms corresponding to the pipeline. The ground-penetrating radar scan and waveform image acquisition can accurately identify the location of components such as the main reinforcement of the foundation slab and structural joints, and can accurately delineate structural restricted areas, effectively avoiding the risk of borehole damage to the main load-bearing structure of the tunnel lining. The control equipment uses a three-dimensional geometric model of the pipeline to perform CFD simulation calculations of the pressure data within the entire pipeline, which can completely obtain steady-state static pressure and water hammer ultimate pressure. The pressure data is complete across the entire range and has high calculation accuracy, providing accurate hydraulic basis for pressure risk classification. The control equipment classifies the pressure risk level into three levels based on the pipeline pressure values, accurately identifying high-risk sections for water hammer overpressure and negative pressure, achieving hydraulic control of the borehole opening red line, and avoiding sensitive pipe sections prone to water hammer impact damage. The control equipment integrates the constraints of the base plate structure and the pressure risk level to screen candidate points, and then combines the stress spacing and the dredging construction spacing to select the target opening position. It takes into account the safety of the lining structure, the hydraulic safety of water hammer and the feasibility of on-site dredging construction, so as to achieve a scientific and reasonable layout of the opening points.

[0011] In one optional implementation, the control device is configured to determine the candidate opening size corresponding to each candidate opening position based on the base plate structure data and the pressure risk level corresponding to each candidate opening position; determine the target opening spacing between adjacent candidate opening positions based on the candidate opening size corresponding to each candidate opening position; determine the target opening position from each candidate opening position based on each target opening spacing, and determine the candidate opening size corresponding to the candidate opening position of the target opening position as the target opening size.

[0012] The pipeline blockage clearing system provided in this application determines candidate opening sizes based on the base plate structure and pressure level. The opening boundaries are dynamically fine-tuned in conjunction with the distribution of base plate components. Opening specifications are matched according to water pressure levels, and a large opening construction allowance is reserved in high-pressure water hammer areas. This avoids damage to the lining structure from excavation and provides operational space for subsequent thick-walled reinforcement and repair. The target opening spacing is calculated based on the candidate slot sizes. The mechanical safety spacing is calculated according to the Saint-Venant stress interference rule, and a stringent value is taken based on the equipment clearing distance to precisely control the opening spacing, prevent stress superposition between adjacent slots, and ensure the overall structural safety of the pipeline. Points are screened according to the target spacing to lock in the target opening location and target opening size. Qualified points are selected, and matching opening sizes are simultaneously finalized. The point layout considers full clearing coverage, structural and water hammer safety, and the dimensional parameters can be directly used for on-site opening construction, ensuring precise matching between design and construction.

[0013] In one optional implementation, the control device is used to determine the initial opening size corresponding to each candidate opening location based on the pressure risk level corresponding to each candidate opening location; the initial opening size includes an initial groove width, an initial groove length, and an initial end chamfer; the initial opening size is adjusted according to the base plate structure data to obtain the temporary opening size corresponding to each candidate opening location; based on the pipe type corresponding to the pipe to be dredged, it is detected whether the temporary opening size meets the preset verification conditions; if the temporary opening size meets the preset verification conditions, the temporary opening size is determined as a candidate opening size; if the temporary opening size does not meet the preset verification conditions, the temporary opening size is adjusted until the preset verification conditions are met to obtain the candidate opening size.

[0014] The pipeline blockage clearing system provided in this application sets the initial opening size according to the pressure risk level: high-pressure water hammer points have enlarged chamfers and moderately enlarged specifications, while low-pressure points use standard sizes, specifically adapted to water hammer loads, and with pre-reserved stress redundancy. The size is then modified to a temporary size based on the base slab structure. The opening range is reduced near reinforcing bars and structural joints to avoid excavation damage to the tunnel lining load-bearing components, ensuring the safety of the base structure. The temporary size is verified according to the pipeline type, checking the lower limit of equipment passage and the upper limit of mechanical requirements, controlling dimensional compliance from both hardware installation and structural strength dimensions. Unqualified sizes are iteratively optimized. Repeated modifications are made until all conditions are met, and the final candidate opening size simultaneously meets all requirements for water pressure conditions, structural limitations, and equipment access, combining practicality and safety in its design.

[0015] In one optional embodiment, the hard blockage clearing device includes: a drilling rig power unit, a roller centering drill bit, at least one drill rod extension device, and a support device; the proximal end of the drill rod extension device is detachably connected to the output end of the drilling rig power unit, the roller centering drill bit is installed at the distal end of the drill rod extension device, and the support device is sleeved on the outside of the drill rod extension device. The drilling rig power unit drives the annular coring drill bit to drill out the central hard blockage core, the diameter of which is smaller than the minimum inner diameter of the hollow channel formed by the drilling rig power unit and the drill rod extension device; the roller centering drill bit is used to abrade the hard blockage surrounding the central hard blockage core; the drill rod extension device extends the power transmission distance and the core removal channel; and the support device provides radial support, coaxial positioning, and axial limiting for the drill rod extension device.

[0016] The pipe blockage clearing system provided in this application embodiment first forms a central blockage core with a diameter smaller than the minimum inner diameter of the hollow channel, maintaining a core discharge gap between the core and the hollow channel to facilitate core recovery and reduce peripheral grinding resistance. The roller-centered drill bit limits radial displacement through rolling contact between the roller and the pipe wall, reducing the risk of the drill bit and grinding disc damaging the PVC pipe wall and internal components. The drill rod extension device adopts a modular, detachable, and splicing structure. Support equipment is arranged at intervals along the drill rod and equipped with releasable axial limiters, thereby suppressing long drill rod deflection and axial movement, improving the stability of long-distance clearing operations.

[0017] In one optional embodiment, the drilling rig's main power unit includes: a core drilling rig, an electronic speed control device, a water-cooled circulating water supply unit, a real-time torque monitoring device, a horizontal leveling mechanism, and a vibration sensing device. The horizontal leveling mechanism is installed below the core drilling rig and is leveled mechanically. The core drilling rig includes a first motor, an annular core drill bit, and a hollow pipe. The inner diameter of the annular core drill bit corresponds to the diameter of a preset central core, and the inner diameter of the hollow pipe is larger than the inner diameter of the annular core drill bit. The first motor drives the annular core drill bit through the hollow pipe and a drill rod extension device. The electronic speed control device is communicatively connected to the first motor, the real-time torque monitoring device, the vibration sensing device, and the control device. The core drilling rig is used to drill out a central hard, clogged core. The water-cooled circulating water supply unit is used for cooling and flushing slag. The control device controls the electronic speed control device to adjust the speed of the first motor according to the current torque and / or vibration amplitude.

[0018] The pipe blockage clearing system provided in this application embodiment features a horizontal leveling mechanism that precisely calibrates the horizontal coaxiality of the drilling rig upon startup, ensuring the core drill bit is aligned with the center of the pipe and preventing off-center drilling and scraping against the PVC pipe wall from the source. The core drill (first motor + hollow pipe + core drill bit) can drill a matching central blockage core in one go. The core is then withdrawn along the hollow pipe, efficiently breaking through hard cement and significantly reducing the subsequent external grinding load. The electronic speed control device can receive commands from the upper control unit to precisely adjust the motor speed, providing stable low-speed drilling for shallow layers and high-speed efficiency for deeper layers, adapting to blockage conditions of varying hardness. A water-cooled circulating water supply unit continuously cools the drill bit and motor, removing cutting heat and preventing high-temperature softening of the pipe material to be cleared, while also flushing away drill cuttings. A real-time torque monitoring device and vibration sensor capture data on stuck drills and eccentricity in real time, working in conjunction with the control equipment for closed-loop speed regulation, speed reduction and shutdown, and automatic overload protection to prevent drill bit jamming and pipe damage from impacts. The closed-loop control system dynamically adjusts the speed based on torque and vibration data, forming a complete safety closed loop that balances dredging efficiency with the operational safety of equipment, pipelines, and internal cables.

[0019] In one optional embodiment, the roller centering drill bit includes a first grinding disc, a roller assembly, and a second grinding disc arranged sequentially along the axial direction of the hollow pipe. Both the first and second grinding discs are annular and are circumferentially torsionally connected to the hollow pipe via at least one of keyed connection, splined connection, or polygonal shaft-hole fit, while being fixed by an axial limiting member. The roller assembly includes multiple roller supports and rollers mounted on each roller support. The rollers are evenly distributed along the circumference of the hollow pipe and roll in contact with the inner wall of the pipe to be dredged. The annular core drill bit extends axially in front of the first grinding disc. The control device controls the axial feed rate, causing the annular core drill bit to first contact and drill out the central hard blockage core, and then the first and second grinding discs contact the peripheral hard blockage object for wear.

[0020] The pipe blockage clearing system provided in this application embodiment comprises a first grinding disc, a roller assembly, and a second grinding disc arranged axially at intervals to form a centering grinding assembly. A circumferential torsion transmission connection structure ensures that the grinding discs rotate synchronously with the hollow pipe, and axial limiting components prevent the grinding disc assembly from shifting. An annular core drill bit extends forward, allowing central core drilling and peripheral annular grinding to be performed in stages according to the same power source and axial feed sequence. Roller contact with the pipe wall limits radial displacement of the grinding discs, thereby reducing the risk of metal components damaging the PVC pipe wall and internal components.

[0021] In one alternative implementation, the pipe blockage dredging system further includes a repair device; the control device is used to determine a target repair plan based on the target opening size corresponding to each target opening location, and send the target repair plan to the repair device; the repair device is used to repair each target opening location according to the target repair plan.

[0022] The pipeline blockage clearing system provided in this application provides a customized repair solution based on the opening size and peak water hammer pressure. High-pressure points are matched with thick-walled reinforcing plates and wide-width bonding solutions. The solution parameters precisely match the load and opening specifications at each point, specifically resisting alternating shear forces from water hammer and preventing secondary cracking after repair. Strict adherence to the customized solution during construction ensures the reinforcing structure's load-bearing capacity matches the original pipeline, the bonding overlap dimensions meet standards, and the repair interface is firmly bonded. It is suitable for long-term water hammer conditions in tunnels, offering high repair durability and significantly reducing rework and maintenance costs.

[0023] In one optional implementation, the control device is used to acquire the pipe parameters corresponding to the pipe to be dredged, and calculate the water hammer wave velocity correction parameters corresponding to the target opening position based on the pipe parameters; acquire the pipe flow velocity mutation value corresponding to the target opening position; calculate the maximum water hammer pressure rise based on the water hammer wave velocity correction parameters and the pipe flow velocity mutation value; calculate the design peak pressure based on the maximum water hammer pressure rise; and determine the target repair scheme based on the target opening size and the design peak pressure.

[0024] The pipeline blockage dredging system provided in this application calculates water hammer wave velocity correction parameters. It incorporates the elastic characteristics of the pipe material to be dredged, ensuring the wave velocity calculation closely matches actual pipeline conditions, resulting in higher accuracy in water hammer pressure calculation and resolving the problem of large deviations in rigid formula calculations. It collects abrupt flow velocity changes, accurately capturing pump station start-up and shutdown limit parameters to recreate real water hammer occurrence conditions, with safe and conservative load values. It solves for the maximum water hammer pressure rise, quantifies instantaneous impact pressure, and fully understands the water hammer impact load at the opening location. It calculates the design peak pressure, superimposes steady-state static pressure, and matches a safety factor with the risk level to obtain the usable design load for the project, providing a reliable basis for reinforcement calculations. A repair plan is formulated based on the opening size and peak pressure. It accurately calculates the thickness of the thick-walled reinforcement plate and the width of the wide bonding area, adapting the plan to water hammer alternating shear loads, effectively preventing delamination of the repair interface and secondary pipeline damage, ensuring long-term stability of the repaired structure.

[0025] In one optional implementation, if the target repair solution is a thick-walled reinforcing plate and a wide-width bonding solution, the control device is used to calculate the minimum thickness of the reinforcing plate and the minimum bonding width on one side based on the design peak pressure, and send the calculation results to the repair device; the repair device is used to repair each target opening position according to the calculation results.

[0026] The pipe blockage clearing system provided in this application calculates the minimum thickness of the reinforcing plate based on the design peak pressure. Strictly adhering to the membrane stress formula, the thickness is quantitatively calculated to ensure that the tensile strength of the thick-walled reinforcing plate fully withstands the peak water hammer pressure, matching the stress characteristics of the pipe to be cleared and preventing the reinforcing plate from bulging and cracking due to internal pressure. The minimum bonding width on one side is calculated. Based on the shear strength formula, the bonding overlap size is determined. Wide bonding significantly improves the shear and peel resistance of the adhesive layer, allowing it to withstand the alternating shear forces of water hammer caused by pump station start-up and shutdown for extended periods, preventing bonding interface detachment and failure. On-site repair is carried out according to the calculated parameters. Scientifically quantified dimensional parameters and clear construction standards ensure that the stress of the reinforcing structure matches the original pipe, completely solving the shortcomings of traditional experience-based repairs that are not resistant to water hammer and suffer secondary damage later, significantly improving the durability of the repair. Attached Figure Description

[0027] To more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the specific embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For those skilled in the art, other drawings can be obtained from these drawings without creative effort.

[0028] Figure 1 This is a schematic diagram of the structure of a first type of pipe blockage clearing system according to an embodiment of the present invention; Figure 2This is a schematic diagram of the structure of a second type of pipe blockage clearing system according to an embodiment of the present invention; Figure 3 This is a schematic diagram of the structure of a rigid sludge removal device according to an embodiment of the present invention; Figure 4 This is a schematic diagram of the structure of the drilling rig power unit according to an embodiment of the present invention; Figure 5 This is a schematic diagram of the axial section and radial structure of a roller centering drill bit according to an embodiment of the present invention. Detailed Implementation

[0029] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0030] The terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of this invention, "a plurality of" means two or more, unless otherwise explicitly specified.

[0031] This invention provides a pipe blockage dredging system, such as Figure 1 As shown, the pipe blockage clearing system includes: rigid blockage clearing equipment 1, drilling equipment 2, and control equipment 3; wherein: Control device 3 is used to acquire the base plate structure data and the internal pressure data of the pipe to be dredged; and to determine the location of each target opening and the size of each target opening based on the base plate structure data and the internal pressure data. The hole-cutting device 2 is used to cut and form target holes at each target hole-cutting position according to each target hole-cutting position and the corresponding target hole-cutting size; The rigid blockage clearing device 1 is used to clear blockages in pipes starting from the target hole.

[0032] The pipe to be dredged can be a PVC pipe. Specifically, the control device 3 can receive the base plate structure data and internal pressure data of the pipe to be dredged, input by the user. Then, based on the base plate structure data and internal pressure data of the pipe to be dredged, at least one candidate opening position is determined. Based on each candidate opening position, each target opening position and the corresponding target opening size are determined.

[0033] The drilling equipment 2 includes a controller and a drilling trolley. The control device 3 sends the target drilling dimensions corresponding to each target drilling location to the controller. The controller, relying on the tunnel's unified mileage markers, controls the drilling trolley to precisely reach the target drilling location. Then, the controller verifies the drilling center corresponding to the target drilling location using laser positioning, levels the drilling trolley, and matches the base slope. It loads the complete set of cutting dimension parameters (i.e., the target drilling dimensions) corresponding to the target drilling location and sets the cutting depth and trajectory. The drilling trolley's track cutter cuts the outer layer of concrete layer by layer according to the wedge-shaped groove contour, leaving a 20mm protective layer from the pipe wall to be dredged, and manually chiseling lightly to avoid cracking the pipe. Then, a water-cooled diamond saw blade is used to cut the pipe wall according to the calculated groove width, groove length, and rounded chamfer. Finally, all burrs on the cut are ground off, and the end rounded chamfer is completed, forming a target hole that meets design standards.

[0034] A rigid blockage clearing device 1 is anchored within the wedge-shaped target hole in the formed base plate. Starting from the target hole, the device 1 clears the blockage in the pipeline. After clearing both upstream and downstream sections of a single hole, an endoscopic inspection of the entire cross-section reveals no residual cement blockage and that the pipe wall and cables are intact. The clearing device is then removed, and the process is repeated in the next target hole until all rigid blockages in the entire pipeline are cleared.

[0035] The pipe blockage clearing system provided in this application embodiment uses a control device 3 to acquire the base plate structure data and internal pressure data of the pipe to be cleared. This allows the system to avoid areas unsuitable for drilling, such as the main reinforcement bars, structural joints, and reinforcement layers of the base plate, and to preferentially locate the target hole in a pipe section with relatively stable pressure. The drilling device 2 cuts according to the target coordinates and the target hole size, reducing damage to the pipe to be cleared caused by excessive cutting and eccentric cutting. The hard blockage clearing device 1 enters the pipe through the target hole and removes cement and stone blockages through a combination of central core drilling and peripheral ring grinding. The roller centering structure limits the radial displacement of the drill bit, thereby reducing the risk of the drill bit and grinding disc damaging the PVC pipe wall and internal components.

[0036] In one alternative implementation, such as Figure 2 As shown, the pipeline blockage clearing system also includes: a ground-penetrating radar 4; the ground-penetrating radar 4 is communicatively connected to the control device 3; wherein: Ground-penetrating radar 4 is used to scan the pipeline to be dredged, and obtain the radar profile image and electromagnetic wave reflection waveform of the pipeline to be dredged. Control device 3 is used to determine the base plate structure data corresponding to the pipeline to be dredged based on radar profile images and electromagnetic wave reflection waveforms; the base plate structure data includes at least one of the following: base plate main reinforcement, transverse drainage branch pipes, structural expansion joints, carbon fiber or steel plate reinforcement layer. Control device 3 is used to acquire the three-dimensional geometric model of the pipe to be dredged, and calculate the pipe pressure data at each detection position of the pipe to be dredged based on the three-dimensional geometric model. Control device 3 is used to determine the pressure risk level of at least one detection location of the pipeline to be dredged based on the pipe pressure data corresponding to each detection location. The control device 3 is also used to determine multiple candidate opening positions based on the base plate structure data and the pressure risk level corresponding to each detection position; and to determine the target opening position from among the candidate opening positions.

[0037] Specifically, a 3D ground-penetrating radar mobile trolley was deployed along the entire length of the pipeline to be dredged, with a planned longitudinal and transverse 10cm grid scanning path. Distributed permeation fiber optic cables were laid along the outer lining interlayer of the pipeline, with a sampling interval of 1m in regular sections and 0.5m in vertical shafts and areas with high incidence of blockage, achieving blind-spot-free monitoring along the entire line.

[0038] The ground-penetrating radar 4 and the distributed osmotic pressure fiber optic cable are both connected to the control device 3 via an industrial wired communication bus to establish a real-time data transmission channel. A unified longitudinal mileage coordinate system is used for the entire pipeline, and all scanning data and water level monitoring data have a unique mileage code, ensuring a one-to-one correspondence between locations.

[0039] Control device 3 inputs basic parameters such as pipeline specifications (e.g., DN250 / DN315), pipeline burial depth, tunnel reference mileage origin, and pipeline operating static pressure, providing a benchmark for subsequent pressure calculation and structural location determination.

[0040] The control equipment 3 sends grid scanning commands to the four ground-penetrating radar vehicles, which then complete a full-coverage scan of the tunnel floor at a constant speed along a preset trajectory.

[0041] Four ground-penetrating radar vehicles synchronously acquire visualized radar profile images and raw electromagnetic wave time-domain reflection waveforms in real time, and upload them to control device 3 in real time. Control device 3 has a built-in dedicated AI structure recognition algorithm that performs layered processing on the radar-transmitted images and waveforms, and automatically analyzes the base plate structure information.

[0042] Specifically, control device 3 automatically filters out invalid interference signals such as concrete air bubbles, surface gravel, and environmental electromagnetic noise, retaining valid medium reflection waveforms. Based on a waveform feature library formed by the dielectric constants of various components, it automatically distinguishes four types of targets, including: main reinforcement of the base plate: continuous high-amplitude spike reflection waveform; transverse drainage branch pipes: regular annular cylindrical reflection characteristics; structural deformation joints: layered continuous low-amplitude wave reflection bands; carbon fiber / steel plate reinforcement layer: large area uniform strong reflection region.

[0043] Control device 3 can automatically calculate the longitudinal mileage, lateral offset, and vertical burial depth of each component, and store the structural data of the base plate in a structured manner, completely recording the distribution range of main reinforcement, the coordinates of transverse branch pipes, the start and end range of expansion joints, and the coverage area of ​​the reinforcement layer. Then, control device 3 automatically delineates the areas where structural openings are prohibited according to preset rules. Areas where structural openings are prohibited, such as the 1m range around the component, the fully covered reinforcement area, and the 1m range on both sides of the structural joint, are stored in the constraint library as hard red lines for subsequent point selection.

[0044] Specifically, control device 3 can receive the three-dimensional geometric model corresponding to the pipeline to be dredged, input by the user. Control device 3 can also build the three-dimensional geometric model corresponding to the pipeline to be dredged according to the actual parameters of the project. Control device 3 can determine the pipeline length L and diameter D of the pipeline to be dredged. This pipeline is a long straight pipe without valves or branches. The model includes the upstream inlet and downstream outlet, and completely restores the location of key geometric features such as the high point and low point of the pipeline.

[0045] For long-distance straight pipes, control device 3 can employ periodic equivalent modeling, dividing the entire pipeline into multiple standard calculation units (e.g., each standard calculation unit is 50–200 m). These standard calculation units fully preserve the circular cross-sectional dimensions of the pipe, balancing computational efficiency and overall accuracy while ensuring the hydraulic characteristics of the cross-section remain unchanged. For local characteristic sections such as high and low points in the pipeline, control device 3 can perform full-size refined modeling, completely restoring the local flow channel morphology and ensuring accurate calculation of pressure distortion areas. After completing the model's geometric check to eliminate modeling defects such as sharp corners, invalid surfaces, and gaps, the fluid computational domain is determined, laying the foundation for subsequent mesh generation.

[0046] For different mesh types, electronic equipment can uniformly use a structured hexahedral mesh for discrete fluid computation, setting mesh sizes for different regions. For straight pipe sections, the radial mesh layer count should be ≥20, and the axial mesh size should be 0.5-2m. For local areas at high and low points in the pipeline, the mesh should be refined to 0.05-0.2m to capture local eddies and pressure abrupt changes. A boundary layer mesh is added to the pipe wall, with the first layer mesh height δ=0.01-0.05mm, a mesh growth rate of 1.1~1.2, and a total of 10~15 layers. The dimensionless wall distance y+ ≤ 5 is strictly controlled to match the near-wall calculation requirements of the SSTk-ω turbulence model, accurately solving for the pressure and velocity distribution near the pipe wall. The total number of meshes in the entire domain is controlled between 2 million and 8 million. Three sets of meshes with different densities are used to verify mesh independence. When the deviation of the pressure calculation results along the line is <1% after mesh refinement, the current mesh size is considered acceptable, and the final mesh file is locked to eliminate pressure calculation errors caused by mesh coarseness.

[0047] Next, control device 3 can use a pressure-based solver to adapt to the calculation of low-speed incompressible water flow in water pipelines. The fluid medium parameters are defined as follows: liquid water, with a fixed parameter ρ = 998.2 kg / m³. 3 The dynamic viscosity μ = 1.003 × 10⁻⁶ -3 Pa·s, is set as an incompressible fluid.

[0048] Control device 3 allows selection of the SSTk-ω model, enabling Enhanced Wall Treatment for near-wall processing to adapt to full-length flow in straight pipes and flow regime changes at local high and low points. A reserved interface for switching operating conditions allows switching between steady-state, transient, and high-speed transient water hammer modes, providing software settings for multi-condition pressure calculations.

[0049] Then, control device 3 can switch the solution mode to Steady steady-state solution. Boundary condition settings: Inlet boundary: Pressure inlet or mass flow inlet, strictly matching the actual design and operating conditions of the pipeline; Outlet boundary: Pressure outlet, with relative pressure set according to the actual downstream back pressure; Pipe wall boundary: No slippage wall conditions, with a pipe wall surface roughness of 0.01-0.045mm set according to PVC pipe material. The second-order format of the pressure term is SecondOrder, and the second-order upwind format of the momentum equation is SecondOrderUpwind. The pressure-velocity coupling adopts the SIMPLEC algorithm, which has stronger convergence stability. The convergence criterion for iterative calculation is: all residuals converge to below 10⁻⁵; at the same time, pressure monitoring points are set at key sections along the entire pipeline. When the long-term fluctuation of the monitored pressure is <0.1%, the steady-state calculation is considered to have fully converged. The output results are: extracting the static pressure distribution curve along the centerline of the entire pipeline and the pressure cloud map of each characteristic section, obtaining the steady-state operating static pressure P0 at each mileage position along the entire pipeline, forming a daily operating benchmark pressure database.

[0050] Next, control device 3 uses the steady-state convergent pressure field as the initial flow field and switches to Transient mode to collect dynamic pressure data under small flow rate adjustments and daily load fluctuations. The time step Δt = 0.001-0.01s, and the total calculation time is 10-60s, fully covering the fluctuation cycle of normal operating conditions. It simulates actual operating disturbances such as variable frequency speed regulation of the water pump and small pulsations in upstream and downstream flow rates, dynamically updating the inlet flow rate and pressure boundary conditions. Iterative calculations are performed step-by-step, with each step iterating until the residual converges. Monitoring points are set up at the pipeline inlet, 1km, 2km, 3km, outlet, and high and low points along the pipeline to record time-pressure time series data throughout the entire process, obtaining the dynamic pressure fluctuation range and velocity change Δv under normal operating conditions, which serve as the basic input parameters for water hammer calculation.

[0051] Within the transient solution framework, control device 3 refines the time step to simulate extreme water hammer accident conditions such as valve closure, pump shutdown, and pump startup, capturing the instantaneous extreme pressure rise and fall of the entire pipeline, which is the core pressure basis for the orifice safety verification. The time step is reduced to Δt=0.0001-0.001s, accurately capturing the millisecond-level pressure wave propagation; based on the water hammer wave velocity a=1000-1200m / s, the round-trip period of the pressure wave is calculated to be T=2L / a≈6.7-8s, and the total calculation time covers the entire process of pressure wave reflection and superposition.

[0052] Three water hammer conditions boundary condition settings: Valve closing water hammer: Valve closing time 0.1~2s, using linear / multi-segment closing curve; Pump stop water hammer: Pump outlet pressure and flow rate drop rapidly to 0 in 0.05~0.5s, simulating emergency power failure and shutdown; Pump start water hammer: Flow rate rises from zero to rated condition in 1~5s.

[0053] After the solution is completed, the complete pressure-time history curves of all monitoring points are output. The maximum water hammer pressure rise ΔP and the minimum negative pressure value at each mileage location along the entire line are extracted, and the positive and negative pressure envelopes of water hammer along the entire line are generated to fully understand the extreme values ​​of the ultimate pressure along the entire line.

[0054] Finally, control device 3 can utilize the Fluent post-processing module to uniformly extract three types of core pressure data within the pipeline. Through interpolation algorithms, it reconstructs the three-dimensional pressure field of the entire 4000m pipeline, forming a structured pressure archive: Steady-state pressure data: steady-state static pressure along the centerline of the entire pipeline, pressure cloud maps of high / low point sections, corresponding to the daily operating static pressure P0 at each point; Conventional transient dynamic pressure: time-series pressure and real-time flow velocity at each monitoring point, allowing calculation of the velocity mutation value Δv at various points along the entire pipeline; Water hammer ultimate pressure: the maximum positive pressure envelope, minimum negative pressure envelope, and pressure wave propagation velocity along the entire pipeline, clearly identifying the peak water hammer pressure rise and negative pressure cavitation hazard areas. All pressure data is bound to the pipeline's longitudinal mileage coordinates and integrated with the coordinate system of the base plate structure radar data, forming a standardized pipeline pressure database that can be interfaced with control device 3.

[0055] Control device 3 can use steady-state pressure, peak positive pressure of water hammer, and negative pressure values ​​as judgment indicators to divide all detection points into three pressure levels: high-risk zone, medium-risk zone, and low-risk safe zone, and define judgment thresholds (adapted to the working conditions of this long straight PVC pipeline). For example, level one risk, namely the high-risk pressure zone (permanently prohibited from opening), is determined to be high-risk if any one of the following conditions is met: the instantaneous peak positive pressure of water hammer far exceeds the conventional design pressure, and the overpressure increase is too large; the negative pressure of water hammer is lower than the safety threshold, and there is a risk of negative pressure collapse and cavitation damage in the pipe; the pressure distortion is severe at the highest and lowest points of the pipeline, and the water hammer wave is easily reflected and superimposed to amplify the pressure impact. At the same time, the prohibited opening range is defined as follows: a range of 20m at the inlet and outlet ends, and a range of 40-60m upstream and downstream of the high and low points, all of which are included in the high-risk zone. Level 2 risk, or medium-risk zone (restricted orifice placement): Steady-state pressure deviates significantly from the overall average, water hammer pressure increase is present, there is no risk of negative pressure cavitation, and orifices can be placed with limited capacity. Subsequent orifice size and repair / reinforcement require increased safety redundancy. Level 3 risk, or low-risk safe zone (preferred orifice placement area): Steady-state static pressure is close to the overall average pressure, water hammer positive pressure increase is minimal, negative pressure consistently exceeds the safety threshold, and pressure conditions are stable. This is the preferred area for orifice placement. The classification results are linked to the mileage of the detection location to form a pressure risk level distribution map for the entire line.

[0056] Control device 3 can employ a two-level progressive elimination mechanism: first, pressure risk is screened, then structural safety is screened, generating candidate locations within hard, clogged pipe sections. The first level: initial screening of pressure risk levels directly eliminates all Level 1 high-risk sections, completely prohibiting the placement of openings; priority is given to selecting locations within continuous clogged pipe sections in the Level 3 low-risk safety zone; Level 2 medium-risk areas are only considered as alternatives and not prioritized unless absolutely necessary. The second level: secondary constraint screening based on base slab structural data: retrieving the base slab structural database from radar analysis, and further eliminating prohibited opening areas within the acceptable pressure range. Prohibited opening areas include: main reinforcement, a 1m radius around transverse drainage branch pipes, structural expansion joint sections, and carbon fiber / steel plate reinforcement layers; base slab slopes > 5° and sections with loose, weak concrete are also excluded.

[0057] Within a rigid, clogged pipe section that simultaneously meets pressure safety and structural safety requirements, the geometric center point of the clogged section is selected as the initial candidate opening location according to the principle of single-hole bidirectional unblocking. The preferred safety zone has preset points at 20m intervals, while the medium-risk alternative zone has sparsely distributed points, ultimately forming a complete set of candidate opening locations.

[0058] Optionally, control device 3 is used to determine the candidate opening size corresponding to each candidate opening position based on the base plate structure data and the pressure risk level corresponding to each candidate opening position. Based on each candidate opening size, determine the corresponding target opening spacing between each candidate opening size; Based on the spacing between each target opening, the target opening position is determined from each candidate opening position, and the candidate opening size corresponding to the candidate opening position of the target opening position is determined as the target opening size.

[0059] Optionally, the control device 3 is used to determine the initial opening size corresponding to each candidate opening position based on the pressure risk level corresponding to each candidate opening position; the initial opening size includes the initial groove width, the initial groove length, and the initial end chamfer. Based on the base plate structure data, the initial opening size is adjusted to obtain the temporary opening size corresponding to each candidate opening position; Based on the pipe type corresponding to the pipe to be dredged, check whether the size of the temporary opening meets the preset verification conditions. If the temporary opening size meets the preset verification conditions, then the temporary opening size will be determined as the candidate opening size; If the temporary opening size does not meet the preset verification conditions, the temporary opening size is adjusted until it meets the preset verification conditions to obtain the candidate opening size.

[0060] Specifically, for each candidate opening location, the control device 3 retrieves the pressure risk level corresponding to that candidate opening location, including only low-risk safety zones and medium-risk zones (red high-risk points have been eliminated in the early stage, and there are no candidate points), and at the same time binds the pipe type (such as DN250 without cable, DN315 with cable).

[0061] Control device 3 has a built-in standardized initial dimension database, which separately stores the dimensions of the concrete construction trench for the base slab and the dimensions of the PVC pipe wall opening. The dimensions of the concrete construction trench for the base slab include the trench width Wc0, the trench length Lc0, and the end arc radius Rc0; the dimensions of the PVC pipe wall opening include the opening width Wp0, the opening length Lp0, and the end arc radius Rp0. These two types of dimensions are determined based on the maximum external dimensions of the equipment and installation allowance, the pipe outer diameter and wall thickness, the structural constraints of the base slab, and the pressure risk level, respectively, to avoid mixing the concrete construction trench dimensions with the pipe wall opening dimensions. For medium-risk pressure levels, to cope with periodically alternating water pressure, control device 3 increases the arc transition and repair / reinforcement safety margin of the pipe wall opening.

[0062] After completing this step, each candidate point will obtain a set of initial dimensions for the base slab concrete construction trench (Wc0, Lc0, Rc0) and a set of initial dimensions for the PVC pipe wall opening (Wp0, Lp0, Rp0).

[0063] Control device 3 retrieves the base plate structure data corresponding to each candidate opening position, and adjusts the initial size of the base plate concrete construction trench and the initial size of the PVC pipe wall operation opening respectively to obtain the temporary size of the construction trench (Wc1, Lc1, Rc1) and the temporary size of the pipe wall operation opening (Wp1, Lp1, Rp1).

[0064] For example, the adjustment rules are as follows: For example, when a candidate opening location is near the main reinforcement of the base slab, a transverse drainage branch pipe, a structural expansion joint, or the edge of a reinforcement layer, the candidate opening location is preferentially moved; if it cannot be moved, the base slab concrete construction trench is reduced only to a extent that does not affect equipment installation and pipe wall strength. The size of the PVC pipe wall opening is not scaled synchronously with the concrete construction trench, but is checked separately based on the remaining cross-sectional strength of the pipe wall, the design peak pressure of the water hammer, and subsequent reinforcement conditions. The base slab slope or local concrete defects are only used to correct the outer contour and excavation depth of the construction trench, avoiding the need to compensate for construction space by enlarging the pipe wall opening.

[0065] Control device 3 can retrieve exclusive preset verification conditions according to the type of pipe to be dredged, and verify the temporary opening size from two dimensions: equipment operating conditions and mechanical performance. The verification conditions are divided into two categories: hardware equipment conditions and mechanical limit conditions.

[0066] For example, verification condition 1 is the equipment passage condition: the net width, net length, and net depth of the concrete construction trench in the base plate should not be less than the sum of the maximum outer dimensions of the roller centering drill bit 12, the drill rod extension device 13, and the installation tools, and the preset installation allowance; the working opening in the PVC pipe wall should meet the passage requirements of the annular coring drill bit, the roller centering drill bit, and the core removal operation. The above two types of dimensions are verified separately, and the contradictory condition of "the lower limit of the trench width is close to the pipe diameter, but at the same time must not exceed a certain proportion of the pipe diameter" is no longer used.

[0067] Verification condition 2 is a mechanical safety condition: the end of the PVC pipe wall opening adopts a continuous arc transition, and the arc radius is determined according to the pipe diameter, wall thickness, opening width, allowable stress of the material, and design peak pressure; the opening width, opening length, and remaining circumferential section should be verified by pipe wall strength calculation or finite element method. The upper limit of the size of the concrete construction trench in the base slab is determined based on the main reinforcement protection distance, the structural joint safety distance, and the local bearing capacity of the base slab.

[0068] Control device 3 can compare the temporary opening size with all the preset conditions for the corresponding pipe type item by item to determine whether it is qualified or unqualified. If the temporary opening size meets all the preset verification conditions, the current temporary opening size is directly determined as the candidate opening size corresponding to the candidate opening position, and the groove width, groove length, and chamfer parameters are completely saved and bound to the candidate point mileage for archiving, and then enter the subsequent opening spacing calculation process.

[0069] If the temporary opening size does not meet any of the preset verification conditions, iteratively adjust the size and repeat the verification until it is qualified. Adjust according to the type of non-compliance. After each size adjustment, re-execute the full set of preset condition verifications in step 3, and repeat the iteration until all conditions are met.

[0070] For situations where equipment access conditions are not met, adjust the construction trench size or replace the drilling tool with one of smaller dimensions within the allowable range of the base plate structure. For situations where the pipe wall opening strength check fails, prioritize reducing the size of the pipe wall opening, increasing the end radius, adjusting the location, or increasing the subsequent reinforcement level; do not blindly expand the construction trench to replace the pipe wall strength check. For situations where the net distance between adjacent openings is insufficient, prioritize moving the candidate opening position; if this cannot be met, recalculate the opening size and equipment clearance distance until a feasible solution is found.

[0071] After determining the candidate opening size corresponding to each candidate opening position, the control device 3 determines the minimum mechanical spacing based on the stress influence range of adjacent PVC pipe wall working openings. For example, it is specified that the net distance between the cut edges of adjacent openings along the pipe axis is not less than 7×max(Wp1, Wp2), where Wp1 and Wp2 are the widths of the two adjacent pipe wall working openings, respectively.

[0072] Let the working opening widths of two adjacent candidate openings be Wp1 and Wp2, and the opening lengths along the pipe axis be Lp1 and Lp2, respectively. Then the minimum mechanical center-to-center distance between the two openings is: Dstress,min = (Lp1 + Lp2) / 2 + 7 × max(Wp1, Wp2). Control device 3 reads the candidate opening dimensions of adjacent points and calculates the corresponding minimum mechanical center-to-center distance.

[0073] Control device 3 determines the maximum allowable opening spacing Ddevice,max based on the effective unidirectional distance of bidirectional dredging in a single hole. For example, when the effective unidirectional dredging distance for a DN250 pipe is 18–20 m, Ddevice,max is 36–40 m; when the effective unidirectional dredging distance for a DN315 pipe is 12–15 m, Ddevice,max is 24–30 m. The specific values ​​are determined by the drill rod stiffness, torque attenuation, pipe slope, and the results of on-site test drilling.

[0074] Control device 3 simultaneously checks the minimum mechanical center-to-center distance Dstress,min and the maximum allowable opening distance Ddevice,max. The actual center-to-center distance D of the target opening should satisfy Dstress,min ≤ D ≤ Ddevice,max. If Dstress,min > Ddevice,max, then there is no feasible combination between the current opening size and the effective dredging distance of the equipment. Control device 3 outputs adjustment commands to reselect points, reduce the pipe wall opening, or increase the effective working distance of the equipment.

[0075] When a feasible spacing range exists, control device 3 should prioritize selecting candidate points that are close to D_device,max and not less than D_stress,min, in order to reduce the number of openings and ensure unblocking coverage; the larger of the two values ​​should not be taken as the target spacing, so as not to exceed the effective unblocking range of the equipment.

[0076] Control device 3 arranges all candidate opening locations in ascending order according to the longitudinal mileage of the pipeline. After selecting the first candidate opening location as the initial target opening, it selects the candidate opening location closest to D_device,max within the feasible spacing interval [D_stress,min, D_device,max] downstream of it as the next target opening; if there is no candidate point within the interval, the candidate position is moved or the opening size is readjusted. The above steps are repeated until the entire clogging section is covered.

[0077] Control device 3 verifies the one-way distance between the target opening at the beginning and end and the sludge boundary to ensure that it does not exceed the effective one-way unblocking distance of the corresponding device; at the same time, it calculates the actual net distance between the edges of adjacent pipe wall openings to ensure that it meets the requirement of 7×max(Wp1, Wp2). After the unblocking coverage and mechanical safety double verification, the remaining points are determined as the final target opening positions. The corresponding construction trench size and pipe wall opening size together constitute the target opening size, which is then issued to the opening device 2 for execution.

[0078] The pipeline blockage clearing system provided in this application embodiment uses a ground-penetrating radar 4 to scan the pipeline to be cleared, obtaining radar profile images and electromagnetic wave reflection waveforms corresponding to the pipeline. The ground-penetrating radar 4 scans and acquires waveform images, accurately identifying the locations of components such as the main reinforcement bars of the foundation slab and structural joints, and precisely delineating prohibited areas for structural openings, effectively avoiding the risk of borehole damage to the main load-bearing structure of the tunnel lining. The control device 3 uses a three-dimensional geometric model of the pipeline to perform CFD simulation calculations of the pressure data within the entire pipeline area, completely acquiring steady-state static pressure and water hammer ultimate pressure. The pressure data is complete across the entire area with high calculation accuracy, providing precise hydraulic basis for pressure risk classification. The control device 3 classifies the pressure risk level into three levels based on the pipeline pressure values, accurately identifying high-risk sections for water hammer overpressure and negative pressure, achieving hydraulic control of the opening red line, and avoiding sensitive pipe sections prone to water hammer impact damage. Based on the foundation slab structural data and the pressure risk level corresponding to each detection location, multiple candidate opening locations are determined.

[0079] Then, the initial opening size is set according to the pressure risk level. For high-pressure water hammer points, the chamfer is enlarged and the specifications are appropriately enlarged, while standard sizes are used for low-pressure points, specifically adapted to water hammer loads, with pre-allocated stress redundancy. Temporary sizes are then modified based on the base slab structure. The opening range is reduced near reinforcing bars and structural joints to avoid excavation damage to the tunnel lining's load-bearing components, ensuring the safety of the base structure. Temporary sizes are verified according to pipe type, checking the lower limit for equipment passage and the upper limit for mechanical requirements, controlling dimensional compliance from both hardware installation and structural strength perspectives. Unqualified sizes are iteratively optimized. Repeated revisions are made until all conditions are met, resulting in a final candidate opening size that simultaneously meets all requirements for water pressure conditions, structural limitations, and equipment access, achieving a balance between practicality and safety.

[0080] The target opening spacing is calculated based on the candidate slot dimensions. The mechanical safety spacing is calculated according to the Saint-Venant stress interference rule, and a stringent value is applied based on the equipment dredging distance to precisely control the opening spacing, preventing stress superposition between adjacent slots and ensuring the overall structural safety of the pipeline. Points are selected based on the target spacing to lock in the target opening location and size. Qualified points are selected based on their suitability, and the corresponding opening sizes are simultaneously finalized. The point layout considers full dredging coverage, structural and water hammer safety, and the dimensional parameters can be directly used for on-site opening construction, ensuring precise matching between design and construction.

[0081] In one alternative implementation, such as Figure 3 As shown, the hard blockage clearing device 1 includes: a drilling rig power unit 11, a roller centering drill bit 12, at least one section of drill rod extension device 13, and a support device 14; the proximal end of the drill rod extension device 13 is detachably connected to the output end of the drilling rig power unit 11, the roller centering drill bit 12 is installed at the distal end of the drill rod extension device 13, and the support device 14 is sleeved on the outside of the drill rod extension device 13, wherein: The drilling rig power unit 11 is used to drive the annular core drill bit 1112 to drill a central hard blockage core of a preset diameter; the diameter of the central hard blockage core is smaller than the minimum inner diameter of the hollow channel formed by the hollow pipe 1113 and the drill rod extension device 13, so as to form a core discharge gap. The roller centering drill bit 12 is used to wear down the outer hard blockage corresponding to the central hard blockage in the pipe to be cleared, so as to remove the outer hard blockage. Drill pipe extension device 13 is used to extend the power transmission distance and hollow core discharge channel of the drilling rig power host device 11; Support device 14 is used to provide radial support, coaxial positioning and releasable axial limit for drill pipe extension device 13.

[0082] Specifically, the front output shaft of the drilling rig's main power unit 11 is detachably connected to the proximal end of the first drill rod extension unit 13 via a sealing thread or a quick-locking connector. Multiple drill rod extension units 13 are connected end-to-end, with the furthest drill rod connected to the roller centering drill bit 12 and the annular core drill bit 1112. The main power unit's torque is transmitted to the front end via the drill rod. The support unit 14 does not participate in torque transmission; it is fitted onto the outer surface of the drill rod extension unit 13 and axially positioned at a predetermined installation position using a releasable limit clasp to prevent the support unit 14 from moving freely along the drill rod during drilling.

[0083] The drilling rig's main power unit 11 has a pre-reserved hollow spindle channel that connects to the hollow pipes in the rig body; the drill rod extension device 13 is a hollow, thickened structure with its inner cavity sealed to the hollow spindle channel. Cooling water ultimately flows into the water passage inside the roller centering drill bit 12, forming a complete circulating cooling water circuit.

[0084] The drill pipe extension device has 13 independently detachable sections that can be flexibly spliced ​​according to the dredging distance.

[0085] The roller centering drill bit 12 is an independent front-end accessory that can be quickly disassembled and replaced. The support device 14 can be directly inserted into and slid out from the drill rod end without disassembling the drill rod and the main unit.

[0086] The drilling rig's main power unit 11 is used to drill for the core material that is blocked by hard deposits in the center. The inner diameter of the annular coring bit 1112 corresponds to the preset diameter of the core material. The diameter of the core material is smaller than the minimum inner diameter of the hollow channel formed by the drill pipe extension device 13 and the hollow pipe 1113, and a core removal gap is reserved between them. After coring is completed, the core material can be retrieved backward along the hollow channel by at least one of the following methods: retracting the drill pipe, using the core retainer, or negative pressure suction.

[0087] The drill pipe extension device 13 is a φ45×15mm hollow thickened single-section drill pipe with sealed threaded joints at both ends, a polyurethane wear-resistant sheath covering the outer wall, and a matching quick-locking buckle. The standard length of a single section is 45cm.

[0088] The drill pipe extension device 13 is used for length extension, extending the working distance of the drilling rig's main power unit. Through multi-section splicing, it is suitable for dredging pipelines 12-20m long, transporting the drilling rig's main power unit 11 to the deep blockage location in the pipeline. It externally transmits rotational torque and axial feed thrust, while the internal hollow channel continuously delivers cooling water to the front core drill bit 1112. The outer polyurethane sheath isolates gravel, preventing the metal rod from scraping against the inner wall of the pipeline to be dredged during reciprocating movement. The threaded splices at both ends are sealed, with sealant applied to the threads to ensure no slippage in torque transmission and no leakage of cooling water. The thickened rod body significantly reduces bending deformation during long-distance drilling, minimizing power loss over ultra-long distances, and works with the support device 14 to maintain coaxial rotation.

[0089] The roller-centered drill bit 12 is used to comprehensively wear and cut away the annular hard blockage surrounding the central blockage after the central core is taken, achieving complete cross-sectional unblocking. Simultaneously, the roller assembly 123 maintains centering throughout the process, preventing the core drill bit 1112 from swaying and scratching the thin-walled pipe to be unblocked. Specifically, after the central core is taken, the main unit torque drives the entire grinding disc frame to rotate synchronously. The carbide cutting blocks on the outer side of the grinding disc are in close contact with the surrounding cement stone, performing circumferential rotational grinding and wear, gradually breaking up the outer blockage. The circumferentially evenly arranged rollers are in close contact with the inner wall of the pipe, performing pure rolling motion, automatically constraining the radial displacement of the core drill bit 1112, always keeping the core drill bit 1112 concentric with the pipe, reducing the risk of pipe wall scratches caused by eccentric swaying. Cooling water is sprayed from the front end of the central core drill, cooling the carbide cutting blocks and flushing away the grinding debris and mud in real time, facilitating subsequent slag removal.

[0090] The support device 14 includes a ring support ring, circumferential elastic rubber support feet, built-in self-aligning bearings, and oil seal components, forming a modular structure. It provides radial support and positioning for the drill pipe extension device 13 throughout the entire process, stabilizing the entire drill pipe assembly and providing stable support for long-distance extension operations of the drilling rig's power unit. The support rings are fitted onto the outside of the drill pipe, with one set every 4 meters. The elastic support feet, relying on internal springs, adaptively conform to the inner wall of the pipe to be dredged, accommodating minor elliptical deformations of the pipe and longitudinal slope deviations of the tunnel. The internal self-aligning bearings allow the drill pipe to rotate while the support rings remain stationary, significantly reducing frictional resistance, suppressing bending and deflection of the long drill pipe under pressure, and ensuring coaxiality between the drill pipe and the pipe throughout the entire process. The oil seal structure prevents mud and groundwater from intruding into the bearing, avoiding sediment buildup and ensuring long-term stable underwater operation.

[0091] The specific workflow includes: anchoring the drilling rig's main power unit 11 to the outside of the target hole and completing mechanical leveling; connecting the water-cooled circulation pipeline and monitoring lines; splicing the drill rod extension equipment 13 according to the working distance and installing the support equipment 14 at intervals along the drill rod, and completing axial fixation through limit clasps; installing the roller centering drill bit 12 and the annular core drill bit 1112 at the farthest end of the drill rod. Starting the low-speed core sampling mode, the annular core drill bit 1112, extending axially in front of the first grinding disc 121, first contacts the central blockage, forming a central core with a diameter smaller than the minimum inner diameter of the hollow channel, and then retrieving it. Subsequently, axial feeding continues, causing the first grinding disc 121 and the second grinding disc 122 to contact the peripheral hard blockage, switching to a speed suitable for annular grinding for peripheral grinding. The roller assembly 123 and the support equipment 14 jointly limit radial offset, while cooling water continuously cools and flushes away slag. After completing a section of unblocking, the drill rod is retracted and an endoscopic inspection is performed; drill rod splicing and repeated operations are performed as needed.

[0092] The pipe blockage clearing system provided in this application embodiment involves a drilling rig power unit 11 first drilling a central blockage core with a diameter smaller than the minimum inner diameter of the hollow channel, creating a core-discharging gap between the core and the channel. This facilitates the retrieval of the central core and reduces peripheral grinding resistance. A roller-centered drill bit 12 limits radial displacement through rolling contact between the roller and the pipe wall, thereby reducing the risk of the drill bit and grinding disc damaging the PVC pipe wall and internal components. A modular drill rod extension device 13 is assembled, and a support device 14 is arranged at intervals along the drill rod and provides axial restraint, suppressing long drill rod deflection and support component movement, thus improving stability during long-distance operations.

[0093] In one alternative implementation, such as Figure 4 As shown, the main power unit 11 of the drilling rig includes: a core drilling rig 111, an electronic speed control device 112, a water-cooled circulating water supply unit 113, a torque real-time monitoring device 114, a horizontal leveling mechanism 115, and a vibration sensing device 116; the horizontal leveling mechanism 115 is installed below the core drilling rig 111 and is leveled mechanically; the core drilling rig 111 includes a first motor 1111, an annular core drill bit 1112, and a hollow pipe 1113. The inner diameter of the annular core drill bit 1112 corresponds to the diameter of the preset central core, and the inner diameter of the hollow pipe 1113 is larger than the inner diameter of the annular core drill bit 1112; the first motor 1111 drives the distal annular core drill bit 1112 through the hollow pipe 1113 and the drill rod extension device 13; the electronic speed control device 112 is communicatively connected to the first motor 1111, the torque real-time monitoring device 114, the vibration sensing device 116, and the control device 3, wherein: Core drilling rig 111 is used to drill out the center of a hard blockage object of a preset diameter corresponding to the pipe to be dredged; The electronic speed control device 112 is communicatively connected to the first motor 1111 and is used to adjust the speed of the first motor 1111 under the control of the control device 3. The water-cooled circulating water supply unit 113 is used to cool the core drilling rig 111 during its operation. The torque real-time monitoring device 114 is used to detect the current torque corresponding to the core drilling rig 111 in real time. Vibration sensing device 116 is used to detect the vibration amplitude corresponding to the core drilling rig 111 in real time; Control device 3 is used to control electronic speed control device 112 according to the current torque and / or vibration amplitude, thereby adjusting the speed of first motor 1111.

[0094] Specifically, the horizontal leveling mechanism 115 is installed as a whole under the base of the core drilling rig 111, serving as a mechanical support and leveling base; the output end of the first motor 1111 is connected to the hollow pipe 1113, which transmits torque and axial feed force to the distal annular core drill bit 1112 through the drill rod extension device 13. The inner diameter of the annular core drill bit 1112 corresponds to the diameter of the central core, and the minimum inner diameter of the hollow pipe 1113 and the drill rod extension device 13 is greater than the diameter of the central core to reserve a core discharge gap.

[0095] The water-cooled circulating water supply unit 113 includes a water tank, a water pump, a water supply pipeline, a water return pipeline, and a rotary joint connected to the hollow pipe 1113. Cooling water enters the hollow pipe 1113 through the rotary joint and reaches the far-end annular coring drill bit 1112. After cooling and slag flushing, the water returns to the water tank through the water return pipeline.

[0096] The electronic speed control device 112 serves as the central control unit for the entire machine. Its hardware communication links are as follows: Output end: Electrically communicates with the first motor 1111 of the core drilling rig 111 to directly control the motor speed; Input end: Simultaneously receives real-time acquisition signals from the torque real-time monitoring device 114 and the vibration sensing device 116. The electronic speed control device 112 communicates bidirectionally with the system's main control device 3, receiving speed commands from the upper level and synchronously uploading torque and vibration data.

[0097] The horizontal leveling mechanism 115 is a purely mechanical actuator with no electrical communication lines. It is only manually leveled and positioned in advance and does not participate in electrical linkage speed regulation during operation.

[0098] Specifically, the coring drill 111 consists of a first motor 1111, a hollow pipe 1113, a drill rod extension device 13, and a distal annular coring drill bit 1112. The first motor 1111 drives the hollow pipe 1113 and the drill rod extension device 13 to rotate, which in turn drives the annular coring drill bit 1112 to drill out the central hard, clogged core. The diameter of the formed central core is smaller than the minimum inner diameter of the hollow channel, allowing it to be retracted within the reserved core removal gap. The hollow pipe 1113 serves multiple functions, including power transmission, water flow, and core removal.

[0099] The electronic speed control device 112 connects downwards to the first motor 1111, horizontally receives torque and vibration sensing signals, and communicates upwards with the main control device 3. It employs a two-layer speed control logic: first, it receives speed range commands from the upper-level control device 3 and actively sets the base speed; second, it dynamically fine-tunes the motor speed based on real-time torque and vibration data in a closed-loop manner to achieve stable drilling and overload protection. By controlling the power supply frequency of the first motor 1111 via frequency converter, it achieves high and low speed switching, corresponding to shallow, low-speed, stable drilling and anti-scratching of PVC, and deep, high-speed, high-efficiency core drilling.

[0100] The water-cooled circulating water supply unit 113 continuously supplies circulating cooling water to the drilling rig throughout its operation, cooling the core drill bit 1112, removing frictional heat, and preventing the underwater pipe wall from softening due to high temperature; it also flushes away fine debris generated during drilling and continuously cools the motor spindle. A water pump drives cooling water into the hollow pipe 1113, directly reaching the cutting position of the core drill bit 1112. After heat exchange, the water returns to the unit for further cooling. The entire process operates independently of the water circuit and is not affected by the electrical speed control system.

[0101] The torque real-time monitoring device 114 continuously collects the real-time torsional torque value of the spindle of the core drilling rig 111 to determine abnormal working conditions such as stuck drill or excessive hardening. The built-in stress sensor collects the spindle deformation signal, converts it into an electrical signal, and transmits it to the electronic speed control device 112 in real time. When the torque exceeds the preset safety threshold, an overload signal is fed back.

[0102] Vibration sensing device 116 collects the vibration amplitude of the entire machine in real time to identify problems such as eccentric drilling, resonance, and wobble of the core drill bit 1112, and avoids fatigue damage to the pipeline to be dredged caused by resonance. Vibration sensors capture the vibration waveform of the entire machine and upload the amplitude data to electronic speed control device 112 in real time.

[0103] The horizontal leveling mechanism 115 is used to complete the horizontal calibration of the base before the drilling rig is started, controlling the overall horizontal deviation within the acceptable range and ensuring that the hollow pipe 1113 and the core drill bit 1112 are coaxially aligned with the center of the pipe, thus preventing the drill rod from tilting and unilaterally squeezing the pipe wall from the source. The screw push-pull mechanical adjustment, together with the laser level, completes the positioning calibration. The equipment remains fixed during the drilling operation, without the need for electrical dynamic adjustment.

[0104] The specific operating logic steps are as follows: Place the horizontal leveling mechanism 115 on the bottom plate of the target hole, place the core drilling rig 111 on top of the leveling mechanism, manually adjust the lead screw, and use a laser level to calibrate the levelness of the entire machine, then fix and lock the position to complete mechanical positioning. Connect the water-cooled circulating water supply unit 113 pipeline to the water inlet of the hollow pipe 1113 of the drilling rig, check that the water circuit is sealed, and test run the water circulation to confirm that the water circuit is unobstructed and leak-free. Complete the wiring: connect the signal lines of the torque monitoring device and vibration sensing device 116 to the electronic speed control device 112; connect the communication lines of the electronic speed control device 112 to the first motor 1111 and the upper-level main control device 3 respectively to complete signal communication. The main control device 3, based on the current hole opening pressure and pipe depth, issues a basic speed command to the electronic speed control device 112. For example, shallow drilling (0~5m): issue a low-speed command (100~150r / min) to stabilize the drilling speed and prevent the coring bit 1112 from eccentrically scraping the thin-walled pipe to be cleared; deep drilling: issue a high-speed command (300~400r / min) to improve the efficiency of center coring.

[0105] Following instructions, the electronic speed control device 112 initially sets the reference operating speed of the first motor 1111, and the drilling rig undergoes a no-load test run. The water-cooled circulating water supply unit 113 starts synchronously, continuously supplying cooling water to the hollow pipe 1113 and the core drill bit 1112, initiating cooling and slag flushing. The first motor 1111 operates at the reference speed, driving the hollow pipe 1113 and the core drill bit 1112 to rotate and feed, beginning the drilling of the central hard blockage. The torque real-time monitoring device 114 and the vibration sensing device 116 continuously collect real-time torque values ​​and overall machine vibration amplitude, and both sets of data are synchronously uploaded to the electronic speed control device 112 in real time.

[0106] The electronic speed control device 112 compares real-time parameters with built-in safety thresholds and automatically controls the motor speed under three working conditions, while simultaneously transmitting the working condition data back to the main control device 3. For example, in working condition 1: torque and vibration are within the normal range, the current reference speed is maintained, and the drilling rig stably and continuously completes the central blockage drilling operation. In working condition 2: real-time torque exceeds the safety threshold (stuck drill bit, excessive blockage hardness): the electronic speed control device 112 immediately issues a command to reduce the speed of the first motor 1111 and decrease the cutting feed speed; if the torque continues to exceed the limit, the motor is directly controlled to slow down and stop to prevent forced twisting and tearing of the pipe to be cleared. In working condition 3: vibration amplitude exceeds the standard, resulting in eccentricity and resonance: the motor speed is automatically reduced to avoid the resonance range; simultaneously, abnormal data is uploaded to the control device 3, prompting on-site inspection of the core drill bit 1112 centering and drill rod support status.

[0107] After the single-section core is drilled, the annular core drill bit 1112 retracts and the core is recovered along the hollow channel by at least one of the core retainer, drill rod retraction, or negative pressure suction; the water-cooled circulating water supply unit 113 continues to operate to complete cooling and slag flushing.

[0108] The pipe blockage clearing system provided in this application embodiment features a horizontal leveling mechanism 115 that precisely calibrates the horizontal coaxiality of the drilling rig upon startup, ensuring that the core drill bit 1112 is aligned with the center of the pipe, thus preventing off-center drilling and scraping against the PVC pipe wall from the source. The core drill rig 111 (first motor 1111 + hollow pipe 1113 + core drill bit 1112) can drill a matching central blockage core in one go. The core is then withdrawn along the hollow pipe 1113, efficiently breaking through hard cement and significantly reducing the subsequent external grinding load. The electronic speed control device 112 can receive commands from the upper control unit to precisely adjust the motor speed, providing stable low-speed drilling for shallow layers and high-speed efficiency for deeper layers, adapting to blockage conditions of varying hardness. The water-cooled circulating water supply unit 113 continuously cools the drill bit and motor, removing cutting heat and preventing the pipe material from softening due to high temperatures, while also flushing away drill cuttings. The torque real-time monitoring device 114 and the vibration sensing device 116 capture abnormal data such as drill bit jamming and eccentricity in real time. Together with the control device 3, they enable closed-loop speed regulation, speed reduction and shutdown, and automatic overload protection to prevent drill bit jamming and pipe damage. The control device 3 dynamically adjusts the speed based on torque and vibration data to form a complete safety closed loop, balancing dredging efficiency with the operational safety of equipment, pipelines, and internal cables.

[0109] In one alternative implementation, such as Figure 5 As shown, the roller centering drill bit 12 includes a first grinding disc 121, a roller assembly 123, and a second grinding disc 122 arranged sequentially along the axial direction of the hollow pipe 1113; both the first grinding disc 121 and the second grinding disc 122 are annular, and are connected to the hollow pipe 1113 circumferentially via at least one of key connection, spline connection, or polygonal shaft hole fit, and are fixed by an axial limiting member; the roller assembly 123 includes multiple roller supports and rollers mounted on each roller support, and each roller is evenly distributed along the circumference of the hollow pipe 1113 and rolls in contact with the inner wall of the pipe to be dredged; the annular core drill bit 1112 extends axially in front of the first grinding disc 121, wherein: The control device 3 is used to control the first motor 1111 to drive the hollow pipe 1113, the annular core drill bit 1112, the first grinding disc 121, the second grinding disc 122 and the roller assembly 123 to rotate synchronously. By controlling the axial feed, the annular core drill bit 1112 first completes the center core extraction, and then the first grinding disc 121 and the second grinding disc 122 contact the hard blockage object on the periphery for wear.

[0110] Specifically, the first grinding disc 121 is located on the side closer to the annular core drill bit 1112, and the second grinding disc 122 is located on the side away from the annular core drill bit 1112. The roller assembly 123 is located between the first grinding disc 121 and the second grinding disc 122. The grinding disc assembly rotates synchronously with the hollow pipe 1113 through a circumferential torsion transmission structure, and is axially limited by at least one of a locking nut, a locating pin, or a limiting sleeve.

[0111] The roller assembly 123 includes various roller brackets and rollers mounted on each roller bracket. Multiple sets of roller brackets are fixedly installed between the annular end faces of the first grinding disc 121 and the second grinding disc 122, and are evenly arranged around the circumference of the hollow pipe 1113; the rollers are rotatably mounted on the roller brackets, and the outer ring of the rollers keeps rolling and in close contact with the inner wall of the pipe to be dredged.

[0112] The first grinding disc 121 and the second grinding disc 122 form a rigid clamping frame to support the outer edge grinding cutter blocks and roller brackets. The two grinding discs are connected to the hollow pipe 1113 by a fixed key or spline connection to transmit torque, and relative movement is prevented by axial limiting components. The grinding disc assembly does not rely on ordinary round hole sliding fit to transmit torque. Its axial feed is driven by the hollow pipe 1113 and the drill rod extension device 13 as a whole.

[0113] The roller assembly 123 (roller bracket + rollers) features evenly distributed rollers that roll in close contact with the inner wall of the pipe, achieving fully automatic centering and positioning. During the rotation of the two grinding discs, the rollers continuously limit the radial offset of the entire drill bit, ensuring the grinding discs remain coaxial with the pipe and preventing eccentric oscillations that could scratch the pipe wall. The bracket serves to fix the roller angle and bear radial pressure.

[0114] Specifically, the first grinding disc 121, the roller assembly 123, and the second grinding disc 122 are pre-assembled to form a grinding disc assembly. The grinding disc assembly is sleeved on the front end of the hollow pipe 1113 through a circumferential torsion transmission structure and locked by an axial limiting component. The annular core drill bit 1112 extends axially a predetermined distance in front of the first grinding disc 121. During operation, the first motor 1111 drives all rotating parts to rotate synchronously. However, since the annular core drill bit 1112 contacts the central blockage body first, only the central core is extracted in the first stage. After the central core body is retrieved, the grinding disc continues to advance, causing the outer edge of the grinding disc to contact the outer blockage body, entering the second stage of peripheral annular grinding.

[0115] The first motor 1111 of the drilling rig drives the hollow pipe 1113, the annular core drill bit 1112, and the grinding disc assembly to rotate synchronously. In the first stage, the annular core drill bit 1112 uses its axial extension to drill out the central hard blockage core. After the central core is retrieved, the hollow pipe 1113 continues to feed axially, causing the first grinding disc 121 and the second grinding disc 122 to contact the peripheral hard blockage outside the central hole. The roller assembly 123 rolls along the pipe wall and restricts the radial displacement of the grinding disc assembly, while the grinding blades on the outer edge of the grinding disc perform circumferential cutting and wear on the peripheral blockage.

[0116] Once the blockage around the current section is completely cleared, control device 3 sends a shutdown command, the first motor 1111 is de-energized and stops rotating, and the grinding disc and roller assembly stops rotating. If it is necessary to continue working deeper into the pipeline, the hollow pipe 1113 advances forward, driving the drill bit to the next grinding station, and repeating a new round of peripheral grinding operations.

[0117] The first motor 1111 serves as the same power source, driving the hollow pipe 1113, the annular core drill bit 1112, and the grinding disc assembly to rotate synchronously. Through the axial forward extension of the annular core drill bit 1112 relative to the first grinding disc 121 and the axial feed control, a two-stage operation of "center core extraction followed by peripheral annular grinding" is achieved, without employing a previously undisclosed second power system. The roller assembly 123 is used to limit the radial offset of the grinding disc assembly, thereby reducing the risk of pipe wall damage caused by eccentric grinding.

[0118] The pipe blockage clearing system provided in this application embodiment comprises a first grinding disc 121, a roller assembly 123, and a second grinding disc 122 arranged sequentially along the axial direction and connected to a hollow pipe 1113 via a circumferential torsion transmission structure and an axial limiting component. An annular core drill bit 1112 extends forward, allowing central core drilling and peripheral annular grinding to be performed in stages according to the axial feed sequence. Roller contact with the pipe wall restricts radial displacement of the grinding disc, thereby reducing the risk of metal components damaging the PVC pipe wall and internal auxiliary components.

[0119] In one optional embodiment of this application, the pipe blockage dredging system further includes a repair device; the control device 3 is used to determine a target repair plan based on the target opening size corresponding to each target opening position, and send the target repair plan to the repair device; the repair device is used to repair each target opening position according to the target repair plan.

[0120] Optionally, the control device 3 is used to acquire the pipe parameters corresponding to the pipe to be dredged, and calculate the water hammer wave velocity correction parameters corresponding to the target opening position based on the pipe parameters; Obtain the sudden change value of pipe flow velocity corresponding to the target opening location; Based on the water hammer wave velocity correction parameters and the sudden change value of pipeline flow velocity, the maximum water hammer pressure rise corresponding to the target opening position is calculated. Based on the maximum water hammer pressure rise, calculate the design peak pressure corresponding to the target opening position; Based on the target opening size and the design peak pressure at the target opening location, determine the target repair plan for the target opening location.

[0121] Specifically, control device 3 retrieves the inherent parameters of the pipeline, the basic parameters of the water body, and the pipe material parameters as input conditions for the water hammer wave velocity correction calculation. Among these, the basic water body parameters are: sound velocity in water c0, bulk modulus of elasticity of water K, and water density ρ; the pipe material parameters are: elastic modulus of elasticity of the pipe E and Poisson's ratio μ; the pipeline geometric parameters are: inner diameter of the pipe D and wall thickness e; and the constraint conditions are: the pipeline can freely expand and contract axially, and the pipe constraint coefficient... The above parameters are linked to the target orifice mileage and are read directly from the database by control device 3, preparing for the calculation of water hammer wave velocity.

[0122] Control device 3 uses a specialized water hammer wave velocity correction formula that takes into account the elasticity of the pipe wall to calculate the water hammer wave velocity correction parameters corresponding to the target opening position: .

[0123] Control device 3 automatically substitutes all parameters into the formula to calculate the actual water hammer wave velocity 'a' after elastic correction of the pipeline to be dredged. This value is the water hammer wave velocity correction parameter for this calculation. Conventional rigid pipeline wave velocity does not consider pipe wall deformation. This formula incorporates the elastic deformation characteristics of the pipeline to be dredged, making the calculated wave velocity more consistent with the actual working conditions of the flexible water conveyance pipeline to be dredged, resulting in higher accuracy of the water hammer pressure calculation results.

[0124] The pipeline flow monitoring sensor collects the steady-state flow velocity during normal operation and the extreme instantaneous flow velocity at the moment of valve opening / closing / pump start / stop in real time, calculates the flow velocity difference, and obtains the flow velocity change value Δv; the control device 3 reads the maximum flow velocity change Δv of the target opening section, takes the maximum value of the working condition limit for water hammer pressure calculation, and ensures that the repair design has sufficient safety redundancy.

[0125] Then, control device 3 can adopt the Joukowsky water hammer boosting foundation formula: By substituting the water density ρ, the corrected water hammer wave velocity a, and the measured sudden change in flow velocity Δv into the control device 3, the instantaneous maximum water hammer pressure rise ΔP at that point can be obtained. The instantaneous additional impact pressure generated by the sudden change in the velocity of the water flow in the pipeline is a core component of the alternating load.

[0126] Next, control device 3 can obtain the steady-state static pressure P0 of the pipeline to be dredged. Then, the steady-state static pressure P0 is added to the maximum water hammer pressure rise ΔP to obtain the theoretical instantaneous total pressure: P raw =P0+ΔP, where P0 is the steady-state water pressure of the target opening during daily operation, which is obtained by distributed osmosis fiber optic measurement.

[0127] The control device 3 can select a safety factor n based on the pressure risk level corresponding to each target opening location. For example, for low-risk pressure level: n=1.5; for medium-risk pressure level: n=2.0.

[0128] Then, based on the safety factor n and the theoretical instantaneous total pressure, the design peak pressure is calculated using the following formula: The peak pressure in this design serves as the core load standard for subsequent calculations of the reinforcement plate thickness and bonding width.

[0129] Finally, control device 3 can retrieve the target opening dimensions corresponding to the target opening position: slot width W, slot length L, and average pipe radius R. avg The pipe wall thickness is e. Then, based on the preset repair scheme relationship table stored in the control device 3, the target repair scheme corresponding to the target opening position is determined according to the target opening size and the design peak pressure.

[0130] Optionally, if the target repair solution is a thick-walled reinforcing plate and a wide-width bonding solution, the control device 3 is used to calculate the minimum thickness of the reinforcing plate and the minimum bonding width on one side based on the design peak pressure, and send the calculation results to the repair device; the repair device is used to repair each target opening position according to the calculation results.

[0131] Specifically, if the target repair solution is a thick-walled reinforcing plate and a wide-width bonding solution, control device 3 obtains the average radius R of the pipe to be dredged. avg And the allowable tensile stress σ of the base material corresponding to the pipeline to be dredged. Then, based on the relationship between the design peak pressure, the average radius of the pipeline, and the allowable tensile stress of the base material, the minimum thickness of the reinforcing plate is calculated, using the formula: ; where t p This is the minimum thickness of the reinforcing plate.

[0132] Control device 3 can obtain the allowable shear strength of the adhesive material corresponding to the pipe to be dredged, and calculate the minimum bonding width on one side based on the relationship between the allowable shear strength of the adhesive material, the design peak pressure and the average radius of the pipe; then send the minimum thickness of the reinforcing plate and the minimum bonding width on one side to the repair device, which will complete the installation of the reinforcing plate and the wide bonding according to the calculated parameters.

[0133] The pipeline blockage dredging system provided in this application calculates water hammer wave velocity correction parameters. It incorporates the elastic characteristics of the pipe material to be dredged, ensuring the wave velocity calculation closely matches actual pipeline conditions, resulting in higher accuracy in water hammer pressure calculation and resolving the problem of large deviations in rigid formula calculations. It collects abrupt flow velocity changes, accurately capturing pump station start-up and shutdown limit parameters to recreate real water hammer occurrence conditions, with safe and conservative load values. It solves for the maximum water hammer pressure rise, quantifies instantaneous impact pressure, and fully understands the water hammer impact load at the opening location. It calculates the design peak pressure, superimposes steady-state static pressure, and matches a safety factor with the risk level to obtain the usable design load for the project, providing a reliable basis for reinforcement calculations. A repair plan is formulated based on the opening size and peak pressure. It accurately calculates the thickness of the thick-walled reinforcement plate and the width of the wide bonding area, adapting the plan to water hammer alternating shear loads, effectively preventing delamination of the repair interface and secondary pipeline damage, ensuring long-term stability of the repaired structure. Finally, it calculates the minimum thickness of the reinforcement plate based on the design peak pressure. Strictly adhering to the membrane stress formula for quantitative thickness calculation ensures that the tensile strength of the thick-walled reinforcing plate fully withstands the peak water hammer pressure, matching the stress characteristics of the pipeline to be dredged and preventing the reinforcing plate from bulging and cracking due to internal pressure. The minimum bonding width on one side is calculated. Based on the shear strength formula, the bonding overlap size is determined; wide bonding significantly improves the shear and peel resistance of the adhesive layer, enabling it to withstand the alternating shear forces of water hammer caused by pump station start-up and shutdown over a long period, avoiding bonding interface detachment and failure. On-site repair is carried out according to the calculated parameters. Scientifically quantified dimensional parameters and clear construction standards ensure that the stress of the reinforced structure matches the original pipeline, completely solving the shortcomings of traditional experience-based repairs that are not resistant to water hammer and prone to secondary damage later, significantly improving the durability of the repair.

[0134] Although embodiments of the invention have been described in conjunction with the accompanying drawings, those skilled in the art can make various modifications and variations without departing from the spirit and scope of the invention, and such modifications and variations all fall within the scope defined by the appended claims.

Claims

1. A pipe clog clearing system, characterized by, The pipeline blockage clearing system includes: rigid blockage clearing equipment, drilling equipment, and control equipment; wherein: The control device is used to acquire the base plate structure data and the internal pressure data of the pipe to be dredged; and to determine the position of each target opening and the size of each target opening corresponding to the pipe to be dredged based on the base plate structure data and the internal pressure data. The hole-opening device is used to cut and form target holes at each of the target hole-opening positions according to each of the target hole-opening positions and the corresponding target hole-opening size; The rigid blockage clearing equipment is used to clear the pipe to be cleared, starting from the target hole.

2. The pipe blockage clearing system according to claim 1, characterized in that, The pipeline blockage clearing system further includes: a ground-penetrating radar; the ground-penetrating radar is communicatively connected to the control equipment; wherein: The ground-penetrating radar is used to scan the pipeline to be dredged, and obtain the radar profile image and electromagnetic wave reflection waveform corresponding to the pipeline to be dredged. The control device is used to determine the base plate structure data corresponding to the pipeline to be dredged based on the radar profile image and the electromagnetic wave reflection waveform; the base plate structure data includes at least one of the following: base plate main reinforcement, transverse drainage branch pipe, structural expansion joint, carbon fiber or steel plate reinforcement layer. The control device is used to acquire a three-dimensional geometric model corresponding to the pipe to be dredged, and to calculate the pipe pressure data at each detection location corresponding to the pipe to be dredged based on the three-dimensional geometric model. The control device is used to determine the pressure risk level of at least one detection location of the pipeline to be dredged based on the pipe pressure data corresponding to each detection location. The control device is further configured to determine multiple candidate opening positions based on the base plate structure data and the pressure risk level corresponding to each of the detection positions; and to determine the target opening position from among the candidate opening positions.

3. The pipe blockage clearing system according to claim 2, characterized in that, The control device is used to determine the size of each candidate opening position based on the base plate structure data and the pressure risk level corresponding to each candidate opening position. Based on the candidate opening size corresponding to each candidate opening position, determine the target opening spacing between adjacent candidate opening positions; Based on the target opening spacing, the target opening position is determined from the candidate opening positions, and the candidate opening size corresponding to the candidate opening position of the target opening position is determined as the target opening size.

4. The pipe blockage clearing system according to claim 3, characterized in that, The control device is used to determine the initial opening size corresponding to each of the candidate opening positions based on the pressure risk level corresponding to each of the candidate opening positions. The initial opening dimensions include the initial slot width, initial slot length, and initial end chamfer. Based on the base plate structure data, the initial opening size is adjusted to obtain the temporary opening size corresponding to each candidate opening position; Based on the pipe type corresponding to the pipe to be dredged, check whether the size of the temporary opening meets the preset verification conditions; If the temporary opening size meets the preset verification conditions, then the temporary opening size is determined as the candidate opening size; If the temporary opening size does not meet the preset verification conditions, the temporary opening size is adjusted until the preset verification conditions are met, and the candidate opening size is obtained.

5. The pipe blockage clearing system according to claim 1, characterized in that, The hard sludge clearing device includes: a drilling rig power unit, a roller centering drill bit, at least one drill rod extension device, and a support device; the proximal end of the drill rod extension device is detachably connected to the output end of the drilling rig power unit, and the roller centering drill bit is installed at the distal end of the drill rod extension device; the support device is sleeved on the outside of the drill rod extension device, wherein: The drilling rig power unit is used to drive the annular core drill bit to drill a central hard blockage core of a preset diameter; the diameter of the central hard blockage core is smaller than the minimum inner diameter of the hollow channel formed by the drilling rig power unit and the drill rod extension device, so as to form a core discharge gap between the central hard blockage core and the hollow channel; The roller centering drill bit is used to wear down the peripheral hard blockage corresponding to the central hard blockage in the pipe to be dredged, so as to remove the peripheral hard blockage. The drill pipe extension device is used to extend the power transmission distance and hollow core discharge channel of the drilling rig power host equipment; The support device is used to provide radial support, coaxial positioning, and releasable axial limiting for the drill pipe extension device.

6. The pipe blockage dredging system according to claim 5, characterized in that, The drilling rig's main power equipment includes: a core drilling rig, an electronic speed control device, a water-cooled circulating water supply unit, a real-time torque monitoring device, a horizontal leveling mechanism, and a vibration sensing device; the horizontal leveling mechanism is installed below the core drilling rig; the core drilling rig includes a first motor, an annular core drill bit, and a hollow pipe; the inner diameter of the annular core drill bit corresponds to the preset diameter of the central hardened blockage core, and the inner diameter of the hollow pipe is larger than the inner diameter of the annular core drill bit; the output end of the first motor is connected to the hollow pipe, and the hollow pipe is connected to the annular core drill bit via the drill rod extension device; the electronic speed control device is communicatively connected to the first motor, the real-time torque monitoring device, the vibration sensing device, and the control device; the horizontal leveling mechanism is a mechanical leveling mechanism, wherein: The core drilling rig is used to drill out the central hard blockage object of a preset diameter corresponding to the pipe to be dredged. The electronic speed control device is communicatively connected to the first motor and is used to adjust the speed of the first motor under the control of the control device; The water-cooled circulating water supply unit is used to cool the coring drill during its operation. The real-time torque monitoring device is used to detect the current torque corresponding to the core drilling rig in real time; The vibration sensing device is used to detect the vibration amplitude of the coring drill in real time. The control device is used to control the electronic speed control device according to the current torque and / or the vibration amplitude, thereby adjusting the speed of the first motor.

7. The pipe blockage clearing system according to claim 6, characterized in that, The roller centering drill bit includes: a first grinding disc, a roller assembly, and a second grinding disc arranged sequentially along the axial direction of the hollow pipe; both the first and second grinding discs are annular, and a circumferential torsion transmission connection structure is provided between the first and second grinding discs and the hollow pipe, and they are fixed to the front end of the hollow pipe by an axial limiting member; the roller assembly includes multiple roller supports and rollers mounted on each roller support, and each roller is evenly distributed along the circumference of the hollow pipe and rolls in contact with the inner wall of the pipe to be dredged; the annular core drill bit extends axially in front of the first grinding disc to drill the central hard blockage core before the first grinding disc contacts the peripheral hard blockage object, wherein: The control device is used to control the first motor to drive the hollow pipe, the annular core drill bit, the first grinding disc, the second grinding disc, and the roller assembly to rotate synchronously, and to control the axial feed to make the annular core drill bit complete the center core first, and then make the first grinding disc and the second grinding disc contact and wear down the hard blockage on the periphery.

8. The pipe blockage dredging system according to claim 1, characterized in that, The pipeline blockage dredging system also includes repair equipment; the control equipment is used to determine a target repair plan based on the target opening size corresponding to each target opening position, and send the target repair plan to the repair equipment; The repair equipment is used to repair each of the target opening positions according to the target repair plan.

9. The pipe blockage dredging system according to claim 8, characterized in that, The control device is used to acquire the pipe parameters corresponding to the pipe to be dredged, and to calculate the water hammer wave velocity correction parameters corresponding to the target opening position based on the pipe parameters. Obtain the sudden change value of the pipe flow velocity corresponding to the target opening position; Based on the water hammer wave velocity correction parameters and the pipeline flow velocity mutation value, the maximum water hammer pressure rise corresponding to the target opening position is calculated. Based on the maximum water hammer pressure rise, calculate the design peak pressure corresponding to the target opening position; Based on the target opening size corresponding to the target opening location and the design peak pressure, determine the target repair scheme corresponding to the target opening location.

10. The pipe blockage clearing system according to claim 9, characterized in that, If the target repair solution is a thick-walled reinforcing plate and a wide-width bonding solution, the control device is used to calculate the minimum thickness of the reinforcing plate and the minimum bonding width on one side based on the design peak pressure, and send the calculation results to the repair device. The repair equipment is used to repair each of the target opening positions according to the minimum thickness of the reinforcing plate and the minimum bonding width on one side.