A high-strength, crack-resistant concrete pole
By segmenting concrete poles and setting prestressed and non-prestressed tendons at angles on each segment to form a skeleton structure, the problem of cracking during pole use is solved, crack resistance and overall strength are improved, and structural stability and ease of assembly are ensured.
Patent Information
- Application Number
- CN202611359413.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-03
- Publication Date
- 2026-11-17
AI Technical Summary
Existing concrete poles are prone to cracking at the root and in areas with high torque during long-term use, resulting in limited improvement in crack resistance and overall strength.
The pole is divided into a root installation section, a middle installation section, and a top installation section. Prestressed tendons and non-prestressed tendons are arranged at intervals along the axial direction on each section. The prestressed tendons are set at an angle to the axis and are encased in concrete to form a skeleton structure. The reasonable tilt angle and outer diameter design are combined to resist the stress caused by bending moment and torque.
This improved the pole's crack resistance and overall strength, ensuring structural stability and reliability, while also preventing corrosion and damage to the metal reinforcement, reducing manufacturing complexity, and increasing assembly efficiency.
Smart Images

Figure CN123109455A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of high-strength utility pole technology, and in particular to a high-strength, crack-resistant concrete utility pole. Background Technology
[0002] As an essential facility for power lines and cables, utility poles need to ensure their stability and reliability. During long-term use, utility poles are mainly subjected to wind force and the tensile force of power lines and cables, which cause the poles to withstand bending moments and torques over a long period of time.
[0003] To ensure the long-term stability of utility poles, the most common practice is to arrange prestressed and non-prestressed tendons along the pole's axial direction, while simultaneously improving the concrete properties to enhance the pole's crack resistance and overall strength. However, due to the limited variety of prestressed and non-prestressed tendon arrangements, the pole's crack resistance cannot be significantly improved, and cracks are still prone to form under long-term conditions, especially at the pole's root and in areas with high torque.
[0004] Therefore, designing a high-strength, crack-resistant concrete pole and improving its crack resistance are urgent problems to be solved. Summary of the Invention
[0005] This invention provides a high-strength, crack-resistant concrete pole.
[0006] To achieve the above objectives, the present invention adopts the following technical solution: In a first aspect, a high-strength, crack-resistant concrete pole is provided, comprising: a root installation section, an intermediate installation section, and a top installation section; multiple intermediate installation sections are sequentially connected along an axial direction to form a pole middle section; one end of the pole middle section is connected to the root installation section, and the other end is connected to the top installation section; multiple prestressed tendons and multiple non-prestressed tendons are arranged circumferentially along the axial direction on the root installation section, and the prestressed tendons are not parallel to the axial direction of the root installation section; the prestressed tendons and non-prestressed tendons on the root installation section are encased in concrete; multiple prestressed tendons and multiple non-prestressed tendons are arranged circumferentially along the axial direction on different intermediate installation sections, and the prestressed tendons are not parallel to the axial direction of the corresponding intermediate installation section; the prestressed tendons and non-prestressed tendons on the intermediate installation sections are encased in concrete; multiple prestressed tendons and multiple non-prestressed tendons are arranged circumferentially along the axial direction on the top installation section, and the prestressed tendons are not parallel to the axial direction of the top installation section; the prestressed tendons and non-prestressed tendons on the top installation section are encased in concrete.
[0007] Therefore, the aforementioned poles achieve modular production by segmenting them into sections, reducing the complexity of the overall pole manufacturing process while effectively ensuring the production efficiency of segmented poles. Simultaneously, prestressed tendons at a certain angle to the axis are installed on different pole segments. On one hand, the prestressed tendons resist the tensile stress distributed along the pole's axis caused by bending moment; on the other hand, since the prestressed tendons are not entirely distributed along the pole's axis, they can generate prestress in the circumferential direction along the axis to resist the stress around the axis caused by torque. Furthermore, a certain number of non-prestressed tendons are also arranged alongside the prestressed tendons, effectively improving the overall strength and stability of the pole. On this basis, the prestressed and non-prestressed tendons are encased in concrete, forming a structure with tendons as a skeleton to a certain extent. Compared to a structure composed solely of tendons, this significantly improves the overall structural strength and stability of the pole and effectively prevents corrosion and damage to the metal tendons due to prolonged contact with the environment, thus avoiding performance degradation. Because the prestressing tendons are arranged at an angle to the axis, they can resist both tensile stress along the axis and stress along the circumferential axis without adding special structures, effectively improving the crack resistance of the pole. At the same time, the structure is simple and reliable.
[0008] Optionally, the middle section, root mounting section, and top mounting section of the pole are connected to each other along a straight line to form a pole, with the root mounting section located at the bottom of the pole and the top mounting section located at the top of the pole; in the direction along the axis of the pole from bottom to top, the outer diameter of the root mounting section is the largest, the outer diameter of the top mounting section is the smallest, and the outer diameters of the different intermediate mounting sections of the middle section of the pole decrease sequentially; in the direction along the axis of the pole from bottom to top, the height of the root mounting section is the highest, the height of the top mounting section is the lowest, and the heights of the different intermediate mounting sections of the middle section of the pole gradually decrease.
[0009] Therefore, it can be seen that for a utility pole composed of a root section, multiple intermediate sections, and a top section, the prestressing tendons are angled to the axial direction. To ensure the prestressing tendons have sufficient stress components to resist axial stress and improve resistance to torque at higher points on the pole, the higher the section, the lower its height should be. This effectively ensures the long-term stability and reliability of the structure under torque. Considering the tensile stress distribution caused by the pole's bending moment, the lower the position on the pole, the greater the tensile stress. Therefore, the lower the section, the larger its outer diameter, which effectively improves the pole's bending resistance from a structural dimensional perspective. Orderly control of the height and outer diameter of the sections along the axial direction improves the pole's crack resistance and effectively ensures its assemblability. Even after on-site pile erection, segmented assembly ensures convenience and stability, as higher sections with lower heights and smaller diameters are easier to assemble.
[0010] Optionally, for different installation sections, the relationship between the installation height H and the inclination angle α between the prestressing tendon axis and the pole axis is determined according to the following formula: ; ;in, This indicates the yield strength of the material corresponding to the prestressing tendon. The yield safety factor is 0 < <1, N represents the number of prestressing tendons on the corresponding installation section. This indicates the minimum starting height of the corresponding installation section on the pole. This represents the minimum radius value at which effective shear stress is obtained on the corresponding installation section. This represents the stress distribution function per unit area of the corresponding installation section. Indicates the effective stress height. Indicates the effective radius of stress. This indicates the effective length of the prestressing tendon. This represents the shear stress component factor, and 0 < <1.
[0011] Therefore, it can be seen that because different installation sections are located at different heights on the pole, their corresponding outer diameters will also differ. This indirectly affects the inclination angle of the prestressing tendons. After all, the magnitude of the torque around the axis that the installation section has to cope with is different at different heights. These torques are converted into stresses, which are stresses acting in the tangential direction perpendicular to the pole axis. To ensure that the stress intensity component of the prestressing tendons in the tangential direction is sufficient to offset the shear stress generated by the torque, the inclination angle of the prestressing tendons needs to be reasonably arranged. The inclination angle of the prestressing tendons is determined by both the shear stress of the corresponding height section and the installation height of the corresponding installation section. Therefore, a reasonable correlation can be established to design the structural arrangement of the inclination angle of the prestressing tendons. The inherent constraint of angular relationships essentially requires ensuring that the tangential stress intensity of the prestressing tendons can offset a significant portion of the tangential stress caused by torque. It's important to note that the prestressing tendons cannot completely offset all tangential stress caused by any torque. Firstly, the stress distribution in reality is dispersed, with the prestressing tendons concentrated in a small area during installation. Secondly, the entire installation section is not solely targeted for stress relief by the prestressing tendons; the concrete and non-prestressed tendons also bear a certain degree of tangential stress. Therefore, as a crucial stress-resisting element, the prestressing tendons only need to offset a substantial portion of the shear stress required by the design. Thus, the shear stress component factor is used to rationally determine the effective shear stress that the prestressing tendons must resist. Of course, the magnitude of the prestress component generated by the prestressing tendon is not directly determined by the yield strength of the material. On one hand, the yield strength of the material must be considered in conjunction with the structural dimensions of the prestressing tendon to ensure a reasonable safety margin. On the other hand, the reduction in prestress caused by material creep and other factors under long-term action must also be taken into account. Therefore, the yield safety factor is used to control the effective prestress intensity provided by the prestressing tendon to ensure that it can provide the required prestress intensity effectively over a long period. The yield safety factor and shear stress component factor are set according to the actual situation, taking into full account the height of the installation section on the pole, the number of prestressing tendons in the installation section, the number of non-prestressing tendons in the installation section, and the material selection of the prestressing tendon. Furthermore, it should be noted that the stress distribution function per unit area is essentially a function characterizing the shear stress distribution. It can be established based on historical data of stress distribution at different heights and locations; any method that achieves a reasonable representation of the shear stress distribution is acceptable.
[0012] Optionally, the root installation section includes a fixed anchorage, an adjusting mounting base, prestressed tendons, non-prestressed tendons, and a protective base; multiple prestressed tendons are arranged circumferentially around the axis of the root installation section, with one end of each prestressed tendon fixedly connected to the fixed anchorage and the other end connected to the stress adjustment structure of the adjusting mounting base; one end of each non-prestressed tendon is fixedly connected to the fixed anchorage and the other end is fixedly connected to the adjusting mounting base; multiple non-prestressed tendons are arranged circumferentially around the axis of the root installation section, and all are located within the non-interference area defined by the arrangement of the multiple prestressed tendons; the fixed anchorage and the adjusting mounting base are... The structure is axially aligned, with coaxially arranged weight-reducing holes on both the fixed anchor mounting base and the adjusting mounting base. A protective base is located on the side of the fixed anchor mounting base away from the adjusting mounting base, and is spaced apart from the fixed anchor mounting base. The protective base connects to the prestressed and non-prestressed tendons passing through the fixed anchor mounting base. Concrete covers all prestressed and non-prestressed tendons between the fixed anchor mounting base and the adjusting mounting base. The outer diameter of the concrete is the same as the diameter of the fixed anchor mounting base, and the diameter of the hollow channel formed in the concrete is the same as the diameter of the weight-reducing hole, connecting the weight-reducing holes on both the fixed anchor mounting base and the adjusting mounting base.
[0013] Therefore, based on the design of the height of the root installation section and the inclination angle of the prestressing tendons, installation points for connecting and installing prestressing and non-prestressing tendons are machined on the anchoring base and the adjusting base, thus facilitating the installation and connection of the tendons to form the overall frame of the root installation section. Regarding the arrangement of prestressing and non-prestressing tendons, it is necessary to consider that the prestressing tendons are crucial structural elements resisting axial tensile stress and tangential stress. Most of the tensile and tangential stresses are generated near the outer perimeter, especially the tangential stress, which has a larger distribution near the outer perimeter. Therefore, the position of the prestressing tendons is relatively closer to the outer perimeter of the final concrete formation compared to the non-prestressing tendons. Of course, it is also necessary to ensure that the installation points of the prestressing tendons on the two bases meet the minimum edge distance requirements for openings and structural settings. This minimum edge distance essentially considers that the connection points have stable strength and will not be damaged under tension. For non-prestressed tendons, they should be positioned relatively deep along the diameter direction compared to the prestressed tendons, but not too close to the internal channels, as this would prevent them from fully utilizing their function. Therefore, the optimal approach is to place them as close as possible to the prestressed tendons while avoiding the area defined by the prestressed tendon arrangement. This avoids interference between the non-prestressed tendons and the prestressed tendons, while also ensuring that the non-prestressed tendons effectively enhance the pole's strength. The boundary of the area defined by the prestressed tendon arrangement, viewed from a cross-sectional perspective, is the boundary of a tangent circle coaxial with the pole's axis, defined after the prestressed tendons are placed. This ensures that the non-prestressed tendons are at most internally tangent to the boundary of this tangent circle. The number of both non-prestressed and prestressed tendons can be designed according to the actual situation, considering factors such as the application scenario and the pole's outer diameter. However, it is crucial to ensure a uniform distribution of both non-prestressed and prestressed tendons to guarantee even stress distribution and avoid stress concentration caused by uneven distribution. The main function of the protective base is to provide electrochemical sacrificial protection for prestressed tendons, non-prestressed tendons, anchor bases, and adjustment bases. Since the entire installation section includes concrete and metal parts, the metal parts will corrode due to electrochemical reactions in the gaps over a long period of time. Therefore, setting up a protective base can make the metal parts on the installation section inert, and the protective base, as the chemical corrosion end, achieves electrochemical protection for the metal of the installation section. Therefore, the material of the protective base needs to be a more reactive metal material than the metal parts in the installation section.
[0014] Optionally, the anchor mounting base has a first connecting hole and a first supporting groove at the corresponding positions of different prestressing tendons, and the first connecting hole and the first supporting groove are coaxially arranged; the diameter of the first supporting groove is larger than the diameter of the first connecting hole; the first supporting groove is located on the side of the anchor mounting base near the protective base; after the prestressing tendon passes through the first connecting hole, it forms a prestressed supporting head in the first supporting groove, and the prestressed supporting head fills the entire first supporting groove; the end of the prestressed supporting head near the protective base continues to extend into the first protective connecting hole of the protective base and connects with the protective base; the anchor mounting base has a second connecting hole at the corresponding positions of different non-prestressing tendons, and the non-prestressing tendon passes through the second connecting hole and continues to extend into the second protective connecting hole on the protective base and connects with the protective base.
[0015] Therefore, the protective base, as a structural element protecting the metal components of the installation section, needs to achieve a close and direct connection with the metal components. Although the protective base is connected to the metal components of the root installation section, different installation sections are interconnected via metal flange bases. These metal flange bases are directly connected to the non-prestressed tendons and prestressed tendons, ensuring that all the metal components of the pole can achieve an electrical connection with the protective base. This guarantees the transfer of electrochemical corrosion to the protective base. The fixed anchor bases on the root installation section are spaced apart from the protective base to facilitate later disassembly and assembly. Since the prestressed and non-prestressed tendons are important load-bearing metal components, connecting them to the protective base is the most effective protective connection method. Therefore, the connection method between the tendons on the fixed anchor base and the protective base needs to be considered. The connection method is diverse. This application considers that one end of the prestressed tendon needs to be fixed, while the other end can achieve reasonable prestress adjustment. Therefore, the anchor base is equipped with coaxially arranged slots of different diameters to achieve stable fixing and support of the prestressed tendon. It can be understood that after installation, since the prestressed tendon forms a head filling the first support slot on the anchor base, the stability of the prestressed tendon at the anchor base end can be effectively guaranteed when the other end is tightened by adjusting the prestress. For the prestressed tendon to extend further into the first protective connection hole of the protective base, this extension section can be part of the prestressed tendon itself, or it can be an independent extension connected by welding, depending on the complexity of the process and cost. For non-prestressed tendons, no prestress adjustment is required, so they can be directly inserted into the second protective connection hole of the protective base after passing through the anchor base. Of course, both the first and second connection holes on the anchor base are assembled with the corresponding tendons with at least a transition fit, or more strictly, an interference fit, to avoid axial displacement of the tendons.
[0016] Optionally, the intermediate installation section includes an upper mounting base, a lower mounting base, prestressed tendons, and non-prestressed tendons; multiple prestressed tendons are circumferentially spaced around the axis of the intermediate installation section, with one end of each prestressed tendon fixedly connected to the lower mounting base to form a supporting structure, and the other end connected to the stress adjustment structure of the upper mounting base; one end of each non-prestressed tendon is fixedly connected to the lower mounting base, and the other end is fixedly connected to the upper mounting base; multiple non-prestressed tendons are circumferentially spaced around the axis of the intermediate installation section, and all are located within the non-interference area defined by the arrangement of multiple prestressed tendons; the upper and lower mounting bases are coaxially arranged, and both the upper and lower mounting bases have coaxially arranged weight-reducing holes; concrete covers all prestressed and non-prestressed tendons between the lower and upper mounting bases; the outer diameter of the concrete is the same as the diameter of the lower mounting base, and the diameter of the hollow concrete channel is the same as the diameter of the weight-reducing hole, and the channel connects the weight-reducing holes on the upper and lower mounting bases.
[0017] Therefore, the structural form of the intermediate installation section is essentially similar to that of the root installation section, with two main differences. Firstly, the supporting structure formed on the lower mounting base differs during installation, as the intermediate installation section does not need to extend and must facilitate connections between different intermediate installation sections. Secondly, the installation height varies, resulting in differences in the dimensions of the concrete, reinforcing bars, mounting bases, and the number of reinforcing bars. Generally, the intermediate installation section also uses flange mounting bases at both ends to arrange prestressed and non-prestressed tendons. The prestressed tendons are arranged at an angle, with their number and angle determined by the height of the intermediate installation section within the pole. Non-prestressed tendons are arranged axially, with their number determined by actual needs. Similarly, to avoid interference between prestressed and non-prestressed tendons, the non-prestressed tendons remain within the non-interference area formed by the prestressed tendons. The mounting bases and the channel holes formed by the concrete further reduce the weight of the pole.
[0018] Optionally, the top mounting section includes a top mounting base, a bottom mounting base, prestressed tendons, and non-prestressed tendons; multiple prestressed tendons are circumferentially spaced around the axis of the top mounting section, with one end of each prestressed tendon fixedly connected to the bottom mounting base to form a supporting structure, and the other end connected to the stress adjustment structure of the top mounting base; one end of each non-prestressed tendon is fixedly connected to the top mounting base, and the other end is fixedly connected to the bottom mounting base; multiple non-prestressed tendons are circumferentially spaced around the axis of the top mounting section, and all are located within the non-interference area defined by the arrangement of multiple prestressed tendons; the top mounting base and the bottom mounting base are coaxially arranged, and the bottom mounting base has coaxially arranged weight-reducing holes; concrete covers all prestressed and non-prestressed tendons between the top mounting base and the bottom mounting base; the outer diameter of the concrete is the same as the diameter of the bottom mounting base, and the diameter of the hollow channel formed in the concrete is the same as the diameter of the weight-reducing holes and they are interconnected.
[0019] Therefore, the top mounting section is the highest mounting section located at the top of the pole. Its structural form is essentially similar to the intermediate mounting section, with two main differences: firstly, the top mounting base does not have weight-reducing holes to prevent rainwater erosion into the pole's interior; secondly, the installation height varies, resulting in differences in the dimensions of the concrete, the reinforcement bars, the mounting base, and the number of reinforcement bars. The arrangement of prestressed and non-prestressed reinforcement in the top mounting section is the same as in the intermediate mounting section.
[0020] Optionally, the stress adjustment structure includes a sealed bearing, an adjusting bolt, and a sealing cover; an adjusting hole is provided on the mounting base at a position corresponding to the prestressing tendon, according to the inclination angle of the prestressing tendon; the sealed bearing is located in the adjusting hole near one end of the prestressing tendon and is coaxial with the adjusting hole; the adjusting end of the prestressing tendon passes through the sealed bearing and is threadedly connected to the adjusting bolt located in the adjusting hole; the sealing cover is placed on the adjusting hole at one end of the adjusting end; the adjusting hole is filled with sealing fluid.
[0021] Therefore, the stress adjustment structure is mainly used to adjust the prestressing force of the prestressing tendons, ensuring that the prestressing tendons can always play a stable and reliable role during long-term use. Since the adjustment of prestress occurs along the axis of the prestressing tendon, the adjustment direction of the stress adjustment structure is also along the axis of the prestressing tendon. Here, the specific adjustment structure is arranged by opening adjustment holes with the axis coinciding with the axis of the prestressing tendon on the mounting seat corresponding to the adjustment head of each prestressing tendon in each installation section. Considering that the prestressing needs to be stable and reliable in the long term, the threaded connection is the best choice, although other connection methods can also be used. For the threaded connection, it is necessary to ensure that the thread is a locking thread to avoid the reduction of the tensile force of the prestressing tendon under long-term action. Considering that the adjustment structure needs to ensure its adjustability, it is necessary to ensure that the structure is isolated from the external environment, otherwise it will fail under the long-term natural environmental action. Therefore, the two ends of the adjustment hole are sealed by installing sealed bearings and sealing caps, and the inside is filled with sealing liquid to prevent long-term corrosion from the internal air. For the sealed bearings, bearings that can withstand axial loads and have sealing properties can be selected, such as deep groove ball bearings or some thrust bearings. To ensure future maintenance, a suitable rubber material can be selected for the sealing cap to achieve the sealing function. The internal filling fluid can be rust-preventive oil or other anti-corrosion and sealing liquid. In general, the prestressing tendons and adjusting bolts are connected by threaded joints to maintain the tension on the prestressing tendons over a long period of time. Regular or irregular adjustments are made to ensure that the prestress of the prestressing tendons is within the specified range.
[0022] Optionally, the adjusting bolt includes a screw head and an adjusting rod; the screw head and the adjusting rod are coaxially arranged, and the outer diameter of the screw head is larger than the outer diameter of the adjusting rod; an internal threaded hole is coaxially opened on one end of the adjusting rod near the adjusting end; the adjusting end is provided with a thread, and the internal threaded hole on the adjusting end and the adjusting rod are connected by a threaded engagement; a connecting hole is coaxially opened on the screw head, and the connecting hole communicates with the internal threaded hole.
[0023] Therefore, it can be seen that various forms of adjusting bolts are acceptable, as long as they can achieve threaded engagement with the prestressing tendons and long-term stable prestressing force. The adjusting bolt structure provided in this application mainly involves creating a threaded blind hole with internal threads on the bolt shank. A stable threaded connection is achieved by engaging the threads in the threaded blind hole with the external threads of the adjusting end of the prestressing tendon. Of course, it is impossible for the adjusting end to initially penetrate to the bottom of the threaded blind hole, but subsequent adjustments will slowly bring it closer to the top. If the threaded blind hole is not ventilated, the internal pressure will gradually increase, making subsequent adjustments difficult. Therefore, creating a connecting hole on the screw head to connect with the threaded blind hole can prevent this from happening.
[0024] Optionally, the abutment structure includes an abutment head and a sealing body; the mounting base for installing the abutment structure on different mounting sections has a first abutment slot and a second abutment slot at the position corresponding to the prestressing tendon, along the axis of the prestressing tendon; the first abutment slot and the second abutment slot are coaxial, and the diameter of the second abutment slot is larger than the diameter of the first abutment slot; the second abutment slot is located on the side of the mounting base away from the prestressing tendon; one end of the prestressing tendon passes through the first abutment slot and is connected to the abutment head in the second abutment slot; the sealing body is disposed in the second abutment slot and is located on the side away from the prestressing tendon.
[0025] Therefore, a specific supporting structure is provided here, which mainly ensures the stable fixation of the fixed end of the prestressing tendon. By opening two slots, the prestressing tendon transitions or is interference-fitted with the first supporting slot, and then connects to the supporting head in the second supporting slot. The supporting head can be part of the prestressing tendon or a separate part connected to the prestressing tendon by welding or other fixing methods. Of course, the supporting head also has a transition or interference fit with the second supporting slot to ensure stable connection. Since the mounting seats of different installation sections need to be connected to each other, using friction stir welding or other connection methods, a sealing body is provided to seal the second supporting slot that still has space after the supporting head is installed, in order to prevent corrosion caused by gaps between the supporting head and the mounting seats of adjacent installation sections. The sealing body can be a material such as rubber or silicone. Attached Figure Description
[0026] Figure 1 This is a side view of the overall structure of a high-strength, crack-resistant concrete pole provided in an embodiment of the present invention. Figure 2 This is a top view of the overall structure of the high-strength crack-resistant concrete pole provided in an embodiment of the present invention; Figure 3 A schematic diagram of the intermediate installation section skeleton structure of a high-strength crack-resistant concrete pole provided in an embodiment of the present invention; Figure 4 This is a top view of the intermediate mounting section skeleton structure of a high-strength crack-resistant concrete pole provided in an embodiment of the present invention; Figure 5 for Figure 1 A magnified view of part I; Figure 6 A schematic diagram of the supporting structure of a high-strength, crack-resistant concrete pole provided in an embodiment of the present invention; Figure 7 A schematic diagram of the stress adjustment structure of a high-strength crack-resistant concrete pole provided in an embodiment of the present invention.
[0027] Explanation of reference numerals in the attached figures 01. Root mounting section; 11. Anchor mounting seat; 111. First connecting hole; 112. First abutment groove; 12. Adjusting mounting seat; 13. Protective base; 02. Intermediate mounting section; 21. Upper mounting seat; 211. Stress adjustment structure; 2111. Sealed bearing; 2112. Adjusting bolt; 21121. Connecting hole; 2113. Sealing cover; 2114. Sealing fluid; 22. Lower mounting seat; 221. Abutment structure; 2211. First abutment groove; 2212. Second abutment groove; 2213. Sealing body; 03. Top mounting section; 31. Top mounting seat; 32. Bottom mounting seat; 04. Prestressed tendon; 41. Prestressed abutment head; 42. Adjusting end; 43. Abutment head; 05. Non-prestressed tendon; 06. Weight reduction hole. Detailed Implementation
[0028] The technical solution of the present invention will now be described with reference to the accompanying drawings.
[0029] In this embodiment of the invention, "instruction" can include direct and indirect instructions, as well as explicit and implicit instructions. The information indicated by a certain piece of information is called the information to be instructed. In specific implementation, there are many ways to instruct the information to be instructed, such as, but not limited to, directly instructing the information to be instructed, such as the information to be instructed itself or its index. It can also indirectly instruct the information to be instructed by instructing other information, where there is a correlation between the other information and the information to be instructed. It can also instruct only a part of the information to be instructed, while the other parts are known or pre-agreed upon. For example, the instruction of specific information can be achieved by using a pre-agreed (e.g., protocol-defined) arrangement of various pieces of information, thereby reducing instruction overhead to some extent. Simultaneously, common parts of various pieces of information can be identified and uniformly indicated to reduce the instruction overhead caused by individually indicating the same information.
[0030] Furthermore, the specific indication method can also be any existing indication method, such as, but not limited to, the above-mentioned indication methods and their various combinations. Specific details of various indication methods can be found in existing technologies, and will not be elaborated upon here. As described above, for example, when multiple pieces of information of the same type need to be indicated, the indication methods for different pieces of information may differ. In specific implementation, the required indication method can be selected according to specific needs. This embodiment of the invention does not limit the selected indication method; therefore, the indication methods involved in this embodiment of the invention should be understood to cover various methods that enable the party to be indicated to obtain the information to be indicated.
[0031] It should be understood that the information to be indicated can be sent as a whole or divided into multiple sub-information messages sent separately, and the sending period and / or timing of these sub-information messages can be the same or different. The specific sending method is not limited in this embodiment of the invention. The sending period and / or timing of these sub-information messages can be predefined, for example, according to a protocol, or configured by the sending device by sending configuration information to the receiving device.
[0032] In this embodiment of the invention, descriptions such as "when," "under the circumstances," "if," and "if" all refer to the device making corresponding processing under certain objective circumstances, and are not limited to a specific time. They do not require the device to make a judgment action during implementation, nor do they imply any other limitations.
[0033] In the description of the embodiments of the present invention, unless otherwise stated, " / " indicates that the objects before and after are in an "or" relationship. For example, A / B can represent A or B. "And / or" in the embodiments of the present invention is merely a description of the relationship between the related objects, indicating that three relationships can exist. For example, A and / or B can represent: A alone, A and B simultaneously, and B alone, where A and B can be singular or plural. Furthermore, in the description of the embodiments of the present invention, unless otherwise stated, "multiple" refers to two or more. "At least one of the following" or similar expressions refer to any combination of these items, including any combination of single or plural items. For example, at least one of a, b, or c can represent: a, b, c, ab, ac, bc, or abc, where a, b, and c can be single or multiple. Additionally, to facilitate a clear description of the technical solutions of the embodiments of the present invention, the terms "first" and "second" are used in the embodiments of the present invention to distinguish identical or similar items with essentially the same function and effect. Those skilled in the art will understand that the terms "first," "second," etc., do not limit the quantity or order of execution, and that "first," "second," etc., are not necessarily different. Furthermore, in the embodiments of this invention, words such as "exemplary" or "for example" are used to indicate that something is being described as an example, illustration, or description. Any embodiment or design scheme described as "exemplary" or "for example" in the embodiments of this invention should not be construed as being more preferred or advantageous than other embodiments or design schemes. Specifically, the use of words such as "exemplary" or "for example" is intended to present the relevant concepts in a concrete manner for ease of understanding.
[0034] refer to Figures 1 to 7 The high-strength, crack-resistant concrete pole is composed of the following components: The pole consists of a root installation section 01, an intermediate installation section 02, and a top installation section 03. Multiple intermediate installation sections 02 are connected sequentially along the axial direction to form the middle section of the pole. One end of the middle section is connected to the root installation section 01, and the other end is connected to the top installation section 03. Multiple prestressed tendons 04 and multiple non-prestressed tendons 05 are arranged circumferentially along the axial direction on the root installation section 01, and the prestressed tendons 04 are not parallel to the axial direction of the root installation section 01. The prestressed tendons 04 and non-prestressed tendons 05 on the root installation section 01 are encased in concrete. Different intermediate installation sections... Multiple prestressed tendons 04 and multiple non-prestressed tendons 05 are arranged at intervals along the circumference of the axis on the installation section 02, and the prestressed tendons 04 are not parallel to the axial direction of the corresponding intermediate installation section 02; the prestressed tendons 04 and non-prestressed tendons 05 on the intermediate installation section 02 are covered with concrete; multiple prestressed tendons 04 and multiple non-prestressed tendons 05 are arranged at intervals along the circumference of the axis on the top installation section 03, and the prestressed tendons 04 are not parallel to the axial direction of the top installation section 03; the prestressed tendons 04 and non-prestressed tendons 05 on the top installation section 03 are covered with concrete.
[0035] Modular production of utility poles is achieved by segmenting them into sections, reducing the complexity of the overall pole manufacturing process while effectively ensuring production efficiency for segmented poles. Simultaneously, prestressed tendons 04 are installed at a certain angle to the pole axis on different pole segments. On the one hand, the prestressed tendons 04 resist the tensile stress distributed along the pole axis caused by bending moment; on the other hand, since the prestressed tendons 04 are not completely distributed along the pole axis, they can generate prestress in the circumferential direction along the axis to resist the stress around the axis caused by torque. In addition, a certain number of non-prestressed tendons 05 are also arranged alongside the prestressed tendons 04, which effectively improves the overall strength and stability of the pole. Furthermore, the prestressed tendons 04 and non-prestressed tendons 05 are encased in concrete, forming a structure with tendons as a skeleton to a certain extent. Compared to a structure composed solely of tendons, this significantly improves the overall structural strength and stability of the pole and effectively prevents corrosion and damage to the metal tendons due to prolonged contact with the environment, thus avoiding performance degradation. Because the prestressing tendons 04 are arranged at an angle to the axis, they can resist both the tensile stress along the axis and the stress along the circumferential axis without adding special structures, effectively improving the crack resistance of the pole. At the same time, the structure is simple and reliable.
[0036] The pole is formed by connecting the middle section, the root mounting section 01, and the top mounting section 03 along a straight line. The root mounting section 01 is located at the bottom of the pole, and the top mounting section 03 is located at the top of the pole. Along the axis of the pole from bottom to top, the outer diameter of the root mounting section 01 is the largest, the outer diameter of the top mounting section 03 is the smallest, and the outer diameters of the different intermediate mounting sections 02 in the middle section of the pole decrease sequentially. Along the axis of the pole from bottom to top, the height of the root mounting section 01 is the highest, the height of the top mounting section 03 is the lowest, and the heights of the different intermediate mounting sections 02 in the middle section of the pole gradually decrease.
[0037] The pole, composed of a root installation section 01, multiple intermediate installation sections 02, and a top installation section 03, has prestressed tendons 04 angled to the axial direction. To ensure sufficient stress components in the prestressed tendons 04 to resist axial stress and improve resistance to torque at higher points on the pole, the higher the section, the lower its height should be. This effectively ensures the long-term stability and reliability of the structure under torque. Considering the tensile stress distribution caused by the pole's bending moment, the lower the pole, the greater the tensile stress. Therefore, the lower the section, the larger its outer diameter, effectively improving the pole's bending resistance from a structural dimensional perspective. Orderly control of the section height and outer diameter along the axial direction improves the pole's crack resistance and ensures its assemblability. Even after on-site pile erection, segmented assembly ensures convenience and stability, as higher sections with lower heights and smaller diameters are easier to assemble.
[0038] For different installation sections, the relationship between the installation height H and the inclination angle α between the axis of the prestressing tendon 04 and the axis of the pole is determined according to the following formula: ; ;in, This indicates the material yield strength corresponding to prestressed tendon 04. The yield safety factor is 0 < <1, N represents the number of prestressed tendons 04 on the corresponding installation section. This indicates the minimum starting height of the corresponding installation section on the pole. This represents the minimum radius value at which effective shear stress is obtained on the corresponding installation section. This represents the stress distribution function per unit area of the corresponding installation section. Indicates the effective stress height. Indicates the effective radius of stress. This indicates the effective length value of prestressed tendon 04. This represents the shear stress component factor, and 0 < <1.
[0039] Because different installation sections are located at different heights on the pole, their corresponding outer diameters will also differ. This indirectly affects the inclination angle of the corresponding prestressing tendon 04. After all, the magnitude of the torque around the axis that the installation section has to cope with is different at different heights. This torque is converted into stress, which is the stress acting in the tangential direction perpendicular to the pole axis. To ensure that the stress intensity component of the prestressing tendon 04 in the tangential direction is sufficient to offset the shear stress generated by the torque, the inclination angle of the prestressing tendon 04 needs to be reasonably arranged. The inclination angle of the prestressing tendon 04 is determined by both the shear stress of the corresponding height section and the installation height of the corresponding installation section. Therefore, a reasonable correlation can be established to design the structural arrangement of the inclination angle of the prestressing tendon 04. The inherent constraint of the angular relationship essentially requires ensuring that the tangential stress intensity of prestressing tendon 04 can offset a significant portion of the tangential stress caused by torque. It should be noted that the prestress of prestressing tendon 04 cannot completely offset any tangential stress caused by torque. Firstly, the stress distribution in reality is dispersed, with the prestress of prestressing tendon 04 concentrated in a small area during installation. Secondly, the entire installation section is not solely targeted for stress relief by prestressing tendon 04; the concrete and non-prestressing tendons 05 above it also bear a certain degree of tangential stress. Therefore, as a crucial stress resistor, prestressing tendon 04 only needs to offset a substantial portion of the shear stress required by the design. Thus, the shear stress that prestressing tendon 04 needs to effectively resist is rationally determined using the shear stress component factor. Of course, the magnitude of the prestress component generated by prestressing tendon 04 is not directly based on the yield strength of the material. On one hand, the yield strength of the material must be considered in conjunction with the structural dimensions of prestressing tendon 04 to ensure a reasonable safety margin. On the other hand, the reduction in prestress caused by material creep and other factors under long-term action must also be considered. Therefore, the yield safety factor is used to control the effective prestress intensity provided by prestressing tendon 04 to ensure that it can provide the required prestress intensity effectively over a long period. The yield safety factor and shear stress component factor are set according to the actual situation, taking into full account the height of the installation section on the pole, the number of prestressing tendons 04 on the installation section, the number of non-prestressing tendons 05 on the installation section, and the material selection of prestressing tendons 04. Furthermore, it should be noted that the stress distribution function per unit area is essentially a function characterizing the shear stress distribution. It can be established based on historical data of stress distribution in different heights and locations; any method that achieves a reasonable representation of the shear stress distribution is acceptable.
[0040] The root installation section 01 includes a fixed anchor mounting base 11, an adjusting mounting base 12, prestressed tendons 04, non-prestressed tendons 05, and a protective base 13. Multiple prestressed tendons 04 are arranged circumferentially around the axis of the root installation section 01, with one end of each tendon fixedly connected to the fixed anchor mounting base 11 and the other end connected to the stress adjustment structure 211 of the adjusting mounting base 12. One end of each non-prestressed tendon 05 is fixedly connected to the fixed anchor mounting base 11, and the other end is fixedly connected to the adjusting mounting base 12. Multiple non-prestressed tendons 05 are arranged circumferentially around the axis of the root installation section 01, and all are located within the non-interference area defined by the arrangement of the multiple prestressed tendons 04. The fixed anchor mounting base 11 and the adjusting mounting base 12 are coaxially arranged. Both the anchor mounting base 11 and the adjusting mounting base 12 are provided with coaxially arranged weight-reducing holes 06; the protective base 13 is located on the side of the anchor mounting base 11 away from the adjusting mounting base 12, and the protective base 13 is spaced apart from the anchor mounting base 11; the protective base 13 is connected to the prestressed tendons 04 and non-prestressed tendons 05 passing through the anchor mounting base 11; concrete covers all the prestressed tendons 04 and non-prestressed tendons 05 between the anchor mounting base 11 and the adjusting mounting base 12; the outer diameter of the concrete is the same as the diameter of the anchor mounting base 11, and the diameter of the hollow channel formed in the concrete is the same as the diameter of the weight-reducing hole 06, and the channel connects the weight-reducing hole 06 on the anchor mounting base 11 and the weight-reducing hole 06 on the adjusting mounting base 12.
[0041] Based on the design of the height of the root installation section 01 and the inclination angle of the prestressing tendons 04, installation points for connecting and installing the prestressing tendons 04 and non-prestressing tendons 05 are machined on the anchor base and the adjusting base, thus facilitating the installation and connection of the tendons to form the overall frame of the root installation section 01. Regarding the arrangement of the prestressing tendons 04 and non-prestressing tendons 05, it is necessary to consider that the prestressing tendons 04 are important structures resisting both axial tensile stress and tangential stress. Most of the tensile and tangential stresses are generated near the outer perimeter, especially the tangential stress, which has a larger distribution near the outer perimeter. Therefore, the position of the prestressing tendons 04 is closer to the outer perimeter of the final concrete formation than the non-prestressing tendons 05. Of course, it is also necessary to ensure that the installation points of the prestressing tendons 04 on the two bases meet the minimum edge distance requirements for openings and structural settings. This minimum edge distance essentially considers that the connection points have stable strength and will not be damaged under tension. For the non-prestressed tendons 05, they are distributed relatively deep along the diameter direction compared to the prestressed tendons 04, but not too close to the internal channels, as this would not fully utilize their function. Therefore, the optimal approach is to place them as close as possible to the prestressed tendons 04 while avoiding the area defined by their placement. This avoids interference between the non-prestressed tendons 05 and 04, while also ensuring that the non-prestressed tendons 05 effectively enhance the pole's strength. The boundary of the area defined by the prestressed tendons 04, viewed from a cross-sectional perspective, is the boundary of a tangent circle coaxial with the pole's axis, defined by the placement of the prestressed tendons 04. This ensures that the non-prestressed tendons 05 are at most internally tangent to the boundary of this tangent circle. The number of non-prestressed tendons 05 and prestressed tendons 04 can be designed according to actual conditions, considering factors such as the application scenario and the pole's outer diameter. However, it is crucial to ensure a uniform distribution of both non-prestressed tendons 05 and 04 to guarantee even stress distribution and avoid stress concentration caused by uneven distribution. The main function of the protective base 13 is to provide electrochemical sacrificial protection for the prestressed tendons 04, non-prestressed tendons 05, anchor bases, and adjustment bases. Since the entire installation section contains concrete and metal parts, the metal parts will corrode due to the electrochemical reaction in the gaps under long-term action. Therefore, the protective base 13 can make the metal parts on the installation section inert. The protective base 13, as the end of chemical corrosion, realizes the electrochemical protection of the metal in the installation section. Therefore, the material of the protective base 13 needs to be a more reactive metal material than the metal parts in the installation section.
[0042] The anchor mounting base 11 has a first connecting hole 111 and a first supporting groove 112 at positions corresponding to different prestressing tendons 04, and the first connecting hole 111 and the first supporting groove 112 are coaxially arranged; the diameter of the first supporting groove 112 is larger than the diameter of the first connecting hole 111; the first supporting groove 112 is located on the side of the anchor mounting base 11 near the protective base 13; after the prestressing tendon 04 passes through the first connecting hole 111, it forms a prestressed supporting head 41 in the first supporting groove 112, and the prestressed supporting head 41 fills the entire first supporting groove 112; the end of the prestressed supporting head 41 near the protective base 13 continues to extend into the first protective connecting hole of the protective base 13 and connects with the protective base 13; the anchor mounting base 11 has a second connecting hole at positions corresponding to different non-prestressing tendons 05, and the non-prestressing tendon 05 passes through the second connecting hole and continues to extend into the second protective connecting hole on the protective base 13 and connects with the protective base 13.
[0043] The protective base 13, as a structural element protecting the metal components of the installation section, needs to achieve a close and direct connection with the metal components. Although the protective base 13 is connected to the metal components of the root installation section 01, different installation sections are interconnected via metal flange bases. These metal flange bases are directly connected by non-prestressed tendons 05 and prestressed tendons 04. Therefore, all the metal components of the pole can achieve an electrical connection with the protective base 13, thus ensuring that electrochemical corrosion is transferred to the protective base 13. The anchor bases on the root installation section 01 are spaced apart from the protective base 13 to facilitate later disassembly and assembly. Since the prestressed tendons 04 and non-prestressed tendons 05 are important load-bearing metal components, connecting them to the protective base 13 is the most effective protective connection method. Therefore, the connection method between the tendons on the anchor bases and the protective base 13 needs to be considered. The connection method is diverse. This application considers that one end of the prestressing tendon 04 needs to be fixed, while the other end allows for reasonable prestress adjustment. Therefore, the anchor base uses coaxially arranged slots of different diameters to achieve stable fixing and support of the prestressing tendon 04. It can be understood that after installation, because the prestressing tendon 04 forms a head filling the first support slot 112 on the anchor base, the stability of the prestressing tendon 04 at the anchor base end can be effectively guaranteed after the other end is tightened by adjusting the prestress. For the prestressing tendon 04 extending further into the first protective connection hole of the protective base 13, this extension section can be part of the prestressing tendon 04 itself, or it can be an independent extension connected by welding, depending on the complexity of the process and cost. For non-prestressed tendons 05, no prestress adjustment is required. Therefore, they can be directly inserted into the second protective connection hole of the protective base 13 after passing through the anchor base. Of course, both the first connection hole 111 and the second connection hole on the anchor base are assembled with the corresponding tendons with at least a transition fit, or more strictly, an interference fit, so as to avoid axial displacement of the tendons.
[0044] The intermediate installation section 02 includes an upper mounting base 21, a lower mounting base 22, prestressed tendons 04, and non-prestressed tendons 05. Multiple prestressed tendons 04 are arranged circumferentially around the axis of the intermediate installation section 02, with one end of each tendon fixedly connected to the lower mounting base 22 to form a supporting structure 221, and the other end connected to the stress adjustment structure 211 of the upper mounting base 21. One end of each non-prestressed tendon 05 is fixedly connected to the lower mounting base 22, and the other end is fixedly connected to the upper mounting base 21. Multiple non-prestressed tendons 05 are arranged circumferentially around the axis of the intermediate installation section 02, and all... Located within the non-interference area defined by the arrangement of multiple prestressing tendons 04; the upper mounting base 21 and the lower mounting base 22 are coaxially arranged, and both the upper mounting base 21 and the lower mounting base 22 are provided with coaxially arranged weight-reducing holes 06; concrete covers all prestressing tendons 04 and non-prestressing tendons 05 between the lower mounting base 22 and the upper mounting base 21; the outer diameter of the concrete is the same as the diameter of the lower mounting base 22, and the diameter of the hollow channel formed in the concrete is the same as the diameter of the weight-reducing hole 06, and the channel connects the weight-reducing hole 06 on the upper mounting base 21 and the weight-reducing hole 06 on the lower mounting base 22.
[0045] The structural form of the intermediate installation section 02 is essentially similar to that of the root installation section 01, with two main differences. Firstly, the supporting structure 221 formed on the lower mounting base differs during installation, as the intermediate installation section 02 does not need to extend and must facilitate connections between different intermediate installation sections 02. Secondly, the installation height varies, resulting in differences in the dimensions of the concrete, reinforcing bars, mounting bases, and the number of reinforcing bars. Generally, the intermediate installation section 02 also uses flange mounting bases at both ends to arrange prestressed tendons 04 and non-prestressed tendons 05. The prestressed tendons 04 are arranged at an angle, with their number and angle determined by the height of the intermediate installation section 02 within the pole. The non-prestressed tendons 05 are arranged axially, with their number determined by actual needs. Similarly, to avoid interference between the prestressed tendons 04 and non-prestressed tendons 05, the non-prestressed tendons 05 remain within the non-interference area formed by the prestressed tendons 04. The mounting bases and the channel holes formed by the concrete further reduce the weight of the pole.
[0046] The top mounting section 03 includes a top mounting base 31, a bottom mounting base 32, prestressed tendons 04, and non-prestressed tendons 05. Multiple prestressed tendons 04 are arranged circumferentially around the axis of the top mounting section 03, with one end of each tendon 04 fixedly connected to the bottom mounting base 32 to form a supporting structure 221, and the other end connected to the stress adjustment structure 211 of the top mounting base 31. One end of each non-prestressed tendon 05 is fixedly connected to the top mounting base 31, and the other end is fixedly connected to the bottom mounting base 32. Multiple non-prestressed tendons 05 are arranged circumferentially around the axis of the top mounting section 03. The top mounting section 03 is arranged circumferentially along its axis, and all are located within the non-interference area defined by the arrangement of multiple prestressing tendons 04; the top mounting base 31 and the bottom mounting base 32 are coaxially arranged, and the bottom mounting base 32 has a coaxially arranged weight-reducing hole 06; concrete covers all prestressing tendons 04 and non-prestressing tendons 05 between the top mounting base 31 and the bottom mounting base 32; the outer diameter of the concrete is the same as the diameter of the bottom mounting base 32, and the diameter of the hollow channel formed in the concrete is the same as the diameter of the weight-reducing hole 06 and they are connected.
[0047] The top mounting section 03 is the highest mounting section located at the top of the pole. Its structural form is essentially similar to the intermediate mounting section, with two main differences: firstly, the top mounting base 31 does not have weight-reducing holes 06 to prevent rainwater erosion into the pole's interior; secondly, the installation height varies, resulting in differences in the dimensions of the concrete, the reinforcement bars, the mounting base, and the number of reinforcement bars. The arrangement of the prestressed reinforcement 04 and non-prestressed reinforcement 05 in the top mounting section 03 is the same as in the intermediate mounting section 02.
[0048] The stress adjustment structure 211 includes a sealed bearing 2111, an adjusting bolt 2112, and a sealing cover 2113. An adjustment hole is provided on the mounting base at a position corresponding to the prestressing tendon 04, according to the inclination angle of the prestressing tendon 04. The sealed bearing 2111 is located in the adjustment hole near one end of the prestressing tendon 04 and is coaxial with the adjustment hole. The adjusting end 42 of the prestressing tendon 04 passes through the sealed bearing 2111 and is threadedly connected to the adjusting bolt 2112 located in the adjustment hole. The sealing cover 2113 is placed on the adjustment hole at one end of the adjusting end 42. The adjustment hole is filled with sealing fluid 2114.
[0049] The stress adjustment structure 211 is mainly used to adjust the prestressing force of the prestressing tendon 04, ensuring that the prestressing tendon 04 can always play a stable and reliable role during long-term use. Since the prestress adjustment occurs along the axis of the prestressing tendon 04, the adjustment direction of the stress adjustment structure 211 is also along the axis of the prestressing tendon 04. Here, the specific adjustment structure is arranged by opening adjustment holes with axes coinciding with the axis of the prestressing tendon 04 on the mounting base corresponding to the adjustment head of each prestressing tendon 04 in each installation section. Considering the need to ensure long-term stability and reliability of the prestressing, a threaded connection is the best choice, although other connection methods can also be used. For the threaded connection, it is necessary to ensure that the thread is a locking thread to prevent a decrease in the tensile force of the prestressing tendon 04 under long-term action. To ensure the adjustability of the adjustment structure, it is essential to isolate it from the external environment; otherwise, it will fail under long-term environmental influences. Therefore, the two ends of the adjustment hole are sealed by installing a sealed bearing 2111 and a sealing cover 2113, and the interior is filled with a sealing fluid 2114 to prevent long-term corrosion from internal air. The sealed bearing 2111 can be a bearing capable of withstanding axial loads and providing sealing, such as a deep groove ball bearing or a thrust bearing. For the sealing cover 2113, a suitable rubber material can be selected to ensure future maintenance. The internal filling fluid can be rust-preventive oil or other anti-corrosion sealing liquid. In summary, the prestressing tendon 04 and the adjusting bolt 2112 are connected by a threaded connection to maintain the tension on the prestressing tendon 04 over a long period. Regular or irregular adjustments ensure that the prestress of the prestressing tendon 04 remains within the specified range.
[0050] The adjusting bolt 2112 includes a screw head and an adjusting rod; the screw head and the adjusting rod are coaxially arranged, and the outer diameter of the screw head is larger than the outer diameter of the adjusting rod; an internal threaded hole is coaxially opened on one end of the adjusting rod near the adjusting end 42; the adjusting end 42 is provided with threads, and the internal threaded hole on the adjusting end 42 and the adjusting rod are connected by thread engagement; a connecting hole 21121 is coaxially opened on the screw head, and the connecting hole 21121 communicates with the internal threaded hole.
[0051] The adjusting bolt 2112 can take many forms; any form that achieves threaded engagement with the prestressing tendon 04 and long-term stable prestressing is acceptable. The adjusting bolt 2112 structure provided in this application mainly involves creating a threaded blind hole with internal threads on the bolt's shank. A stable threaded connection is achieved through the engagement of the threads in the blind hole with the external threads of the adjusting end 42 of the prestressing tendon 04. Of course, the adjusting end 42 cannot initially penetrate to the bottom of the threaded blind hole, but subsequent adjustments will slowly bring it closer to the top. If the threaded blind hole is not ventilated, the internal pressure will gradually increase, making subsequent adjustments difficult. Therefore, creating a connecting hole 21121 on the screw head to connect with the threaded blind hole can prevent this from happening.
[0052] The supporting structure 221 includes a supporting head 43 and a sealing body 2213. The mounting bases for installing the supporting structure 221 on different mounting sections have a first supporting slot 2211 and a second supporting slot 2212 along the axis of the prestressing tendon 04 at the corresponding positions. The first supporting slot 2211 and the second supporting slot 2212 are coaxial, and the diameter of the second supporting slot 2212 is larger than the diameter of the first supporting slot 2211. The second supporting slot 2212 is located on the side of the mounting base away from the prestressing tendon 04. One end of the prestressing tendon 04 passes through the first supporting slot 2211 and is connected to the supporting head 43 in the second supporting slot 2212. The sealing body 2213 is disposed in the second supporting slot 2212 and is located on the side away from the prestressing tendon 04.
[0053] This document provides a specific abutment structure 221, which primarily ensures the stable fixation of the fixed end of the prestressing tendon 04. By opening two slots, the prestressing tendon 04 transitions or is press-fitted into the first abutment slot 2211, and then connects to the abutment head 43 in the second abutment slot 2212. The abutment head 43 can be part of the prestressing tendon 04 or a separate part connected to the prestressing tendon 04 via welding or other fixing methods. Of course, the abutment head 43 also has a transition or press-fitted relationship with the second abutment slot 2212 to ensure stable connection. Since the mounting seats of different installation sections need to be connected to each other, using friction stir welding or other connection methods, a sealing body 2213 is provided to seal the remaining space in the second abutment slot 2212 after the abutment head 43 is installed, to prevent corrosion caused by gaps between the abutment head 43 and the mounting seats of adjacent installation sections. The sealing body 2213 can be made of a material such as rubber or silicone.
[0054] This application provides a specific implementation method for the production and assembly of utility poles: For the production and assembly of different installation sections, the root installation section 01 is first processed to produce the anchor mounting seat 11, the adjustment mounting seat 12, and the protective base 13, all of which are flanges. A first connecting hole 111, a first abutment groove 112, and a second connecting hole are provided on the anchor mounting base 11. An adjustment hole for adjusting the prestress of the prestressing tendon 04 and a through hole for the non-prestressing tendon 05 to pass through are provided on the adjustment mounting base 12. A first protective connecting hole and a second protective connecting hole are provided on the protective base 13. The anchor mounting base 11 is located below, and the adjustment mounting base 12 is located above. One end of the non-prestressing tendon 05 passes through the through hole and reaches the second connecting hole of the anchor mounting base 11, and continues to extend into the second protective connecting hole of the protective base 13. One end of the prestressing tendon 04 is located in the second protective connecting hole of the protective base 13, and the other end passes through the first abutment groove 112 and the first connecting hole 111 of the anchor mounting base and extends into the adjustment hole of the adjustment mounting base 12. In the first abutment groove 112, it combines with the adjustment bolt 2112, the sealing bearing 2111, the sealing cover 2113, and the sealing liquid 2114 to form a stress adjustment structure 211. For intermediate installation section 02, two flange mounting seats are processed in the same way and corresponding holes and slots are opened. First, the prestressing tendon 04 is installed. One end of the prestressing tendon 04 with the abutment structure 221 is inserted into the stress adjustment structure 211. Then, the assembled semi-finished product is installed through the through hole of the non-prestressing tendon 05, which passes through the root installation section 01. All intermediate installation sections 02 are installed using the same production assembly sequence.
[0055] The same processing and assembly sequence was used for the top installation section 03. After all installations were completed, the prestressing tendons 04 were prestressed to the preset prestressing tension value. Then, the pole was inverted, and formwork was installed on the outer perimeter and internal through holes of different installation sections. After completion, concrete was poured, and after the concrete solidified, the formwork was removed to form the finished pole. Finally, it was checked whether the prestressing tension value of each prestressing tendon 04 met the requirements.
[0056] Those skilled in the art will recognize that the units and algorithm steps of the various examples described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are implemented in hardware or software depends on the specific application and design constraints of the technical solution. Those skilled in the art can use different methods to implement the described functions for each specific application, but such implementations should not be considered beyond the scope of this invention.
[0057] Those skilled in the art will understand that, for the sake of convenience and brevity, the specific working processes of the systems, devices, and units described above can be referred to the corresponding processes in the foregoing method embodiments, and will not be repeated here.
[0058] In the embodiments provided by this invention, it should be understood that the disclosed systems, apparatuses, and methods can be implemented in other ways. For example, the apparatus embodiments described above are merely illustrative; for instance, the division of units is only a logical functional division, and in actual implementation, there may be other division methods. For example, multiple units or components may be combined or integrated into another system, or some features may be ignored or not executed. Furthermore, the coupling or direct coupling or communication connection shown or discussed may be through some interfaces; the indirect coupling or communication connection between devices or units may be electrical, mechanical, or other forms.
[0059] The units described as separate components may or may not be physically separate. The components shown as units may or may not be physical units; that is, they may be located in one place or distributed across multiple network units. Some or all of the units can be selected to achieve the purpose of this embodiment according to actual needs.
[0060] In addition, the functional units in the various embodiments of the present invention can be integrated into one processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit.
[0061] The above description is merely a specific embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any changes or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in the present invention should be included within the scope of protection of the present invention.
Claims
1. A high-strength, crack-resistant concrete pole, characterized in that, include: The pole comprises a root mounting section, a middle mounting section, and a top mounting section; multiple middle mounting sections are connected sequentially along the axial direction to form a pole middle section; one end of the pole middle section is connected to the root mounting section, and the other end is connected to the top mounting section. Multiple prestressed tendons and multiple non-prestressed tendons are arranged circumferentially along the axis of the root installation section, and the prestressed tendons are not parallel to the axial direction of the root installation section; the prestressed tendons and the non-prestressed tendons on the root installation section are covered with concrete. Multiple prestressed tendons and multiple non-prestressed tendons are arranged at circumferential intervals along the axis on different intermediate installation sections, and the prestressed tendons are not parallel to the axial direction of the corresponding intermediate installation section; the prestressed tendons and non-prestressed tendons on the intermediate installation sections are covered with concrete. Multiple prestressed tendons and multiple non-prestressed tendons are arranged circumferentially along the axis of the top installation section, and the prestressed tendons are not parallel to the axial direction of the top installation section; the prestressed tendons and non-prestressed tendons on the top installation section are covered with concrete.
2. The utility pole according to claim 1, characterized in that, The middle section, the root mounting section, and the top mounting section of the pole are connected to each other along a straight line to form a pole, with the root mounting section located at the bottom of the pole and the top mounting section located at the top of the pole. Along the axis of the pole from bottom to top, the outer diameter of the root mounting section is the largest, and the outer diameter of the top mounting section is the smallest, with the outer diameters of the different middle mounting sections of the pole decreasing sequentially. Along the axis of the pole from bottom to top, the height of the root mounting section is the highest, and the height of the top mounting section is the lowest, with the heights of the different middle mounting sections of the pole gradually decreasing.
3. The utility pole according to claim 2, characterized in that, For different installation sections, the relationship between the installation height H and the inclination angle α between the prestressing tendon axis and the pole axis is determined according to the following formula: ; ; in, This represents the yield strength of the material corresponding to the prestressing tendon. The yield safety factor is 0 < <1, N represents the number of prestressed tendons on the corresponding installation section. This indicates the minimum starting height of the corresponding installation section on the pole. This represents the minimum radius value at which effective shear stress is obtained on the corresponding installation section. This represents the stress distribution function per unit area of the corresponding installation section. Indicates the effective stress height. Indicates the effective radius of stress. This represents the effective length value of the prestressing tendon. This represents the shear stress component factor, and 0 < <1.
4. The utility pole according to claim 3, characterized in that, The root installation section includes a fixed anchor mounting base, an adjustable mounting base, prestressed tendons, non-prestressed tendons, and a protective base; a plurality of prestressed tendons are arranged circumferentially around the axis of the root installation section, and one end of each prestressed tendon is fixedly connected to the fixed anchor mounting base, and the other end is connected to the stress adjustment structure of the adjustable mounting base; one end of each non-prestressed tendon is fixedly connected to the fixed anchor mounting base, and the other end is fixedly connected to the adjustable mounting base; The multiple non-prestressed tendons are arranged circumferentially around the axis of the root installation section, and are all located within the non-interference area defined by the arrangement of the multiple prestressed tendons; The anchor mounting base and the adjusting mounting base are coaxially arranged, and both the anchor mounting base and the adjusting mounting base are provided with coaxially arranged weight reduction holes; The protective base is located on the side of the fixed anchor mounting seat away from the adjusting mounting seat, and the protective base is spaced apart from the fixed anchor mounting seat; the protective base is connected to the prestressed tendon and the non-prestressed tendon passing through the fixed anchor mounting seat. The concrete encapsulates all the prestressed tendons and non-prestressed tendons between the fixed anchor mounting base and the adjusting mounting base; the outer diameter of the concrete is the same as the diameter of the fixed anchor mounting base, and the diameter of the hollow channel formed in the concrete is the same as the diameter of the weight-reducing hole, and the channel connects the weight-reducing hole on the fixed anchor mounting base and the weight-reducing hole on the adjusting mounting base.
5. The utility pole according to claim 4, characterized in that, The anchor mounting base has a first connecting hole and a first abutment groove at positions corresponding to different prestressing tendons, and the first connecting hole and the first abutment groove are coaxially arranged; the diameter of the first abutment groove is larger than the diameter of the first connecting hole; the first abutment groove is located on the side of the anchor mounting base closer to the protective base; after the prestressing tendon passes through the first connecting hole, it forms a prestressed abutment head in the first abutment groove, and the prestressed abutment head fills the entire first abutment groove; The prestressed bearing head extends from one end near the protective base into the first protective connection hole of the protective base and connects to the protective base. The anchor mounting base has a second connecting hole at a position corresponding to each of the non-prestressed tendons. After passing through the second connecting hole, the non-prestressed tendon extends to the second protective connecting hole on the protective base and connects with the protective base.
6. The utility pole according to claim 3, characterized in that, The intermediate mounting section includes an upper mounting base, a lower mounting base, prestressed tendons, and non-prestressed tendons. Multiple prestressed tendons are circumferentially spaced around the axis of the intermediate mounting section, with one end of each prestressed tendon fixedly connected to the lower mounting base to form a supporting structure, and the other end connected to the stress adjustment structure of the upper mounting base. One end of each non-prestressed tendon is fixedly connected to the lower mounting base, and the other end is fixedly connected to the upper mounting base. Multiple non-prestressed tendons are circumferentially spaced around the axis of the intermediate mounting section, and all are located within the non-interference area defined by the arrangement of the multiple prestressed tendons. The upper mounting base and the lower mounting base are coaxially arranged, and both the upper mounting base and the lower mounting base are provided with coaxially arranged weight reduction holes; The concrete covers all the prestressed tendons and non-prestressed tendons between the lower mounting base and the upper mounting base; the outer diameter of the concrete is the same as the diameter of the lower mounting base, the diameter of the channel formed in the hollow concrete is the same as the diameter of the weight-reducing hole, and the channel connects the weight-reducing hole on the upper mounting base and the weight-reducing hole on the lower mounting base.
7. The utility pole according to claim 3, characterized in that, The top mounting section includes a top mounting base, a bottom mounting base, prestressed tendons, and non-prestressed tendons. A plurality of prestressed tendons are circumferentially spaced around the axis of the top mounting section, with one end of each prestressed tendon fixedly connected to the bottom mounting base to form a supporting structure, and the other end connected to the stress adjustment structure of the top mounting base. One end of each non-prestressed tendon is fixedly connected to the top mounting base, and the other end is fixedly connected to the bottom mounting base. A plurality of non-prestressed tendons are circumferentially spaced around the axis of the top mounting section, and all are located within the non-interference area defined by the arrangement of the plurality of prestressed tendons. The top mounting base and the bottom mounting base are coaxially arranged, and the bottom mounting base is provided with a coaxially arranged weight reduction hole; The concrete covers all the prestressed tendons and non-prestressed tendons between the top mounting base and the bottom mounting base; the outer diameter of the concrete is the same as the diameter of the bottom mounting base, and the diameter of the hollow channel formed in the concrete is the same as the diameter of the weight-reducing hole and they are connected.
8. The utility pole according to any one of claims 4, 6, or 7, characterized in that, The stress adjustment structure includes a sealed bearing, an adjusting bolt, and a sealing cap. An adjusting hole is provided on the mounting base at a position corresponding to the prestressing tendon, according to the inclination angle of the prestressing tendon. The sealed bearing is located in the adjusting hole near one end of the prestressing tendon and is coaxial with the adjusting hole. The adjusting end of the prestressing tendon passes through the sealed bearing and is threadedly connected to the adjusting bolt located in the adjusting hole. The sealing cap covers one end of the adjusting hole away from the adjusting end. The adjusting hole is filled with sealing fluid.
9. The utility pole according to claim 8, characterized in that, The adjusting bolt includes a screw head and an adjusting rod; the screw head and the adjusting rod are coaxially arranged, and the outer diameter of the screw head is larger than the outer diameter of the adjusting rod; an internal threaded hole is coaxially formed on one end of the adjusting rod near the adjusting end; the adjusting end is provided with a thread, and the adjusting end and the internal threaded hole on the adjusting rod are connected by a threaded engagement; a connecting hole is coaxially formed on the screw head, and the connecting hole communicates with the internal threaded hole.
10. The utility pole according to any one of claims 6 or 7, characterized in that, The supporting structure includes a supporting head and a sealing body; the mounting bases on different mounting sections that mount the supporting structure have a first supporting slot and a second supporting slot along the axis of the prestressing tendon at the corresponding positions of the prestressing tendon; the first supporting slot and the second supporting slot are coaxial, and the diameter of the second supporting slot is larger than the diameter of the first supporting slot; the second supporting slot is located on the side of the mounting base away from the prestressing tendon; one end of the prestressing tendon passes through the first supporting slot and is connected to the supporting head in the second supporting slot; the sealing body is disposed in the second supporting slot and is located on the side away from the prestressing tendon.
