An integrated construction method for crack-resistant and seepage-proof joints of aerated concrete strip panels for exterior walls.
By employing vertical joint cavity buffer composite sealing and horizontal joint staggered overlap methods in the construction of aerated concrete strip panels for exterior walls, the problems of easy cracking and leakage at the joints were solved, achieving an overall waterproof sealing system and improving crack resistance, seepage prevention performance, and construction efficiency.
Patent Information
- Application Number
- CN202611510187.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-28
- Publication Date
- 2026-11-17
AI Technical Summary
In the construction of existing aerated concrete panels for exterior walls, the joints are prone to cracking and leakage, which leads to a reduction in the stability and service life of the wall.
The system employs a vertical joint cavity buffer composite seal, with horizontal joints staggered and overlapped for flexible seepage prevention. Combined with flexible support pads and waterproof isolation pads, it forms an overall waterproof and sealed system that buffers temperature deformation stress.
It effectively prevents the formation of through cracks and water seepage channels, improves the crack resistance and seepage prevention performance of external walls, extends service life, and improves construction efficiency.
Smart Images

Figure CN123109292A_ABST
Abstract
Description
Technical Field
[0001] This application relates to the technical field of building construction, and in particular to an integrated construction method for crack-proofing and seepage-proofing joints of aerated concrete strip panels for exterior walls. Background Technology
[0002] Aerated concrete (ACP) panels for exterior walls are porous, lightweight, prefabricated wall panels made primarily from siliceous and calcareous materials and cured under high-temperature autoclaving. With advantages such as lightweight insulation, fire resistance, sound insulation, efficient construction, and environmental friendliness, they are widely used in the construction of modern building exterior wall structures and are one of the mainstream materials for prefabricated building exterior wall construction.
[0003] Currently, the conventional construction process for aerated concrete (ACP) panels for exterior walls has significant technical shortcomings, with joint cracking and wall leakage becoming common quality problems in the industry. Traditional construction methods rely solely on mortar grouting combined with a simple surface sealant, resulting in poor structural protection. ACP panels themselves exhibit wet and dry shrinkage characteristics, which, combined with environmental temperature deformation and building structural settlement, easily lead to continuous internal stress at wall joints. This causes vertical and horizontal joints of the panels to easily form through-cracks. Rainwater can seep into the wall through the capillary channels formed by these cracks, leading to a series of problems such as dampness and mold growth on interior walls, moisture-induced failure of the exterior wall insulation layer, and corrosion and damage to metal connectors, severely reducing the stability and overall service life of the exterior wall envelope. Therefore, there is an urgent need to optimize and improve existing construction techniques and develop a construction method that enhances crack and water leakage resistance. Summary of the Invention
[0004] To improve the crack resistance and seepage prevention performance of aerated concrete panel exterior walls, this application provides an integrated construction method for crack-resistant and seepage-proof joints of aerated concrete panel exterior walls.
[0005] This application provides an integrated construction method for crack-resistant and seepage-proof joints of aerated concrete strip panels for exterior walls, employing the following technical solution: An integrated construction method for crack-proofing and seepage-proofing joints of aerated concrete (ACP) exterior wall panels includes the following steps: S1, pre-construction preparation and pretreatment of the main base layer; S2, layout and line setting of exterior wall panels, and installation of an adjustable support system at the bottom of the panels; S3, hoisting and erecting of the ACP exterior wall panels, multi-level verticality elevation correction and flexible limiting and fixing; S4, construction of vertical joint cavity buffer composite sealing joints; S5, construction of horizontal joint staggered overlap flexible seepage-proofing joints; S6, construction of flexible expansion and contraction connection joints between the top beam and the panel; S7, forming of the bottom leveling buffer sealing joints; S8, construction of integrated reinforcement joints with angle steel edging and rebar installation at door and window openings; S9, overall curing and surface crack-resistant treatment.
[0006] By adopting the above technical solutions, the vertical joint cavity is buffered and sealed to eliminate waterproof dead corners; the horizontal joint is staggered and overlapped and formed into a flexible waterproof mold; the outer side of the horizontal joint is coated with weather-resistant sealant, which is continuously closed with the vertical sealant to form an overall waterproof sealing system. The buffer pad absorbs interlayer displacement and temperature deformation stress, avoids horizontal joint tearing, and improves the crack resistance and seepage prevention performance of the aerated concrete panel exterior wall.
[0007] Optionally, step S2 includes: a) using a total station to mark out the outer wall edge line, door and window opening control line, vertical joint positioning line, and tie rod vertical wiring line, and to mark the elevation baseline on the top surface of the floor slab; b) laying galvanized steel adjustable spiral support pads along the bottom of the wall, and laying a waterproof isolation pad layer at the bottom of the support pads to form an adjustable buffer support system for the bottom of the slab.
[0008] By adopting the above technical solutions, the flexible support pads and waterproof isolation pads form an adjustable buffer support system, which can release internal stresses caused by temperature, settlement, and wind vibration, and eliminate through cracks and water seepage channels from the structural source, thus greatly improving the durability of the external wall's waterproofing.
[0009] Optionally, in step S1, the appearance, size, and strength of the aerated concrete strip are re-inspected, and trapezoidal grooves are pre-processed on the splicing side of the strip; in step S4, the trapezoidal grooves on the side of adjacent strips are interlocked to form a central buffer cavity, and the cavity is filled with a closed-cell elastic foam insulation sealant strip.
[0010] By adopting the above technical solution, the trapezoidal grooves on the sides of adjacent strips interlock to form a central buffer cavity, and foamed thermal insulation sealant strips are laid in the cavity to improve the overall sealing and thermal insulation effect.
[0011] Optionally, step S9 includes: a) moisturizing and curing all joints and nodes of the wall; b) laying a full-length fiberglass mesh on the outside of the wall as an overall crack-resistant layer; and then carrying out exterior wall insulation, plastering, and finishing work.
[0012] By adopting the above technical solution, fiberglass mesh is laid on the outside of the wall as an overall crack-resistant layer, which further improves the crack resistance of the overall structure.
[0013] Optionally, in step S9, the fiberglass mesh is secured to the wall with locking nails. The locking nails include a nail cap and a nail body. The nail cap abuts against the fiberglass mesh, and one end of the nail body is connected to the nail cap. The other end passes through the fiberglass mesh and is driven into the wall. The locking nails are driven into the wall through an operating platform equipped with a nailing machine.
[0014] By adopting the above technical solution, when fixing the fiberglass mesh, the locking nails are driven into the wall by the nailing machine on the operating platform to lock the fiberglass mesh, thereby improving construction efficiency.
[0015] Optionally, the nailing machine includes an installation cylinder, a gripping disc, and a hammer block. The installation cylinder is set on the operating platform. The gripping disc and the hammer block are slidably installed on the installation cylinder. The gripping disc is used to grip the nail cap of the locking nail, and the hammer block is used to hammer the gripping disc.
[0016] Optionally, a slider connected to the gripper is slidably installed inside the mounting cylinder, and a power storage spring is provided between the hammer block and the inner wall of the mounting cylinder. The power storage spring normally forces the hammer block to approach the slider; a power storage component is provided between the hammer block and the slider.
[0017] Optionally, the energy storage assembly includes an energy storage block and a return spring. The energy storage block is disposed between the hammer block and the slider, and the return spring is disposed between the energy storage block and the inner wall of the mounting cylinder. The return spring normally forces the energy storage block to abut against the slider. The energy storage block is connected to a guide rod, and the end of the guide rod away from the energy storage block is used to abut against the end face of the hammer block. The end face of the hammer block has a slot, and the inner wall of the mounting cylinder has a guide surface. When the slider approaches the hammer block, the guide surface guides the guide rod into the slot.
[0018] By employing the above technical solution, the locking nail is gripped by a gripping disc, driving the installation cylinder towards the wall, allowing the nail body to pass through the fiberglass mesh and abut against the wall surface. As the installation cylinder continues to slide, the slider pushes the energy storage block closer to the hammer block, forcing the energy storage spring and return spring to deform under pressure and retain elastic force. During the sliding of the slider towards the hammer block, the guide surface of the installation cylinder guides the end of the guide rod away from the energy storage block into the slot. The elastic force stored in the energy storage spring and return spring is released instantaneously, the hammer block strikes the guide rod, driving the slider to slide, thereby driving the locking nail body into the wall through the gripping disc to lock the fiberglass mesh, improving the overall ease of operation of the structure.
[0019] Optionally, the operating platform has a storage rack with a storage channel for storing locking nails. The storage channel is located on the side of the mounting cylinder away from the fiberglass mesh, and the nail heads of the locking nails in the storage channel face the mounting cylinder. A movable seat is slidably installed on the operating platform, and the mounting cylinder is provided with a flip shaft, which is rotatably installed on the movable seat.
[0020] Optionally, an eccentric column is connected to the flipping shaft, and a guide groove is provided on the operating platform for the eccentric column to be embedded in; the two ends of the guide groove form a first point and a second point respectively, the first point being located on the side of the second point away from the storage rack; when the eccentric column moves to the first point, the gripping plate faces the fiberglass mesh cloth, and when the eccentric column moves to the second point, the gripping plate faces the storage channel.
[0021] By employing the above technical solution, the movable base is driven to reciprocate. When the movable base approaches the storage rack, the guide groove and eccentric column work together to rotate the mounting cylinder around the central axis of the flipping shaft, causing the gripper on the mounting cylinder to flip towards the storage channel to grab the nail head of the locking nail in the storage channel. When the movable base is in the storage rack, the guide groove and eccentric column work together to rotate the mounting cylinder around the central axis of the flipping shaft, causing the gripper on the mounting cylinder to flip towards the fiberglass mesh, completing the "flipping" of the locking nail. This allows the mounting cylinder to press the nail body of the locking nail into the wall, improving the overall ease of operation of the structure. Attached Figure Description
[0022] Figure 1 This is the overall construction process diagram of Example 1; Figure 2 This is a schematic diagram illustrating the structure of the locking screw in Example 2; Figure 3 This is a schematic diagram illustrating the structure of the operating platform in Example 2; Figure 4 This is a schematic diagram illustrating the structure of the nailing machine in Example 2; Figure 5 This is a partial cross-sectional view of the mounting cylinder in Embodiment 2; Figure 6 yes Figure 5 Enlarged view of point A in the middle; Figure 7 This is a schematic diagram illustrating the structure of the storage rack in Example 2; Figure 8 This is a partial cross-sectional view of the gripping opening in Embodiment 2; Figure 9 This is a schematic diagram illustrating the structure of the flipping shaft and eccentric column in Example 2; Figure 10 This is a schematic diagram of the guide groove structure in Example 2.
[0023] Explanation of reference numerals in the attached drawings: 1. Operating platform; 11. Guide groove; 111. First point; 112. Second point; 113. Guide section; 114. Straight section; 2. Nail driver; 21. Mounting cylinder; 211. Guide surface; 212. First sliding cavity; 213. Second sliding cavity; 214. Clearance groove; 215. Through groove; 216. Through part; 217. Guide part; 22. Grip plate; 221. Sink; 23. Hammer block; 231. Energy storage spring; 232. Slot; 24. Slider; 25. 1. Slide rod; 242. Adsorption channel; 243. Adsorption hose; 25. Energy storage block; 251. Return spring; 26. Guide rod; 261. First guide part; 262. Second guide part; 27. Flip shaft; 271. Eccentric column; 272. Swing arm; 3. Storage rack; 31. Storage channel; 32. Gripping port; 33. Support block; 331. Magnet; 4. Moving seat; 5. Moving cart; 6. Scissor lifter; 7. Drive motor; 71. Drive screw; 8. Locking pin; 81. Pin cover; 82. Pin body. Detailed Implementation
[0024] The following combination Figures 1-10 This application will be described in further detail. Example 1
[0025] This application discloses an integrated construction method for crack-resistant and seepage-proof joints of aerated concrete strip panels for exterior walls.
[0026] Reference Figure 1 A method for integrated construction of crack-resistant and seepage-proof joints for aerated concrete strip panels on exterior walls, comprising the following steps: S1. Pre-construction preparation and main body base pretreatment: a. Upon arrival, the appearance, dimensions, and strength of the gas-filled panels are re-inspected. The cut edges of the panels are ground smooth. Trapezoidal grooves are pre-processed on the sides of the panels to form a vertical joint cavity structure.
[0027] b. Clean the laitance and loose concrete from the main structural beams, columns, beam bottoms, and floor slab bases. Use expansion bolts and pre-embedded anti-corrosion steel plates at the beam and column exterior wall installation locations.
[0028] c. All metal tie parts, angle steel frames, and adjustable supports are hot-dip galvanized for corrosion protection. Matching flexible rubber buffer pads, closed-cell elastic sealant strips, alkali-resistant fiberglass mesh, high-elasticity weather-resistant sealant, and polymer crack-resistant mortar are prepared in place.
[0029] S2. Layout and setting out of exterior wall panels, and installation of adjustable support system at the bottom of the panels: a. Use a total station to mark out the outer wall edge lines, door and window opening control lines, vertical joint positioning lines, and vertical wiring lines for tie parts, and then mark the elevation baseline on the top surface of the floor slab.
[0030] b. Galvanized steel adjustable spiral support pads are laid along the bottom of the wall, and a waterproof isolation pad is laid at the bottom of the support to form an adjustable buffer support system for the bottom of the board.
[0031] S3. Installation of aerated concrete strip panels for exterior walls, multi-level verticality correction and flexible limiting and fixing: a. Use special plate clamps to hoist the aerated concrete strips, arrange them vertically with staggered joints, and stagger the horizontal joints of adjacent upper and lower strips by ≥600mm; place the strips on adjustable support blocks.
[0032] b. Use a coarse adjustment pry bar to correct the wall edge line, and use an electronic straightedge and level to monitor multiple points to control the wall verticality deviation to ≤2mm / m and the flatness to ≤1.5mm.
[0033] c. A set of L-shaped galvanized tie brackets is installed every 500mm between the wall and the structural beams and columns. Rubber buffer pads are added to the contact surface between the brackets and the plate. The brackets are limited to positioning and do not rigidly press against the plate. U-shaped adjustable tie members are arranged every 600mm vertically and horizontally. Expansion bolts are fixed to the main base and flexibly adhere to the plate surface to achieve micro-deformation release.
[0034] S4. Construction of vertical joint cavity buffer composite sealing node: a. The trapezoidal grooves on the sides of adjacent strips interlock to form a central buffer cavity, and the cavity is filled with a closed-cell elastic foam insulation sealant strip; a sealing groove is reserved on the outside of the sealant strip.
[0035] b. The groove is sealed in three continuous layers: the bottom layer is filled with polymer crack-resistant mortar, the middle layer is pressed with 100mm wide alkali-resistant fiberglass mesh, and the surface is fully scraped and leveled; after the mortar has initially set, high-elasticity weather-resistant exterior wall sealant is applied along the entire length to form a four-layer composite sealing structure of "cavity buffer + mortar crack resistance + mesh reinforcement + surface waterproof adhesive".
[0036] c. The vertical seam sealing layer extends vertically to the horizontal seam, and the mesh fabric overlaps and runs through the cross joints to eliminate waterproof dead corners.
[0037] S5. Construction of flexible seepage-proof joints with staggered horizontal seams: a. A continuous flexible rubber shock-absorbing pad is laid on the top surface of the lower layer of panels, and the upper layer of panels is placed on the shock-absorbing pad. The width of the horizontal gap is controlled at 8-12mm.
[0038] b. The lower half of the gap is filled with polymer crack-resistant mortar, and a horizontal continuous fiberglass mesh is pressed on the surface, with the mesh overlapping the vertical mesh on both sides.
[0039] c. Apply weather-resistant sealant to the entire outer side of the horizontal seam, which is continuously sealed with the vertical sealant to form an overall waterproof sealing system. The buffer pad absorbs interlayer displacement and temperature deformation stress, preventing the horizontal seam from tearing.
[0040] S6. Construction of flexible expansion joint between slab top beam and slab: a. A 20-30mm long expansion joint should be reserved between the top of the strip and the bottom of the structural beam. It is forbidden to harden and compact the mortar.
[0041] b. Fill the expansion joint with high-density polyurethane insulation and sealing rods, filling to 2 / 3 of the joint depth; seal the outside of the joint with high-elasticity weather-resistant sealant, leaving room for deformation to accommodate the settlement of the main structure and the shrinkage of the board.
[0042] c. A continuous L-shaped limiting angle steel is installed at the bottom of the beam every 600mm. A rubber gasket is added between the angle steel and the top of the slab to limit the lateral movement of the wall but not to constrain vertical shrinkage deformation.
[0043] S7. Forming of bottom leveling, buffering, and sealing nodes: a. After the overall wall correction and tying are completed for 72 hours and the self-weight of the strip is stable, fill the gaps of the bottom support with flexible dry-hard crack-resistant mortar.
[0044] b. A waterproof isolation layer is laid at the bottom of the mortar to block the capillary infiltration of groundwater; after the mortar has been cured for 3 days to reach its strength, all adjustable spiral support pads are removed, and the mortar in the gaps at the bottom of the slab forms a flexible stress buffer layer.
[0045] S8. Construction of integrated reinforcement joint for angle steel edging and rebar installation at door and window openings: a. The four sides of the door and window openings are covered with a continuous hot-dip galvanized angle steel corner frame, and the angle steel frame is fixed to the main structure with expansion bolts; a flexible rubber sheet is placed between the angle steel and the plate.
[0046] b. Insert L-shaped anchor bars into the side strip of the opening. One end of the anchor bar should penetrate ≥120mm into the plate, and the other end should be spot welded to the angle steel corner guard frame.
[0047] c. The joints around the opening are widened to 15mm, filled with crack-resistant mortar, reinforced with double-layer fiberglass mesh, and sealed with two layers of weather-resistant sealant on the outside to eliminate stress concentration diagonal cracks at the opening.
[0048] S9. Overall maintenance and surface crack-resistant treatment: a. All joints and nodes shall be sealed and kept moist at room temperature for no less than 5 days. During the curing period, the wall shall not be bumped or vibrated.
[0049] b. The entire exterior wall is covered with a continuous fiberglass mesh as the overall surface anti-cracking layer, with the mesh overlapping with the local reinforcement mesh at each node; after drying, the exterior wall insulation, plastering, and finishing are carried out.
[0050] The implementation principle of Embodiment 1 of this application is as follows: the vertical joint cavity is buffered and sealed to eliminate waterproof dead corners; the horizontal joint is staggered and overlapped and formed into a flexible waterproof sealant; the outer side of the horizontal joint is coated with weather-resistant sealant, which is continuously closed with the vertical sealant to form an overall waterproof sealing system; the buffer pad absorbs interlayer displacement and temperature deformation stress, avoids horizontal joint tearing, and improves the crack resistance and seepage prevention performance of the aerated concrete strip wall.
[0051] Vertical and horizontal joints utilize a cavity buffer and multi-layer composite continuous waterproofing. Expansion joints are pre-installed at the top and bottom of the panels. Flexible gaskets release internal stresses from temperature, settlement, and wind vibration, preventing through cracks and seepage channels. Cross joints have no waterproof dead corners, significantly improving the durability of the exterior wall's waterproofing. Rubber buffer layers are installed between all metal connectors and panels, limiting positioning without hard compression and allowing for slight adaptive inter-layer displacement. Under high-rise wind loads and earthquakes, the wall has the ability to deform and absorb energy, avoiding the risk of panel chipping and detachment. The entire process is unified and continuous, with layout, panel erection, tying, joint filling, sealing, and reinforcement seamlessly connected to reduce rework. Factory-prefabricated panel splicing grooves eliminate on-site grooving, shortening the overall exterior wall construction period. Example 2
[0052] This application discloses an integrated construction method for crack-resistant and seepage-proof joints of aerated concrete strip panels for exterior walls.
[0053] The difference between the integrated construction method for crack-resistant and seepage-proof joints of aerated concrete strip panels for exterior walls disclosed in this application and Embodiment 1 is as follows: Reference Figure 2 In step S9, the fiberglass mesh is secured to the wall using locking nails 8. In this embodiment, the locking nail 8 includes a nail cover 81 and a nail body 82. The nail cover 81 is a circular sheet structure, and one end of the nail body 82 is fixedly connected to the nail cover 81, while the other end forms a pointed tip that inserts into the wall. When the fiberglass mesh is secured, the nail cover 81 abuts against the surface of the fiberglass mesh, and the pointed tip of the nail body 82 passes through the fiberglass mesh and is nailed into the wall.
[0054] Reference Figure 3 , Figure 4 In this embodiment, the locking nail 8 is driven into the wall through the operating platform 1. The bottom of the operating platform 1 has a moving cart 5, and the moving cart 5 is connected to the operating platform 1 through a scissor lift 6 (the scissor lift 6 is an existing technology structure, and its structure will not be described in detail here), so that the operating platform 1 can be raised and lowered vertically and slid horizontally.
[0055] A nailing machine 2 is installed on the operating platform 1, and multiple nailing machines 2 are arranged side by side. In this embodiment, the nailing machine 2 includes a mounting cylinder 21, a gripping disc 22, and a hammer block 23. A movable seat 4 is slidably installed on the operating platform 1. The moving direction of the movable seat 4 is perpendicular to the wall (not shown in the figure). The mounting cylinders 21 of all nailing machines 2 are installed on the movable seat 4 so that they can be close to or away from the wall. The movable seat 4 is driven by a drive motor 7. The drive motor 7 is fixedly installed on the operating platform 1. The output shaft of the drive motor 7 is coaxially connected to a drive screw 71, and the drive screw 71 is threaded through the movable seat 4.
[0056] Reference Figure 4 , Figure 5 , Figure 6 The mounting cylinder 21 forms a first sliding cavity 212 and a second sliding cavity 213. A slider 24 is slidably mounted in the first sliding cavity 212. The slider 24 is connected to a sliding rod 241. One end of the sliding rod 241 is fixedly connected to the slider 24, and the other end extends out of the mounting cylinder 21 and is fixedly connected to the gripper plate 22. The gripper plate 22 is slidably mounted on the mounting cylinder 21 through the slider 24 so that it can slide along the axial direction of the sliding rod 241.
[0057] The gripping disc 22 is used to grip the nail cover 81 of the locking nail 8. The gripping disc 22 has a recess 221 for the nail cover 81 to be embedded in. The slide rod 241 has an adsorption channel 242. One end of the adsorption channel 242 is connected to the recess 221 of the gripping disc 22, and the other end passes through the outer peripheral wall of the slider 24. The adsorption channel 242 is located at one end of the slider 24 and is connected to an adsorption hose 243. The outer wall of the mounting cylinder 21 has a clearance groove 214 for the adsorption hose 243 to pass through.
[0058] Hammer 23 is used to hammer the slider 24 of the gripper plate 22. Hammer 23 is slidably installed in the second sliding cavity 213. A storage spring 231 is installed in the second sliding cavity 213. One end of the storage spring 231 abuts against the inner wall of the second sliding cavity 213, and the other end abuts against the hammer 23. Under normal conditions, the storage spring 231 forces the hammer 23 to slide towards the side closer to the slider 24.
[0059] A power storage assembly is provided between the hammer block 23 and the slider 24. The power storage assembly includes a power storage block 25 and a return spring 251. The power storage block 25 is disposed in the first sliding cavity 212 and is located on the side of the slider 24 closer to the hammer block 23. One end of the return spring 251 is fixedly connected to the inner wall of the first sliding cavity 212, and the other end is fixedly connected to the power storage block 25. Under normal conditions, the return spring 251 forces the power storage block 25 to slide away from the hammer block 23 and forces the power storage block 25 to abut against the slider 24.
[0060] The inner wall of the mounting cylinder 21 is provided with a through groove 215, through which the first sliding cavity 212 and the second sliding cavity 213 are connected. The through groove 215 includes a through portion 216 and a guide portion 217. One end of the through portion 216 is connected to the second sliding cavity 213, and the other end is connected to the guide portion 217. The end of the guide portion 217 away from the through portion 216 is connected to the first sliding cavity 212. The inner diameter of the guide portion 217 gradually increases from the end closer to the through portion 216 to the end away from the through portion 216 to form a guide surface 211.
[0061] A guide rod 26 is mounted on the end face of the energy storage block 25 away from the slider 24. The axial direction of the guide rod 26 is inclined, meaning that the axial direction of the guide rod 26 is not parallel to the axial direction of the slider 241. The guide rod 26 includes a first guide portion 261217 and a second guide portion 262217. One end of the first guide portion 261217 is hinged to the energy storage block 25, and the first guide portion 261217 and the energy storage block 25 are connected by a ball joint (the hinge structure is not shown in the figure). The other end of the first guide portion 261217 is coaxially fixed to the second guide portion 262217. The outer diameter of the first guide portion 261217 is larger than the outer diameter of the second guide portion 262217, and the outer diameter of the first guide portion 261217 is adapted to the inner diameter of the through portion 216. The first guide section 261217 is embedded with a gravity block (not shown in the figure). The gravity block forces the second guide section 262217 of the guide rod 26, away from the end of the energy storage block 25, to abut against the inner peripheral wall of the through section 216.
[0062] The end face of the hammer block 23 is provided with a slot 232. The virtual central axis of the slot 232 is set to coincide with the central axis of the slide bar 241. When the slider 24 drives the power storage block 25 to approach the hammer block 23, the guide surface 211 guides the first guide part 261217 to pass through the through part 216 and introduces the second guide part 262217 into the slot 232 of the hammer block 23.
[0063] Reference Figure 4 , Figure 7 , Figure 8 Multiple storage racks 3 are installed on the operating platform 1. The storage racks 3 are located on the side of the movable base 4 away from the wall, and the number of storage racks 3 corresponds to the number of nailing machines 2. The storage racks 3 have storage channels 31 for storing locking nails 8. The storage channels 31 are vertically arranged, with the upper end of the storage channel 31 open to form the inlet end of the storage channel 31. The lower side wall of the storage rack has a gripping opening 32, which connects to the storage channel 31 so that the gripping plate 22 can extend into it. It should be noted that in this embodiment, among the locking nails 8 in the storage channel 31, the nail head of the locking nail 8 faces the mounting cylinder 21, that is, the nail body 82 is located on the side of the nail head away from the mounting cylinder 21. A support block 33 is fixedly installed on the side wall of the storage rack 3. The support block 33 is used to support the nail body 82 of the locking nail 8. A magnet 331 for magnetically attracting the nail body 82 is embedded in the support block 33.
[0064] Reference Figure 9 , Figure 10 A rotating shaft 27 is fixedly installed on the outer wall of the mounting cylinder 21. The axial direction of the rotating shaft 27 is vertical. The rotating shaft 27 passes through the movable seat 4, and the mounting cylinder 21 is rotatably mounted on the movable seat 4 via the rotating shaft 27. A swing arm 272 is fixedly connected to the lower end of the rotating shaft 27. An eccentric column 271 is rotatably installed at the end of the swing arm 272 away from the rotating shaft 27. The eccentric column 271 is arranged parallel to the central axis of the rotating shaft 27. A guide groove 11 is provided on the operating platform 1 for the eccentric column 271 to be inserted.
[0065] The guide groove 11 includes a guide section 113 and two straight sections 114. The guide section 113 is arc-shaped, and the two straight sections 114 connect to both ends of the guide section 113. The length direction of both straight sections 114 is consistent with the sliding direction of the movable seat 4. For ease of description, the ends of the two straight sections 114 that are far apart from each other are defined as the first point 111 and the second point 112, respectively. The first point 111 is located on the side of the second point 112 that is far away from the storage rack 3. When the eccentric column 271 moves to the first point 111, the gripping plate 22 faces the fiberglass mesh cloth. When the eccentric column 271 moves to the second point 112, the gripping plate 22 faces the storage channel 31.
[0066] The implementation principle of Embodiment 2 of this application is as follows: When nailing, the moving seat 4 is driven to slide towards the side closer to the storage rack 3. With the cooperation of the guide groove 11 and the eccentric column 271, the mounting cylinder 21 is driven to rotate around the central axis of the flipping shaft 27, causing the gripping disc 22 on the mounting cylinder 21 to flip towards the storage channel 31. As the eccentric column 271 continues to slide in one of the straight segments 114, the gripping disc 22 of the mounting cylinder 21 can extend into the storage channel 31 of the storage rack 3 and grab the locking nail 8.
[0067] After the gripping is completed, the moving seat 4 is driven to slide away from the storage rack 3. With the cooperation of the guide groove 11 and the eccentric column 271, the mounting cylinder 21 is driven to rotate around the central axis of the flipping shaft 27, causing the gripping disc 22 on the mounting cylinder 21 to flip to face the fiberglass mesh, completing the "flipping" of the locking nail 8, so that the nail body 82 of the locking nail 8 faces the wall. As the eccentric column 271 continues to slide on another straight segment 114, the gripping disc 22 of the mounting cylinder 21 can push the locking nail 8 into the wall.
[0068] After the mounting cylinder 21 drives the nail body 82 of the locking nail 8 through the fiberglass mesh and abuts against the wall surface, as the mounting cylinder 21 continues to slide, the slider 24 pushes the energy storage block 25 closer to the hammer block 23, forcing the energy storage spring 231 and the return spring 251 to deform under pressure and retain elastic force. As the slider 24 slides towards the side closer to the hammer block 23, the guide surface 211 of the mounting cylinder 21 guides the end of the guide rod 26 away from the energy storage block 25 to the slot 232 opposite the hammer block 23. At this time, the elastic force stored in the energy storage spring 231 and the return spring 251 is released instantly, and the hammer block 23 strikes the guide rod 26, causing the slider 24 to slide, thereby driving the nail body 82 of the locking nail 8 into the wall through the gripper 22 to lock the fiberglass mesh, improve the overall operational convenience of the structure, and reduce the burden on the drive motor 7.
[0069] By setting up multiple nailing machines 2 on the operating platform 1, and coordinating the lifting and horizontal displacement of the operating platform 1, the nailing efficiency is improved, thereby improving the laying efficiency of fiberglass mesh cloth.
[0070] The above are preferred embodiments of this application, and are not intended to limit the scope of protection of this application. Therefore, all equivalent changes made to the structure, shape and principle of this application should be covered within the scope of protection of this application.
Claims
1. A method for integrated construction of crack-resistant and seepage-proof joints in aerated concrete strip panels for exterior walls, characterized in that: The process includes the following steps: S1. Pre-construction preparation and pre-treatment of the main base layer; S2. Layout and setting out of the exterior wall panels, and installation of the adjustable support system at the bottom of the panels; S3. Hoisting and erecting of the aerated concrete panels, multi-level verticality and elevation correction, and flexible limiting and fixing; S4. Construction of the composite sealing node for the vertical joint cavity buffer; S5. Construction of the flexible seepage prevention node for the horizontal joint staggered overlap; S6. Construction of the flexible expansion and contraction connection node for the top beam of the panel; S7. Forming of the bottom leveling buffer sealing node; S8. Construction of the integrated reinforcement node for the angle steel edging and rebar installation at the door and window openings; S9. Overall curing and surface crack resistance treatment.
2. The integrated construction method for crack-resistant and seepage-proof joints of aerated concrete strip panels for exterior walls according to claim 1, characterized in that: Step S2 includes: a) Using a total station to mark out the outer wall edge line, door and window opening control line, vertical joint positioning line, and tie rod vertical wiring line, and to mark the elevation baseline on the top surface of the floor slab; b) Laying out galvanized steel adjustable spiral support pads along the bottom of the wall, and laying a waterproof isolation pad layer at the bottom of the support pads to form an adjustable buffer support system at the bottom of the slab.
3. The integrated construction method for crack-resistant and seepage-proof joints of aerated concrete strip panels for exterior walls according to claim 1, characterized in that: In step S1, the appearance, size, and strength of the aerated concrete strip are re-inspected, and trapezoidal grooves are pre-processed on the side of the splicing of the strips. In step S4, the trapezoidal grooves on the side of adjacent strips are interlocked to form a central buffer cavity, and the cavity is filled with a closed-cell elastic foam insulation sealant strip.
4. The integrated construction method for crack-resistant and seepage-proof joints of aerated concrete strip panels for exterior walls according to claim 1, characterized in that: Step S9 includes: a) moisturizing and curing all joints and nodes of the wall; b) laying a full-length fiberglass mesh on the outside of the wall as an overall crack-resistant layer; and then carrying out exterior wall insulation, plastering, and finishing work.
5. The integrated construction method for crack-resistant and seepage-proof joints of aerated concrete strip panels for exterior walls according to claim 4, characterized in that: In step S9, the fiberglass mesh is locked to the wall by locking nails (8). The locking nail (8) includes a nail cover (81) and a nail body (82). The nail cover (81) abuts against the fiberglass mesh, and one end of the nail body (82) is connected to the nail cover (81), while the other end passes through the fiberglass mesh and is nailed into the wall. The locking nail (8) is driven into the wall through the operating platform (1), which is equipped with a nailing machine (2).
6. The integrated construction method for crack-resistant and seepage-proof joints of aerated concrete strip panels for exterior walls according to claim 5, characterized in that: The nailing machine (2) includes a mounting cylinder (21), a gripping disc (22), and a hammer block (23). The mounting cylinder (21) is set on the operating platform (1). The gripping disc (22) and the hammer block (23) are both slidably mounted on the mounting cylinder (21). The gripping disc (22) is used to grip the nail cap (81) of the locking nail (8), and the hammer block (23) is used to hammer the gripping disc (22).
7. The integrated construction method for crack-resistant and seepage-proof joints of aerated concrete strip panels for exterior walls according to claim 6, characterized in that: A slider (24) connected to the gripper plate (22) is slidably installed inside the mounting cylinder (21). A power storage spring (231) is provided between the hammer block (23) and the inner wall of the mounting cylinder (21). The power storage spring (231) normally forces the hammer block (23) to approach the slider (24). A power storage component is provided between the hammer block (23) and the slider (24).
8. The integrated construction method for crack-resistant and seepage-proof joints of aerated concrete strip panels for exterior walls according to claim 7, characterized in that: The power storage assembly includes a power storage block (25) and a return spring (251). The power storage block (25) is located between the hammer block (23) and the slider (24). The return spring (251) is located between the power storage block (25) and the inner wall of the mounting cylinder (21). The return spring (251) normally forces the power storage block (25) to abut against the slider (24). The power storage block (25) is connected to a guide rod (26). The end of the guide rod (26) away from the power storage block (25) is used to abut against the end face of the hammer block (23). The end face of the hammer block (23) has a slot (232). The inner wall of the mounting cylinder (21) has a guide surface (211). When the slider (24) approaches the hammer block (23), the guide surface (211) guides the guide rod (26) into the slot (232).
9. The integrated construction method for crack-resistant and seepage-proof joints of aerated concrete strip panels for exterior walls according to claim 6, characterized in that: The operating platform (1) has a storage rack (3), and the storage rack (3) has a storage channel (31) for storing locking nails (8). The storage channel (31) is located on the side of the mounting cylinder (21) away from the fiberglass mesh, and the nail head of the locking nail (8) in the storage channel (31) faces the mounting cylinder (21). A movable seat (4) is slidably installed on the operating platform (1). The mounting cylinder (21) is provided with a flip shaft (27), and the flip shaft (27) is rotatably installed on the movable seat (4).
10. The integrated construction method for crack-resistant and seepage-proof joints of aerated concrete strip panels for exterior walls according to claim 9, characterized in that: An eccentric column (271) is connected to the flipping shaft (27), and a guide groove (11) is provided on the operating platform (1) for the eccentric column (271) to be embedded. The two ends of the guide groove (11) form a first point (111) and a second point (112) respectively. The first point (111) is located on the side of the second point (112) away from the storage rack (3). When the eccentric column (271) moves to the first point (111), the gripping plate (22) faces the fiberglass mesh cloth. When the eccentric column (271) moves to the second point (112), the gripping plate (22) faces the storage channel (31).