A quick-assembly and quick-disassembly support system for densely ribbed structures in factory buildings
The support system, which uses disc-lock uprights and wedge pins, combined with ground prefabrication and overall hoisting technology, solves the problems of long installation cycle, significant safety hazards, and slow demolding speed of the dense rib structure formwork support system, and achieves rapid and accurate construction and efficient turnover.
Patent Information
- Application Number
- CN202611261568.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-19
- Publication Date
- 2026-11-17
AI Technical Summary
Existing ribbed formwork support systems have long installation cycles, significant safety hazards, slow demolding speeds, and difficulty in controlling precision. Furthermore, the adjustment of the top elevation of the uprights in traditional support systems is cumbersome, making it difficult to meet the requirements for construction efficiency and turnover speed.
The system employs multiple disc-lock uprights, wedge-pin connected horizontal bars, and support adjustment components, combined with rectangular steel pipe keels and casting mold components. The support system is quickly erected through ground prefabrication and overall hoisting, and the elevation is precisely adjusted using adjusting nuts to achieve rapid demolding.
It significantly reduces the risks of working at heights, improves installation efficiency and demolding speed, ensures construction accuracy, shortens the construction cycle, and improves the turnover efficiency of the formwork system.
Smart Images

Figure CN123109384A_ABST
Abstract
Description
Technical Field
[0001] This invention mainly relates to the field of ribbed structure support technology, specifically a quick-assembly and quick-disassembly support system for ribbed structures in factory buildings. Background Technology
[0002] A closely ribbed structure is a floor or roof structure composed of thin slabs and closely spaced ribs. Its typical characteristic is that the orthogonal ribs are arranged at equal or similar intervals, forming a grid-like texture on the bottom surface of the slab. The ribs and slab are cast integrally as a single load-bearing unit. This structure achieves high load-bearing capacity and stiffness using relatively thin slabs and close rib spacing, effectively increasing span capacity while reducing structural weight. It is suitable for large-span, large-space industrial plants and public buildings.
[0003] Existing ribbed formwork support systems typically employ a piecemeal construction method, installing formwork boxes one by one, laying secondary joists one by one, and laying bottom formwork piece by piece. All installation procedures must be completed at height, resulting in a large workload and limited operating space, leading to a long installation cycle. Furthermore, workers must perform numerous repetitive operations at height, posing significant safety hazards. During dismantling, each formwork piece must be pried off the concrete surface and each formwork box removed individually, resulting in slow dismantling speed and potential damage to the formwork and boxes, affecting the number of times the components can be reused. In addition, the traditional support system's method for adjusting the top elevation of the uprights is cumbersome, making it difficult to quickly and accurately adjust to the design height. Insufficient positioning and anti-slip measures between the main joists and support uprights result in the scaffolding erection accuracy being significantly affected by human factors. Dismantling requires removing the joists first, followed by the formwork, a complex and time-consuming process that fails to meet the requirements of ribbed structures for construction efficiency and turnover speed. Summary of the Invention
[0004] Based on this, the purpose of the present invention is to provide a quick-disassembly and quick-assembly support system for factory-type dense rib structures, so as to solve the technical problems mentioned in the background art.
[0005] To achieve the above objectives, the present invention provides the following technical solution:
[0006] A quick-assembly and quick-disassembly support system for a factory-type ribbed structure includes multiple disc-buckle uprights. Multiple adjacent disc-buckle uprights are connected by horizontal bars through wedge pins. Each disc-buckle upright has a support and adjustment component inserted into its top. A keel component is provided above the support and adjustment components, and a casting mold component is provided above the keel components.
[0007] Preferably, the receiving and adjusting assembly includes an adjusting rod, an adjusting nut, and a U-shaped bearing seat. The top of each of the multiple disc buckle uprights is inserted with an adjusting rod, and an adjusting nut is threaded to the outer side of one end of each of the multiple adjusting rods. The top of each of the multiple adjusting rods is fixedly installed with a U-shaped bearing seat.
[0008] Preferably, the keel assembly includes a main keel and a secondary keel. Multiple main keels are provided above the multiple supporting and adjusting components. The multiple main keels are rectangular steel pipes with a cross-sectional dimension of 50mm×100mm×3mm. Each main keel is placed inside multiple U-shaped bearing seats arranged along the length of the main keel.
[0009] Multiple secondary keels are horizontally connected to the top of each of the main keels. The secondary keels are rectangular steel pipes with a cross-sectional dimension of 40mm×40mm×3mm.
[0010] Preferably, the casting mold assembly includes a bottom template and a mold box. The bottom template is provided above the multiple keel assemblies, and the top of the bottom template is connected to multiple mold boxes by self-tapping screws. The bottom end of the bottom template is fixedly connected to the top end of multiple secondary keels.
[0011] Preferably, the adjusting rod is inserted into the top of the disc buckle upright, the lower end face of the adjusting nut abuts against the top opening of the disc buckle upright, and the adjusting rod moves up and down relative to the disc buckle upright by rotating the adjusting nut.
[0012] Preferably, the plurality of disc buckle uprights are further fixedly connected by horizontal and vertical scissor braces via wedge pins.
[0013] Preferably, the height of the main keel is higher than the groove depth of the U-shaped support seat, the upper part of the main keel protrudes from the top opening of the U-shaped support seat, and the bottom wall of the secondary keel is directly located on the top surface of the upper flange of the main keel.
[0014] Preferably, a limit block is welded to one side of each of the multiple U-shaped support seats used to support the two ends of the main keel.
[0015] Preferably, threaded sleeves for installing lifting rings are pre-embedded at the four corners of the top of the bottom template.
[0016] In summary, the present invention has the following main beneficial effects:
[0017] 1. By fixing multiple formwork boxes to the top of the bottom formwork at designed intervals and fixing multiple secondary keels to the bottom of the bottom formwork, the formwork boxes, bottom formwork, and secondary keels are pre-formed into a complete prefabricated unit on the ground. This prefabricated unit is then hoisted by a tower crane to the top of the erected keel assembly using threaded sleeves embedded at the four corners of the top of the bottom formwork. This eliminates the need to lay the bottom formwork piece by piece, install the secondary keels one by one, and install the formwork boxes one by one in the high-altitude environment of the construction site. This transforms a large amount of high-altitude bulk work into ground-based prefabrication and hoisting operations, significantly reducing the risks of high-altitude operations. At the same time, it reduces the number of on-site installation procedures and time, significantly improves the installation efficiency of the ribbed formwork system, and realizes the rapid erection of the formwork system.
[0018] 2. By inserting the adjusting rod of the receiving and adjusting component into the top of the disc buckle upright, the lower end face of the adjusting nut abuts against the top opening of the disc buckle upright. Rotating the adjusting nut drives the adjusting rod to rise and fall relative to the disc buckle upright, precisely adjusting the U-shaped support seat to the design elevation. This ensures that the main keel and secondary keel are in the accurate design position. After the concrete has cured to the design strength, rotating the adjusting nut in the opposite direction causes the adjusting rod to lower the U-shaped support seat as a whole. The main keel falls synchronously with the U-shaped support seat, and the secondary keel, along with the bottom formwork and mold box, detaches from the solidified concrete bottom surface synchronously with the main keel. This achieves rapid demolding of the entire piece without having to pry up the formwork piece by piece or remove the mold box one by one, significantly shortening the demolding cycle and effectively improving the overall turnover efficiency of the support system and formwork system. Attached Figure Description
[0019] Figure 1 This is a schematic diagram of the overall structure of the present invention;
[0020] Figure 2 This is a front view of the overall structure of the present invention;
[0021] Figure 3 This is a schematic diagram of the structure of the disc buckle upright, horizontal bar, and keel assembly of the present invention.
[0022] Figure 4 This is a schematic diagram of the disc buckle upright, the receiving and adjusting component, the limiting block, and the main keel structure of the present invention.
[0023] Figure 5 for Figure 3 Enlarged view of point A in the middle.
[0024] Attached diagram descriptions: 1. Disc buckle upright; 2. Horizontal bar; 3. Receiving and adjusting assembly; 31. Adjusting rod; 32. Adjusting nut; 33. U-shaped bearing seat; 4. Keel assembly; 41. Main keel; 42. Secondary keel; 5. Casting mold assembly; 51. Bottom template; 52. Mold box; 6. Horizontal scissor brace; 7. Vertical scissor brace; 8. Limiting block; 9. Threaded sleeve. Detailed Implementation
[0025] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and should not be construed as limiting the present invention.
[0026] The embodiments of the present invention will now be described.
[0027] Please refer to the appendix carefully. Figure 1-5A quick-assembly and quick-disassembly support system for factory-type ribbed structures includes multiple disc-buckle uprights 1 arranged in a matrix in the horizontal plane. Adjacent disc-buckle uprights 1 are fixedly connected by transverse bars 2 via wedge pins. The two ends of the transverse bars 2 are locked to connecting discs on the disc-buckle uprights 1 by wedge pins. The transverse bars 2 are arranged in layers along the height direction of the disc-buckle uprights 1, with equal vertical distances between adjacent layers of transverse bars 2. This creates a stable spatial grid structure in both the horizontal and vertical directions for all disc-buckle uprights 1, thereby enhancing the overall rigidity and lateral displacement resistance of the support system. Horizontal scissor braces 6 and vertical scissor braces 7 are also fixedly connected between the multiple disc-buckle uprights 1 via wedge pins. The horizontal scissor braces 6 are located in the horizontal layer of the support system at the same height as the transverse bars 2, while the vertical scissor braces 7 are located in the vertical facade of the support system. These components resist horizontal wind loads and the impact force generated by pumped concrete during construction, preventing the support system from overturning or twisting.
[0028] Each disc buckle upright 1 has a receiving and adjusting assembly 3 inserted into its top. The receiving and adjusting assembly 3 includes an adjusting rod 31, an adjusting nut 32, and a U-shaped bearing seat 33. The lower end of the adjusting rod 31 is inserted into the tube opening at the top of the disc buckle upright 1. The adjusting rod 31 is a cylindrical rod with an outer diameter smaller than the inner diameter of the disc buckle upright 1, allowing the adjusting rod 31 to move freely up and down inside the disc buckle upright 1, thus ensuring the flexibility of height adjustment. The upper outer side of the adjusting rod 31 is machined with an external thread, through which the adjusting nut 32 is threadedly connected to the adjusting rod 31. The top of the adjusting nut 32 has two symmetrical casting or stamping structures on both sides, with an outer diameter larger than that of the top of the disc buckle upright 1. The inner diameter of the end pipe opening allows the lower end face of the adjusting nut 32 to abut against the top pipe opening of the disc buckle upright 1. The two protrusions facilitate the use of tools by construction personnel to clamp and rotate the nut to apply a larger torque. When the support height needs to be adjusted, the adjusting nut 32 is rotated. The adjusting nut 32 is axially limited by the top pipe opening of the disc buckle upright 1 and cannot move up or down. The adjusting rod 31 extends upward or retracts downward relative to the disc buckle upright 1 under the drive of the threaded engagement, thereby achieving precise adjustment of the support elevation. A U-shaped bearing seat 33 is welded and fixed to the top of the adjusting rod 31. The U-shaped bearing seat 33 has an upward-facing groove, and the inner bottom wall of the groove is a horizontal plane, thus forming a stable support structure.
[0029] Please refer to the appendix carefully. Figure 1 , 23, 4. Multiple main keels 41 are installed above the receiving and adjusting assembly 3. Each main keel 41 is made of 50mm × 100mm × 3mm rectangular steel pipe, possessing excellent bending resistance and high rigidity. The length of each main keel 41 extends along the longitudinal direction of the disc-buckle upright 1. Each main keel 41 is simultaneously placed inside the grooves of multiple U-shaped bearing seats 33 arranged along its length. The width of the grooves of the U-shaped bearing seats 33 matches the width of the lower flange of the main keel 41, allowing the lower flange of the main keel 41 to be embedded in the groove and subjected to two... The lateral restraint of the sidewalls prevents the main keel 41 from slipping laterally during use. The height of the main keel 41 is greater than the groove depth of the U-shaped support 33. When the bottom surface of the lower flange of the main keel 41 is in contact with the inner bottom wall of the groove, the upper flange of the main keel 41 protrudes from the top opening of the U-shaped support 33. This exposes the top surface of the upper flange of the main keel 41 above the U-shaped support 33, allowing the secondary keel 42 to be directly pressed onto the top surface of the upper flange of the main keel 41. This avoids additional intermediate force transmission components in the load transfer path and ensures load transmission. To ensure directness and efficiency, a limiting block 8 is welded and fixed to one side wall of each U-shaped support seat 33 used to support both ends of the main keel 41. The end side wall of the main keel 41 abuts against the limiting block 8, and the limiting block 8 forms a longitudinal limit on the end of the main keel 41, thereby preventing the main keel 41 from shifting or slipping away from the U-shaped support seat 33 in the length direction. Multiple secondary keels 42 are vertically placed above the multiple main keels 41. The secondary keels 42 are made of rectangular steel pipes of 40mm×40mm×3mm, and the length direction of the secondary keels 42 is perpendicular to that of the main keels 41. The length direction of the keel 41 is perpendicular to each other in the horizontal plane. The bottom wall of the secondary keel 42 is directly pressed onto the top surface of the upper flange of the main keel 41. The main keel 41 and the secondary keel 42 are fixedly connected by angle brackets and self-tapping screws. The angle brackets are placed at the junction of the main keel 41 and the secondary keel 42. After passing through the through holes on the angle brackets, the self-tapping screws are screwed into the side wall of the main keel 41 and the bottom wall or side wall of the secondary keel 42 respectively, locking the secondary keel 42 onto the main keel 41. This ensures that the components of the keel assembly 4 maintain their designed positions and do not shift relative to each other when bearing loads.
[0030] Please refer to the appendix carefully. Figure 1 , 2A casting mold assembly 5 is installed above the keel assembly 4. The casting mold assembly 5 includes a bottom template 51 and mold boxes 52. The bottom template 51 is laid on top of the keel assembly 4. The bottom surface of the bottom template 51 is fixedly connected to the top of multiple secondary keels 42. The bottom template 51 is nailed to the secondary keels 42 with self-tapping screws, so that the bottom template 51 and the secondary keels 42 form an integral unit that cannot move relative to each other. This ensures that the bottom template 51 will not move relative to the secondary keels 42 when bearing concrete load. The top surface of the bottom template 51 is a flat plane and multiple mold boxes 52 are fixedly connected to it with self-tapping screws. Multiple mold boxes 52 are arranged in a matrix evenly on the top surface of the bottom template 51 according to the design spacing of the ribbed structure. Each mold box 52 has a fixing hole at the bottom for self-tapping screws to pass through. The self-tapping screws pass through the fixing hole from the inside of the mold box 52 and are screwed into the bottom template 51 to lock and fix the mold box 52 on the top surface of the bottom template 51. This ensures that the mold box 52 remains in the designed position during the concrete pouring process and ensures the forming accuracy of the ribbed structure. Threaded sleeves 9 are pre-embedded at the four corners of the top of the bottom template 51. The threaded sleeves 9 can be threaded with lifting rings inside, which serve as connection points for the overall hoisting.
[0031] The working principle of this invention is as follows:
[0032] First, the prefabrication of the casting formwork component 5 is completed on the ground. Multiple secondary joists 42 are fixedly connected to the bottom of the bottom formwork 51. Multiple mold boxes 52 are then fixed to the top of the bottom formwork 51 at designed intervals using self-tapping screws. Simultaneously, lifting rings are installed on the threaded sleeves 9 at the four corners of the top of the bottom formwork 51 as lifting connection points, forming a prefabricated unit integrating the mold boxes 52, the bottom formwork 51, and the secondary joists 42. Then, the disc-buckle uprights 1 are arranged vertically at designed intervals. The horizontal bars 2 are fixedly connected to the connecting plates on the disc-buckle uprights 1 using wedge pins, forming a support frame with a standard floor height. The frame is then internally connected... The horizontal scissor brace 6 and the vertical scissor brace 7 are fixedly connected by wedge pins to enhance overall stability. Next, the adjusting rod 31, which receives the adjusting assembly 3, is inserted into the top of the disc buckle upright 1, so that the lower end face of the adjusting nut 32 abuts against the top opening of the disc buckle upright 1. Rotating the adjusting nut 32 raises and lowers the adjusting rod 31 relative to the disc buckle upright 1, thereby precisely adjusting the U-shaped bearing seat 33 fixed to the top of the adjusting rod 31 to the design elevation. Then, the main keel 41 with a cross-section of 50mm × 100mm × 3mm is placed inside the multiple U-shaped bearing seats 33 arranged along the length of the main keel 41. The lower end of the main keel 41 is embedded in the groove of the U-shaped support seat 33, and its height is greater than the depth of the groove, so that the upper part of the main keel 41 protrudes from the top opening of the U-shaped support seat 33. At the same time, the limiting blocks 8 welded to one side of the U-shaped support seat 33 at both ends form a longitudinal limit on the end of the main keel 41 to prevent slippage. The secondary keel 42 with a cross section of 40mm×40mm×3mm is vertically fixed to the upper surface of the main keel 41 using angle brackets and self-tapping screws. Then, the prefabricated casting mold assembly 5 is hoisted as a whole to the keel assembly 4 using a tower crane, so that the bottom wall of the secondary keel 42 fixed at the bottom end of the bottom template 51 is directly set on the main keel 41. At this point, the support system and formwork system are quickly assembled on the top surface of the upper flange of the keel 41. After pouring concrete and curing it to the design strength, a downward impact force is applied to the edge of the bottom formwork 51 with a pry bar or similar tool to overcome the initial adhesion force of the concrete, causing a micro-crack of 0.5~1mm to appear between the bottom formwork 51 and the bottom surface of the concrete. The adjusting nut 32 is rotated in the opposite direction to make the adjusting rod 31 drive the U-shaped bearing seat 33 and the main keel 41 to descend as a whole. The descent of the main keel 41 causes the secondary keel 42, the bottom formwork 51 and the mold box 52 to detach from the solidified bottom surface of the concrete, achieving rapid demolding of the entire piece.
[0033] Although embodiments of the present invention have been shown and described, these specific embodiments are merely explanations of the invention and are not intended to limit it. The specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples. After reading this specification, those skilled in the art may make modifications, substitutions, and variations to the embodiments as needed without departing from the principles and spirit of the invention, but such modifications, substitutions, and variations are protected by patent law as long as they are within the scope of the claims of the present invention.
Claims
1. A fast disassembly and fast assembly support system for a factory building type multi-rib structure, comprising a plurality of disc buckle vertical rods (1), characterized in that: A horizontal bar (2) is connected between multiple adjacent disc buckle uprights (1) by wedge pins, and a receiving adjustment component (3) is inserted into the top of multiple disc buckle uprights (1). A keel component (4) is provided above the multiple receiving adjustment components (3), and a casting mold component (5) is provided above the multiple keel components (4).
2. The fast disassembly and fast assembly support system for a plant type multi-ribbed structure according to claim 1, characterized in that, The receiving and adjusting assembly (3) includes an adjusting rod (31), an adjusting nut (32), and a U-shaped bearing seat (33). The top of each of the multiple disc buckle uprights (1) is inserted with an adjusting rod (31), and an adjusting nut (32) is threaded to the outer side of one end of each of the multiple adjusting rods (31). The top of each of the multiple adjusting rods (31) is fixedly installed with a U-shaped bearing seat (33).
3. The quick-assembly and quick-disassembly support system for a factory-type dense rib structure according to claim 1, characterized in that, The keel assembly (4) includes a main keel (41) and a secondary keel (42). Multiple main keels (41) are provided above multiple receiving and adjusting assemblies (3). The multiple main keels (41) are rectangular steel pipes with a cross-sectional dimension of 50mm×100mm×3mm. Each main keel (41) is placed inside multiple U-shaped bearing seats (33) arranged along the length direction of the main keel (41). Multiple secondary keels (42) are horizontally connected to the top of each of the main keels (41). The secondary keels (42) are rectangular steel pipes with a cross-sectional dimension of 40mm×40mm×3mm.
4. The quick-assembly and quick-disassembly support system for a densely ribbed factory building according to claim 1, characterized in that, The casting mold assembly (5) includes a bottom template (51) and a mold box (52). The bottom template (51) is provided above the multiple keel assemblies (4), and the bottom template (51) is connected to multiple mold boxes (52) by self-tapping screws. The bottom end of the bottom template (51) is fixedly connected to the top end of multiple secondary keels (42).
5. A quick-assembly and quick-disassembly support system for a factory-type dense rib structure according to claim 2, characterized in that, The adjusting rod (31) is inserted into the top of the disc buckle upright (1), and the lower end face of the adjusting nut (32) abuts against the top opening of the disc buckle upright (1). The adjusting rod (31) moves up and down relative to the disc buckle upright (1) by rotating the adjusting nut (32).
6. The quick-assembly and quick-disassembly support system for a factory-type dense rib structure according to claim 1, characterized in that, The multiple disc buckle uprights (1) are also fixedly connected by horizontal scissor braces (6) and vertical scissor braces (7) through wedge pins.
7. A quick-assembly and quick-disassembly support system for a factory-type dense rib structure according to claim 3, characterized in that, The height of the main keel (41) is higher than the groove depth of the U-shaped support seat (33). The upper part of the main keel (41) protrudes from the top opening of the U-shaped support seat (33). The bottom wall of the secondary keel (42) is directly located on the top surface of the upper flange of the main keel (41).
8. A quick-assembly and quick-disassembly support system for a factory-type dense rib structure according to claim 3, characterized in that, Limiting blocks (8) are welded to one side of multiple U-shaped bearing seats (33) used to support the two ends of the main keel (41).
9. A quick-assembly and quick-disassembly support system for a factory-type dense rib structure according to claim 4, characterized in that, The bottom template (51) has threaded sleeves (9) embedded at the four corners of its top for installing lifting rings.
