Construction method of column-anchored suspended formwork support system

By adopting a column-anchored suspended formwork support system in the construction of building roof slabs, and utilizing the combination of frame columns and climbing frames, the suspended support of roof slab formwork was achieved, solving the problem of low construction efficiency in existing technologies and improving construction efficiency and safety.

CN123109385APending Publication Date: 2026-11-17GUANGDONG JIUWEI ENG SAFETY TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611540788.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-30
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

The construction of existing building roof slabs requires the erection of complex support systems, resulting in low construction efficiency.

Method used

A column-anchor type suspended formwork support system is adopted. Multiple frame columns are formed on the construction ground, a climbing frame is installed, and a power structure is used to drive the climbing frame to move upward along the frame columns. Combined with tie rods for fixation, the suspended support of the top slab formwork is achieved.

Benefits of technology

It simplifies the construction process, improves construction efficiency, enables efficient erection of the roof formwork, and completes construction on the ground, reducing the risks and material consumption of high-altitude assembly operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109385A_ABST
    Figure CN123109385A_ABST
Patent Text Reader

Abstract

This invention relates to the technical field of building roof slab construction, and discloses a construction method for a column-anchored suspended formwork support system, including the following construction steps: 1) forming a frame column with through holes; 2) arranging climbing guide rails; 3) installing a climbing frame on the frame column, with a power structure on the climbing frame; 4) arranging inter-column trusses; 5) arranging beam bottom distribution beams on the inter-column trusses, with vertical support structures on the beam bottom distribution beams; 6) arranging beam bottom secondary joists on the beam bottom distribution beams, with beam bottom formwork and beam side formwork on the beam bottom secondary joists to form the beam formwork; 7) arranging longitudinal distribution beams, with roof slab secondary joists on the longitudinal distribution beams, and roof slab formwork on the roof slab secondary joists; 8) the power structure moves upward along the climbing guide rails to a set height; 9) inserting tie rods to fix the climbing frame to the frame column; the column-anchored suspended formwork support system has a simple structure and high construction efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the technical field of building roof slab construction, and more specifically, to a construction method for a column-anchor type suspended formwork support system. Background Technology

[0002] Currently, the construction of building roof slabs requires the erection of roof slab formwork, which encloses the roof slab cavity. Reinforcing bars are then tied inside the roof slab cavity, and concrete is poured into the cavity. After the concrete solidifies, the roof slab is formed.

[0003] In existing technologies, before constructing the roof slab of a building, it is necessary to build a complex support system, such as scaffolding and ground supports, so that the roof slab formwork can be suspended and fixed. This results in a complex structure and low construction efficiency. Summary of the Invention

[0004] The purpose of this invention is to provide a construction method for a column-anchored suspended formwork support system, which aims to solve the problem of low construction efficiency of building roof slabs in the prior art.

[0005] This invention is implemented as follows: a construction method for a column-anchored suspended formwork support system includes the following construction steps: 1) Multiple vertically arranged frame columns are constructed on the construction ground. The multiple frame columns are arranged in sequence and spaced around each other, with column spacing between adjacent frame columns; the frame columns are provided with horizontally arranged through holes, which penetrate the frame columns laterally and are formed at a set height of the frame columns. 2) A climbing guide rail is arranged on the surface of the frame column, and the climbing guide rail extends along the height direction of the frame column; 3) On the construction ground, a climbing frame is fitted around the outer periphery of the frame column, and the climbing frame is arranged around the circumference of the frame column; the climbing frame is equipped with a power structure, and the power structure is movably connected to the climbing guide rail. 4) Inter-column trusses are arranged at intervals between the columns, and the ends of the inter-column trusses are connected to the climbing frame; 5) Multiple bottom distribution beams are arranged on the inter-column truss, and the multiple bottom distribution beams extend along the length direction of the inter-column truss and extend along the width direction of the inter-column truss; the two ends of the bottom distribution beams extend out of the inter-column truss to form an extension section, and a vertically arranged vertical support structure is arranged on the extension section. 6) Multiple beam bottom secondary joists are arranged on multiple beam bottom distribution beams, and beam bottom templates and beam side templates are arranged on multiple beam bottom secondary joists. The beam bottom templates and beam side templates are combined to form a beam body template for forming the beam body. 7) Arrange multiple longitudinal distribution beams on the vertical support structure, arrange multiple top slab secondary keels on the multiple longitudinal distribution beams, and arrange the top slab template for forming the building top slab on the multiple top slab secondary keels. 8) The power structure moves upward along the climbing guide rail, and the climbing frame and the inter-column truss move upward synchronously to the set height; 9) A tie rod is inserted into the through hole, the tie rod having a support section extending out of the through hole, the support section abutting against the climbing frame from bottom to top, so that the climbing frame and the inter-column truss are fixed to the frame column.

[0006] Furthermore, in construction step 1), four frame columns are arranged on the construction ground. The frame columns are cuboid in shape and have four outer peripheral surfaces.

[0007] Furthermore, in construction step 2), the climbing guide rail is a rack set on the outer peripheral surface, and the rack extends along the height direction of the frame column; in construction step 3), the power structure includes a motor and a gear, and the gear meshes with the rack; in construction step 8), the motor drives the gear to rotate, and the gear meshes and moves upward along the length direction of the rack, and the climbing frame and the inter-column truss move upward synchronously.

[0008] Furthermore, in construction step 2), guide rails are arranged on the outer peripheral surface of the frame column, and the guide rails and racks are respectively arranged on adjacent outer peripheral surfaces, and the guide rails extend along the height direction of the frame column; in construction step 3), a guide frame is provided on the climbing frame, and a guide roller is provided on the guide frame, and the guide roller movably abuts against the guide rail. In construction step 8), as the power structure moves upward along the climbing guide rail, the guide rollers roll synchronously along the guide rail.

[0009] Furthermore, in construction step 1), the frame column is provided with a flip-up filling template, the filling template is located above the through hole, the filling template swings upward and is attached to the outer periphery of the frame column; In construction step 7, there is a hollowed-out filling area between the top plate template and the outer periphery of the frame column; in construction step 9), after the climbing frame is fixed on the frame column, the filling template swings downward to fill the filling area.

[0010] Furthermore, in construction step 1), during the process of constructing the frame column, a through-hole sleeve is embedded in the frame column. The sleeve encloses and forms the through hole, and the sleeve penetrates the outer periphery of the frame column to form a side opening that connects to the through hole.

[0011] Furthermore, in construction step 3), the climbing frame encloses a central passage area, the frame column passes through the central passage area, and there is a ring-shaped fitting interval between the outer periphery of the climbing frame and the frame column; the power structure is set on the upper part of the climbing frame, and a through hole is provided in the lower part of the climbing frame. In construction step 8), after the climbing frame moves to the set height, the through hole and the through hole are arranged horizontally aligned; in construction step 9), the tie rods pass through the through hole and the through hole respectively, and the climbing frame presses against the tie rods from top to bottom, so that the climbing frame is fixed on the frame column.

[0012] Furthermore, in construction step 3), two side holes are provided on both sides of the through hole, and the side holes penetrate the climbing frame laterally; a top shaft that can move elastically along the axial direction of the side hole is provided in the side hole, and an elastic sleeve is fitted on the outer periphery of the top shaft, and the elastic sleeve is connected to the inner side of the side hole. The outer periphery of the climbing frame is recessed to form a recessed area, and the through hole and the side hole extend to the bottom of the recessed area; the outer end of the top shaft is exposed in the recessed area to form an external exposed section, and the inner end of the top shaft is formed in the side hole to form an internal pressing section. In construction step 9), the tie rod has a connecting section that extends out of the through hole and extends outside the climbing frame. The connecting section passes through the recessed area and has external threads on its outer periphery. A nut head is connected to the connecting section. The nut head has an end face facing the climbing frame. The end face is recessed outward to form an annularly arranged groove ring. The groove ring is arranged around the circumference of the connecting section. After the tie rod passes through the climbing frame and the frame column, the nut head is threadedly connected to the connecting section; as the nut head is screwed toward the climbing frame, the outer exposed section is embedded in the grooved ring, the nut head presses against the top shaft and moves elastically toward the frame column, the elastic sleeve deforms elastically until the end face presses against the bottom of the recessed area, and the inner pressing section passes through the fitting interval and presses against the outer periphery of the frame column.

[0013] Furthermore, in construction step 3), the middle part of the top shaft is split into two spaced elastic segments, the two elastic segments bend away from each other, and the two elastic segments are enclosed to form an elastic interval, and the two elastic segments are wrapped in an elastic sleeve. In construction step 9), during the process of the top shaft moving elastically toward the frame column, the two elastic segments deform in opposite directions until the inner pressing segment presses against the outer periphery of the frame column.

[0014] Furthermore, in construction step 3), the bottom of the climbing frame is provided with two inclined anti-fall outer slope plates, which are respectively arranged opposite to each other on both sides of the frame column; the upper end of the anti-fall outer slope plate is connected to the bottom of the climbing frame, and the lower end of the anti-fall outer slope plate is inclined towards the outer periphery of the frame column; the lower end of the anti-fall outer slope plate extends downward with a lower straight plate, which abuts against the outer periphery of the frame column; A perforated strip is formed in the middle of the outer inclined plate of the fall arrestor. The perforated strip extends along the inclined direction of the outer inclined plate of the fall arrestor. An inner inclined plate of the fall arrestor is connected to the outer inclined plate of the fall arrestor. The upper end of the inner inclined plate of the fall arrestor is connected to the upper end of the perforated strip. The lower end of the inner inclined plate of the fall arrestor is offset from the outer inclined plate of the fall arrestor and is inclined inward. An upper straight plate extends downward from the lower end of the inner inclined plate of the fall arrestor. The upper straight plate is formed above the lower straight plate and abuts against the outer periphery of the frame column. An elastic block is formed between the inner and outer inclined plates of the fall arrestor. The upper end of the elastic block is connected to the inner inclined plate from bottom to top, and the lower end of the elastic block is connected to the outer inclined plate from top to bottom. The upper and lower straight plates are respectively covered with an elastic layer. The elastic layer abuts against the outer periphery of the frame column and is in an elastic compression deformation state. In construction step 8), during the process of the power structure driving the climbing frame to move upward, the outer and inner anti-fall inclined plates move upward synchronously with the climbing frame, and the elastic layer abuts against the outer periphery of the frame column and moves upward synchronously.

[0015] Compared with the prior art, the column-anchor type suspended formwork support system construction method provided by the present invention constructs multiple frame columns on the construction ground, and a climbing frame is fitted on the frame columns. The power structure on the climbing frame is movably connected to the climbing guide rail on the frame column. In this way, the column truss can be directly erected on the construction ground, and the beam bottom distribution beam and beam bottom secondary joists are arranged on the column truss. Then, the beam bottom formwork and beam side formwork are arranged to form the beam formwork. A vertical support structure is arranged on the outer extension of the beam at the bottom of the beam, a longitudinal distribution beam is arranged on the vertical support structure, a top slab secondary joist is arranged on the longitudinal distribution beam, and a top formwork is arranged on the top slab secondary joist. The top slab formwork and the beam formwork are combined to form the top formwork of the building. The climbing frame is driven by a power structure to move upward along the frame column to a set height, and the top formwork of the building also moves to the set height. The climbing frame is fixed to the frame column by tie rods passing through the through hole, and the top surface of the building is suspended and fixed. The structure is simple, and the construction of the top formwork can be completed on the construction ground, resulting in high construction efficiency. Attached Figure Description

[0016] Figure 1This is a front view schematic diagram of the column-anchor type suspended formwork support system provided by the present invention; Figure 2 This is a front view schematic diagram of the climbing frame and frame column provided by the present invention; Figure 3 This is a side view schematic diagram of the column-anchor type suspended formwork support system provided by the present invention; Figure 4 yes Figure 3 Enlarged diagram of point C in the diagram; Figure 5 yes Figure 1 A cross-sectional diagram along the AA direction; Figure 6 yes Figure 1 A cross-sectional diagram along the BB direction in the middle; Figure 7 This is an internal schematic diagram of the climbing frame provided by the present invention; Figure 8 This is an internal schematic diagram of the top shaft provided by the present invention. Detailed Implementation

[0017] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the invention.

[0018] The implementation of the present invention will be described in detail below with reference to specific embodiments.

[0019] In the accompanying drawings of this embodiment, the same or similar reference numerals correspond to the same or similar components. In the description of this invention, it should be understood that if terms such as "upper," "lower," "left," and "right" indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, they are only for the convenience of describing this invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, the terms used to describe positional relationships in the drawings are only for illustrative purposes and should not be construed as limiting this invention. For those skilled in the art, the specific meaning of the above terms can be understood according to the specific circumstances.

[0020] Reference Figures 1-8 The image shown is a preferred embodiment of the present invention.

[0021] The construction method for column-anchored suspended formwork support system includes the following construction steps: 1) Multiple vertically arranged frame columns 200 are constructed on the construction ground. The multiple frame columns 200 are arranged in sequence and spaced around each other, with column gaps between adjacent frame columns 200. The frame columns 200 are provided with horizontally arranged through holes that penetrate the frame columns 200 laterally and are formed at a set height of the frame columns 200. 2) A climbing guide rail 201 is arranged on the surface of the frame column 200, and the climbing guide rail 201 extends along the height direction of the frame column 200. 3) On the construction ground, a climbing frame 100 is installed around the outer periphery of the frame column 200. The climbing frame 100 is arranged around the circumference of the frame column 200. A power structure is provided on the climbing frame 100, and the power structure is movably connected to the climbing guide rail 201. 4) Inter-column trusses 301 are arranged at intervals between columns, and the ends of the inter-column trusses 301 are connected to the climbing frame 100. 5) Multiple bottom distribution beams 300 are arranged on the inter-column truss 301. The multiple bottom distribution beams 300 extend along the length direction of the inter-column truss 301 and extend along the width direction of the inter-column truss 301. The two ends of the bottom distribution beams 300 extend out of the inter-column truss 301 to form an extension section 305. A vertically arranged and vertically adjustable vertical support structure 400 is arranged on the extension section 305. 6) Multiple beam bottom secondary joists 303 are arranged on multiple beam bottom distribution beams 300, and beam bottom formwork 501 and beam side formwork 500 are arranged on multiple beam bottom secondary joists 303. The beam bottom formwork 501 and beam side formwork 500 are combined to form a beam formwork for forming beam body 601. 7) Multiple longitudinal distribution beams 401 are arranged on the vertical support structure 400, multiple top plate secondary keels 402 are arranged on the multiple longitudinal distribution beams 401, and top plate templates 403 for forming building top plate 600 are arranged on the multiple top plate secondary keels 402. The top plate templates 403 are combined with the beam templates to form a building top template. 8) The power structure moves upward along the climbing guide rail 201, and the climbing frame 100 and the inter-column truss 301 move upward simultaneously to the set height; 9) A tie rod 700 is inserted into the through hole. The tie rod 700 has a support section 701 extending out of the through hole. The support section 701 abuts against the climbing frame 100 from bottom to top, so that the climbing frame 100 and the inter-column truss 301 are fixed on the frame column 200.

[0022] The above-mentioned column-anchored suspended formwork support system construction method involves constructing multiple frame columns 200 on the construction ground. A climbing frame 100 is fitted on the frame column 200. The power structure on the climbing frame 100 is movably connected to the climbing guide rail 201 on the frame column 200. In this way, the inter-column truss 301 can be directly erected on the construction ground. The beam bottom distribution beam 300 and the beam bottom secondary keel 303 are arranged on the inter-column truss 301. Then, the beam bottom formwork 501 and the beam side formwork 500 are arranged to form the beam formwork. A vertical support structure 400 is arranged on the extension section 305 of the bottom distribution beam 300, a longitudinal distribution beam 401 is arranged on the vertical support structure 400, a top plate secondary keel 402 is arranged on the longitudinal distribution beam 401, and a top template is arranged on the top plate secondary keel 402. The top template 403 is combined with the beam template to form the building top template. The climbing frame 100 is driven by a power structure to move upward along the frame column 200 to a set height. The top formwork of the building also moves to the set height. The climbing frame 100 is supported by tie rods 700 passing through the through hole, so that the climbing frame 100 is fixed on the frame column 200. The top surface of the building is suspended and fixed. The structure is simple, and the construction and erection of the top formwork of the building can be completed on the construction ground, resulting in high construction efficiency.

[0023] The above-mentioned construction method for column-anchored suspended formwork support system has the following technical advantages: 1) 100% no grounding required. The entire load of the building top formwork is transferred to the frame column 200 through tie bolts. During the construction and maintenance period, there is no scaffolding on the construction ground, realizing parallel operation between the building top formwork and the ground works on the construction ground. 2) The climbing frame 100 is clearly separated from the load-bearing function. The climbing guide rail 201 works with the drive structure and only undertakes the climbing drive. The construction load is transmitted through the independent tie rod 700. The force path is clear and the drive structure does not bear the heavy construction load. 3) The structure is simple, eliminating the need for independent support shoes. The load-bearing function is integrated into the climbing frame 100 itself, reducing the number of structural components and on-site installation procedures. 4) The structure is reasonable. The bottom distribution beam 300 extends at both ends to form an extension section 305. A vertical support structure 400 is arranged on the extension section 305. The vertical support structure 400 can support the top plate formwork 403. The load of the top plate formwork 403 is transferred through the extension section 305. The beam side formwork 500 is not subject to vertical force and is completely closed. 5) No interference risk. The through hole has no protrusion on the outer peripheral surface of the frame column 200, and the climbing frame 100 can slide without obstacles throughout the entire process without the need to set up clearance slots or retrofit brackets. 6) The installation accuracy is controllable. The climbing guide rail 201 and the guide rail 202 are installed after the formwork is removed, and can be accurately positioned and installed after the frame column 200 is demolded.

[0024] 7) Safe and efficient: The bottom formwork 501, the side formwork 500, and the top slab formwork 403 are all pre-installed on the construction ground and lifted into place as a whole with the climbing frame 100, eliminating the risk of high-altitude assembly operations. 8) Extremely low material consumption, no need for full-floor shelving, significantly reducing the amount of turnover materials used; 9) The construction period is significantly shortened and the construction efficiency is improved. The assembly on the construction ground and the construction of the frame column 200 can be carried out simultaneously. After being lifted into place, the reinforcement is tied and the concrete is poured directly.

[0025] The vertical support structure 400 can be multiple hydraulic cylinders, each with a hydraulic shaft. These hydraulic shafts can support the top plate template 403, and the horizontality of the top plate template 403 can be adjusted by extending or retracting the hydraulic shafts of the multiple hydraulic cylinders. Of course, the vertical support structure 400 can also be other structures, as long as it can provide support and allow for vertical adjustment.

[0026] As an extended embodiment, in construction step 1), four frame columns 200 are arranged on the construction ground. The frame columns 200 are cuboid in shape, and each frame column 200 has four outer peripheral surfaces. Thus, the building roof slab is also square, and the frame columns 200 are cuboid in shape, which facilitates the enclosure and cooperation with the climbing frame 100. Of course, different numbers of frame columns 200 can be arranged to meet different needs, and the shape of the frame columns 200 can also be other shapes, such as cylindrical, etc.

[0027] As an extended embodiment, in construction step 2), the climbing guide rail 201 is a rack set on the outer peripheral surface, and the rack extends along the height direction of the frame column 200; in construction step 3), the power structure includes a motor 102 and a gear 104, the motor 102 has a rotating shaft 103, the gear 104 is connected to the rotating shaft 103, and the gear 104 meshes with the rack; in construction step 8), the motor 102 drives the gear 104 to rotate, and the gear 104 meshes and moves upward along the length direction of the rack, and the climbing frame 100 and the inter-column truss 301 move upward synchronously.

[0028] When the rotating shaft 103 of the motor 102 rotates, the gear 104 rotates accordingly. Thus, since the gear 104 meshes with the rack, it drives the entire climbing frame 100 to move along the frame column 200.

[0029] As an extended embodiment, in construction step 2), a guide rail 202 is arranged on the outer peripheral surface of the frame column 200. The guide rail 202 and the rack are respectively arranged on adjacent outer peripheral surfaces. The guide rail 202 extends along the height direction of the frame column 200. In construction step 3), a guide frame is provided on the climbing frame 100. A guide roller 101 is provided on the guide frame. The guide roller 101 is movably abutted against the guide rail 202. In construction step 8), as the power structure moves upward along the climbing guide rail 201, the guide roller 101 rolls synchronously along the guide rail 202.

[0030] The gear 104 meshes with the rack. The rotation of the gear 104 causes the gear 104 to roll along the rack, thereby enabling the climbing frame 100 to move along the height direction of the frame column 200. Furthermore, by arranging the guide roller 101 to engage with the guide rail 202, the movement of the climbing frame 100 relative to the frame column 200 can be guided, thereby achieving the stability of the movement of the climbing frame 100.

[0031] As an extended embodiment, in construction step 1), the frame column 200 is provided with a flip-up filling template, the filling template is located above the through hole, the filling template swings upward and attaches to the outer periphery of the frame column 200. In construction step 7, there is a hollowed-out filling area between the top slab formwork 403 and the outer periphery of the frame column 200; in construction step 9), after the climbing frame 100 is fixed on the frame column 200, the filling formwork swings downwards and fills the filling area.

[0032] When the top slab formwork 403 is erected on the construction ground, in order to facilitate the subsequent movement of the climbing frame 100 on the frame column 200, there must be a gap-filling area with openwork. After the top slab formwork 403 is moved to the set height, before pouring concrete to form the building top slab, it is necessary to ensure the integrity of the top slab formwork 403. Therefore, by swinging the gap-filling formwork downwards, the gap-filling area is covered and sealed, thus achieving the integrity of the top slab formwork 403, so as to facilitate the pouring of concrete to form the building top slab.

[0033] As an extended embodiment, in construction step 1), during the construction of the frame column 200, a through-hole sleeve is embedded in the frame column 200. The sleeve encloses and forms the aforementioned through hole, and the sleeve penetrates the outer periphery of the frame column 200 to form a side opening that connects to the through hole.

[0034] When the concrete frame column 200 is poured, a sleeve is pre-embedded in the concrete. After the frame column 200 is formed, a through hole is formed in the sleeve, and the through hole penetrates the frame column 200 so that the subsequent tie rod 700 can pass through the through hole.

[0035] As an extended embodiment, in construction step 3), the climbing frame 100 encloses and forms a central passage area, and the frame column 200 passes through the central passage area. There is a ring-shaped mating interval 109 between the outer periphery of the climbing frame 100 and the frame column 200. The power structure is set on the upper part of the climbing frame 100, and a through hole is provided in the lower part of the climbing frame 100. In construction step 8), after the climbing frame 100 moves to the set height, the through holes and the through holes are arranged horizontally aligned; in construction step 9), the tie rods 700 pass through the through holes and the through holes respectively, and the climbing frame 100 presses against the tie rods 700 from top to bottom so that the climbing frame 100 is fixed on the frame column 200.

[0036] By providing through holes in the lower part of the climbing frame 100, when the through holes and through holes are aligned, the tie rod 700 can pass through the through holes and through holes, so that the climbing frame 100 is fixed on the frame column 200. Furthermore, the entire climbing frame 100 is passed through by the through rod and abuts against the tie rod 700, so that the tie rod 700 can more stably support the climbing frame 100.

[0037] As an extended embodiment, in construction step 3), two side holes are provided on both sides of the perforation, and the side holes penetrate the climbing frame 100 laterally; a top shaft 900 that moves elastically along the axial direction of the side hole is provided in the side hole, and an elastic sleeve 904 is sleeved on the outer periphery of the top shaft 900, and the elastic sleeve 904 is connected to the inner side of the side hole. The outer periphery of the climbing frame 100 is recessed to form a recessed area, with through holes and side holes extending to the bottom of the recessed area; the outer end of the top shaft 900 is exposed in the recessed area, forming an outer exposed section 903, and the inner end of the top shaft 900 is formed in the side hole, forming an inner pressing section 901. In construction step 9), the tie rod 700 has a connecting section 702 that extends out of the through hole and extends outside the climbing frame 100. The connecting section 702 passes through the recessed area and has external threads on its outer periphery. A nut head 703 is connected to the connecting section 702. The nut head 703 has an end face facing the climbing frame 100. The end face is recessed outward to form an annularly arranged groove ring. The groove ring is arranged around the circumference of the connecting section 702. After the tie rod 700 passes through the climbing frame 100 and the frame column 200, the nut head 703 is threadedly connected to the connecting section 702. As the nut head 703 is screwed toward the climbing frame 100, the outer exposed section 903 is embedded in the groove ring. The nut head 703 presses against the top shaft 900 and moves elastically toward the frame column 200. The elastic sleeve 904 deforms elastically until the end face presses against the bottom of the recessed area. The inner pressing section 901 passes through the mating interval 109 and presses against the outer periphery of the frame column 200.

[0038] By arranging the elastically movable top shaft 900, during the process of screwing the nut head 703 onto the connecting section 702, the outer exposed section 903 will be embedded in the grooved ring. As the nut head 703 is screwed in, the grooved ring can guide the position of the top shaft 900, and the nut head 703 presses against the top shaft 900 and moves elastically inward, so that the inner pressing section 901 passes through the mating interval 109 and presses against the outer periphery of the frame column 200. At the same time, the end face of the nut head 703 also presses against the bottom of the recessed area.

[0039] Since the elastic sleeve 904 is in an elastic deformation state, the top shaft 900 is subjected to the elastic force of the elastic sleeve 904 and presses against the nut head 703 in the opposite elastic direction, so that the nut head 703 and the connecting section 702 are firmly connected, and the phenomenon of loosening between the nut head 703 and the connecting section 702 is avoided. In addition, the top shaft 900 is abutted against the frame column 200 by the nut head 703. The top shaft 900 plays an elastic positioning role to position the lateral position between the climbing frame 100 and the frame column 200, and elastically buffer the vibration between the climbing frame 100 and the frame column 200.

[0040] As an extended embodiment, in construction step 3), the middle part of the top shaft 900 is split to form two spaced elastic segments 902, the two elastic segments 902 are bent away from each other, and the two elastic segments 902 are enclosed to form an elastic interval, and the two elastic segments 902 are wrapped in an elastic sleeve 904. In construction step 9), as the top shaft 900 moves elastically toward the frame column 200, the two elastic segments 902 deform in opposite directions until the inner pressing segment 901 presses against the outer periphery of the frame column 200.

[0041] By forming two elastic segments 902, the middle part of the top shaft 900 has better elastic deformation performance. Combined with the elastic deformation of the elastic sleeve 904, the top shaft 900 can form a double rigid-elastic deformation between the nut head 703 and the frame column 200, so that the top shaft 900 can better buffer the vibration and lateral movement between the climbing frame 100 and the frame column 200.

[0042] As an extended embodiment, in construction step 3), the bottom of the climbing frame 100 is provided with two inclined anti-fall outer slope plates 800, which are respectively arranged opposite to each other on both sides of the frame column 200; the upper end of the anti-fall outer slope plate 800 is connected to the bottom of the climbing frame 100, and the lower end of the anti-fall outer slope plate 800 is inclined towards the outer periphery of the frame column 200; a lower straight plate 801 extends downward from the lower end of the anti-fall outer slope plate 800, and the lower straight plate 801 abuts against the outer periphery of the frame column 200; A perforated strip is formed in the middle of the outer inclined plate 800. The perforated strip extends along the inclined direction of the outer inclined plate 800. An inner inclined plate 803 is connected to the outer inclined plate 800. The upper end of the inner inclined plate 803 is connected to the upper end of the perforated strip. The lower end of the inner inclined plate 803 is offset from the outer inclined plate 800 and is inclined inward. An upper straight plate 804 extends downward from the lower end of the inner inclined plate 803. The upper straight plate 804 is formed above the lower straight plate 801 and abuts against the outer periphery of the frame column 200. An elastic block 806 is formed between the inner inclined plate 803 and the outer inclined plate 800. The upper end of the elastic block 806 is connected to the inner inclined plate 803 from bottom to top, and the lower end of the elastic block 806 is connected to the outer inclined plate 800 from top to bottom. An elastic layer 802 is respectively covered on the upper straight plate 804 and the lower straight plate 801. The elastic layer 802 abuts against the outer periphery of the frame column 200 and is in an elastic compression deformation state. In construction step 8), as the power structure drives the climbing frame 100 to move upward, the outer anti-fall inclined plate 800 and the inner anti-fall inclined plate 803 move upward synchronously with the climbing frame 100, and the elastic layer 802 abuts against the outer periphery of the frame column 200 and moves upward synchronously.

[0043] As the climbing frame 100 moves upward along the frame column 200, the inner anti-fall inclined plate 803 and the outer anti-fall inclined plate 800 are tilted away from the frame column 200 along the direction of movement of the climbing frame 100. The upper straight plate 804 and the lower straight plate 801 will not interfere with the outer periphery of the frame column 200. The inner anti-fall inclined plate 803 and the outer anti-fall inclined plate 800 move upward along the frame column 200 synchronously.

[0044] When the climbing frame 100 moves downwards beyond the set speed, for example, if a support failure occurs and it suddenly falls, the inner anti-fall inclined plate 803 and the outer anti-fall inclined plate 800 are tilted towards the frame column 200 along the direction of movement of the climbing frame 100. At this time, the upper straight plate 804 and the lower straight plate 801 will interfere with the outer periphery of the frame column 200. At this time, the inner anti-fall inclined plate 803 deforms relative to the outer anti-fall inclined plate 800, and the elastic block 806 deforms elastically. The inner anti-fall inclined plate 803 is locked to the outer periphery of the frame column 200, thereby limiting the downward movement speed of the climbing frame 100, or directly fixing the climbing frame 100 to the frame column 200.

[0045] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. A construction method of a column anchor type suspended formwork support system, characterized in that, The construction steps include the following: 1) Multiple vertically arranged frame columns are constructed on the construction ground. The multiple frame columns are arranged in sequence and spaced around each other, with column spacing between adjacent frame columns; the frame columns are provided with horizontally arranged through holes, which penetrate the frame columns laterally and are formed at a set height of the frame columns. 2) A climbing guide rail is arranged on the surface of the frame column, and the climbing guide rail extends along the height direction of the frame column; 3) On the construction ground, a climbing frame is fitted around the outer periphery of the frame column, and the climbing frame is arranged around the circumference of the frame column; the climbing frame is equipped with a power structure, and the power structure is movably connected to the climbing guide rail. 4) Inter-column trusses are arranged at intervals between the columns, and the ends of the inter-column trusses are connected to the climbing frame; 5) Multiple bottom distribution beams are arranged on the inter-column truss, and the multiple bottom distribution beams extend along the length direction of the inter-column truss and extend along the width direction of the inter-column truss; the two ends of the bottom distribution beams extend out of the inter-column truss to form an extension section, and a vertically arranged vertical support structure is arranged on the extension section. 6) Multiple beam bottom secondary joists are arranged on multiple beam bottom distribution beams, and beam bottom templates and beam side templates are arranged on multiple beam bottom secondary joists. The beam bottom templates and beam side templates are combined to form a beam body template for forming the beam body. 7) Arrange multiple longitudinal distribution beams on the vertical support structure, arrange multiple top slab secondary keels on the multiple longitudinal distribution beams, and arrange the top slab template for forming the building top slab on the multiple top slab secondary keels. 8) The power structure moves upward along the climbing guide rail, and the climbing frame and the inter-column truss move upward synchronously to the set height; 9) A tie rod is inserted into the through hole, the tie rod having a support section extending out of the through hole, the support section abutting against the climbing frame from bottom to top, so that the climbing frame and the inter-column truss are fixed to the frame column.

2. The construction method of the column-anchored suspended formwork support system as described in claim 1, characterized in that, In construction step 1), four frame columns are arranged on the construction ground. The frame columns are cuboid in shape and have four outer peripheral surfaces.

3. The construction method of the column-anchored suspended formwork support system as described in claim 2, characterized in that, In construction step 2), the climbing guide rail is a rack set on the outer peripheral surface, and the rack extends along the height direction of the frame column; in construction step 3), the power structure includes a motor and a gear, and the gear meshes with the rack; in construction step 8), the motor drives the gear to rotate, and the gear meshes and moves upward along the length direction of the rack, and the climbing frame and the inter-column truss move upward synchronously.

4. The construction method of the column-anchored suspended formwork support system as described in claim 3, characterized in that, In construction step 2), guide rails are arranged on the outer peripheral surface of the frame column. The guide rails and racks are respectively arranged on adjacent outer peripheral surfaces. The guide rails extend along the height direction of the frame column. In construction step 3), a guide frame is provided on the climbing frame. The guide frame is provided with guide rollers. The guide rollers movably abut against the guide rails. In construction step 8), as the power structure moves upward along the climbing guide rail, the guide rollers roll synchronously along the guide rail.

5. The construction method of the column-anchored suspended formwork support system as described in any one of claims 1 to 4, characterized in that, In construction step 1), the frame column is provided with a flip-up filling template. The filling template is located above the through hole and swings upward to attach to the outer periphery of the frame column. In construction step 7, there is a hollowed-out filling area between the top plate template and the outer periphery of the frame column; in construction step 9), after the climbing frame is fixed on the frame column, the filling template swings downward to fill the filling area.

6. The construction method of the column-anchored suspended formwork support system as described in any one of claims 1 to 4, characterized in that, In construction step 1), during the process of constructing the frame column, a through-hole sleeve is embedded in the frame column. The sleeve encloses and forms the through hole, and the sleeve penetrates the outer periphery of the frame column to form a side opening that connects to the through hole.

7. The construction method of the column-anchored suspended formwork support system as described in any one of claims 1 to 4, characterized in that, In construction step 3), the climbing frame encloses a central passage area, the frame column passes through the central passage area, and there is a ring-shaped matching interval between the climbing frame and the outer periphery of the frame column; the power structure is set on the upper part of the climbing frame, and a through hole is provided in the lower part of the climbing frame. In construction step 8), after the climbing frame moves to the set height, the through hole and the through hole are arranged horizontally aligned; in construction step 9), the tie rods pass through the through hole and the through hole respectively, and the climbing frame presses against the tie rods from top to bottom, so that the climbing frame is fixed on the frame column.

8. The construction method of the column-anchored suspended formwork support system as described in claim 7, characterized in that, In construction step 3), two side holes are provided on both sides of the through hole, and the side holes penetrate the climbing frame laterally; a top shaft that moves elastically along the axial direction of the side hole is provided in the side hole, and an elastic sleeve is fitted on the outer periphery of the top shaft, and the elastic sleeve is connected to the inner side of the side hole. The outer periphery of the climbing frame is recessed to form a recessed area, and the through hole and the side hole extend to the bottom of the recessed area; the outer end of the top shaft is exposed in the recessed area to form an external exposed section, and the inner end of the top shaft is formed in the side hole to form an internal pressing section. In construction step 9), the tie rod has a connecting section that extends out of the through hole and extends outside the climbing frame. The connecting section passes through the recessed area and has external threads on its outer periphery. A nut head is connected to the connecting section. The nut head has an end face facing the climbing frame. The end face is recessed outward to form an annularly arranged groove ring. The groove ring is arranged around the circumference of the connecting section. After the tie rod passes through the climbing frame and the frame column, the nut head is threadedly connected to the connecting section; as the nut head is screwed toward the climbing frame, the outer exposed section is embedded in the grooved ring, the nut head presses against the top shaft and moves elastically toward the frame column, the elastic sleeve deforms elastically until the end face presses against the bottom of the recessed area, and the inner pressing section passes through the fitting interval and presses against the outer periphery of the frame column.

9. The construction method of the column-anchored suspended formwork support system as described in claim 8, characterized in that, In construction step 3), the middle part of the top shaft is split into two spaced elastic segments. The two elastic segments bend away from each other and form an elastic interval between them. The two elastic segments are wrapped in an elastic sleeve. In construction step 9), during the process of the top shaft moving elastically toward the frame column, the two elastic segments deform in opposite directions until the inner pressing segment presses against the outer periphery of the frame column.

10. The construction method of the column-anchored suspended formwork support system as described in any one of claims 1 to 4, characterized in that, In construction step 3), the bottom of the climbing frame is provided with two inclined anti-fall outer slope plates, which are respectively arranged opposite to each other on both sides of the frame column; the upper end of the anti-fall outer slope plate is connected to the bottom of the climbing frame, and the lower end of the anti-fall outer slope plate is inclined towards the outer periphery of the frame column; the lower end of the anti-fall outer slope plate extends downward with a lower straight plate, which abuts against the outer periphery of the frame column; A perforated strip is formed in the middle of the outer inclined plate of the fall arrestor. The perforated strip extends along the inclined direction of the outer inclined plate of the fall arrestor. An inner inclined plate of the fall arrestor is connected to the outer inclined plate of the fall arrestor. The upper end of the inner inclined plate of the fall arrestor is connected to the upper end of the perforated strip. The lower end of the inner inclined plate of the fall arrestor is offset from the outer inclined plate of the fall arrestor and is inclined inward. An upper straight plate extends downward from the lower end of the inner inclined plate of the fall arrestor. The upper straight plate is formed above the lower straight plate and abuts against the outer periphery of the frame column. An elastic block is formed between the inner and outer inclined plates of the fall arrestor. The upper end of the elastic block is connected to the inner inclined plate from bottom to top, and the lower end of the elastic block is connected to the outer inclined plate from top to bottom. The upper and lower straight plates are respectively covered with an elastic layer. The elastic layer abuts against the outer periphery of the frame column and is in an elastic compression deformation state. In construction step 8), during the process of the power structure driving the climbing frame to move upward, the outer and inner anti-fall inclined plates move upward synchronously with the climbing frame, and the elastic layer abuts against the outer periphery of the frame column and moves upward synchronously.